Waverley Borough Council Authority Monitoring Report 2015-2016

Waverley Borough Council Authority Monitoring Report 2015 -2016

Waverley Borough Council Authority Monitoring Report 2015-2016

Waverley Borough Local Plan

Further information If you would like to be kept up to date with the progress of the new Local Plan, please get in touch with us and we can add your name to our database, and let you know about events and consultations.

You can:  Email to [email protected]  Visit our website at www.waverley.gov.uk/consult and register yourself on to our local plan consultation database; or  Telephone 01483 523291.

Waverley Borough Council Authority Monitoring Report 2015-2016

Contents

Further Information Introduction ...... 1 Summary of key findings ...... 1-2 Part 1: Progress of the new Local Plan ...... 2-3 Evidence Documents (as of March 31st 2016) ...... 3 Unused Local Plan Policies and Saved policies ...... 3-4 Duty to Co-operate ...... 4-5 Neighbourhood Development Plans ...... 6-7 Developer Contributions ...... 6-8 Planning Infrastructure Contributions ...... 8-9 Thames Basin Heaths Special Protection Area (SPA)/SANG Contributions ...... 9 Wealden Heaths Special Protection Area (SPA) (Phase I and Phase II) 10

Part 2: Housing Monitoring ...... 11 Current requirement for new homes ...... 11 New homes built on previously developed land ...... 11 Future hew homes...... 11-12 Five year supply of deliverable housing land ...... 12-13 New affordable homes ...... 13-14 Part 3: Commercial Monitoring: Employment and Retail ...... 15 Employment ...... 15-17 Retail Uses ...... 18 Appendix 1: Thames Basin Heaths SPA: Position Statement and Monitoring Report ...... 19-20 Appendix 2: Council's Five year Housing Suppley Statement 1 April 2016 ...... 21-58

Waverley Borough Council Authority Monitoring Report 2015-2016

Introduction 1. This report monitors the period from 1 April 2015 to 31 March 2016.

2. This Authority’s Monitoring Report is prepared in accordance with the requirements of legislation (the Localism Act 2011 and the Planning and Compulsory Purchase Act 2004). There are specific topics we must report on while others are discretionary.

3. The Authority Monitoring report must provide information on:-  Progress with the Local Plan preparation  Any Supplementary planning documents that have been prepared or adopted during the reporting period  Information on any local plan policies that are not being used, and the reasons for this  An indication of net additional dwellings or net additional affordable dwellings that have been permitted and completed during the reporting period  Any activity on duty to cooperate  How implementation of local plan policies is progressing  Information on the progress of neighbourhood plans  the contributions made by developers, including Section 106 planning obligations and how they have been used  Any other information collected for monitoring purposes

Summary of key findings  342 new homes have been built this year, of which 226 are on previously developed land. Of these, 82 homes are affordable.  1,289 homes were granted planning permission this year, an increase on last year, mainly on larger sites. These will provide 175 new affordable homes as part of the development.  At the end of March 2016, there was a total of 2,579 dwellings with planning permission.  Considerable progress has been made with the preparation of the new Local Plan, particularly in respect of the number of evidence documents that have been completed or commissioned. However, as of the end date of this Monitoring report we currently do not have an up to date Local Plan. Although achieved outside of the reporting period, it is significant to note that the Local Plan Part 1: Strategic Policies and Sites was submitted to the Secretary of State on 21st December 2016.  At 1 April 2016, the Council had a 4.66 year supply of deliverable housing land, which equates to approximately 670 houses per annum. Since then there have been further updates to the 5-year housing land supply information. View the latest information on five year housing supply here  The new Local Plan is being progressed in accordance with the provisional timetable that was approved in July 2016 (outside the AMR reporting period). Waverley designated one new Neighbourhood Plan area within the reporting period, for and Weyburn. Area designations have previously been approved for , , , , , , Ewhurst & Ellen’s Green and . A further are designation for was approved in October 2016, outside the reporting period.

- 1 -

Waverley Borough Council Authority Monitoring Report 2015-2016

 Total Planning Infrastructure Contributions (PIC) for the monitoring year amounted to £483,166.  At 2 March 2016, unallocated Suitable Alternative Natural Greenspace (SANG) at Farnham Park amounted to 298 dwellings. While outside the reporting period, the Avoidance Strategy was reviewed in July 2016, which resulted in an increase in capacity at Farnham Park. As of October 2016 the unallocated SANG was 1,348 dwellings.

Part 1: Progress of the new Local Plan

4. This section of the Monitoring Report looks at Waverley’s progress in preparing a new Local Plan. The new Local Plan will positively seek opportunities to meet the development needs of the area.

5. A new provisional Local Plan Timetable was adopted on 1st September 2015, and this has since been superseded by a revised timetable and Local Development Scheme, which was approved by the Council on 19 July 2016, outside the AMR reporting period.

6. The Local Plan for Waverley will be in two parts. The Waverley Borough Local Plan Part 1: Strategic Policies and Sites sets out the strategic policies relating to the development and use of land in Waverley and development proposals for the strategic sites identified within it, for the period up to 2032. It covers a range of issues, including the Council's overall strategy for where development should be located as well as tackling issues that are of particular importance locally, such as the Council's policies for delivering affordable housing and the preservation of a healthy and attractive environment. The Local Plan was published for representations to be made on 19th August 2016 and then submitted to the Secretary of State for Communities and Local Government on 21st December 2016, both dates are outside the reporting period.

7. The new Local Plan includes a monitoring framework and the indicators within this will be used to assess whether the policies are working effectively, with the outcomes reported in future AMRs.

8. The Waverley Borough Local Plan Part 2: Non-Strategic policies and Sites will provide more detailed policies which will largely replace those in the current adopted Waverley Local Plan 2002. It will allocate non-strategic sites for development, as will many of the Neighbourhood Plans that are currently being prepared. The revised Local Development Scheme indicates that Local Plan Part 2 is scheduled for publication in August 2018 and adoption in March 2019.

9. Following the Council’s decision to withdraw from examination the Core Strategy in October 2013, the Council has been carrying out a detailed programme of work to address the matters raised by the Examination Inspector in order to prepare an updated local plan for re-submission for examination. The Council’s Executive endorsed the direction of travel, which has provided the focus for work going forward at its meeting on 3rd March 2015. A further update report was given to the Executive on 1 December 2015. After this, and outside the reporting date, the Council approved the publication of the

- 2 -

Waverley Borough Council Authority Monitoring Report 2015-2016

Pre-Submission Plan on 12 July 2016 and then the Submission for Examination on 29 November 2016.

Evidence Documents (as of March 31st 2016) 10. Waverley has been working on a number of evidence documents and other pieces of work during the reporting period, the majority having been commissioned and carried out by external consultants. Some of these have been published within the reporting period and some since that date, for completeness these are also listed below.

Documents published between April 1 2015 and March 31 2016  Hotels Futures (June 2015)  Waverley Older Persons Housing Needs Survey (2015)  Waverley Strategic Flood Risk Assessment (July 2015)  The West Surrey Strategic Housing Market Assessment (SHMA) jointly commissioned with Guildford and Woking Borough Councils (September 2015)  West Surrey Strategic Housing Market Assessment (SHMA): Waverley Summary Report and Addendum (December 2015)  Internet Shopping Report (December 2015)  Mott MacDonald Transport Assessment Report Stages 1 and 2 (February 2016)

Documents worked on during the reporting period but published up until December 2016  The updated Land Availability Assessment (LAA) (base date April 2016)  Updated Traveller Accommodation Assessment (April 2016)  Waverley Employment Land Review (April 2016)  Mott MacDonald Transport Assessment Report Stages 3 and 4 (June 2016)  Habitats Regulations Assessment: Waverley Borough Local Plan Part 1: Strategic Policies and Sites Pre-Submission Draft (July 2016)  Sustainability Appraisal Report (August 2016)  High Level Water Cycle Study (August 2016)  Strategic Highway Assessment (August 2016)  Waverley Viability Study (August 2016)  Infrastructure Delivery Plan (December 2016)  Water Quality Assessment (December 2016)  Strategic Flood Risk Assessment Level 2 Report and Sites (December 2016)  Green Belt Topic Paper (December 2016)  SANG Topic Paper (December 2016)  Housing Implementation Topic Paper (December 2016)  Transport Topic Paper (December 2016)  Aerodrome Delivery Rates Assessment (November 2016)

Unused Local Plan Policies and Saved policies 11. From 28 September 2007, some of the policies in the 2002 Local Plan ceased to have effect. The remaining policies continue to be part of the development plan and are known as 'Saved Policies'. View the schedule of saved polices and the list of policies which have been removed from the plan.

- 3 -

Waverley Borough Council Authority Monitoring Report 2015-2016

12. Of the saved policies, we have no evidence to show which, if any are unused.

Duty to Co-operate 13. The ‘Duty to Co-operate’ became a legal requirement under the provisions of the Localism Act, which came into force in November 2011. In essence it requires local planning authorities such as Waverley and other prescribed bodies to co-operate on strategic matters so as to maximise the effectiveness of preparing development plan documents (such as the Local Plan Part 1) and other local development documents.

14. The AMR should include details of any activities undertaken in relation to the Duty to Co-operate. In practice the ‘duty to co-operate’ affects Waverley in the following ways:-

 Working with neighbouring local authorities to identify and address strategic cross- boundary issues;  Working with the County Council to identify and address strategic issues both within Waverley and those affecting more than one local authority area;  Working with other public bodies and infrastructure providers to ensure that relevant strategic planning matters are identified and addressed.

15. Co-operation is not a duty to agree and Waverley has sought to liaise with and work jointly with neighbouring authorities and other relevant organisations to deal with the strategic issues that extend across local authority boundaries or involve a number of different agencies. This has included:

 Organisations set up to deal with regional and sub-regional issues. A good example being the Thames Basin Heaths Special Protection Area (SPA) Joint Strategic Partnership Board (JSPB), which was formed to ensure consistent and collaborative working to address issues arising from the potential impact of new housing close to the Thames Basin Heaths SPA.  We have also worked effectively with East Hampshire District Council and Natural to agree a common approach to addressing the potential impact of new development on the Wealden heaths Special Protection Area (SPA).  Jointly produced or procured evidence to support planning policy development, for example, the West Surrey Strategic Housing Market Assessment (SHMA), which was jointly procured by Waverley, Guildford and Woking Borough Councils. This also included consultation with other neighbouring districts with housing connections on the methodology and the findings of the emerging SHMA.  Working with Guildford and Woking to agree a joint statement on the FEMA.  Involvement in the preparation of plans in adjoining areas through the consultation and engagement process.  Work on the Infrastructure Delivery Plan (IDP) and other infrastructure-related work, such as the Strategic Highways Assessment, to support the Local Plan Part 1. This has included extensive liaison with Surrey County Council and other key infrastructure and service providers e.g. Thames Water, to identify the infrastructure required to support the level of growth planned in Waverley. It also includes discussion on addressing cross-boundary infrastructure issues, including improvements to the strategic road network and rail improvements.

- 4 -

Waverley Borough Council Authority Monitoring Report 2015-2016

 Work to support the Surrey Hills AONB Board and the application of the Surrey Hills AONB Management Plan and the collaborative approach undertaken to the review of the County-wide Area of Great Landscape Value (AGLV)  Collaboration on the preparation of the Surrey Local Transport Plan, together with the work to develop the County Council’s evidence base to support planning infrastructure contributions and the preparations to introduce the Community Infrastructure Levy (CIL)  Working with Surrey County Council and Guildford Borough Council to deliver the Strategic Highway Assessment to support our respective Local Plans  In 2012 the Surrey Boroughs and Districts agreed a joint methodology for undertaking Traveller Accommodation Assessments (TAA). Waverley carried out its own TAA in accordance with this agreed methodology, which had been subject to consultation with all the Surrey Districts and Boroughs during 2011 and 2012 as well as all relevant Gypsy, Traveller and Travelling Showmen organisations.  Work with ‘Enterprise M3 Local Enterprise Partnership (LEP), to identify priorities for using the grant funding allocated to the LEP.  Working with the County Council and other Surrey Districts to support the Surrey strategic Planning and Infrastructure Board and the development of a Local Strategic Statement (LSS) for Surrey  Officer working groups such as the Surrey Planning Officers Association (SPOA) and the Surrey Planning Working Group (PWG)  Meetings with key stakeholders such as Highways England

16. Waverley has therefore undertaken regular and on-going co-operation with its neighbouring authorities and with other organisations active in the borough to address strategic issues. Through the continuing production of the Local Plan Part 1, the Council has also been active in both identifying the major cross boundary and other strategic issues and seeking to work with partners to find a solution. This information is documented in the Council’s Statement of Compliance with Duty to Co-operate: December 2016.

- 5 -

Waverley Borough Council Authority Monitoring Report 2015-2016

Neighbourhood Development Plans 17. The following eleven applications for the designation of neighbourhood plan areas have been approved as follows, with one of these being in the current reporting period:

18. Each area is for the whole parish, with the exception of Elstead and Weyburn, which includes an area of Peperharow. This is because a potential development site (Weyburn Works) is situated across the boundary between these parishes.

Area Date designated Farnham 19 February 2013 (outside reporting period) Haslemere 19 February 2013 (outside reporting period) Godalming 16 July 2013 (outside reporting period) Cranleigh 16 July 2013 (outside reporting period) Alfold 3 June 2014 (outside reporting period) Chiddingfold 3 June 2014 (outside reporting period) Hascombe 8 July 2014 (outside reporting period) Ewhurst & Ellen’s Green 4 November 2014 (outside reporting period) Witley 4 November 2014 (outside reporting period) Elstead and Weyburn 9 June 2015 Busbridge 3 October 2016 (outside reporting period)

19. Since the area designations were approved each neighbourhood planning body has been working on its plan. Some are more advanced than others. The Farnham Neighbourhood Plan is the most advanced. It was submitted to Waverley on 21 July 2016, outside of the reporting period, with statutory consultation undertaken between 19 August and 3 October 2016. In September 2016 the council appointed an independent - 6 -

Waverley Borough Council Authority Monitoring Report 2015-2016

examiner, Derek Stebbing, to undertake an Examination of the Neighbourhood Plan to review whether it met the Basic Conditions required by legislation and should proceed to referendum. This took place on Friday 25 November 2016. The council received the Examiner’s ‘Report on the Farnham Neighbourhood Development Plan 2013-2031’ on 22 February 2017, in which the Examiner found that subject to a number of modifications, the plan meets the Basic Conditions and other legal requirements and can proceed to Referendum. On 10th March 2017 the Council published a Decision Statement confirming that the Plan, modified as recommended by the Examiner, meets the basic conditions and can proceed to referendum. The referendum will be held on 4th May 2017.

20. More details for each neighbourhood plan can be found on the relevant town or parish council’s website.

21. The Council is continuing to work with the qualifying bodies to assist when requested, in the production of their neighbourhood plans. It has created a webpage for Neighbourhood Planning and this shows not only details of those that have been designated, but includes resources and guidance for qualifying bodies to assist them with the process.

Developer Contributions 22. The Community Infrastructure Levy (CIL) is a levy that councils can choose to charge on new developments to raise funds to provide infrastructure. The money raised could be used towards improvements to transport, schools, parks, playgrounds and other community facilities.

23. The CIL will largely replace the existing system of ‘Section 106’ developer contributions. However, such agreements will still be used for site-specific infrastructure and to provide affordable housing.

24. The CIL Charging Schedule will specify which types of development will be subject to the levy, and what we are proposing to charge for different uses. It will be subject to consultation and an independent examination before it is adopted by the Council.

25. Waverley appointed Roger Tym & Partners to assess development viability in the borough and recommend CIL charging rates accordingly. They produced a Viability Study Final Report in October 2012, and the Council consulted on a Preliminary Draft Charging Schedule in November/ December 2012. This was linked to the level of development envisaged in the Council’s then Draft Core Strategy. However, work on this was been suspended to give priority to preparing the new Local Plan.

26. In 2016 the Council commissioned Three Dragons and Troy Planning + Design to produce a Viability Study to provide the Council with evidence to assist in drawing up the Local Plan, affordable housing policies and a revised CIL Draft Charging Schedule and this was published in July 2016. The evidence has been prepared in consultation with the development industry and has followed the relevant regulations and guidance as well as being in line with the National Planning Policy Framework. This assessment also takes into account, and informs the policies in the new Local Plan (Part 1: Strategic

- 7 -

Waverley Borough Council Authority Monitoring Report 2015-2016

Policies and Sites) and its supporting evidence base. This work provides information for the CIL Charging Schedule for both residential and non-residential uses.

Planning Infrastructure Contributions 27. Between April 2008 and April 2015 Waverley was collecting developer contributions through ‘Section 106’ legal agreements, as well as for smaller ‘windfall’ schemes through Planning Infrastructure Contributions (PIC) as set out in a Supplementary Planning Document (SPD). The SPD extended infrastructure contributions on a standard basis to every scheme involving any additional dwelling or commercial space.

28. With effect from 6th April 2015, however, no more contributions may be collected in respect of a specific infrastructure project or a type of infrastructure through a Section 106 agreement, if five or more obligations for that project or type of infrastructure have already been entered into since 6th April 2010 and it is a type of infrastructure that is capable of being funded by CIL. Pending the introduction of CIL in Waverley, the Council will continue to secure Section 106 contributions as appropriate and in accordance with national policy and guidelines.

29. Since 6 April 2015, and until the Council adopts its CIL Charging Schedule, infrastructure contributions will only be requested:

(i) on a site-specific basis at the request of the infrastructure provider

(ii) where the infrastructure provider can confirm that the request meets the pooling limit of no more than five permissions/obligations since 6 April 2010; and

(iii) in accordance with the following thresholds:

Schemes of more than 10 Schemes of 6 to 10 units Schemes of 5 or less units units

Affordable housing provision Affordable housing and tariff- Affordable housing provision and tariff-style payment can still style contributions can still be and tariff style payments can be sought in accordance with sought in the following only be sought if the combined existing policies circumstances: gross floor space of the 1. Where the combined gross development exceeds 1,000 floor space of the development sq.m exceeds 1,000sqm, affordable housing provision and tariff-style payments can still be sought in accordance with existing policies. 2. If the gross floor space of the development is 1,000 sq.m or less, then contributions can only be sought for sites that are within the AONB. In such cases, affordable housing and tariff-style contributions can still be sought in the form of a cash payment that is commuted until after completion of units within the development

- 8 -

Waverley Borough Council Authority Monitoring Report 2015-2016

Note:

It will still be possible to seek planning obligations for developments below the 5 or 10 unit thresholds in the following circumstances:

1. For site specific infrastructure, where appropriate to make the scheme acceptable in planning terms. 2. For contributions to fund measures with the purpose of facilitating development that would otherwise be unable to proceed because of regulatory or EU Directive requirements.

Planning Infrastructure Contributions 2013 - 2016 Surrey CC Waverley BC Total PICs 2013/14 1,236,165 542,628 1,778,793 2014/15 821,748 599,425 1,421,173 2015/16 251,319 231,847 483,166 Totals 2,309,232 1,373,900 3,683,132

Thames Basin Heaths Special Protection Area (SPA) / SANG Contributions 30. Natural England is consulted on all applications for new housing in a 5 km ‘Zone of Influence’ of the boundary of the SPA. In order for such applications to be permitted, the developer will need to ensure that significant impacts on the SPA are avoided.

31. New housing can cause a number of impacts, such as increasing the number of people using the SPA, resulting in disturbance to the ground-nesting birds. Closer to the SPA, new housing can also result in increased numbers of cats which prey on the heathland birds.

32. In order to avoid residents of new housing in the Farnham area having an adverse impact on the SPA, the Council adopted an Avoidance Strategy on 15th December 2009 (updated May 2013). Consultation on a further review took place in March/ April 2016 and the revised strategy was adopted by the Council on 19 July 2016 (outside the reporting period).

33. The Strategy provides guidance to developers on the level of avoidance measures that the Council expects to see incorporated within planning applications. In this instance, “avoidance measures” means providing or contributing towards Suitable Alternative Natural Greenspace (SANG), and contributing towards a programme of strategic access management and monitoring (SAMM) of the SPA.

34. Avoiding and mitigating the effects of development on the habitats of these SPAs is a legal requirement of the EU Directive. Contributions will continue to be collected from all residential developments within 5 km of the SPAs in accordance with the approved Thames Basin Heaths Avoidance Strategy.

- 9 -

Waverley Borough Council Authority Monitoring Report 2015-2016

Wealden Heaths Special Protection Area (SPA) (Phase I and Phase II) 35. The issues for this SPA are similar to that for Thames Basin Heaths SPA, in that an increased number of people can cause disturbance to specific species of ground nesting birds, which support the sites’ designation as being of international importance. The Phase I site also supports populations of all six native reptile species.

36. The Avoidance Strategy (2011) identifies avoidance measures in the Hindhead area. The Strategy relates to a defined area covered by the Hindhead Concept Statement, and includes land that was expected to come forward for development following the opening of the A3 Hindhead Tunnel. Development in this area are required to make appropriate contributions in accordance with the Avoidance Strategy unless it can be demonstrated that the proposal will not have a likely significant adverse effect on the ecological integrity of the Wealden Heaths Phase II SPA.

37. More generally, where new development is proposed that would result in a net increase in residential accommodation within 400m of the SPA, the Council will require a project- level Habitats Regulations Assessment (HRA). Housing proposals outside of this zone will be considered on a case-by-case basis as to whether an HRA is required. Contributions towards avoidance measures, or the provision of SANG may be required

38. The SPA position statement and monitoring report can be found at Appendix 1.

- 10 -

Waverley Borough Council Authority Monitoring Report 2015-2016

Part 2: Housing Monitoring

Current requirement for new homes 39. We do not currently have an up to date housing requirement in an adopted Development Plan . However, the SHMA in September 2015 indicates an ‘unvarnished’ figure of 519 homes per annum.

40. At the end of the AMR reporting period the Council had not determined a housing requirement for its new Local Plan. Therefore, pending the approval of a new housing target in the Local Plan, the identified need figure of 519 homes per annum in the West Surrey SHMA was the starting point for identifying whether or not the Council has a five- year supply of land for housing. However, the Local Plan that was submitted for Examination in December 2016, requires 519 new homes per annum from 2013 to 2032.

Completions of new homes

Year Net Annual Housing Source of Housing completions Requirement Requirement 2010/11 141 250 South East Plan 2009 2011/12 120 250 South East Plan 2009 2012/13 230 250 South East Plan 2009 2013/14 137 519* 2015 SHMA 2014/15 237 519* 2015 SHMA 2015/16 342 519* 2015 SHMA

* Unvarnished SHMA figure yet to be tested through the Local Plan

New homes built on previously developed land 41. National planning policy encourages the re-use of land that has been developed before.

 226 of the new homes completed this year (2015/2016) were on previously- developed (‘brownfield’) land (67%).  25 of the new homes completed were on garden land (7.4%).

42. Waverley will continue to monitor the use of previously developed land.

Future new homes 43. Councils are required by national planning policy to demonstrate a five year supply of housing land, on which they think that new homes can be delivered within that timeframe.

44. Councils are also required to illustrate the expected rate of delivery of new homes for the period of the Local Plan, and set out a housing strategy to show how we will maintain a five-year supply of deliverable housing land.

- 11 -

Waverley Borough Council Authority Monitoring Report 2015-2016

Number of new homes granted planning permission

Year Number of new homes granted planning permission (net) 2010/11 239 2011/12 199 2012/13 468 2013/14 404 2014/15 697 2015/16 1289

45. A large number of new homes have been granted planning permission this year, including:-  120 new homes on land at Crondall Lane, Farnham  149 new homes on land at 106 and Chantreys Bungalow & Land to South West of Horsham Road, Cranleigh and  425 new homes on land South of Elmbridge Road and the High Street, Cranleigh

46. The number of homes with planning permission that have not yet been built is 2,579 as of 1st April 2016, which is an increase on 1st April 2015 (1,704).

47. The number of homes permitted has steadily increased since 2011/2012 to 2014/2015 and significantly since 2014/2015. However, the number of completions remains relatively low. This is possibly due to the fact that there are a number of large sites that have received outline planning permission, and as such further work is needed before the physical implementation of these permissions. In addition, since 2008/2009, completion rates have been much lower than previously experienced, due to the prevailing economic conditions. However, completions are now beginning to increase in Waverley.

Five-year supply of deliverable housing land 48. A five- year supply statement set out the position in Waverley on 1 April 2016. At the time of the statement the published West Surrey SHMA December September 2015 indicated an objectively assessed need in Waverley for 519 new homes per annum from 2013 to 2033. Based on this evidence, the five year supply statement demonstrated that, as of 1st April 2016, the Council had approximately 4.66 years’ worth of housing which equates to approximately 670 dwellings per annum. The Council’s Five Year Housing Supply Statement 1st April 2016 is attached as Appendix 2.

49. On 1 April 2016 Waverley was therefore not able to demonstrate a five year supply of deliverable housing land. Since then there have been further updates to the 5-year housing land supply information. View the latest 5 year housing supply information here

50. The Submitted Local Plan Part 1 includes a housing target to deliver at least 9,861 new homes between 2013 and 2032, and proposes a number of strategic site allocations that are key to delivering the development needed over the plan period. The housing

- 12 -

Waverley Borough Council Authority Monitoring Report 2015-2016

trajectory included in the Local Plan shows that at the point that the Local Plan is expected to be adopted in 2017, there will be a five-year supply of housing land.

New affordable homes 51. Affordable housing is defined as social rented, affordable rented and intermediate housing, provided to eligible households whose needs are not met by the market. Eligibility is determined with consideration of local incomes and local house prices. More information is available in the NPPF, in Annex 2 (Glossary).

52. The 2015 West Surrey SHMA estimated that the net affordable housing need in Waverley is 314 homes per year which amounts to approximately 64% of the overall housing needed in the Borough each year. As at 1 April 2016 there were over 1,500 households in housing need on Waverley’s Housing Register with connection to the Borough via family, residence or employment.

53. Waverley granted permission for 175 affordable units during 2015 -2016, which is a significant increase on the previous year.

54. Of these dwellings, 48 are on land at Crondall Lane, Farnham, 60 are on land at 106 & Chantreys Bungalow and Land to South West of Horsham Road, Cranleigh and 28 are on land to the west of St George's Road, Farnham, while the remainder are on other smaller sites in Farnham.

55. There were 82 new affordable homes completed this year (2015/2016 gross).

56. Of these, 52 are on Wurth House and Anvil Park, Catteshall Lane, Godalming and 12 are on the Milford Hospital site with the remainder on smaller sites across the borough.

Number of new affordable homes completed by year

Year Number of new affordable homes (gross) 2009/10 27 2010/11 0 2011/12 24 2012/13 83 2013/14 10 2014/15 39 2015/16 82

57. Permissions have also been granted for a further 99 affordable units on sites across the borough since the reporting period, and a proportion of these could commence during the next year.

- 13 -

Waverley Borough Council Authority Monitoring Report 2015-2016

58. The Council recognises the need for new affordable homes, and is working to provide new affordable homes on land it owns where possible. In the longer term, however, the amount of suitable land owned by the Council is limited, so securing affordable housing via planning obligations on private development sites will be essential to meeting affordable housing need.

59. The West Surrey SHMA has shown that there is a high need for affordable homes in our borough; this can also be seen from the numbers of applicants on our housing register. Recent delivery is relatively low, but increasing, and the new Local Plan will address how more affordable homes can come forward. Seeking a proportion of affordable homes from large development sites will help provide many new affordable homes in Waverley.

- 14 -

Waverley Borough Council Authority Monitoring Report 2015-2016

Part 3: Commercial Monitoring: Employment and Retail

Employment 60. The Council has an Employment Land Review (ELR) (April 2016) which regularly updates the assessment of employment floorspace and land requirements. The Review sets out the conclusions and recommendations for taking forward employment land policies in Waverley and the rationale for this in some detail. It concludes that an Economic Strategy Aligned approach, using a trend based scenario as a starting point, but making a number of assumptions to better align it with the Waverley Economic Strategy 2015 -2020 is the most realistic projection of future employment levels and land requirements for the Borough. This is because it takes into account both past trends and future aspirations.

61. The ELR makes a strong case for safeguarding good quality existing employment sites and exploring opportunities to intensify economic activity on employment sites where appropriate. Any surplus industrial and warehousing sites should be considered for re- use to meet the Borough’s growing B1 needs.

62. The Table below summarises the evidence from the ELR on how much employment floorspace is needed in the borough by 2033. It also shows the balance of demand and supply following an assessment of the Borough’s 150 major employment sites to establish if there is any land in existing employment use that could potentially be suitable for redevelopment or intensification in the short term, medium term and long term. This includes potential for additional employment land on which amounts to a net increase of approximately 26,000 sq m.

Use Class Projected Need Potential supply Need/supply (sq m) from existing balance employment (sq m) sites (sq m) B1a/b (Offices/Research and Shortfall of 11,141 Shortfall of Development) 15,800 4,659 B1c/B2 (Light industrial/ Surplus of 17,774 Surplus of General Industrial 11,600 29,374 B8 (Storage and Distribution) Surplus of 38,202 Surplus of 18,900 57,102 Totals Surplus of 67,117* Surplus of 14,700 81,817

63. As this table demonstrates, the surplus in B1c/B2 and B8 up to 2033 is forecast to be more than enough to meet the shortfall in B1a/b forecast in the same period. However, the ELR states that while in quantitative terms the identified potential supply should be sufficient, qualitative factors such as the location quality, type, size and accessibility of sites does not mean that all surplus B1c/B2 (Light/General Industrial) and B8 (Storage and Distribution) sites will be suitable for meeting future need for B1a/b (Offices/Research & Development). - 15 -

Waverley Borough Council Authority Monitoring Report 2015-2016

64. Through consultation and analysis the ELR also suggests that the Waverley’s market is currently constrained by a lack of flexible industrial premises that can accommodate SMEs. The Borough has also lost all or part of, 90 employment premises under use class B1a to housing since the amendment to the permitted development rights10 has allowed this change of use without the need for express planning permission. This will continue to reduce the existing supply of employment sites in the plan period.

65. The limited supply of employment land and premises and the limited pipeline of future development are likely to constrain business growth and the ability to attract new investment in the Borough. The ELR therefore recommends that in addition to providing additional B1a/b floorspace it is also important that the Borough provides a continuing supply of land suitable for B2 and B8 Use Classes as well as premises meeting the business needs of all sizes in order to maintain a healthy mix of businesses. Furthermore it considers that the Council works with landowners and developers to bring forward new employment land provision.

66. The economic context, the supporting evidence and feedback from the business community therefore demonstrates that the Local Plan needs to ensure that there is sufficient suitable employment land to meet short and longer term requirements from a variety of sources.

Monitoring Employment Land 67. The Council monitors planning permissions for new employment uses and changes of use including those applications for prior approval.

68. In accordance with the recommendations of the ELR, the Council seeks to provide additional employment floorspace including at least 16,000 sq m of B1a/b as a target over the Plan period to 2032. This is included in the Submission Local Plan Part 1.

69. To monitor this, it includes the following indicators:  Total amount of additional employment floorspace by type  New employment development completions and refusals (Floorspace by Type)  Assessment of Employment Land supply against demand.

70. The Council also seeks to protect existing employments sites including those sites identified in saved local plan policies. Development that involves the loss of B uses will be monitored, including completions and refusals (Floorspace by type). Performance is monitored on the changing amount of floorspace available in planning permissions and vacant floorspace.

71. Currently, Waverley’s monitoring system is not split amongst B uses. In order to monitor the changes in specific classes in accordance with the proposed monitoring indicators, the system will be refined to allow for this in the next AMR.

- 16 -

Waverley Borough Council Authority Monitoring Report 2015-2016

Vacant Office, Industrial/ and warehousing (m2)

Source: B1a/b B1c/B2 (light B8 (Storage and Total offices/research industrial/ distribution) and development general industrial) Vacant 10,500 (2%) 13,100 (2%) 6,200 (1%) 29,800 (5%) Premises 20151

Overall changes in B Class employment floorspace between April 1 2015 and March 31 2016 (Planning permissions)

Floorspace gained Floorspace lost Total (m2) (m2) (demolition or (change of use or new change of use)(m2) build) B Class uses 770 8636 -7666

72. The majority of employment space lost has been from B1a uses to C3 dwelling houses, this amounts to some 13 commercial properties. The majority of this has been through permitted development where only prior approval needs to be sought.

1 Employment Land Review 2016: Source: Atkins based on EGi and VOA data, 2015. Figures in the table are rounded

- 17 -

Waverley Borough Council Authority Monitoring Report 2015-2016

Retail Uses 73. Waverley has five defined Town Centres and each has a shopping area within it. The delivery of new retail, leisure and business floorspace within Farnham, Godalming, Haslemere/ Weyhill and Cranleigh is a target in the adopted Local Plan 2002 and is carried through to Local Plan Part 1, in order to meet the requirements of the Town Centre and Retail Study.

74. In addition to these areas, there are three local shopping areas in the larger villages of Milford, Bramley and also in . Local Plan Part 1 seeks to maintain the vitality and viability of these local centres by supporting shops and services within them.

Vacancy Rates per shopping area 75. Vacancy rates in the defined shopping areas have been monitored annually for a number of years. As can be seen from the table below, they remain steady and well below the national average rates: 2014 13.9%, 2015 14.7% and 2016 10.9%.

Town/Area 2013-2014 2014-2015 2015-2016 Farnham 20 (7.2%) 21 (7.6%) 19 (6.9%) Godalming 9 (4.4%) 7 (3.4%) 8 (3.39%) Cranleigh 7 (5.7%) 2 (1.17%) 3 (2.6%) Haslemere Town 5(4.2%) 3 (2.5%) 5 (4.2%) Centre Haslemere Weyhill Not done 3 (4%) 3 (4%)

Loss of retail space to other uses and from which locations

Shopping Areas within Town Centres 76. Permissions granted during the reporting year amounts to the loss of 1,234m2 of retail floorspace (Classes A1, A2 and A3) in Waverley. The majority of this loss (979m2) is through changes of use to C3 dwelling houses. Three of these are in the Farnham shopping area.

Local Shopping Areas 77. The vacancy rates in local shopping centres will be monitored to check their retail role and function. To begin to assess this, monitoring of these has begun in 2016 and will be reported in the next AMR.

- 18 -

Waverley Borough Council Authority Monitoring Report 2015-2016

Appendix 1: Thames Basin Heaths SPA: Position Statement and Monitoring Report

Introduction 78. The Thames Basin Heaths Special Protection Area (SPA) Avoidance Strategy was adopted in December 2009, with a subsequent update in May 2013. It was further reviewed in March/ April 2016 and a revised strategy was adopted by the Council in July 2016 (outside of the reporting period). Its purpose is to provide guidance to developers on the level of avoidance measures that the Council expects to see incorporated within planning applications in the light of Natural England’s advice. In this instance, “avoidance measures” means contributing towards Suitable Alternative Natural Greenspace (SANG) and contributing towards a programme of Strategic Access Management and Monitoring (SAMM) of the SPA.

79. The Avoidance Strategy allows the Council to approve planning applications for new residential development by ensuring that there will be no adverse impact on the SPA and therefore discharge our obligations under the Conservation of Habitats and Species Regulations 2010.

SANG in Waverley 80. The Council’s only current SANG resource is Farnham Park. The notional area of the park designated as SANG has been gradually increased since 2009 to its current size of 34.6ha, as advised by Natural England (adopted as part of the Avoidance Strategy Review July 2016, outside the reporting period). The developer tariff was also reviewed in 2016 to reflect this change. The table below shows how the varying SANG capacity has been taken up by planning permissions. It should be noted that the park area designated as SANG between 2013-2016 was 21.25ha.

81. The table below shows how the varying SANG capacity has been taken up by planning permissions. The increase in the dwellings capacity in March 2016 followed a review of occupancy rates. In addition, as explained above, the size of the SANG at Farnham Park was increased outside the reporting period.

Area Total Capacity Dwellings Unallocated Date (ha) (no. of dwellings) Permitted capacity 31.10.08 10.9 567 271 296 27.05.09 10.9 567 306 261 31.03.10 10.9 567 558 9 08.04.11 14.35 746 579 167 05.04.12 14.35 746 635 111 27.03.13 21.25 1104 672 432 26.03.14 21.25 1104 760 344 30.03.15 21.25 1104 876 228 02.03.16 21.25 1341 1043 298

- 19 -

Waverley Borough Council Authority Monitoring Report 2015-2016

82 The Council closely monitors the amount of SANG allocated to housing developments as they occur to ensure that for the foreseeable future, sufficient capacity is available at Farnham Park. The Council’s Area Planning Committee (Western) receives updates on the SANG capacity quarterly.

Implementation and monitoring 83. Alongside the Avoidance Strategy, the TBH Delivery Framework (February 2009) gives further guidance to all affected local authorities on how to deal with development proposals within the ‘Zone of Influence’ of the SPA. The Framework was produced by the Joint Strategic Partnership Board (JSPB) on behalf of the member local authorities and other stakeholders.

84. Each affected authority provides information to the JSPB relating to:  the stage reached in the preparation, adoption or revision of its Avoidance Strategy;  the supply, availability and capacity of Suitable Alternative Natural Greenspace (SANG) in their respective boroughs; and  the collection of payments towards Strategic Access Management and Monitoring (SAMM) and appeals.

85. Information relating to planning applications received, Section 106 agreements made and the financial contributions is continually recorded and monitored by the council’s Planning Policy team. The Avoidance Strategy includes details of access and monitoring projects on which will be spent. We present monitoring reports twice a year to the JSPB.

86. The monies collected from approved developments have been spent on various measures, as set out in the Avoidance Strategy, as well as providing funding for the long term maintenance of the land as SANG.

Received (£) Expenditure (£) 2007/2008 £241,055.71 41,995.23 2008/2009 £178,952.71 150,965.76 2009/2010 £59,739.79 98,026.50 2010/2011 £4,949.00 103,378.28 2011/2012 £25,491.00 54,109.27 2012/2013 £85,725.00 52,000.00 2013/2014 £114,171.69 55,900.45 2014/2015 £181,974.14 65,655.00 2015/2016 £128,170.97 55,320 Total £1,032,541.1 £ 677,350.49

- 20 -

Waverley Borough Council Authority Monitoring Report 2015-2016

Appendix 2: Council’s Five Year Housing Supply Statement 1st April 2016

Five Year Housing Supply 1st April 2016

- 21 -

Waverley Borough Council Authority Monitoring Report 2015-2016

Contents

The Five Year Housing Supply ...... 23 Table 1 - Housing required in Waverley 1st April 2016 to 31st March 2021 ...... 244 Table 2 - Housing Supply Waverley 1st April 2016 to 31st March 2021 ...... 244-25 The Components of the Five Year Housing Supply ...... 25-28

Appendix 1 Housing Completions within Waverley Borough Council 2002/03- 2015/16 ...... 29-30

Appendix 2 Sites with Outstanding Planning Permission as of 01/04/16 ...... 31 Outstanding planning permissions on small sites (1 to 4 dwellings) 01/04/16 . 31-49 Outstanding planning permissions on large sites (5 or more dwellings) 01/04/16 ...... …………………………………………………………………………………..50-54 Application approved subject to legal agreement ...... 54

Appendix 3 Potential Sites to be identified in the Waverley LAA ...... 56-58

Appendix 4 Windfall Contribution to Five Year Housing Supply ...... 59

- 22 -

Waverley Borough Council Authority Monitoring Report 2015-2016

Introduction

1.0 Local Planning Authorities are required to identify five years worth of housing against their requirements under Paragraph 47 of the National Planning Policy Framework (NPPF). This document sets out the position on the five year housing supply in Waverley on 1st April 2016.

The Five Year Housing Supply

2.0 Pending the completion of the new Waverley Borough Local Plan, it is considered that the assessment of housing needs in the West Surrey Strategic Housing Market Assessment (SHMA) September 2015 should be the starting point for identifying the housing requirement. The evidence in the SHMA indicates an unvarnished figure of 519 homes per annum.

2.1 Notwithstanding that, evidence has yet to be completed to assess whether this unvarnished figure can be sustainably delivered within the Borough. Table 1 below demonstrates the amount of housing required within Waverley for five years from 1st April 2016 using this figure. This includes the amount of housing required to meet all the undersupply of housing from 1st April 2013 to 31st March 2016 and a 5% additional buffer required under paragraph 47 of the NPPF. This suggests a housing land supply of 4.66 years, which equates to approximately 670 new dwellings per annum.

2.2 1st April 2013 is the base date for the housing requirement as it is the start date for the proposed new local plan for Waverley and the base date for the West Surrey SHMA.

2.3 Footnote 11 to paragraph 47 of the NPPF says that:

“To be considered deliverable, sites should be available now, offer a suitable location for development now and be achievable with a realistic prospect that housing will be delivered on the site within five years and in particular that development of the site is viable”.

2.4 In accordance with paragraph 47 of the NPPF, Table 2 below sets out the number of net new homes that can be delivered in the five years between 1st April 2016 and 31st March 2021.

- 23 -

Waverley Borough Council Authority Monitoring Report 2015-2016

Table 1 - Housing required in Waverley 1st April 2016 to 31st March 2021

Number Average per of annum Dwellings a Housing requirement 01/04/13 – 31/03/2016 1557 519 (519 x 3 yr) b Number of dwellings completed 01/04/13 – 727 242 31/03/16 c Shortfall in supply 01/04/13 – 30/09/16 (a – 830 b) d Housing Requirement 01/04/16 to 2595 519 31/03/2021 (519 x 5 yrs) e Total Five Year housing requirement 3425 685 01/04/16 to 31/03/2021 (c + d) f Total Five year housing requirement 3596 719 01/04/16 to 31/03/2021 plus an additional 5% (e x 1.05)

Table 2 - Housing Supply 1st April 2016 to 31st March 2021

Number Average per of annum Dwellings a Outstanding planning permissions on small 394 79 sites (net dwellings on sites less than 5 net dwellings) as of 01/04/16 b Outstanding planning permissions on large 2185 437 sites (net dwellings on sites of 5 net dwellings or more) as of 01/04/16 c Applications approved subject to legal 66 13 agreement as of 01/04/16

- 24 -

Waverley Borough Council Authority Monitoring Report 2015-2016

d Allocated sites in the adopted Local Plan 0 0 2002

e Dwellings that can potentially be delivered 633 107 between 01/04/16 and 31/03/2021 on sites to be identified in the LAA

f Estimated contribution from small sites 70 14 windfalls from 01/04/16 to 31/03/2021 (sites where less than five net new homes can be delivered)

g Total Housing supply identified for 3348 670 01/04/16 to 31/03/2021(a+b+c+d+e+f)

The Components of the Five Year Housing Supply

Undersupply from previous years

3.0 In the last five year housing supply update the method used to address the backlog of unmet need was to distribute this over the whole of the proposed Local Plan period to 2032. However, the National Planning Practice Guidance (NPPG) says that local authorities should aim to deal with any undersupply within the first five years of the plan period where possible and this expectation has been made clear in two recent appeal decisions in Waverley. Therefore, the five year housing supply addresses all the backlog of unmet need from 2013 in the five years from 1st April 2016 to 31st March 2021.

The additional buffer

3.1 Paragraph 47 of the NPPF says that an additional buffer of 5% (moved forward from later in the plan period) should be provided to ensure choice and competition or, where there is a record of persistent under delivery, a 20% additional buffer should be provided.

3.2 The NPPG states that: “The approach to identifying a record of persistent under delivery of housing involves questions of judgment for the decision maker in order to determine whether or not a particular degree of under delivery of housing triggers the requirement to bring forward an additional supply of housing.

- 25 -

Waverley Borough Council Authority Monitoring Report 2015-2016

The factors behind persistent under delivery may vary from place to place and, therefore, there can be no universally applicable test or definition of the term. It is legitimate to consider a range of issues, such as the effect of imposed housing moratoriums and the delivery rate before and after any such moratoriums.

The assessment of a local delivery record is likely to be more robust if a longer term view is taken, as this is likely to take account of the peaks and troughs of the housing market cycle”.

3.3 The number of additional houses that were completed from 2002 to 2016 compared with the housing requirement set out in the statutory development plan in place at the time is shown in Appendix 1. Between 2002 and 2009, housing supply exceeded the amount of housing that was annually required in the development plan at the time. It is only since 2009, that the amount of housing being delivered each year has been less than the housing that was required by development plan at the time. However, this recent undersupply reflects the lower building rates resulting from the economic recession that started in 2008. Therefore, there is no record of persistent under delivery of housing in the Borough and an additional buffer of 5% is the right one to apply to Waverley. As explained above, for the last three years the housing requirement is based on the unvarnished figure of housing need set out in the West Surrey SHMA September 2015.

Sites with planning permission or allocated in the adopted Local Plan 2002

3.4 Footnote 11 of the NPPF says that “Sites with planning permission should be considered deliverable until permission expires, unless there is clear evidence that schemes will not be implemented within five years, for example they will not be viable, there is no longer a demand for the type of units or sites have long term phasing plans”.

3.5 The NPPG repeats this advice saying that permissions can include outline or full planning permissions that have not been implemented. It also says that deliverable sites can also include those that are allocated for housing in the local plan.

3.6 Details of those sites of 1 - 4 net additional dwellings (small sites) and sites of 5 or more net additional dwellings with planning permission (including those sites where the council has resolved to grant planning permission subject to a legal agreement) that are capable of being delivered by 31st March 2021 are attached as Appendix 2.

- 26 -

Waverley Borough Council Authority Monitoring Report 2015-2016

Sites to be identified in the Land Availability Assessment (LAA)

3.7 The NPPG says that planning permission or an allocation in a development plan is not a prerequisite for a site being deliverable in terms of the five year supply. Local planning authorities will need to provide robust, up to date evidence to support the deliverability of sites, ensuring that their judgements on deliverability are clearly and transparently set out. If there are no significant constraints (e.g. infrastructure) to overcome, sites not allocated within a development plan or without planning permission can be considered capable of being delivered within a five year timeframe. For the purpose of this five year housing supply statement, some sites that are candidate sites for the LAA are considered to be deliverable within five years. These sites have therefore been included and their details are attached as Appendix 3.

Contribution from Small windfall sites

3.8 Paragraph 48 of the NPPF says that “Local planning authorities may make an allowance for windfall sites in the five year housing supply if they have compelling evidence that they have consistently become available in the local area and will continue to provide a reliable source of supply. However, the allowance must be realistic having regard to the SHLAA, historic windfall delivery rates and expected future trends and should not include residential gardens”.

3.9 The Council considers that a windfall allowance in the five year housing supply from sites of less than five dwellings (small windfall sites) is justified. This is because historically sites of less than five new homes excluding residential gardens, have contributed significantly to new housing in the Borough. The potential contribution of the number of new homes from small windfall sites to the overall supply of housing is based on past trends from this source since 2003. This is set out in Appendix 4. In line with the NPPF advice, it excludes residential gardens. As the LAA only identifies sites available for housing of five or more new dwellings, it is therefore realistic to include a contribution from sites below this threshold to the five year housing supply.

3.10 Furthermore, the contribution from small windfall sites is considered appropriate for the last two years of the five years housing supply only. This is because any windfall sites contributing in the first three years will have already received planning permission and to include them would be double counting.

- 27 -

Waverley Borough Council Authority Monitoring Report 2015-2016

3.11 There is no contribution to the five year housing supply from windfalls sites that deliver five or more net new homes (large windfalls). This is because the LAA has tried to identify all new homes that can be delivered on sites of more than 5 dwellings. However, it is likely that other sites will deliver five or more net new homes in the next five years that the Council is not currently aware of.

- 28 -

Waverley Borough Council Authority Monitoring Report 2015-2016

Appendix 1

Housing Completions within Waverley Borough Council

2003 – 2016

Year Total Annual Housing Source of the Housing Completions Requirement Requirement

2002-03 211 187 Surrey Structure Plan 2004

2003–04 216 187 Surrey Structure Plan 2004

2004-05 262 187 Surrey Structure Plan 2004

2005-06 262 187 Surrey Structure Plan 2004

2006-07 458 250 South East Plan 2009

2007-08 255 250 South East Plan 2009

2008-09 286 250 South East Plan 2009

2009-10 186 250 South East Plan 2009

2010-11 141 250 South East Plan 2009

2011-12 120 250 South East Plan 2009

2012-13 230 250 South East Plan 2009

- 29 -

Waverley Borough Council Authority Monitoring Report 2015-2016

2013 -14 143 5192 SHMA

2014 – 15 242 519 SHMA

2015 – 16 342 519 SHMA

2 Unvarnished Draft SHMA figure yet to be tested through the Local Plan

- 30 -

Waverley Borough Council Authority Monitoring Report 2015-2016

Appendix 2

Sites with outstanding planning permissions as of 01/04/16

a) Outstanding planning permissions on small sites (1 to 4 dwellings) 01/04/16

(Net)

(Net) (Net) (Net)

Latest

(Gross)

Address

Permitted Permitted

Completed

Permission

Outstanding

Commenced Commenced Development

PRA/2014/0008 Linden Farm, Rosemary No 2 2 0 0 2 Lane, Alfold GU6 8EU

PRA/2014/0009 Linden Farm, Rosemary No 1 1 0 0 1 Lane, Alfold GU6 8EU

WA/2014/1518 Land adjoining Byway No 2 2 0 0 2 Cottage, Dunsfold Road, Alfold GU6 8JB

WA/2015/0316 Little Bookers Lea Farm, No 1 1 0 0 1 Wildwood Lane, Alfold GU6 8FF

WA/2015/0565 Brockhurst Farm, Dunsfold No 2 2 0 0 2 Road, Alfold GU6 8JB

WA/2013/0132 The Crown, Loxwood Road, Yes 2 2 2 0 2 Alfold, GU6 8ET

WA/2014/2307 Mobil Garage, Dunsfold Yes 4 4 4 0 4 Road, Alfold GU6 8JB

WA/2014/0913 Units 1-6 & 9-12 Alfold Yes 4 4 4 0 4 Business Centre, Loxwood Road, Cranleigh GU6 8HP

WA/2007/0097 1 Crossways Cottages, Yes 1 1 1 0 1 Guildford Road, Alfold GU6 8HF

WA/2013/0945 Shortlands,Snowdenham No 2 1 0 0 1 Lane, Bramley,GU5 0AT

- 31 -

Waverley Borough Council Authority Monitoring Report 2015-2016

(Net)

(Net) (Net) (Net)

Latest

(Gross)

Address

Permitted Permitted

Completed

Permission

Outstanding

Commenced Commenced Development

WA/2013/1727 Land Adjacent 1 The No 1 1 0 0 1 Coombes, Bramley, GU5 0HT

CR/2013/0015 The Bothy, Smithbrook, No 1 1 0 0 1 Horsham Road, Cranleigh GU6 8LH

CR/2013/0013 Honeygreen Barn, No 1 1 0 0 1 Smithbrook, Horsham Road, Cranleigh GU6 8LH

CR/2013/0014 Great Barn, Smithbrook, No 2 2 0 0 2 Horsham Road, Cranleigh GU6 8LH

CR/2014/0030 2nd Floor, The Kiln Building, No 3 3 0 0 3 85 Smithbrook Kilns, Cranleigh GU6 8JJ

CR/2014/0029 1st Floor, The Kiln Building, No 4 4 0 0 4 85 Smithbrook Kilns Cranleigh GU6 8JJ

CR/2014/0028 Mezzanine Floor, The Kiln No 4 4 0 0 4 Building 85 Smithbrook Kilns Cranleigh GU6 8JJ

CR/2014/0027 1st Floor, The Eastern No 2 2 0 0 2 Building, Smithbrook Kilns, Cranleigh GU6 8JJ

CR/2014/0031 2nd Floor, The Eastern No 2 2 0 0 2 Building, Smithbrook Kilns, Cranleigh GU6 8JJ

WA/2014/2460 Willow Brook Cottage, No 1 1 0 0 1 Gosden Common, Bramley GU5 0AQ

WA/2015/1652 Roadside Barn, Nursecombe No 1 1 0 0 1 Farm, Snowdenham Lane, Bramley, GU5 0DB

WA/2015/2276 Beggars Roost, 57 Linersh No 1 1 0 0 1 Wood, Bramley GU5 0EF

- 32 -

Waverley Borough Council Authority Monitoring Report 2015-2016

(Net)

(Net) (Net) (Net)

Latest

(Gross)

Address

Permitted Permitted

Completed

Permission

Outstanding

Commenced Commenced Development

WA/2016/0077 Nurscombe Farm, No 1 1 0 0 1 Snowdenham Lane, Bramley GU5 0DB

WA/2014/0001 24 High Street, Bramley, Yes 1 1 1 0 1 GU5 0HB

WA/2014/1916 Hollyhocks Cottage, High Yes 1 1 1 0 1 Street, Bramley GU5 0HB

WA/2014/1952 Hydestile Joinery, No 2 2 0 0 2 Hambledon Road, Hydestile GU8 4DE

PRA/2015/0024 Granary Building, Tuesley No 1 1 0 0 1 Farm, Tuesley Lane, Godalming, GU7 1UG

WA/2014/1320 The Farm Studio, Fisher No 1 1 0 0 1 Lane Farm, Fisher Lane, Chiddingfold GU8 4TB

WA/2014/1222 Sydenhurst, Mill Lane, No 1 1 0 0 1 Chiddingfold GU8 4SJ

WA/2015/0274 Fisher Lane Farm, Fisher No 1 1 0 0 1 Lane, Chiddingfold GU8 4TB

WA/2015/1683 Barn at Northbridge Farm, No 1 1 0 0 1 Petworth Road, Chiddingfold, GU8 4UU

WA/2015/1193 Land at Garden Cottage No 1 1 0 0 1 Farm, Shillinglee Park Road, Chiddingfold, GU8 4TA

WA/2011/1291 Combe Court Farm, Yes 1 1 1 0 1 Prestwick Lane, Chiddingfold GU8 4XW

WA/2015/0532 The Butchers Rest, Petworth No 1 1 0 0 1 Road, Chiddingfold GU8 4TY

WA/2015/1238 8 Woodside Close, No 1 1 0 0 1 Chiddingfold, GU8 4RH

- 33 -

Waverley Borough Council Authority Monitoring Report 2015-2016

(Net)

(Net) (Net) (Net)

Latest

(Gross)

Address

Permitted Permitted

Completed

Permission

Outstanding

Commenced Commenced Development

WA/2013/1528 Land Adjacent To No 2 2 0 0 2 Southdown House, Hale House Lane, , GU10 2JA

WA/2014/1494 Southdown House, Hale No 1 1 0 0 1 House Lane, Churt GU10 2JA

CR/2014/0041 VDU House, Old Kiln Lane, No 1 1 0 0 1 Churt, Farnham GU10 2JH

WA/2014/1961 Land at Silverbeck, Jumps No 1 1 0 0 1 Road, Churt GU10 2HL

CR/2015/0020 Ground Floor and First Floor, No 1 1 0 0 1 Jacobson House, Barford Lane, Churt, GU10 2JD

WA/2012/1498 Unit 5 Sterling Barns, Knowle No 1 1 0 0 1 Lane, Cranleigh, GU6 8JP

WA/2013/1934 128 High Street, Cranleigh, No 1 1 0 0 1 GU6 8RF

WA/2013/0759 Land Adjacent to Rowly No 1 1 0 0 1 Lodge, Rowly Drive, Cranleigh, GU6 8PJ

WA/2014/0292 Little Barn, The Ridgeway, No 1 1 0 0 1 Cranleigh, GU6 7HR

WA/2014/0368 Former Swallow Tiles, No 2 2 0 0 2 Bookhurst Road, Cranleigh, GU6 7DP

CR/2014/0022 Bullimores House, Church No 1 1 0 0 1 Lane, Cranleigh GU6 8AR

CR/2013/0023 The Yard, Ewhurst Road, No 1 1 0 0 1 Cranleigh GU6 7EF

CR/2014/0038 Western House, 250 High Yes 2 2 2 0 2 Street, Cranleigh GU6 8RL

- 34 -

Waverley Borough Council Authority Monitoring Report 2015-2016

(Net)

(Net) (Net) (Net)

Latest

(Gross)

Address

Permitted Permitted

Completed

Permission

Outstanding

Commenced Commenced Development

WA/2014/1303 Land at the Cranley Hotel, No 2 2 0 0 2 The Common, Cranleigh GU6 8SQ

WA/2014/1560 Lapscombe Farm, No 1 1 0 0 1 Smithwood Common, Cranleigh GU6 8QX

WA/2015/0437 1 Bookhurst Hill, Cranleigh No 1 1 0 0 1 GU6 7DP

WA/2014/2292 Macleod Garage, The No 3 2 0 0 2 Common, Cranleigh GU6 8RZ

WA/2015/1283 The Spinney, 128 Horsham No 1 1 0 0 1 Road, Cranleigh, GU6 8DY

WA/2015/1373 Nestled Inn, New Park Road, No 1 1 0 0 1 Cranleigh, GU6 7HN

WA/2015/2193 Land at Sherrydon, Cranleigh No 2 2 0 0 2

WA/2016/0021 Windy Way, The Common, No 3 3 0 0 3 Cranleigh, GU6 8SQ

WA/2016/0123 Ivyhurst, 126 Horsham Road No 1 1 0 0 1 Cranleigh GU6 8DY

WA/2015/2422 Yew Tree Cottage, No 1 1 0 0 1 Bookhurst Road, Cranleigh GU6 7DN

WA/2012/0491 London House, 106 High Yes 4 4 3 3 1 Street, Cranleigh GU6 8AJ

WA/2014/2379 Land at Eldon Farm, No 1 1 0 0 1 Elmbridge Road, Cranleigh Road, Cranleigh, GU6 8JX

WA/2016/0103 Farm, Barn C, No 1 1 0 0 1 Pitt Lane, GU10 4HR

WA/2014/1277 Bayfield Stud, Mendips, The No 1 1 0 0 1 Common, Dunsfold GU8 4LA

- 35 -

Waverley Borough Council Authority Monitoring Report 2015-2016

(Net)

(Net) (Net) (Net)

Latest

(Gross)

Address

Permitted Permitted

Completed

Permission

Outstanding

Commenced Commenced Development

PRA/2015/0033 Leylands Farm, Wrotham No 1 1 0 0 1 Hill, Dunsfold, GU8 4PA

WA/2013/0870 Gem House, Road, No 2 2 0 0 2 Elstead,GU8 6LN

WA/2013/1657 Land Adjacent To Redcot, No 1 1 0 0 1 Beacon View Road, Elstead, GU8 6DT

WA/2015/0667 Elstead Post Office and No 1 1 0 0 1 Newsagents, Thursley Road, Elstead GU8 6DW

WA/2015/1180 Testcombe, Beacon View No 1 1 0 0 1 Road, Elstead GU8 6DU

CR/2015/0010 The Old Forge, The Green, No 1 1 0 0 1 Elstead GU8 6DD

WA/2015/1933 Land at Finches Acre, No 2 2 0 0 2 Thursley Road, Elstead GU8 6DG

WA/2014/0790 Land Adjacent to Weywood, Yes 1 1 1 0 1 Red House Lane, Elstead, GU8 6DR

WA/2013/1623 The Wheatsheaf, Horsham No 1 1 0 0 1 Road, Ellens Green, RH12 3AS

WA/2014/0659 Garlands & Little Garlands, No 1 -1 0 0 -1 The Street, Ewhurst GU6 7QA

WA/2015/0261 Honey Brook House, The No 1 1 0 0 1 Avenue, Ewhurst GU6 7QH

WA/2014/2219 Barn Hilll Gardens Nursery, No 1 1 0 0 1 Pitch Hill, Ewhurst

PRA/2015/0019 Lemans Barn Farm, No 2 2 0 0 2 Wykehurst Lane, Ewhurst, Cranleigh GU6 7PF

- 36 -

Waverley Borough Council Authority Monitoring Report 2015-2016

(Net)

(Net) (Net) (Net)

Latest

(Gross)

Address

Permitted Permitted

Completed

Permission

Outstanding

Commenced Commenced Development

WA/2015/2236 Whinfields, Cranleigh Road, No 2 2 0 0 2 Ewhurst GU6 7RN

PRA/2015/0034 Land at Yard Farm, North No 2 2 0 0 2 Breache Lane, Ewhurst GU6 7SN

WA/2014/1207 Land at Marylands, Pitch Hill, No 1 1 0 0 1 Ewhurst, GU6 7NN

WA/2013/0406 3 West Street, Farnham, No 1 1 0 0 1 GU9 7DN

WA/2013/1325 Bishops Table Hotel, 27 Yes 4 4 4 0 4 West Street, Farnham, GU9 7DR

WA/2013/2027 22 Longdown Road, No 1 1 0 0 1 Farnham, GU10 3JU

WA/2012/2019 Land at 7 & 9 Pine Ridge No 1 1 0 0 1 Drive, Farnham, GU10 3JW

WA/2014/0109 1- 4 Waverley Close, No 2 -2 0 0 -2 Waverley Lane, Farnham, GU9 8BE

WA/2014/0562 Block B, Former Clenmay No 4 4 0 0 4 House, Runfold St George, Farnham, GU10 1PL

WA/2014/0738 8 Lea Close, No 1 1 0 0 1 GU9 9LW

WA/2014/1002 Pace House, Cambridge No 4 4 0 0 4 Place, East Street, Farnham GU9 7RX

PRA/2014/0002 Upper Old Park Farm, Upper No 1 1 0 0 1 Old Park Lane, Farnham GU9 0AR

WA/2014/1020 15 Pine Ridge Drive, Lower No 1 1 0 0 1 Bourne, Farnham GU10 3JR

- 37 -

Waverley Borough Council Authority Monitoring Report 2015-2016

(Net)

(Net) (Net) (Net)

Latest

(Gross)

Address

Permitted Permitted

Completed

Permission

Outstanding

Commenced Commenced Development

WA/2014/1490 Cambridge House, No 3 3 0 0 3 Cambridge Place, East Street, Farnham GU9 7RX

WA/2014/1753 11 Monkshanger, Farnham No 1 1 0 0 1 GU9 8BU

WA/2014/2285 45 The Fairfield, Farnham No 1 1 0 0 1 GU9 8AG

WA/2014/2099 Former Site of Garages, No 4 4 0 0 4 Middlefield, Farnham GU9 8QA

WA/2015/0016 Quernsmuir Cottage, 19 No 1 1 0 0 1 Sands Road, Farnham GU10 1PX

WA/2014/0405 Willey Mill House, Alton No 1 1 0 0 1 Road, Farnham GU10 5EL

WA/2014/0976 73 Heath Lane, Farnham No 1 1 0 0 1 GU9 0PX

WA/2014/1631 The Lodge, Cavell House, No 4 4 0 0 4 Roman Way, Farnham GU9 9RE

WA/2015/0346 Land at 29 Aveley Lane, No 1 1 0 0 1 Farnham GU9 8PR

WA/2015/0573 White Beam, 79A Middle No 2 1 0 0 1 Bourne Lane, Lower Bourne, Farnham GU10 3NJ

WA/2015/0643 Former Potting Shed, No 1 1 0 0 1 Ground Control, Gardeners Hill Road, Lower Bourne GU10 3JB

WA/2015/0647 Land at 1 Elm Crescent, No 1 1 0 0 1 Farnham, GU9 0QW

CR/2015/0005 95 Farnborough Road, No 2 2 0 0 2 Farnham GU9 9AL

- 38 -

Waverley Borough Council Authority Monitoring Report 2015-2016

(Net)

(Net) (Net) (Net)

Latest

(Gross)

Address

Permitted Permitted

Completed

Permission

Outstanding

Commenced Commenced Development

WA/2015/0464 39 West Street, Farnham No 1 1 0 0 1 GU9 7DX

WA/2015/0493 14A Abbott House, Hale No 4 4 0 0 4 Road, Farnham GU9 9QH

WA/2015/0696 1A Park House, Park Row, No 1 1 0 0 1 Farnham GU9 7JH

WA/2015/0940 Land at 79 Burnt Hill Road, No 1 1 0 0 1 Lower Bourne, GU10 3LL

WA/2015/0964 The Old Tennis Court, Gold No 1 1 0 0 1 Hill, Lower Bourne GU10 3JH

WA/2014/1564 Land at 2 Wicket Hill, No 1 1 0 0 1 GU10 4RD

WA/2015/0651 1-2 Castle Street, Farnham No 3 3 0 0 3 GU9 7HR

WA/2015/0965 26 Mead Lane Farnham GU9 No 2 1 0 0 1 7DY

WA/2014/2260 Land at 100 Lodge Hill Road, No 1 1 0 0 1 Farnham Gu10 3RD

WA/2015/1290 Land at 13 The Old Barn, No 1 1 0 0 1 School Hill, Farnham GU10 4QA

WA/2015/1415 Land At 26 Brookley Lodge, No 1 1 0 0 1 Crooksbury Road, Farnham GU10 1QE

WA/2015/1439 Land to rear of Lodge Hill No 1 1 0 0 1 Wood, 106 Lodge Hill Road, Lower Bourne GU10 3RD

CR/2015/0015 24 Long Garden Walk, No 1 1 0 0 1 Farnham GU9 7HX

WA/2015/1280 Land to the rear of Viners No 3 3 0 0 3 Mead, Wrecclesham Road, Farnham GU10 4PT

- 39 -

Waverley Borough Council Authority Monitoring Report 2015-2016

(Net)

(Net) (Net) (Net)

Latest

(Gross)

Address

Permitted Permitted

Completed

Permission

Outstanding

Commenced Commenced Development

WA/2015/1050 2-8 South Street, Farnham, No 1 1 0 0 1 GU9 7RP

WA/2014/2280 Land to rear 97&95 No 2 2 0 0 2 Farnborough Road, Farnham GU9 9AL

WA/2015/1544 104B West Street, Farnham No 1 1 0 0 1 GU9 7EN

WA/2014/2048 Land Adjacent to 45, No 2 2 0 0 2 Firgrove Hill, Farnham GU9 8LP

WA/2015/1530 Land at 32 St Johns Road, No 1 1 0 0 1 Farnham

WA/2015/1704 Land at Lowndes End, Long No 1 1 0 0 1 Garden Walk East, Farnham GU9 7HX

WA/2015/1454 Land to rear of Heroncourt, No 1 1 0 0 1 39 Ford Lane, Wrecclesham GU10 4SF

WA/2015/0142 Land Between 13 and 15 No 1 1 0 0 1 Longdown Road, Lower Bourne, Farnham GU10 3JT

WA/2015/2149 Chapel, Green Lane, No 1 1 0 0 1 Farnham, GU9 8PT

WA/2015/1949 49 Downing Street, Farnham, No 3 3 0 0 3 GU9 7PH

WA/2015/1895 The Lobster Pot, 40 Upper No 4 4 0 0 4 Hale Road, Farnham GU9 0NS

WA/2015/2333 99 West Street, Farnham, No 2 2 0 0 2 GU9 7EN

WA/2015/2372 40 The Borough, Farnham, No 1 1 0 0 1 GU9 7NW

- 40 -

Waverley Borough Council Authority Monitoring Report 2015-2016

(Net)

(Net) (Net) (Net)

Latest

(Gross)

Address

Permitted Permitted

Completed

Permission

Outstanding

Commenced Commenced Development

WA/2003/2676 Land Adjacent To 50 Yes 1 1 1 0 1 Boundstone Road, Farnham, GU10 4TR

WA/2012/1435 Hoghatch Farm, 6 Hoghatch Yes 1 1 1 0 1 Lane, Farnham GU9 0BY

WA/2013/0034 3 Wicket Hill, Wrecclesham, Yes 1 1 1 0 1 GU10 4RD

WA/2013/1400 20 - 21 The Borough, Yes 1 1 1 0 1 Farnham, GU9 7NQ

WA/2013/1910 Land Adjacent To, 64 Yes 1 1 1 0 1 Firgrove Hill, Farnham, GU9 8LL

WA/2013/1425 Land Adjacent to 17 Yes 1 1 1 0 1 Gardeners Hill Road, Farnham, GU10 3HY

WA/2015/0224 Land East of Bourne View, Yes 2 2 2 1 1 Lodge Hill Road, Lower Bourne, GU10 3RD

WA/2015/0955 Land at Cherryfields, Fullers No 1 1 0 0 1 Road,

WA/2015/1867 St Mary's Parish Church, Old No 1 1 0 0 1 Compton Lane, Farnham GU9 8EG

WA/2014/2336 Land West of 20 Longdown No 1 1 0 0 1 Road, Lower Bourne GU10 3JU

WA/2015/1945 54 & 55 Southern Way, No 3 3 0 0 3 Farnham, GU9 8DF

PRA/2016/0002 Kilnside Farm, Moor Park No 3 3 0 0 3 Lane, Farnham

WA/2015/1497 Land at End of Cul De Sac, No 1 1 0 0 1 North West Side, Three Stiles Road, Farnham GU9 7DE

- 41 -

Waverley Borough Council Authority Monitoring Report 2015-2016

(Net)

(Net) (Net) (Net)

Latest

(Gross)

Address

Permitted Permitted

Completed

Permission

Outstanding

Commenced Commenced Development

WA/2008/1083 7 Wrecclesham Road, Yes 2 2 2 0 2 Farnham GU9 8TY

CR/2014/0039 The White Building, Unit 2 No 1 1 0 0 1 The Reeds Business Units, The Reeds Road, Frensham GU10 3BP

WA/2014/1763 Reeds Hatch Farm, No 1 1 0 0 1 Boundary Road, Dockenfield GU10 4ET

WA/2014/2406 The Coach House, Moor No 1 1 0 0 1 House, Road, Rushmoor GU10 2EB

WA/2015/0009 Liscombe, Hamlash Lane, No 2 2 0 0 2 Frensham GU10 3AT

WA/2015/1020 Land between Shortfield No 2 2 0 0 2 House and Tignells Cottage, Hamlash Lane, Frensham GU10 3AU

WA/2015/1452 The Holly Bush, Shortfield No 1 1 0 0 1 Common Road, Frensham, GU10 3BJ

WA/2015/1432 The Old Chapel, Shortfield No 1 1 0 0 1 Common Road, Frensham GU10 3EJ

WA/2015/2291 Elvetham House, Shortfield No 2 2 0 0 2 Common Road, Farnham GU10 3BJ

WA/2014/2031 St Mary's Church, The Yes 1 1 1 0 1 Street, Frensham GU10 3EA

WA/2014/0183 Hunters Barn, Mill Lane, Yes 1 1 1 0 1 Frensham, GU10 3EB

WA/2013/0539 Land at Silo Drive, No 2 2 0 0 2 Godalming, GU7 3NZ

WA/2013/0743 147 High Street, Godalming, No 2 1 0 0 1 GU7 1AF

- 42 -

Waverley Borough Council Authority Monitoring Report 2015-2016

(Net)

(Net) (Net) (Net)

Latest

(Gross)

Address

Permitted Permitted

Completed

Permission

Outstanding

Commenced Commenced Development

WA/2013/0712 51 High Street, Godalming, No 3 3 0 0 3 GU7 1AW

WA/2013/0935 Squirrels Leap, 20Wolseley No 3 2 0 0 2 Road, Farncombe,GU7 3DX

WA/2013/0952 61 Brighton Road, No 4 3 0 0 3 Godalming GU7 1NT

WA/2013/0483 59 High Street, Godalming, No 1 1 0 0 1 GU7 1AW

CR/2013/0035 1 The Mews, Wharf Street, No 4 4 0 0 4 Godalming, GU7 1NN

CR/2014/0004 84A Lammas Gate, No 2 2 0 0 2 Meadrow, Godalming, GU7 3HT

WA/2014/0676 1st Floor The Lodge House, No 1 1 0 0 1 Catteshall Mill, Catteshall Road, Godalming GU7 1NJ

CR/2014/0020 First and Second Floor Yes 2 2 2 1 1 Offices, 1 St Johns Court, Farncombe Street, Godalming GU7 3BA

WA/2014/0897 38A High Street, Godalming No 1 1 0 0 1 GU7 1DZ

CR/2014/0033 2 Ballfield Road, Godalming No 1 1 0 0 1 GU7 2EZ

WA/2014/0603 27 High Street, Godalming No 1 1 0 0 1 GU7 1AU

CR/2014/0036 Roebuck House and Latimer No 2 2 0 0 2 House, Brighton Road, Godalming GU7 1NS

CR/2014/0043 First Floor, 10 Queen Street, No 2 2 0 0 2 Godalming, GU7 1BD

WA/2014/1509 28 High Street, Godalming No 1 1 0 0 1 GU7 1DZ

- 43 -

Waverley Borough Council Authority Monitoring Report 2015-2016

(Net)

(Net) (Net) (Net)

Latest

(Gross)

Address

Permitted Permitted

Completed

Permission

Outstanding

Commenced Commenced Development

WA/2014/1699 Colbourne, 41 Barnes Road, No 1 1 0 0 1 Godalming, GU7 3RG

CR/2014/0046 78 Meadrow, Godalming No 1 1 0 0 1 GU7 3HT

WA/2014/1418 Craddocks Printing Works, No 3 3 0 0 3 Great George Street, Godalming GU7 1EE

WA/2014/1716 Car Park Site to the Rear of No 3 3 0 0 3 72-76 High Street, Godalming GU7 1AY

WA/2014/1684 23 South Hill, Godalming, No 1 1 0 0 1 GU7 1JT

WA/2015/1240 Lime House, 35 The No 1 1 0 0 1 Horseshoe, Godalming, GU7 2LN

WA/2015/1922 1 South Hill, Godalming, No 1 1 0 0 1 GU7 1JT

WA/2015/1722 20 Riverside Chambers, No 2 2 0 0 2 Bridge Street, Godalming GU7 1HY

WA/2015/2068 Land at 56 Birch Road, No 2 2 0 0 2 Farncombe GU7 3NU

WA/2015/1853 Quintus, 134 Busbridge No 2 2 0 0 2 Lane, Godalming GU7 1QJ

WA/2015/2355 Land at rear of 33 High No 1 1 0 0 1 Street, Godalming, GU7 1AU

WA/2003/0833 22 Church Street, Yes 1 1 1 0 1 Godalming.

WA/2011/1324 Land At 74 Pullman Lane, Yes 1 1 1 0 1 Godalming GU7 1YB

WA/2011/0314 Land to rear of Sandness, Yes 1 1 1 0 1 The Close, Godaming GU7 1PQ

- 44 -

Waverley Borough Council Authority Monitoring Report 2015-2016

(Net)

(Net) (Net) (Net)

Latest

(Gross)

Address

Permitted Permitted

Completed

Permission

Outstanding

Commenced Commenced Development

WA/2012/1335 2 Summers Road, Yes 2 2 2 0 2 Farncombe GU7 3BB

WA/2012/1843 Land to Rear of 66 & 66A Yes 3 3 3 0 3 High Street, Godalming GU7 1DU

WA/2013/0924 The Rotunda,The Burys, Yes 2 2 2 0 2 Godalming,GU7 1HY

CR/2014/0045 4 Ballfield Road, Godalming, Yes 1 1 1 0 1 GU7 2EZ

WA/2014/2027 32 Primrose Cottage, Station Yes 1 1 1 0 1 Road, Godalming GU7 3NG

WA/2014/2263 2 Long Gore, Godalming Yes 1 1 1 0 1 GU7 3TD

WA/2015/0083 139 George Road, Yes 3 3 3 0 3 GodalmingGU7 3LX

PRA/2014/0012 20A Farncombe Street, No 1 1 0 0 1 Godalming GU7 3LH

WA/2009/0072 1 Nursery Road, Godalming Yes 2 1 1 0 1 GU7 3JU

WA/2015/0929 Oakbraes, Frith Hill Road, Yes 9 2 1 1 1 Godalming GU7 2EA

WA/2015/0054 Marepond Farm, Markwick No 1 1 0 0 1 Lane, Godalming GU8 4BD

WA/2015/1167 Nightingales, Vann Lane, No 1 1 0 0 1 Hambledon GU8 4EB

WA/2013/0464 Place Farm Nore Lane No 4 4 0 0 4 Formerly The Street Hascombe GU8 4JT

WA/2013/0562 The Colosseum, 67BWey No 3 3 0 0 3 Hill, Haslemere, GU27 1HN

WA/2013/1242 14 Petworth Road, No 1 1 0 0 1 Haslemere, GU27 2HR

- 45 -

Waverley Borough Council Authority Monitoring Report 2015-2016

(Net)

(Net) (Net) (Net)

Latest

(Gross)

Address

Permitted Permitted

Completed

Permission

Outstanding

Commenced Commenced Development

WA/2013/1679 5 Beacon Hill Road, No 1 1 0 0 1 Hindhead, GU26 6NR

WA/2012/2036 Lyndale, Farnham Lane, No 1 1 0 0 1 Haslemere, GU27 1EZ

WA/2014/0170 4 Chestnut Avenue, No 1 1 0 0 1 Haslemere, GU27 2AT

WA/2014/0277 Land at Hillside, Beacon Hill No 1 1 0 0 1 Road, Hindhead GU26 6QB

WA/2014/1390 Land at Glen Road, No 1 1 0 0 1 Hindhead GU26 6QE

WA/2014/1326 Chase House, Hindhead No 1 1 0 0 1 Road, Hindhead GU26 6AY

WA/2014/1430 Land at 20 Havenwood, No 1 1 0 0 1 Woodlands Lane, Haslemere GU27 1JU

WA/2014/1388 Hindhead Furnishing Yes 4 4 4 0 4 Warehouse, Hill Road, Hindhead GU26 6QW

WA/2014/1742 Land at Red Gables, No 1 1 0 0 1 Weydown Road, Haslemere GU27 1DS

WA/2014/1993 Park Lodge, Lythe Hill Park, No 2 1 0 0 1 Haslemere GU27 3BD

CR/2014/0051 West House, 19-21 West No 3 3 0 0 3 Street, Haslemere GU27 2AB

WA/2014/2185 Grasmere, Tilford Road, No 4 3 0 0 3 Hindhead GU26 6SQ

WA/2014/1847 19 St Christophers Road, No 2 2 0 0 2 Haslemere GU27 1DQ

WA/2014/2393 Land at Stepstones, 2 No 1 1 0 0 1 Scotlands Close, Haslemere GU27 3AE

- 46 -

Waverley Borough Council Authority Monitoring Report 2015-2016

(Net)

(Net) (Net) (Net)

Latest

(Gross)

Address

Permitted Permitted

Completed

Permission

Outstanding

Commenced Commenced Development

WA/2015/0273 Land at Littlejohn, Tower No 1 1 0 0 1 Road, Hindhead GU26 6SU

WA/2015/0269 Devon House, 9 Beacon Hill No 1 1 0 0 1 Road, Hindhead GU26 6NR

PRA/2015/0003 7 Beacon Hill Road, No 1 1 0 0 1 Hindhead GU26 6NR

WA/2014/1563 Barkers Garden Machinery, No 2 2 0 0 2 37 Lower Road, Grayswood, GU27 2DR

WA/2015/1162 Little Barn, Linkside North, No 1 1 0 0 1 Hindhead, GU26 6NZ

WA/2015/1477 44 West Street, Haslemere No 1 1 0 0 1 GU27 2AB

CR/2015/0014 Exchange House, Hindhead No 1 1 0 0 1 Road, Hindhead GU26 6AA

WA/2015/1302 Little Mead, Church Lane, No 3 3 0 0 3 Haslemere GU27 1AT

WA/2015/1539 33 Bridge Road, Haslemere No 2 2 0 0 2 GU27 2AY

WA/2015/1633 The Lodge, Manormead, No 1 1 0 0 1 Tilford Road, Hindhead, GU26 6RA

PRA/2015/0029 Crown House, Lower Street, No 2 2 0 0 2 Haslemere GU27 2PD

WA/2015/2208 Land at 128 Lion Lane, No 1 1 0 0 1 Haslemere GU27 1JH

WA/2015/2352 Pevensey, Beacon Hill Road, No 2 2 0 0 2 Hindhead GU26 6NT

WA/2016/0042 16 Kings Road Haslemere No 2 2 0 0 2 GU27 2QA

WA/2016/0197 Wychwood Residential Care No 1 1 0 0 1 Home, Headley Road, Hindhead GU26 6TN

- 47 -

Waverley Borough Council Authority Monitoring Report 2015-2016

(Net)

(Net) (Net) (Net)

Latest

(Gross)

Address

Permitted Permitted

Completed

Permission

Outstanding

Commenced Commenced Development

WA/2004/0834 Park Lodge, Lythe Hill Park, Yes 1 1 1 0 1 Haslemere

WA/2005/0658 50 High Street, Haslemere, Yes 1 1 1 0 1 GU27 2LA

WA/2010/1096 26 - 32 Meadway, Haslemere Yes 4 2 2 1 1 GU27 1NW

WA/2011/1241 Land to Rear of 4&5, Yes 2 2 2 0 2 Hampton Terrace Beacon Hill Road, Hindhead GU26 6NR

WA/2011/2109 58B High Street, Haslemere, Yes 1 1 1 0 1 GU27 2LA

WA/2012/1182 Burgress House, West Yes 2 2 2 0 2 Street, Haslemere GU27 2AB

WA/2014/0119 Land at Enderby, Bunch Yes 1 1 1 0 1 Lane, Haslemere,GU27 1ET

WA/2015/1392 18B Lower Street, No 1 1 0 0 1 Haslemere, GU27 2NX

WA/2015/1896 Land at Trimmers Field and No 2 2 0 0 2 Woodlands, Wood Road, Hindhead, GU26 6PX

WA/2014/1767 Land Adjacent To Crosse No 1 1 0 0 1 Garden, Church Lane, Haslemere, GU27 2BJ

WA/2015/0416 Prices Cottage (Hindhead No 1 1 0 0 1 Youth Hostel), Punch Bowl Lane, Thursley GU8 6NS

WA/2013/1216 Greenhills Court,Tilford No 1 1 0 0 1 Road, Farnham, GU10 2DZ

WA/2013/1042 Harvest Nursery, Grange No 1 1 0 0 1 Road, Tilford, GU10 2DY

- 48 -

Waverley Borough Council Authority Monitoring Report 2015-2016

(Net)

(Net) (Net) (Net)

Latest

(Gross)

Address

Permitted Permitted

Completed

Permission

Outstanding

Commenced Commenced Development

WA/2014/2156 Former Charles Hill Nursery, No 3 3 0 0 3 Charles Hill, Tilford GU10 2AU

CR/2013/0027 1 Robin Way, Wormley, GU8 No 1 1 0 0 1 5TN

WA/2014/0449 Fairview, Gasden Copse, No 1 1 0 0 1 Witley GU8 5QD

WA/2014/1093 Church House, Church Lane, No 0 -1 0 0 -1 Witley GU8 5PN

WA/2014/1269 Land Adjacent Hurst Farm No 1 1 0 0 1 Surgery, Chapel Lane, Milford GU8 5HU

WA/2014/1450 Chester House, Petworth No 1 1 0 0 1 Road, Witley GU8 5LY

WA/2014/1737 Goldwell Services, Cherry No 2 2 0 0 2 Tree Road, Milford GU8 5AX

CR/2014/0049 Miltons House, Miltons Yard, No 4 4 0 0 4 Petworth Road, Witley GU8 5LH

WA/2015/0496 Wineham, New Road, No 1 1 0 0 1 Wormley GU8 5SU

WA/2015/1232 Soller, Manor Lea Road, No 1 1 0 0 1 Milford GU8 5EF

WA/2015/1075 Land at 17a Oxted Green, No 2 2 0 0 2 Milford GU8 5DD

WA/2015/1594 Ivy Lodge, Portsmouth Road, No 3 3 0 0 3 Milford GU8 5DS

WA/2015/1316 Greenacre. Gasden Copse, No 4 4 0 0 4 Godalming GU8 5QE

WA/2015/2018 Land at 29 Sunny Hill, Witley, No 1 1 0 0 1 GU8 5RN

- 49 -

Waverley Borough Council Authority Monitoring Report 2015-2016

(Net)

(Net) (Net) (Net)

Latest

(Gross)

Address

Permitted Permitted

Completed

Permission

Outstanding

Commenced Commenced Development

WA/2015/2037 Lane at rear of Rendlesham, No 2 2 0 0 2 Manor Lea Road, Milford, GU8 5EF

WA/2015/0508 Culmer Firs, Petworth Road, Yes 1 1 1 0 1 Wormley GU8 5SW

WA/2014/2456 Rockwood Estate, No 1 1 0 0 1 Haslemere Road, Witley GU8 5PT

WA/2013/1855 Ladymead, Barnett Lane, No 4 -1 4 0 -1 , GU5 0RZ

WA/2014/0210 Land Adjacent to 64, No 2 2 2 0 2 Hullmead, Shamley Green, GU5 0UG

WA/2014/0772 Little Garden Cottage, No 2 1 0 1 0 Garden Close, Shamley Green GU5 0UW

WA/2014/1270 Great Tangly Manor Farm, No 4 4 0 0 4 Great Tangley, Wonersh, GU5 0PT

WA/2014/0770 Spring House, Willinghurst No 1 1 0 0 1 Estate, Shamley Green GU5 0SU

WA/2014/2236 Lee Farm, Northcote Lane, No 1 1 0 0 1 Shamley Green GU5 0RB

WA/2015/1847 Land at Leybourne Lane, No 1 1 0 0 1 Wonersh GU5 0RZ

Total 394

- 50 -

Waverley Borough Council Authority Monitoring Report 2015-2016

b) Outstanding planning permissions on large sites (5 or more dwellings) 01/04/16

(Net) (Net) (Net) (Net)

Latest

(Gross) (Gross)

Address

Permitted Permitted

Completed

Permission

Outstanding Outstanding

Commenced Commenced

Development Notes WA/2014/0249 Land adjacent to Little No 24 24 0 0 24 24 Decision date: Saddlers, Ricardo Court, 13/03/2015 Bramley GU5 0HU

CR/2015/0023 The Courtyard, Eastwood No 6 6 0 0 6 6 Decision date: Road, Bramley GU5 0DS 11/02/2016

WA/2013/1926 Milford Hospital, Tuesley Lane, Yes 120 104 26 52 68 52 Development Godalming, GU7 1UF commenced.

CR/2015/0021 Catteshall Manor & Dean No 11 11 0 0 11 11 Decision date: Cottage, Catteshall Lane, 14/01/2016 Godalming, GU7 1UU

CR/2014/0024 First and Second Floors East No 5 5 0 0 5 5 Decision date: Lodge House, 116-120 High 05/08/2014 Street, Cranleigh GU6 8AJ

WA/2014/1038 Land South of Amlets Lane No 125 125 0 0 125 125 Decision Date: and North of Roberts Way, 20/11/2014 Cranleigh

WA/2014/1754 Land at 106 & Chantreys No 149 149 0 0 149 149 Decision Date: Bungalow & Land to South 28/01/2016 West of Horsham Road, Cranleigh

WA/2011/2129 Former Swallow Tiles Site, Yes 58 58 58 53 5 5 Development Bookhurst Road, Cranleigh commenced. GU6 7DP

WA/2013/1947 Cranleigh Brick and Tile No 19 19 0 0 19 19 Decision Date: Works, Knowle Lane, 10/08/2015 Cranleigh, GU6 8JP

WA/2014/0912 Land South of High Street No 425 425 0 0 425 425 Decision Date: between Alfold Road and 06/01/2016 Knowle Lane.

WA/2016/0201 Dockenfield Farm, Pitt Lane, No 5 5 0 0 5 5 Decision Date: Frensham GU10 3EF 22/03/2016

- 51 -

Waverley Borough Council Authority Monitoring Report 2015-2016

WA/2014/1936 Honeypot Antiques, Milford No 5 5 0 0 5 5 Decision Date: Road, Elstead GU8 6HP 13/03/2015

WA/2013/0196 9 School Hill, Wrecclesham, No 9 9 0 0 9 9 Conditions GU10 4PU discharged

WA/2011/1921 Land at Stockwood Way, No 13 13 0 0 13 13 Decision Date: Farnham, GU9 9TE 20/06/2013

WA/2014/1163 Land Adjoining Bourne Mill, No 16 16 0 0 16 16 Development Guildford Road, Farnham, GU9 commenced. 9PU

WA/2013/1213 Travis Perkins, West Street, Yes 22 22 6 17 5 5 Development Farnham, GU9 7AF commenced.

CR/2013/0034 Firlex House, 18 Firgrove Hill, No 6 6 0 0 6 6 Decision date: Farnham, GU9 8LQ 28/01/2014

CR/2014/0044 Bridge House, South Street, No 12 12 0 0 12 12 Decision date: Farnham GU9 7RS 23/10/2014

WA/2015/0545 Land at Harts Yard, West No 13 13 0 0 13 13 Decision date: Street, Farnham GU9 7EN 08/06/2015

CR/2015/0007 The Old Hop Kiln, 1 Long No 5 5 0 0 5 5 Decision date: Garden Walk, Farnham GU9 03/07/2015 7HX

WA/2015/1510 7 Frensham Road, Farnham No 5 5 0 0 5 5 Decision date: GU9 8HD 28/10/2015

CR/2015/0017 The Woolmead East Street No 45 45 0 0 45 45 Decision date: Farnham 03/11/2015

WA/2014/2028 Land at Baker Oates Stables, No 43 43 0 0 43 43 Decision date : Gardeners Hill Road, 25/11/2015 Frensham GU10 3AL

WA/2014/2113 Land to the West of St No 74 74 0 0 74 74 Decision Date: George's Road, Farnham 23/12/2015

CR/2015/0022 The Barbican, East Street, No 11 11 0 0 11 11 Decision date: Farnham GU9 7TB 18/01/2016

WA/2015/1084 Prospect House, Bethel Lane, No 7 7 0 0 7 7 Decision date : Farnham GU9 0QB 06/08/2015

WA/2011/1068 Land at Portland House, Hale Yes 9 9 6 6 3 3 Development Road, Farnham GU9 9QX commenced.

WA/2014/0394 Former Police Station, Long Yes 50 50 0 0 50 50 Development Bridge, Farnham GU9 7PZ commenced

WA/2014/2211 Alresford House, 60 West Yes 6 6 6 0 6 6 Conditions Street, Farnham GU9 7EH discharged

- 52 -

Waverley Borough Council Authority Monitoring Report 2015-2016

WA/2015/2294 Dairy Crest, 40 Weydon Lane, No 21 21 0 0 21 21 Decision date: Farnham GU9 8UP 24/03/16

WA/2014/0933 Langham Court, Ridgway No 18 -25 0 0 18 -25 Conditions Road, Farnham GU9 8NL discharged.

WA/2014/1565 Land at Crondall Lane No 120 120 0 0 120 120 Decision date 11/09/2015

WA/2012/0912 Land at East Street, Farnham Yes 239 235 0 0 239 235 Development Commenced

WA/2013/0660 Land At Barco And Nantmore, Yes 9 7 2 6 3 1 Development Charterhouse Road, commenced Godalming, GU7 2AW

CR/2013/0019 Panda House, Weyside Park, Yes 36 36 12 25 11 11 Development Catteshall Lane, Godalming, commenced GU7 1XR

CR/2013/0037 Network House, Lower South No 9 9 0 0 9 9 Decision date: Street, Godalming, GU7 1BZ 11/02/2014

CR/2014/0005 Ockford Mill, Ockford Road, No 10 10 0 0 10 10 Decision date: Godalming, GU7 1RH 07/04/2014

WA/2013/0676 Land at , Yes 46 46 10 16 30 30 Conditions Tuesley Lane & Land to the discharged South of Ashstead Lane, Godalming GU7 1RS

CR/2014/0021 Sandford House, Catteshall No 9 9 0 0 9 9 Decision date: Lane, Godalming GU7 1LG 24/072014

WA/2014/0932 Land at Ockford Ridge, No 99 34 0 0 99 34 Conditions Godalming discharged

CR/2014/0037 Roebuck House & Latimer No 6 6 0 0 6 6 Decision date: House, Brighton Road, Godalming GU7 1NS 16/09/2014

CR/2014/0035 Highfield, Brighton Road, No 11 11 0 0 11 11 Decision date: Godalming GU7 1NS 16/09/2014

WA/2014/1047 First Church of Christ Scientist, Yes 31 31 0 0 31 31 Development Ockford Road, Godalming GU7 Commenced. 1QY

CR/2015/0011 Bridge House, Flambard Way, No 8 8 0 0 8 8 Decision date: Godalming GU7 1JB 27/08/2015

CR/2015/0012 Thornbrook House, Weyside No 34 34 0 0 34 34 Decision date: Park, Godalming GU7 1XE 27/08/2015

- 53 -

Waverley Borough Council Authority Monitoring Report 2015-2016

WA/2014/1330 Land at Furze Lane, No 50 50 0 0 50 50 Conditions Godalming discharged.

CR/2015/0018 Craven House, Station Road, Yes 21 21 21 0 21 21 Decision date: Godalming GU7 1EX 11/11/2015

CR/2015/0019 Southern House, Flambard No 10 10 0 0 10 10 Decision date: Way, Godalming, GU7 1HH 15/12/2015

WA/2011/1981 Priory Orchard & Car Park Yes 14 13 13 0 14 13 Development Land, Station Approach, commenced. Godalming, GU7 1EU

WA/2012/0453 Land at Flambard Way, Yes 137 137 135 0 137 137 Development Catteshall Lane and Woolsack commenced. Way, Godalming. GU7 1JN

WA/2012/1078 Wurth House and Anvil Park, Yes 147 147 85 127 20 20 Development Catteshall Lane, Godalming, Commenced GU7 1NP

WA/2013/0402 139-143 High Street, Yes 6 6 6 0 6 6 Development Godalming. Commenced

WA/2013/1464 Land to rear of 49-55 Silo Yes 7 7 8 1 6 6 Development Road, Godalming, GU7 3PA Commenced

WA/2015/2396 Old Fire Station, 12 Queen No 5 5 0 0 5 5 Decision date : Street, Godalming GU7 1BD 10/03/2016

WA/2006/1672 Oakhurst, Frith Hill Road, Yes 11 10 4 4 6 6 Development Godalming, GU7 2ED commenced.

WA/2012/1917 34 Kings Road, Haslemere, No 9 8 0 0 9 8 Decision date: GU27 2QG 18/10/2013

WA/2015/0204 Woolmer Hill Lodge, Lower No 8 8 0 0 8 8 Decision date: Hanger, Haslemere GU27 1LT 19/03/2015

WA/2014/1054 Land at Sturt Road, Haslemere No 135 135 0 0 135 135 Decision date: GU27 3SE 03/03/2015

WA/2015/0259 The Crown And Cushion, 4 No 6 6 0 0 6 6 Decision date : Wey Hill, Haslemere, GU27 03/03/2015 1BX

CR/2015/0002 Exchange House, Hindhead No 7 7 0 0 7 7 Decision date: Road, Hindhead GU26 6AA 10/04/2015

WA/2015/1470 Former Police Station, 46 West No 5 5 0 0 5 5 Decision date Street, Haslemere GU27 2AB 01/10/2015

- 54 -

Waverley Borough Council Authority Monitoring Report 2015-2016

WA/2015/1872 Marston Lodge, Weydown No 6 6 0 0 6 6 Decision date: Road, Haslemere GU27 1BT 26/11/2015

WA/2013/0148 Kirkpatrick Buildings, 25 Yes 36 36 24 35 1 1 Development London Road, Hindhead GU26 commenced. 6AB

WA/2013/0506 14-18 Lower Street, Yes 9 9 9 0 9 9 Development Haslemere, GU27 2NX commenced.

CR/2016/0001 Longdene House, Hedgehog No 14 14 0 0 14 14 Decision date: Lane, Haslemere GU27 2PH 02/03/2016

WA/2015/1019 Tilford Garage & Appleton, No 8 8 0 0 8 8 Decision date Tilford Street, Tilford GU10 04/09/15 2BL

WA/2015/0446 Garages North of 12 Nursery No 5 5 0 0 5 5 Decision date: Hill, Shamley Green 22/04/15

Total 2185

c) Applications approved subject to legal agreement

The Council resolved to grant planning permission subject to a legal agreement for the following:

1.) Change of use, demolition and alterations to provide 12 (net 11) dwellings at first and second floor with ground floor entrance area and bicycle storage and refuse facility at 2-3 The Borough, Farnham (WA/2015/2185) on 02/03/16

2.) Outline application with all matters reserved except access for the erection of up to 55 dwellings (including 22 affordable) with associated landscaping and open space, children’s play area and private drainage system together with associated works at Land West of Sweeters Copse, Loxwood Road, Alfold (WA/2015/2261) on 17/02/16.

- 55 -

Waverley Borough Council Authority Monitoring Report 2015-2016

Appendix 3

Potential Sites to be identified in the Waverley LAA ID Site Address Parish Potential Number Comments on deliverability of new homes 16 Weyburn Works, Elstead/Peper 70 Planning application WA/2015/0789. Road Harow 70 dwellings, incl. 21 affordable and a 60-bed care home. Refused 13 49 - 53 Horsham Road Cranleigh 20 Planning application WA/2015/0495. 25 retirement appartments for 49/53

Horsham Road refused but site considered appropriate for housing in principle. 285 The Bush Hotel, The Farnham 5 Site promoted in “call for sites” 2014. Borough

380 Stephensons Engineering Farnham 13 Planning application WA/2015/1116. site, 66 Wrecclesham Hill Erection of 12 dwellings. Pending determination. 619 Part of Farnham 10 Planning application WA/2014/2119 (Tennis Courts), east of for 14 dwellings, refused, but site Firgrove Hill considered appropriate for housing in principle.

670 The Woolmead, Farnham Farnham 55 Part of East Street Area of Opportunity designated in Local Plan

2002. Has prior approval for 45 homes. 66 Land at Charterhouse Godalming 10 Site promoted in “call for sites” 2014. School, Peperharow Road

209 Land at Keys Cottage & Godalming 10 Planning application WA/2014/0182 Wedgewood, Holloway erection of a dwelling on part of the Hill site was refused, but whole site considered appropriate for housing in principle.

- 56 -

Waverley Borough Council Authority Monitoring Report 2015-2016

706 Land rear of 46-48 Godalming 5 Site promoted in “call for sites” 2014. Peperharow Road, Godalming

828 Foxdene and Southwall, Godalming 7 Planning application WA/2015/0468 Charterhouse Road was refused for 9 dwellings but site considered appropriate for housing in principle. 144 Central Hindhead, London Haslemere 30 The owner of the land indicated in Road, Hindhead 2013 that the site is available for residential development.

145 Land at Oakdale, Haslemere 50 The owner of the land indicated in Portsmouth Road, 2013 that the site is available for Hindhead residential development.

245 Clement Windows and Haslemere 39 Planning permission in 2010 expired Motorcycle shop, 5 - 21 but site considered appropriate for Weyhill housing in principle.

697 Land at Wey Hill, Haslemere 31 The owner of the land indicated in Haslemere 2015 that the site is available for residential development.

829 35 The Golden Hind, Haslemere 10 Planning application WA/2015/1968 – London Road 7 flats and 4 townhouses. Permission granted 14/04/2016.

94 Land rear of 38-58 Witley 15 Site promoted in “call for sites” 2014. Church Road, Milford

713 Garden Style, Farnham 65 Planning application WA/2015/2163 Wrecclesham Hill for 65 new dwellings. Pending determination 914 Gorse Hill, Petworth Witley 5 Planning application WA/2016/0151 Road, Wormley for 5 dwellings. Pending determination 648 Woodside Park Godalming 100 Planning application for WA/2016/0101 for 107 dwellings. Pending determination

- 57 -

Waverley Borough Council Authority Monitoring Report 2015-2016

264 Victoria House Farnham 8 Site promoted in call for sites – confirmed in 2014 853 Land at Little Meadow, Cranleigh 75 Planning application WA/2015/0478 Alfold Road approved subject to legal agreement on 16/05/16 Total 633

- 58 -

Waverley Borough Council Authority Monitoring Report 2015-2016

Appendix 4

Windfall Contribution to Five Year Housing Supply

Contribution of Total net Completions on Windfalls as % of windfalls to total completions - small PDL (sites net 1-4) small site completions 2003 sites (Windfalls) completions to 2016 Year 2003-04 68 29 43% 2004-05 82 37 45% 2005-06 64 26 41% 2006-07 90 31 34% 2007-08 95 49 52% 2008-09 81 23 28% 2009-10 77 31 40% 2010-11 67 21 31% 2011-12 46 25 54% 2012-13 69 40 58% 2013-14 61 35 57% 2014-15 74 49 66% 2015-16 76 60 79% Total 950 456 48%

Estimation of windfall contribution to the five year housing supply

Total Completions 2003 – 2015 456 Average Completions per 35 annum 2003 - 2015 Projected supply from small 70 windfall sites 01/04/18 – 31/03/2020 (32.2 x 2)

- 59 -