GRID CONNECTION INFRASTRUCTURE FOR THE AGGENEYS 1 SOLAR PV FACILITY, NORTHERN CAPE PROVINCE ENVIRONMENTAL MANAGEMENT PROGRAMME June 2019 Prepared for ABO Wind Aggeneys 1 PV (Pty) Ltd Unit B1, Mayfair Square Century City 7441 Cape Town 8001 Prepared by: Savannah Environmental (Pty) Ltd First Floor, Block 2, 5 Woodlands Drive Office Park Woodmead Johannesburg, 2191 Tel: +27 (0)11 656 3237 Fax: +27 (0)86 684 0547 E-mail:
[email protected] www.savannahsa.com Grid connection infrastructure for the Aggeneys 1 solar PV facility Environmental Management Programme (EMPr) June 2019 PROJECT DETAILS DEA Reference : 14/12/16/3/3/1/2023 Title : Environmental Impact Assessment Process Environmental Management Programme: Grid connection infrastructure for the Aggeneys 1 Solar PV Facility, Northern Cape Province Authors : Savannah Environmental Reuben Maroga Thalita Botha Jo-Anne Thomas Specialists : 3Foxes Biodiversity Solutions Dr. Neville Bews and Associates Savannah Environmental Environmental Planning and Design Agricultural Research Council (ARC): Climate, Water and Soil Asha Consulting (in consultation with John Almond of Natura Viva) Applicant : ABO Wind Aggeneys 1 PV (Pty) Ltd Report Status : Environmental Management Programme for the final BA Report for submission to the Department of Environmental Affairs (DEA) Date : June 2019 When used as a reference this report should be cited as: Savannah Environmental (2019). Environmental Management Programme: Grid connection infrastructure for the Aggeneys 1 solar PV facility, Northern Cape Province COPYRIGHT RESERVED This technical report has been produced for ABO Wind Aggeneys 1 PV (Pty) Ltd. The intellectual property contained in this report remains vested in Savannah Environmental and ABO Wind Aggeneys 1 PV (Pty) Ltd.