February 2021 the Project in Figures
Total Page:16
File Type:pdf, Size:1020Kb
SADESIGN.FR - CREDITS : FEFGBI/NAVAL ENERGIES - FEFGBI SAS au capital de 5.015.170 € - 10 PLACE DE CATALOGNE 75014 PARIS € - 10 PLACE DE CATALOGNE SAS au capital de 5.015.170 ENERGIES - FEFGBI : FEFGBI/NAVAL SADESIGN.FR - CREDITS FEBRUARY 2021 THE PROJECT IN FIGURES Born of a partnership with the Brittany Region, the project won the ADEME EOLFO Call for Projects in 2016, with the objective to encourage the development of a French industrial sector in floating offshore wind energy. As such, it benefits from State support through investments for the future. -3 28,5- MW 60- m 9.5 MW WIND CONSUMPTION OF MORE THAN WATER TURBINES 20 000 HOUSEHOLDS/YEAR DEPTH 2022- 20 years- 230- M€ CONSTRUCTION OPERATIONS AND COST OF MONITORING INVESTMENT Groix & Belle-Ile’s floating wind turbines will allow the selected technologies to be deployed under real operating conditions. The experience gained will bring us unparallel expertise, prove the bankability of floating offshore wind technology, competitive advantages for future commercial floating wind farms in France and abroad. BENEFITS INCREASED LIMITED VISUAL REDUCED JOB ENERGY IMPACT AND USAGE COSTS AND CREATING PRODUCTION CONFLICTS IMPACTS SECTOR • Strong and constant winds • Eliminate negative visual • Onshore platform • New opportunities for the on the high seas. impact. assembly and offshore offshore wind industry. • More powerful wind turbines • Located in deep water with turbine installation and • New jobs creation, in and the potential for larger varied underwater landscapes, major repairs perform in particular during the wind farms in the long term. accessing the higher quality port areas. construction and O&M wind resources. activities. • Extended lifespan thanks to • Eliminates the need for machine refurbishment that • Outside of semaphore and specialized and expensive can be carried out onshore. radar easement areas. installation vessels. GROIX & BELLE-ILE FLOATING WIND FARM – FEBRUARY 2021 THE GROIX & BELLE-ILEUER PILOT WIND FARM The concession area selected for the project is 14 km² wide. Its location was Lorient approved by the Brittany Region Sea and Gâvres Coastal Conference in 2014. Auray Edeven Groix Vannes The oceanic conditions in the Groix & Belle project 22 m Pare are representative of 80% of global floating potential, 1 m therefore the technologies (foundation and wind turbines) which have been selected are important to leverage our RTE 23 m experience for future floating projects. eron B N This location has also been determined after an 1 m engagement period with key local partners/stakeholders Ha in order to co-exist with other sea users, and with minimal 0 3,5 ,5 15 meers Naa mes Bee-Ie environmental and ecological impacts to the sea-bed. 0 2,5 5 10 Ssa A maintenance base, located in the port of Lorient, will 63000 s er ensure the Operation & Maintenance activities of the assets. Saint-Nazaire INVESTORS PARTNERS 2016 201 2018 201 2020 2021 2022 2023 ENVIRONMENTAL STUDIES INITIAL AUTHORIATIONS AMENDED AUTHORIATIONS CONSTRUCTION DESIGN AND TECHNICAL STUDIES - 6 MW DESIGN AND TECHNICAL STUDIES - ,5 MW INSTALLATION GROIX & BELLE-ILE FLOATING WIND FARM – FEBRUARY 2021 ARCHITECTURE The nacelle The blades It contains the 9.5 MW Being 80 metres long, generator that converts the they capture the energy kinetic energy of the wind of the wind. into electricity. The tower It supports the nacelle and is designed to withstand The floater the displacements and Built entirely in steel, accelerations induced by its ballasted and the movements of the sea submerged base ensures for more than 20 years. It stability and its columns also contains the electrical provide buoyancy to the and electronic components. wind turbine. The inter-wind The anchor lines turbine cables 5 anchoring lines allow They are said to be dynamic the wind turbine to be because they allow the held in position and horizontal and vertical ensure its stability. movements of wind turbines to be absorbed (due to swells, tides, etc.). sadesign.fr MONITORING THE SITE OVER 20 YEARS OF OPERATION In addition to the studies and inventories conducted to draw up farms. The results can be shared with the scientific community in an initial report and draft the impact study, the project owners order to improve global knowledge and protocols to be put in place. will set up a monitoring system throughout the operational phase. EOLFI, the appointed project leader, also participates in scientific Adapted to the ecological sectors and their challenges, it will research programmes led by France Marine Energies (FEM) and improve knowledge of the effects that floating wind farms and co-financed by the French National Research Agency (ANR), whose their connections may have on biodiversity. This system will provide aims are to improve knowledge of the challenges related to offshore valuable feedback with a view to the deployment of commercial wind wind farms. GROIX & BELLE-ILE FLOATING WIND FARM – FEBRUARY 2021 GROIX & BELLE-ILE FLOATING WIND FARM – FEBRUARY 2021 ELECTRICAL CONNECTION CONNECTION CONCEPT FOR A « PILOT » FLOATING WIND FARM Sea side Land side Generator RTE substation Landing point Dynamic Underground cable cables Static cable Subsea cable Dynamic/static connection Connection to the power grid To transport the electricity produced by the 3 wind between the offshore pilot farm turbines, RTE plans to connect the pilot farm to the Public Power Transmission Network by delivering a 63 000 volt and the onshore network is the via 32 km long subsea and underground power cables responsibility of the RTE, the French to the Kerhellegant substation in Plouharnel. It will be Electricity Transmission Network. routed via a subsea cable to a landing point located in the Kerhillio area of Erdeven and then via a buried cable to the Kerhellegant substation. NAVIGATION REGULATIONS Nautical commissions, bringing together sea stakeholders and other users of the sea, have made it possible to establish recommendations that will be taken up by the Maritime Prefecture of the Atlantic (Préfecture Maritime de l’Atlantique) to define the specific navigation regulations applicable to the pilot farm. Floating wind turbines will be equipped with visual and electronic warning systems to ensure safe navigation © CDPMEM 56 and allowing recreational and fishing vessels to circulate between the units, subject to respecting local regulations and associated minimum safe distance. GROIX & BELLE-ILE FLOATING WIND FARM – FEBRUARY 2021 WHAT WILL BE SEEN FROM THE COAST A landscape study has been carried-out, considering the main Île, Houat and on the coast from Quiberon to Moëlan-sur-Mer. Here are characteristics of the coastal scenery and heritage. Multiples two examples, based on photos taken with the best possible visibility photomontages have been produced between the islands of Groix, Belle- conditions: bright and clear sky. From the port of Locmaria, Groix Distance from the nearest wind turbine : 14km Near Fort Sarah Bernhardt, Belle-Ile-en-Mer Distance from the nearest wind turbine : 19km Appointed project leader of the floating wind farm 10 place de Catalogne 75014 Paris 18 rue du sous-marin Vénus 56100 Lorient +33 (0)1 40 07 95 00 www.eolfi.com www.eoliennes-groix-belle-ile.com SADESIGN.FR - CREDITS : FEFGBI/NAVAL ENERGIES - FEFGBI SAS au capital de 5.015.170 € - 10 PLACE DE CATALOGNE 75014 PARIS € - 10 PLACE DE CATALOGNE SAS au capital de 5.015.170 ENERGIES - FEFGBI : FEFGBI/NAVAL SADESIGN.FR - CREDITS.