RP- 31 III Highway Project VOL. I Summarization of the Migrant Settlement Plan The Third Henan Highway Project is proposed to be a World Bank loan supported project. This project shall include 3 parts: -XinyangExpressway, linking highways to the Zhumadian-XinyangExpressway and rural roads (location of the

Public Disclosure Authorized project see schematicmap).

Zhumadian-XinyangExpressway is an important part of -ZhuhaiNational Trunk Highway (NTH), which shall connect two important areas in south of Henan Province---ZhumadianPrefecture and City. It shall start from the terminalof -ZhumadianExpressway (under construction), go along the east side of Beijing-GuangzhouRailway, run through the south part of Henan Province, pass ,Queshan Countyand Pingqiao ,and end in the east of Xinyang City where the interchangeshall overpassthe NationalHighway 312, with total length of 95 .52 km. IThisProject is planed to commencein June 2000 and complete in June 2003. Public Disclosure Authorized The linking highways, as attachmentfacilities to the Expresswayshall fuinctionto convert and divert the traffic flow, will directly influencethe integral benefit of the Expressway.Along the route of the Zhumadian-XinyangExpressway, There are five linking highways connectingthe Expresswayto the local roads, they are Zhumadian Linking Highway, Queshang Linking Highway, Minggang Linking Highway, FenjiatangLinking Highway and Guopeng LinkingHighway.

The rural roads, as a attachmentproject to the Expressway,is also an importantpart of the WorldBank loan supportedproject. A Rural Roads ImprovementPlan, combining

Public Disclosure Authorized with the " the 9thfive-year-plan in highway network of Henan Province",is drawn up. This plan includes9 systems, which contains 272kmlong rural roads to be improved or upgraded with total estimated cost of 224.10 million RMB. Seven impoverished counties including Shancai, Pinyu, Xixian, Luoshan, Guangshan, ShAgcheng, Xinxian and Pinqiao District in Xinyang City are invloved in this plan. The fulfil of this improvementplan shall greatly advancethe economicaldevelopment of the said impoverished areas and shall enhance the traffic capacity of the rural roads.

The implementationof the Henan III Highway Project shall occupy a certain of land permanently and temporarily, demolish some of the attachments in the land requisitioned,therefore the normal life and production of the residences along the Public Disclosure Authorized highway shall be influenced in various degrees. In order to handle these issues properly,have the residencesaffected got reasonable compensatedand resettled, and safeguard the migrants lawful rights and benefit, the Migrant SettlementPlan is due prepared.The Migrant SettlementPlan for the third Henan Project includesthree parts, i.e. the Migrant Settlement Plan for Zhumadian-XinyangExpressway, the Migrant Settlement Plan for Linking Highways to Zhumadian-XinyangExpressway and the Migrant SettlementPolicies for Rural Roads ImprovementProject (attachedbelow).

The total permanent land requis tion for this project shall be 9,753.6mu, the temporary land requisition 2,0711 mu, and the houses to be demolished shall be 43,693sq.m.The total compensationcost shall be 242.21065million yuan RMB and the peopleaffected shall be 8,586. In which, for Zhumadian-XinyangExpressway, the permanent lRdjequisition shall be 9,0'4mu, while the temporary land requisition shall be 1 mu, houses removal shall be 31,752sq.r, which totally need 218.760723million yuan RMB for compensationwith 4,920 affected people. For the linking roads, the permanent lend requisition shall be 67§.6imu,while the temporary land requilition shall be 687b3mu,houses removal shall be 11,941sq.m,which totally need 23.449936million yuan RMB for compensation with 3,666affected people. Generally,the rural roads improvementproject shall not need land requisition.If there need any land requisition, the migrant settlement shall be carried out accordingto the policies given in "the Migrant Settlement Policies for Rural Roads Improvement Project".

2 ? .X, . 7-

2 enan mHighway Project Schematic Map .+'

:~~~~~~~~~~~~~~~~~~~~~~~~~~~:Z.

34~~ ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~~~~~~~~~~~"

{ owa g 5 i~~~~~~- t~^ / k l iIj;*w 7 f \ \ F~~~~~~~ZengztnLndgCty(RnRsso*t~.Gaghnou

s \ / | /2 > \ XuopengL}nkitHloy -1X- ouny@t~~~~~~~~~~~~Shngel Rural)Roads) asegonyR Zeumsdtang LiSeJUg Eigw,7 '. uasanCut(urlRd) upng Linking HigIr*uy Jll County~ (Rural Rosds)O, -

MinggangHitbv-y Linidng yj CountychenguraunRoa(R)

Xinyang Luoshsn ~~~County(R/ ral Ro*kdi