Telangana State Information Commission

Total Page:16

File Type:pdf, Size:1020Kb

Telangana State Information Commission TELANGANA STATE INFORMATION COMMISSION (Under Right to Information Act, 2005) Samachara Hakku Bhavan, D.No.5-4-399, ‘4’ Storied Commercial Complex, Housing Board Building, Mojam Jahi Market, Hyderabad – 500 001. Phone Nos: 040-24740665 (o); 040-24740592(f) Appeal No. 13162/CIC/2018 Dated: 05-08-2019 Appellant : Sri Kamireddy Nagireddy, Bhadadri Kothagudem District-507114. Respondents : 1.The Public Information Officer (U/RTI Act, 2005) / O/o The Forest Divisional Officer, Kothagudem, Bhadradri Kothagudem District. 2.The Public Information Officer (U/RTI Act, 2005) / O/o The Forest Divisional Officer, Yellandu, Bhadradri Kothagudem District. 3.The Public Information Officer (U/RTI Act, 2005) / O/o The Forest Divisional Officer, Paloncha, Bhadradri Kothagudem District. 4.The Public Information Officer (U/RTI Act, 2005) / O/o The Forest Divisional Officer, Manuguru, Bhadradri Kothagudem District. 5.The Public Information Officer (U/RTI Act, 2005) / O/o The Forest Divisional Officer, Bhadrachalam, Bhadradri Kothagudem District. 6.The Public Information Officer (U/RTI Act, 2005) / O/o The Forest Divisional Officer, Wild Life Management, Kinnerasani, Bhadradri Kothagudem District. The Appellate Authority (U/RTI Act, 2005) / O/o The District Forest Officer, Forest Department, Kothagudem, Bhadradri Kothagudem District. O R D E R 1. Sri Kamireddy Nagireddy, Bhadradri Kothagudem District-507114 has filed 2nd appeal dated 25-09-2018 which was received by this Commission on 25-09-2018 for not getting the information sought by him from the PIO-1 / O/o The Forest Divisional Officer, Kothagudem, Bhadradri Kothagudem District, PIO-2 / O/o The Forest Divisional Officer, Yellandu, Bhadradri Kothagudem District, PIO-3 / O/o The Forest Divisional Officer, Paloncha, Bhadradri Kothagudem District, PIO-4 / O/o The Forest Divisional Officer, Manuguru, Bhadradri Kothagudem District, PIO-5 / O/o The ForestTSIC Divisional Officer, Bhadrachalam, Bhadradri Kothagudem District, PIO-6 / O/o The Forest Divisional Officer, Wild Life Management, Kinnerasani, Bhadradri Kothagudem District and 1st Appellate Authority / O/o The District Forest Officer, Forest Department, Kothagudem, Bhadradri Kothagudem District. 2. The brief facts of the case as per the appeal and other records received along with it are that the appellant herein filed an application dated 04-01-2018 before the PIO / O/o. The Dist. Revenue Officer, Bhadradri Kothagudem District under Sec.6(1) of the RTI Act, 2005, requesting to furnish the information on the following points mentioned in his application: P.T.O Note: This is system generated copy and no signature is required. ::2:: 3. The Public Information Officer / O/o. The Dist. Forest Officer, Bhadradri Kothagudem District vide Rc.No.27/2018/D3, dated 27-01-2018 has transferred the application u/s 6(3) of the RTI Act to the Public Information Officers / O/o. The Forest Divisional Officers, Kothagudem, Yellandu, Paloncha, Manuguru, Bhadrachalam, WLM Kinnerasani, Bhadadri Kothagudem District to furnish the information directly to the Complainant under intimation to their office. 4. Since the appellant did not receive the information from the Public Information Officer, he filed 1st appeal dated 13-06-2018 before the 1st Appellate Authority u/s 19(1) of the RTI Act, 2005 requesting him to furnish the information sought by him. 5. The 1st Appellate Authority has not responded to the Appellant. 6. As the appellant did not get the information from the Public Information Officer / 1st Appellate Authority even after 30 days of filing his 1st appeal, he preferred this 2nd appeal before this Commission u/s 19(3) of the RTI Act, 2005 requesting to take action against the PIO and 1st Appellate Authority for not furnishing information sought by him and also to arrange to furnish the information sought by him. The Appeal was taken on file and notices were issued to both the parties for hearing on 05-08-2019. The case is called on 05-08-2019. The Appellant is present. The Public Information Officer-1 / Sri P. V. Ramana, Superintendent, O/o The Forest Divisional Officer, Kothagudem, Bhadadri Kothagudem District is present. The Public Information Officer-2 / Sri V. V. Swamy, Superintendent, O/o The Forest Divisional Officer, Yellandu, Bhadadri Kothagudem District is present. The Public Information Officer-3 / Sri K. Padmaja, Superintendent O/o The Forest Divisional Officer, Paloncha, Bhadadri Kothagudem District is present. The Public Information Officer-4 / Sri Ch. Venkateswara Rao, Superintendent, O/o The Forest Divisional Officer, Manuguru, Bhadadri Kothagudem District is present. The Public Information Officer-5 / Sri B. Rama Krishna, Superintendent, O/o The Forest Divisional Officer, Bhadrachalam, Bhadadri Kothagudem District is present. The Public Information Officer-6 / Sri A. Nageswar Rao, Superintendent, O/o The Forest Divisional Officer, Wild Life Management, Kinnerasani, Bhadadri Kothagudem District is present. The First Appellate Authority is absent. The Appellant submitted that after receipt of notice from the Commission, the PIOs have furnished the sought information. He also submitted that the PIOs are not aware of the provisions of the RTI Act and action should be taken on the persons responsible. The Public Information Officer-1 submitted that vide letter Rc. No. 684/09/A5 dated 30-07-2019, information was furnished to the appellant. He submitted that there was delay because the Appellant was seeking information from 1950 onwards and also on account of reorganization of Divisions. The Public Information Officer-2 submitted that vide letter Rc. No.150(i)/2018/Y7(RTI) dated 02-08-2019, information was furnished to the appellant. The Public Information Officer-3 submitted that vide letter Rc. No.1213/2018/P5 dated 30-07-2019, information was furnished to the appellant under acknowledgment. TSIC The Public Information Officer-4 submitted that vide letter Rc. No.151/2018/M8 dated 30-07-2019, information was furnished to the appellant. The Public Information Officer-5 submitted that vide letter Rc. No.322/2018/B9 dated 05-08-2019, information was furnished to the appellant. The Public Information Officer-6 submitted that vide letter Rc. No.31/2018/K6(RTI) dated 31-07-2019, information was furnished to the appellant. The Commission directed the Public Information Officers to furnish once again the above information with due attestation to the appellant within two weeks from the date of receipt of this order. With the above direction, the appeal is closed. Dr. Raja Sadaram Soma Chief Information Commissioner Authenticated by: Section Officer CIC (Peshi-3) Copy to: - IT Section/SF Note: This is system generated copy and no signature is required..
Recommended publications
  • Separating Indian Military and Civilian Nuclear Facilities
    Separating Indian Military and Civilian Nuclear Facilities Institute for Science and International Security (ISIS) By David Albright and Susan Basu December 19, 2005 The agreement announced on July 18, 2005 by President George Bush and Prime Minister Manmohan Singh regarding the establishment of a U.S.-India “global partnership” will require changes to U.S. non-proliferation laws and policies and could dramatically increase nuclear and nuclear-related commerce with India. Part of this agreement is an Indian commitment to separate its civil and military nuclear programs and put declared civil facilities under international safeguards. Safeguards should apply in perpetuity, with minor, standard exceptions that do not include use in nuclear explosives or weapons. In addition, safeguarded nuclear material should not co-mingle with unsafeguarded nuclear material in any facility, unless this unsafeguarded nuclear material also comes under safeguards. This latter condition is an example of “contamination,” a key principle of safeguards. Although these conditions do not appear to have been accepted by India, they are necessary to prevent civil nuclear cooperation from benefiting India’s nuclear weapons program. To accomplish these goals, India needs to place all its nuclear facilities not directly associated with nuclear weapons production or deployment under safeguards. India has many civil nuclear facilities in this category. In addition, India should place its nuclear facilities associated with its naval nuclear fuel cycle under international safeguards. Exempting such naval-related facilities from safeguards would undermine efforts to safeguard such facilities in non-nuclear weapon states party to the Nuclear Non-Proliferation Treaty. Brazil accepted safeguards on its prototype naval reactor and its enrichment plants at Aramar dedicated to the production of naval reactor fuel.
    [Show full text]
  • List Police Station Under the District (Comma Separated) Printable District
    Passport District Name DPHQ Name List of Pincode Under the District (Comma Separated) List Police Station Under the District (comma Separated) Printable District Saifabad, Ramgopalpet, Nampally, Abids , Begum Bazar , Narayanaguda, Chikkadpally, Musheerabad , Gandhi Nagar , Market, Marredpally, 500001, 500002, 500003, 500004, 500005, 500006, 500007, 500008, Trimulghery, Bollarum, Mahankali, Gopalapuram, Lallaguda, Chilkalguda, 500012, 500013, 500015, 500016, 500017, 500018, 500020, 500022, Bowenpally, Karkhana, Begumpet, Tukaramgate, Sulthan Bazar, 500023, 500024, 500025, 500026, 500027, 500028, 500029, 500030, Afzalgunj, Chaderghat, Malakpet, Saidabad, Amberpet, Kachiguda, 500031, 500033, 500034, 500035, 500036, 500038, 500039, 500040, Nallakunta, Osmania University, Golconda, Langarhouse, Asifnagar, Hyderabad Commissioner of Police, Hyderabad 500041, 500044, 500045, 500048, 500051, 500052, 500053, 500057, Hyderabad Tappachabutra, Habeebnagar, Kulsumpura, Mangalhat, Shahinayathgunj, 500058, 500059, 500060, 500061, 500062, 500063, 500064, 500065, Humayun Nagar, Panjagutta, Jubilee Hills, SR Nagar, Banjarahills, 500066, 500067, 500068, 500069, 500070, 500071, 500073, 500074, Charminar , Hussainialam, Kamatipura, Kalapather, Bahadurpura, 500076, 500077, 500079, 500080, 500082, 500085 ,500081, 500095, Chandrayangutta, Chatrinaka, Shalibanda, Falaknuma, Dabeerpura, 500011, 500096, 500009 Mirchowk, Reinbazar, Moghalpura, Santoshnagar, Madannapet , Bhavaninagar, Kanchanbagh 500005, 500008, 500018, 500019, 500030, 500032, 500033, 500046, Madhapur,
    [Show full text]
  • Pre Feasibility Report of Manuguru Opencast Mine
    RESTRICTED CIRCULATION Pre Feasibility Report of Manuguru Opencast Mine (Mining Plan (Revision-2) (Including Mine Closure Plan) For Manuguru Mining Lease Rajupeta (Village), Manuguru (Mandal) Manuguru Area (Capacity - 2.10 Mty) Department of Project Planning (ISO 9001:2015 Certified) P.O. Kothagudem Collieries - 507 101. Dist: Bhadradri State: Telangana April, 2019 (Base date- April’2018) PFR of Manuguru Opencast Mine (Mining Plan (Revision-2) (Including Mine Closure Plan) For Manuguru Mining Lease) Manuguru Area INDEX Description Page No. Location Plan Plate-I Text 1 - 40 List of Plates Topographical Plan Plate - II Geological Plan Plate-III Pre-Mining Land Use Plan Plate-IV Initial Stage Plan ( As on 01.04.2018) Plate - V Final Year Stage Plan Plate - VI During Mining Land Use Plan Plate - VII Mine Closure/ Reclamation Plan Plate – VIII List of Annexures Copy of Approved MP&MCP Annexure – 1 Copy of Mining Leases Annexure -2 &2A Copy of Board approval of Mine Annexure-3 Closure Cost Copy of Environmental Clearance Annexure -4 Copies of Consent For Establishment & Annexure-5 & 5A Consent For Operation Copy of Forest Clearances Annexure -6 & 6A The Singareni Collieries Company Limited 1. EXECUTIVE SUMMARY 1.1. Introduction: Manuguru Opencast Mine is an operating opencast mine which belongs to M/s. The Singareni Collieries Company Limited (A Govt. Company). The project is located in Bhadradri district of Telangana State. The project was planned up to 200m depth of Index-1 seam. Currently, the project is being worked by shovel dumper technology with an annual capacity of 1.50 MT. 1.2. Location: Manuguru Opencast Mine lies in Northeastern extremity of Manuguru coal belt.
    [Show full text]
  • Ramanujavaram (Gp) Vijayanagaram Sand Reach Godavari River, Ramanujavaram (Gp) Vijayanagaram Village, Manuguru Mandal, Bhadradri Kothagudem District, Telangana State
    RAMANUJAVARAM (GP) VIJAYANAGARAM SAND REACH GODAVARI RIVER, RAMANUJAVARAM (GP) VIJAYANAGARAM VILLAGE, MANUGURU MANDAL, BHADRADRI KOTHAGUDEM DISTRICT, TELANGANA STATE PROPOSED SAND MINING AT GODAVARI RIVER - 24.0 ha SUBMITTED BY STUDIES AND DOCUMENTATION BY M/s. Telangana State Mineral Development TEAM Labs and Consultants Corporation Limited B-115, 116, 117 & 509, Annapurna Block, H. No. 6-2-915,4th Floor, Rear block, Aditya Enclave, Ameerpet, HMWSSB Premises, Khairathabad, Hyderabad-500 038 Hyderabad – 500 004 Phone: 040-23748 555/616, Telefax: 040-23748666 Email: [email protected] SUBMITTED TO STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, TELANGANA STATE GOVERNMENT OF INDIA Telangana State Mineral Development Corporation Limited Form-1 APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information S. No. Item Details 1 Name of the Project/s Ramanujavaram (GP) Vijayanagaram Sand Reach, Godavari River by M/s. Telangana State Mineral Development Corporation Limited, Government of Telangana 2 S. No in the Schedule 1(a) 3 Proposed capacity/area/length/tonnage to Lease area is 24.0 Ha. be handled/command area/lease area/ (Sand mining – 240000 m3/annum). number of wells to be drilled Estimated cost of project Rs. 40 Lakhs 4 New/Expansion/Modernization New 5 Existing Capacity/Area etc. -NA- 6 Category of Project i.e 'A' or 'B' B1 7 Does it attract the general condition? If yes, No please specify. 8 Does it attract the Specific condition? If yes, No please specify. 9 Location Plot/Survey/Khasra No. North Latitude East Longitude 18°00'35.40"N 80°48’25.27"E 18°00'29.64"N 80°48'16.94"E 18°00'14.53"N 80°48'39.22"E 18°00'20.71"N 80°48'47.46"E Village Ramanujavaram (GP) Vijayanagaram Tehsil Village, Manuguru Mandal, Bhadradri District Kothagudem District, Telangana State State 10 Nearest railway station/airport along with Railway Station : Manuguru Railway distance in kms.
    [Show full text]
  • Hot Water Seepage Into Shallow Coal Mines of Manuguru Coalbelt
    IMWA Proceedings 1985 | © International Mine Water Association 2012 | www.IMWA.info MINE WATER. GRANADA, SPAIN.1985 HOT WATER SEEPAGE INTO SHALl...OW COAL l<UNES OF MM"'UGURU COALBEL'r, GODAVARI VALLEY CO!..LFIELD ANDHRA PRADESH, INDIA. Krishna Murthy.K.· Mattaiah.G. Venkatappaiah.A. Singareni Collieries Company Limited, Kothagudem Collieries-507101, Andhra Pradesh, India ABSTRACT Occurrence of hot wa~er in shallow coal mines of Permian age in !1anuguru coalbelt, without: apparent igneous activity is being reported for the first time in this country. A number of hot arld cold springs aL·e locG.ted in and around this coal­ belt in fault zones. This anomalous thermal gradient is possibly due to the spatial redistribution of heat by convec­ tion in ground water, flowing through high permeability conduits in the basement rocks extending into the overlying lower Gondwana sediments of this coalbclt. It is estimated that the thermal reservoir temperature is arour.d 150°C. It is likely that the thermal "\-later emerge onto the surface after thE circulation of the meteoric watE:or mainly through Archaean gneisses which ,:c;re t.he basement rocks, upto depths of about 5 kms. The waters both in tho shallo•,; and deep aquifer systems hcove a high fluoride and silica contents. INTROOOCTION Hot water seepage (41°C} were encountered in two coal mines in the Hanuguru coal belt of Godavari Valley Coalfield, Andhra Pradesh, India, at very shallow depths of 70 to 140m. This is the first recorded occurrence of hot water in a coal mine in this country which is apparently not connected with any igneous activity.
    [Show full text]
  • Nuclear India VOL
    Website : http:// www.dae.gov.in ISSN-09929-5523 Nuclear India VOL. 40/NO.1-2/Jul.-Aug. 2006 540 MWe Unit-3 of Tarapur Atomic Power Project synchronized with the grid The 540 MWe, Unit-3 of Tarapur Atomic Power Project (TAPP-3) was synchronized with the grid on June 15. Atomic Energy Regulatory Board (AERB) has authorised synchronisation of the unit and raising its power level The 540 MWe Unit-3 of Tarapur Atomic Power Project (TAPP-3) attained criticality on May 21, 2006. This signifies the start of self-sustaining nuclear fission chain reaction in the reactor core. The criticality of Unit-3 came about two months ahead of schedule. Last year Unit-4 of this project, had achieved criticality on March 6. Designed and built by the Nuclear Power Corporation of India Limited (NPCIL), a public sector undertaking under the Department of Atomic Energy (DAE), TAPP-3 is the 16 th nuclear power reactor in the country. Many DAE units have provided valuable research and development and material inputs. Indian industry too played a major role in the supply of critical equipment and in meeting highly crashed construction schedules. Tarapur Atomic Power Project -3&4 (TAPP-3&4) comprises two Pressurised Heavy Water Reactor (PHWR) units of 540 MWe each. PHWRs use natural uranium fuel and heavy water both as moderator and coolant. TAPP-3&4, India ‘s largest nuclear power plant has been built in the shortest time of any PHWR in India. This gestation period is comparable to international benchmarks. All major milestones of TAPP-3 have been achieved ahead of schedule.
    [Show full text]
  • Meos & MIS Co-Ordinators
    List of MEOs, MIS Co-orfinators of MRC Centers in AP Sl no District Mandal Name Designation Mobile No Email ID Remarks 1 2 3 4 5 6 7 8 1 Adilabad Adilabad Jayasheela MEO 7382621422 [email protected] 2 Adilabad Adilabad D.Manjula MIS Co-Ordinator 9492609240 [email protected] 3 Adilabad ASIFABAD V.Laxmaiah MEO 9440992903 [email protected] 4 Adilabad ASIFABAD G.Santosh Kumar MIS Co-Ordinator 9866400525 [email protected] [email protected] 5 Adilabad Bazarhathnoor M.Prahlad MEO(FAC) 9440010906 n 6 Adilabad Bazarhathnoor C.Sharath MISCo-Ord 9640283334 7 Adilabad BEJJUR D.SOMIAH MEO FAC 9440036215 [email protected] MIS CO- 8 Adilabad BEJJUR CH.SUMALATHA 9440718097 [email protected] ORDINATOR 9 Adilabad Bellampally D.Sridhar Swamy M.E.O 7386461279 [email protected] 10 Adilabad Bellampally L.Srinivas MIS CO Ordinator 9441426311 [email protected] 11 Adilabad Bhainsa J.Dayanand MEO 7382621360 [email protected] 12 Adilabad Bhainsa Hari Prasad.Agolam MIS Co-ordinator 9703648880 [email protected] 13 Adilabad Bheemini K.Ganga Singh M.E.O 9440038948 [email protected] 14 Adilabad Bheemini P.Sridar M.I.S 9949294049 [email protected] 15 Adilabad Boath A.Bhumareedy M.E.O 9493340234 [email protected] 16 Adilabad Boath M.Prasad MIS CO Ordinator 7382305575 17 Adilabad CHENNUR C.MALLA REDDY MEO 7382621363 [email protected] MIS- 18 Adilabad CHENNUR CH.LAVANYA 9652666194 [email protected] COORDINATOR 19 Adilabad Dahegoan Venkata Swamy MEO 7382621364 [email protected] 20
    [Show full text]
  • THE TELANGANA MUNICIPALITIES ACT, 2019. (ACT NO. 11 of 2019) ARRANGEMENT of SECTIONS Sections CHAPTER - I PRELIMINARY and DEFINITIONS 1
    THE TELANGANA MUNICIPALITIES ACT, 2019. (ACT NO. 11 OF 2019) ARRANGEMENT OF SECTIONS Sections CHAPTER - I PRELIMINARY AND DEFINITIONS 1. Short title, extent, application and commencement. 2. Definitions. CHAPTER II CONSTITUTION AND COMPOSITION OF MUNICIPALITIES 3. Constitution of Municipalities. 4. Power of Government over property of Municipalities. COMPOSITION OF MUNICIPALITIES 5. Composition of Municipality. 6. Division of Municipalities into wards for the purpose of election of members of the Municipal Council. 7. Reservation of seats. 8. Oath of the members. 9. Action by Commissioner and member after the member ceases office. 10. Term of office of members of Municipality. 11. Qualifications of candidates. 12. General disqualifications. 2 [Act No. 11 of 2019] 13. Authority to decide questions of disqualification of members. 14. Special provision in the case of newly- constituted and reconstituted municipalities. 15. Vacancies of members. 16. Procedure when no member is elected. 17. Appointment of Committees. 18. Acts of the Municipality not to be invalidated by defect in constitution and vacancy. MUNICIPAL AUTHORITIES 19. Municipal Authorities. 20. Election of Chairperson and Vice-Chairperson. 21. Resolution of disputes relating to cessation for disobedience of party whip. 22. Oath of the office of the Chairperson or Mayor. 23. Duties and Responsibilities of the Chairperson. 24. Municipality wise “Green Action Plan”. 25. Function of Chairperson to incur contingent expenditure. 26. Emergency powers of the Chairperson. 27. Delegation and devolution of functions of Chairperson. 28. Reservation of the office of the Chairperson. 29. Reservation of the office of the Mayor. 30. Constitution of Ward Committees. 31. Functions of the Ward Committee. 32.
    [Show full text]
  • Details of Staff Working at Dist. / Constituency / Mandal Level As on 27-07-2019
    GOVERNMENT OF TELANGANA DEPARTMENT OF HORTICULTURE & SERICULTURE Details of Staff Working at Dist. / Constituency / Mandal Level as on 27-07-2019 INDEX Page Numbers Page Numbers S.No District Name S.No District Name From -- To From -- To 1 Adilabad 1 to 2 17 Mahabubnagar 29 to 30 2 Nirmal 3 to 4 18 Narayanapet 31 3 Mancherial 5 to 6 19 Nagarkurnool 32 to 33 4 Komarambheem 7 20 Gadwal 34 to 35 5 Karimnagar 8 to 9 21 Wanaparthy 36 to 37 6 Peddapalli 10 22 Vikarabad 38 to 39 7 Jagityal 11 to 12 23 Rangareddy 40 to 41 8 Siricilla 13 24 Medchal 42 9 Warangal ( R) 14 to 15 25 Sangareddy 43 to 44 10 Warangal(U) 16 to 17 26 Medak 45 to 46 11 Bhupalapally 18 to 19 27 Siddipiet 47 to 48 12 Mulugu 20 28 Nizamabad 49 to 50 13 Mahbubabad 21 to 22 29 Kamareddy 51 to 52 14 Jangaon 23 to 24 30 Nalgonda 53 to 55 15 Khammam 25 to 26 31 Suryapet 56 to 57 16 Kothagudem 27 to 28 32 Yadadri 58 to 59 Statement showing the Officer & Staff working in Horticulture & Sericulture Department No. of Assembly Constituencies : 2 Adilabad Constituency = 5 mandals Boath Constituency = 9 mandals Name of the new District:- No. of Mandals : 18 ADILABAD Part of Khanapur Constituency = 2 mandals Part of Asifabad constituency = 2 mandals Total mandals = 18 Sl. Name of the Employee Head Quarters / Assembly No. of Name of the Designation Name of the Mandals (Jurisdiction) No. Sarvasri/ Smt./ Kum. Constituency Mandals MLH&SO A - District Level Horticulture & Sericulture Officer Mulug, Venkatapur, Govindaraopet, K.Venkateshwarlu PD/ DH&SO, Adilabad 1 Adilabad Tadvai, Eturnagaram, Mangapet, 7997724995 (DDO - Adilabad ) Kannaigudem, Wajedu, Venkatapuram B - Constituency Level Officers Adilabad 1 Adilabad (R), Ch.Pranay Reddy MLH&SO(MIP) G.Srinivas Boath 1 Bheempur 7997725008 1 HO(T)/ CLH&SO 7997725002 A.
    [Show full text]
  • ANDHRA PRADESH STATE CO-OPERATIVE BANK LTD.Pdf
    STATE DISTRICT BRANCH ADDRESS CENTRE IFSC CONTACT1 CONTACT2 CONTACT3 MICR_CODE The Adilabad Adilabad District D. District cooperative Central Shashikant cooperative Bank Ltd., Adilabad, A.R. Naik h ANDHRA Central Bank Ltd, Cinema Road, 08732- Savitha 849808988 PRADESH ADILABAD Adilabad Adilabad – 504001 ADILABAD APBL0019002 232339 8498089831 2 Adilabad District The Adilabad cooperative Central District Bank Ltd., Br. G. Ashwin cooperative Asifabad, Gandhi Narsaiah Kumar ANDHRA Central Bank Ltd, Chowk, Asifabad – 08733- Narsaiah 849808989 PRADESH ADILABAD Asifabad 504293. ASIFABAD APBL0019003 279517 8498089893 6 The Adilabad District Adilabad District Cooperative cooperative Central K.C.Mohan Central Bank Ltd, Bank Ltd., Adilabad, Reddy I. Pranitha ANDHRA Head office Cinema Road, 08732- E. Mallaiah 849805387 PRADESH ADILABAD Branch Adilabad - 504001 ADILABAD APBL0019001 232339 8498089818 8 Adilabad District cooperative Central The Adilabad Bank Ltd, Br. District Bellampally, Beside K. S. cooperative Telephone Exchange, Gangaiah Chaitanya ANDHRA Central Bank Ltd, Coll Tax, Bellampally- BELLAMPAL 08735- K. Gangaiah 849808989 PRADESH ADILABAD Bellampalli 504251 LI APBL0019004 222158 8498089898 9 Adilabad District The Adilabad cooperative Central District Bank Ltd., Br. Bhainsa, Bheemend L. Richa cooperative Narsimlu Nagar, er Rani ANDHRA Central Bank Gandhi Ashram, 08752- Bheemender 849808986 PRADESH ADILABAD Ltd,Bhainsa Bhainsa – 504103. BHAINSA APBL0019006 231058 8498089903 4 The Adilabad Adilabad District District cooperative Central Bhaskar Chandra cooperative Bank Ltd., Br. Boath, Reddy Shekar ANDHRA Central Bank Agriculture Godown 08751- Bhaskar Reddy 849805385 PRADESH ADILABAD Ltd,Boath Road, Boath – 504304. BOATH APBL0019005 245225 8498089849 7 Adilabad District The Adilabad cooperative Central District Bank Ltd., Br. cooperative Chennur, Gandhi Rama Rao P. Shailaja ANDHRA Central Bank Chowk, Chennur- 08737- Rama Rao 849808988 PRADESH ADILABAD Ltd,Chennur 504201.
    [Show full text]
  • India's Nuclear Program
    India’s Nuclear Program: History, Issues and role in global nuclear politics By M Suleman Shahid Updated:- May, 2017 Introduction India’s nuclear weapons program is a cornerstone of New Delhi’s security strategy for the 21st century. For most of the post-war period, India badly trailed the established nuclear powers in weapon quality, quantity, and the sophistication of delivery systems. In recent years, however, India has indicated a willingness to take the steps necessary to becoming a first rate nuclear power[1]. History The Indian nuclear program evolved before the partition of United Hindustan. In 1944, Dr. Homi Jahangir Bhaba submitted proposal to Sir Durab Tata Trust in order to build the Nuclear Research Institute (NRI)[2]. Sir Durab was the uncle of Dr. Bhaba and well known wealthy businessman of India. Soon the NRI established in Bangalore on the fund of Tata Trust, after its completion in 1945. The name was also given to it on Tata Trust i.e., Tata Institute of Fundamental Research (TIFR)[3]. Dr. Bhaba became the first Director of TIFR[4]. In the end of 1945 Bhaba shifted the TIFR in Bombay, where it is still working on nuclear research since its inception[5]. On August 15, 1947, India got independence from British rule and year later it passed the country Atomic Energy Act and crafted the Indian Atomic Energy Commission (AEC)[6]. The essential purpose of AEC was carried out the in-depth studies of nuclear research and encompassed three associates, Dr. Bhabha, Dr. Krishnan and Dr. S.S. Bhatnagar[7].
    [Show full text]
  • Government Degree College Manuguru
    Estd: 2008 College code: 2430 GOVERNMENT DEGREE COLLEGE MANUGURU An ISO 9001:2015 Certified Institution & Affiliated to Kakatiya University, Warangal Samithi singaram, Besides Bus Depot Manuguru, Manuguru (M), Bhadradri Kothagudem (Dt), Telangana-507117, email: [email protected]. SEMINAR HALL (DIGITAL CLASS ROOM-1) Estd: 2008 College code: 2430 GOVERNMENT DEGREE COLLEGE MANUGURU An ISO 9001:2015 Certified Institution & Affiliated to Kakatiya University, Warangal Samithi singaram, Besides Bus Depot Manuguru, Manuguru (M), Bhadradri Kothagudem (Dt), Telangana-507117, email: [email protected]. DIGITAL CLASS ROOM-2 Estd: 2008 College code: 2430 GOVERNMENT DEGREE COLLEGE MANUGURU An ISO 9001:2015 Certified Institution & Affiliated to Kakatiya University, Warangal Samithi singaram, Besides Bus Depot Manuguru, Manuguru (M), Bhadradri Kothagudem (Dt), Telangana-507117, email: [email protected]. DIGITAL CLASS ROOM-3 Estd: 2008 College code: 2430 GOVERNMENT DEGREE COLLEGE MANUGURU An ISO 9001:2015 Certified Institution & Affiliated to Kakatiya University, Warangal Samithi singaram, Besides Bus Depot Manuguru, Manuguru (M), Bhadradri Kothagudem (Dt), Telangana-507117, email: [email protected]. VIRRTUAL CLASSROOM Estd: 2008 College code: 2430 GOVERNMENT DEGREE COLLEGE MANUGURU An ISO 9001:2015 Certified Institution & Affiliated to Kakatiya University, Warangal Samithi singaram, Besides Bus Depot Manuguru, Manuguru (M), Bhadradri Kothagudem (Dt), Telangana-507117, email: [email protected]. Estd: 2008 College code: 2430 GOVERNMENT DEGREE COLLEGE MANUGURU An ISO 9001:2015 Certified Institution & Affiliated to Kakatiya University, Warangal Samithi singaram, Besides Bus Depot Manuguru, Manuguru (M), Bhadradri Kothagudem (Dt), Telangana-507117, email: [email protected]. Estd: 2008 College code: 2430 GOVERNMENT DEGREE COLLEGE MANUGURU An ISO 9001:2015 Certified Institution & Affiliated to Kakatiya University, Warangal Samithi singaram, Besides Bus Depot Manuguru, Manuguru (M), Bhadradri Kothagudem (Dt), Telangana-507117, email: [email protected].
    [Show full text]