ADP and COB 2020

Total Page:16

File Type:pdf, Size:1020Kb

ADP and COB 2020 METRO MIDSAYAP WATER DISTRICT 007 Poblacion 8, Midsayap, Cotabato (North) Province Annual Development Plan for the CY 2020 Ref MAJOR FINAL OUTPUT Target/s Primary Responsible Time Frame Budget 1 WATER FACILITY SERVICE MANAGEMENT 1.1 Service Expansion and Improvement 1.1.1 To provide 24/7 water service to customers 1.1.1.1 Ensure provision of water service 24/7 and maintain a desirable water pressure from pump stations 1.1.1.1.01 Provide budget for power consumption at Pump At least 90% of the pump stations’ operation will PED-PWQS RADS, OIM, JFT, Monthly January to 5,443,200.00 NSP Stations (PSs) and Booster Pumps (BPs). Monitor not be interrupted due to non- monitoring of JGSA, NRDT December DRMP, WSP and ensure payment of the monthly power electricity consumption consumption of PSs and BPs. 1.1.1.1.02 Provide budget for fuel of generator sets. Monitor At least 90% of black-out period are powered with PED-PWQS RADS, OIM, JFT, Monthly January to 360,800.00 NSP DRMP, WSP and ensure availability of fuel of generator sets. generator sets ACD-AS-PMG JGSA, JOS, NRDT December 1.1.1.1.03 Provide budget for the maintenance of generator At least once per quarter, generator sets are PED-PWQS RADS, OIM, JFT, Quarterly As scheduled 90,000.00 NSP sets. Conducts regular maintenance check-up, maintained JGSA, NRDT DRMP, WSP change oil and filter of every generator sets. 1.1.1.1.04 Conduct regular predictive maintenance of At least once per semester-all pumps and motors PED-PWQS RADS, JFT, JGSA, Semestral As scheduled 25,920.00 NSP pumping facilities. of active pump stations are scheduled for PED-ECS PBD, RMA, ABP, DRMP, WSP preventive maintenance pull-out OIM, NRDT 1.1.1.1.05 Maintenance and upgrading of pull-out tools and Pull-out tools, equipment and appurtenances for PED-PWQS RADS, JFT, JGSA, Within the year As scheduled 76,200.00 NSP OIM, NRDT DRMP, WSP equipment. Purchase additional and regularly pump stations are 100% available and serviceable clean pull-out tools and equipment. 1.1.1.1.06 Provide spare for all pumping facilities. Purchase At least 90% of the spare equipment are available PED-PWQS NRDT Within the year As scheduled 806,160.00 NSP DRMP, WSP spare pump, motor and accessories as needed 1.1.1.1.07 Provide standby power/generator sets to all PSs At least 1 generator set will be recommended for PED-PWQS NRDT Within the year As scheduled 750,000.00 NSP DRMP, WSP and BPs. Recommend purchase of generator sets provision to active PSs to all PSs and BPs. 1.1.1.2 Ensure that sufficient water supply and desirable water pressure is maintained Ref MAJOR FINAL OUTPUT Target/s Primary Responsible Time Frame Budget 1.1.1.2.01 Closely monitor activities of Supplier for Bulk BWS production are 100% recorded and PED-PWQS RADS, OIM, JFT, Monthly January to 21,734,692.26 NSP Water Supply to ensure delivery of supply of monitored JGSA, NRDT December WSP water. Increase the minimum volume supplied by the BWS from 2500cmd to 4300cmd 1.1.1.2.02 Close coordination with the plant supervisor so BWS water interruption are 100% forwarded to CS PED-PWQS RADS, OIM, JFT, Monthly As necessary - NSP that any water interruption will be forwarded to CS for announcement JGSA, NRDT DRMP, WSP for announcement 1.1.1.2.03 Drilling of Additional Water Source at Brgy. Provided water supply at Brgy. Ilbocean and PED-PWQS JCT, RADS, JFT, Within the year February to 1,757,400.00 NSP JGSA, NRDT, OIM March WSP Ilbocean, Midsayap, Cotabato increased water pressure at Kimagango 1.1.1.2.04 Drilling of Additional Water Source at Sadaan, Increased water supply at Kimagango area PED-PWQS JCT, RADS, JFT, Within the year April to May 634,950.00 NSP Midsayap, Cotabato JGSA, NRDT, OIM WSP 1.1.1.2.05 Construction of 48 cu. m. Concrete Ground Water Maintained water supply at Brgy. Kimagango PED-PWQS JCT, RADS, JFT, Within the year April to May 923,000.00 NSP WSP Tank at Sitio Iskaget JGSA, NRDT, OIM 1.1.1.2.06 Conduct Water Rationing/Water Delivery Deliver/provide water to affected areas during PED-PWQS JCT, RADS, JFT, Within the year June to 875,000.00 NSP JGSA, NRDT, December WSP interruptions OIM, RLNG 1.1.1.2.07 Payment of annual dues to NWRB for APS1, Submission of duly accomplished water permit PED-PWQS JCT, NRDT, DLLB, Within the year January to 218,000.00 NSP APS2, APS3, and submit application of water application together with the payment thru the ACD-ABG DPP December WSP permit for MMWD, Kiwanan, SCC and LPS4. Postal Money Order 1.1.1.3 Ensure that pump stations and other water service equipment are properly safeguarded and upgraded 1.1.1.3.01DRMP, WSP Repair of perimeter fence of APS 1 Repaired perimeter fence at APS1 GMO-GSO CST, JCT, BVR, Within the year February 230,000.00 NSP PED-ECS NRDT, Outsourced DRMP, WSP Labor 1.1.1.3.02 Install Barb Wires & Renovate Pump House of Installed barbed wires & Renovated Pump House GMO-GSO CST, JCT, BVR, Within the year March 85,000.00 NSP DRMP, WSP APS 2 at APS 2 PED-ECS NRDT, Outsourced Labor Ref MAJOR FINAL OUTPUT Target/s Primary Responsible Time Frame Budget 1.1.1.3.03 Construct Generator House and enclose exposed Constructed Generator House and enclosed GMO-GSO CST, JCT, BVR, Within the year April 135,000.00 NSP PED-ECS NRDT, Outsourced DRMP injection fittings & accesories of APS 3 injection fittings & acc. at APS3 Labor 1.1.1.3.04 Repair of perimeter fence and Pump Station of Repaired perimeter fence and Pump Station at GMO-GSO CST, JCT, BVR, Within the year October 150,000.00 NSP DRMP, WSP (DPS) DPS PED-ECS NRDT, Outsourced Labor 1.1.1.3.05 Repair of perimeter fence and Pump House of Repaired perimeter fence and Pump House at GMO-GSO CST, JCT, BVR, Within the year November 115,000.00 NSP (LPS2) LPS2 PED-ECS NRDT, Outsourced DRMP, WSP Labor 1.1.1.3.06 Activation of LPS 4 LPS 4 is 100% activated GMO-GSO CST, JCT, BVR, Within the year November 451,550.00 NSP PED-ECS NRDT, Outsourced DRMP, WSP Labor 1.1.1.3.07 Rehabilitate well of LPS 5 Rehabilitated well at LPS 5 GMO-GSO CST, JCT, BVR, Within the year November 360,000.00 NSP PED-ECS NRDT, Outsourced DRMP, WSP Labor 1.1.1.3.08 Install Perimeter Fence & Ladder Cage of Abaga Installed Perimeter Fence & Ladder Cage at GMO-GSO CST, JCT, BVR, Within the year November 210,000.00 NSP Steel Tank (AST) Abaga Steel Tank (AST) PED-ECS NRDT, Outsourced DRMP, WSP Labor 1.1.1.3.09 Repair of perimeter fence and Pump Station of Repaired perimeter fence and Pump Station at GMO-GSO CST, JCT, BVR, Within the year November 120,000.00 NSP (LPS 1 Tank) LPS 1 Tank PED-ECS NRDT, Outsourced DRMP, WSP Labor 1.1.1.3.10 Construct Generator House and Chlorine Room of Constructed Generator House and Chlorine Room GMO-GSO CST, JCT, BVR, Within the year November 195,500.00 NSP LPS 8 at LPS 8 PED-ECS NRDT, Outsourced DRMP, WSP Labor 1.1.1.3.11 Construction of STEM Booster Pump House STEM Booster Pump House is 100% Constructed GMO-GSO CST, JCT, BVR, Within the year November 450,000.00 NSP PED-ECS NRDT, Outsourced DRMP, WSP Labor 1.1.2 To closely monitor service line information and consistent updating for reference 1.1.2.1 Update pipeline maps to have exact and accurate reference in locating valves and pipeline for operational and tactical use 1.1.2.1.01 Updating of maps and sketch plans of the existing Updating of maps and sketch plan is 100% PED-ECS BVR, RLR, JGR Within the year January 25,000.00 NSP DRMP, WSP water supply system distribution provided and available Ref MAJOR FINAL OUTPUT Target/s Primary Responsible Time Frame Budget 1.1.2.1.02 Provide updated zone map with pipelines and Updated maps and sketch plans of existing water PED-ECS BVR, RLR, JGR Within the year January to - NSP households supply system inclusive of pump stations, booster December WSP pumps, reservoirs, and transmission and distribution lines within the year 1.1.2.1.03 Keep detailed records that indicate location, pipe Repairs are 100% recorded and monitored with PED-ECS BVR, RLR, JGR Monthly As necessary - NSP diameter and type of leak as well as date and complete pertinent information of the requesting DRMP, WSP duration of repair party and duly acknowledged by the MMWD ECS personnel 1.1.2.1.04 Plot map to determine active, disconnected Plotted map at least one (1) zone per month ACD-CS DAD, FBP, FBV, Monthly January to 144,000.00 NSP service connections and households without CAC, VMT December WSP service connections with MMWD, for marketing purposes 1.1.3 To provide for extension and expansion of water services to unserved barangays and waterless communities 1.1.3.1 Upgrade and expand the pipelines in selected areas at Midsayap and Libungan 1.1.3.1.01 Upgrading of Pipeline from 3/4" dia PE tube to 2" Pipelines are laid 90% as programmed PED-ECS BVR, RLR, GSF, Within the year January 152,890.00 NSP WSP diameter uPVC pipe from Cadava RM to Yanto PBD, ABP, AJAD, Res., Poblacion 2, Midsayap - 550 meters JGR 1.1.3.1.02 Upgrading of Pipeline from 3/4" dia PE tube to 2" Pipelines are laid 90% as programmed PED-ECS BVR, RLR, GSF, Within the year February 123,515.00 NSP WSP diameter uPVC pipe from Beradeo to Mediadea PBD, ABP, AJAD, Res., Poblacion 1, Midsayap - 250 meters JGR 1.1.3.1.03 Upgrading of Pipeline from 3/4" dia PE tube to 2" Pipelines are laid 90% as programmed PED-ECS BVR, RLR, GSF, Within the year February 128,390.00 NSP WSP diameter uPVC pipe from Biscara to Saragoza PBD, ABP, AJAD, Res., Poblacion 2, Midsayap - 230 meters JGR 1.1.3.1.04 Upgrading of Pipeline from 3/4" dia PE tube to 2" Pipelines are laid 90% as programmed PED-ECS BVR, RLR, GSF, Within the year March 251,390.00 NSP WSP diameter uPVC pipe from Old NIA
Recommended publications
  • POPCEN Report No. 3.Pdf
    CITATION: Philippine Statistics Authority, 2015 Census of Population, Report No. 3 – Population, Land Area, and Population Density ISSN 0117-1453 ISSN 0117-1453 REPORT NO. 3 22001155 CCeennssuuss ooff PPooppuullaattiioonn PPooppuullaattiioonn,, LLaanndd AArreeaa,, aanndd PPooppuullaattiioonn DDeennssiittyy Republic of the Philippines Philippine Statistics Authority Quezon City REPUBLIC OF THE PHILIPPINES HIS EXCELLENCY PRESIDENT RODRIGO R. DUTERTE PHILIPPINE STATISTICS AUTHORITY BOARD Honorable Ernesto M. Pernia Chairperson PHILIPPINE STATISTICS AUTHORITY Lisa Grace S. Bersales, Ph.D. National Statistician Josie B. Perez Deputy National Statistician Censuses and Technical Coordination Office Minerva Eloisa P. Esquivias Assistant National Statistician National Censuses Service ISSN 0117-1453 FOREWORD The Philippine Statistics Authority (PSA) conducted the 2015 Census of Population (POPCEN 2015) in August 2015 primarily to update the country’s population and its demographic characteristics, such as the size, composition, and geographic distribution. Report No. 3 – Population, Land Area, and Population Density is among the series of publications that present the results of the POPCEN 2015. This publication provides information on the population size, land area, and population density by region, province, highly urbanized city, and city/municipality based on the data from population census conducted by the PSA in the years 2000, 2010, and 2015; and data on land area by city/municipality as of December 2013 that was provided by the Land Management Bureau (LMB) of the Department of Environment and Natural Resources (DENR). Also presented in this report is the percent change in the population density over the three census years. The population density shows the relationship of the population to the size of land where the population resides.
    [Show full text]
  • Philippines Mindanao Response Humanitarian Situation Update 17 June 2011
    Philippines Mindanao Response Humanitarian Situation Update 17 June 2011 This report is produced by OCHA in collaboration with humanitarian partners. It was issued by OCHA Philippines. It covers the period from 13 May to 16 June 2011. The next report will be issued on or around 18 July. I. HIGHLIGHTS/KEY PRIORITIES • Widespread rains over eastern and southern Mindanao have caused flooding and flashfloods in nine provinces of Mindanao, affecting 120,038 families (611,196 individuals). • The Senate has approved the postponement of August 2011 ARMM elections to synchronize it with the 2013 national and local elections. • The members of the Mindanao Humanitarian Team are undertaking the Mid Year Review of the Mindanao Humanitarian Action Plan. I. SITUATION OVERVIEW NATURAL DISASTERS Flooding in Regions X, XI, XII and ARMM Widespread rains over eastern and southern Mindanao due to the presence of Low Pressure Area have caused flooding and flashfloods in nine provinces in Mindanao, affecting 120,038 families (611,196 individuals). NDRRMC (15 June) reported that 48 municipalities, five cities, and 395 barangays in four regions (X, XI, XII and the Autonomous Region in Muslim Mindanao (ARMM)) have been affected by flooding. A total of 3,130 families (12,875 individuals) are in four Evacuation Centers (one in Malaybalay City, Bukidnon Province and three in North Cotabato). NDRRMC further reported that 7,023 hectares of agricultural crops have been damaged by flooding Residential area along Main road of Barangay in Mindanao, of which 5,391 hectares (or 77 per cent) are in Tamontaka 2, Cotabato City. Photo: Courtesy of Maguindanao.
    [Show full text]
  • Sitrep 44 NDCC Update Complex Emergency
    • The NDCC and the Commission of Human Rights encourage the need for more information exchange between the NDCC and other humanitarian actors to improve on data collection, validation and disaggregated data for purposes of identifying further relief needs of IDPs by sex, age group and beliefs, etc. • The Commission on Human Rights reported that there are no reports of sexual abuse and human trafficking in ECs • Despite of the identified concerns, the government through the NDCC and Task Force CAMP have already served 65,306 families both inside and outside EC • DSWD deployed the Quick Response and Social Welfare and Development (QR/SWAD) teams to undertake data generation, relief distribution, operation/ management of evacuation centers, community kitchens, supplemental feeding to children, crisis counseling, etc. in coordination with the LGUs, other government agencies, and local and international NGOs • DOH HEMS provided P5,618,495.00 worth of logistics support consisting of drugs, medical supplies, compact foods, water disinfectant, containers, blood, and P5 Million cash to the CHDs in Regions X, XII, ARMM and Region IX in view of its proximity to Basilan Province • Logistics provided by PHO, UNICEF and PCSO through the CHDs X and XII and DOH-HEMS amounted to P4,712,466.80 A. IDPs/Evacuation Centers /Total Served (Details on Tab A) • IDPs: 120,000 100,000 80,000 60,000 40,000 20,000 0 30- 31- 1- 2- 3- 4- 5- 6- 7- 8- 9- 10- 11- 12- 13- 14- 15- 16- 17- 18- 19- 20- 21- 22- AugAugSepSepSepSepSepSepSepSepSepSepSepSepSepSepSepSepSepSepSepSepSepSep CUMMULATIVE AFFECTED FAMILIES IDPs FAM (OUTSIDE) IDPs FAM (INSIDE) IDPs in 123 evacuation centers decreased from 14,048 families / 69,450 persons to 13,985 / 69,168 persons The number of IDPs OUTSIDE evacuation centers remains at 51,258 families / 253,255 persons B.
    [Show full text]
  • PHILIPPINES Mindanao Humanitarian Situation As of 25 September 2019
    PHILIPPINES Mindanao Humanitarian Situation as of 25 September 2019 DISPLACEMENT IN MAGUINDANAO DISPLACEMENT IN NORTH COTABATO EFFECTS OF SOUTHWEST MONSOON 8,500 1,000 displaced population 6,850 displaced population displaced population As of 4 September 2019, more than 1,700 families/8,500 people Nearly 200 families are displaced due to a rido or clan feud on 9 remain displaced due to the 25 July armed conflict between As of 23 September, the effects of Southwest Monsoon September in Barangay Damatulan, municipality of Midsayap. Most government armed forces and a non-state armed group in Shariff enhances by Tropical Depression (TD) Marilyn affected more of those displaced are staying with host families in nearby Saydona Mustapha and Datu Salibo municipalities and the 19 than 3,000 families/15,000 people from 32 barangays of barangay. Meanwhile, the police and military personnel have been August improvised explosive device (IED) explosion in Barangay Zamboanga del Norte, Zamboanga del Sur, Davao del Sur, deployed to prevent further conflict between the warring families. Bakat, Rajah Buayan municipality. Most families are staying in host South Cotabato and Sultan Kudarat provinces. More than Local authorities are providing relief assistance and verifying the communities. Local authorities and the Rapid Emergency Action 6,800 people are still displaced in which 500 people are number of displaced people. on Disaster Incidence of the Bangsamoro Autonomous Region in Muslim Mindanao (READI-BARMM) continue to provide food staying in five evacuation centres (ECs) while 6,350 people assistance to the displaced families. are taking shelter with host families. There are 199 damaged houses of which 44 are totally damaged.
    [Show full text]
  • PALMA+PB Alliance of Municipalities
    PALMA+PB Alliance of Municipalities Province of Cotabato Region X11 PALMA+PB is an acronym DERIVED FROM the first letter of the names of the municipalities that comprise the Alliance, namely: Pigcawayan Alamada Libungan Midsayap Aleosan Pikit Banisilan Pikit became a member of the alliance only last April 25, 2008 and Banisilan in August 18,2011 after one (1) year of probation as observer . PALMA+PB Alliance Luzon Alamada Banisilan Pigcawayan Visayas Libungan Aleosan Midsayap Mindanao Pikit Located in the first congressional district of Cotabato Province, Region XII in the island of Mindanao, Philippines. PALMA+PB Alliance THE CREATION OF PALMA+PB Alliance The establishment of this Alliance gets its legal basis from REPUBLIC ACT 7160 “THE LOCAL GOVERNMENT CODE OF 1991, Section 33, Art. 3, Chapter 3, which states that; “LGUs may, through appropriate ordinances, group themselves, consolidate, or ordinate their efforts, services, and resources for purposes commonly beneficial to them. In support to such undertakings, the LGUs involved may, upon approval by the Sanggunian concerned after a public hearing conducted for the purpose, contribute funds, real estate, equipment and other kinds of property and appoint or assign, personnel under such terms and conditions as may be agreed upon by the participating local units through Memoranda of Agreement (MOA).” PALMA+PB Alliance Profile Land Area :280,015.88 has. Population :393,831 Population Density :1.41 person/ha. Population by Tribe: Cebuano :30.18% Maguindanaon :25.45% Ilonggo :19.82% Ilocano :11.15% IP’s :10.55% Other Tribes :2.85% Number of Barangays :215 Number of Households :81,767 Basic Products Agricultural and Fresh Water fish PALMA+PB Alliance B.
    [Show full text]
  • EMBRACE PROJECT) End-Of-Project Evaluation Report External Evaluator: Nasrudin Buisan
    OXFAM EVALUATION REPORT SEPTEMBER 2019 Numo Organic Farmers Association members participating in the Women’s Market in Sultan Kudarat. Photo: Denvie Balidoy/Oxfam EMPOWERING POOR WOMEN AND MEN IN BUILDING RESILIENT AND ADAPTIVE COMMUNITIES IN MINDANAO (EMBRACE PROJECT) End-of-Project Evaluation Report External evaluator: Nasrudin Buisan This evaluation assessed the achievements of the extension phase of the EMBRACE project, which focused on improving the livelihood and social status of vulnerable poor women and establishing partnerships between farmers and local government units for climate adaptive farming. The study involved key informant interviews, focus group discussions, a case study and a survey of 436 respondents (319 EMBRACE and 117 non-EMBRACE participants). Overall, it found that 32% of EMBRACE farmers who shifted to organic farming experienced higher yields and spent less on farming inputs. philippines.oxfam.org ACRONYMS BINDS Building Resilient and Adaptive Communities and Institutions in Mindanao CCA Climate change adaptation COM Community Organizers Multiversity CRFS Climate Resiliency Field School DA Department of Agriculture EMBRACE Empowering Poor Women and Men in Building Resilient and Adaptive Communities in Mindanao LGU Local government unit NGO Non-government organization NOFA Numo Organic Farmers Association R1 Rice Watch Action Network RDISK Rural Development Institute of Sultan Kudarat SCALE Landscape-based Climate Adaptive Livelihood Field School SIMCARRD Sustainable Integrated Area Development (SIAD) Initiatives
    [Show full text]
  • Chapter 5 Existing Conditions of Flood and Disaster Management in Bangsamoro
    Comprehensive capacity development project for the Bangsamoro Final Report Chapter 5. Existing Conditions of Flood and Disaster Management in Bangsamoro CHAPTER 5 EXISTING CONDITIONS OF FLOOD AND DISASTER MANAGEMENT IN BANGSAMORO 5.1 Floods and Other Disasters in Bangsamoro 5.1.1 Floods (1) Disaster reports of OCD-ARMM The Office of Civil Defense (OCD)-ARMM prepares disaster reports for every disaster event, and submits them to the OCD Central Office. However, historic statistic data have not been compiled yet as only in 2013 the report template was drafted by the OCD Central Office. OCD-ARMM started to prepare disaster reports of the main land provinces in 2014, following the draft template. Its satellite office in Zamboanga prepares disaster reports of the island provinces and submits them directly to the Central Office. Table 5.1 is a summary of the disaster reports for three flood events in 2014. Unfortunately, there is no disaster event record of the island provinces in the reports for the reason mentioned above. According to staff of OCD-ARMM, main disasters in the Region are flood and landslide, and the two mainland provinces, Maguindanao and Lanao Del Sur are more susceptible to disasters than the three island provinces, Sulu, Balisan and Tawi-Tawi. Table 5.1 Summary of Disaster Reports of OCD-ARMM for Three Flood Events Affected Damage to houses Agricultural Disaster Event Affected Municipalities Casualties Note people and infrastructures loss Mamasapano, Datu Salibo, Shariff Saydona1, Datu Piang1, Sultan sa State of Calamity was Flood in Barongis, Rajah Buayan1, Datu Abdulah PHP 43 million 32,001 declared for Maguindanao Sangki, Mother Kabuntalan, Northern 1 dead, 8,303 ha affected.
    [Show full text]
  • Petron Stations As of 21 July 2020 for Diesel
    List of Liquid Fuel Retail Stations or LPG Dealers Implementing the 10% Tariff (EO 113) Company: PETRON Report as of: July 21, 2020 Diesel Estimated No. Station Name Location Implementation Tariff Dates 1 GAMBOA WILLIE MC ARTHUR HIGHWAY VILLASIS, PANGASINAN 20/06/2020 P 1.60/liter 2 NACINO SAMUEL SR. NATIONAL HIGHWAY, GARDEN ARTECHE, EASTERN SAMAR 20/06/2020 P 1.60/liter 3 ROBLES CARMEL C NATIONAL HIGHWAY, POBLACION GAAS BA LEYTE 20/06/2020 P 1.60/liter 4 101 VENTURES SUPPORT CORPORATI OSMENA HIGHWAY COR. CALHOUN ST. MAKATI CITY, METRO MANILA 21/06/2020 P 1.60/liter 5 6PILLARS CORPORATION NATIONAL ROAD BRGY LIDONG STO. DOMINGO ALBAY 21/06/2020 P 1.60/liter 6 8EJJJE TRADING CORP. N DOMINGO COR M PATERNO ST CORAZON DE JESUS, SAN JUAN CITY 21/06/2020 P 1.60/liter 7 8EJJJE TRADING CORP. #47 VALENZUELA COR. F. BLUMENTRITT SAN JUAN CITY, METRO MANI 21/06/2020 P 1.60/liter 8 A8 GAS STATION CORPORATION DULONG NORTE 1 MALASIQUI PANGASINAN 21/06/2020 P 1.60/liter 9 AACAHULOGAN CORPORATION FR MASTERSON AVE. XAVIER STATES CAGAYAN DE ORO CITY, MISAMIS 21/06/2020 P 1.60/liter 10 ABENES GERARDO DELA CRUZ NATIONAL ROAD CORNER METROGATE 2, B MEYCAUAYAN, BULACAN 21/06/2020 P 1.60/liter 11 ABINAL SABI T. III 1 UNANG HAKBANG ST. COR. BAYANI ST. QUEZON CITY 21/06/2020 P 1.60/liter 12 ABREGANA GINY DIOLATA NATIONAL HIGHWAY CAMP1 MARAMAG BUKIDNON 21/06/2020 P 1.60/liter 13 ABUEG FRANCESCA P NATIONAL HIGHWAY PUERTO PRINCESA CITY, PALAWAN 21/06/2020 P 1.60/liter 14 ACAIN FREDIELYN MARTIN LABRADOR - SUAL ROAD LABRADOR, PANGASINAN 21/06/2020 P 1.60/liter 15 ACEDILLO FRITZ GERALD J PUROK SUBIDA PAGADIAN CITY, ZAMBOANGA 21/06/2020 P 1.60/liter 16 ACLER GAS STATION INC COR.
    [Show full text]
  • DEPARTMENT of EDUCATION SOCCSKSARGEN February 17, 2020 REGION MEMORANDUM PPRD No. 9, S. 2020 SCHEDULE of REGION
    Republic of the Philippines DEPARTMENT OF EDUCATION SOCCSKSARGEN Regional Center, Brgy. Carpenter Hill, City of Koronadal Telefax No.: (083) 2288825/(083) 2281893 Website: depedroxii.org Email:[email protected] February 17, 2020 REGION MEMORANDUM PPRD No. 9, s. 2020 SCHEDULE OF REGIONAL SBM VALIDATION OF SELECTED SCHOOLS TO: Schools Division Superintendents Divisions of Koronadal City Tacurong City Kidapawan City Cotabato Attn: SGOD Chief, Division SBM Coordinator & Division SBM Coordinating Teams (DSCTs) & Regional SBM Coordinating Teams (RSCTs) 1. This has reference to the requests of the Schools Division Offices of Koronadal City, Tacurong City, Kidapawan City and Cotabato regarding the conduct of Regional School-Based Management (SBM) Validation to some of their identified schools. 2. In response to such request, the Regional SBM Validation shall be conducted this February to March 2020. Initially, the schedule of validation is as follows: Schools Division Office Schedule of Activities Koronadal City February 26-27, 2020 Tacurong City To Be Arranged (TBA) Kidapawan City To Be Arranged (TBA) Cotabato To Be Arranged (TBA) 3. A follow-up region advisory shall be released in line with the final schedule of the other divisions. All schools endorsed for validation shall already prepare for the DOD (Document Analysis-Observation-Discussion) Process prior to their schedule. 4. Attached is Enclosure No. 1: List of Schools for SBM Level 3 Validation by Division. A. Koronadal City Division (10 Schools); B. Tacurong City Division (10 Schools); C. Kidapawan City Division (33 Schools); and D. Cotabato Division (60 Schools). 5. The SBM validation is generally aimed to establish the quality assurance and technical assistance mechanisms of DepEd SOCCSKSARGEN Regional Office.
    [Show full text]
  • Philrice Midsayap
    Branch-Based Highlights PHILRICE MIDSAYAP Branch-Based Highlights TABLE OF CONTENTS Executive Summary Page PhilRice Midsayap 1 I. Intensified Rice-based Agri-Bio System (IRBAS): 1 Palayamanan Plus Model Farm II. Boosting Frontliners’ Capacity in Extending Agricultural 3 Education and Extension Through Rice S&T Updates III. Empowering Stakeholders in Turning Rice Biomass into 4 a profitable enterprise IV. Accelerating Technology Adoption Through the 6 Promotion of Rice and Rice-Based Technologies in Regions IX, XII and the Autonomous Region in Muslim Mindanao (ARMM) V. Learning Center 7 VI. Rural Transformation Movement 9 VII. Experts Dispatch-PhilRice Midsayap 10 VIII. JICA Technical Cooperation Project (TCP5) : “Rice- 11 Based Farming Technology Extension Project for the Autonomous Region in Muslim Mindanao”, (ARMM) (March 2012-2017) IX. National Irrigation Sector Rehabilitation & Improvement 13 Project Agricultural Support Component X. Upland Rice Development Program in Region IX, XII 16 & ARMM (2012-2015): Development of Community- Based Palayamanan System in the Upland for Increased Productivity and Food Sufficiency in Southern and Western Mindanao XI. FSSP: Accelerating the Dissemination of Associated 18 Technologies for Increasing Yield and Profitability in Irrigated (NIS, CIP, SWIP) Environment XII. Philippine Rice Information Management System 21 (PRiSM) Abbreviations and acronymns 23 List of Tables 25 PhilRice Midsayap 1 PhilRice Midsayap Acting Director: Sailila E. Abdula Executive Summary In 2014, the Development Unit of PhilRice
    [Show full text]
  • Mindanao and Sulu
    MAGINDANAO, 1860-1888: THE CAREER OF DATU UTO OF BUAYAN THE CORNELL UNIVERSITY SOUTHEAST ASIA PROGRAM The Southeast Asia Program was organized at Cornell University in the Department of Far Eastern Studies in 1950. It is a teaching and research program of interdisciplinary studies in the humanities, social sciences, and some natural sciences. It deals with Southeast Asia as a region, and with the individual countries of the area: Brunei, Burma, Cambodia, Indonesia, Laos, Malaysia, the Philippines, Singapore, Thailand, and Vietnam. The activities of the Program are carried on both at Cornell and in Southeast Asia. They include an undergraduate and graduate curri�ulum at Cornell which provides instruction by specialists in Southeast Asian cultural history and present-day affairs and offers intensive training in each of the major languages of the area. The Program sponsors group research projects on Thailand, on Indonesia, on the Philippines, and on the area's Chinese minorities. At the same time, individual staff and students of the Program have done field research in every Southeast Asian country. A list of publications relating to Southeast Asia which may be obtained on prepaid order directly from the Program is given at the end of this volume. Information on Program staff, fellowships, requirements for degrees, and current course offerings will be found in an Announaement of the Department of Asian Studies, obtainable from the Director, Southeast Asia Program, Franklin Hall, Cornell University, Ithaca, New York 14850. ii MAGINDANAO, 1860-1888: THE CAREER OF DATU UTO OF BUAYAN by Reynaldo Clemena Ileto Data Paper: Number 82 Southeast Asia Program Department of Asian Studies Cornell University, Ithaca, New York October 1971 Price: $3.50 C 1971 CORNELL UNIVERSITY SOUTHEAST ASIA PROGRAM 1V PREFACE The situation in which the "hero" of history finds himself is as important as his personality and his actions.
    [Show full text]
  • Republic of the Philippines Department of Public Works and Highways Cotabato Second District Engineering Office Villarica, Midsayap, Cotabato
    Republic of the Philippines Department of Public Works and Highways Cotabato Second District Engineering Office Villarica, Midsayap, Cotabato INDICATIVE ANNUAL PROCUREMENT PLAN FY 2020 CIVIL WORKS AND GOODS AND SERVICES Procurement PMO/ Is This an Early Mode of Schedule for Each Procurement Activity Estimated Budget (PhP) Remarks Procurement Activity Procurement Advertisement/ Submission/ Notice of Contract Source of Total Brief Description of Program/Project EndSection -User (Yes/No) Bidding Posting01/04/2018 of IB/REI Opening of Bids Award Signing Funds ('000) MOOE CO Program/Project Midsayap-Makar Rd - K1696 + 820 - 10/01-07/2019 10/21/2019 01/13/2020 01/20/2020 1.0 K1698 + 066.30 Const. Section Yes Public Bidding NEP 2020 40.434 Asphalt Overlay Banisilan-Guiling-Alamada-Libungan Rd - K1640 + 500 - K1640 + 1000, K1642 + 10/01-07/2019 10/21/2019 01/13/2020 01/20/2020 036 - K1642 + 114, K1643 + 000 - K1645 2.0 + 062 Const. Section Yes Public Bidding NEP 2020 41.542 Asphalt Overlay Dualing-Baliki-Silik Road - K1695+000 - 3.0 K1699+002 (Baliki-Dungguan-Langayen Public Bidding 10/01-07/2019 10/21/2019 01/13/2020 01/20/2020 43.249 Section) Const. Section Yes NEP 2020 Asphalt Overlay Dualing-New Panay-Midsayap Road - K1707+000 - K1709+000, K1710+000 - Public Bidding 10/01-07/2019 10/21/2019 01/13/2020 01/20/2020 4.0 K1712+075 (New Panay - Lawili Section) Const. Section Yes NEP 2020 42.754 Asphalt Overlay Midsayap-Makar Road - K1694+(- Public Bidding 10/01-07/2019 10/21/2019 01/13/2020 01/20/2020 Widening 5.0 269.50) - K1694+980 (Midsayap Section) Const.
    [Show full text]