Republic of the Philippines Department of Public Works and Highways Cotabato Second District Engineering Office Villarica, Midsayap, Cotabato

Total Page:16

File Type:pdf, Size:1020Kb

Republic of the Philippines Department of Public Works and Highways Cotabato Second District Engineering Office Villarica, Midsayap, Cotabato Republic of the Philippines Department of Public Works and Highways Cotabato Second District Engineering Office Villarica, Midsayap, Cotabato INDICATIVE ANNUAL PROCUREMENT PLAN FY 2020 CIVIL WORKS AND GOODS AND SERVICES Procurement PMO/ Is This an Early Mode of Schedule for Each Procurement Activity Estimated Budget (PhP) Remarks Procurement Activity Procurement Advertisement/ Submission/ Notice of Contract Source of Total Brief Description of Program/Project EndSection -User (Yes/No) Bidding Posting01/04/2018 of IB/REI Opening of Bids Award Signing Funds ('000) MOOE CO Program/Project Midsayap-Makar Rd - K1696 + 820 - 10/01-07/2019 10/21/2019 01/13/2020 01/20/2020 1.0 K1698 + 066.30 Const. Section Yes Public Bidding NEP 2020 40.434 Asphalt Overlay Banisilan-Guiling-Alamada-Libungan Rd - K1640 + 500 - K1640 + 1000, K1642 + 10/01-07/2019 10/21/2019 01/13/2020 01/20/2020 036 - K1642 + 114, K1643 + 000 - K1645 2.0 + 062 Const. Section Yes Public Bidding NEP 2020 41.542 Asphalt Overlay Dualing-Baliki-Silik Road - K1695+000 - 3.0 K1699+002 (Baliki-Dungguan-Langayen Public Bidding 10/01-07/2019 10/21/2019 01/13/2020 01/20/2020 43.249 Section) Const. Section Yes NEP 2020 Asphalt Overlay Dualing-New Panay-Midsayap Road - K1707+000 - K1709+000, K1710+000 - Public Bidding 10/01-07/2019 10/21/2019 01/13/2020 01/20/2020 4.0 K1712+075 (New Panay - Lawili Section) Const. Section Yes NEP 2020 42.754 Asphalt Overlay Midsayap-Makar Road - K1694+(- Public Bidding 10/01-07/2019 10/21/2019 01/13/2020 01/20/2020 Widening 5.0 269.50) - K1694+980 (Midsayap Section) Const. Section Yes NEP 2020 50.624 Midsayap-Makar Road - K1710+128, 6.0 11/07-13/2019 11/26/2019 01/13/2020 01/20/2020 Widening K1713+000 (Olandang Section) Const. Section Yes Public Bidding NEP 2020 80.506 Banisilan-Guiling-Alamada-Libungan Road - K1696+798 - K1698+219 10/22-28/2019 11/11/2019 01/13/2020 01/20/2020 Widening 7.0 (Cabaruyan Section) Const. Section Yes Public Bidding NEP 2020 34.147 Dualing-New Panay-Midsayap Road - 10/15-21/2019 11/04/2019 01/13/2020 01/20/2020 Widening 8.0 K1691+551 - K1693+767 (Baliki Section) Const. Section Yes Public Bidding NEP 2020 58.937 Midsayap (Sadaan-Central Glad), North 9.0 Public Bidding 10/18-24/2019 11/06/2019 01/13/2020 01/20/2020 50.000 Bypass Road Cotabato Const. Section Yes NEP 2020 Jct. Asik-Asik Falls to Mimbalawag leading to Daday Falls, Brgy. Dado, Const. Section Public Bidding 10/22-28/2019 11/11/2019 01/13/2020 01/20/2020 10.0 Alamada, North Cotabato Yes NEP 2020 10.000 Concreting Jct. San Mateo to Upper Mingading leading to UK Peak, Brgy. San Mateo, 10/22-28/2019 11/11/2019 01/13/2020 01/20/2020 11.0 Aleosan, North Cotabato Const. Section Yes Public Bidding NEP 2020 10.000 Concreting Aleosan Barangay Road from Katalicanan-Cawilihan connecting to 12.0 Public Bidding 11/20-26/2019 12/09/2019 01/13/2020 01/20/2020 Lawili in support of Rubber and Palm Oil Industries, Aleosan, Cotabato Const. Section Yes NEP 2020 10.000 Concreting Aleosan Barangay Road from Lawili to Pentil connecting to Palacat in support of 11/29-12/05/2019 12/18/2019 01/13/2020 01/20/2020 Rubber and Palm Oil Industries, Aleosan, 13.0 Cotabato Const. Section Yes Public Bidding NEP 2020 36.812 Concreting Aleosan Barangay Road from San Mateo- Sitio Taguan connecting to Pupoyon Dualing, in support of Rubber, Palm Oil 10/08-14/2019 10/28/2019 01/13/2020 01/20/2020 14.0 and Coconut Industries, Aleosan, Const. Section Yes Public Bidding NEP 2020 18.000 Concreting Aleosan Barangay Road from Upper 15.0 Katalicanan connecting to Sition Citrus 12/06-12/2019 12/26/2019 01/13/2020 01/20/2020 New Leon in support of Rubber and Palm GokotanOil Industries, Bridge Aleosan, Section-Kibayao-Jct. Cotabato Const. Section Yes Public Bidding NEP 2020 35.000 Concreting National Highway in support to Palm Oil 10/17-23/2019 11/05/2019 01/13/2020 01/20/2020 16.0 Mill Project, Pikit, Cotabato Const. Section Yes Public Bidding NEP 2020 15.000 Concreting Republic of the Philippines Department of Public Works and Highways Cotabato Second District Engineering Office Villarica, Midsayap, Cotabato INDICATIVE ANNUAL PROCUREMENT PLAN FY 2020 CIVIL WORKS AND GOODS AND SERVICES Procurement PMO/ Is This an Early Mode of Schedule for Each Procurement Activity Estimated Budget (PhP) Remarks Procurement Activity Procurement Advertisement/ Submission/ Notice of Contract Source of Total Brief Description of New Panay/TupigProgram/Project connecting to End -User (Yes/No) Posting of IB/REI Opening of Bids Award Signing Funds ('000) MOOE CO Program/Project Kibenes/Carmen in support of Rubber Const. Section Public Bidding 10/17-23/2019 11/05/2019 01/13/2020 01/20/2020 10.000 17.0 Processing Center, Aleosan, Cotabato Yes NEP 2020 Bridge Completion Poblacion, Pikit-Batulawan-Balatican- Gokotan Bridge in support of Palm Oil 18.0 Public Bidding 11/21-27/2019 12/10/2019 01/20/2020 01/30/2020 NEP 2020 Industry-Univanich Carmen Palm Oil Mill (BOI Registered), Pikit, Cotabato Const. Section Yes 10.000 Concreting Concreting of Dualing Baliki National Highway to Purok L. Dualing, Aleosan, 11/21-27/2019 12/10/2019 01/13/2020 01/20/2020 NEP 2020 Construction of Concrete 19.0 Cotabato Const. Section Yes Public Bidding 2.000 Road Concreting of Junction Dualing-New Panay National Highway to Sitio Lapu- 10/17-23/2019 11/05/2019 01/20/2020 01/27/2020 NEP 2020 Construction of Concrete 20.0 Lapu, Lawili, Aleosan, Cotabato Const. Section Yes Public Bidding 2.000 Road Concreting of Junction Dualing-New Panay National Highway crossing 21.0 Public Bidding 11/21-27/2019 12/10/2019 01/20/2020 01/27/2020 NEP 2020 Purok Gumamela, Katalicanan, Construction of Concrete Aleosan, Cotabato Const. Section Yes 2.000 Road Concreting of Junction New Panay National Highway Sitio Nangka New Leon Aleosan connecting Barangay Public Bidding 11/28-12/04/2019 12/20/2019 01/20/2020 01/27/2020 NEP 2020 Cawilihan, New Leon, Aleosan, Construction of Concrete 22.0 Cotabato Const. Section Yes 2.000 Road Concreting of Dualing-New Panay National Highway Junction - Centro New Panay connecting road to Public Bidding 11/21-27/2019 12/10/2019 01/20/2020 01/27/2020 NEP 2020 Tunganon, Carmen, New Panay, Construction of Concrete 23.0 Aleosan, Cotabato Const. Section Yes 2.000 Road Concreting of Tomado Proper to 24.0 Lower Mingading, Tomado, Aleosan, 12/06-12/2019 12/26/2019 01/20/2020 01/27/2020 NEP 2020 Construction of Concrete Cotabato Const. Section Yes Public Bidding 2.000 Road Concreting of Local Road Martin to Construction of Concrete 11/28-12/04/2019 12/20/2019 01/20/2020 01/27/2020 25.0 Tinago State, Ulamian, Libungan Const. Section Yes Public Bidding NEP 2020 2.000 Road Concreting of Purok 2 - Slaughter Construction of Concrete 11/28-12/04/2019 12/20/2019 01/20/2020 01/27/2020 26.0 House Road, Poblacion, Libungan Const. Section Yes Public Bidding NEP 2020 2.000 Road Concreting of Local Road Purok 7, Construction of Concrete 27.0 Const. Section Public Bidding 11/28-12/04/2019 12/20/2019 01/20/2020 01/27/2020 Gumaga, Libungan, Cotabato Yes NEP 2020 2.000 Road Concreting of Local Road Purok Yellow Bell-District 6, Magsaysay 12/06-12/2019 12/26/2019 01/14/2020 01/20/2020 NEP 2020 Street, Sinawingan, Libungan, Construction of Concrete 28.0 Cotabato Const. Section Yes Public Bidding 2.000 Road Concreting of Local Road NIA Village, Construction of Concrete 12/06-12/2019 12/26/2019 01/14/2020 01/20/2020 29.0 Villarica, Midsayap, Cotabato Const. Section Yes Public Bidding NEP 2020 4.000 Road Concreting of Purok 5 - Purok 10, Construction of Concrete 30.0 11/28-12/04/2019 12/20/2019 01/14/2020 01/20/2020 Malamote, Midsayap, Cotabato Const. Section Yes Public Bidding NEP 2020 2.000 Road Concreting of Kimagango - Anonang Construction of Concrete Public Bidding 11/28-12/04/2019 12/20/2019 01/14/2020 01/20/2020 31.0 Road, Midsayap, Cotabato Const. Section Yes NEP 2020 2.000 Road Concreting of Lower Katingawan - Public Bidding 12/03-09/2019 12/22/2019 01/14/2020 01/20/2020 Construction of Concrete 32.0 Poblacion 7 Road, Midsayap, Cotabato Const. Section Yes NEP 2020 2.000 Road 33.0 Concreting Kiwanan Road to Llanda Public Bidding 12/03-09/2019 12/22/2019 01/14/2020 01/20/2020 Construction of Concrete Kiwanan, Midsayap, Cotabato Const. Section Yes NEP 2020 2.000 Road Republic of the Philippines Department of Public Works and Highways Cotabato Second District Engineering Office Villarica, Midsayap, Cotabato INDICATIVE ANNUAL PROCUREMENT PLAN FY 2020 CIVIL WORKS AND GOODS AND SERVICES Procurement PMO/ Is This an Early Mode of Schedule for Each Procurement Activity Estimated Budget (PhP) Remarks Procurement Activity Procurement Advertisement/ Submission/ Notice of Contract Source of Total Brief Description of Program/Project End -User (Yes/No) Posting of IB/REI Opening of Bids Award Signing Funds ('000) MOOE CO Program/Project Concreting of Purok 5 - Purok 7, Upper Construction of Concrete Const. Section Public Bidding 12/03-09/2019 12/22/2019 01/14/2020 01/20/2020 34.0 Glad, Midsayap, Cotabato Yes NEP 2020 2.000 Road Concreting of Agriculture, Bual Sur Road, Const.
Recommended publications
  • POPCEN Report No. 3.Pdf
    CITATION: Philippine Statistics Authority, 2015 Census of Population, Report No. 3 – Population, Land Area, and Population Density ISSN 0117-1453 ISSN 0117-1453 REPORT NO. 3 22001155 CCeennssuuss ooff PPooppuullaattiioonn PPooppuullaattiioonn,, LLaanndd AArreeaa,, aanndd PPooppuullaattiioonn DDeennssiittyy Republic of the Philippines Philippine Statistics Authority Quezon City REPUBLIC OF THE PHILIPPINES HIS EXCELLENCY PRESIDENT RODRIGO R. DUTERTE PHILIPPINE STATISTICS AUTHORITY BOARD Honorable Ernesto M. Pernia Chairperson PHILIPPINE STATISTICS AUTHORITY Lisa Grace S. Bersales, Ph.D. National Statistician Josie B. Perez Deputy National Statistician Censuses and Technical Coordination Office Minerva Eloisa P. Esquivias Assistant National Statistician National Censuses Service ISSN 0117-1453 FOREWORD The Philippine Statistics Authority (PSA) conducted the 2015 Census of Population (POPCEN 2015) in August 2015 primarily to update the country’s population and its demographic characteristics, such as the size, composition, and geographic distribution. Report No. 3 – Population, Land Area, and Population Density is among the series of publications that present the results of the POPCEN 2015. This publication provides information on the population size, land area, and population density by region, province, highly urbanized city, and city/municipality based on the data from population census conducted by the PSA in the years 2000, 2010, and 2015; and data on land area by city/municipality as of December 2013 that was provided by the Land Management Bureau (LMB) of the Department of Environment and Natural Resources (DENR). Also presented in this report is the percent change in the population density over the three census years. The population density shows the relationship of the population to the size of land where the population resides.
    [Show full text]
  • Department of Science and Technology Philippine Institute of Volcanology and Seismology
    Republic of the Philippines DEPARTMENT OF SCIENCE AND TECHNOLOGY PHILIPPINE INSTITUTE OF VOLCANOLOGY AND SEISMOLOGY UPDATE ON THE OCTOBER 2019 COTABATO FAULT SYSTEM EARTHQUAKE SERIES Update as of 08 November 2019 What is happening in Cotabato and vicinity? As of 07:00 AM Philippine Standard Time (PST) of 08 November 2019 (Friday), the total number of earthquakes recorded since the 29 October 2019 Magnitude 6.6 earthquake event is now 2226, with 917 plotted and 161 felt at various intensities. Figure 1 shows earthquake plots as of 07 November 2019 (6PM). Figure 1. Seismicity map related to the October 2019 Cotabato Fault System earthquake series (as of 07 November 2019, 6PM) Another DOST-PHIVOLCS Quick Response Team (QRT), consisting of geologists, civil engineers, seismologists and information officers, was immediately deployed on 30 October 2019. The team will investigate geologic impacts, assess structural Minor earthquakes: 3 to 3.9; Light earthquakes: 4 to 4.9; Moderate earthquakes: 5 to 5.9; Strong earthquakes: 6 to 6.9; Major earthquakes: 7 to 7.9; Great earthquakes: 8.0 and above. Postal Ad Postal address: PHIVOLCS Building, C.P. Garcia Avenue, U.P. Campus Tel. Nos.: +63 2 8426-1468 to 79; +63 2 8926-2611 Diliman, Quezon City 1101 Philippines Fax Nos.: +63 2 8929-8366; +63 2 8928-3757 Website Website: www.phivolcs.dost.gov.ph 1 damages, establish additional portable seismic stations in the vicinity of the earthquake epicenters to augment existing DOST-PHIVOLCS seismic monitoring network (Figure 2) to monitor and study ongoing occurrence of earthquake events, and conduct intensity surveys and information education campaigns and briefings with local DRRMOs and residents of affected communities.
    [Show full text]
  • The Participation of Government Agencies (Gas) and Civil Society Organizations (Csos) Inthe War Disaster Management Operation
    International Journal of Humanities and Social Science Vol. 3 No. 17; September 2013 “The Participation of Government Agencies (GAs) and Civil Society Organizations (CSOs) inthe War Disaster Management Operation in North Cotabato, Southern Philippines: A Comparative Analysis.” Dr. Radzak Abag Sam Senior Lecturer School of Social Sciences UniversitiSains Malaysia (USM) Pulau Pinang, Malaysia. Solayha Abubakar-Sam Asst. Professor College of Education Mindanao State University, Maguindanao Philippines Abstract Both Government Agencies (GAs) and Civil Society Organizations (CSOs) thatparticipated in the War Disaster Management Operation in Pikit, Aleosan, Midsayap, and Pigkawayan, North Cotabato, Southern Philippines have extended food and non- food relief assistance for the Internally Displaced Persons(IDPs)coming from those areas mentioned. In addition, Core ShelterUnits were provided for the IDPs whose houses were totally damaged during the war, while financial assistance for those whose houses were partially damaged. Clustering approach, coordination and sharing of information with other humanitarian actors, and designation of field workers were the common strategies used by both GAs and CSOs for the social preparation of IDPs for relief assistance. However, Civil Society Organizations that have no funding support wentto the extent of house to house, school to school, and solicitations through Masjid in the pursuit of their interest toextend assistance. While the readiness and prepared of IDPs for pre- disaster was low due to the slow
    [Show full text]
  • Estimation of Local Poverty in the Philippines
    Estimation of Local Poverty in the Philippines November 2005 Republika ng Pilipinas PAMBANSANG LUPON SA UGNAYANG PANG-ESTADISTIKA (NATIONAL STATISTICAL COORDINATION BOARD) http://www.nscb.gov.ph in cooperation with The WORLD BANK Estimation of Local Poverty in the Philippines FOREWORD This report is part of the output of the Poverty Mapping Project implemented by the National Statistical Coordination Board (NSCB) with funding assistance from the World Bank ASEM Trust Fund. The methodology employed in the project combined the 2000 Family Income and Expenditure Survey (FIES), 2000 Labor Force Survey (LFS) and 2000 Census of Population and Housing (CPH) to estimate poverty incidence, poverty gap, and poverty severity for the provincial and municipal levels. We acknowledge with thanks the valuable assistance provided by the Project Consultants, Dr. Stephen Haslett and Dr. Geoffrey Jones of the Statistics Research and Consulting Centre, Massey University, New Zealand. Ms. Caridad Araujo, for the assistance in the preliminary preparations for the project; and Dr. Peter Lanjouw of the World Bank for the continued support. The Project Consultants prepared Chapters 1 to 8 of the report with Mr. Joseph M. Addawe, Rey Angelo Millendez, and Amando Patio, Jr. of the NSCB Poverty Team, assisting in the data preparation and modeling. Chapters 9 to 11 were prepared mainly by the NSCB Project Staff after conducting validation workshops in selected provinces of the country and the project’s national dissemination forum. It is hoped that the results of this project will help local communities and policy makers in the formulation of appropriate programs and improvements in the targeting schemes aimed at reducing poverty.
    [Show full text]
  • The Arakan Valley Experience an Integrated Sectoral Programming in Building Resilience
    THE ARAKAN VALLEY EXPERIENCE AN INTEGRATED SECTORAL PROGRAMMING IN BUILDING RESILIENCE A CASE STUDY ON HOW ACTION AGAINST HUNGER INTERVENTIONS HELPED BARANGAY KINAWAYAN IN ARAKAN VaLLEY WORK TOWARDS RESILIENCE INTERNATIONAL INSTITUTE OF RURAL RECONSTRUCTION The Arakan Valley Experience An Integrated Sectoral Programming in Building Resilience All rights reserved © 2018 Humanitarian Leadership Academy Philippines The Humanitarian Leadership Academy is a charity registered in England and Wales (1161600) and a company limited by guarantee in England and Wales (9395495). Humanitarian Leadership Academy Philippines is a branch office of the Humanitarian Leadership Academy. This publication may be reproduced by any method without fee or prior permission for teaching purposes, but not for resale. For copying in any other circumstances, prior written permission must be obtained from the publisher, and a fee may be payable. Written by International Institute of Rural Reconstruction Designed by Marleena Litton Edited by Ruby Shaira Panela Images are from the International Institute of Rural Reconstruction www.humanitarianleadershipacademy.org TABLE OF CONTENTS List of Acronyms ii Introduction 1 Arakan Valley 2 Action Against Hunger Goes to Arakan Valley 6 Fighting Malnutrition 8 Improving Food Security and Livelihood (FSL) 12 Better Water, Sanitation and Hygiene (WASH) 15 Disaster Risk Reduction (DRR) 24 Gender Mainstreaming 28 Background: The Program 28 Conceptualization 28 Implementation 31 Systems and Processes to Mainstream Sectoral Programs 32 in Municipal and Barangay Level Internal Monitoring and Evaluation 35 Evidence of good practices 37 Lessons Learned 40 Annexes 42 Annex 1. Methodology 43 Annex 2. Itinerary of data gathering activity in 46 Kidapawan City, North Cotabato Annex 3. Partnership with Key Stakeholders 47 Annex 4.
    [Show full text]
  • PALMA+PB Alliance of Municipalities
    PALMA+PB Alliance of Municipalities Province of Cotabato Region X11 PALMA+PB is an acronym DERIVED FROM the first letter of the names of the municipalities that comprise the Alliance, namely: Pigcawayan Alamada Libungan Midsayap Aleosan Pikit Banisilan Pikit became a member of the alliance only last April 25, 2008 and Banisilan in August 18,2011 after one (1) year of probation as observer . PALMA+PB Alliance Luzon Alamada Banisilan Pigcawayan Visayas Libungan Aleosan Midsayap Mindanao Pikit Located in the first congressional district of Cotabato Province, Region XII in the island of Mindanao, Philippines. PALMA+PB Alliance THE CREATION OF PALMA+PB Alliance The establishment of this Alliance gets its legal basis from REPUBLIC ACT 7160 “THE LOCAL GOVERNMENT CODE OF 1991, Section 33, Art. 3, Chapter 3, which states that; “LGUs may, through appropriate ordinances, group themselves, consolidate, or ordinate their efforts, services, and resources for purposes commonly beneficial to them. In support to such undertakings, the LGUs involved may, upon approval by the Sanggunian concerned after a public hearing conducted for the purpose, contribute funds, real estate, equipment and other kinds of property and appoint or assign, personnel under such terms and conditions as may be agreed upon by the participating local units through Memoranda of Agreement (MOA).” PALMA+PB Alliance Profile Land Area :280,015.88 has. Population :393,831 Population Density :1.41 person/ha. Population by Tribe: Cebuano :30.18% Maguindanaon :25.45% Ilonggo :19.82% Ilocano :11.15% IP’s :10.55% Other Tribes :2.85% Number of Barangays :215 Number of Households :81,767 Basic Products Agricultural and Fresh Water fish PALMA+PB Alliance B.
    [Show full text]
  • The Philippines
    The Philippines Impact of Early Warning Early Action Exploring the interplay between El Niño-induced drought, conflict and gender Efficient humanitarian assistance requires anticipation. For FAO, this means harnessing risk information systems to act faster and avert acute hunger. QU Dongyu FAO Director-General The Philippines Impact of Early Warning Early Action Exploring the interplay between El Niño-induced drought, conflict and gender Food and Agriculture Organization of the United Nations Rome, 2020 REQUIRED CITATION FAO. 2020. The Philippines – Impact of Early Warning Early Action. Rome. The designations employed and the presentation of material in this information product do not imply the expression of any opinion whatsoever on the part of the Food and Agriculture Organization of the United Nations (FAO) concerning the legal or development status of any country, territory, city or area or of its authorities, or concerning the delimitation of its frontiers or boundaries. Dashed lines on maps represent approximate border lines for which there may not yet be full agreement. The mention of specific companies or products of manufacturers, whether or not these have been patented, does not imply that these have been endorsed or recommended by FAO in preference to others of a similar nature that are not mentioned. The views expressed in this information product are those of the author(s) and do not necessarily reflect the views or policies of FAO. ©FAO, 2020 Some rights reserved. This work is made available under the Creative Commons Attribution- NonCommercial-ShareAlike 3.0 IGO licence (CC BY-NC-SA 3.0 IGO; https://creativecommons.org/licenses/by-nc-sa/3.0/igo/legalcode/legalcode).
    [Show full text]
  • Policy Briefing
    Policy Briefing Asia Briefing N°83 Jakarta/Brussels, 23 October 2008 The Philippines: The Collapse of Peace in Mindanao Once the injunction was granted, the president and her I. OVERVIEW advisers announced the dissolution of the government negotiating team and stated they would not sign the On 14 October 2008 the Supreme Court of the Philip- MOA in any form. Instead they would consult directly pines declared a draft agreement between the Moro with affected communities and implied they would Islamic Liberation Front (MILF) and the Philippines only resume negotiations if the MILF first disarmed. government unconstitutional, effectively ending any hope of peacefully resolving the 30-year conflict in In the past when talks broke down, as they did many Mindanao while President Gloria Macapagal-Arroyo times, negotiations always picked up from where they remains in office. The Memorandum of Agreement on left off, in part because the subjects being discussed Ancestral Domain (MOA-AD or MOA), the culmination were not particularly controversial or critical details of eleven years’ negotiation, was originally scheduled were not spelled out. This time the collapse, followed to have been signed in Kuala Lumpur on 5 August. At by a scathing Supreme Court ruling calling the MOA the last minute, in response to petitions from local offi- the product of a capricious and despotic process, will cials who said they had not been consulted about the be much harder to reverse. contents, the court issued a temporary restraining order, preventing the signing. That injunction in turn led to While the army pursues military operations against renewed fighting that by mid-October had displaced three “renegade” MILF commanders – Ameril Umbra some 390,000.
    [Show full text]
  • NORTH COTABATO (In P0.00 )
    Annex 1 LBM No. 61 CY 2009 FINAL INTERNAL REVENUE ALLOTMENT FOR BARANGAYS REGION XII PROVINCE OF NORTH COTABATO (In P0.00 ) BARANGAY TOTAL 01 MUNICIPALITY OF ALAMADA 1 Bao 2,400,680.00 2 Barangiran 1,668,634.00 3 Camansi 965,004.00 4 Dado 2,925,158.00 5 Guiling 1,756,356.00 6 Kitacubong (Pob.) 2,026,317.00 7 Macabasa 945,545.00 8 Malitubog 1,265,854.00 9 Mapurok 1,192,031.00 10 Mirasol 915,583.00 11 Pacao 1,071,568.00 12 Paruayan 1,272,958.00 13 Pigcawaran 1,870,950.00 14 Polayagan 1,234,966.00 15 Rangayen 1,259,367.00 16 Raradangan 1,038,827.00 ----------------------- Total 23,809,798.00 ============== 02 MUNICIPALITY OF ALEOSAN 1 Bagolibas 836,819.00 2 Cawilihan 874,502.00 3 Dualing 1,319,599.00 4 Dunguan 1,125,622.00 5 Katalicanan 820,139.00 6 Lawili 942,456.00 7 Lower Mingading 825,699.00 8 Luanan 807,166.00 9 Malapang 888,093.00 10 New Leon 1,130,255.00 11 New Panay 1,248,247.00 12 Pagangan 1,379,830.00 13 Palacat 721,607.00 14 Pentil 918,672.00 15 San Mateo 1,782,610.00 CY 2009 FINAL INTERNAL REVENUE ALLOTMENT FOR BARANGAYS REGION XII PROVINCE OF NORTH COTABATO (In P0.00 ) BARANGAY TOTAL 16 Santa Cruz 800,062.00 17 Tapodoc 982,919.00 18 Tomado 1,296,742.00 19 Upper Mingading 1,202,224.00 ----------------------- Total 19,903,263.00 ============== 03 MUNICIPALITY OF ANTIPAS 1 Camutan 1,112,958.00 2 Canaan 745,081.00 3 Dolores 795,120.00 4 Kiyaab 1,130,255.00 5 Luhong 859,367.00 6 Magsaysay 954,811.00 7 Malangag 817,977.00 8 Malatad 1,451,800.00 9 Malire 979,522.00 10 New Pontevedra 926,085.00 11 Poblacion 2,374,425.00 12 B.
    [Show full text]
  • One Big File
    MISSING TARGETS An alternative MDG midterm report NOVEMBER 2007 Missing Targets: An Alternative MDG Midterm Report Social Watch Philippines 2007 Report Copyright 2007 ISSN: 1656-9490 2007 Report Team Isagani R. Serrano, Editor Rene R. Raya, Co-editor Janet R. Carandang, Coordinator Maria Luz R. Anigan, Research Associate Nadja B. Ginete, Research Assistant Rebecca S. Gaddi, Gender Specialist Paul Escober, Data Analyst Joann M. Divinagracia, Data Analyst Lourdes Fernandez, Copy Editor Nanie Gonzales, Lay-out Artist Benjo Laygo, Cover Design Contributors Isagani R. Serrano Ma. Victoria R. Raquiza Rene R. Raya Merci L. Fabros Jonathan D. Ronquillo Rachel O. Morala Jessica Dator-Bercilla Victoria Tauli Corpuz Eduardo Gonzalez Shubert L. Ciencia Magdalena C. Monge Dante O. Bismonte Emilio Paz Roy Layoza Gay D. Defiesta Joseph Gloria This book was made possible with full support of Oxfam Novib. Printed in the Philippines CO N T EN T S Key to Acronyms .............................................................................................................................................................................................................................................................................. iv Foreword.................................................................................................................................................................................................................................................................................................... vii The MDGs and Social Watch
    [Show full text]
  • REPUBLICOF the PHILIPPINES Joint Memorandum Circular No. 01, Series of 2010 06 August 2010 TO
    dti OE~A"rM("T OF TRAot: AND IJCOUSTlfY "HIll"PI,.rS REPUBLICOF THE PHILIPPINES Joint Memorandum Circular No. 01, Series of 2010 06 August 2010 TO: THE REGIONAL AND PROVINCIAL DIRECTORS OF THE DEPARTMENT OF THE INTERIOR AND LOCAL GOVERNMENT (DILG) AND THE DEPARTMENT OF TRADE AND INDUSTRY (DTI), THE BUREAU OF FIRE PROTECTION (BFP) AND MEMBERS OF THE SANGGUNIANG PANGLUNGSOD AND SANGGUNIANG BAYAN SUBJECT: GUIDELINES IN IMPLEMENTING THE STANDARDS IN PROCESSING BUSINESS PERMITS AND LICENSESIN ALL CITIESAND MUNICIPALITIES 1.0 Purpose 1.1 To disseminate the service standards in processing business permits and licenses which cities and municipalities are enjoined to follow; 1.2 To provide the guidelines for streamlining the business permits and licensing systems (BPLS) in cities and municipalities in accordance with the service standards which the national government is setting consistent with Republic Act No. 9485, otherwise known as the Anti-Red Tape Act of 2007 (ARTA); 1.3 To clarify the roles and responsibilities of the Department of the Interior and Local Government (DILG), the Department of Trade and Industry (DTI), and the various cities and municipalities in the country in ensuring the implementation of the BPLSstandards. 2.0 Statement of Policies 2.1 The government recognizes the importance of improving the country's growth potential through enhancing its competitiveness at the national and local levels. This can only be achieved through reforms that reduce the cost of doing business in the country and address the other policy issues that discourage international and local investors. 2.2 Pursuant to Republic Act No. 9485, all government instrumentalities and local government units are mandated to provide efficient delivery of services to the public by reducing bureaucratic red tape and preventing graft and corruption, and providing penalties thereof.
    [Show full text]
  • EMBRACE PROJECT) End-Of-Project Evaluation Report External Evaluator: Nasrudin Buisan
    OXFAM EVALUATION REPORT SEPTEMBER 2019 Numo Organic Farmers Association members participating in the Women’s Market in Sultan Kudarat. Photo: Denvie Balidoy/Oxfam EMPOWERING POOR WOMEN AND MEN IN BUILDING RESILIENT AND ADAPTIVE COMMUNITIES IN MINDANAO (EMBRACE PROJECT) End-of-Project Evaluation Report External evaluator: Nasrudin Buisan This evaluation assessed the achievements of the extension phase of the EMBRACE project, which focused on improving the livelihood and social status of vulnerable poor women and establishing partnerships between farmers and local government units for climate adaptive farming. The study involved key informant interviews, focus group discussions, a case study and a survey of 436 respondents (319 EMBRACE and 117 non-EMBRACE participants). Overall, it found that 32% of EMBRACE farmers who shifted to organic farming experienced higher yields and spent less on farming inputs. philippines.oxfam.org ACRONYMS BINDS Building Resilient and Adaptive Communities and Institutions in Mindanao CCA Climate change adaptation COM Community Organizers Multiversity CRFS Climate Resiliency Field School DA Department of Agriculture EMBRACE Empowering Poor Women and Men in Building Resilient and Adaptive Communities in Mindanao LGU Local government unit NGO Non-government organization NOFA Numo Organic Farmers Association R1 Rice Watch Action Network RDISK Rural Development Institute of Sultan Kudarat SCALE Landscape-based Climate Adaptive Livelihood Field School SIMCARRD Sustainable Integrated Area Development (SIAD) Initiatives
    [Show full text]