Earthquake in Sikkim, India

Total Page:16

File Type:pdf, Size:1020Kb

Earthquake in Sikkim, India EHA, WHO, SEARO Situation Report (SR-1) 19 September 2011 Emergency and Humanitarian Action (EHA) Unit World Health Organization (WHO) Regional Office for South East Asia (SEARO) Earthquake in Sikkim, India Highlights • At least 21 people have been killed, 16 in India, and 5 in Nepal and over 100 are injured after an earthquake measuring 6.8 on the Ric hter Scale shook Sikkim on Sunday e vening, 18 September 2011. • Strong tremors were a lso felt in parts of North and East India and parts of Bangladesh and Nepal, causing widespread panic. The epicenter of the quake is said to be just 64 kilometer North-West of Gangtok. • Government organizations are trying their best to carry out rescue and relief operations and are conducting rapid damage assessments in remote areas. • WHO SEARO and Country Offices are in close contact with concerned ministries, monitoring the situation and standby to support emergency supplies and teams as needed. Earthquake Report Major Earthquake Time: 6.10 pm; Indian Standard Time; (12 :40 GMT) Richter Scale: 6.8 (USGS) Epicenter: 64 Kilometers North-West of Gangtok Depth: 20+ Kilometers below earth surface After Shocks Three after shocks measuring 5.7, 5.1 and 4.6 Richter Scale were felt after the major Earthquake. Page 1 of 5 EHA, WHO, SEARO Situation Report (SR-1) 19 September 2011 Incident sit mapping Caption: Map showing the epicenter of the major earthquake Situation Analysis India India was worst affected with at least 16 people killed. Seven people were reportedly killed in Sikkim, out of which two a t Singtham, one at Dikchu in Ea st Sikkim district and another a t Mangan. At least two people have died in Bihar, while fo ur deaths have been reported from West Bengal. Power supply was disrupted in areas near Sikkim, including Kalimpong of Darjeeling district, and adjoining Jalpaiguri and Cooch Behar districts; the outages were in part blamed on an House damaged due to earthquake in Sikkim, India affected electric substation in Siliguri. Water supply was interrupted in Sikkim. National Highway 31, the major highway linking Page 2 of 5 EHA, WHO, SEARO Situation Report (SR-1) 19 September 2011 Sikkim to the rest of India, was damaged. Two buildings of the Indo-China Border Police in the Pegong area of North Sikkim collapsed. Nepal In the capital city of Nepal, Kathmandu, the damage of earthquake was less serious. The magnitude of the earthquake was 5.8 Mw in the region. In Kathmandu, three people were killed when a wall at the British Embassy collapsed. Many more people were injured. The effec t of the s hock was more serious in the eastern region of Nepal, which was closer to the epicenter. Sunsari experienced powercuts and the telephone lines died. Two people were killed in the eastern city of Dharan. Car damaged due to earthquake, Kathmandu, Nepal Bhutan Bhutan has not rec eived any casualty reports so fa r, however cracks on wa lls and ceilings of houses have been reported in Wa ngthangkha village, Lango and the town area in Paro. It also received reports of a land s lide right after c rossing the Isuna B ridge from Paro towards Thimphu and falling boulders after crossing Chundzom Bridge. Citizens asked avoid traveling on the Paro- Thimphu highway. Phone lines remains clogged. No damage reporte d from Eas t Bhutan. Fo ur road blocks caused by falling debris are reported on the Chukha - Phuntsholing road. Two homes in Haa report damage with 3-4 people having suffered minor injury. Thimphu Dzong has sustained some cracks in the Utse and one of the four corner towers. Occupants have been moved out to safer parts. Bangladesh The earthquake was strongest felt in northern Bangladesh. The quake was also felt in Dhaka, Sylhet, Faridpur, Bogra and as far as Chittagong. Panicked people rushed out of their homes and offices, but the only damage seems to be tilted and cracked buildings; no casualties were reported. Cell phone lines were also down for a few minutes during the quake. Its epicentre was in 495 kilometre away from Dhaka, 68 kilometres north-west of Gangtok, Sikkim, India, 119 km north-west of Shiliguri, West Bengal, according to the US Geological Survey. It was 10 km (6.2 miles) deep. The Pacific Tsunami Warning Center said a destructive tsunami was not generated based on earthquake and historical tsunami data. Few buildings have tilted and developed cracks in capital Dhaka and other part of t he country but there have been no reports of casualties so far. Telecommunication network was jammed and disrupted for a while after earthquake as everybody was trying to know the whereabouts of their near and dear ones at the same time. Page 3 of 5 EHA, WHO, SEARO Situation Report (SR-1) 19 September 2011 Causalities and Damages Table showing casualties and damages (Number of damage health facilities and homes not confirmed as yet) Affected countries Deaths Injured Cases India 16 >100 Nepal 5 Not yet identified Bhutan - Not yet identified Bangladesh - Not yet identified Communication, Transportation and Electricity Power India Communication: Partial disruption in communication. Transportation: Local transportation is disrupted is some places. Electric Power: Temporary electricity outage is reported in Sikkim. Response India Government: Government is deploying army personnel, helicopters and relie f supplies for the affected areas. Loca l Disaster Management Agency, India has dispatched 4 air force plane s to affected areas for emergency rescue and relief operations. WHO: WHO SEARO and Country Offices are in close contact with concern ministries, monitoring the situation and stand by to support emergency supplies and teams as needed. Bangladesh Government: DGHS Control room informed that they didn’t receive any causality reports from any part of the country as yet. WHO: WHO EHA program is in close coordination with DGHS and has assu red necessary support, whenever needed. Nepal: Government: Ministry of Home Affai rs (MoHA) organized an emergency meet ing on 19 September. A Central Natural Disaster Relief Committee (CNDRC) meeting was also held on 19 September. Security personnel were mobilised for s earch and resc ue in the most affected Page 4 of 5 EHA, WHO, SEARO Situation Report (SR-1) 19 September 2011 areas in Ka thmandu, Sankhuwasabha, Dhankuta and Sunsari districts where da mages to lives and properties have been reported. UN: The UNOCHA Humanitarian Support Unit i n Nepal is cl osely working with MoHA. The UN Field Coordination Office (UNFCO) Biratnagar held an emergency meeting with partners to provide updates and collate information received across the region. The Nepal Red Cross Society (NRCS) established a three member task team to communicate and coordinate the response with the affected. WHO: WHO EHA Unit in Nepal is keeping a close coordination with all the agencies. Sources of Information: Information is gathered from the following sources. This report is for reference only and should not be quoted as factual accuracy can change. 1. WHO Country Offices 2. National, international websites and media Page 5 of 5 .
Recommended publications
  • A Detailed Report on Implementation of Catchment Area Treatment Plan of Teesta Stage-V Hydro-Electric Power Project (510Mw) Sikkim
    A DETAILED REPORT ON IMPLEMENTATION OF CATCHMENT AREA TREATMEN PLAN OF TEESTA STAGE-V HYDRO-ELECTRIC POWER PROJECT (510MW) SIKKIM - 2007 FOREST, ENVIRONMENT & WILDLIFE MANAGEMENT DEPARTMENT GOVERNMENT OF SIKKIM GANGTOK A DETAILED REPORT ON IMPLEMENTATION OF CATCHMENT AREA TREATMENT PLAN OF TEESTA STAGE-V HYDRO-ELECTRIC POWER PROJECT (510MW) SIKKIM FOREST, ENVIRONMENT & WILDLIFE MANAGEMENT DEPARTMENT GOVERNMENT OF SIKKIM GANGTOK BRIEF ABOUT THE ENVIRONMENT CONSERVATION OF TEESTA STAGE-V CATCHMENT. In the Eastern end of the mighty Himalayas flanked by Bhutan, Nepal and Tibet on its end lays a tiny enchanting state ‘Sikkim’. It nestles under the protective shadow of its guardian deity, the Mount Kanchendzonga. Sikkim has witnessed a tremendous development in the recent past year under the dynamic leadership of Honorable Chief Minister Dr.Pawan Chamling. Tourism and Power are the two thrust sectors which has prompted Sikkim further in the road of civilization. The establishment of National Hydro Project (NHPC) Stage-V at Dikchu itself speaks volume about an exemplary progress. Infact, an initiative to treat the land in North and East districts is yet another remarkable feather in its cap. The project Catchment Area Treatment (CAT) pertains to treat the lands by various means of action such as training of Jhoras, establishing nurseries and running a plantation drive. Catchment Area Treatment (CAT) was initially started in the year 2000-01 within a primary vision to control the landslides and to maintain an ecological equilibrium in the catchment areas with a gestation period of nine years. Forests, Environment & Wildlife Management Department, Government of Sikkim has been tasked with a responsibility of nodal agency to implement catchment area treatment programme by three circle of six divisions viz, Territorial, Social Forestry followed by Land Use & Environment Circle.
    [Show full text]
  • Date of Acceptance of Contract Period of Completion Of
    Page 1 (SENSITIZING REPORT) SENSITIZING THE PUBLIC ABOUT CORRUPTION - DISPLAY OF STANDARD NOTICE BOARD BY DEPARTMENTS/ORGANISATION REGARDING : 764 BRTF (P) SWASTIK : JULY 2012 (CONTRACT MORE THAN 50 LAKHS) (Reference HQ CE (P) Swastik letter No.16500/Policy/69/Vig dated 10 Dec 2009) S/ CA No Name of work Name of contractor CA Amount Date of Period of Actual date Actual Date Reason for Remarks No /Firm (In Lacs) acceptance completion of starting of delay, if any of contract of contract work completion 1 2 3 4 5 6 7 8 9 10 11 1 CE(P)/SW Handling & conveyance of cement, The G.M Sikkim Rs. 01.04.2008 1 year 01.04.2008 31.03.2009 Completed TK/ bitumen, steel etc Nationalised 8.17/MT/Km MOT-01/ Transport, Gangtok 08-09 2 CE (P) Construction of Toe walls and RCC M/S Shiv Shakti 2891.21/ 28.08.2008 15 months 02.09.2008 - Extended upto SWTK/02/ retaining walls from Km 24.00 to Km 51.00 Enterprises, A-340/2, 1792.50 31.03.2012 2008-09 on Road Gangtok-Nathula (JNM) under Near P & T Colony, 764 BRTF sector of project Swastik In Shastri Nagar, Sikkim State. Jodhpur-342003 3 CE (P) Supply and stacking of coarse river sand M/s Anil Steel 92.57 29.08.2008 120 days 02.09.2009 15.04.2009 Completed SWTK/03/ between km 24.00 to 51.00 on road Furniture, Shop 2008-09 Gangtok-Nathula No.150, Sector 7C, Chandigarh-160026 4 CE (P) Design & construction of 110 m long major M/S Poddar 892/ 25.10.2008 24 months 24.11.2008 23.11.2010 Completed SWTK/07/ pmt bridge over river Dikchu-Khola at km Construction 899.5 2008-09 31.103 on road Singtham-Dikchu Co;Engineers
    [Show full text]
  • List of Bridges in Sikkim Under Roads & Bridges Department
    LIST OF BRIDGES IN SIKKIM UNDER ROADS & BRIDGES DEPARTMENT Sl. Total Length of District Division Road Name Bridge Type No. Bridge (m) 1 East Singtam Approach road to Goshkan Dara 120.00 Cable Suspension 2 East Sub - Div -IV Gangtok-Bhusuk-Assam lingz 65.00 Cable Suspension 3 East Sub - Div -IV Gangtok-Bhusuk-Assam lingz 92.50 Major 4 East Pakyong Ranipool-Lallurning-Pakyong 33.00 Medium Span RC 5 East Pakyong Ranipool-Lallurning-Pakyong 19.00 Medium Span RC 6 East Pakyong Ranipool-Lallurning-Pakyong 26.00 Medium Span RC 7 East Pakyong Rongli-Delepchand 17.00 Medium Span RC 8 East Sub - Div -IV Gangtok-Bhusuk-Assam lingz 17.00 Medium Span RC 9 East Sub - Div -IV Penlong-tintek 16.00 Medium Span RC 10 East Sub - Div -IV Gangtok-Rumtek Sang 39.00 Medium Span RC 11 East Pakyong Ranipool-Lallurning-Pakyong 38.00 Medium Span STL 12 East Pakyong Assam Pakyong 32.00 Medium Span STL 13 East Pakyong Pakyong-Machung Rolep 24.00 Medium Span STL 14 East Pakyong Pakyong-Machung Rolep 32.00 Medium Span STL 15 East Pakyong Pakyong-Machung Rolep 31.50 Medium Span STL 16 East Pakyong Pakyong-Mamring-Tareythan 40.00 Medium Span STL 17 East Pakyong Rongli-Delepchand 9.00 Medium Span STL 18 East Singtam Duga-Pacheykhani 40.00 Medium Span STL 19 East Singtam Sangkhola-Sumin 42.00 Medium Span STL 20 East Sub - Div -IV Gangtok-Bhusuk-Assam lingz 29.00 Medium Span STL 21 East Sub - Div -IV Penlong-tintek 12.00 Medium Span STL 22 East Sub - Div -IV Penlong-tintek 18.00 Medium Span STL 23 East Sub - Div -IV Penlong-tintek 19.00 Medium Span STL 24 East Sub - Div -IV Penlong-tintek 25.00 Medium Span STL 25 East Sub - Div -IV Tintek-Dikchu 12.00 Medium Span STL 26 East Sub - Div -IV Tintek-Dikchu 19.00 Medium Span STL 27 East Sub - Div -IV Tintek-Dikchu 28.00 Medium Span STL 28 East Sub - Div -IV Gangtok-Rumtek Sang 25.00 Medium Span STL 29 East Sub - Div -IV Rumtek-Rey-Ranka 53.00 Medium Span STL Sl.
    [Show full text]
  • LTOA-Minutes
    Minutes of Meeting in regard to Connectivity / Open Access with constituents of Eastern Region held on 08-02-2012 at NRPC, Delhi List of participants is enclosed at Annexure-1. OPTCL initiated the discussion regarding the transmission system planned under open access/connectivity for generation projects in Orissa and stated that the transmission system need to be planned in a coordinate manner in order to take care of evacuation arrangement for delivery of the States’ share from the generation projects. After several rounds of discussion, it was concluded that there would be no change in the transmission system planned for Phase-I generation projects in Orissa which is already under implementation. The transmission system for phase-II generation projects in Orissa is being reviewed in consultation with OPTCL. Accordingly, it was decided that the Open Acess/LTA cases for the generation projects other than Orissa Phase-II projects would be discussed in the present meeting. The details of the deliberation in this regard is given below : 1.0 Connectivity / Open Access for Phase-II Generation Projects in Jharkhand, Bihar and West Bengal of Eastern Region POWERGRID explained the details of the Phase-II generation projects in Jharkhand, Bihar and West Bengal who have applied for connectivity/open access for transfer of power to various beneficiaries. The status of above projects was discussed in a meeting for Connectivity and Long Term Access held on 29-07-2011 at POWERGRID office, Gurgaon. Keeping in view the progress of above projects, it was decided to discuss some of the projects in the present Standing Committee meeting.
    [Show full text]
  • Liberation War of Bangladesh
    Bangladesh Liberation War, 1971 By: Alburuj Razzaq Rahman 9th Grade, Metro High School, Columbus, Ohio The Bangladesh Liberation War in 1971 was for independence from Pakistan. India and Pakistan got independence from the British rule in 1947. Pakistan was formed for the Muslims and India had a majority of Hindus. Pakistan had two parts, East and West, which were separated by about 1,000 miles. East Pakistan was mainly the eastern part of the province of Bengal. The capital of Pakistan was Karachi in West Pakistan and was moved to Islamabad in 1958. However, due to discrimination in economy and ruling powers against them, the East Pakistanis vigorously protested and declared independence on March 26, 1971 under the leadership of Sheikh Mujibur Rahman. But during the year prior to that, to suppress the unrest in East Pakistan, the Pakistani government sent troops to East Pakistan and unleashed a massacre. And thus, the war for liberation commenced. The Reasons for war Both East and West Pakistan remained united because of their religion, Islam. West Pakistan had 97% Muslims and East Pakistanis had 85% Muslims. However, there were several significant reasons that caused the East Pakistani people to fight for their independence. West Pakistan had four provinces: Punjab, Sindh, Balochistan, and the North-West Frontier. The fifth province was East Pakistan. Having control over the provinces, the West used up more resources than the East. Between 1948 and 1960, East Pakistan made 70% of all of Pakistan's exports, while it only received 25% of imported money. In 1948, East Pakistan had 11 fabric mills while the West had nine.
    [Show full text]
  • An Assessment of Dams in India's North East Seeking Carbon Credits from Clean Development Mechanism of the United Nations Fram
    AN ASSESSMENT OF DAMS IN INDIA’S NORTH EAST SEEKING CARBON CREDITS FROM CLEAN DEVELOPMENT MECHANISM OF THE UNITED NATIONS FRAMEWORK CONVENTION ON CLIMATE CHANGE A Report prepared By Mr. Jiten Yumnam Citizens’ Concern for Dams and Development Paona Bazar, Imphal Manipur 795001 E-add: [email protected], [email protected] February 2012 Supported by International Rivers CONTENTS I INTRODUCTION: OVERVIEW OF DAMS AND CDM PROJECTS IN NORTH EAST II BRIEF PROJECT DETAILS AND KEY ISSUES AND CHALLENGES PERTAINING TO DAM PROJECTS IN INDIA’S NORTH EAST SEEKING CARBON CREDITS FROM CDM MECHANISM OF UNFCCC 1. TEESTA III HEP, SIKKIM 2. TEESTA VI HEP, SIKKIM 3. RANGIT IV HEP, SIKKIM 4. JORETHANG LOOP HEP, SIKKIM 5. KHUITAM HEP, ARUNACHAL PRADESH 6. LOKTAK HEP, MANIPUR 7. CHUZACHEN HEP, SIKKIM 8. LOWER DEMWE HEP, ARUNACHAL PRADESH 9. MYNTDU LESHKA HEP, MEGHALAYA 10. TING TING HEP, SIKKIM 11. TASHIDING HEP, SIKKIM 12. RONGNINGCHU HEP, SIKKIM 13. DIKCHU HEP, SIKKIM III KEY ISSUES AND CHALLENGES OF DAMS IN INDIA’S NORTH EAST SEEKING CARBON CREDIT FROM CDM IV CONCLUSIONS V RECOMMENDATIONS VI ANNEXURES A) COMMENTS AND SUBMISSIONS TO CDM EXECUTIVE BOARD ON DAM PROJECTS FROM INDIA’S NORTH EAST SEEKING REGISTRATION B) MEDIA COVERAGES OF MYNTDU LESHKA DAM SEEKING CARBON CREDITS FROM CDM OF UNFCCC GLOSSARY OF TERMS ACT: Affected Citizens of Teesta CDM: Clean Development Mechanism CC : Carbon Credits CER: Certified Emissions Reductions CWC: Central Water Commission DPR: Detailed Project Report DOE: Designated Operating Entity DNA: Designated Nodal Agency EAC:
    [Show full text]
  • GANGTOK (Civil Extraordinary Jurisdiction)
    THE HIGH COURT OF SIKKIM : GANGTOK (Civil Extraordinary Jurisdiction) ------------------------------------------------------------------------------------------ D.B.: THE HON’BLE MR. JUSTICE JITENDRA KUMAR MAHESHWARI, C.J. THE HON’BLE MR. JUSTICE BHASKAR RAJ PRADHAN, JUDGE ---------------------------------------------------------------------------------------------------------------------- W.P. (PIL) No. 04 of 2017 In Re: Release of Water from Dikchu Hydelpower Project. .... Petitioner. Versus 1. The Chief Secretary, Government of Sikkim, Gangtok. 2. The Home Secretary, Government of Sikkim, Gangtok. 3. The District Collector, East District, Gangtok. 4. Mr. Niladri Mondal, Plant Head, Sneha Kinetic Power Project Ltd., D.H.E.P. 96 MW East Sikkim. 5. National Hydroelectric Power Corpn. Ltd., Teesta Stage-V Balutar, Sirwani Singtam, East Sikkim. 6. General Manager, Teesta State III. Hydro Power at Chungthang, North Sikkim 7. The Director, Shiga Energy Ltd., Implementing company of Tashiding, Hydroelectric Project at Lower Kabithang, Labing, West Sikkim. 8. The General Manager, National Hydroelectric Power Project at Hingdam, Tashiding Road, South Sikkim. 2 W. P. (PIL) No. 04 of 2017 In Re: Release of Water from Dikchu Hydelpower Project v. Chief Secretary & Ors. 9. Site Incharge/Plant Incharge, O and M, Dans Energy Private Limited, Chisopaney, South Sikkim. 10. Site Incharge/Plant Incharge, O and M. Chuzachen Hydro Electric Project At Rangpo and Rongli, East Sikkim. 11. Site Incharge/Plant Incharge, O and M. Rongli Dam at Rongli, East Sikkim. ….. Respondents. ---------------------------------------------------------------------------- Appearance: Mr. N. Rai, Senior Advocate as Amicus Curiae. Dr. Doma T. Bhutia, Additional Advocate General with Mr. S. K. Chettri, Government Advocate for the Respondent nos.1 to 3. Mr. Tashi Rapten Barfungpa, Advocate for the respondent no.4. Mr. A. K.
    [Show full text]
  • Help Is Just a Phone Call Away Help Is Just A
    extras 1 NOW! extrasextrasTHE NOW! SPECIAL 8-PAGE PULL-OUT Yana ko HELPHELP ISIS dekhne yahan JUSTJUST AA aana PHONEPHONE CALLCALL AWAYAWAY SamSamSam RaiRaiRai andandand hishishis fourfourfour friendsfriendsfriends areareare notnotnot ininin governmentgovernmentgovernment service,service,service, THE butbutbut theytheythey areareare definitelydefinitelydefinitely FACTOR intointointo publicpublicpublic service...service...service... PROFILE ON pg 3 THE MIRACLE MUSHROOM EATERS CONGREGATE LOAN TURN TO pg 4 FOR DETAILS MELA’S LOST ALL ITS OM THE SIKKIM JOINS HANDS TO MANTRA FOR MAZAA BRING SUNSHINE TO THE ON pg 3 AUTUMNAL YEARS WEEKEND - TURN TO pg 4 FOR DETAILS - BLUES LIVE IN CONCERT! 6 & 7 MAY 2003 ORGANISED BY THE RANIPOOL YOUTH 7 extras 2 Panorama presents extraneous Color Lab THE GANGTOK STATE OF MIND GOOD AFTERNOON, GANGTOK BAZAAR Buzz pic KARCHOONG DIYALI . VOICE MAIL? vidently this Bazaar ‘Booze’ E(phonetic for Buzz)column now seems kind of incomplete without the mobile service run- ning on 22 lakhs handsets in India. Billing and charges for FREE SMS aside, has anyone used the VMS service promised on the numerous hoardings around town? A friend tried and Service? Dhundte reh jaoge!! a NOW! pic. he’s still trying. Why won’t he get the message that M is for expected over the coming minimize risks. The State gov- Mute NOT Mail in the VMS. months, some guidelines have to ernment here needs to take Information age indeed. How be set. A meeting has been called quick and preventive action be- about a night of heavy rain and for health workers and others on fore we face an epidemic we phone numbers get inter- the 1st May.
    [Show full text]
  • Minutes of Mom Rangpo SPS Review 290317
    Eastern Regional Power Committee, Kolkata Minutes of Special Meeting to review the limit of maximum power flow through 400kV Rangpo – Siliguri D/c line in respect of Rangpo SPS held on 29th March, 2017 at ERPC, Kolkata List of participants is at Annexure-A. Member Secretary, ERPC welcomed all the participants to the special meeting. He informed that this special meeting was convened in continuation to the special meeting held on 14.10.2016 and 30.11.2016 at ERPC, Kolkata to review the limit of maximum power flow through 400kV Rangpo – Siliguri D/c line in respect of SPS at 400kV level at Rangpo S/s for reliable power evacuation. It was informed that the meeting was convened on the request of Teesta Urja after the declaration of COD of their all six units. Following issues were discussed: 1. Progress of Rangpo – Kishanganj 400kV D/c (Quad) line: Teesta valley Power Transmission Ltd. (TPTL) updated the progress of Rangpo – Kishanganj 400kV D/c (Quad) line as given below: Total Completed Locations/Foundation 591 521 Erection 591 511 Stringing 215km 145km It was informed that the work is getting delayed due to severe ROW issues nearby Darjeeling (Gorkhaland) area. During the meeting held on 30.11.2016, it was intimated that the line would be completed by March 17. However, the line is now expected to be commissioned by October, 2017 as mentioned by TPTL. On query, it was informed that contract was awarded in November, 2009 but the work got delayed due to land issues and finally the work started in 2012 after the MoU with Govt.
    [Show full text]
  • CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Petition No. 10/SM/2017 Coram: Shri P. K. Pujari, Chairperson Dr. M. K
    CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Petition No. 10/SM/2017 Coram: Shri P. K. Pujari, Chairperson Dr. M. K. Iyer, Member Date of Order: 21st of February, 2019 In the matter of Non-compliance of the provision of the Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations, 2009 And In the matter of Teestavellay Power Transmission Limited 2nd Floor, Vijaya Building 17, Barakhamba Road New Delhi-110 001 ....Respondent Parties present: 1) Sh. Tarun Johri, Advocate, TPTL 2) Shri Ankur Gupta, Advocate, TPTL 3) Ms. Swapna Seshadri, Advocate Dans Energy 4) Shri Piyush Shandilya, TPTL 5) S. K. Bhowmick, TPTL ORDER The Commission, vide order dated 22nd June, 2017 in Petition No. 10/SM/2017, observed as under: “By order dated 14.5.2009 in Petition No. 116/2008, Teestavalley Power Transmission Ltd. (the licensee), an SPV, and a joint venture between POWERGRID and Teesta Urja Ltd. (TUL) was granted transmission license to execute the following transmission system: Order in Petition No. 10/SM/2017 Page 1 Sl. No. Description Length 1. 400 kV D/C transmission line with quad Moose 2 km conductor from Teesta-III generating station to Mangan Pooling Station. 2. 400 kV D/C transmission line with quad Moose 204 km conductor from Mangan to new pooling station at Kishanganj including 2 line bays and 2 nos. 63 MVAR Reactors at Kishanganj switchyard 2. As per Annexure 2 of BPTA dated 24.2.2010 entered into between POWERGRID and seven LTTCs for LTA, Teesta III-Mangan and Mangan- Kishanganj 400 kV D/C with quad moose conductor along with associated line bays was required to be completed on or before August, 2011 along with Teesta-III generation project.
    [Show full text]
  • Assessment of Hydromorphological Conditions of Upper and Lower Dams of River Teesta in Sikkim
    Journal of Spatial Hydrology Volume 15 Number 2 Article 1 2019 Assessment of hydromorphological conditions of upper and lower dams of river Teesta in Sikkim Follow this and additional works at: https://scholarsarchive.byu.edu/josh BYU ScholarsArchive Citation (2019) "Assessment of hydromorphological conditions of upper and lower dams of river Teesta in Sikkim," Journal of Spatial Hydrology: Vol. 15 : No. 2 , Article 1. Available at: https://scholarsarchive.byu.edu/josh/vol15/iss2/1 This Article is brought to you for free and open access by the Journals at BYU ScholarsArchive. It has been accepted for inclusion in Journal of Spatial Hydrology by an authorized editor of BYU ScholarsArchive. For more information, please contact [email protected], [email protected]. Journal of Spatial Hydrology Vol.15, No.2 Fall 2019 Assessment of hydromorphological conditions of upper and lower dams of river Teesta in Sikkim Deepak Sharma1, Ishwarjit Elangbam Singh2, Kalosona Paul3 & Somnath Mukherjee4 1 Doctoral Fellow, Department of Geography, Sikkim University, Gangtok, Sikkim 2Assistant Professor, Department of Geography, Sikkim University, Gangtok, Sikkim 3Assistant Professor, Department of Geography, Sidho-Kanho-Birsha University, Purulia, West Bengal 4Assistant Professor, Department of Geography, Bankura Christian College, Bankura, West Bengal Abstract River is a main source of fresh water. Although since past river water and basin morphology both have affected and changed by some natural and human induced activities. Human civilization since time immemorial has been rooted close to river basin. Changing morphology of a river channel has done also by natural causes. The hydromorphological state of a river system replicates its habitat quality and relies on a variety of both physical and human features.
    [Show full text]
  • Class-6 Chapter-13 (Geography) a Globe, Latitudes and Longitudes I
    CLASS-6 CHAPTER-13 (GEOGRAPHY) A GLOBE, LATITUDES AND LONGITUDES I. Tick the correct option. 1. The Earth’s axis is: (a). an imaginary line that horizontally divides the Earth (b). an angular line that runs across the Tropic of Cancer (c). an imaginary line on which the Earth rotates Ans: (c) 2. The Torrid Zone lies between the: (a) Arctic Circle and Antarctic Circle (b) Tropic of Cancer and Tropic of Capricorn (c). North Pole and South Pole Ans: (b) 3. The total number of meridians is (a) 340 (b) 360 (c) 180 Ans: (b) 4. The Equator is also known as the (a) Great Circle (b) Meridian (c) Ante meridian Ans: (a) 5. The longitude that determines the Indian Standard Time is (a) 00 (b) 1800 (c) 820 30’E Ans: (a) II. State whether the following statements are true or false and rewrite the incorrect statements to correct them. 1. All lines of longitude are circles. True 2. The temperate Zone is the hottest zone. False Ans: The Torrid Zone is the hottest zone. 3. ‘Geod’ is the term used to describe the shape of the Earth. True 4. The world is divided into 28 time zones. False Ans: The world is divided into 24 time zone. 5. The Antarctic Circle lies in the Southern Hemisphere. True III. Answer the following in one sentence. 1. What is a globe? Ans: A globe is a round model of the Earth that shows its shapes, landforms and directions as they truly relate to one another. 2. Name the heat zone in which the Equator is located? Ans: Torrid Zone in which the Equator is located.
    [Show full text]