World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document World Bank-financed Guizhou Rural Development and Poverty Alleviation Project Public Disclosure Authorized Public Disclosure Authorized Social Assessment Report Public Disclosure Authorized Foreign Capital Project Management Center of Guizhou Provincial Poverty Alleviation & Development Office Public Disclosure Authorized May 2014 Contents Contents .................................................................................................................................................................. II List of Tables ........................................................................................................................................................ IV List of Figures ........................................................................................................................................................ V Abstract ..................................................................................................................................................................... i 1 Foreword .......................................................................................................................................................... 1 1.1 Background of the Project ....................................................................................................................... 1 1.2 Tasks of SA ................................................................................................................................................ 1 1.3 Scope of SA .............................................................................................................................................. 1 1.4 Key Points of SA ....................................................................................................................................... 1 1.5 Methods of SA .......................................................................................................................................... 2 2 Socioeconomic Profile of the Project Area .................................................................................................. 4 2.1 Identification of the Project Area ............................................................................................................ 4 2.2 Socioeconomic Profile ............................................................................................................................. 4 2.2.1 Population ...................................................................................................................................... 4 2.2.2 Income ............................................................................................................................................ 5 2.2.3 Land ................................................................................................................................................ 5 2.2.4 Cultivation ....................................................................................................................................... 6 2.2.5 Stockbreeding ................................................................................................................................ 6 2.2.6 Ecological Resettlement............................................................................................................... 7 2.2.7 Infrastructure .................................................................................................................................. 7 2.3 Current Situation of FPCs in the Project Area...................................................................................... 8 2.4 Development of Local Leading Industries ............................................................................................ 8 3 Stakeholder Analysis .................................................................................................................................... 10 3.1 Stakeholder Identification ...................................................................................................................... 10 3.2 Participation of Stakeholders ................................................................................................................ 10 3.2.1 Participation Process of Stakeholders ..................................................................................... 10 3.2.2 Participation Outcomes of Stakeholders .................................................................................. 11 3.3 Demand Analysis of Stakeholders ....................................................................................................... 13 3.4 Social Impact Analysis ........................................................................................................................... 17 3.4.1 Opportunities ................................................................................................................................ 17 3.4.2 Risks ............................................................................................................................................. 18 4 FPC Analysis ................................................................................................................................................. 20 4.1 FPCs......................................................................................................................................................... 20 4.2 Current Situation of FPCs ..................................................................................................................... 20 4.2.1 Main Types of FPCs ................................................................................................................... 20 4.2.2 Organization and Composition .................................................................................................. 21 4.2.3 Profit Distribution Mechanism ................................................................................................... 21 4.2.4 Participation and Benefiting Mechanism ................................................................................. 22 4.3 Operating Patterns, and Pros and Cons ............................................................................................. 23 4.3.1 Enterprise + FPC + Base + Household ................................................................................... 23 4.3.2 FPC + Base + Household .......................................................................................................... 29 4.3.3 FPC + Household ........................................................................................................................ 30 4.4 Perceptions of and Attitudes to FPCs ................................................................................................. 30 4.5 Existing Issues of FPCs ........................................................................................................................ 32 4.6 Suggestions for Improving FPCs ......................................................................................................... 34 II 5 Poverty Analysis ............................................................................................................................................ 35 5.1 Poverty in the Project Area ................................................................................................................... 35 5.1.1 Poverty in the Project Area ........................................................................................................ 35 5.1.2 Livelihoods of Poor Households ............................................................................................... 36 5.1.3 Participation in FPCs .................................................................................................................. 36 5.1.4 Capacity to Participate in Advantaged Industries ................................................................... 37 5.2 Perceptions of and Attitudes to FPCs among Poor Population ....................................................... 38 5.2.1 Perceptions of FPCs among Poor Population ........................................................................ 38 5.2.2 Attitudes to and Needs for FPCs among Poor Population .................................................... 39 5.3 Project Impacts on Poor Population .................................................................................................... 41 5.3.1 Positive Impacts .......................................................................................................................... 41 5.3.2 Potential Risks ............................................................................................................................. 42 6 Social and Gender Analysis ........................................................................................................................ 43 6.1 Women‘s Development in the Project Area ........................................................................................ 43 6.1.1 Women‘s Development .............................................................................................................. 43 6.1.2 Women‘s Development Activities in the Project Area ............................................................ 44 6.2 Women‘s FPC Analysis ......................................................................................................................... 44 6.2.1 Overview of Women‘s FPCs .....................................................................................................
Recommended publications
  • Optimization of Rocky Desertification Classification Model Based On
    remote sensing Article Optimization of Rocky Desertification Classification Model Based on Vegetation Type and Seasonal Characteristic Chunhua Qian 1,2 , Hequn Qiang 2,3, Feng Wang 2 and Mingyang Li 1,* 1 School of Forestry, Nanjing Forestry University, Nanjing 210037, China; [email protected] 2 School of Smart Agricultural, Suzhou Polytechnic Institute of Agriculture, Suzhou 215008, China; [email protected] (H.Q.); [email protected] (F.W.) 3 School of Computer Science and Technology, Soochow University, Suzhou 215301, China * Correspondence: [email protected]; Tel.: +86-025-8542-7327 Abstract: Building a high-precision, stable, and universal automatic extraction model of the rocky desertification information is the premise for exploring the spatiotemporal evolution of rocky de- sertification. Taking Guizhou province as the research area and based on MODIS and continuous forest inventory data in China, we used a machine learning algorithm to build a rocky desertification model with bedrock exposure rate, temperature difference, humidity, and other characteristic factors and considered improving the model accuracy from the spatial and temporal dimensions. The results showed the following: (1) The supervised classification method was used to build a rocky desertifi- cation model, and the logical model, RF model, and SVM model were constructed separately. The accuracies of the models were 73.8%, 78.2%, and 80.6%, respectively, and the kappa coefficients were 0.61, 0.672, and 0.707, respectively. SVM performed the best. (2) Vegetation types and vegetation Citation: Qian, C.; Qiang, H.; Wang, seasonal phases are closely related to rocky desertification. After combining them, the model accuracy F.; Li, M.
    [Show full text]
  • Guizhou Rocky Desertification Area Water Management Project (RRP PRC 48468)
    Guizhou Rocky Desertification Area Water Management Project (RRP PRC 48468) Resettlement Plan Project Number: 48468-001 May 2017 People’s Republic of China: Guizhou Rocky Desertification Area Water Management Project Nayong County Prepared by the Guizhou provincial government for the Asian Development Bank. ADB Loan: Guizhou Rocky Desertification Area Water Management Project Resettlement Plan for Nayong County (Final Draft for ADB Approval) Nayong County People’s Government November 2016 LIST OF ACRONYMS AND MEASURES AAOV Annual Average Output Value ACWF All China Women’s Federation ADB Asian Development Bank AHs Affected Households APs Affected Persons CFRD Concrete-Faced Rockfill Dam DMS Detailed Measurement Survey EMA External Monitoring Agency FSR Feasibility Study Report GDRC Guizhou Development and Reform Commission GPG Guizhou Provincial Government GRO Guizhou Resettlement Office for Water Resources and Hydropower Engineering HD House Demolishment HHs Households Hydro China Guiyang Engineering Corp. Limited Guiyang Investigation and Survey HCGECLGISDI Design Institute IA Implementing Agency LA Land Acquisition LAR Land Acquisition and Resettlement LO Land Occupation M&E Monitoring and Evaluation MLG Minimum Living Guarantee NCG Nayong County Government NDRC National Development and Reform Commission NLRAB Nayong Land and Resources Administration Bureau NPMO Nayong Project Management Office NRO Nayong Resettlement Office No. Number PLA Permanent Land Acquisition PLG Project Leading Group PMO Project Management Office PPTA Project
    [Show full text]
  • Guizhou Rocky Desertification Area Water Management Project (RRP PRC 48468)
    Guizhou Rocky Desertification Area Water Management Project (RRP PRC 48468) Ethnic Minority and Social Development Plan Project Number: 48468-001 June 2017 People’s Republic of China: Guizhou Rocky Desertification Area Water Management Project Nayong County Prepared by the Guizhou provincial government for the Asian Development Bank. ADB Loan: Guizhou Rocky Desertification Area Water Management Project Ethnic Minority and Social Development Plan for Nayong County (Final ADB review version) Nayong County People’s Government October 2016 LIST OF ACRONYMS AND MEASURES ACWF All China Women’s Federation ADB Asian Development Bank AP Affected Person CAB Civil Affairs Bureau CDC Center for Disease Control DPA Direct Project Area EB Education Bureau EM Ethnic Minority EMRAO Ethnic Minority and Religion Affairs Office EMP Environmental Management Plan EMSDP Ethnic Minority and Social Development Plan FB Forest Bureau GAP Gender Action Plan GPG Guizhou Provincial Government GPMO Guizhou Project Management Office HHs Households IPA Indirect Project Area LAR Land Acquisition and Resettlement LSSB Labor and Social Security Bureau M&E Monitoring and Evaluation NCG Nayong County Government NPMO Nayong Project Management Office PAO Poverty Alleviation Office PIC Project Implementation Consultants PIU Project Implementation Unit PMO Project Management Office PPMS Project Performance Monitoring System PPTA Project Preparatory Technical Assistance PRC Peoples Republic of China PSA Poverty and Social Analysis RP Resettlement Plan SCO Street Committee Office SD Sanitation Department TO Township Office WCB Water Conservancy Bureau TABLE OF CONTENT COMMITMENT LETTER OF THE EMSDP 1. INTRODUCTION 3 2. PROJECT DESCRIPTION ............................................................................................................................... 3 3. OBJECTIVES AND LEGAL FRAMEWORK OF EMSDP 4 3.1 Objectives of the EMSDP 4 3.2 Legal Framework 4 4.
    [Show full text]
  • Preliminary Investigation of the Potential for Using the Cs Technique
    Sediment Dynamics for a Changing Future (Proceedings of the ICCE symposium held at 149 Warsaw University of Life Sciences - SGGW, Poland, 14–18 June 2010). IAHS Publ. 337, 2010. Preliminary investigation of the potential for using the 137Cs technique to date sediment deposits in karst depressions and to estimate rates of soil loss from karst catchments in southwest China X. B. ZHANG1,2, X. Y. BAI1 & A. B. WEN1 1 Key Laboratory of Mountain Environment Evolvement and Regulation, Institute of Mountain Hazards and Environment, Chinese Academy of Sciences, Sichuan 610041, China [email protected] 2 State Key Laboratory of Environmental Geochemistry, Institute of Geochemistry, Chinese Academy of Sciences, Guiyang, Guizhou 550002, China Abstract Soil erosion plays an important role in land desertification in the karst mountain areas of southwest China, but reliable data on rates of surface soil loss in the area are very limited. Hill-depressions are common landforms in the karst areas. The 137Cs technique was used to date the sediment deposits in six karst depressions, to estimate average rates of surface soil loss from their catchments. The estimates of soil loss rates obtained from this study evidenced considerable variability. A value of 1.0 t km-2 year-1 was obtained for a catchment under original dense karst forest, but the erosion rates ranged between 19.3 t km-2 year-1 and 48.7 t km-2 year-1 in four catchments under secondary forest or grasses, where the original forest cover had been removed in the Ming and Qing dynasties, several hundred years ago. The highest rate of 1643 t km-2 year-1 was obtained for a catchment underlain by clayey carbonate rocks, where the soil cover was thicker and more extensive than in the other catchments and extensive land reclamation for cultivation had occurred during the period 1979–1981, immediately after the Cultural Revolution.
    [Show full text]
  • Introduction to a Sewage Treatment Pilot Project
    Introduction to A Sewage Treatment Pilot Project with VGT in Caixin Village, Puding County, Guizhou Province, Southwest China Ziyuan Feng Guangzhou Vetiver Grass Industry Science and Technology Co. Ltd. Hanping Xia South China Botanical Garden, Chinese Academy Sciences Yuan Xiong The People’s Government of Anshun City June 2016 Project organizer: Agriculture Commission of Guizhou Province Project co-organizer: Agriculture Commission of Anshun City, Guizhou Province Project supervision unit: Agricultural Bureau of Puding Country, Guizhou Province Project construction unit : Guangzhou Vetiver Industry Science and Technology Co. Ltd. Project contents: 1. Integrated wastewater treatment system (60 m3/d) 2. Sewage pipe network collection system with a total length of 3000 m 3. Total project investment: 1.5 million Yuan Project completion date: November 2015 Project Profile • Caixin village is located in the Shawan Development Zone, Chengguan Town, Puding County, belonging to an economic tourism development demonstration site of municipal orchards; • The village is 6 kilometers away from the county town and 1.5 kilometers away from the drinking water source, "Yelang Lake" reservoir of Anshun City; • The whole village has a total of 129 households, of which 400 people are permanent residents; about 20 mu of fishing pond, 1000 mu (15 mu = 1 ha) of vineyard and 5 peasant-restaurants are built nearby. This village is one place of vacationlands for country or town residents; • Sewage treatment capacity of this project is 60 m3/day, and “biochemical reaction integrated system of ecological three- dimensional micro-circulation” is adopted in this project; • The project was funded by Agriculture Commission of Guizhou Province and Mayor’s Foundation of Anshun City.
    [Show full text]
  • People's Republic of China FY2017 Ex-Post Evaluation of Japanese
    People's Republic of China FY2017 Ex-Post Evaluation of Japanese ODA Loan Project “Guizhou Province Environment Improvement and Education Project” External Evaluators: Toshihiro Nishino/Ayako Nomoto, International Development Center of Japan Inc. 0. Summary The project aimed to improve environment and hygiene, and to develop human resources in local farming villages and suburban cities in 12 national poverty-stricken counties in Guizhou Province by constructing or improving facilities for (i) environmental measures such as methane gas facilities, waste and disposal facilities, and reforestation; (ii) hygiene measures such as roads for daily use, water supply, and medical services; and (iii) senior high school buildings. The project has been consistent with China’s development plans and development needs as well as with Japan’s ODA policy. Therefore, the relevance of the project is high. Although the project cost was within the plan, the project period significantly exceeded it. Therefore, the efficiency of the project is low. The effectiveness/impact is high. Indicators set to measure quantitative effects such as culling of forests, flooded area, volume of soil erosion, percentage of population served water, number of patients, volume and percentage of waste disposed, and senior high school enrollment rate have largely achieved targets or improved. As to qualitative effects, improvements in the environment (including living environment) such as the decrease in the collection of firewood and charcoal, improvement of medical services, improvement of hygiene as well as effects of education have been observed. As for impacts, a decrease in the population of rural poverty, regional economic development, sustainable environmental and social development, and a reduction in the women’s household workload have been observed.
    [Show full text]
  • Table of Codes for Each Court of Each Level
    Table of Codes for Each Court of Each Level Corresponding Type Chinese Court Region Court Name Administrative Name Code Code Area Supreme People’s Court 最高人民法院 最高法 Higher People's Court of 北京市高级人民 Beijing 京 110000 1 Beijing Municipality 法院 Municipality No. 1 Intermediate People's 北京市第一中级 京 01 2 Court of Beijing Municipality 人民法院 Shijingshan Shijingshan District People’s 北京市石景山区 京 0107 110107 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Haidian District of Haidian District People’s 北京市海淀区人 京 0108 110108 Beijing 1 Court of Beijing Municipality 民法院 Municipality Mentougou Mentougou District People’s 北京市门头沟区 京 0109 110109 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Changping Changping District People’s 北京市昌平区人 京 0114 110114 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Yanqing County People’s 延庆县人民法院 京 0229 110229 Yanqing County 1 Court No. 2 Intermediate People's 北京市第二中级 京 02 2 Court of Beijing Municipality 人民法院 Dongcheng Dongcheng District People’s 北京市东城区人 京 0101 110101 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Xicheng District Xicheng District People’s 北京市西城区人 京 0102 110102 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Fengtai District of Fengtai District People’s 北京市丰台区人 京 0106 110106 Beijing 1 Court of Beijing Municipality 民法院 Municipality 1 Fangshan District Fangshan District People’s 北京市房山区人 京 0111 110111 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Daxing District of Daxing District People’s 北京市大兴区人 京 0115
    [Show full text]
  • Majalah Ilmiah Tabuah Ta’Limat, Budaya, Agama Dan Humaniora | ISSN (Online) 2614-7793 |
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by Rumah jurnal Fakultas Adab dan Humaniora UIN IB DOI: https://doi.org/10.37108/tabuah.vi.240 Available Online at: https://www.rjfahuinib.org/index.php/tabuah Majalah Ilmiah Tabuah Ta’limat, Budaya, Agama dan Humaniora | ISSN (Online) 2614-7793 | PERAN STRATEGIS PITI SUMATERA BARAT Doni Nofra Sejarah Peradaban Islam Fakultas FUAD, IAIN Bukittinggi email: [email protected] Inggria Kharisma email: [email protected] Abstract The Government of Indonesia released different terms related to the Chinese: Cina, China, Tionghoa and Tiongkok. Cina is a term for people with Chinese passport living in Japan, Malaysia, Singapore, Taiwan, and even in Indonesia, i.e. foreign nationals. The term China (with an 'h') is an official writing issued by the Embassy of the People's Republic of China to refer to the citizens of the People's Republic of China (PRC) in Bahasa Indonesia. The term Tionghoa is used to designate those of Chinese descent living in Indonesia. Meanwhile, Tiongkok is how Bahasa Indonesia refers to the citizens of the People’s Republic of China. On March 14, 2014 President SBY changed the term China to Tiongkok by issuing the Presidential Decree No. 12. The history of Chinese Muslims in West Sumatera cannot be separated from the history of the arrival of Islam into the Archipelago. The term Tionghoa refers to the people of Chinese origins. According to Ernawati, in her Asap Hio di Ranah Minang, the Chinese people have been living in Pariaman since the 12th century CE.
    [Show full text]
  • Ethnic Minority Development Plan
    Public Disclosure Authorized World Bank Financed Guiyang Rural Road Project Public Disclosure Authorized Ethnic Minority Development Plan Public Disclosure Authorized World Bank Financed Guiyang Transport Project Management Office Public Disclosure Authorized August, 2013 1 Abbreviations DPs Displaced Persons EMDP Ethnic Minority Development Plan GNP Gross National Product IMO Independent Monitoring Organization OP Operational Policy PAD Project Appraisal Document PAPs Project Affected Persons PDI Project Design Institute PFSR Project Feasibility Study Report PMO Project Management Office PPAs Project Affected Areas PRO Project Resettlement Office PSA Project Social Assessment PSR Project Supervision Report RAP Resettlement Action Plan RO Resettlement Office RPF Resettlement Policy Framework SAT Social Assessment Team 2 Contents 1 Ethnic Minority Development Plan Preparation ........................................... 5 1-1 Major Findings of Social Assessment for the Project ............................................. 5 1-2 the Objectives of EMDP................................................................................................... 9 1-3 Method and Procedures for EMDP Preparation ......................................................... 9 2 Brief Description of Ethnic Minorities in PAAs ........................................ 11 2-1 Distribution of Ethnic Minorities in PAAS ................................................................ 11 2-2 Customs and Culture of Ethnic Minorities in PPAs ................................................
    [Show full text]
  • Editorial Note
    Editorial Note This volume was produced under difficult conditions. The publication of articles was not only very slow; the number of articles was also reduced due to circumstances beyond our control - the heavy flood in Thailand during October to December 2011. So we ask the reader’s indulgence for any effects this may have on the volume. For this volume, we are pleased to present articles focused on the following languages: Jieyang-Hakka, Jowai-Pnar, Lai, Pumi, Ten-edn, Tai and Viet-Mường; these papers make contributions to language documentation, especially in phonetics and lexicography, and better understanding the historical processes of language diversification. Additionally there are typological papers on phonetics and narrative in Mon-Khmer languages which address important general issues. Graceful acknowledgement should be made to Paul Sidwell for seeing the final volume through to press, and to Brian Migliazza for facilitating the publication of his volume. The Mon-Khmer Studies (MKS) was first published by the Linguistic Circle of Saigon and the Summer Institute of Linguistics in 1964. After nearly 50 years, the print edition will be discontinued. From the volume 41 onward, the MKS is going completely digital and open access. The journal will move to a continuous online publication model, consistent with trends in academic publishing internationally. Also, arrangements will be made for print-on- demand delivery, although we expect electronic distribution to become normal. We thank our readers, authors, reviewers and editors for their continuing support of the journal, now and into the future. Naraset Pisitpanporn for MKS Editorial Board April 2012 iv Table of Contents Editorial Note.……………………………………………………………...….iv Articles John D.
    [Show full text]
  • For Personal Use Only Use Personal for a Loan That Mr Zhang Claimed Had Been Guaranteed by PRC DSX
    5 May 2017 Elizabeth Harris Principal Advisor ASX Listing Compliance Level 40, Central Park 152-158 St Georges Terrace PERTH WA 6000 Dear Ms Harris ASX Query: Ding Sheng Xin Finance Co. Limited We refer to your letter dated 24 April 2017 in which you have sought a response from the Company in relation to questions raised by the ASX regarding judgements made involving the Company’s subsidiary (“PRC DSX”) in the People’s Republic of China. In response to ASX’s queries, the Company advises as follows: 1. It is a natural consequence of the nature of PRC DSX business, being guaranteeing the repayment of loans and other specific performances, that it will be involved in legal processes. Where lenders seek recovery of loans following any default of the performance of borrowers, and that borrower is a client of PRC DSX and their repayment obligations are guaranteed by PRC DSX, PRC DSX will be named in the relevant legal processes. Accordingly, PRC DSX has been and is likely to continue to be a party to legal processes and by extension to have judgements made against it in its capacity as guarantor. PRC DSX processes are such that if a client defaults and a judgement is made against that client, and by extension PRC DSX, PRC DSX then seeks to renegotiate the terms of the obligation on behalf of the client. If that process is successful the judgement is no longer relevant and is withdrawn, however if that process is not successful PRC DSX makes the payments on behalf of the client and proceeds to seek recovery from the client.
    [Show full text]
  • Appendix 1. a Brief Description of China's 56 Ethnic Groups
    Appendix 1. A Brief Description of China’s 56 Ethnic Groups Throughout history, race, language and religion have divided China as much as physical terrain, political fiat and conquest.1 However, it is always a politically sensitive issue to identify those non-Han people as different ethnic groups. As a result, the total number of ethnic groups has never been fixed precisely in China. For example, in 1953, only 42 ethnic peoples were identified, while the number increased to 54 in 1964 and 56 in 1982. Of course, this does not include the unknown ethnic groups as well as foreigners with Chinese citizenship.2 Specifically, China’s current 56 ethnic groups are, in alphabetical order, Achang, Bai, Baonan, Blang, Buyi, Dai, Daur, Deang, Derung, Dong, Dongxiang, Ewenki, Gaoshan, Gelao, Han, Hani, Hezhe, Hui, Jing, Jingpo, Jino, Kazak, Kirgiz, Korean, Lahu, Lhoba, Li, Lisu, Manchu, 1 The text is prepared by Rongxing Guo based on the following sources: (i) The Ethnic Minorities in China (title in Chinese: “zhongguo shaoshu minzu”, edited by the State Ethnic Affairs Commission (SEAC) of the People’s Republic of China and published in 2010 by the Central Nationality University Press, Beijing) and (ii) the introductory text of China’s 56 ethnic groups (in Chinese, available at http://www.seac.gov.cn/col/col107/index.html, accessed on 2016–06–20). 2 As of 2010, when the Sixth National Population Census of the People’s Republic of China was conducted, the populations of the unknown ethnic groups and foreigners with Chinese citizenship were 640,101 and 1448, respectively.
    [Show full text]