Report to Transportation Strategic Policy Committee Dublin City

Total Page:16

File Type:pdf, Size:1020Kb

Report to Transportation Strategic Policy Committee Dublin City Report to Transportation Strategic Policy Committee Dublin City Centre Cycle Count May 2016 Said Shawqi Executive Engineer, Environment and Transportation Department Dublin City Council June, 2017 1 Dublin City Centre Cycle Count – May 2016 As part of the 2007-2012 cycle action plan it was proposed to carry out a new city centre cycle count every May in order to measure changes in cycle usage within the city centre. These counts were to be carried out in addition to the annual canal cordon counts which are carried out in November each year. The differences between the two counts are as follows: The canal cordon count measures all inbound vehicles crossing the canal cordon between 7 am and 10 am averaged over two days in November. Each pedestrian /car / bicycle / bus / van is normally counted only once. The city centre cycle count measures the total number of cyclists travelling in any direction on either side of the bridges over the Liffey and other selected junctions in the city centre on one day in May (or June) from 7 a.m. to 7 p.m. As part of the cycle action plan it was proposed to continue to conduct these annual city centre cycle counts. Twenty-six locations were originally selected between Heuston Station and the East Link Bridge and Parnell Street and St. Stephen’s Green. As new bridges were built these were included in the annual counts in recent years. The Samuel Beckett Bridge (27-28) was added in 2011 and the Rosie Hackett Bridge (61-62) in 2015. Numbers in brackets refer to the locations as shown on the attached location map. The 2016 count was carried out during the period May 11-31, from 7 am to 7 pm on a Tuesday, Wednesday or Thursday. Table 1 show the results of the total number of cyclists counted at each location from 2011 to 2016 (previous five years) between 7 am and 7 pm. The results show continuous yearly growth in the number of cyclists, with a total number of 89092 cyclists in year 2016. 2 Table 1 - Total No. of Pedal Cycles 7.00 am to 7.00 pm Location of Count 2011 2012 2013 2014 2015 2016 1 Wolfe Tone Quay / Frank Sherwin Bridge 1159 1346 1889 1399 2182 2141 2 Frank Sherwin Bridge / Victoria Quay 785 1065 1372 1156 1842 1842 3 Ellis Quay / Watling St Bridge 871 1126 1197 1131 1712 1695 4 Usher’s Island / Watling St Bridge 718 836 1160 897 1401 1257 5 Blackhall Place / Ellis Quay 1390 1550 1656 1716 2545 2357 6 James Joyce Bridge / Usher’s Island 882 983 1236 1039 1676 1616 7 Queen Street / Arran Quay 1234 1583 1712 1706 2553 2844 8 Queen Street / Usher’s Quay 984 1188 1420 1215 1904 1742 9 Church Street / Inn’s Quay 1813 2332 2878 2465 3542 3894 10 Merchant’s Quay / Usher’s Quay /Church St 1493 1900 2120 1728 2460 2765 11 Inns Quay / Ormond Qy Upr / Chancery Place 1984 2121 2734 3133 3370 3516 12 Wood Quay / Merchant’s Qy / Winetavern St 1328 1671 2031 2235 2308 2549 13 Ormond Quay / Capel St / Grattan Bridge 2133 2645 3181 3892 3776 3894 14 Wellington Quay / Essex Quay 1799 2158 2439 2903 2908 3177 15 O’Connell St Lower / Eden Quay 2250 5371 4770 6885 5848 7353 16 D’Olier St / Aston Quay / Burgh Quay 3305 3985 4637 6581 5805 5286 17 Butt Bridge / Beresford Pl / Custom Hse Quay 1420 1400 2020 2990 2755 3981 18 Butt Bridge / Burgh Qy / Georges Qy / Tara St 1346 1362 1543 2377 2171 2577 19 Memorial Rd / Custom Hse Qy / George’s Qy 1733 2007 2599 4156 2928 4944 20 Moss St / City Quay / George’s Quay 589 1780 2036 3534 1938 3016 21 East Link Bridge / N. Wall Quay / East Wall Rd 657 671 1000 1225 917 1642 22 East Link Bridge 523 554 914 1084 799 1009 23 Cuffe Street / Cuffe Lane 1385 1550 1542 1660 2277 3125 24 Dame Street / George’s Street 2736 3820 3878 5500 5813 6319 25 Parnell Street / Dominick Street 868 1415 1387 1693 1685 1659 26 Pearse Street / Westland Row 2101 2241 2891 4128 2779 3461 27 Samuel Beckett Bridge (north) 1084 1692 2669 3417 3875 4817 28 Samuel Beckett Bridge (south) 1460 1920 2374 3241 3666 4614 61 Rosie Hackett Bridge (north) - - - - 2042 3721 62 Rosie Hackett Bridge (south) - - - - 1657 2353 Total (excluding nos. 61, 62) 40,030 52,272 61,285 75,086 77,435 89092 Table 2 shows the percentage changes in the number of cyclists at each location and the total percentage change for 2015-2016. The majority of locations shows a positive change, hence an increase in the number of cyclists, and overall the total number of cyclists for 2016 is 17.3% up on 2015. 3 Table 2 - Total No. of Pedal Cycles 7.00 am to 7.00 pm 2015-16 Location of Count 2015 2016 %change 1 Wolfe Tone Quay / Frank Sherwin Bridge 2182 2141 -1.9 2 Frank Sherwin Bridge / Victoria Quay 1842 1842 0.0 3 Ellis Quay / Watling St Bridge 1712 1695 -1.0 4 Usher’s Island / Watling St Bridge 1401 1257 -10.3 5 Blackhall Place / Ellis Quay 2545 2357 -7.4 6 James Joyce Bridge / Usher’s Island 1676 1616 -3.6 7 Queen Street / Arran Quay 2553 2844 +11.4 8 Queen Street / Usher’s Quay 1904 1742 -8.5 9 Church Street / Inn’s Quay 3542 3894 +9.9 10 Merchant’s Quay / Usher’s Quay /Church St 2460 2765 +12.4 11 Inns Quay / Ormond Qy Upr / Chancery Place 3370 3516 +4.3 12 Wood Quay / Merchant’s Qy / Winetavern St 2308 2549 +10.4 13 Ormond Quay / Capel St / Grattan Bridge 3776 3894 +3.1 14 Wellington Quay / Essex Quay 2908 3177 +9.3 15 O’Connell St Lower / Eden Quay 5848 7353 +25.7 16 D’Olier St / Aston Quay / Burgh Quay 5805 5286 -8.9 17 Butt Bridge / Beresford Pl / Custom Hse Quay 2755 3981 +44.5 18 Butt Bridge / Burgh Qy / Georges Qy / Tara St 2171 2577 +18.7 19 Memorial Rd / Custom Hse Qy / George’s Qy 2928 4944 +68.9 20 Moss St / City Quay / George’s Quay 1938 3016 +55.6 21 East Link Bridge / N. Wall Quay / East Wall Rd 917 1642 +79.1 22 East Link Bridge 799 1009 +26.3 23 Cuffe Street / Cuffe Lane 2277 3125 +37.2 24 Dame Street / George’s Street 5813 6319 +8.7 25 Parnell Street / Dominick Street 1685 1659 -1.5 26 Pearse Street / Westland Row 2779 3461 +24.5 27 Samuel Beckett Bridge (north) 3875 4817 +24.3 28 Samuel Beckett Bridge (south) 3666 4614 +25.9 61 Rosie Hackett Bridge (north) 2042 3721 +82.2 62 Rosie Hackett Bridge (south) 1657 2353 +42.0 +17.3 Total 81134 95166 Table 3 shows the total number of cyclists at each location and the percentage of all traffic represented by cyclists. The location with the highest percentage of cyclists in 2016 was Dame Street / Georges Street (location no 24) where cyclists made up 29.3% of all traffic. This location has had the highest 4 percentage of cyclists in every year from 2007 to 2016 since the city centre cycle counts began. A close second is Burgh Quay/Aston Quay/D’Olier St with 28.2% (highlighted in green). The overall percentage of cyclists increased from 7.9% in 2013, 10.1 % in 2014, 10.3% in 2015 and 12.7% in 2016. Table 3 - No. of Pedal Cycles 7.00 am to 7.00 pm (cyclists as % of all traffic) Location of Count 2013 2014 2015 2016 No. % No. % No. % No % 1 Wolfe Tone Quay / Frank Sherwin Bridge 1889 7.1 1399 5.3 2182 8.4 2141 7.9 2 Frank Sherwin Bridge / Victoria Quay 1372 4.1 1156 3.4 1842 5.6 1842 5.9 3 Ellis Quay / Watling St Bridge 1197 6.5 1131 6.2 1712 9.3 1695 9.7 4 Usher’s Island / Watling St Bridge 1160 4.8 897 3.7 1401 5.8 1257 5.3 5 Blackhall Place / Ellis Quay 1656 7.3 1716 7.6 2545 11.0 2357 10.8 6 James Joyce Bridge / Usher’s Island 1236 5.1 1039 4.2 1676 6.8 1616 6.7 7 Queen Street / Arran Quay 1712 7.2 1706 7.2 2553 10.9 2844 12.7 8 Queen Street / Usher’s Quay 1420 5.3 1215 4.4 1904 7.1 1742 6.5 9 Church Street / Inn’s Quay 2878 8.4 2465 7.2 3542 10.6 3894 12.4 10 Merchants Qy / Usher’s Qy /Church Street 2120 5.3 1728 4.5 2460 6.2 2765 6.8 11 Inns Qy / Ormond Qy Upr / Chancery Place 2734 9.6 3133 10.5 3370 11.8 3516 13.4 Wood Qy / Merchant’s Qy / Winetavern 12 2031 6.5 2235 7.3 2308 7.2 Street 2549 8.4 13 Ormond Qy / Capel St / Grattan Bridge 3181 10.3 3892 13.1 3776 12.6 3894 14.3 14 Wellington Quay / Essex Quay 2439 10.2 2903 12.7 2908 12.3 3177 13.8 O’Connell St Lr / Bachelor’s Walk / Eden 15 4770 13.5 6885 19.7 5848 17.0 Quay 7353 24.4 16 D’Olier St / Aston Quay / Burgh Quay 4637 12.0 6581 18.0 5805 15.1 5286 28.2 Butt Bridge / Beresford Pl / Custom Hse 17 2020 7.2 2990 10.8 2755 9.9 Quay 3981 14.0 Butt Bridge / Burgh Qy / Georges Qy / Tara 18 1543 5.4 2377 8.6 2171 7.3 St 2577 9.6 19 Memorial Rd / Custom Hse Qy / George’s Qy 2599 7.6 4156 12.4 2928 8.7 4944 15.4 20 Moss St / City Quay / George’s Quay 2036 7.8 3534 14.4 1938 8.0 3016 12.5 21 East Link Bridge / Nth Wall Qy / East Wall Rd 1000 4.6 1225 5.4 917 3.8 1642 7.0 22 East Link Bridge 914 6.0 1084 6.9 799 4.8 1009 5.8 23 Cuffe Street / Cuffe Lane 1542 8.2 1660 8.8 2277 11.5 3125 14.4 24 Dame Street / George’s Street 3878 18.4 5500 27.0 5813 26.9 6319 29.3 25 Parnell Street / Dominick Street 1387 8.5 1693 11.6 1685 13.2 1659 17.0 26 Pearse Street / Westland Row 2891 8.9 4128 12.4 2779 8.2 3461 10.7 27 Samuel Beckett Bridge (North) 2669 10.8 3417 12.8 3875 14.9 4817 18.5 28 Samuel Beckett Bridge (South) 2374 14.5 3241 18.4 3666 20.0 4614 24.4 61 Rosie Hackett Bridge (north) - - - - 2042 14.7 3721 7.9 62 Rosie Hackett Bridge (south) - - - - 1657 9.9 2353 5.9 Total (1-28) 61,285 7.9 75,086 10.1 77,435 10.3 89092 12.7 5 Total Annual Number of Cyclist as % of all traffic 14 12 10 8 6 Cyclist as % of all traffic Percentage% 4 2 0 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Year Figure 1 Dublinbikes Dublinbikes began operation on September 13th 2009.
Recommended publications
  • Download the Liberty Ballygown Article Here
    Vol.13 No. 5 June 2014 ISSN 0791-458X CRISIS AT BAUSCH PRIVATISATIONdscsdcsdcsdcsd THREAT cdscdscdscdsDEFENDING IRISH AND LOMB TO BUS SERVICES UNIVERSITIES Page 2, 6, 7 PagePage xxxxxxxx10 PagePage xxxxxxxxx 22 REMEMBERING No to THE TUAM BABIES further Page 9 budget ENDING THE HOUSING CRISIS cuts Page 13 by Frank Connolly Labour in Government must insist that there will be no further cuts affecting working fami- lies or those who depend on public services in the October budget, SIPTU President Jack O’Connor has said. He said the plan for a further €2 billion in cuts or LIBERTY new taxes is not justified in the light of recent excheq- CROSSWORD uer returns which are €1.2 billion ahead of target for the first five months of the year. WIN A HOTEL BREAK O’Connor said that the new leader of the Labour FOR TWO... Party must resist the call for the €2 billion adjustment in any talks with Fine Gael over Budget 2015 and to Page 31 leave the Government over the issue, if necessary. 1122 33454 5 “If the public finances remain as good as this for the 7 8 remainder of the year there will be absolutely no justi- 9 10 fication for a budget of anything remotely approaching Activists from the SIPTU Fair Deal for Cleaners Campaign held a series of colourful events to mark 111211 12 13 International Justice Day for Cleaners on Monday, 16th June in Dublin, Cork and Galway. 14 €2bn. Therefore, it is perfectly feasible to insist that 15 16 Pictured at the event in Connolly Station in Dublin were from left to right: Galyna Korytko, 17 there must be no further cuts affecting working 18 19 20 Jay Esteron and Carmen Maria Villanueva See page 3.
    [Show full text]
  • Luas Red Line Customer Notice
    Luas Red Line Customer Notice Luas Red Line stops from Abbey Street to The Point are closed until the end of July. Red Line services from Jervis to Tallaght and Saggart are running as normal but inbound trams will terminate at Jervis stop. A replacement bus is serving Jervis and the closed stops during this temporary closure. The bus stops are located on the Quays a short walking distance from the closed Luas stops. The inbound Bus departs from Bachelor’s Walk (close to Jervis stop) and terminates at Castleforbes Road (close to The Point stop) serving stops along The Quays. The outbound bus departs from Mayor Street Upper (close to The Point stop) terminating at Crampton Quay (close to Jervis stop) serving stops along the Quays. You don’t need a ticket for the replacement bus. You do need a valid ticket for tram services. Leap Card customers should Touch On/Off at Jervis stop. Customers who buy tickets from ticket machines should buy a ticket to/from Jervis stop. This temporary closure is necessary to facilitate Luas Cross City construction works on O’Connell Street and Marlborough Street. Thank you for your patience and cooperation during these works. For more info see www.luas.ie & www.luascrosscity.ie 1 Walking Directions Abbey Street Luas Stop to/from Replacement Bus Service Bus Stops Abbey Street Luas Stop to Bus Stop Number 297, Eden Quay (150 meters) for replacement bus services to The Point Head east on Abbey Street Lower towards Marlborough Street for approximately 40 meters. Cross Marlborough Street at the traffic lights turning right along Marlborough Street.
    [Show full text]
  • Seanad Éireann
    Vol. 235 Thursday, No. 9 13 November 2014 DÍOSPÓIREACHTAÍ PARLAIMINTE PARLIAMENTARY DEBATES SEANAD ÉIREANN TUAIRISC OIFIGIÚIL—Neamhcheartaithe (OFFICIAL REPORT—Unrevised) Insert Date Here 13/11/2014A00100Business of Seanad 516 13/11/2014A00300Order of Business 516 13/11/2014K00100Commemoration Planning: Statements ����������������������������������������������������������������������������������������������������������������532 13/11/2014W00800Adjournment Matters ��������������������������������������������������������������������������������������������������������������������������������������������558 13/11/2014W00850Autism Support Services 558 13/11/2014Y00350Housing Regeneration 562 SEANAD ÉIREANN Déardaoin, 13 Samhain 2014 Thursday, 13 November 2014 Chuaigh an Cathaoirleach i gceannas ar 1030 am Machnamh agus Paidir. Reflection and Prayer. 13/11/2014A00100Business of Seanad 13/11/2014A00200An Leas-Chathaoirleach: I have received notice from Senator Rónán Mullen that, on the motion for the Adjournment of the House today, he proposes to raise the following matter: The need for the Minister for Education and Skills to implement a programme of fund- ing, support and promotion of the rapid prompting method of education for children with learning disabilities I have also received notice from Senator Colm
    [Show full text]
  • Council 08 Jul 2021 Pdf 2.96MB Dublin Coastal Flooding Protection
    Final Report Volume 1 - Main Report Dublin City Council Fingal County Council 29 April 2005 Final Report 9M2793 A COMPANY OF ROYAL HASKONING COASTAL & RIVERS 19 Baggot Street Lower Dublin 2 Ireland +353 (0)1 634 5353 Telephone +353 (0)1 634 5305 Fax [email protected] E-mail www.royalhaskoning.com Internet Document title Final Report Volume 1 - Main Report Document short title Status Final Report Date 29 April 2005 Project name Dublin Coastal Flooding Protection Project Project number 9M2793 Client Dublin City Council Reference 9M2793 Drafted by Owen Mc Manus/Ian Cooke/John Greenyer Checked by Eric Huyskes Date/initials check …………………. …………………. Approved by Steve Magenis Date/initials approval …………………. …………………. CONTENTS Page 1 INTRODUCTION 1 1.1 General 1 1.2 Scope, Objectives and Project Aims 1 1.3 Sponsoring Authorities 3 1.4 The Dublin Coastal Flooding Protection Project in the Context of the European SAFER Initiative 3 1.4.1 INTERREG III B 3 1.4.2 SAFER 3 1.5 Description of the Project Area 5 1.5.1 Fingal County Council 5 1.5.2 Dublin City Council 6 2 FEBRUARY 2002 EVENT 11 2.1 General Description 11 2.2 Weather Conditions 12 2.2.1 The General Situation 12 2.2.2 The Detailed Meteorological Situation 12 2.3 Marine and Irish Sea Conditions 13 2.4 Fluvial Conditions 13 2.5 UK Met Office Surge Model 14 3 FEBRUARY 2002 FLOODED AREAS 16 3.1 Introduction 16 3.2 Fingal County Council 16 3.2.1 Portmarnock to Baldoyle 16 3.2.2 Sutton 17 3.3 Dublin City Council 18 3.3.1 Dublin City Council – North City Flooding 18 3.3.2 East Wall – Royal
    [Show full text]
  • Road Closures
    Temporary closure of roads to facilitate the Papal visit on the dates and times listed below: Saturday 25th August 2018 - Temporary Road Closures 18414- H- Saturday Road Closures 18414-H-200-B_Saturday Road Closure No. Location | Closure period 1 | Sean McDermott Street between Buckingham Street and Cumberland Street North | 12pm-3.45pm 2 | James Joyce Street | 12pm- 3.45pm 3 | Gloucester Place Lower | 12pm-3.45pm 4 | Rutland Street Lower | 12pm - 3.45pm 5 | Cathal Brugha Street between Cumberland Street North and O'Connell Street Upper | 12pm-4.30pm 6 | O'Connell Street Upper | 12pm - 4.30pm 7 | O'Connell Street Lower | 12pm - 4.30pm 8 | Talbot Street between Gardiner Street Lower and Marlborough Street | 12pm-4.30pm 9 | North Earl Street | 12pm-4.30pm 10 | Earl Place | 12pm-4.30pm 11 | Sackville Place | 12pm-4.30pm 12 | Abbey Street Lower 12pm-4.30pm 13 | Old Abbey Street | 12pm 4.30pm 14 | Harbour Court | 12pm - 4.30pm 15 | Abbey Street Middle from Jervis Street to O'Connell Street Lower | 12pm - 4.30pm 16 | North Lotts | 12pm - 4.30pm 17 | Bachelors Way | 12pm - 4.30pm 18 | Liffey Street Lower | 12pm - 4.30pm 19 | Henry Street Between Jervis Street and Moore Street | 12pm - 4.30pm 20 | Henry Street between Moore Street and O'Connell Street Upper | 12pm - 4.30pm 21 | Moore Street | 11am - 4.30pm 22 | Moore Lane | 12pm - 4.30pm 23 | Rosie Hackett Bridge | 12pm - 4.30pm 24 | O'Connell Bridge | 12pm - 4.30pm 25 | Marlborough Street between Cathal Brugha Street and Talbot Street | 6am - 4.30pm 26 | Cathedral Street | 10am (Fri 24/08/18)
    [Show full text]
  • 10 Worst Junctions in Dublin
    Dublin Cycling Campaign PO Box 10295 Dublin 6w [email protected] www.dublincycling.ie 2011- January 18th Dublin City Council Cycle Forum Re: Schedule of dangerous places for cyclists in Dublin. The cyclists’ view The Dublin Cycling Campaign recently asked its members and friends which parts of the Dublin street fabric they find could benefit from re-design. This report sets out the feedback received, under the following headings- 1. The Quays- including bridges and surrounding roads 2. North City centre 3. South City centre 4. North city outside canals 5. South city outside canals The ten junctions most cited in our survey are printed in red. Illustrations have been copied from Google Maps and other sources where possible. One constantly-recurring feature of the feedback is the fear and danger arising from multi-lane systems. 1 1. The Quays Grattan bridge, turning right onto Essex Quay, the bridge is one way and cars are pushing behind and you're not sure which side of the lane you should cycle: very dangerous! Talbot Memorial Bridge [1] Heading left on to city quay, you're directed off road on the corner, conflict with peds and lose priority when joining the road after the corner [2] Heading straight or heading right, the time delay on the toucan crossing can take ages even when there’s light traffic. 2 Ormond Quay junction with Jervis Street Presence & position of cycle lane encourages cars to turn left across cyclists and knock them over. Victoria Quay (just outside Guinness gate), turning right on to Frank Sherwin Bridge (to then turn left to go up to the Pheonix Park), cyclists need to go from the bus lane to the third of four lanes.
    [Show full text]
  • Tunnel Vision Unlocks Alicante Lrt Promise
    THE INTERNATIONAL LIGHT RAIL MAGAZINE www.lrta.org www.tautonline.com DECEMBER 2018 NO. 972 TUNNEL VISION UNLOCKS ALICANTE LRT PROMISE RewardingXxxxxx xxxxxx excellence xxxxx at the xxxxxx Global xxxxx Light Rail xxxxxxxx Awards Tramway service returns to Milwaukee UK tram-train finally opens for business Atlanta scales up multi-mode ambitions Dublin Isle of Man 12> £4.60 From tram to metro Victorian pioneer in Ireland’s capital celebrates 125 years 9 771460 832067 “I am delighted that the UK Light Rail Conference is coming back to Greater Manchester in 2019. “Metrolink forms a key backbone of sustainable travel for the region as it continues to grow, so this important two-day event offers an invaluable chance to network with peers from around the world and share knowledge and best practice as we all aim to improve the way we plan, build and deliver exceptional light rail services to passengers.” Manchester Danny Vaughan 23-24 July 2019 head of Metrolink – transport for Greater Manchester “An excellent event, providing a stimulating and varied two-day programme addressing current The industry’s premier exhibition and knowledge-sharing and future issues pertinent to Voices event returns to Manchester for 2019! today’s light rail industry” V from the clive Pennington With unrivalled networking opportunities, this invaluable technical Director – Light rail, industry… two-day congress is well-known as the place to do amey consulting & rail business and build long-lasting relationships. There is no better place to gain true insight into the “I thought the whole conference was great – there was a workings of the sector and help shape its future.
    [Show full text]
  • Nr 1 Stanczyk.Indd
    Mosty Dublina ANDRZEJ STAŃCZYK Irlandia – nieduża, zielona wyspa Politechnika Warszawska – ulubiony azyl naszych emigran- [email protected] tów. Wiecznie wilgotna i ciepła za przyczyną Atlantyku i Golfsztromu, zapewnia znakomite warunki we- getacji. Nie tylko roślin. W samolocie tanich linii angielskich z Polski do Belfastu i podczas podniebnego powrotu sły- chać szczebiot kilkuletnich dzieci po polsku. To młode mał- żeństwa z dwojgiem, trojgiem maleńkich pociech, także z niemowlętami, lecą na wakacje do dziadków w Polsce lub wracają od nich do nowej, przyjaznej im ojczyzny. Też jakby „przedmurza” srodze doświadczonego w historii przez protestanckich sąsiadów. W hotelach i restauracjach można porozumieć się w naszym języku, a w kościołach trafić na mszę dla rodaków. Wyprawa zorganizowana przez nestora krakowskich mo- stowców – profesora Kazimierza Flagę – wiodła na mosty, a że w programie przewidziano też kilka średniowiecznych zamków, to była nadzieja na zdjęcia prowadzących do nich mostów. Być może zwodzonych nad fosami. W większej ich liczbie ujawniłyby się jakieś podobieństwa… podstawy do uogólnień. Nic z tego. Przy zamkach nie było fos. Nawet suchych. Ani mostów… a jeśli nawet były dawniej, to dziś ustąpiły miejsca nasypom i wyasfaltowanym drogom dojaz- dowym. Lecz ponieważ drogi te wiodą dawnymi szlakami – przebiegają też po dawnych mostach sklepionych z ciosów kamiennych. Kamień, materiał miejscowy, łatwo dostępny, odporny, ponadczasowy, więc i mostów przetrwało niemało. W większości – podobne. Wystarczy kilka zdjęć (fot. 1). Kulminacją wyprawy były mosty w Dublinie. Mieszanka dawnych i współczesnych. Wśród nich dwa mosty Santiago Calatravy. Niewiele jest miast, gdzie ten słynny architekt i mostowiec postawił więcej niż jeden obiekt. Można przy- puszczać, że polubił to miasto…, wszak Dublin to koleb- ka piwa Guiness i whisky Jameson.
    [Show full text]
  • Lower Liffey Model DOCUMENT CONTROL SHEET
    Eastern CFRAM Study HA09 Hydraulics Report – DRAFT FINAL Eastern CFRAM Study HA09 Hydraulics Report Lower Liffey Model DOCUMENT CONTROL SHEET Client OPW Project Title Eastern CFRAM Study Document Title IBE0600Rp0027_HA09 Hydraulics Report Model Name Lower Liffey Rev. Status Author Checked By Approved By Office of Origin Issue Date D01 Draft M.Houston A. Sloan I. Bentley Belfast 12/02/2014 D02 Draft M.Houston A. Sloan S. Patterson Belfast 11/07/2014 D03 Draft A. Sloan S. Patterson G. Glasgow Belfast 13/01/2015 F01 Draft Final A. Sloan S. Patterson G. Glasgow Belfast 13/03/2015 F02 Draft Final A. Sloan S. Patterson G. Glasgow Belfast 13/08/2015 F03 Draft Final A. Sloan S. Patterson G. Glasgow Belfast 05/08/2016 IBE0600Rp00027 Rev F03 Eastern CFRAM Study HA09 Hydraulics Report – DRAFT FINAL Table of Reference Reports Report Issue Date Report Reference Relevant Section Eastern CFRAM Study Flood Risk December IBE0600Rp0001_Flood Risk 3.2.3 Review 2011 Review_F02 Eastern CFRAM Study Inception August 2012 IBE0600Rp0008_HA09 Inception Various Report UoM09 Report_F02 Eastern CFRAM Study Hydrology September IBE0600Rp0016_HA09_Hydrology 4.4 Report UoM09 2013 Report_F01 Eastern CFRAM Study HA09 Liffey November 2001s4884- SC2 Survey Report v1 Various Survey Contract Report 2012 IBE0600Rp00027 Rev F03 Eastern CFRAM Study HA09 Hydraulics Report – DRAFT FINAL 4 HYDRAULIC MODEL DETAILS 4.7 LOWER LIFFEY MODEL 4.7.1 General Hydraulic Model Information (1) Introduction: On the basis of a review of historic flooding and the extent of flood risk determined during the PFRA, the Eastern CFRAM Flood Risk Review (IBE0600Rp0027_Flood Risk Review) highlighted the River Liffey in Dublin City AFA as a HPW, subject to both fluvial and coastal flood risk.
    [Show full text]
  • Appendices Appendix I Land Use Matrix
    APPENDICES APPENDIX I LAND USE MATRIX LAND USE Z1 Z2 Z3 Z4 Z5 Z6 Z7 Z7A Z8 Z9 Z10 Z11 Z12* Z13* Z14 Z15 Advertisements and OOOOOO O Advertisement Structures Amusement/Leisure YY OO O Y Complex ATM YYYYYY Y Y Bed and Breakfast O Y Y Y O O Y Y Betting Office O Y Y Y Y Y Y Y Y Boarding Kennels Y Y Buildings for the health, YYYYY OOO Y Y safety and welfare of the public Caravan Park (Holiday) O Car Park O Y Y Y Y Y Y O O Y Casual Trading O O O O Chemical Processing and YY Storage Childcare Facility Y Y Y Y Y Y Y Y Y O Y Y Civic Amenity/Recycling O OOOOYY O Y Centre Civic Offices Y Y O Y Community Facility Y Y Y Y O O O O Y Conference Centre O Y Y O Y Cultural/recreational OOYYYYOOYOY Y building and uses Discount Food Store O O Education Y Y Y Y O Y Y Y Embassy Y O O O Y Y O Y Enterprise Centre Y Y Y Y Y Y Y O Y Funeral Home O O Y O O O Garages – Motor Repair O O O Y Y O Garden Centre O Y Y O O Golf Course and Clubhouse O O Guest House O Y Y Y O O Y Y Y Halting Site Y Y Y Y Heavy Vehicle Park Y Y Home-based Economic YYYYY Y Y Y Activity Hostel O Y Y Y Y Y O Hotel O Y Y Y O O Y Y Y Household Fuel Centre O O O Y Y Incinerator/waste to energy Y plant Industrial Building Y Y Y O Industrial Process O Y Y Internet Cafe and Call YYYO Y Y Centre Light Industrial Building O Y Y O Y Y Y O Live Work Units O O Y Y Y Y O Y Y 228 APPENDIX I Land Use Z1 Z2 Z3 Z4 Z5 Z6 Z7 Z7A Z8 Z9 Z10 Z11 Z12* Z13* Z14 Z15 Media recording and general OOOYYYOO O Y media associated uses Medical and related YYYYY Y Y Y consultants Motor Sales Showroom Y Y O Y Y Y O Nightclub
    [Show full text]
  • 2015, Annual Report
    ABBEY THEatRE AMHARCLANN NA MAINISTREACH 2015 annual report 2015 ANNUAL REPORT CONTENTS About 5 Chairman’s Welcome 6 2005 – 2015 at the Abbey Theatre 14 Overview 29 The Abbey Theatre in Numbers 30 2015 on Our Stages: Director’s Report 32 Artistic Programme 38 Awards 52 Literary 54 Community and Education 56 Abbey Talks 60 Green-Light Programme 63 Archive 66 Handbook of the Irish Revival 67 Diversifying our Income Streams 68 Staff 72 Board of Directors 74 Supporters and Members 80 Gallery and Reviews 83 Directors’ Report and Financial Statements 101 3 ABBEY THEATRE ANNUAL REPORT 2015 As Ireland’s national theatre, our mission is to create a world class national theatre that actively engages with and reflects Irish society. The Abbey Theatre invests in, nurtures and promotes Irish theatre artists. We do this by placing the writer and theatre-maker at the heart of all that we do, commissioning and producing exciting new work and creating discourse and debate on the political, cultural and social issues of the day. Our aim is to present great theatre art in a national context so that the stories told on stage have a resonance with artists and audiences alike. The Abbey Theatre produces an ambitious annual programme of Irish and international theatre across our two stages and on tour in Ireland and internationally, having recently toured to Belfast, Edinburgh, London, New York and Sydney. The Abbey Theatre is committed to building the Irish theatre repertoire, through commissioning and producing new Irish writing, and re-imagining national and international classics in collaboration with leading contemporary talent.
    [Show full text]
  • Luas Cross City Cycling Report October 2017
    Cycling and Luas Cross City Assessment of cycling feasibility on the Luas Cross City route 1 CONTENTS Introduction Current Situation Design guidance Options Development Methodology Quality of Service Assessment Recommendations for Cycling Part A: North-bound Assessment - Saint Stephen’s Green to Broadstone Part B: South-bound Assessment – Broadstone to Saint Stephen’s Green Summary of Recommendations October 2017 2 Introduction Luas Cross City (LCC) connects the northern end of the Luas Green Line at St. Stephen’s Green to Broombridge station in Cabra, intersecting with the Luas Red Line at O’Connell Street and Abbey Street. Between St. Stephen’s Green and Broadstone Station the route runs on-street. The alignment includes a number of streets that form part of the city centre cycle network (see below), with other cycle network routes crossing the LCC route at junctions. The Greater Dublin Area Cycle Network Plan (NTA, 2013) (GDACNP) is the primary reference document for the identification of higher volume cycle routes. However, the nature of urban cycling is such that all roads are likely to attract cyclists to some degree unless it is specifically precluded (one-way streets, pedestrian streets with no marked cycle facility, etc.). The GDACNP proposed the following cycle network for the city centre (Sheet N1a): 3 The written report for the proposed cycle network for Dublin City Centre includes the following commentary regarding Luas: 3.1.2 Dublin City Centre - Context for the Cycle Route Network In the city centre sector there is considerable competition for road space between the various modes of transport of bus, light rail, car, truck, bicycle and pedestrian.
    [Show full text]