2017-2018 Annual Report

Total Page:16

File Type:pdf, Size:1020Kb

2017-2018 Annual Report SERCUL ANNUAL REPORT 2017-18 CONTENTS Welcome 3 From the Chair–Pat Hart 4 From the CEO–Amy Krupa 5 SERCUL Staff and Committee 6 Achievements and Highlights 2017–18 7 Our Constitution 8 Our Projects 9 Environmental Education 10-13 Community Capacity 14-21 Landcare and Restoration 22-30 Monitoring and Research 31-33 Environmental Services 34 Auditor’s Report 35 2017-18 Financial Overview 36-37 Financial Report 38-40 Balance Sheet 38-39 Profit and Loss 40 Statement by the Management Committee 41 New Projects for 2018–19 42-43 Acknowledgement of Partnerships 44 Thank You 45 2 WELcoME Welcome to the South East Regional Centre for Urban Landcare’s (SERCUL) 2017-18 Annual Report to our stakeholders and community. SERCUL is the sub-regional Natural Resource Management (NRM) organisation that operates within the metropolitan and peri-urban areas of the Canning River Catchment. As part of the community we work with State and Federal Government agencies, Local Governments, businesses and volunteers to care for the environment and our local communities. This is done in many ways; working to improve biodiversity, protecting riverine environments, working with turf managers to sustainably improve turf best management practices, and engaging with our extensive community network to increase knowledge and skills in environmental management. We are extremely proud of this year’s achievements, which we have undertaken in partnership with the community and a range of other important project partners and stakeholders. Through these partnerships we have been working together to improve the health of our land and waterways. 3 EXECUTIVE MessAGES From the Chair - Pat Hart It is difficult to know where to begin to write this annual report. Of the 16 years that I have been Chairperson of SERCUL, I have found this year to be the most difficult. The sad demise of the Swan River Trust following its merger into the then Department of Parks and Wildlife in July 2015, reached another low point in the past 12 months when it became just a branch of the Department of Biodiversity, Conservation and Attractions (DBCA). The destruction of this once respected, specialist organisation has seen many fine staff with strong community connections leave or transfer to other parts of the Department. The abolition of the Swan River Trust has, in my opinion, been to the detriment of the Swan Canning system and reflected a decline in its importance for the State Government. The official rhetoric that this river system is highly valued and a State ‘icon’ is belied by the reduced State Government funding and staffing for its repair and management. This has necessitated other organisations, community groups and local government having to take on roles that should be undertaken by State Government because the work is critical for the rivers’ ongoing health and management. I can only hope that the State Government’s financial commitment to our Swan and Canning River system will return to the level that it so rightly deserves now that the State financial outlook appears to be looking positive. While SERCUL has for years received some core funding, it has not been sufficient to support all the varied roles we undertake in our sub-region. This funding deficiency now requires SERCUL to run its Environmental Services Unit as a small, not-for-profit business with its income critical for SERCUL’s financial sustainability. Over the next 12 months we need to make some major decisions about the future of SERCUL; in essence whether we can afford to deliver all the Objectives of our Constitution without taking on unacceptably high business risks. I joined SERCUL as a volunteer to assist in furthering the health of our environment, not to also manage a small business. I would like to thank those staff of the DBCA Rivers and Estuaries Branch with whom we work closely for their ongoing support; all the local governments in our sub-region for their support and commitment to their environmental responsibilities, particularly to our waterways. To Perth NRM for their support and all other agencies and organisations that we have worked with over the year – thank you. Thank you to Amy Krupa our CEO who has recently taken on that role and thank you to my Executive Committee for their time, in particular my deputy Stephen Johnston who has been of great assistance and whose support I greatly appreciate. I would finally like to thank most sincerely SERCUL’s amazing staff who go above and beyond their roles to further SERCUL’s objectives. Such is their commitment that many of them have volunteered to reduce their working hours to help balance our budget. Pat Hart Chairperson 4 EXECUTIVE MessAGES From the CEO - Amy Krupa The 2017-18 financial year has been challenging for the SERCUL Executive Committee and staff on a number of fronts. During the 2017-18 financial year some major staffing changes occurred at SERCUL which has shaped how we go about our business. Brett Kuhlmann, our previous CEO, resigned in November 2017 due to family reasons and Glen Byleveld, General Manager and Julie Robert, Special Projects Manager left the organisation around the same period to take up other opportunities. The loss of these three highly experienced managers was felt by the staff but this also provided an opportunity for staff members to step up and take on more responsibility in their areas which they did accordingly. This financial year also saw us implement a new accounting and payroll system and a complete overhaul of our Chart of Accounts. This was not an easy process that took many, many months to get right and I would like to say a big thank you to our Finance team of Monica Estrada, Jose Alcala and Farina Gandadjaja for all the hours they worked on this and their commitment to ensuring it was implemented correctly. This new accounting system and how we manage our income and expenses in the system showed us that we were not in the stable financial position that we thought we were in as is indicated in the Profit and Loss statement that is part of this annual report. This has led us to thoroughly review our overhead administrative costs to reduce them where possible, to some staff voluntarily reducing their hours to help save money in our largest expenses area, wages, and for our Environmental Services Unit to attract more fee for service work through tenders and requests for quote. To the staff that have volunteered to reduce their hours to help with our budget a huge thank you for your passion and commitment to keeping SERCUL financially viable. Matt Grimbly and Dan Friesen have also stepped up to the challenge of attracting more fee for service work for our Environmental Services Unit and for applying for major grants through our landcare program. After many sleepless nights and a lot of work by the Executive Committee and senior staff we are now heading in the right direction. Amazon frogbit, an aquatic weed, was also a priority during this financial year. Increased outbreaks of this weed occurred throughout the SERCUL region, and further afield around Perth, resulting in SERCUL hosting a stakeholder forum in partnership with the Department of Primary Industries and Regional Development in June 2018 to have this weed declared as a pest organism. Amazon frogbit has recently been gazetted as a declared species under section 22(2) - no Control Category for the whole of the State. SERCUL were hoping that Amazon frogbit would be declared as a C3 - management category but as none of the State Government agencies were willing to take on the compliance of this level the no Control Category was the only option. We are heartened though that Amazon frogbit is now a declared species and we will be working over the coming years to implement an Amazon frogbit management, education and research project to highlight the impact of this threatening aquatic weed. Finally, I would like to say thank you to our Executive Committee for putting your faith in me to take on the role of Chief Executive Officer. While my first few months in this position have certainly not been easy, I have enjoyed the challenge and also greatly appreciate the unwavering support from the SERCUL staff. Amy Krupa Chief Executive Officer 5 STAFF and COMMITTEE STAFF EMPLOYED DURING 2017–18 Jose Alcala – HR Payroll and Administration Officer EXECUTIVE COMMITTEE Daniel Barczi – Landcare Officer, ESU Chair: Pat Hart *Anneliese Bone – Landcare Officer, ESU (Oct 17) Deputy Chair: Stephen Johnston Natasha Bowden – Environmental Education Officer/ Education and Promotion Manager Treasurer: Max Houghton *Glen Byleveld – General Manager (Nov 17) Member: Marc Lane Caitlin Conway – Water Quality Officer/Volunteer Member: Kobi Bradshaw-Chen Coordinator Member: Marie Taylor Megan Crotty – Landcare Officer, ESU Monica Estrada – Business and Finance Manager Erin Farley – Environmental Education Officer Dan Friesen – Community and Grants Manager Farina Gandadjaja – Administration and Financial Assistant Matthew Grimbly – Environmental Services Unit Manager Amy Krupa – Education and Promotion Manager/Chief Executive Officer *Brett Kuhlmann – Chief Executive Officer (Nov 17) *Noratiah Larry – Work for the Dole Supervisor (Jan 18) John Maliunas – Landcare Officer and Precinct Manager Daniel Millea – Landcare and DNIP Officer *Catherine Morgan – Landcare Officer, ESU (Apr 18) Darren O’Brien – Landcare Officer, ESU Tarnisha Ogilvie – Booyi Program Coordinator Wilson Orjuela – Landcare Officer, ESU and OHS Officer Andy Owen – Landcare Officer, ESU *Tony Parrelli – Landcare
Recommended publications
  • Nyungar Tradition
    Nyungar Tradition : glimpses of Aborigines of south-western Australia 1829-1914 by Lois Tilbrook Background notice about the digital version of this publication: Nyungar Tradition was published in 1983 and is no longer in print. In response to many requests, the AIATSIS Library has received permission to digitise and make it available on our website. This book is an invaluable source for the family and social history of the Nyungar people of south western Australia. In recognition of the book's importance, the Library has indexed this book comprehensively in its Aboriginal and Torres Strait Islander Biographical Index (ABI). Nyungar Tradition by Lois Tilbrook is based on the South West Aboriginal Studies project (SWAS) - in which photographs have been assembled, not only from mission and government sources but also, importantly in Part ll, from the families. Though some of these are studio shots, many are amateur snapshots. The main purpose of the project was to link the photographs to the genealogical trees of several families in the area, including but not limited to Hansen, Adams, Garlett, Bennell and McGuire, enhancing their value as visual documents. The AIATSIS Library acknowledges there are varying opinions on the information in this book. An alternative higher resolution electronic version of this book (PDF, 45.5Mb) is available from the following link. Please note the very large file size. http://www1.aiatsis.gov.au/exhibitions/e_access/book/m0022954/m0022954_a.pdf Consult the following resources for more information: Search the Aboriginal & Torres Strait Islander Biographical Index (ABI) : ABI contains an extensive index of persons mentioned in Nyungar tradition.
    [Show full text]
  • 080052-16.022.Pdf
    ver the years,land for regional parks has been identified, progressivelypurchased and managed by the Western Australian Plannin$ Commission.ln 1997,responsibility for managingand protecting eight regional parks beganto be transferredgradually to the Depatment of Consenrationand LandManagement (CALM). The parks- Yellagonga,Herdsman Lake, Rockingham Lakes,Woodman Point, CanningRiver, Beeliar, Jandakot (Botanic) Park and DarlingRange-include river foreshores, ocean beaches,wetlands, banksia woodlandsand the DarlingScarp. They contain a number of featuresand land uses,including reseryes for recreation puposes, managed by relevant local governments. Each park has its own and visitors. With local involvement, Giventhe complexissues and the unique history. the Unit aims to develop facilities to need to closely monitor parks on a cooperatively BUSHIN THE CITY createa placefor peopleto use.enjoy regular basis,working and developa feeling of ownership. with local community groupsand local Formed two years ago, CALM'S The eight regional parks span the governments is very important. The RegionalParks Unit worksclosely with map from Joondalup in Perth's parksbenefit from council rangers,local local councils and community groups northern suburbsto Port Kennedyjust citizens and CALM officers working to managethese diverse,multipurpose south of Rockinghamand inland to the togetheron managementissues. parksfor the enjoymentoflocal residents Darling Range.These urban parksare Each regionalpark may havespecial usedon a daily basisby the community, physical
    [Show full text]
  • WABN #079 1996 Sep.Pdf
    I Western Australian 1 Bird Notes Quarterly Newsletter of the WA Group Royal Australasian Ornithologists Union Sighting of Purple-backed Starling (Sturnus sturninus) on Christmas Island On 4 June 1996 our family were sitting on the east a Brown Shrike. We contacted Richard Hill, RAOU Project verandah of House MQ63 1 at Silver City, Christmas Island, Officer on Christmas Island, who was fortunately willing and Indian Ocean. Graham saw a bird in the bushes along the able to come to have a look. He brought two Asian field guides. fenceline. At first glance it appeared to be a honeyeater These were MacKinnon and Phillipps (1993) and King et al. approximately the size of a Tawny-crowned Honeyeater (1984). (Phylidonyris rnelanops). Graham collected the binoculars From our description, Richard indicated the starlings on (Zeiss 8 x 20 B and Nikon 8 x 32). We ventured closer for a Plate 82 of MacKinnon and Phillipps, (1993). The male better look at it. It was moving around the small white flowers Purple-backed Starling was a distinct likeness. on a garden fenceline shrub, acting like a honeyeater, but its We looked around the garden and eventually a bird flew beak, instead of being long and curved, was quite straight. from a tree adjacent to the fenceline. It landed in a tall acacia, It was a light grey bird approximately 18 cm in length. Lucaena leucocephala in the neighbour's yard. Richard and I The head and body appeared very sleek with a shortish tail in went to one side of the tree and Graham went to the other.
    [Show full text]
  • Survey of the Port Coogee Development Area Jeremy Green
    Survey of the Port Coogee Development Area Jeremy Green Report—Department of Maritime Archaeology Western Australian Museum, No. 213 2006 Figure . Plan showing breakwater of proposed Port Coogee development, together with positions of wreck sites and objects of interest. Introduction current positions relative to chart datum. Additionally, The Port Coogee Development involves the historical research was carried out to try and identify construction of breakwaters and dredged channels other material that was known to have been located in an area approximately 500 m offshore extending in the general area. from latitude 32.09678°S longitude 5.75927°E south to the 32.04926°S 115.67788°E (note all The project aims latitude and longitude are given in decimal degrees and in WGS984 datum); a distance of about 000 m . To locate and precisely delineate the James, Diana (see Figure ). At the north end of the development and Omeo sites; the position of two important wreck sites are known: 2. To survey the area of the Port Coogee development James(830) and (Diana878); at the south end of that will either cover the sea bed or be affected by the development the remains of the iron steamship dredging for cultural remains; and Omeo (905) are still visible (for the background 3. To establish datum points in the James and Diana history of these three vessels see Appendix ). Since the site area and on the Omeo so that changes in the development is in an important historical anchorage level of the sea bed and movements of the wrecks area, Owen Anchorage, there is a possibility that can be monitored in the future.
    [Show full text]
  • Drainage Management in South J Andakot and for the Beeliar Wetlands
    ::I7' Drainage Management in South J andakot and for the Beeliar Wetlands Report to the Environmental Protection Authority by A Technical Advisory Group • \ Environmental Protection Authority Perth, Western Australia Bulletin 371 March 1989 DRAINAGE MANAGEMENT IN SOUTH JANDAKOT AND FOR THE BEELIAR WETLANDS Report to the Environmental Protection Authority by A Technical Advisory Group Environmental Protection Authority Perth, Western Australia Bulletin 371 March 1989 ISBN 0 7309 1924 2 ISSN 1030-0120 FORWARD The Environmental Protection Authority is currently examining a drainage management plan submitted by the State Planning Commission for land east of Thomsons Lake, South Jandakot. The drainage management plan outlines drainage mechanisms intended to allow urban development of the land. Public submissions were sought on the plan by the Environmental Protection Authority, closing 20 January 1989. The Environmental Protection Authority established a Technical Advisory Group to provide advice on the plan, in particular its ability to protect the Beeliar wetlands. The Technical Advisory Group has reported, and the Environmental Protection Authority has decided to release this report for public information. It should be noted that the report is an advisory document and that the Environmental Protection Authority has not yet determined whether it supports the recommendations it contains. The Environmental Protection Authority is reviewing the Technical Advisory Group's report, the proponent's response to that report, and submissions received during the public review period, and will be reporting to the Minister for Environment. The Environmental Protection Authority will advise the Minister whether it believes the drainage management plan is satisfactory and in particular whether water levels in the urban areas would be adequately controlled, the Beeliar wetlands protected, and surplus water put to good use.
    [Show full text]
  • ECM 8789952 V1 Special Council Meeting
    City of Cockburn Special Council Meeting Agenda Paper For Thursday, 24 October 2019 Document Set ID: 8789952 Version: 1, Version Date: 21/10/2019 SCM 24/10/2019 City of Cockburn PO Box 1215, Bibra Lake Western Australia 6965 Cnr Rockingham Road and Coleville Crescent, Spearwood Telephone: (08) 9411 3444 Facsimile: (08) 9411 3416 NOTICE OF MEETING Pursuant to Clause 2.5 of Council’s Standing Orders, a Special Meeting of Council has been called for Thursday 24 October 2019. The meeting is to be conducted at 7.00 PM in the City of Cockburn Council Chambers, Administration Building, Coleville Crescent, Spearwood. The purpose of this meeting is to is for the: (1) Election of Deputy Mayor (2) Setting Elected Member Allowances (3) Appointment of Standing Committee Members (4) Appointment of Council Delegates to External Organisations (5) Appointment of Reference Group Members. 2 of 191 Document Set ID: 8789952 Version: 1, Version Date: 21/10/2019 SCM 24/10/2019 The Agenda will be made available on the City’s website prior to the Meeting. Stephen Cain CHIEF EXECUTIVE OFFICER 3 of 191 Document Set ID: 8789952 Version: 1, Version Date: 21/10/2019 SCM 24/10/2019 CITY OF COCKBURN SUMMARY OF AGENDA TO BE PRESENTED TO THE SPECIAL COUNCIL MEETING TO BE HELD ON THURSDAY, 24 OCTOBER 2019 AT 7.00 PM Page 1. DECLARATION OF MEETING ................................................................................... 6 2. APPOINTMENT OF PRESIDING MEMBER (IF REQUIRED) ..................................... 6 3. DISCLAIMER (TO BE READ ALOUD BY PRESIDING MEMBER) ............................. 6 4. ACKNOWLEDGEMENT OF RECEIPT OF WRITTEN DECLARATIONS OF FINANCIAL INTERESTS AND CONFLICT OF INTEREST (BY PRESIDING MEMBER) .................................................................................................................
    [Show full text]
  • Cockburncoast District Structure Plan
    CockburnCoast district structure plan September 2009 Albert Facey House 469 Wellington Street Perth Western Australia 6000 CockburnCoast Disclaimer This document has been published by the Western Australian Planning Commission. Any representation, statement, opinion or advice expressed or implied in this publication is made in good faith and on the basis that the government, its employees and agents are not liable for any damage or loss whatsoever which may occur as a result of action taken or not taken, as the case may be, in respect of any representation, statement, opinion or advice referred to herein. Professional advice should be obtained before applying the information contained in this document to particular circumstances. © State of Western Australia Published by the Western Australian Planning Commission Albert Facey House 469 Wellington Street Perth Western Australia 6000 Published September 2009 ISBN O 7309 9639 5 internet: http://www.wapc.wa.gov.au email: [email protected] tel: 08 9264 7777 fax: 08 9264 7566 TTY: 08 9264 7535 infoline:1800 626 477 Western Australian Planning Commission owns all photography in this document unless otherwise stated. Copies of this document are available in alternative formats on application to the disability services coordinator. district structure plan ii CockburnCoast Foreword Exciting prospects for Cockburn coast The Cockburn Coast District Structure Plan establishes an exciting A key feature of the structure plan is its focus on sustainability future for the Cockburn coast, promising a range of housing types, through the establishment of ambitious performance targets. It also activities and employment choices. provides for a variety of housing types and styles such as apartments, townhouses and smaller dwellings that will offer The structure plan aims to transform the area by redeveloping the choice to people interested in modern, beachside development in South Fremantle Power Station and introducing a transit system the metro area.
    [Show full text]
  • Long-Term Shellsand Dredging, Owen Anchorage ______
    Long-Term Shellsand Dredging, Owen Anchorage ___________________________________________________________________________ Cockburn Cement Limited Report and recommendations of the Environmental Protection Authority Environmental Protection Authority Perth, Western Australia Bulletin 1033 November 2001 ISBN. 0 7307 6659 4 ISSN. 1030 - 0120 Assessment No.1300 Summary and recommendations Cockburn Cement Limited (CCL) has been dredging shellsand from Owen Anchorage since 1972. CCL now proposes to dredge shellsand in the long-term (to 2034) from additional specific locations on Success Bank, Parmelia Bank and West Success Bank, Owen Anchorage. The proposal comprises Stage 1 (2002-2014) on Success and Parmelia Bank and Stage 2 (2015-2034) on West Success Bank. CCL has proposed dredging a total area of 783ha which comprises 168.5ha of seagrass and 614 ha of unvegetated habitat. This report provides the Environmental Protection Authority’s (EPA’s) advice and recommendations to the Minister for the Environment and Heritage on the environmental factors relevant to the proposal. The EPA has previously undertaken assessments on CCL’s short and medium term dredging proposals. The EPA in its assessment of the medium-term proposal in Owen Anchorage recommended that proposals involving the further removal of seagrass and potential seagrass habitat in the long-term for shellsand should be recognised as ‘environmentally unreasonable’ (EPA, 1996a). The challenge for CCL, in its application for the long-term dredging proposal involving further seagrass removal, was to provide additional information which could lead the EPA to the view that the further removal of some seagrass and potential seagrass habitat was environmentally reasonable. Section 44 of the Environmental Protection Act 1986 requires the EPA to report to the Minister for the Environment and Heritage on the environmental factors relevant to the proposal and on the conditions and procedures to which the proposal should be subject, if implemented.
    [Show full text]
  • Woodman Point Regional Park Management Plan
    Woodman Point Regional Park Management Plan 2010 Conservation Commission of Western Australia Department of Environment and Conservation City of Cockburn Department of Transport Department of Sport and Recreation Woodman Point Regional Park Management Plan 2010 PLANNING TEAM The Planning Team, representing the managers of Woodman Point Regional Park, coordinated the development of this plan on behalf of the Conservation Commission of Western Australia. The Planning Team was assisted by a consultancy team led by CoastWise. Jacinta Overman Department of Environment and Conservation Brendan Dooley Department of Environment and Conservation Tim Bowra Department of Environment and Conservation Tim Swart Department of Sport and Recreation James Holder Department of Transport Robert Avard City of Cockburn ii How to Use This Plan This Plan is divided into chapters and sections as set out in the table of contents. Guiding principles are stated at the beginning of each chapter. An objective is given at the beginning of each section, followed by a discussion of the main issues and then strategies, which list responsible agencies and a priority rating. Priority ratings provide an indication of the relative importance of a strategy. Key performance indicators are listed in the Plan and outline performance measures, targets and reporting requirements. A number of issues raised in this Plan are interrelated and are dealt with under more than one section. Where this is the case, the discussion refers the reader to other related sections. ACKNOWLEDGEMENTS Numerous individuals and groups have contributed valuable ideas and information in the preparation of this Plan and their efforts are gratefully acknowledged. In particular, the contribution of the Woodman Point Regional Park Community Advisory Committee is appreciated.
    [Show full text]
  • Download the Perth and Peel Mountain Bike Master
    Mountain Bike Recreation, Tourism and Event Development PERTH & PEEL MOUNTAIN BIKE MASTER PLAN WEST AUSTRALIAN MOUNTAIN BIKE ASSOCIATION PERTH & PEEL MOUNTAIN BIKE MASTER PLAN Prepared by Common Ground Trails Pty Ltd for WestCycle Inc [email protected] www.westcycle.org.au FUNDED AND SUPPORTED BY Lotterywest Department of Local Government, Sport and Cultural Industries (DLGSC), formerly Department of Sport and Recreation Department of Biodiversity, Conservation and Attractions (DBCA), formerly Department of Parks and Wildlife West Australian Mountain Bike Association (WAMBA) ACKNOWLEDGEMENTS: The authors of this Perth & Peel Mountain Bike Master Plan respectfully acknowledge that this land on which we live and work is Noongar country, and that the Noongar people are the traditional custodians who have a rich social, spiritual and historical connection to this country, which is as strong today, as it was in the past. Common Ground Trails wishes to acknowledge the significant contribution of the project steering committee as well as the valuable input from Perth & Peel mountain bike bodies, stakeholders, organisation representatives, users and individuals. PHOTOGRAPHY: Carl Fox, Eerik Sandstrom, Louise Fox, Kelly Doye, Sean Lee and Travis Deane. DISCLAIMER Common Ground Trails Pty Ltd, its employees, directors and associated entities shall not be liable for any loss, damage, claim, costs, demands and expenses for any damage or injury of any kind whatsoever and howsoever arriving in connection with the use of this Master Plan or in connection with activities undertaken in mountain biking generally. While all due care and consideration has been undertaken in the preparation of this report, Common Ground Trails Pty Ltd advise that all recommendations, actions and information provided in this document is based upon research as referenced in this document.
    [Show full text]
  • Beeliar Regional Park Management Plan
    Beeliar Regional Park Final Management Plan 2006 PLANNING TEAM This plan was co-ordinated by a consultancy team led by Thompson Palmer Pty Ltd working closely with the managers of Beeliar Regional Park – the Department of Conservation and Land Management (CALM), the City of Melville, the City of Cockburn, the Town of Kwinana and Murdoch University. The Planning Team prepared the plan for the Conservation Commission of Western Australia. Brendan Dooley CALM Tim Bowra CALM Paddy Strano City of Cockburn Ian Davis City of Melville Rosalind Murray Town of Kwinana John McGowan Murdoch University i How to Use This Plan. This plan is divided into sections as set out in the table of contents. Within each section are subsections. Each subsection begins with the objectives to be achieved by management, followed by a discussion of the main issues, and then strategies, accompanied by the agencies responsible for achieving each objective and a priority rating. Priority ratings provide an indication of the relative importance of a strategy. The management agencies names have been abbreviated and a list of all abbreviations used and their meaning is listed in Appendix A. Key Performance Indicators are listed in the plan and outline performance measures, targets, and reporting requirements. A number of issues raised in the plan are interrelated and are dealt with under more than one section. Where this is the case, the discussion refers the reader to other related sections. ACKNOWLEDGMENTS Numerous individuals and groups have contributed valuable ideas and information in the preparation of this management plan and their efforts are gratefully acknowledged.
    [Show full text]
  • ECM 7598972 V1 Appendix E
    i Appendix E Cocckburn Coast Cultural Heritage Strategy v _E Document Set ID: 7598972 \\hps002\data2\pro\pla\02\PPP0235\12 Reports\ROBB JETTY Local Structure Plan - Planning\Appendicies\Appendicies.indd Version: 1, Version Date: 29/06/2018 COCKBURN COAST CUlTURAl heRiTAge STRATegy 711-228 OctOber 2012 Document Set ID: 7598972 Version: 1, Version Date: 29/06/2018 ii CoCkburn Coast Cultural Heritage strategy OCTOBER 2012 DOCUmeNT CONTROl Document ID: PLANNING/PG 2011/711-228 cockburn coast Heritage counsultancy/Final Documents/Amended/14 August 2012 cockburn coast Heritage Strategy.indd Issue Date Status Prepared by Approved by Name Initials Name Initials 5 20.10.2012 Final -updated Nerida Moredoundt & Nerida Moredoundt Susannah Kendall this report has been prepared for the exclusive use of the client, in accordance with the agreement between the client and tPG (‘Agreement’). tPG accepts no liability or responsibility whatsoever in respect of any use of or reliance upon this report by any person who is not a party to the Agreement or an intended recipient. In particular, it should be noted that this report is a qualitative assessment only, based on the scope and timing of services defined by the client and is based on inf ormation supplied by the client and its agents. tPG cannot be held accountable for information supplied by others and relied upon by tPG. copyright and any other Intellectual Property arising from the report and the provision of the services in accordance with the Agreement belongs exclusively to tPG unless otherwise agreed and may not be reproduced or disclosed to any person other than the client without the express written authority of tPG.
    [Show full text]