Initial Environmental Examination

Total Page:16

File Type:pdf, Size:1020Kb

Initial Environmental Examination Initial Environmental Examination January 2013 TAJ: Improved Maternal and Child Health through Connectivity Prepared by the Ministry of Transport, Republic of Tajikistan for the Asian Development Bank Table of Contents Abbreviations and Acronyms ............................................................................................................. 5 Executive Summary ........................................................................................................................... 6 1. Introduction ................................................................................................................................ 8 1.1 Purpose of the report .............................................................................................. 8 1.2 Identification of the Project and Project Proponent ................................................ 8 1.3 Nature, Size and Location of the Project ................................................................ 8 1.4 IEE Boundaries ....................................................................................................... 8 1.5 Methodology Applied .............................................................................................. 9 1.6 Structure of the Report ........................................................................................... 9 2. Legal, Policy and Administrative Framework ............................................................................ 9 2.1 General ................................................................................................................... 9 2.2 Country Policies and Administrative Framework ................................................... 9 2.3 Legal framework for EA, environmental licensing and permitting .......................... 11 2.4 Local Environmental Statutes ................................................................................. 13 2.5 Asian Development Bank Safeguard Policies 2009 ............................................... 13 3. Description of the Project ......................................................................................................... 14 3.1 Type of project ........................................................................................................ 14 3.2 Category of Project ................................................................................................. 15 3.3 Need for project ...................................................................................................... 15 3.3.1 Indicative Implementation Arrangements .................................................................... 16 3.4 Location and Size of Operation .............................................................................. 16 3.4.1 Project Location ........................................................................................................... 16 3.5 Scope of Works ....................................................................................................... 18 3.5.1 Project Phases ............................................................................................................. 18 3.5.2 Major Components and Design Characteristics .......................................................... 18 3.5.3 Source of Construction Materials ................................................................................ 21 3.5.4 Temporary Storage Areas ........................................................................................... 23 3.5.5 Road Safety ................................................................................................................. 23 3.5.6 Contracting and Institutional Issues ............................................................................ 24 3.6 Alternatives ............................................................................................................. 24 3.6.1 The No Action Alternative ............................................................................................ 24 3.6.2 Site and alignment Alternatives ................................................................................... 24 3.7 Proposed schedule for implementation .................................................................. 25 4. Description of the Environment ............................................................................................... 25 4.1 Physical Resources ................................................................................................ 25 4.1.1 Air quality & Climate..................................................................................................... 25 4.1.2 Topography .................................................................................................................. 28 4.1.3 Soils .............................................................................................................................. 29 4.1.4. Hydrology - Surface water and Flooding ................................................................. 32 4.1.4 Hydrology - Groundwater ............................................................................................. 36 4.1.5 Geology ........................................................................................................................ 36 4.1.6 Natural Hazards and Disasters .................................................................................... 36 4.2 Ecological Resources ............................................................................................. 38 4.2.1 Flora ............................................................................................................................. 38 4.2.2 Fauna ........................................................................................................................... 39 4.2.3 Aquatic biology ............................................................................................................. 39 4.2.4 Forests and Protected Areas ....................................................................................... 39 4.3 Economic Development .......................................................................................... 40 Improved Maternal and Child Health through Connectivity - Initial Environmental Examination 4.3.1 Industries ...................................................................................................................... 40 4.3.2 Infrastructure and Transportation facilities .................................................................. 41 4.3.3 Land use ...................................................................................................................... 41 4.3.4 Agricultural development, mineral development, and tourism facilities ...................... 41 4.4 Social and Cultural Resources ............................................................................... 41 4.4.1 Population and communities ....................................................................................... 41 4.4.2 Health & Education facilities ........................................................................................ 42 4.4.3 Socio-economic conditions .......................................................................................... 43 4.4.4 Historical and Archeological Areas of Significance ..................................................... 44 4.4.5 Noise and Vibration...................................................................................................... 44 5. Screening of Potential Environmental Impacts and Mitigation Measures .............................. 44 5.1 Introduction ............................................................................................................. 44 5.2 Impact Phases ........................................................................................................ 45 5.3 Mitigation Aspects ................................................................................................... 45 5.4 Physical Resources ................................................................................................ 45 5.4.1 Air quality ..................................................................................................................... 45 5.4.2 Topography .................................................................................................................. 47 5.4.3 Soils .............................................................................................................................. 48 5.4.4 Hydrology - Surface water & Flooding ......................................................................... 50 5.4.5 Hydrology – Groundwater ............................................................................................ 53 5.4.6 Geology ........................................................................................................................ 53 5.4.7 Natural Hazards ........................................................................................................... 53 5.5 Ecological Resources ............................................................................................. 54 5.5.1 Flora ............................................................................................................................. 54 5.5.2 Fauna ......................................................................................................................... 544 5.5.3 Aquatic biology ............................................................................................................
Recommended publications
  • The Republic of Tajikistan Ministry of Energy and Industry
    The Republic of Tajikistan Ministry of Energy and Industry DATA COLLECTION SURVEY ON THE INSTALLMENT OF SMALL HYDROPOWER STATIONS FOR THE COMMUNITIES OF KHATLON OBLAST IN THE REPUBLIC OF TAJIKISTAN FINAL REPORT September 2012 Japan International Cooperation Agency NEWJEC Inc. E C C CR (1) 12-005 Final Report Contents, List of Figures, Abbreviations Data Collection Survey on the Installment of Small Hydropower Stations for the Communities of Khatlon Oblast in the Republic of Tajikistan FINAL REPORT Table of Contents Summary Chapter 1 Preface 1.1 Objectives and Scope of the Study .................................................................................. 1 - 1 1.2 Arrangement of Small Hydropower Potential Sites ......................................................... 1 - 2 1.3 Flowchart of the Study Implementation ........................................................................... 1 - 7 Chapter 2 Overview of Energy Situation in Tajikistan 2.1 Economic Activities and Electricity ................................................................................ 2 - 1 2.1.1 Social and Economic situation in Tajikistan ....................................................... 2 - 1 2.1.2 Energy and Electricity ......................................................................................... 2 - 2 2.1.3 Current Situation and Planning for Power Development .................................... 2 - 9 2.2 Natural Condition ............................................................................................................
    [Show full text]
  • Tajikistan Young Leaders Program
    TAJIKISTAN YOUNG LEADERS PROGRAM Knowledge, Attitude and Practice (KAP) Survey Pre and Post Test Month and Year Counterpart YLP Office 66 Rudaki Avenue, Apartment 4, Dushanbe, Tajikistan, 734001 1 Today’s date: ____/_____________/ ______ date month year INTRODUCTION You have been selected to participate in the survey to help Counterpart International better understand the knowledge and skills of our program participants. We would like to learn more from you about your perception of the Youth Leadership Program and what you have learned through participating in it. Your participation in the survey is voluntary. If you do not wish to participate, please return the empty questionnaire to the Youth Educator. Your participation in the survey is confidential. Only the researcher in Dushanbe and Counterpart’s Dushanbe-based team will have access to your questionnaire. The researcher will analyze all the responses from the participating youth in Zarafshan Valley, Rasht Valley and Badakhshan in an aggregate form. No one will be looking at your individual answers – the researcher will look for common trends among all participants of the survey. Please answer the questions below to the best of your knowledge. If you are not sure of the answer, simply circle Don’t Know. Thank you for participating in the survey! Your responses are very important to the Youth Leadership Program! The Young Leaders Program is one of the many assistance projects supported by the American people through USAID. Since 1992, USAID has provided more than $360 million in programs that support Tajikistan’s security, democratic institutions, the social sector, and economic growth.
    [Show full text]
  • ROAD ASSET MANAGEMENT SYSTEMS and PERFORMANCE-BASED CONTRACTING TRAINING 12-14 February 2020Dushanbe, Tajikistan
    ROAD ASSET MANAGEMENT SYSTEMS AND PERFORMANCE-BASED CONTRACTING TRAINING 12-14 February 2020Dushanbe, Tajikistan LIST OF PARTICIPANTS I. MINISTRY OF TRANSPORT 1. Mr. Suhrob Mirzozoda, First Deputy Minister of Transport 2. Mr. Suhrob Yoqubzoda, Head of IT Unit, Department of Economic Analysis and Forecasting 3. Mr. Sayod Suriyev, Chief Specialist, Department of Economic Analysis and Forecasting 4. Mr. Qudrat Negmatov, Chief Specialist, Department of Roads Construction and Facilities 5. Mr. Salim Niyozov, Specialist, Department of Roads Construction and Facilities 6. Mr. Farhod Kholov, Specialist of Foreign Investments Unit II. MINISTRY OF FINANCE 7. Ms. Risolat Nazarova, Head of Main Unit on Economic Management III. MINISTRY OF ECONOMIC DEVELOPMENT AND TRADE 8. Mr. Ilyos Yunusov, Chief Specialist, Department of Industry and Infrastructure Development IV. COMMITTEE ON ARCHITECTURE AND CONSTRUCTION UNDER THE GOVERNMENT OF TAJIKITAN 9. Mr. Hotamshoh Sharifov, Chief Specialist, Department of Industry, Transport and Energy Programs V. STATE COMMITTEE ON INVESTMENTS AND STATE PROPERTY MANAGEMENT 10. Mr. Manuchehr Mirzozoda, Specialist, Department of State Property Management 1 VI. STATE UNITARY ENTERPRISE “DESIGN INSTITUTE OF TRANSPORT INFRASTRUCTURE” 11. Mr. Anvar Soirov, Engineer, Unit of Roads Design VII. STATE ENTERPRISES ON ROAD FACILITIES MANAGEMENT AND LOGISTIC SERVICE (under the Ministry of Transport) 12. Mr. Ismoilbek Odinaev, Head of Production and Technical Unit, State Enterprise “Road Department of Gissar Region” 13. Mr. Umed Ismoilov, Chief Engineer, State Enterprise on Road Maintenance of Gissar City 14. Mr. Jamshed Jobirov, Chief Engineer, State Enterprise on Road Maintenance of Varzob District 15. Mr. Odil Negmatov, Chief Engineer, State Enterprise on Road Maintenance of Fayzabad District 16. Mr.
    [Show full text]
  • Humanitarian Aid in Favour of the Population of Tajikistan Affected by Floods and Landslides
    EUROPEAN COMMISSION HUMANITARIAN AID OFFICE (ECHO) Emergency Humanitarian Aid Decision 23 02 01 Title: Humanitarian aid in favour of the population of Tajikistan affected by floods and landslides Location of operation: TAJIKISTAN Amount of Decision: Euro 350,000 Decision reference number: ECHO/TJK/BUD/2004/02000 Explanatory Memorandum 1 - Rationale, needs and target population. 1.1. - Rationale: On 13 and 14 July, torrential rains accompanied by heavy winds and landslides resulted in flooding in the Varzob district of Tajikistan, causing first of all, substantial damage to infrastructure. The major Dushanbe-Anzob-Istarafshan road was severely affected at several points and key bridges were destroyed or damaged. Although flooding is a normal phenomenon in Tajikistan at this time of year, the water levels this year have been much higher than in previous years. In addition to the damage to infrastructure, the floods have caused severe problems for the water supply to the capital, Dushanbe. The Varzob river which provides up to 60% of the city’s water supply, was highly polluted by landslides. Dushanbe’s water system, which is in terrible condition following years of neglect, is unable to cope. On 14 July, tap water was deemed unfit for human consumption and recommendations were made not to touch the contaminated water. Water supplies were rapidly shut down, with consequently over half of the 600,000 population in the capital having no access to water at all. Despite the warnings there is a serious risk that many people will become infected with disease through collecting and using unsafe water. From 15 July water has been provided by authorities from 44 water trucks.
    [Show full text]
  • Report Are Those of the Consultants and Do Not Necessarily Reflect the Position of the Committee of Environmental Protection and Its Agencies, GEF Or UNDP
    Tajikistan Terminal Evaluation Atlas Project ID: 00048392; PIMS: 1768 Demonstrating New Approaches to Protected Areas and Biodiversity Management in the Gissar Mountains as a Model for Strengthening the National Tajikistan Protected Areas System Michael J.B. Green & Gulbahor Jumabaeva January 2012 CONTENTS ACKNOWLEDGEMENTS .............................................................................................................. ii ABBREVIATIONS AND ACRONYMS .......................................................................................... iii EXECUTIVE SUMMARY ............................................................................................................... iv 1. INTRODUCTION ................................................................................................................... 1 1.1 Purpose of the evaluation ............................................................................................ 1 1.2 Methodology and structure of the evaluation ............................................................... 1 2. PROJECT DESCRIPTION AND DEVELOPMENT CONTEXT ............................................. 6 2.1 Project start and duration ............................................................................................. 6 2.2 Problems that the project seeks to address ................................................................. 6 2.3 Immediate and development objectives of the project ............................................... 10 2.4 Main stakeholders .....................................................................................................
    [Show full text]
  • The Economic Effects of Land Reform in Tajikistan
    FAO Regional Office for Europe and Central Asia Policy Studies on Rural Transition No. 2008-1 The Economic Effects of Land Reform in Tajikistan Zvi Lerman and David Sedik October 2008 The Regional Office for Europe and Central Asia of the Food and Agriculture Organization distributes this policy study to disseminate findings of work in progress and to encourage the exchange of ideas within FAO and all others interested in development issues. This paper carries the name of the authors and should be used and cited accordingly. The findings, interpretations and conclusions are the authors’ own and should not be attributed to the Food and Agriculture Organization of the UN, its management, or any member countries. Zvi Lerman is Sir Henry d’Avigdor Goldsmid Professor of Agricultural Economics, The Hebrew University of Jerusalem, Israel David Sedik is the Senior Agricultural Policy Officer in the FAO Regional Office for Europe and Central Asia. Contents Executive summary . 1 1. Introduction: purpose of the study. 5 2. Agriculture in Tajikistan. 7 2.1. Geography of agriculture in Tajikistan. 8 Agro-climatic zones of Tajikistan. 10 Regional structure of agriculture. 13 2.2. Agricultural transition in Tajikistan: changes in output and inputs. 15 Agricultural land. 16 Agricultural labor. 17 Livestock. 17 Farm machinery. 19 Fertilizer use. 19 3. Land reform legislation and changes in land tenure in Tajikistan. 21 3.1. Legal framework for land reform and farm reorganization. 21 3.2. Changes in farm structure and land tenure since independence. 24 4. The economic effects of land reform . 27 4.1. Recovery of agricultural production in Tajikistan.
    [Show full text]
  • Environmental Impact Assessment FINAL
    Environmental Impact Assessment Project: ADB TA-9530 TAJ July 2020 Central Asia Regional Economic Cooperation Corridors 2, 3, and 5 (Obigarm-Nurobod) Road Project Volume 1 – Environmental Impact Assessment (Volume 2 comprises Annexes to the EIA document) FINAL Prepared by the Ministry of Transport. The Environmental Assessments contained in this document have been prepared based on the policy requirements of several International financial institutions who will fund the Project. However the reporting in this document follows the requirements of the ADB Safeguards Policy Statement (2009). This Environmental Impact Assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status or any territory or area. i TAJ - Obigam Nurobod EIA Volume 1 text FINAL.docx REPUBLIC OF TAJIKISTAN MINISTRY OF TRANSPORT Looking towards Bridge #8 at Km36 (looking from Tunnel 2 north portal) (August 2018) Snowfall, Kandak, Obigarm looking north. Alignment mid picture (November 2018) Environmental Impact Assessment OBIGARM-NUROBOD ROAD Dushanbe, July 2020 Date Notes Created Checked Approved Document code 1 Jul 2020 Final issue document AJT FINAL Funding Agency Implementing Agency: Project Implementation Unit for Roads Rehabilitation Executing Agency: Asian Development Bank Ministry of Transport ii TAJ - Obigam Nurobod EIA Volume 1 text FINAL.docx Contents Executive Summary 1 Introduction ......................................................................................................................
    [Show full text]
  • Project Document Blank
    TABLE OF CONTENTS TABLE OF CONTENTS .............................................................................................................................................. 2 LIST OF FIGURES ..................................................................................................................................................... 3 LIST OF TABLES ...................................................................................................................................................... 4 LIST OF ACRONYMS AND ABBREVIATIONS ............................................................................................................. 5 I. DEVELOPMENT CHALLENGE ........................................................................................................................... 8 INTRODUCTION .............................................................................................................................................................. 8 GEOGRAPHICAL CONTEXT ................................................................................................................................................. 8 SOCIO-ECONOMIC CONTEXT ............................................................................................................................................ 10 ENVIRONMENTAL CONTEXT ............................................................................................................................................. 12 KOFIRNIGHAN RIVER BASIN ...........................................................................................................................................
    [Show full text]
  • The Geodynamics of the Pamir–Punjab Syntaxis V
    ISSN 00168521, Geotectonics, 2013, Vol. 47, No. 1, pp. 31–51. © Pleiades Publishing, Inc., 2013. Original Russian Text © V.S. Burtman, 2013, published in Geotektonika, 2013, Vol. 47, No. 1, pp. 36–58. The Geodynamics of the Pamir–Punjab Syntaxis V. S. Burtman Geological Institute, Russian Academy of Sciences, Pyzhevskii per. 7, Moscow, 119017 Russia email: [email protected] Received December 19, 2011 Abstract—The collision of Hindustan with Eurasia in the Oligocene–early Miocene resulted in the rear rangement of the convective system in the upper mantle of the Pamir–Karakoram margin of the Eurasian Plate with subduction of the Hindustan continental lithosphere beneath this margin. The Pamir–Punjab syn taxis was formed in the Miocene as a giant horizontal extrusion (protrusion). Extensive nappes developed in the southern and central Pamirs along with deformation of its outer zone. The Pamir–Punjab syntaxis con tinued to form in the Pliocene–Quaternary when the deformed Pamirs, which propagated northward, were being transformed into a giant allochthon. A fold–nappe system was formed in the outer zone of the Pamirs at the front of this allochthon. A geodynamic model of syntaxis formation is proposed here. DOI: 10.1134/S0016852113010020 INTRODUCTION Mujan, BandiTurkestan, Andarab, and Albruz– The tectonic processes that occur in the Pamir– Mormul faults (Fig. 1). Punjab syntaxis of the Alpine–Himalayan Foldbelt The Pamir arc is more compressed as compared and at the boundary of this syntaxis with the Tien Shan with the Hindu Kush–Karakoram arc. Disharmony of have attracted the attention of researchers for many these arcs arose in the western part of the syntaxis due years [2, 7–9, 13, 15, 28].
    [Show full text]
  • Rapid Chromosomal Evolution in Enigmatic Mammal with XX in Both Sexes, the Alay Mole Vole Ellobius Alaicus Vorontsov Et Al., 1969 (Mammalia, Rodentia)
    COMPARATIVE A peer-reviewed open-access journal CompCytogen 13(2):Rapid 147–177 chromosomal (2019) evolution in enigmatic mammal with XX in both sexes... 147 doi: 10.3897/CompCytogen.v13i2.34224 DATA PAPER Cytogenetics http://compcytogen.pensoft.net International Journal of Plant & Animal Cytogenetics, Karyosystematics, and Molecular Systematics Rapid chromosomal evolution in enigmatic mammal with XX in both sexes, the Alay mole vole Ellobius alaicus Vorontsov et al., 1969 (Mammalia, Rodentia) Irina Bakloushinskaya1, Elena A. Lyapunova1, Abdusattor S. Saidov2, Svetlana A. Romanenko3,4, Patricia C.M. O’Brien5, Natalia A. Serdyukova3, Malcolm A. Ferguson-Smith5, Sergey Matveevsky6, Alexey S. Bogdanov1 1 Koltzov Institute of Developmental Biology, Russian Academy of Sciences, Moscow, Russia 2 Pavlovsky Institu- te of Zoology and Parasitology, Academy of Sciences of Republic of Tajikistan, Dushanbe, Tajikistan 3 Institute of Molecular and Cellular Biology, Siberian Branch RAS, Novosibirsk, Russia 4 Novosibirsk State University, Novosibirsk, Russia 5 Cambridge Resource Centre for Comparative Genomics, Department of Veterinary Me- dicine, University of Cambridge, Cambridge, UK 6 Vavilov Institute of General Genetics, Russian Academy of Sciences, Moscow, Russia Corresponding author: Irina Bakloushinskaya ([email protected]) Academic editor: V. Lukhtanov | Received 1 March 2019 | Accepted 28 May 2019 | Published 20 June 2019 http://zoobank.org/4D72CDB3-20F3-4E24-96A9-72673C248856 Citation: Bakloushinskaya I, Lyapunova EA, Saidov AS, Romanenko SA, O’Brien PCM, Serdyukova NA, Ferguson- Smith MA, Matveevsky S, Bogdanov AS (2019) Rapid chromosomal evolution in enigmatic mammal with XX in both sexes, the Alay mole vole Ellobius alaicus Vorontsov et al., 1969 (Mammalia, Rodentia). Comparative Cytogenetics 13(2): 147–177. https://doi.org/10.3897/CompCytogen.v13i2.34224 Abstract Evolutionary history and taxonomic position for cryptic species may be clarified by using molecular and cy- togenetic methods.
    [Show full text]
  • Pdf | 445.96 Kb
    Rapid Emergency Assessment & Coordination Team | Tajikistan REACT Mudflow in Direct Rule Districts Tajikistan Situation report № 2 27 July 2015 Key Highlights: One person killed, and 842 people were displaced as a result of mudflow in Rasht and Tajikabad Districts; Preliminary number of fully destroyed houses in Rasht is 72 and partially damaged is 56; A mudflow on 24 July fully destroyed 6 houses and partially damaged 4 houses in Tajikabad District; At least 4,000 people do not have electricity supplies and access to water supply system due to damages to existing Mudflow affected area in Navdi Jamoat of Rasht District (DRD), 22 July, 2015 systems in Rasht and Tajikabad (photo by REACT Rapid Response Team) districts. Drinking water, food and non-food items are among the highest priority needs noted by initial sources. Situation On 20 July 2015, three villages (Bedak and Halqarf villages of Navdi Jamoat and Pingon village of B.Rahimzoda Jamoat) of Rasht District, Direct Rule Districts (DRD) affected by the mudflow. CoES reports that one person was killed and 630 people were displaced. The poor housing construction, coupled with a lack of coping mechanisms, resulted in displacement of at least 72 households and severe damage to arable lands, roads, bridges, water and electricity supply systems. The majority of the 630 displaced have found shelter in a tented camp near Bedak Mudflow affected area in Langari Shoh Jamoat of Tajikabad District (DRD), 27 July, 2015 (photo by German Agro Action) village. In total, 4,713 people (2,420 men and 2,293 women), among them 1,053 boys and 953 girls under 16, 449 boys and 424 girls under 5,15 pregnant and 85 lactating women, 6 boys and 3 girls with disabilities have been affected in three villages.
    [Show full text]
  • Development Programs for Poverty Alleviation: Comparative
    DEVELOPMENT PROGRAMS FOR POVERTY ALLEVIATION: COMPARATIVE STUDY OF MICROFINANCE PROGRAM IN TWO AREAS OF TAJIKISTAN A thesis presented to the faculty of the Center for International Studies of Ohio University In partial fulfillment of the requirements for the degree Master of Arts Ravshan Grezov June 2008 2 This thesis titled DEVELOPMENT PROGRAMS FOR POVERTY ALLEVIATION: COMPARATIVE STUDY OF MICROFINANCE PROGRAM IN TWO AREAS OF TAJIKISTAN by RAVSHAN GREZOV has been approved for the Center for International Studies by ________________________________ Ann R. Tickamyer Professor of Sociology _________________________________ Jieli Li Director, International Development Studies _________________________________ Drew McDaniel Interim Director, Center for International Studies 3 Abstract GREZOV, RAVSHAN, M.A., June 2008, International Development Studies DEVELOPMENT PROGRAMS FOR POVERTY ALLEVIATION: COMPARATIVE STUDY OF MICROFINANCE PROGRAM IN TWO AREAS OF TAJIKISTAN (87 pp.) Director of Thesis: Ann R. Tickamyer This study analyzes the macro- and micro-level development programs for poverty alleviation in the Republic of Tajikistan. At the macro-level, this study examines the International Monetary Fund's macroeconomic stabilization programs and the World Bank's structural adjustment programs in collaboration with the Government of Tajikistan to highlight the challenges that the International Financial Institutions face in building sound economic development. At the micro-level, it analyzes a case of the UNDP program on microfinance to see if there is a statistically significant correlation between micro-loans and improved livelihoods. This research shows that poor governance and high corruption are widespread at the macro-level and thus policies should take a different approach through building strong capacities of local institutions and politicians. At the micro-level, however, the study concludes that microfinance is a more efficient and effective way to reach and empower the poor.
    [Show full text]