Environment and Living Scrutiny Committee ENVIRONMENT AND LIVING SCRUTINY COMMITTEE 3 October 2012 PRESENT: Councillor Hunter-Watts (Chairman); Councillors Adams, Mrs Bloom, Bond, Mrs Brandis, Cashman, Fealey (Vice Chairman), Foster, Hughes, Mrs Russel, Stuchbury, Vick and Winn. Councillors Edmonds and Mrs Paternoster attended also. Apology: Councillors Mrs Chapple and Mrs L Smith. 1. VALE OF AYLESBURY PLAN The Vale of Aylesbury Plan (VAP) would guide the development of the District through to 2031. In the light of changes to the planning regime it was being produced in separate parts and this first part covered the strategic policies. Once the Strategy part had completed its statutory process, the Development Management (VAP Delivery) and if needed allocations policies would be prepared. The submission of this Plan would need to be agreed by Council and at their meeting on 9 October, Cabinet would be asked to recommend this to Council for the meeting on 17 October. The Plan had been prepared in accordance with the decisions of Cabinet on 14 August 2012 which covered the accelerated production of the Strategy Document, as well as the level of jobs and homes growth and the apportionment of that growth across the District to be used as the basis of VAP work. In preparing the Plan, account had to be taken of relevant international, national, regional, and local policies. A list of all the plans and policies that had been considered during the preparation of VAP were included in the Sustainability Appraisal. The National Planning Policy Framework (NPPF) published in March 2012 had replacing the majority of previous national planning guidance in Planning Policy Statements and Planning Policy Guidance notes. VAP and the policies had been prepared in conformity with the NPPF. VAP was in ‘general conformity’ with most of the policies in the South East Plan, which still remained in place. However bearing in mind that the South East Plan was based on broad data across the region, and that some evidence was now several years old, the VAP had been based on robust local evidence, where available, that was more detailed and up-to-date. In particular there was more up to date and robust evidence now available about the housing needs for Aylesbury Vale. With the introduction of the Localism Act in 2010, and the Government’s confirmed intention to revoke the South East Plan, the Council commissioned a review of the housing needs of the district. The Aylesbury Vale Housing and Economic Growth Assessment (GL Hearn 2011) identified the needs for new jobs and homes to 2031 to meet the existing and future needs of people in the District. At its meeting on 14 August, Cabinet received a report which reviewed the consultation responses and considered options for narrowing down the options for further work on the Strategy elements of VAP. That report looked at the “bottom-up” input to the process from parish and town councils, at the District-wide position, in particular the Housing and Economic Growth Assessment mentioned above, as well as the broader issues which extended beyond the District’s administrative boundaries. Cabinet’s decision, including the levels and distribution of growth across the District, had shaped the drafting of the Plan. Sustainability appraisals had been carried out at each stage of the development of the VAP strategy document. The production of VAP has also been supported by a number of technical studies. Some of these were part of the previous work on the Core Strategy while others had been commissioned as part of the on-going work since the Core Strategy had been withdrawn. These would be published on the web- site as part of the pre-submission publicity. In addition to the Housing and Economic Growth Assessment, these included: Strategic Housing Market Assessment Validation study, Strategic Housing Land Availability Assessment. Employment Land review update. Water Cycle Strategy update. Leisure and Cultural Facilities Study. A VAP Members’ forum had been held on Monday evening to provide Councillors with a further opportunity for briefing and answering any queries on the approach being taken in the Plan or on the processes involved. In response to the changing planning regime, and Members wishes that the strategic elements of VAP were progressed in an accelerated timescale to respond to the NPPF transitional arrangements, the overall Vale of Aylesbury Plan would now come forward in sections as follows: Vale of Aylesbury Plan – Strategy – the current document – setting out the vision, strategic objectives, jobs and housing targets, along with apportionment across the District, and the principles of how development should take place in terms of delivering infrastructure, economic growth, housing, environmental protection and the localism agenda. No site specific allocations would be made, nor would detailed Development Management policies be included. The document, in effect, replaced the strategic elements of the South East Plan. Vale of Aylesbury Plan – Delivery (Development Management) – this document would set out development management policies for the entire District which, taken together with the current Strategy document, would provide a completely updated planning policy picture. As far as possible, this element of the Plan will be worked on in parallel with taking the Strategy document through its formal processes. It was hoped that consultations on the content could take place in the first half of 2013. Allocations – New allocations were only anticipated to be required at the Strategic Settlements – Aylesbury (pending Development Management decisions), Buckingham, Haddenham and Winslow and possibly some of the larger villages. Some of these could be developed by neighbourhood plans (led by Town /Parish Councils) or through locally focussed planning documents (led by AVDC working with local communities). Smaller scale sites, consistent with the policies of the Strategy document, were likely to come forward through the Development Management process. Gypsy and Traveller allocations would be dealt with by a specific development plan document led by AVDC. Understanding this staged approach would hopefully assist Members in focussing any comments they had on the Strategic aspects of VAP rather than other components that will come forward subsequently. Members should also be aware of the guidance that our Plans should not repeat what is already set out in the NPPF. Moving forward, if the Plan was agreed for submission by Council then there would be the need to finalise documents and supporting material, before embarking on a statutory pre-submission publicity period. It was hoped that this could be completed before the end of the year, when people can comment on the soundness of the Plan. The Council would then need to summarise and collate all of the representations received before submitting all of this for independent Examination by the Planning Inspectorate. If the Inspector found that the Plan was “sound” at inspection the council would be able to adopt it and at that stage it would become part of the statutory Development Plan. The Council’s work on the VAP had assumed the revocation of the South East Plan (SEP), in line with the stated intention of the Government. If this happened it would leave a gap in terms of housing numbers and require AVDC to produce its own up-to- date assessments of jobs and homes growth for the District. However, the SEP remained in place and was part of the statutory Development Plan. There was a clear tension here between the Government’s strong pressure on Authorities to progress rapidly with their plan-making activities and their commitment to move away from “top-down” dictated growth with the tests an Inspector will have to apply in judging the soundness of the plan. Other Authorities were currently in the examination process in somewhat similar situations (including Milton Keynes Council) and AVDC would keep a close watching brief on their position. If the Government fail to deliver on their stated intentions then this could have timescale implications or require a revision to the explanatory text and other supporting material at submission or pre-submission publicity stage. This was a key issue on which we would need to take specialist legal advice after the current democratic processes have been completed and could possibly alter the narrative and presentation of the Plan in this respect. Members requested further information and were informed:- (i) that the VAP housing allocations figure was approximately half of those required in the current SE Plan. The Planning Inspector would have to rule whether these housing growth figures were acceptable. VAP had been put together on more detailed, up-to-date and robust local evidence the housing needs for Aylesbury Vale, when compared to the broad regional data used in the SE Plan. (ii) Spatial Vision – that while the location of the Silverstone University Technical College had moved and would now be sited in Northamptonshire, it remained but was only a very small part of the whole Silverstone development. The facilities and other development taking place at Silverstone as a whole were supporting jobs and opportunities for Buckingham businesses. (iii) Policy VS7 (Timely delivery of housing) – that Neighbourhood Plans dealing with growth in localities would not be able to come forward until the Council had a statutory Development Plan (VAP) in place. Community-led non- statutory planning documents would be used as material considerations in assessing proposals for
Recommended publications
  • Swansuppingissue
    FREE Issue 74 OCT/NOV 2009 NOW WE ARE 100,000! Members of CAMRA were thrilled to announce a landmark moment CAMRA was formed in 1971 by Michael Hardman, Jim Makin, in their 38 year history as their numbers have swelled to 100,000 Graham Lees and Bill Mellor, when an idea of a campaign arose members. This milestone was confi rmed at the opening day of the whilst they were bemoaning the state of British beer and pubs during Great British Beer Festival, which was held at the beginning of a holiday in Ireland. Popularity for the then-named Campaign for August (and the news was embargoed for our previous issue!). the Revitalisation of Ale quickly grew, and membership levels rose, Despite many campaigning successes over its 38 year history, with CAMRA boasting over 5,000 members by the end of 1973. CAMRA is pledging to push middle-age to one side as it steps up its In the early years of the organisation, CAMRA quickly formed campaigns to save Britain’s pubs and get a fair deal for beer drinkers. three key campaigning tools, which remain integral to this day. The As the UK heads for a general election next spring, CAMRA is year 1974 saw CAMRA publish the Good Beer Guide for the fi rst pushing for reform of the beer tie, fair taxes on beer, minimum time, selling 30,000 copies in the fi rst seven months of its release. pricing regulations to stamp out loss-leaders in supermarkets, zero In the same year, the Corn Exchange, Cambridge, played host to duty rate on low strength beers, planning law reforms to protect the fi rst CAMRA beer festival, with half of the beer supply in the pubs and for a central Government policy framework to protect and venue selling out in the fi rst day.
    [Show full text]
  • Dunsmore, Wendover and Halton HS2 London-West Midlands May 2013
    PHASE ONE DRAFT ENVIRONMENTAL STATEMENT Community Forum Area Report 10 | Dunsmore, Wendover and Halton HS2 London-West Midlands May 2013 ENGINE FOR GROWTH DRAFT ENVIRONMENTAL STATEMENT Community Forum Area Report ENGINE FOR GROWTH 10 I Dunsmore, Wendover and Halton High Speed Two (HS2) Limited, 2nd Floor, Eland House, Bressenden Place, London SW1E 5DU Telephone 020 7944 4908 General email enquiries: [email protected] Website: www.hs2.org.uk © Crown copyright, 2013, except where otherwise stated Copyright in the typographical arrangement rests with the Crown. You may re-use this information (not including logos or third-party material) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence/ or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. To order further copies contact: DfT Publications Tel: 0300 123 1102 Web: www.dft.gov.uk/orderingpublications Product code: ES/10 Printed in Great Britain on paper containing at least 75% recycled fibre. CFA Report – Dunsmore, Wendover and Halton/No 10 I Contents Contents Draft Volume 2: Community Forum Area Report – Dunsmore, Wendover and Halton/No 10 5 Structure of the HS2 draft Environmental Statement 5 Part A: Introduction 6 1 Introduction 7 1.1 Introduction to HS2
    [Show full text]
  • London Road, Wendover HP22 6PN Petitions Numbered: 370 – Chisholm; 378 – Adam and Others; 600 – Dixon; 822 - Ansell Sara Dixon Roll B Agent
    EXHIBIT LIST Reference No: HOL/00600 Petitioner: Robert Dixon and Mrs Sara Dixon Published to Collaboration Area: Tuesday 01-Nov-2016 Page 1 of 240 No Exhibit Name Page 1 A496_2nd Nov Slides for London Road Wendover HoL.pdf (A496) 2 - 25 2 A497_Combined petition asks and location in hearing.pdf (A497) 26 - 27 3 A498_CML witness p48 onwards.pdf (A498) 28 - 119 4 A516_HOC_ Sara Dixon and Others 873.pdf (A516) 120 - 160 5 A517_Transcript_HOC_17 Sept Thurs Morning.pdf (A517) 161 - 240 HOL/00600/0001 London Road, Wendover HP22 6PN Petitions numbered: 370 – Chisholm; 378 – Adam and others; 600 – Dixon; 822 - Ansell Sara Dixon Roll B agent A496 (1) HOL/00600/0002 Appendices/Evidence/How we’ve tried to save the court’s time in hearing… Overview of all 4 petition ‘asks’ and where they are in this presentation (attached) House of Commons transcript and slides from hearing on 17 September 2015 (attached) Assurance re Footway (HS2 doc) Assurance re Service Road (HS2 doc) Assurance re Viaduct Maintenance and Graffiti clearance (HS2 doc) 1st Special Report House of Commons December 2015 (extract included in these slides) Mortgage rejections (available if needed) 23rd November 2015 Council of Mortgage Lenders (attached) DfT Response to SC March 2016 (extract included in these slides) A496 (2) HOL/00600/0003 3 main ‘asks’: 1. Minimise problems of being a ‘cut off community’ 2. Minimise the environmental impact of (1) the construction route and ‘compounds’ and (2) the railway line 3. Make the compensation scheme fit for purpose for us Acknowledge: House of Commons Select Committee David Walker Clerk’s Office HS2 team Bucks County Council team A496 (3) HOL/00600/0004 About Us A496 (4) HOL/00600/0005 Our situation – geographic and human Wendover End – 285m from line Missenden • 3 - under 20; 2 - 40-50; end – 400m 8 – 50–60; 11 – 60-70; 14 – 70 + Garage side – excluding Vince and Mandy – 280m-300m range.
    [Show full text]
  • Dunsmore, Wendover and Halton | CFA10 | Dunsmore, Wendover and Halton
    LONDON-WEST MIDLANDS ENVIRONMENTAL STATEMENT ENVIRONMENTAL MIDLANDS LONDON-WEST | Vol 2 Vol LONDON- | Community Forum Area report Area Forum Community WEST MIDLANDS ENVIRONMENTAL STATEMENT Volume 2 | Community Forum Area report CFA10 | Dunsmore, Wendover and Halton | CFA10 | Dunsmore, Wendover and Halton and Halton Wendover Dunsmore, November 2013 VOL VOL VOL ES 3.2.1.10 2 2 2 London- WEST MIDLANDS ENVIRONMENTAL STATEMENT Volume 2 | Community Forum Area report CFA10 | Dunsmore, Wendover and Halton November 2013 ES 3.2.1.10 High Speed Two (HS2) Limited has been tasked by the Department for Transport (DfT) with managing the delivery of a new national high speed rail network. It is a non-departmental public body wholly owned by the DfT. A report prepared for High Speed Two (HS2) Limited: High Speed Two (HS2) Limited, Eland House, Bressenden Place, London SW1E 5DU Details of how to obtain further copies are available from HS2 Ltd. Telephone: 020 7944 4908 General email enquiries: [email protected] Website: www.hs2.org.uk High Speed Two (HS2) Limited has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the HS2 website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact High Speed Two (HS2) Limited. Printed in Great Britain on paper containing at least 75% recycled fibre. CFA Report – Dunsmore, Wendover and Halton/No 10
    [Show full text]
  • HS2 Ltd FOI & EIR Disclosure
    HS2 Ltd FOI & EIR Disclosure log ‐ September 2015 to September 2017 Ref No Request Outcome Subject Completion date FOI15-1357 Fully met Skills forecasting, railfreight, and rolling stock requirement. 01/09/2015 Technical agreement between Secretary of State for Transport and Packington Estate in FOI15-1363 Fully met 04/09/2015 relation to the realignment of Diddington Lane FOI15-1365 Fully met Detailed analysis including costings for Wendover Dean Viaduct 07/09/2015 Met but some info not Information relating to HS2 Phase One landscape costs and value for money environmental FOI15-1366 07/09/2015 held assessment for the area between Amersham and Chilterns North at Wendover Information about HS2 Ltd procurements under the EU procurement directives which were FOI15-1367 Partially met 11/09/2015 concluded/awarded between 1 April 2014 and 31 July 2015 FOI15-1368 Fully met Previously unpublished photomontage images of the HS2 rail proposals 14/09/2015 FOI15-1369 Fully met Text of termination clauses in all HS2 Ltd contracts 10/09/2015 Details of investigations undertaken by HS2 Ltd on the effectiveness of a noise barrier at FOI15-1373 Fully met 04/09/2015 Westbury Viaduct FOI15-1376 Fully met Information relating to HS2 construction at Nash Lee Lane overbridge satellite compound 18/09/2015 FOI15-1379 Fully met Fujitsu contract details 21/09/2015 FOI15-1383 Fully met Number of employees based at HS2 Ltd London and Birmingham offices 17/09/2015 Minutes of meetings held between HS2 Ltd and Solihull MBC, Hampton in Arden Parish FOI15-1385 Partially
    [Show full text]
  • On Merits - Praying to Be Heard by Counsel
    1793 In Padiament House of Commons Session (2013-2014) ^~ - -~ _ HIGH SPEED RAIL (London - West Midlands) BILL AGAINST- on Merits - Praying to be heard By Counsel. &c. To the Honourable the Commons of the United Kingdom of Great Britain and Northern Ireland in Parliament assembled The Humble Petition of DAVID AND MARY ANNE STEWART OF CROWN COTTAGE, LITTLE MISSENDEN, AMERSHAM, BUCKINGHAMSHIRE. Shewith as follows:- 1 a Bill(herein after referred to as "the bill") has been introduced and is now pending in your honourable House instituted "A Bill to make provision for a railway between Euston in London and a junction with the West Coast Mail Line at Handsacre in Staffordhire, with a spur from Old Oak Common in the London Borough of Hammersmith and Fulham to a junction with the Channel Tunnel Rail Link at York Way in the London Borough of Islington and a spur from Water Orton in Warwickshire to Curzon Street in Birmingham; and for connected purposes." 2.The Bill is presented by Mr Secretary McLoughlin, supported by The Prime Minister, The Deputy Prime Minister, Mr Chancellor of the Exchequer, Secretary Theresa May, Secretary Vince Cable, Secretary lain Duncan Smith, Secretary Eric Pickles, Secretary Owen Paterson, Secretary Edward Davet, and Mr Robert Goodwill. 3 Clauses 1 to 36 set out the Bill's objectives in relation tothe construction and operation of the railway mentioned in paragraph 1 above . they include provision for the construction of works, highways, works, highways and road traffic matters, the compulsory acquisition of Land and other provisions relating to the use of land, planning permission, heritage issues, trees and noise.
    [Show full text]
  • Aylesbury Vale Strategic Flood Risk Assessment
    Aylesbury Vale District Council Level 1 Strategic Flood Risk Assessment Final Report May 2017 This page has intentionally been left blank 2016s3990 - Aylesbury SFRA Level 1 (FINAL) v3.0 i JBA Project Manager Anna Beasley 8a Castle Street Wallingford Oxfordshire OX10 8DL Revision History Revision Ref / Date Issued Amendments Issued to Charlotte Stevens / David Draft Report v1 / May 2016 Broadley (AVDC) Minor amendments and Charlotte Stevens / David Draft Report v2 / July 2016 updates from revised site Broadley (AVDC) assessment Amendments following Charlotte Stevens / David Final Report / October 2016 comments from steering Broadley (AVDC) group Additional amendments Charlotte Stevens / David Final Report v2 / March 2017 following comments from Broadley (AVDC) IDB and BCC Addendum added covering Charlotte Stevens / David Final Report v3 / May 2017 additional sites Broadley (AVDC) Contract This report describes work commissioned by Peter Williams, on behalf of Aylesbury Vale District Council, by email dated 18th February 2016. Aylesbury Vale District Council’s representative for the contract was Charlotte Stevens of Forward Plans and Community Fulfilment. Ian Ringer, Rebecca Price and Georgina Latus of JBA Consulting carried out this work. Prepared by .................................................. Rebecca Price BSc MSc Assistant Analyst, ....................................................................... Georgina Latus BSc Assistant Analyst, ....................................................................... Ian Ringer BSc MSc MCIWEM C.WEM Chartered Senior Analyst Reviewed by ................................................. Anna Beasley BSc MSc CEnv MCIWEM C.WEM Principal Analyst Purpose This document has been prepared as a Final Report for Aylesbury Vale District Council. JBA Consulting accepts no responsibility or liability for any use that is made of this document other than by the Client for the purposes for which it was originally commissioned and prepared.
    [Show full text]
  • Public Session
    PUBLIC SESSION MINUTES OF ORAL EVIDENCE taken before HIGH SPEED RAIL COMMITTEE On the HIGH SPEED RAIL (LONDON – WEST MIDLANDS) BILL Thursday, 17 September 2015 (Morning) In Committee Room 5 PRESENT: Mr Robert Syms (Chair) Sir Peter Bottomley Mr Henry Bellingham Geoffrey Clifton-Brown Mr David Crausby Mr Mark Hendrick _____________ IN ATTENDANCE Mr James Strachan QC, Counsel, Department for Transport Witnesses: Ms Sara Dixon Ms Margaret Cole Ms Julie Lue Mr Oswald De Sybel Dr James Conboy _____________ IN PUBLIC SESSION INDEX Subject Page Sara Dixon et al Submissions by Ms Dixon 3 Submissions by Margaret Cole 21 Further S ubmissions by Ms Dixon 22 Submissions by Julie Lue 27 Response from Mr Strachan 29 Oswald De Sybel Submissions by Mr De S ybel 46 Response from Mr Strachan 51 James Conboy Submissions by Dr Conboy 56 Response from Mr Strachan 68 Closing submissions by Dr Conboy 77 Statement from the Promoter 78 2 (At 09.30) 1. CHAIR: Order, order. Good morning, welcome to the HS2 Select Committee. We start off with petitioners, represented by Sara Dixon, and that’s 873, 887, 888, 875, 876, 877, 879, 880, 881, 882, 883, 889, 890, 892, 893, 894 and 895, 898 and 891, which is a nice spread. We’ll have the update after we have Sara’s – you go first, carry on? Sara Dixon et al. 2. MS DIXON: Alright, thank you very much for having us. You’ve already listed us all. There are just two or three people from the road who are not here, two will be heard in October and two didn’t put in a petition, but basically you’ve got our entire road here, all listening at home on the camera thing.
    [Show full text]
  • HS2 E Update June 2021
    HS2 E Update June 2021 What is Buckinghamshire Council doing on behalf of residents? Councillor Peter Martin has been appointed as Deputy Cabinet Member for Transport with responsibility for HS2 and EWR. Since his appointment, Councillor Martin has been undertaking site visits, attending meetings and meeting affected communities. In the last month or so Buckinghamshire Council issued a number of press releases on the design of the Amersham Vent Shaft headhouse, the A413 road closure detailed below, our concerns around tunnelling on the aquifer and Wendover Dean Viaduct. With regards to our recent approval of the Schedule 17 application for Wendover Dean Viaduct, we commissioned external advice regarding noise issues raised by local communities, as it was important that we ensured we had sufficient information to take the decision. HS2 Ltd/Align needed to close the A413 for weekend working to carry out utility works. Buckinghamshire Council initially refused permission for 2 weekend closures and continued to discuss plans for these proposed works to cause the least disruption possible. We have worked with HS2 Ltd/Align to reduce the impacts by limiting the works to a single weekend and providing mitigation. The closure took place from 9pm on 18 June until 5am on 21 June and no major disruption was reported and works were completed to schedule. Buckinghamshire Council has written to HS2 Ltd with a long list of questions regarding the potential impact of tunnelling and other structures on the Chilterns aquifer and chalk streams. HS2 Ltd has until now played down any risks to the aquifer but a recent article takes a more cautious approach and admits they face ‘significant challenges’ to stop cement leaking into the water system.
    [Show full text]
  • P91 House of Lords Select Committee Report 2016-2017.Pdf
    HOUSE OF LORDS Select Committee on the High Speed Rail (London - West Midlands) Bill Special Report of Session 2016–17 High Speed Rail (London - West Midlands) Bill Ordered to be printed 12 December 2016 and published 15 December 2016 Published by the Authority of the House of Lords HL Paper 83 Select Committee on the High Speed Rail (London - West Midlands) Bill The Select Committee on the High Speed Rail (London - West Midlands) Bill provides individuals and bodies directly and specifically affected by the bill with the opportunity to object to the bill’s specific provisions and to seek its amendment, although not to object to the principle of the bill. Membership The members of the Select Committee on the High Speed Rail (London - West Midlands) Bill are: Lord Brabazon of Tara Baroness O’Cathain Lord Elder (from 25 May 2016) Lord Plant of Highfield (until 25 May 2016) Lord Freeman Lord Walker of Gestingthorpe (Chair) Lord Jones of Cheltenham Lord Young of Norwood Green Declaration of interests See Appendix 1 A full list of Members’ interests can be found in the Register of Lords’ Interests: http://www.parliament.uk/mps-lords-and-offices/standards-and-interests/register-of-lords- interests Publications All publications of the Committee are available at: http://www.parliament.uk/high-speed-rail-london-west-midlands-bill-select-committee-lords Parliament Live Live coverage of public sessions of the Committee’s meetings are available at: http://www.parliamentlive.tv Committee staff The staff of the Committee were Christopher Clarke (Clerk), Andrew Conway (Committee Assistant), and Mary Harvey (Administrative Support).
    [Show full text]
  • Notice of A413 Road Closures, Little Missenden July 2021 |
    Notification Notice of A413 road closures, Little Missenden July 2021 | www.hs2.org.uk High Speed Two (HS2) is the new high speed railway for Britain. We are Duration of works continually reviewing the works on our construction sites in line with Government and Public Health England (PHE) advice on dealing with Various dates starting COVID-19. The Government’s current strategy makes it clear that from July 2021 to construction activity can continue as long as it complies with this September 2021 guidance. Why are we doing these works? As part of the construction of the Little Missenden vent shaft site, What to expect utilities need to be diverted and installed. These include water, Overnight lane closures electricity, and telecoms. We also need to install ducting so we can and full road closures prepare for the construction of the signalised junction. This junction will of the A413 at Little mean we can safely move vehicles on and off the site, with vent shaft Missenden with a vehicles crossing from the northbound carriageway, across the signed diversion route southbound carriageway and onto the site. We previously closed the A413 for a weekend in June which allowed us to install the ducting across the road required for the utilities, traffic signals and street lighting. What we will do What will we be doing? Do all we can to keep We will need to apply a road closures on the A413 on various dates noise to a minimum for starting from July 2021 until the middle of September 2021 which is local residents during when the signalised junction is due to become operational.
    [Show full text]
  • Herefore a True Representation of the Views of the Weedon Village Community in 2011 and of Its Wishes for Weedon's Future
    Final Cover:Layout 1 3/4/11 21:24 Page 1 The production of this Parish Plan for Weedon Village was initiated by the Parish Council in late 2008, and completed in early 2011. The village community was substantially and actively involved in the process. 22% of households contributed members of the Steering Committee or Working Groups, took part in writing, designing and editing the Plan document, or provided pictures, maps and research data. 66% of households completed the detailed questionnaire. We believe the Plan is therefore a true representation of the views of the Weedon village community in 2011 and of its wishes for Weedon's future. Weedon Village Parish Plan 2011 Published by Weedon Village Parish Plan Steering Committee 2011 For details of how to obtain additional printed copies, to download a pdf, or for access to the Evidence document, refer to the Weedon website. www.weedonbucks.org.uk Final Cover:Layout 1 3/4/11 21:24 Page 2 perfectly placed for the future Weedon Plan 1.6:Layout 1 3/4/11 22:11 Page 1 Weedon Village Parish Plan 2011 Introduction 3 Orientation 4 History 6 Weedon Today: An Overview 10 The Environment 12 The Economy 18 Transport 20 Social and Community 24 Conclusions 29 Appendix – Parish Plan Process 30 Acknowledgements 32 EVIDENCE Please see supplementary document Contents page 1 Weedon Plan 1.6:Layout 1 3/4/11 22:11 Page 2 Weedon Plan 1.6:Layout 1 3/4/11 22:11 Page 3 Introduction The production of this Parish Plan was initiated by Villagers were kept informed of progress by means of the village website Weedon Parish Council in the summer of 2008.
    [Show full text]