Es22008120940, Page 1-10 @ Normalize ( S2-09-LN040 )

Total Page:16

File Type:pdf, Size:1020Kb

Es22008120940, Page 1-10 @ Normalize ( S2-09-LN040 ) L. S. NO. 2 TO GAZETTE NO. 9/2008L.N. 40 of 2008 B903 L.N. 40 of 2008 SCHEDULE OF ROUTES (NEW LANTAO BUS COMPANY (1973) LIMITED) ORDER 2008 (Made by the Chief Executive in Council under section 5(1) of the Public Bus Services Ordinance (Cap. 230)) 1. Commencement This Order shall come into operation on 1 May 2008. 2. Specified non-exclusive routes The routes set out in the Schedule are specified as the routes on which the New Lantao Bus Company (1973) Limited has the non-exclusive right to operate a public bus service. 3. Repeal The Schedule of Routes (New Lantao Bus Company (1973) Limited) Order 2006 (L.N. 165 of 2006) is repealed. SCHEDULE [s. 2] NON-EXCLUSIVE ROUTES South Lantau Ordinary Route No. 1 Mui Wo—Tai O MUI WO to TAI O: via South Lantau Road, Keung Shan Road and Tai O Road. TAI O to MUI WO: via Tai O Road, Keung Shan Road and South Lantau Road. L. S. NO. 2 TO GAZETTE NO. 9/2008L.N. 40 of 2008 B905 North-South Lantau Ngong Ping Route No. 1R Hung Hom Ferry Concourse—Ngong Ping HUNG HOM FERRY CONCOURSE to NGONG PING: via Wah Shun Street, Hung Luen Road, Hung Hom Bypass, Salisbury Road, Nathan Road, Cheung Sha Wan Road, Tonkin Street, Tonkin Street West, Sham Mong Road, Lai Po Road, Lin Cheung Road, Tsing Kwai Highway, Cheung Tsing Tunnel, Cheung Tsing Highway, Lantau Link, North Lantau Highway, Tung Chung Waterfront Road, Shun Tung Road, *(Tat Tung Road, Tung Chung Station Bus Terminus, Tat Tung Road, Shun Tung Road,) Yue Tung Road, Chung Yan Road, Tung Chung Road, South Lantau Road, Keung Shan Road, Sham Wat Road and Ngong Ping Road. * Departures to Ngong Ping are diverted via Tung Chung Station Bus Terminus if spare carrying capacity is available. South Lantau Ordinary Route No. 1S Mui Wo—Tai O MUI WO to TAI O: via South Lantau Road, Keung Shan Road and Tai O Road. TAI O to MUI WO: via Tai O Road, Keung Shan Road and South Lantau Road. South Lantau Ngong Ping Route No. 2 Mui Wo—Ngong Ping MUI WO to NGONG PING: via South Lantau Road, Keung Shan Road, Sham Wat Road and Ngong Ping Road. NGONG PING to MUI WO: via Ngong Ping Road, Sham Wat Road, Keung Shan Road and South Lantau Road. South Lantau Ngong Ping Route No. 2S Mui Wo—Ngong Ping MUI WO to NGONG PING: via South Lantau Road, Keung Shan Road, Sham Wat Road and Ngong Ping Road. L. S. NO. 2 TO GAZETTE NO. 9/2008L.N. 40 of 2008 B907 NGONG PING to MUI WO: via Ngong Ping Road, Sham Wat Road, Keung Shan Road and South Lantau Road. Air-Conditioned New Territories Route No. B2 Yuen Long Station to Shenzhen Bay YUEN LONG STATION to SHENZHEN BAY PORT: via Long Yat Road, Long Lok Road, Long Yat Road, Castle Peak Road, silp road, Long Tin Road, Tong Yan San Tsuen Interchange, Long Tin Road, Tin Fuk Road, Tin Shing Road, Tin Wu Road, Tin Yiu Road, Ping Ha Road, Hung Tin Road, Tin Shui Wai West Interchange, Yuen Long Highway, Kong Sham Western Highway, Shenzhen Bay Bridge and unnamed access road. SHENZHEN BAY PORT to YUEN LONG STATION: via unnamed access road, Shenzhen Bay Bridge, Kong Sham Western Highway, Yuen Long Highway, Tin Shui Wai West Interchange, Hung Tin Road, Ping Ha Road, Tin Yiu Road, Tin Wu Road, Tin Shing Road, Tin Fuk Road, Long Tin Road, Shui Pin Wai Interchange, Wang Tat Road, Ma Wang Road, Castle Peak Road and Long Yat Road. North-South Lantau Ordinary Route No. 3M Mui Wo—Tung Chung Town Centre MUI WO to TUNG CHUNG TOWN CENTRE: via Mui Wo Ferry Pier Road, *(Ngan Kwong Wan Road, Ngan Shek Street, Ngan Kwong Wan Road,) South Lantau Road, Tung Chung Road, Chung Yan Road, Yu Tung Road, Shun Tung Road, Tat Tung Road and Tung Chung Town Centre Bus Terminus, #(Tat Tung Road, Yu Tung Road, Chung Yan Road north bound, Tung Chung Road and Tung Chung Old Pier.) TUNG CHUNG TOWN CENTRE to MUI WO: via #(Tung Chung Old Pier, Tung Chung Road, Chung Yan Road, Yu Tung Road, Shun Tung Road, Tat Tung Road,) Tung Chung Town Centre Bus Terminus, Tat Tung Road, Shun Tung Road, Yu Tung Road, Chung Yan Road, Tung Chung Road, South Lantau Road, *(Ngan Kwong Wan Road, Ngan Shek Street, Ngan Kwong Wan Road) and Mui Wo Ferry Pier Road. * For departures via Mui Wo Old Town. # For departures departing and terminating at Tung Chung Old Pier. L. S. NO. 2 TO GAZETTE NO. 9/2008L.N. 40 of 2008 B909 South Lantau Ordinary Route No. 4 Mui Wo—Tong Fuk MUI WO to TONG FUK: via South Lantau Road. TONG FUK to MUI WO: via South Lantau Road. North-South Lantau Ordinary Route No. 11 Tai O—Tung Chung Town Centre TUNG CHUNG TOWN CENTRE to TAI O: via Tat Tung Road, Shun Tung Road, Yu Tung Road, Chung Yan Road, Tung Chung Road, South Lantau Road, Keung Shan Road and Tai O Road. TAI O to TUNG CHUNG TOWN CENTRE: via Tai O Road, Keung Shan Road, South Lantau Road, Tung Chung Road, Chung Yan Road, Yu Tung Road, Shun Tung Road and Tat Tung Road. North-South Lantau Ordinary Route No. 11S Tung Chung Town Centre—Tai O TUNG CHUNG TOWN CENTRE to TAI O: via Tat Tung Road, Shun Tung Road, Yu Tung Road, Chung Yan Road, Tung Chung Road, South Lantau Road, Keung Shan Road and Tai O Road. TAI O to TUNG CHUNG TOWN CENTRE: via Tai O Road, Keung Shan Road, South Lantau Road, Tung Chung Road, unnamed temporary road, Chung Yat Street, Chung Mun Road, Yu Tung Road, Shun Tung Road and Tat Tung Road. North-South Lantau Ordinary Route No. 13S Tung Chung Town Centre—Mui Wo TUNG CHUNG TOWN CENTRE to MUI WO: via Tat Tung Road, Shun Tung Road, Yu Tung Road, Chung Yan Road, Tung Chung Road, South Lantau Road. MUI WO to TUNG CHUNG TOWN CENTRE: via South Lantau Road, Tung Chung Road, unnamed temporary road, Chung Yat Street, Chung Mun Road, Yu Tung Road, Shun Tung Road and Tat Tung Road. L. S. NO. 2 TO GAZETTE NO. 9/2008L.N. 40 of 2008 B911 South Lantau Ngong Ping Route No. 21 Tai O—Ngong Ping TAI O to NGONG PING: via Tai O Road, Keung Shan Road, Sham Wat Road and Ngong Ping Road. NGONG PING to TAI O: via Ngong Ping Road, Sham Wat Road, Keung Shan Road and Tai O Road. South Lantau Ngong Ping Route No. 21S Tai O—Ngong Ping TAI O to NGONG PING: via Tai O Road, Keung Shan Road, Sham Wat Road and Ngong Ping Road. NGONG PING to TAI O: via *Ngong Ping Road, Sham Wat Road, Keung Shan Road and Tai O Road. * Departures may be departed from Yin Hing Monastery subject to demand. North-South Lantau Ngong Ping Route No. 23 Ngong Ping—Tung Chung Town Centre NGONG PING to TUNG CHUNG TOWN CENTRE: via Ngong Ping Road, Sham Wat Road, Keung Shan Road, South Lantau Road, Tung Chung Road, Chung Yan Road, Yu Tung Road, Shun Tung Road and Tat Tung Road. TUNG CHUNG TOWN CENTRE to NGONG PING: via Tat Tung Road, Shun Tung Road, Yu Tung Road, Chung Yan Road, Tung Chung Road, South Lantau Road, Keung Shan Road, Sham Wat Road and Ngong Ping Road. North-South Lantau Ngong Ping Route No. 23S Tung Chung Town Centre—Ngong Ping TUNG CHUNG TOWN CENTRE to NGONG PING: via Tat Tung Road, Shun Tung Road, Yu Tung Road, Chung Yan Road, Tung Chung Road, South Lantau Road, Keung Shan Road, Sham Wat Road and Ngong Ping Road. L. S. NO. 2 TO GAZETTE NO. 9/2008L.N. 40 of 2008 B913 Short-working departures may be operated from Tung Chung Old Pier to Cheung Sha Beach, and from Cheung Sha Beach to Ngong Ping to meet passenger demand. NGONG PING to TUNG CHUNG TOWN CENTRE: via Ngong Ping Road, Sham Wat Road, Keung Shan Road, South Lantau Road, Tung Chung Road, Chung Yan Road, Yu Tung Road, Shun Tung Road and Tat Tung Road. North-South Lantau Ordinary Route No. 34 Tung Chung Town Centre—Shek Mun Kap TUNG CHUNG TOWN CENTRE to SHEK MUN KAP: via Tat Tung Road, Shun Tung Road, Yu Tung Road, Chung Yan Road, Yat Tung Street, Yat Tung Estate Bus Terminus, Yat Tung Street, Chung Yan Road, Tung Chung Road, *(Wong Lung Hang Road, Tung Chung Road) and Shek Mun Kap Road. SHEK MUN KAP to TUNG CHUNG TOWN CENTRE: via Shek Mun Kap Road, Tung Chung Road, *(Wong Lung Hang Road, Tung Chung Road,) Chung Yan Road, Yat Tung Street, Yat Tung Estate Public Transport Terminus, Yat Tung Street, Chung Yan Road, Yu Tung Road, Shun Tung Road and Tat Tung Road. * For departures via Chek Lap Kok Tsuen. North-South Lantau Ordinary Route No. A35 Mui Wo—Airport (Passenger Terminal Building) MUI WO to AIRPORT (PASSENGER TERMINAL BUILDING): via Mui Wo Ferry Pier Road, *(Ngan Kwong Wan Road, Ngan Shek Street, Ngan Kwong Wan Road,) South Lantau Road, Tong Fuk Village, South Lantau Road, Tung Chung Road, Chung Yan Road, Yu Tung Road, Shun Tung Road, #(Tat Tung Road, Tung Chung Town Centre Bus Terminus, Tat Tung Road, Shun Tung Road,) Chek Lap Kok South Road, Science Road, Chun Wan Road Interchange, Scenic Road, East Coast Road, Airport Road and Cheong Tat Road.
Recommended publications
  • (B) Road Network and Traffic Facilities Improvement Projects
    Islands District Council Paper IDC 52/2015 Transport Department Traffic and Transport Working Plan 2015-16 Purpose This Paper presents the Traffic and Transport Working Plan of the Transport Department for Islands District in 2015-16. Work Objectives 2. We hope that the work programmes planned for implementation in 2015-16 can achieve the following objectives: (i) To monitor and improve the traffic and transport facilities to cope with the local development needs; (ii) To adjust existing public transport services to meet the demand of the public; and (iii) To coordinate different public transport modes in order to provide efficient public transport services to the public. Brief Description of Work A. Traffic Management 3. One of the major objectives of traffic management is to improve the traffic flow and to ensure the road safety. We will continue to closely monitor the overall traffic situation and to design and implement suitable traffic management scheme, if necessary, to improve the efficiency, performance and safety of the road network. The following traffic management programmes have been planned for implementation in 2015-16: (a) Monitor the Traffic Network and Management Measures 4. We will continue to monitor the traffic network of Islands District to enhance the safety and improve its efficiency. The major items include: 1 (i) To monitor and review the road traffic situation of Tung Chung Road and south Lantau, and to implement suitable traffic management measures, if necessary; (ii) To monitor and review the operation of major junctions in the district, including the operational efficiency of road and pavement junctions, and to enhance their safety; and (iii) To regularly meet the project contractors in the district for the assessment of temporary traffic arrangement.
    [Show full text]
  • MTR Corporation Limited Tung Chung Line Extension – Project Profile
    MTR Corporation Limited Tung Chung Line Extension – Project Profile April 2020 Tung Chung Line Extension - Project Profile TABLE OF CONTENTS 1 BASIC INFORMATION ................................................................................................................ 1 Project Title ........................................................................................................................ 1 Purpose and Nature of the Project .................................................................................... 1 Name of the Project Proponent ......................................................................................... 1 Location and Scale of Project and History of Site ............................................................. 1 Number and Types of Designated Projects ....................................................................... 2 Name and Telephone Number of Contact Persons ........................................................... 2 2 OUTLINE OF PLANNING AND IMPLEMENTATON PROGRAMME .......................................... 3 Project Planning and Implementation ................................................................................ 3 Project Programme ............................................................................................................ 3 Project Interface ................................................................................................................. 3 3 POSSIBLE IMPACT ON THE ENVIRONMENT ..........................................................................
    [Show full text]
  • Information Note Strategic Cavern Area No. 46 – Tung Chung South
    - 1 - CAVERN MASTER PLAN – INFORMATION NOTE STRATEGIC CAVERN AREA NO. 46 – TUNG CHUNG SOUTH This Information Note describes the characteristics, key development opportunities and constraints of Strategic Cavern Area No. 46 - Tung Chung South (the SCVA). It indicates the potential land uses suitable for cavern development within the area, but would not pre-empt other possible land uses put forward by the project proponents with justifications. It also denotes the extent of potential portal locations. The spatial context of the SCVA is illustrated in the Reference Drawing appended to this Information Note. Reference should be made to the Explanatory Statement of the Cavern Master Plan for its background and purposes, as well as the definition and delineation criteria of SCVAs. 1. Location Plan Information Note (SCVA46 – Tung Chung South) - 2 - 2. Strategic Cavern Area Details Outline Zoning Plan (OZP): Approved Tung Chung Town Centre Area OZP No. S/I-TCTC/22 Area: 106.6 ha Maximum elevation in the SCVA: +429 mPD Minimum elevation in the SCVA: +7 mPD 3. District Context Location The SCVA is located in the northern part of Lantau Island. It covers the hillside area of Pok To Yan to the south of Tung Chung. Lantau North (Extension) Country Park is to the east and south of the SCVA, Tung Chung New Town is to the north and northwest, the Hong Kong International Airport (HKIA), the Hong Kong-Zhuhai-Macao Bridge (HZMB) and Hong Kong Boundary Crossing Facilities (HKBCF) are to the further north. The SCVA is generally hilly with a maximum elevation of about +429 mPD.
    [Show full text]
  • Tips on Driving on Lantau Closed Roads
    Tips on driving on Note particularly the following Distribution of public parking spaces in Lantau Closed Roads traffic signs and road marking South Lantau (Figures in brackets denote the number of private car parking spaces) Plan your journey in advance. Lung Shing Street in Yim Tin, Tai O (30) Tai O Road near Tai O Bus Terminal (97) Comply with the conditions of the Lantau Closed Road Bend to left ahead Permit, and leave the closed roads (i.e. all roads south of (right if symbol reversed) Tai O Road near entrance of Tai O Town (18) Tung Chung Road junction with Shek Mun Kap Road) Ngong Ping near Ngong Ping Village Bus Terminal (22) before 7 p.m. Keung Shan Road near Shek Pik Reservoir (10) Roads in South Lantau are mainly single 2-lane Side road on the left ahead South Lantau Road near Cheung Sha Beach (28) carriageways for 2-way traffic, and some road sections (right if symbol reversed) South Lantau Road near Tong Fuk (25) are relatively narrow and winding. Before entering South South Lantau Road near San Shek Wan (19) Lantau, check your car (especially its braking system) to ensure it functions properly. Please also obtain the South Lantau Road near Pui O (24) contact of a towing company that is permitted to enter Mui Wo Ferry Pier Road near Ferry Pier (81) South Lantau in case of need. Steep Hill downwards ahead Mui Wo Ferry Pier Road near the former New Territories Fully charge or fill up the fuel tank before entering South Heung Yee Kuk Southern District Secondary School (149) Lantau.
    [Show full text]
  • (Translated Version) for Information on 5 March 2015 Landac TTSC
    (Translated Version) For information on LanDAC TTSC Paper No. 06/2015 5 March 2015 Lantau Development and Advisory Committee Traffic and Transport Subcommittee Traffic Restrictions and the Closed Road Permit Arrangements in South Lantau PURPOSE This paper aims to invite Members’ views on the proposed review of the closed roads arrangement in Lantau and the issuance of Lantau Closed Road Permits (“LCRPs”). BACKGROUND 2. At the meeting of the Traffic and Transport Subcommittee of the Lantau Development Advisory Committee held in October 2014, Members noted that the current closed road arrangements in Lantau was put in place based on the planning intention of preserving South Lantau as a natural conservation area. They considered that the closed road arrangement would hinder the development of green tourism and local economy in Lantau. In his Policy Address delivered in January this year, the Chief Executive announced that the Government would roll out in full swing a review of the closed road arrangements in Lantau and the issuance of LRCPs to support its short term economic and social development. RESTRICTIONS ON THE CURRENT LCRPs ISSUANCE AND THEIR USAGE 3. Currently, to cater for the public needs to enter the Lantau closed road area, 1 (Translated Version) motorists may apply to the Transport Department (“TD”) for the LCRPs1. There are two types of LCRPs: long-term permits and temporary permits. Long-term LCRPs are generally issued to residents/people doing business in South Lantau for a period of 12 months in the first instance. Holders may apply to the TD’s Licensing Offices for permit renewal upon expiry.
    [Show full text]
  • Engineering Study on Road P1 (Tai Ho – Sunny Bay Section) and Work Progress of the Sustainable Lantau Office
    LC Paper No. CB(1)328/19-20(04) For discussion on 20 January 2020 Legislative Council Panel on Development 782CL - Engineering Study on Road P1 (Tai Ho – Sunny Bay Section) and Work Progress of the Sustainable Lantau Office PURPOSE This paper briefs Members on the following items: (a) the proposal to upgrade 782CL – Engineering Study on Road P1 (Tai Ho – Sunny Bay Section) to Category A at an estimated cost of $130.2 million in money-of-the-day prices, for carrying out an engineering study on Road P1 between Tai Ho and Sunny Bay; and (b) the progress of work made by the Sustainable Lantau Office of the Civil Engineering and Development Department. 2. Details of the proposal for (a) and the progress report for (b) above are at Enclosures 1 and 2 respectively. WAY FORWARD 3. For the proposed engineering study under 782CL, we plan to seek funding approval from the Finance Committee after consulting the Public Works Subcommittee. Development Bureau Civil Engineering and Development Department January 2020 Enclosure 1 782CL – Engineering Study on Road P1 (Tai Ho – Sunny Bay Section) PROJECT SCOPE We propose to upgrade 782CL to Category A, the scope of which comprises – (a) an investigation study 1 and the preliminary design for the works relating to the Road P1 (Tai Ho – Sunny Bay Section) that mainly consists of the following works components – (i) a carriageway of approximately 9.5 km long that extends from the Tai Ho Interchange2 to Sunny Bay and connects to the North Lantau Highway (NLH) and the proposed Route 11, which involves viaduct(s), tunnel(s) and reclamation works; and (ii) the associated building, civil, structural, marine, electrical and mechanical, landscaping 3 , and environmental protection and mitigation works; and (b) the associated site investigation works and works supervision.
    [Show full text]
  • CHAPTER 6 Highways Department Tung Chung Road Improvement
    CHAPTER 6 Highways Department Tung Chung Road Improvement Project Audit Commission Hong Kong 28 March 2013 This audit review was carried out under a set of guidelines tabled in the Provisional Legislative Council by the Chairman of the Public Accounts Committee on 11 February 1998. The guidelines were agreed between the Public Accounts Committee and the Director of Audit and accepted by the Government of the Hong Kong Special Administrative Region. Report No. 60 of the Director of Audit contains 8 Chapters which are available on our website at http://www.aud.gov.hk Audit Commission 26th floor, Immigration Tower 7 Gloucester Road Wan Chai Hong Kong Tel : (852)28294210 Fax : (852) 2824 2087 E-mail : [email protected] TUNG CHUNG ROAD IMPROVEMENT PROJECT Contents Paragraph EXECUTIVE SUMMARY PART 1: INTRODUCTION 1.1 – 1.17 Audit review 1.18 – 1.19 Acknowledgement 1.20 PART 2: PROJECT PLANNING AND 2.1 ENVIRONMENTAL IMPACT ASSESSMENT Decision in 1997 of not adopting 2.2 – 2.4 on-line widening arrangement Consultation on Tai Ho Wan Option from 1997 to 2000 2.5 – 2.20 Areas for improvement 2.21 – 2.28 Audit recommendations 2.29 Response from the Administration 2.30 PART 3: PROJECT IMPLEMENTATION 3.1 Project cost and completion time 3.2 – 3.8 Areas for improvement 3.9 – 3.28 — i — Paragraph Audit recommendations 3.29 Response from the Administration 3.30 – 3.32 PART 4: ADOPTION OF ALTERNATIVE DESIGNS 4.1 Contractor’s alternative design 4.2 2001 Technical Circular 4.3 2004 Technical Circular 4.4 Negotiation over alternative designs from 2004 to
    [Show full text]
  • For Information on Landac Paper No. 03/2020 5 December 2020
    (Translated Version) For information on LanDAC Paper No. 03/2020 5 December 2020 LANTAU DEVELOPMENT ADVISORY COMMITTEE Work Progress of the Sustainable Lantau Office PURPOSE This paper aims to brief the Lantau Development Advisory Committee (LanDAC) on the work progress of the Sustainable Lantau Office (SLO). BACKGROUND 2. The SLO of the Civil Engineering and Development Department (CEDD) was set up on 1 December 2017 to take forward the planning, assessment, design and implementation of various development projects and initiatives in conservation, local improvement as well as leisure and recreation in Lantau in a well prioritised, coordinated and integrated manner. PROGRESS OF MAJOR TASKS (1) Development Projects 3. The SLO has been pressing ahead with development projects in Lantau, including the Tung Chung New Town Extension (TCNTE), the Infrastructure Works for Public Housing Development at Area 54, Tung Chung, the Engineering Study on Road P1 (Tai Ho - Sunny Bay Section), and the Studies related to Artificial Islands in the Central Waters. Project Latest Work Progress TCNTE (a) The 130-hectare (ha) reclamation works in (comprising Tung Chung TCE extension area commenced in late 2017. East (TCE) and Tung Two public housing sites (about 7 ha) and a Chung West (TCW) commercial site of about 1.2 ha were handed 1 (Translated Version) Project Latest Work Progress extension areas) over to the Hong Kong Housing Authority (HKHA) and Lands Department in March and June 2020 respectively for public housing development and land disposal. Another two public housing sites (about 3 ha) were also made available to HKHA in October 2020 for public housing development.
    [Show full text]
  • Archaeological Interest San Tau Site Of
    ¾ ÷ HWAY ³ HIG U õ TA  AN © L •»´ä°Ó¥Î @ C H R @ G HU T Å l C  MIN N OR ª na O H N N DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE. i A U HU m C Hong Kong Business w D ¹ D r N A e O K ¬ T R ¹ W t Aviation Centre È h B A ª g N W @ C ¨ i N  ¾ ALL RIGHTS RESERVED. e O A  H r µ f R N U r R i T A D N a H ¸ c OVE ARUP & PARTNERS HONG KONG LIMITED. si A LEGEND ¤g¤ì ª P ¸ ªïª I ºû­ N ï G ¿³«Ø¤¤ N Civil Work ± R Public Rental Housing D Depot under construction Y I N ª@ G POSSIBLE DEVELOPMENT AREA ry H siona O i N SOUTH PERIMETER ROAD ¹ The V G  L S  T @ D ¸ OA R C R O @ © H D A A ô AN U O ¯ D R W N ¹ N E F 500M ASSESSMENT AREA (LIA) U HU Y C S W B ª O N A HU U N C T ªF¯Fµo H Tung Chung D L OAD WORK AREA FOR A I HEI R O A Development Pier YING 100 •¸¾÷¿U® R R T T HK LINK ROAD OF HZMB Aviation Fuel R ïÁ ª C O ª ß San Tau Site of I P SERVICE RESERVOIR N R ³ Tank Farm E I C A S 77 ½àÀ (BY¸ OTHERS) Monterey SITES OF ARCHAEOLOGICAL ¨ Â@ NT RD ª WATERFRO ž ¾÷³õº CHUNG Cove P Æ[´ TUNG © ¨ ¹L¸ôÆW É ½ e INTEREST Archaeological Interest Airport Authority SCENIC HILL Lin õ ª g W n G RD hu Kwo Lo Wan Office A UN ³ KIN T C C I g H ´ N ü¬Ä ° un E T DECLARED MONUMENTS K ÷ 0 O ® T 6 R U ¤ôÂÅ¡ er · L [ T N La M AP ¾ G Le Bleu Deux ª H 200 Æ R s D s e K r OK ®ü³ö ¬MÆ p S ¤ô x OUT ¬MÀ E H Seaview R Le Bleu Caribbean Coast Albany Cove D L t HISTORIC BUILDINGS A Crescent r N Y o I p T r A ®®À i U A T ´ U Carmel Cove N ª ÂÅ¤Ñ G LANDSCAPE RESOURCES (LR) Å¥À H ¸ Coastal Skyline R ©ù I D Crystal Cove © ® GH ¨ W F W ªž Ngo A TOTAL AREA OF LR WITHIN THE STUDY
    [Show full text]
  • Road Users' Code
    RoadRoad Users’Users’ CodeCode PreparedPrepared by by the the Transport Transport Department Department TheThe Government Government of of the the DesignedDesigned by by the the Information Information Services Services Department Department PrintedPrinted by by the the Government Government Logistics Logistics Department Department HongHong Kong Kong Special Special Administrative Administrative Region Region HongHong Kong Kong Special Special Administrative Administrative Region Region Government Government $42 JuneJune 2020 2020 Edition Edition EffectiveEffective from from 19 19 June June 2020 2020 Prepared by the Transport Department Designed by the Information Services Department Printed by the Government Logistics Department Copyright Reserved ‛Pursuant to the Road Traffic Ordinance, a failure on the part of any person to observe any rule or follow any advice in the Road Usersʼ Code is in itself not an offence, but any such failure may be taken into account in any proceedings (whether civil or criminal, and including proceedings for an offence under the Road Traffic Ordinance) when deciding if a road user was at fault or not and to what extent, and may also be relied on for establishing or negativing any liability under any of these proceedings. It should however be noted that many of the rules in the Road Usersʼ Code directly reflect the law and a person not observing these rules may be committing an offence. Changes in legislation may render parts of the Code incorrect. In all instances, the prevailing legislation takes precedence.ʼ
    [Show full text]
  • Typhoons Affecting Hong Kong: Case Studies
    Typhoons affecting Hong Kong: Case Studies by S. Campbell The Hong Kong University of Science and Technology A report submitted for the APEC 21st Century COE Short Term Fellowship April 2005 Abstract This report, “Typhoons affecting Hong Kong: Case Studies”, accompanies the main document concerning wind-induced damage in Hong Kong, entitled “History of Wind Damage in Hong Kong”. The case studies presented in this report offer the raw data collected from a selected number of storms that have severely damaged Hong Kong or highlighted its vulnerability to typhoons. For a summary of the overall effects of wind and wind-induced damage in Hong Kong, the reader is advised to examine “History of Wind Damage in Hong Kong”. The reader wanting more detail into specific damage occurring during typhoons is recommended to also read this report. This report contains data and qualitative reports from the Hong Kong Observatory, newspapers (published in English) and other sources. While information from the Hong Kong Observatory and newspapers can generally be trusted, other sources, although being valuable, may be anecdotal. Nevertheless, the gathered information is presented as raw data with few comments from the author, thus providing an unbiased account as to what happened during each typhoon. In addition to “The History of Wind Damage in Hong Kong” and this report, the following is also provided in electronic format for future use solely by the staff and students at Tokyo Polytechnic University: a) A tabulated summary of quantitative typhoon measures and damage categories in the file “COE_WindDamage_HK.xls”. This table contains all relevant typhoon-induced damage data collected between the years 1957 to 2004, inclusive.
    [Show full text]
  • Public Health and Municipal Services Ordinance
    Chapter: 132 PUBLIC HEALTH AND MUNICIPAL SERVICES Gazette Number Version Date ORDINANCE Long title 30/06/1997 To make provision for public health and municipal services. (Amended 10 of 1986 s. 2) [11 November 1960] G.N.A. 132 of 1960 (Originally 30 of 1960; 15 of 1935) Part: I PRELIMINARY 30/06/1997 Section: 1 Short title 30/06/1997 This Ordinance may be cited as the Public Health and Municipal Services Ordinance. (Amended 10 of 1986 s. 3) Section: 2 Interpretation L.N. 194 of 2003 01/01/2004 (1) In this Ordinance, unless the context otherwise requires- "advertisement" (宣傳、宣傳品) includes any structure or apparatus erected, used, or intended to be used, solely for the display of advertisements; "analysis" (分析) includes micro-biological assay but no other form of biological assay, and "analyse" (分析) shall be construed accordingly; "animal" (動物) includes reptiles, but does not include birds or fish; "Authority" (主管當局) means the public officer designated to be the Authority by the provisions of section 3; (Amended 78 of 1999 s. 7) "bath" (浴、沐浴) includes shower bath and turkish bath; "billiard establishment" (桌球場所) means any place opened, kept or used for the purpose of playing billiards, snooker, pool or similar games; (Added 53 of 1988 s. 3) "book" ( 書籍) includes a document, periodical, magazine, newspaper, pamphlet, music-score, picture, print, engraving, etching, deed, photograph, map, chart, plan or manuscript, and any other article or thing of a like nature provided for the use of the public in any library; (Replaced 50 of 1979 s. 2) "canopy" (簷篷) means any shade, shelter or other structure not carrying a floor load which- (a) projects from a wall of a building and is cantilevered or supported by brackets, posts or other means; or (b) is erected on any building or in or over any open space adjacent to or on a building and is supported by posts or other means; (Added 43 of 1972 s.
    [Show full text]