POWER GRID COMPANY OF LTD.

Description of the generation of various Power Stations Date : 2-Sep-10 Page -2 Present Peak Hour Energy Name of Machine Generation Generation Generated Remarks Capacity MW MW KWHr 14640 Karnafuli Hydro Power Station 24636 1535000 3500 Under maint since 19/04/08 45050 2243200 55050 Raozan Power Station 1 180 130 2800000 gas pressure low 2 180 120 2900000 gas pressure low Shikalbaha Power station Steam 40 40 869200 gas pressure low Sikalbaha GT 150 0 0 7/26/2010 Ashugonj Power Station 16450 2719980 26464 3 102 105 2511044 4 140 140 3304930 5 150 140 3356030 ,, CCPP GT-1 40 34 2221054 GT-2 40 40 ST. 18 18 Ghorasal Power Station 15545 1060000 2300 Under S/D since 26/04/10. 3 190 170 3699876 4 190 170 3778822 5 190 190 4441500 6 195 0 0 Tripped on 18/07/10. Tongi Power Station 1 105 30 902381 gas pressure low Siddhirgonj Power Station 210MW 190 150 3512250 gas pressure low GT1 & GT-2 240 45 1482000 Under S/D GT-1(18/06/10), gas pressure low. GT-1 32 0 Haripur SBU GT-2 32 29 933000 GT-3 32 0 Under maint. since 18/06/09 .

Shahjibazar Power Station 83432 1349000 93520 Fenchugonj Comb. Cycle GT-1, 2 & St 91 90 1783000 GT-3,4 & St 0 0 Fenchugonj RPP (51 MW) 0.9X19 51 52 1251280 Sylhet Power Station GT 20 20 240000 Khulna Power Station 110MW 60 0 0 Under maint. since 31/03/09 . 60MW 35 31 728300 Barisal Power Station GT-1 16 10.5 GT-2 16 10 218452 GT-1 18 16 Bheramara Power Station GT-2 18 14 510000 GT-3 18 16 Bagabari Power Station 71 MW 71 70 1625000 100 MW 100 60 1707000 gas pressure low Barapukuria power station ST 1 &2 220 145 3382251 Rangpur Power Station GT 20 12 151000 Saidpur Power Station GT 19 0 8000 Combined Diesel 7 1.5 4468 Meghnaghat Power Ltd CCPP (3) 450 448 7964500 Haripur Power Ltd CCPP (2) 360 351 8007500 gas pressure low NEPC, Haripur 7 x 15.5 110 90 2107000 gas pressure low RPCL, Mymensingh GTs & ST GT1-4 175 105 2190000 gas pressure low Summit Power Ltd (REB) 176 92 2871420 Synchronized at 33KV Ullapara Summit 4 X 2.90 11 8 211122 Synchronized at 33KV Khulna Power Co Ltd. KPCL 110 102 2369400 West Mont (WMPL) pvt. GT 1 & 2 72 70 1566024 Ashuganj RPP 27 49 1187520 Narsingdi (REB) 8 x 2.9 22 22 524200 Synchronized at 33KV Feni SIPP 8 X 2.94 22 19 455940 Synchronized at 33KV Tangail SIPP 8 x 2.50 22 20 355000 Synchronized at 33KV Shahjibazar P. co (SPCL) 32X2.88 89 89 2082240 Shahjibazar RPP 1.85X27 50 40 918000 Hobiganj (REB) (11MW) 11 11 251040 Synchronized at 33KV Barabkunda RPP 23 22 535700 Synchronized at 33KV Malancha Ctg 28 1003540 Synchronized at 33KV Shikalbaha RPP 0 23 288000 Sylhet 52 MW RPP 27 x 1.95 48 40 946340 Sylhet 11 MW RPP 11 MW 11 7 231840 Synchronized at 33KV Jangalia RPP 34 28 690900 Synchronized at 33KV Dorin Mohipal 10 11 267864 Synchronized at 33KV Ghorashal RPP+Ghorashal quick 45+100 141 354720 Synchronized at 33KV Khulna RPP 52 x 0.85 40 36 881878 Synchronized at 33KV Khulna RPP 55 MW 55 46.0 877230 Synchronized at 33KV Thakurgaon Rental 50 MW 50 25.0 269048 Bhola RPP 34.5 28 601036 Synchronized at 33KV Bogra RPP 21 22 507000 PDB Total 3740 2486 57228018 IPP & othersTotal 2033.5 1973.0 40516002.0 Eastern Grid Total 4735.0 3736.0 82126811.0 Western Grid Total 906.5 723.0 15617209.0 National Grid Total 5641.5 4459.0 97744020.0