PDF Created with Fineprint Pdffactory Pro Trial Version POWER GRID COMPANY OF BANGLADESH LTD. Description of the generation of various Power Stations Date :15-Sep-08 Page -2 Present Peak Hour Energy Name of Power Station MachineGeneration Generation Generated Remarks Capacity MWMWKWHr 140 0 Under maint. since 13/09/08 Karnafuli Hydro Power Station 240 26 568000 350 0 Under maint. since 19/04/08 450 40 1998300 550 45 Raozan Power Station 121070450000Under S/D since 15/09/08 due to Gas limitation. 2210601800000Gas limitation Shikalbaha Power station Steam4000Under S/D since 19/06/08 due to Gas limitation. barge 28 2800Gas limitation. Ashugonj Power Station 164 29 1676622 264 60 31501002491272 41401403265350 51501403356030 ,, CCPP GT-139 38 1838880 GT-235 40 ST.1818440160 Ghorasal Power Station 155 30 730000 230 0 Under maint. since 13/09/08 31851703099039 41901903128369 51901904410000 61901903301200 Tongi Power Station 1105701637398Gas limitation. Siddhirgonj Power Station 210MW2101602642850 GT-132 0 Under S/D since 05/09/08 Gas limitation. Haripur SBU GT-232 0 0Under S/D since 30/08/08 Gas limitation. GT-332 0 Under S/D since 09/09/08 Gas limitation. 210 0 Under S/D since 27/07/08 due to Gas limitation. Sahjibazar Power Station 410 0 Under S/D since 07/09/08 due to Gas limitation. 515 10 482000 615 10 835 34 1498000 935 30 GT-130 25 Fenchugonj Comb. Cycle GT-230 25 1923000 Steam30 18 GT-335 0 GT-435 36 876700 Steam Sylhet Power Station (1) GT2020293000 110MW85591359078 Khulna Power Station 60MW / Rental 35/404093890060 MW is under maint. since 05/07/06 O/H Barge 1 0 Under maint. since 27/08/07 (Dismantling) Barge28 0 0 Barisal Power Station GT-118 15 GT-217 16.5 242518 GT-118 16 Bheramara Power Station GT-218 0 262100 GT-318 16 Bagabari Power Station 71 MW 71681516000gas limitation 100 MW 100451389000gas limitation Barapukuria power station ST 1 &2 250932197963#2 is under shut down since 10/09/08 Rangpur Power Station GT1820101100 Saidpur Power Station GT1802000 Combined Diesel 66.223370 Meghnaghat Power Ltd CCPP (3)45044310136500 Haripur Power Ltd GT2353498046000gas pressure low Steam125 NEPC, Haripur 7*15.5110902192400 R P C L , Mymensingh GTs GT1-41401072637000 R P C L , Mymensingh ST St70 Summit Power Ltd (REB) 103952109780Synchronized at 33KV Khulna Power Co Ltd. KPCL1109021750004 units is under shut down West Mont (WMPL) pvt. GT 1 &2 70701694447gas pressure low Sylhet RPP 3241975520 Bogra RPP 2018427000Synchronized at 33KV PDB Total 2408.749938199 IPP Total 119028283867 Eastern Grid Total 3139.067027850.0 Western Grid Total 572.713303996 National Grid Total 3711.780331846.0 PDF created with FinePrint pdfFactory Pro trial version http://www.fineprint.com.
Recommended publications
  • BANGLADESH POWER DEVELOPMENT BOARD Tel: 880-2-9554209
    '?trf qtfrffirBrEr{, 951q6trfrqq" Central Secretariate, WAPDA Building (1't floor), Motijheel C/A BPDB, Dhaka-1 000 BANGLADESH POWER DEVELOPMENT BOARD Tel: 880-2-9554209 g y- 0) Memo no. 27 .11.0000.101 .14,O0%,>O - R Date: toztzozo EOI DOCUMENT FOR RENDERING CONSULTANCY SERVIGES AS OWNER'S ENGINEER FOR CONSTRUCTION OF RAOZAN 4OO MW + 10% COMBINED CYCLE POWER PLANT PROJECT, CHATTOGRAM, BANGLADESH 1.0 lntroduction: A Combined Cycle Power Plant of 400 MW t10% capacity at site conditions (35oC, 1.013 bar, 98% R.H.) is intended to be set up by Bangladesh Power Development Board at the specified space within existing Raozan Power Station, Chattogram, Bangladesh. Raozan Upazila is located in Chattogram District, 25 kilometers north-east from Chattogram on the south side of the Chattogram-Kaptai Highway. The proposed combined cycle Plantwill be 1:1:1 with single shaft configuration having capacity of 400 MW t 10% at site conditions (35oC, 1 .013 bar, 98% R.H.). Natural Gas will be used as fuel of this Power Plant. Around 38 acres of land is available in the southern & eastern side of existing power station boundaries. Portion of this land will be used for Construction of Raozan 400 MW t 10% Combined Cycle Power Plant Project (around 10 acres) and the remaining space will be used for future Power Plant expansion. The completion period of the power plant project in 900 Days from the Effective Date of Contract and warranty period is 24 months from the Operational acceptance of the facilities. 2.0 Expression of lnterest: BPDB now invites reputed lnternational Engineering Consulting Firms to indicate their interest in providing consultancy services as Owner's Engineer for Construction of Raozan 400 MW ! 1Ao/o Gas Based Combined Cycle Power Plant Project, Chattogram.
    [Show full text]
  • Together Towards Tomorrow’
    annual reporT together towards 2019 tomorrow annual reporT 2019 annual reporT together towards 2019 tomorrow EXPORT IMPORT BANK OF BANGLADESH LIMITED CONTENTS Our Vision 3 Our Mission 4 Board of Directors 5 Brief Profile of the Directors 6 List of Sponsors 9 Executive Committee 10 Board Audit Committee 10 Risk Management Committee 11 Shariah Supervisory Committee 11 Management Team 12 Corporate Information 14 Five years Financial Performance at a Glance 15 Notice of the 21st Annual General Meeting 16 From the Desk of the Chairman 18 Round-up: Managing Director & CEO 21 Directors’ Report 25 Compliance Status of Corporate Governance Guidelines of BSEC 61 Corporate Social Responsibilities 80 Report on Risk Management 85 Market Discipline Disclosure 103 Report of the Board Audit Committee 131 Annual Report of the Shariah Supervisory Committee 132 Auditor’s Report 134 Consolidated Balance Sheet 141 Consolidated Profit and Loss Account 143 Consolidated Cash Flow Statement 144 Consolidated Statement of Changes in Equity 145 Consolidated Liquidity Statement 146 Balance Sheet 147 Profit and Loss Account 149 Cash Flow Statement 150 Statement of Changes in Equity 151 Liquidity Statement 152 Notes to the Financial Statements 153 Highlights on the Overall Activities 225 Financial Statements–Off-shore Banking Unit 226 Financial Statements of Subsidiaries 232 Photo Album 282 International & National Recognition 290 Branches of EXIM Bank 296 Proxy Form 306 OUR VISION The gist of our vision is ‘Together Towards Tomorrow’. Export Import Bank of Bangladesh Limited believes in togetherness with its customers, in its march on the road to growth and progress with service. To achieve the desired goal, there will be pursuit of excellence at all stages with a climate of continuous improvement, because, in EXIM Bank, we believe, the line of excellence is never ending.
    [Show full text]
  • Annual Report 2018-19
    Annual Report 2018-19 Bangladesh Power Development Board Bangladesh Power Development Board Vision To deliver uninterrupted quality power to all. To secure continuous growth of electricity Mission for sustainable development and ensure customer satisfaction. Objectives To be engaged in implementing the development program of the government in the power sector; To adopt modern technology and ensure optimum utilization of the primary and alternative source of fuel for sustainable development of power generation projects; To purchase power as a Single Buyer from power producers; To provide reliable power supply to customers enabling socio economic development; To promote a work culture, team spirit and inventiveness to overcome challenges; To promote ideas, talent and value systems for employees. Annual Report 2018-19 From the desk of Chairman It is a matter of immense pleasure that Bangladesh Power Development Board (BPDB), the largest electricity utility of the country is going to publish its Annual Report for the financial year 2018-2019. Power sector of Bangladesh is a proud sector of the country with installed power generation capacity of 22,562 MW as of October 2019 (including captive and renewable energy). Power sector of Bangladesh is one of the booming sectors of the country. Now 95% of the total population has access to electricity. The largest energy consumers in Bangladesh are residential sector, followed by industries, commercial and agricultural sectors. Only few years back high system loss, low plant efficiency, erratic power supply, shortages of funds for power plant maintenance and absence of new power generation plan were the big problems in Bangladesh's power sector, but now the scenario is completely different.
    [Show full text]
  • SAIF POWERTEC LIMITED Rupayan Center (8Th Floor), 72 Mohakhali C/ A, Dhaka 1212
    “If you have any query about this document, you may consult the issuer, the issue manager and the underwriters” PROSPECTUS OF SAIF POWERTEC LIMITED Rupayan Center (8th floor), 72 Mohakhali C/ A, Dhaka 1212. Tel: (880 2)9856358-9, Fax: (880 2) 9855949, Web: www.saifpowertecltd.com E-mail: [email protected] PUBLIC ISSUE OF 12,000,000 ORDINARY SHARES OF TK. 10.00 EACH AT AN ISSUE PRICE OF TK. 30.00 INCLUDING A PREMIUIM OF TK. 20.00 PER SHARE TOTALLING TO TK. 360,000,000.00 Opening date for subscription : July 06, 2014 Closing date for subscription : July 10, 2014 Non-Resident Bangladeshi (NRB) subscription opens on : July 06, 2014 Non-Resident Bangladeshi (NRB) subscription closes on : July 19, 2014 UNDERWRITERS Prime Finance Capital Management Limited 63, Dilkusha C/A (3rd floor), Dhaka PLFS Investments Limited Janata Capital & Investment Ltd. Paramount Heights (13th Floor) 48, Motijheel C/A (3rd Floor), Dhaka-1000. 65/2/1, Box Culvert Road, Dhaka-1000. ICB Capital Management Limited BDBL Bhaban (level-16), 8, RAJUK Avenue, Dhaka-1000. MANAGER TO THE ISSUE ICB Capital Management Limited (A S u b s i d i a r y o f I C B ) BDBL Bhaban (level-16), 8, Rajuk Avenue, Dhaka-1000. Phone: 9585691-92, Fax: 02-9555707, Website: www.icbcml.com.bd CREDIT RATING STATUS Long Term Short Term Entity Rating BBB1 ST-3 Date of Rating 18 December, 2013 Rated by CREDIT RATING AGENCY OF BANGLADESH LTD. (CRAB) Validity of the Rating December 15, 2014 The issue shall be placed in “N” category Issue Date of Prospectus : 27-04-2014 SAIF POWERTEC LIMITED Dhaka Office: Rupayan Center (8th floor), 72 Mohakhali C/A, Dhaka 1212.
    [Show full text]
  • Revisiting Power System Master Plan (PSMP) 2016 2018
    NOV Revisiting Power System Master Plan (PSMP) 2016 2018 Contents Chapter I: Introduction 9 1.1 Background ...................................................................................................................... 9 1.1.1 Procedure Followed ................................................................................................................. 9 1.1.2 PSMP 2016 .............................................................................................................................. 9 1.1.3 Policy Vision of PSMP 2016 ................................................................................................ 10 1.1.4 Sustainable Development Goal (SDG) .................................................................................. 10 Chapter II: Power Demand Forecast 11 2.1 Present Power Supply Situation ........................................................................................ 11 2.2 Zone-wise Demand up to 2041 according to Distribution Utilities ...................................... 11 2.3 Peak Power Demand Forecast as per GDP Elasticity Method ............................................. 13 2.4 Electricity for Economic Growth ...................................................................................... 19 2.5 Economic Development ................................................................................................... 19 2.6 Per Capita Income ........................................................................................................... 19 2.7 Industrialization
    [Show full text]
  • Urban Sector and Water Supply and Sanitation in Bangladesh: an Exploratory Evaluation of the Programs of Adb and Other Aid Agencies
    ASIAN DEVELOPMENT BANK Independent Evaluation Department SECTOR ASSISTANCE PROGRAM EVALUATION FOR THE URBAN SECTOR AND WATER SUPPLY AND SANITATION IN BANGLADESH: AN EXPLORATORY EVALUATION OF THE PROGRAMS OF ADB AND OTHER AID AGENCIES In this electronic file, the report is followed by Management’s response, and the Board of Directors’ Development Effectiveness Committee (DEC) Chair’s summary of a discussion of the report by DEC. Evaluation Study Reference Number: SAP: BAN 2009-02 Sector Assistance Program Evaluation July 2009 Urban Sector and Water Supply and Sanitation in Bangladesh An Exploratory Evaluation of the Programs of ADB and Other Aid Agencies Independent Evaluation Department CURRENCY EQUIVALENTS (in averages by fiscal year [July to June]) Currency Unit – Taka (Tk) average 2000–2001 2001–2002 2002–2003 2003–2004 2004–2005 2005–2006 2006–2007 2007–2008 Tk 1.00 = $0.0185 $0.0174 $0.0173 $0.0169 $0.0163 $0.0149 $0.0145 $0.0145 $ 1.00 = Tk53.93 Tk57.45 Tk57.90 Tk59.01 Tk61.39 Tk67.08 Tk68.87 Tk68.80 ABBREVIATIONS ADB – Asian Development Bank ADP – annual development program BMDF – Bangladesh Municipal Development Fund BRM – Bangladesh Resident Mission DANIDA – Danish Agency for International Development Aid DFID – Department for International Development DPHE – Department of Public Health Engineering EA – executing agency FY – fiscal year HYSAWA – Hygiene, Sanitation and Water Services IED – Independent Evaluation Department IEG – Independent Evaluation Group IMED – Implementation Monitoring and Evaluation Division IUDP – Integrated
    [Show full text]
  • Appendix XIII
    Preparatory Survey on Dhaka-Chittagong Main Power Grid Strengthening Project Final Report Appendices Appendix XIII Final Report on Abbreviated Resettlement Plan (ARP) PREPARATORY SURVEY ON DHAKA-CHITTAGONG MAIN POWER GRID STRENGTHENING PROJECT FINAL REPORT ON ABBREVIATED RESETTLEMENT PLAN (ARP) FOR MEGHNAGHAT-MADUNAGHAT-MATARBARI 400KV TRANSMISSION LINE PROJECT SUBMITTED BY ENGINEERS ASSOCIATES LIMITED (EAL) 1/3, ASAD GATE ROAD, BLOCK– A MOHAMMADPUR HOUSING ESTATE, DHAKA-1207 TEL.: 880-2-9111358, 880-2-8117246 FAX.: 880-2-8118512 E-MAIL: [email protected] WEBSITE: www.ealbd.com February 15, 2015 Table of Contents 1.0 Brief Project Description .................................................................................................... 1 1.1 Project Proponent .......................................................................................................... 1 1.2 Project location and area ................................................................................................ 1 1.2.1 Proposed Meghnaghat 400kV substation: .............................................................. 1 1.2.2 Propposed Madunaghat 400kV substation: ............................................................ 3 1.2.3 Route of Proposed 400kV Transmission Line: ........................................................ 5 1.3 Nature and size of the Project ........................................................................................ 8 2.0 Examination of Alternatives .........................................................................................
    [Show full text]
  • Mirsarai 2 Economic Zone
    Pre-feasibility Report Mirsarai 2 Economic Zone Submitted to Bangladesh Economic Zones Authority 30 November 2016 Contents Executive Summary ........................................................................................................... 5 Abbreviations .................................................................................................................. 10 1 Introduction .............................................................................................................. 11 1.1 Background ............................................................................................................................................................ 12 1.2 Description of the Project ...................................................................................................................................... 14 1.3 Chittagong District .................................................................................................................................................. 15 1.4 Mirsarai upazilla ..................................................................................................................................................... 18 1.5 Project Site and Off-site Infrastructure .................................................................................................................. 22 1.6 Outline of Future Mirsarai Industrial City ............................................................................................................... 27 1.7 Transport Connectivity Assessment
    [Show full text]
  • Identifying High Priority Clean Energy Investment Opportunities for Bangladesh
    Identifying High Priority Clean Energy Investment Opportunities for Bangladesh Kenji Shiraishi1, Rebekah Shirley2, Daniel M. Kammen3, Saleemul Huq4, and Feisal Rahman5 1,2Goldman School of Public Policy (GSPP), University of California, Berkeley 1, 3Energy and Resource Group (ERG), University of California, Berkeley 1, 2, 3Renewable and Appropriate Energy Laboratory (RAEL), University of California, Berkeley 4, 5International Centre for Climate Change and Development (ICCCAD) 5School of Environmental Science and Management, Independent University, Bangladesh (IUB) February 18, 2018 1 Summary for Policymakers Bangladesh has committed to provide electricity for all by 2021, to reduce its green- house gas emissions by 5% from power and other sectors by 2030, and to develop 100% domestic renewable energy as rapidly as possible. This study is the first of its kind to examine potential areas for solar and wind energy projects in Bangladesh that can help to meet those goals. To do this, we excluded all areas likely to be environmentally or socially unacceptable for solar or wind projects (low-lying areas, steep slopes, dense settlements, protected areas and their buffer zones, etc.), and then estimated the lev- elized cost of electricity for each 5km2 “project opportunity area”. We found that there is far more utility-scale solar PV potential than previ- ously estimated, at costs lower than coal power, and conversion of cropland can likely be avoided. In 2016, electricity demand in Bangladesh was 11.4 GW. By 2021, the Government plans to develop 13.3 GW from new coal plants, and less than 2 GW of solar energy. But Bangladesh could replace large portion of 13.3 GW of planned coal projects with utility-scale solar for an average LCOE of $91/MWh, compared to $110/MWh for coal, given the identified 53GW potential from solar PV.
    [Show full text]
  • A Path to Renewable Energy from the Energy Crisis in Bangladesh
    Journal of Engineering Research and Reports 11(2): 6-19, 2020; Article no.JERR.55315 ISSN: 2582-2926 A Path to Renewable Energy from the Energy Crisis in Bangladesh Zafrin Ahmed Liza1, Hajera Akhter2, Md. Shahibuzzaman1 and Mohammad Rakibul Islam3* 1Department of Anthropology, Shahjalal University of Science and Technology (SUST), Sylhet-3114, Bangladesh. 2Department of Political Science, Shahjalal University of Science and Technology (SUST), Sylhet-3114, Bangladesh. 3Department of Electrical and Electronic Engineering, Islamic University of Technology (IUT), Gazipur-1704, Bangladesh. Authors’ contributions This work was carried out in collaboration among all authors. Author ZAL designed the study, managed the literature searches, organized different sections and wrote the social impact part, authors HA and MS wrote the first draft of the manuscript and author MRI performed the technical analysis part. All authors read and approved the final manuscript. Article Information DOI: 10.9734/JERR/2020/v11i217055 Editor(s): (1) Dr. Felipe Silva Semaan, Federal University, Brazil. Reviewers: (1) Bankole Adebanji, Ekiti State University, Nigeria. (2) Wen-Yeau Chang, St. John’s University, Taiwan. (3) Guy Clarence Semassou, University of Abomey-Calavi, Benin. (4) Alfred Ba’amani Ba’ams, Modibbo Adama University of Technology, Nigeria. Complete Peer review History: http://www.sdiarticle4.com/review-history/55315 Received 06 January 2020 Original Research Article Accepted 11 March 2020 Published 20 March 2020 ABSTRACT Bangladesh is facing a tremendous energy crisis and the economic development of this country was jeopardized due to the lack of energy resources. Due to the progression of technology, the consumption of power is rising gradually. Adequate and consistent source of electricity is a key requirement for a constant and successful economic development.
    [Show full text]
  • List of Project in RADP 2018-19
    List of Project in RADP 2018-19 Project Description Allocation (in Lakh) Parliament Affairs Secretariate Ministry's Own 0201-5000 Strengthening Parliament Capacity into Population ‡÷ªs‡`wbs cvj©v‡g›Um K¨vcvwmwU BbUz ccy‡jkb GÛ 73.00 and Development Issues. †W‡fjc‡g›Um Bm¨yR 30/07/19 Page 1 of 127 1 List of Project in RADP 2018-19 Project Description Allocation (in Lakh) Prime Minister's Office Prime Minister's Office 0301-1111 ‡UKmB Dbœqb Afxó AR©‡b RbcÖkvm‡bi `ÿZv e„w×KiY 11,698.00 0301-5822 Lump provision for development of special areas we‡kl GjvKvi Dbœq‡bi Rb¨ †_vK eivÏ (cve©Z¨ PÆMÖvg 4,000.00 (except Hill Tracts) e¨ZxZ) Autonomous Bodies & Other Institutions 0305-5011 Support to Capacity Building of Bangladesh mv‡cvU© Uz K¨vcvwmwU wewìs Ae evsjv‡`k BKbwgK †Rvbm 2,200.00 Economic Zones Authority. A_wiwU| 0305-5012 Bangladesh Economic Zones Development Project evsjv‡`k BK‡bvwgK †Rvbm †W‡fjc‡g›U cÖ‡R± (†dR-1)| 18,215.00 (Phase-I). National Security Intelligence 0321-5010 Construction of 10-storied Office Building for NSI KÝóvKkb Ae 10 (‡Ub) ÷i‡qW Awdm wewìs di 4,950.00 with 20-Storied Foundation & a Basement. Gb.Gm.AvB DB_ 20 (Uz‡qw›U) ÷i‡qW dvD‡Ûkb GÛ G †eBR‡g›U| Export Processing Zone Authority (BEPZA) 0325-0007 Construction of 4 nos. Multistoried Factory Buildings PÆMÖvg Bwc‡R‡W 4wU eûZj KviLvbv feb wbg©vY 12,561.00 at Chattogram EPZ 0325-5020 Capacity Building of the Bangladesh Export K¨vcvwmwU wewìs Ad evsjv‡`k G·‡cvU© cÖ‡mwms †Rvbm 1,160.00 Processing Zones Authority.
    [Show full text]
  • Interconnected Power Transmission Network of Chattogram Circle: a Survey
    International Journal of Science and Research (IJSR) ISSN: 2319-7064 Impact Factor (2018): 7.426 Interconnected Power Transmission Network of Chattogram Circle: A Survey Rubana Hoque Chowdhury1, Mohammad Ismail Hossain2, Sazzad Hossain3, Muhammad Liakat Ali4 Southern University Bangladesh, Department of Electrical and Electronic Engineering, 739/A, Mehedibag Road, Chattogram-4000, Bangladesh Abstract: This paper deals with the problem of power transmission system in Chattogram Zone. Firstly Interconnected grid system in Chattogram circle and generation capacity of Chattogram areas is briefly discussed. We have studied schematic diagram, existing sub- stations, protection scheme and existing transmission lines. We have also discussed maximum load study in some important sub- stations and peak hour demands of different grid sub-stations. A discussion is included on the problems of existing transmission system of Chattogram and remedies of those problems. Keywords: Transmission system, Power plant, Sub-station, power load, PGCB 1. Introduction principle components are the generating system, the transmission system and the distribution systems. The Power transmission systems have been growing in size and transmission lines are the connecting links between the complexity due to the necessity to monitor lower and generating stations and the distribution system and lead to the lower voltage levels in detail in order to track power flows power systems over interconnections. manipulated by renewable sources. These sources are increasingly being connected in large numbers at lower In this modern world, the dependence on electricity so much voltage sections of the grid. Furthermore, due to the that it has become a part of our life. Power Systems (PS) are possibilities brought up by wide-area control and continuously monitored in order to maintain the normal and optimization over long distances, monitoring very large scale secure state of operating conditions [4].