Sl No Company MHS Village Taluk District Total MW Location River G.O .No Date of Allotment 1994-1995 1 Bhoruka Power Corporation

Total Page:16

File Type:pdf, Size:1020Kb

Sl No Company MHS Village Taluk District Total MW Location River G.O .No Date of Allotment 1994-1995 1 Bhoruka Power Corporation LIST OF SMALL HYDRO PROJECTS ALLOTTED YET TO BE COMMISSIONED YEARWISE AS ON 31.07.2021. Sl Company MHS Village Taluk District Total MW Location River G.O .No Date of No Allotment 1994-1995 1 Bhoruka Power Kumaradha kunturu Putturu Dakshina 18.00 Kumaradha Kumaradha Allotment GO DE 154 06-09-1994 Corporation Ltd. ra Kannada ra MHS ra river PPC 94(3) for (48 MW) across dated 6.9.1994, Time Kumaradha extended till 31.12.2004 ra river at vide GO.No EN 161 NCE Kunturu 2001 dt: 01.01.2002, village of Capacity reduced from Putturu 48 MW to 22 MW vide Taluk in GO.No. DE 333 NCE Dakshina 2004 dated: 06.10.2004, kannada Cancelled vide GO.No. district EN 164 NCE 2007 date: 15.05.2007, Reallotted Vide G.O No. EN 206 NCE 2007dated 29.6.2007. Recommended to ED for cancellation . 18.00 1996-1997 2 Vijayalakshmi Hydro Hebbakava Gopanahalli Malavalli Mandya 1.25 Hebbakava Cauvery DE 56 NCE 95 dated 16.02.1996 Power Pvt. Ltd.(unit -2) di di MHS 16/02/ 1996 across Hebbakava di Branch Canal of Gopanahalli village of Malavalli Taluk in Mandya District Total 1.25 1997-1998 NIL 1998-1999 NIL 1999-2000 NI L 2000-2001 NIL 2001-2002 3 Pavanaganga Power Pvt. Honnamma Attigundi Chikkamag Chikkamag 6.00 Honnamma Honnamma DE 107 NCE 2001(1) 19-09-2001 Ltd. nahalla alore alore nahalla nahalla dated 19/09/2001(1.5 MHS across Stream MW)EN 123 NCE 2004 Honnamma dated 24/08/2004(1.5 naHalla in to 4.1 MW) EN 367 NCE Attigundi 2006 dated village of 12/09/2006(4.1 to 6 Chikkamag MW) alore Taluk in Chikkamag alore District 4 Bhadragiri Power Pvt. Gondi Chikkagopa Bhadravath Shimoga 3.00 Gondi MHS Bhadra DE 111 NCE 2001 08-10-2001 Ltd. nahalli i across river dated 08/10/2001( 1 Gondhi MW) & EN 449 NCE anicut at 2004 dated 30/12/2004 Chikkagopa ( 3 MW), EN 255 NCE nahalli 2005 dated 16/12/2005 Village of ( change in location ), Bhadravath EN 167 NCE 2010 dated i taluk in 28/02/2011 (Time Shimoga extended upto district 30/06/2011), Time extended vide Go.No. EN 174 NCE 2016 dt:28.07.2016 from 01.07.2011 to 30.06.2016 with performance guarantee of Rs. 1 Lakh Per MW. Time extended from 01.07.2016 to 31.03.2019 vide GO.No. EN 285 NCE 2018 dt: 28.05.2018 with a condition that the firm has to pay the applicable time extension fees. 5 Photon Energy Systems Yegachi Yegachi Hassan Hassan 1.00 Yegachi Yegachi DE 66 NCE 1001(3) dt: 29-11-2001 Ltd. MHS across river 29.11.01,EN 362 NCE water from 2009 dt 12/3/2010(1 irrigationc MW), EN 362 NCE 2009 canal of dt yegachi 12/03/2010(Reallotted) river at Belur town in Hassan District 6 Photon Energy Systems Hosaholalu Hosaholalu K.R.Pet Mandya 0.50 Hosaholalu Doddakere DE 66 NCE 2001 (2) 29-11-2001 Ltd. MHS across tank dated 29/11/2001(0.5 Doddakere MW), EN 357 NCE 2005 tank at dated Hosaholalu 01/10/2006(Cancellatio Village of n), EN 58 NCE 2007(2) KR Pet dated 24/08/2007 (Re Taluk in allotted) Mandya District 7 Photon Energy Systems Sampkatte Sampakatte Hosanagara Shimoga 3.50 Sampakatte Chakra DE 66 NCE 2001 (1) 29-11-2001 Ltd. MHS across river dated 29/11/2001(3.5 Chakra MW), EN 357 NCE 2005 water dated conduting 01/07/2006(Cancellatio channel at n), EN 58 NCE 2007(1) Sampakatte dated 24/08/2007 (Re Village of allotted) Hosanagar Taluk in Shimoga District Total 14.00 2002-2003 8 Pioneer Genco Ltd. Budikatte Nettakallu Malavalli Mandya 24.750 Budikatte Cauvery DE 33 NCE 2002 dated 13-06-2002 (Formerly Chanakya MHS across river 13/06/2002(2 MW) & Cements Ltd) Cauvery EN 152 NCE 2007 river 2 KM dated 30/04/2007 of (24.75 MW) and Change downstrea of MHS to Adi Shakthi m of Maramma from Shivanasam Budikatte MHS and udram at change of Company Nettakallu name as M/s. Pioneer village of Gaenco Limited. Malavalli Taluk in Mandya District 9 Penna Cements Sreeramade Sreemadeva Malavalli Mandya 24.750 Sreeramade Handihalla DE 37 NCE 2002 13-06-2002 Industries Ltd. vara ra vara MHS Stream dated 13/06/2002 across Handihalla stream 2KM downstrea m of Shivansam udram mlavalli Taluk in Mandya district 10 Shivanasamudram Chikkamutt Shivanasam Malavalli Mandya 20.00 Left Bank Cauvery DE 70 NCE 2002 11-07-2002 iraya MHS udram canal of river dated 11/07/2002(4 (formerly Gaganachu MW), EN 26 NCE 2006 Gaganachu kki scheme- dated 27/01/2006(36 kki LBC) 2 near Months), EN 434 NCE Shivanasam 2007 dated udram falls 11/12/2007, EN 303 of Kollegala NCE 2011 dated Taluk in 07.09.2011 (24.75 MW) Chamaraja nagara District 11 Shivanasamudram Basaveshw Shivanasam Kollegala Chamaraja 24.750 Right Bank Cauvery DE 70 NCE 2002 11-07-2002 ara MHS udram nagar canal of river dated 11/07/2002(4 (Formerly Ganganach MW), EN 26 NCE 2006 Gaganachu ukki dated 27/01/2006(36 kki RBC) scheme-2 Months), EN 434 NCE near 2007 dated Shivanasam 11/12/2007, EN 303 udram falls NCE 2011 dated of Kollegala 07.09.2011 (enhanced 4 Taluk in MW to 24.75 MW and Chamaraja change of name) (upto nagara 27/01/2012) District 12 Indra Dhanursh Power Dhanagere Dhanagere Kollegala Chamaraja 2.00 Dhanagere DE 71 NCE 2002 15-07-2002 Pvt. Ltd. RBC nagar RBC MHS dated 15/07/2002, EN at 25 NCE 2006 dated Dhanagere 27/1/2006(36 months), Right Bank EN 434 NCE canal of 2007/11/12/2007(23/1 Kollegal 1/2008 to 23/11/2011) Taluk in Chamaraja nagar District 13 Sidhi Shree Shive Powers Sankadagu Shiru Kundapura Udupi 1.20 Sankadagu Sankundi DE 82 NCE 2002 15-07-2002 Pvt. Ltd. ndi ndi MHS, stream dated 15/07/2002( V.I 50mts Shetty and company-3 downstrea MW ) Change of name m of vide GO EN 383 NCE sankundi 2006 dated 22/9/2006, stream, EN 354 NCE 2006 dated Shiru 26/6/2006(Time Village, extension upto Baindur 26.06.2009), EN 383 town, NCE 2006 dated Kundapur 8/5/2007 (Capacity Taluk, reduction from 3 MW to 1.20 MW) 14 Soham Kilanjara Kilanjara Kilanjar Mudabidire Dakshina 6.00 Kilanjara Gundihalla DE 240 NCE 2002 10-10-2002 Renewable Energy Pvt. Kannada MHS across /KelaHole/ dated 10.10.2002. EN Ltd. Phalguni Gurupur 148 NCE 2010 dated river at river/Hosan 19/06/2010(cancelled), Kilanjar gadiHole/P EN 148 NCE 2010 dated Village of uchamogar 18/02/2011 Mudabidre u (restoration, upto Taluk of Hole/Phalg 31/03/2012) Dakshina uni river Kannada District 15 Soham Kolavur Kolavur Kolavur Mudabidire Dakshina 18.00 Kolavur Gundihalla DE 239 NCE 2002 10-10-2002 Renewable Energy Pvt. Kannada MHS across /KelaHole/ dated 10/10/2002(6 Ltd. Phalguni(Pu Gurupur MW, M/s Phalguni chamogaru river/Hosan Power Projects Pvt. Ltd.- /Gurupur) gadiHole/P II ), DE 78 NCE 2003 river, near uchamogar dated 04/04/2003 (M/s Kolavur u Phalguni Power Projects- Village of Hole/Phalg II (A division of Ground Mudabidre uni river & Air Technical Services Taluk in (P) Ltd.),DE 289 NCE Dakshina 2003 dated Kannada 07/01/2004(change of District taluk & district), EN 423 NCE 2006 dated 09/11/2006(3 years), EN 438 NCE 2006 dated 15/2/2007(9 MW), EN 176 NCE 2011 dated 04/08/2011 (Change of name to M/s Soham Kolavur Renewable Energy Pvt. Ltd. & 3 years TE from 24/05/2010), EN 463 NCE 2011 dated 07.05.2012 (9 to 18 MW), EN 174 NCE 2013 dated 16.09.2013 (TE upto 23.05.2016) Total 122.95 2003-2004 16 Aji Engineers Dabewadi Dabewadi Joida Uttara 12.00 Dabewadi Pandari DE 238 NCE 2002 10-04-2003 kannada MHS across river dated 10/04/2003( 2 Pandhari MW), EN 93 NCE 2005 river a dated 18/04/2006 (12 tributory to MW), EN 28 NCE 2005 Kali river at dated 03/03/2008 ( 1 Dabewadi Year), EN 70 NCE 2009 Village of dated 12/6/2009( Joida 31/03/2010), EN 70 Taluk in NCE 2009 dated Uttara 23/02/2011(upto Kannada 31/12/2011) District 17 South West Hydro Power Abilbiru Marenahalli Sakaleshap Hassan 6.00 Abilbiru Abilbiru DE 148 NCE 2003 18-11-2003 Pvt. Ltd. ura MHS across Stream dated 18/11/2003( 4.5 Abilbiru MW) EN 148 NCE Stream at 2003dated Marenahalli 22/03/2004(6 MW) EN village of 63 NCE 2006 dated Sakaleshpu 02.02.2006 (time ra Taluk in extended upto Hassan 01.02.2009) District 18 Malleshwara Power Gen Keri Hole Keri Sakaleshap Hassan 1.50 Across Keri Keri Hole DE 245 NCE 2003 19-01-2004 Pvt. Ltd. ura Hole near dated 19/01/2004, EN Keri Village, 196 NCE 2008 dated Sakaleshpu 17.09.2008 (Time r Taluk, extended upto 16.09.2011), EN 47 NCE 2013 dated 07.08.2013 (Time extension from 17.09.2011 to 16.09.2013) 19 South Canara Electric Varahi Mavinakan Kundapura Udupi 2.00 Varahi MHS Varahi river DE 244 NCE 2003 10-02-2004 Company Pvt. Ltd. a across dated 10.02.2004 Varahi river at Kunchikal Falls, Mavinakan a Village of Kundapur Taluk in Udupi district 20 Manasa Sarovara Power Harihara Harihara Harihara Davanagere 0.25 Harihara Bhadra DE 61 NCE 2004 13-02-2004 Pvt.
Recommended publications
  • KALASA-BANDURI PROJECT (States) a Day After the Centre's
    KALASA‐BANDURI PROJECT (States) A day after the Centre’s notification of the Mahadayi inter‐State water dispute tribunal award, Chief Minister B.S. Yediyurappa said on Friday that the State government would expedite the Kalasa‐Banduri nala drinking water and hydro power projects in the region. Kalasa‐Banduri project was planned in 1989; Goa raised an objection to it. Kalasa‐Banduri Nala Project is undertaken by the Government of Karnataka to improve drinking water supply to the three districts of Belagavi, Dharwad, and Gadag. It involves building across Kalasa and Banduri, two tributaries of the Mahadayi river to divert water to the Malaprabha river (a tributary of Krishna river). Malaprabha river supplies the drinking water to Dharwad, Belgaum, and Gadag districts. The cost of the Kalasa‐Banduri Nala project on the Mahadayi basin has risen from about ` 94 crores (2000) to `1,677.30 crores (2020) due to the ongoing inter‐State river water dispute. Mahadayi or Mhadei, the west‐flowing river, originates in Bhimgad Wildlife Sanctuary (Western Ghats), Belagavi district of Karnataka. It is essentially a rain‐fed river also called Mandovi in Goa. It is joined by a number of streams to form the Mandovi which is one of two major rivers (the other one is Zuari river) that flows through Goa. The river travels 35 km in Karnataka; 82 km in Goa before joining the Arabian Sea. The Mahadayi Water Disputes Tribunal was set up in 2010. Goa, Karnataka and Maharashtra are parties to the tribunal. MISSION PURVODAYA (States) Purvodaya in steel sector is aimed at driving accelerated development of Eastern India through establishment of integrated steel hub.
    [Show full text]
  • Assessment of Water Quality Changes in Krishna River of Andhrap Radesh Through Geoinformatics
    International Journal of Recent Technology and Engineering (IJRTE) ISSN: 2277-3878, Volume-7, Issue-6C2, April 2019 Assessment of Water Quality Changes in Krishna River of Andhrap radesh Through Geoinformatics Lakshman Kumar.C.H, D. Satish Chandra, S.S.Asadi Abstract--- Pancha Boothas are Life and Death for the are permissible in river water but exceed their level its Environment. In that any one is Disrupted that can be Escort to causes several diseases for users and Toxic elements, excess the danger of environment. Water is the one of the Pancha nutrients create vadose zones in river courses [5]. Most of Boothas. Quality of the water is very crucial in the present and the assured irrigation in India is surface water of rivers. It is future users. Natural issues and manmade activities are depending on the water quality. The ratio of transportation of essential to monitor and assess the water quality in the fresh water in liquid form to covert useless form is 70%. The Krishna river course. ratio of sedimentation is also one of the parameter of the water quality, if changes are happen in sedimentation the quality of the Notations: water also changes. The causes of water pollution source are GDSQ: Gauge Discharge Sediment and Water Quality many, of which sewage discharge, industrial effluents, agricultural effluents and several man made activities are play a GDQ : Gauge Discharge Water Quality key role on water quality. The total percentage of water in the pH : Potential of Hydrogen world is 97% in Oceans and reaming 3% of water in form of EC : Electric Conductivity glaciers, in which the consumption of water quantity is in form of CO3 : Carbonate surface and subsurface water bodies.
    [Show full text]
  • Karnataka Commissioned Projects S.No. Name of Project District Type Capacity(MW) Commissioned Date
    Karnataka Commissioned Projects S.No. Name of Project District Type Capacity(MW) Commissioned Date 1 T B Dam DB NCL 3x2750 7.950 2 Bhadra LBC CB 2.000 3 Devraya CB 0.500 4 Gokak Fall ROR 2.500 5 Gokak Mills CB 1.500 6 Himpi CB CB 7.200 7 Iruppu fall ROR 5.000 8 Kattepura CB 5.000 9 Kattepura RBC CB 0.500 10 Narayanpur CB 1.200 11 Shri Ramadevaral CB 0.750 12 Subramanya CB 0.500 13 Bhadragiri Shimoga CB M/S Bhadragiri Power 4.500 14 Hemagiri MHS Mandya CB Trishul Power 1x4000 4.000 19.08.2005 15 Kalmala-Koppal Belagavi CB KPCL 1x400 0.400 1990 16 Sirwar Belagavi CB KPCL 1x1000 1.000 24.01.1990 17 Ganekal Belagavi CB KPCL 1x350 0.350 19.11.1993 18 Mallapur Belagavi DB KPCL 2x4500 9.000 29.11.1992 19 Mani dam Raichur DB KPCL 2x4500 9.000 24.12.1993 20 Bhadra RBC Shivamogga CB KPCL 1x6000 6.000 13.10.1997 21 Shivapur Koppal DB BPCL 2x9000 18.000 29.11.1992 22 Shahapur I Yadgir CB BPCL 1x1300 1.300 18.03.1997 23 Shahapur II Yadgir CB BPCL 1x1301 1.300 18.03.1997 24 Shahapur III Yadgir CB BPCL 1x1302 1.300 18.03.1997 25 Shahapur IV Yadgir CB BPCL 1x1303 1.300 18.03.1997 26 Dhupdal Belagavi CB Gokak 2x1400 2.800 04.05.1997 AHEC-IITR/SHP Data Base/July 2016 141 S.No. Name of Project District Type Capacity(MW) Commissioned Date 27 Anwari Shivamogga CB Dandeli Steel 2x750 1.500 04.05.1997 28 Chunchankatte Mysore ROR Graphite India 2x9000 18.000 13.10.1997 Karnataka State 29 Elaneer ROR Council for Science and 1x200 0.200 01.01.2005 Technology 30 Attihalla Mandya CB Yuken 1x350 0.350 03.07.1998 31 Shiva Mandya CB Cauvery 1x3000 3.000 10.09.1998
    [Show full text]
  • The Kalasa & Bhandura Nala Diversion Scheme for Drinking
    KALASA & BHANDURA NALA DIVERSION SCHEME FOR DRINKING WATER SUPPLY, KHANAPUR TALUK, BELAGAVI DISTRICT, KARNATAKA BY KARNATAKA NEERAVARI NIGAM LIMITED, GOVERNMENT OF KARNATAKA The Kalasa & Bhandura Nala Diversion Scheme for Drinking Water Supply involves diversion of west flowing streams/nalas in Mahadayi basin to water deficit Malaprabha basin by construction of three diversion dams across Haltara Nala, Kalasa Nala and Bhandura Nala. It is proposed to divert 7.56 TMC of water during monsoon season through Inter Connecting gravity Canals for crossing the ridges. The project is exclusively proposed for providing drinking water facilities to Hubli-Dharwad Towns, Kundgol Town and enroute villages as part of commitment to National Water Policy, 2012. The total cost of the project is 840.52 Cr. The construction activities include: 1. Construction of Diversion dam across Haltara nala. 2. Construction of Diversion dam across Kalasa nala. 3. Construction of Inter connecting gravity canal from FRL of Haltara diversion dam to FRL of Kalasa diversion dam. 4. Construction of interconnecting canal from Kalasa diversion dam to Malaprabha River. 5. Construction of Diversion dam across Bhandura nala. 6. Construction of Inter connecting gravity canal from Bhandura Diversion dam to Malaprabha River. The proposed project requires a total land of 730.92 Ha of land for the construction of project components and submergence of forest, Government and Private land. The proposed project involves diversion of 499.13 Ha (including submergence of 406.60 Ha) of forest land. The private land will be acquired as per the Right to Fair Compensation and Transparency in Land Acquisition Act, 2013. Whereas, the forest land will be diverted as per the provisions of Forest (Conservation) Act, 1980.
    [Show full text]
  • 6. Water Quality ------61 6.1 Surface Water Quality Observations ------61 6.2 Ground Water Quality Observations ------62 7
    Version 2.0 Krishna Basin Preface Optimal management of water resources is the necessity of time in the wake of development and growing need of population of India. The National Water Policy of India (2002) recognizes that development and management of water resources need to be governed by national perspectives in order to develop and conserve the scarce water resources in an integrated and environmentally sound basis. The policy emphasizes the need for effective management of water resources by intensifying research efforts in use of remote sensing technology and developing an information system. In this reference a Memorandum of Understanding (MoU) was signed on December 3, 2008 between the Central Water Commission (CWC) and National Remote Sensing Centre (NRSC), Indian Space Research Organisation (ISRO) to execute the project “Generation of Database and Implementation of Web enabled Water resources Information System in the Country” short named as India-WRIS WebGIS. India-WRIS WebGIS has been developed and is in public domain since December 2010 (www.india- wris.nrsc.gov.in). It provides a ‘Single Window solution’ for all water resources data and information in a standardized national GIS framework and allow users to search, access, visualize, understand and analyze comprehensive and contextual water resources data and information for planning, development and Integrated Water Resources Management (IWRM). Basin is recognized as the ideal and practical unit of water resources management because it allows the holistic understanding of upstream-downstream hydrological interactions and solutions for management for all competing sectors of water demand. The practice of basin planning has developed due to the changing demands on river systems and the changing conditions of rivers by human interventions.
    [Show full text]
  • Davisian's Normal Cycle of Erosion
    UNIT – IV GEOMORPHIC PROCESSES: DAVISIAN’S NORMAL CYCLE OF EROSION: 1. INTRODUCTION i. This is the most important concept develop in geomorphology between 1890-1900. ii. It was proposed by W.M. Davis. iii. It explains evolution of landforms in a region. iv. Davis got the idea from many scholars they include work of Brothers of purity in Dark Ages, Hutton, Powell, Hilbert and many others. v. Davis synthesized the earlier ideas put them in a logical frame work and explained the concept. So, he has not given any new idea but only terms like pheneplain. vi. The terms “cycle” is used because the beginning and the end have same condition the end may be the beginning for next cycle. vii. The term “Normal” indicate temperate humid climate which is Normal for Davis. viii. Davis calls Glacial and Arid conditions as “climatic accident”. ix. Since, the temperate humid condition is normal, river is the major processes. Therefore it is also known as “Fluvial cycle of Erosion” (Fluv means water). 2. BASIC POINTS TO REMEMBER A few basic points should be kept in mind when explanation is given for cycle of erosion. They are, 1. They cycle concept is an idealized modal. 2. Stages in the cycle of erosion do not undergo the same rate of development. 3. Stages in the cycle of erosion cannot be equated with specific amount of time. 4. The theoretical final stage of the cycle, pheniplain is not absorbed any were in the world. One possible area may be the Siberian plain. 3. BACKROUND Brothers of purity, Hutton, school of denudation.
    [Show full text]
  • Report of the Comptroller and Auditor General of India on Public Sector Undertakings
    Report of the Comptroller and Auditor General of India on Public Sector Undertakings for the year ended March 2014 Government of Karnataka Report No.9 of the year 2014 Table of contents Paragraph Particulars Page No. No. Preface v Overview vii-xiii Chapter I Overview of State Public Sector Undertakings Introduction 1.1-1.3 1-2 Accountability framework 1.4-1.8 2-3 Stake of Government of Karnataka 1.9-1.13 4-5 Budgetary support to PSUs 1.14-1.15 5-6 Guarantees for loan and guarantee commission 1.16 6 outstanding Absence of accurate figures of the investment in PSUs 1.17-1.18 6-7 Arrears in finalisation of accounts 1.19-1.22 7-8 Impact of non-finalisation of accounts 1.23-1.26 8 Performance of PSUs 1.27-1.35 8-11 Non-working PSUs 1.36-1.38 11-12 Comments on Accounts and Internal Audit 1.39-1.42 12-14 Finalisation of accounts by Statutory Corporations 1.43-1.45 15-16 Recoveries at the instance of Audit 1.46 16 Disinvestment, privatisation and restructuring of PSUs 1.47 16-17 Reforms in power sector 1.48-1.49 17-18 Chapter II Performance Audits relating to Government Companies Karnataka Power Corporation Limited 2.1 19 Performance Audit on ‘Construction and performance of Bellary Thermal Power Station’ Executive Summary 19-20 Introduction 2.1.1 21 Audit Objectives 2.1.2 21 Scope of Audit 2.1.3 21-22 Audit Methodology 2.1.4 22-23 Audit Criteria 2.1.5 23 Audit Findings 2.1.6 23 Planning 2.1.7-2.1.7.3 23-27 Project execution 2.1.8.1-2.1.10 27-31 Operational efficiency 2.1.11-2.1.11.8 31-36 i Audit Report –PSUs for the year ended 31 March 2014 Paragraph Particulars Page No.
    [Show full text]
  • Western Ghats
    Western Ghats From Wikipedia, the free encyclopedia "Sahyadri" redirects here. For other uses, see Sahyadri (disambiguation). Western Ghats Sahyadri सहहदररद Western Ghats as seen from Gobichettipalayam, Tamil Nadu Highest point Peak Anamudi (Eravikulam National Park) Elevation 2,695 m (8,842 ft) Coordinates 10°10′N 77°04′E Coordinates: 10°10′N 77°04′E Dimensions Length 1,600 km (990 mi) N–S Width 100 km (62 mi) E–W Area 160,000 km2 (62,000 sq mi) Geography The Western Ghats lie roughly parallel to the west coast of India Country India States List[show] Settlements List[show] Biome Tropical and subtropical moist broadleaf forests Geology Period Cenozoic Type of rock Basalt and Laterite UNESCO World Heritage Site Official name: Natural Properties - Western Ghats (India) Type Natural Criteria ix, x Designated 2012 (36th session) Reference no. 1342 State Party India Region Indian subcontinent The Western Ghats are a mountain range that runs almost parallel to the western coast of the Indian peninsula, located entirely in India. It is a UNESCO World Heritage Site and is one of the eight "hottest hotspots" of biological diversity in the world.[1][2] It is sometimes called the Great Escarpment of India.[3] The range runs north to south along the western edge of the Deccan Plateau, and separates the plateau from a narrow coastal plain, called Konkan, along the Arabian Sea. A total of thirty nine properties including national parks, wildlife sanctuaries and reserve forests were designated as world heritage sites - twenty in Kerala, ten in Karnataka, five in Tamil Nadu and four in Maharashtra.[4][5] The range starts near the border of Gujarat and Maharashtra, south of the Tapti river, and runs approximately 1,600 km (990 mi) through the states of Maharashtra, Goa, Karnataka, Kerala and Tamil Nadu ending at Kanyakumari, at the southern tip of India.
    [Show full text]
  • Cif,Ct{6{Dfi (A) Whether the Government Proposes to Develop New Waterways on Rivers and If So, the Details Thereof , Riverl Waterways-Wise;
    GOVERNMENT OF INDIA MINISTRY OF SHIPPING LOK SABHA UNSTARRED QUESTION NO. 441 TO BE ANSWERED ON 1gth JULY, 2018 DEVELOPMENT OF WATERWAYS 441. SHRI MANSUKHBHAI DHANJIBHAI VASAVA: SHRI HARISHCHANDRA CHAVAN: DR. RAMESH POKHRIYAL "NISHANK'': Will the Minister of SHIPPING be pleased to state: cIf,ct{6{dfi (a) whether the Government proposes to develop new waterways on rivers and if so, the details thereof , riverl waterways-wise; (b) the details of waterways which are operational in the country, river/ watenrvays-wise; (c) the present status of the National Waterways along with their navigability status, wateruays-wise; (d) whether the Government has established any mechanism for regular monitoring and evaluation of navigability of such waterways and if so, the details thereof; and (e) the details of watenrtrays being used regularly for transportation in the country as on date? ANSWER MINISTER OF STATE IN THE MINISTRY OF SHIPPING (SHRI PON. RADHAKRISHNAN) (a) to (e) To create a country wide waterway network so as to optimize the full potential of this mode of transport, 111 inland waterways (including the existing 5 national waterways) have been declared as National Waterways (NWs) under the 'National Wateruays Act, 2016' which has been enforced w.e.l. 12.04.2016. The list of these NWs is at Annex-|. Subsequent to the declaration of a National Wateruray, feasibility study which inter-alia covers the potential of navigability, cargo availability, cost of development etc. on the NW is undertaken by the lnland WateMays Authority of lndia (lWAl). The details of NWs which are operational/ navigable and being used for transportation at present in the country are at Annex-ll.
    [Show full text]
  • Report Sno 5695-2008
    REPORT SNO 5695-2008 Hydrology and Water Allocation in Malaprabha Comprehensive database and integrated hydro economic model for selected water services in the Malaprabha river basin Norwegian Institute for Water Research – an institute in the Environmental Research Alliance of Norway REPORT Main Office Regional Office, Sørlandet Regional Office, Østlandet Regional Office, Vestlandet Regional Office Central Gaustadalléen 21 Televeien 3 Sandvikaveien 41 P.O.Box 2026 P.O.Box 1266 NO-0349 Oslo, Norway NO-4879 Grimstad, Norway NO-2312 Ottestad, Norway NO-5817 Bergen, Norway NO-7462 Trondheim Phone (47) 22 18 51 00 Phone (47) 22 18 51 00 Phone (47) 22 18 51 00 Phone (47) 22 18 51 00 Phone (47) 22 18 51 00 Telefax (47) 22 18 52 00 Telefax (47) 37 04 45 13 Telefax (47) 62 57 66 53 Telefax (47) 55 23 24 95 Telefax (47) 73 54 63 87 Internet: www.niva.no Title Serial No. Date Hydrology and water allocation 5695-2008 28.11.2008 Comprehensive database and integrated hydro economic model for Report No. Sub-No. Pages Price selected water services in the Malaprabha river basin 70 Author(s) Topic group Distribution Reshmi, T.V. (CISED), Anne Bjørkenes Christiansen (NIVA), Hydrology Shrinivas Badiger (CISED), David N. Barton (NIVA) Geographical area Printed India NIVA Client(s) Client ref. Norwegian Embassy in India IND 3025 /052 Abstract Malaprabha river basin has been the study area for the development of comprehensive database on the status of water sector and the development of integrated hydro economic model for selected water services. For the purpose of studying the feasibility of Payment for Watershed Services (PWS) to improve water availability, a detailed analysis of the historic hydrologic data is done and a hydro-allocation model is developed using ArcView SWAT (AVSWAT) and MIKE-BASIN models.
    [Show full text]
  • 1. New Mangalore Port Trust Sl. No. National Waterway No. Length
    1. New Mangalore Port Trust Sl. National Waterway No. Length Details of Waterways (KM) No. 1 National Waterway 51 23 Kabini River 2 National Waterway 43 10 Gurupur River 3 National Waterway 52 53 Kali River 4 National Waterway 74 79 Netravathi River 5 National Waterway 90 29 Sharavati River 6 National Waterway 41 112 Ghataprabha River 7 National Waterway 67 94 Malaprabha River 8 National Waterway 104 232 Tungabhadra River 9 National Waterway 21 139 Bheema River 2. Jawaharlal Nehru Port Trust Sl. National Waterway No. Length (KM) Details of Waterways No. 1 National Waterway 10 45 Amba River 2 National Waterway 11 99 Arunavati-Aran River 3 National Waterway 28 45 Dabhol Creek-Vashisti River 4 National Waterway 53 145 Kalyan-Thane-Mumbai Waterway Vasai Creek Ulhas River 5 National Waterway 70 245 Manjara River 6 National Waterway 72 59 Nag River 7 National Waterway 78 262 Penganga-Wardha River 8 National Waterway 85 31 Revdanda Creek- Kundalika River 9 National Waterway 89 46 Bankot Creek – Savitri River 10 National Waterway 100 436 Tapi River 11 National Waterway 109 166 Wainganga-Pranahita River 3. Deendayal Port Trust (Kandla) Sl. National Waterway No. Length Details of Waterways (KM) No. 1. National Waterway 66 248 Mahi River 2. National Waterway 73 227 Narmada River 3. National Waterway 100 436 Tapi River 4. National Waterway 48 590 Jawai-Luni rivers and Rann of Kutch 5. National Waterway 63 327 Luni River 4. Paradip Port Trust Sl. National Waterway No. Length Details of Waterways No. (KM) 1. National Waterway 5 332 Brahmani- Kharsua - Tantighai- PanduaNala- DedheiNala- KaniDhamra- river System, Geonkhali- Charbatia Stretch of East Coast canal, Charbatia- Dhamra Stretch of Matai River and Mahanadi Delta Rivers 2.
    [Show full text]
  • Development of House Boat Facilities Camps on PPP Model at Various
    Sector Specific Inventory & Institutional Strengthening for PPP Mainstreaming - Tourism Department DEVELOPMENT OF HOUSEBOAT FACILITIES ON PUBLIC PRIVATE PARTNERSHIP MODEL AT VARIOUS LOCATIONS IN KARNATAKA PRELIMINARY FEASIBILITY REPORT APRIL 2012 One state. Many worlds. Sector Specific Inventory & Institutional Strengthening for PPP Mainstreaming - Tourism Department DISCLAIMER The information in this Report has been prepared based on information collected from secondary sources. Wherever information was not readily available, reasonable assumptions have been made, in good faith to draw meaningful inferences and these have been mentioned in the respective sections of the report. All such assumptions are subject to further corroboration based on availability of information. The information and analysis presented in this Report is not and does not purport to be comprehensive or to have been independently verified. This report has been prepared by Feedback Infrastructure Private Limited for its client, Infrastructure Development Department (IDD) for its use for furthering the project. No external agency shall use any part of this report without the prior permission from IDD. The information contained in this Report is selective and is subject to updating, expansion, revision and amendment. It does not, and does not purport to, contain all the information that may be required. This Report includes certain statements, estimates, projections and forecasts. Such statements, estimates, projections, targets and forecasts are based on reasonable assumptions made by the management, officer and employees of Feedback Infrastructure Private Limited. Assumptions and the base information on which they are made may or may not prove to be correct. No representation or warranty is given as to the reasonableness of forecasts or the assumptions on which they may be based and nothing in this Report is, or should be relied on as, a promise, representation or warranty.
    [Show full text]