Ministry of Road Transport & Highways Government of India

Total Page:16

File Type:pdf, Size:1020Kb

Ministry of Road Transport & Highways Government of India Ministry of Road Transport & Highways Government of India (1) Consult ancy Se rvices for preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of Stretch from Chatarpur (NH- 98) Japla - Dangwa - Navinagar - Barun (NH-2) (Length in JH = 38 km, in Bihar = 34 km) (2) Daltonganj (On NH-39, new) - Sagalim - Tarhasi - Manatu - Chak - Raniganj - Imamganj - Sherghati (On NH-2 in Bihar) (Length in Jharkhand = 72 km, Bihar = 58 km) (3) Stretch of Gaya- Panchanpur- Daudnagar-Nasariganj-Bikramganj-Dawath-Maliyabagh-Nawanagar- Dumrawn of NH-120 in Bihar on EPC Mode .DPR/BIHAR/NHD-MOD-PAT/04 REQUEST FOR PROPOSAL (RFP) December 2016 MORT&H through Chief Engineer ( N.H Wing), Road Construction Department, Govt. of Bihar, Patna. 1 2 INDEX Sl. No. Content PageNo. s 1 Notice Inviting Tender (NIT) As per Orignal NIT 3 2 Letter of Invitation 4-18 3 Annex -I:Listof Projects along with Package Nos. 19 4 Annex-II: Procedure of Assessment of Least Cost to MORT&H under special circumstances 20-25 5 Data Sheet 26-36 6 Appendix-I: Terms of Reference 37-85 7 Supplement-I: Additional Requirements for Hill Roads 86-90 8 Supplement-II: Additional Requirements for Bridges 91-93 9 Supplement–III: Additional requirement for safety audit 94-98 10 Enclosure-I: Manning Schedule 99 11 Enclosure-II: Qualification Requirements of Key Personnel 100-107 12 Enclosure-III: Schedule for Submission of Reports and Documents 108-109 13 Appendix–II: Formats for Eligibility 110-115 14 Appendix-III: Formats for Technical Proposals 116-129 15 Appendix-IV: Formats for Financial Proposals 130-139 16 Appendix-V: Detailed Evaluation Criteria 140-158 17 Appendix-VI: Draft Contract Agreement 159-203 3 Ministry of Road Transport &Highways Government of India NOTICE INVITING TENDER(NIT) MORT&H through Chief Engineer ( N.H Wing), Road Construction Department, Govt. of Bihar,Patna. has been assigned the work of preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder (1) Stretch from Chatarpur (NH-98) Japla - Dangwa - Navinagar - Barun (NH-2) (Length in JH = 38 km, in Bihar = 34 km) (2)Daltonganj (On NH-39, new) - Sagalim - Tarhasi - Manatu - Chak - Raniganj - Imamganj - Sherghati (On NH-2 in Bihar) (Length in Jharkhand = 72 km, Bihar = 58 km) (3)Stretch of Gaya- Panchanpur- Daudnagar-Nasariganj-Bikramganj-Dawath-Maliyabagh-Nawanagar-Dumrawn of NH- 120 in Bihar on EPC Mode. DPR/BIHAR/NHD-MOD-PAT/04 as per Annexure I ). 2. Proposals are hereby invited from eligible Consultants for preparation of Detailed Project Report of 1)Stretch from Chatarpur (NH-98) Japla - Dangwa - Navinagar - Barun (NH-2) (Length in JH = 38 km, in Bihar = 34 km) (2)Daltonganj (On NH-39, new) - Sagalim - Tarhasi - Manatu - Chak - Raniganj - Imamganj - Sherghati (On NH-2 in Bihar) (Length in Jharkhand = 72 km, Bihar = 58 km) (3)Stretch of Gaya- Panchanpur- Daudnagar-Nasariganj-Bikramganj-Dawath-Maliyabagh-Nawanagar-Dumrawn of NH- 120 in Bihar on EPC Mode. The Letter of Invitation (LOI) and Terms of Reference (ToR) including Request for Proposal (RFP) is available online on e-tender portal of MORT&H https://morth.eproc.in. The document can also be downloaded from MoRT&H https://morth.eproc.in Cost of the Document in the form of a Non-refundable document fee of Rs.5,000 (Rupees Five Thousand only) in the form of Demand Draft favouring ‘Regional Pay & Accounts Officer, Patna” and payable at Patna must be furnished in a separate envelop while submitting the proposal. 3. The RFP has also been uploaded on “INFRACON” (www.infracon.nic.in).As such before submitting the proposal the Consultant shall mandatorily register and enlist themselves (thefirmandallkey personnel),on the MoRTH portal“ INFRACON”and furnish registration details along with its RFP.Acopy of Infracon Operation Procedure is also enclosed for bidder’s reference. 4. All the bidders registered on Infracon shall form aTeam on Infracon and which would be assigned unique InfraconTeam ID.Bidders while submitting the proposal shall quote the InfraconTeamID. 5. Bid must be submitted online at e-tenderportal of MORT&Hhttps://morth.eproc.in on or before 07.01.2017(15:00hrs .) 6. The following schedule is to befollowed forthis assignment: i) Dead line for downloading of bid 06.01.2017(17:00hrs .) ii)Last date for submission of queries: 26.12.2016(15:00hrs .) 4 iii) Prebid meeting:30.12.2016(11:30hrs .) iv) Deadline for Submission of bids : 07.01.2017(15:00hrs.) Yours sincerely, Executive Engineer NH Division Gulzarbagh , Patna Tel: 9470001312 Fax: <Fax> E-mail:[email protected] Website: <Website> 5 Letter of Invitation(LOI) No. DPR/BIHAR/NHD-MOD-PAT/04 Dated: 05-12-2016 Dear Sir, (1) Sub: Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of Stretch from Chatarpur (NH-98) Japla - Dangwa - Navinagar - Barun (NH-2) (Length in JH = 38 km, in Bihar = 34 km) (2) Daltonganj (On NH-39, new) - Sagalim - Tarhasi - Manatu - Chak - Raniganj - Imamganj - Sherghati (On NH-2 in Bihar) (Length in Jharkhand = 72 km, Bihar = 58 km) Stretch of Gaya- Panchanpur- Daudnagar-Nasariganj-Bikramganj-Dawath-Maliyabagh-Nawanagar-Dumrawn of NH- 120 in Bihar on EPC Mode .DPR/BIHAR/NHD-MOD-PAT/04 1. Introduction 1.1 The MORT&H through Chief Engineer ( N.H Wing), Road Construction Department, Govt. of Bihar, Patna. has been entrusted with the assignment (4) of< preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of Stretch from Chatarpur (NH-98) Japla - Dangwa - Navinagar - Barun (NH-2) (Length in JH = 38 km, in Bihar = 34 km) (5) Daltonganj (On NH-39, new) - Sagalim - Tarhasi - Manatu - Chak - Raniganj - Imamganj - Sherghati (On NH-2 in Bihar) (Length in Jharkhand = 72 km, Bihar = 58 km) Stretch of Gaya- Panchanpur- Daudnagar-Nasariganj-Bikramganj-Dawath-Maliyabagh-Nawanagar-Dumrawn of NH- 120 in Bihar on EPC Mode .DPR/BIHAR/NHD-MOD-PAT/04 MORT&H through Chief Engineer ( N.H Wing), Road Construction Department, Govt. of Bihar, Patna now invites proposal from Technical consultants for carrying out detailed project report as per details given in Annexure-1. 1.2 A brief description of the assignment and its objectives are given in the Appendix-I, “Terms of Reference”. 1.3 The The MORT&H through Chief Engineer ( N.H Wing), Road Construction Department, Govt. of Bihar, Patna invites Proposals (the “Proposals”) through e-tender (on-line bid submission) for selection of Technical Consultant (the “Consultant ”)who shall prepare DPR . A Consultant with “a Particular Team” may submit proposals for more than one package. However, a Consultant is not allowed to bid for a package with more than one team. For the sake of clarity, it is mentioned that one consultant can not submit two proposals / bids for the same package. A consultant (either as sole or as in JV / Association) can be awarded only upto 2 packages. Consultants are hereby invited to submit proposals in the manner as prescribed in the RFP. A Consultant with “a Particular Team” may submit only one “proof of eligibility (Part1) ”and“ Technical Proposal (Part 6 II)” for any number of packages applied for by them. However, the packages for which a Consultant with “a Particular Team” applies should be clearly mentioned. Financial proposal for each package are to be submitted separately. Financial proposal are only to be submitted online and no hard copy of the financial proposal should be submitted. The most preferred bidder (H-1) for each package would be determined on the basisof Quality and Costas mentioned in the RFP. Award of work to a Consultant with “a Particular Team” either Association JV / Association shall be limited to one package only. Incase, a Consultant with “a Particular Team” turns out to be the most preferred bidder (H-1) in more than one package, the package which is to be awarded to this Consultant with “a Particular Team” shall be determined on the basis of least cost to MORT&H considering the financial quote of H-1 bidder and H-2 bidder limited to those packages, which shall be worked out as per the procedure given in the RFP. The consultants are hereby invited to submit proposals in the manner prescribed in the RFP. 1.4 The consultants shall submit proposals either insole capacity or in JV or in Association. Joint Venture/Association shall not have more than two firms. Any entity which has been barred by the Ministry of Road Transport and Highways (MORTH) or its implementing agencies for the works of Expressways, National Highways, ISC and EI Works and the bar subsists as on the date of application would not be eligible to submit the bid, either individually or as a member of a Joint Venture. 1.5 To obtain first hand information on the assignment and on the local conditions, the consultants are encouraged to pay a visit to the client, local State PWD sand the project site before submitting a proposal and attend a pre – proposal conference. They must fully inform them selves of local and site conditions and take them in to account in preparing the proposal. 1.6 Financial Proposals will be opened only for the firms found to be eligible and scoring qualifying marks in accordance with Para-5 thereof. The consultancy services will be awarded to the highest ranking consultant on the basisof Qualityand Cost. 1.7 Please note that (i) costs of preparing the proposal and of negotiating the contract, including visits to the Client, etc., are not reimbursable as a direct cost of the assignment; and (ii) Client is not bound to accept any of the proposals submitted and reserve the right to reject any or all proposals with out assigning any reasons.
Recommended publications
  • State District Name of Bank Bank Branch/ Financial Literacy Centre
    State District Name of Bank Branch/ Address ITI Code ITI Name ITI Address State District Phone Email Bank Financial Category Number Literacy Centre Bihar Araria State Araria Lead Bank Office, PR10000055 Al-Sahaba Industrial P Alamtala Forbesganj Bihar Araria NULL Bank of ADB Building, Training Institute India Araria, Pin- 854311 Bihar Arwal PNB ARWAL ARWAL PR10000083 Adarsh ITC P Umerabad Bihar Arwal NULL Bihar Arwal PNB ARWAL ARWAL PR10000284 Shakuntalam ITC P Prasadi English Bihar Arwal NULL Bihar Arwal PNB ARWAL ARWAL PR10000346 Aditya ITC P At. Wasilpur, Main Road, Bihar Arwal NULL P.O. Arwal, Bihar Arwal PNB ARWAL ARWAL PR10000396 Vikramshila Private P At. Rojapar, P.O. Arwal Bihar Arwal NULL ITI Bihar Arwal PNB ARWAL ARWAL PR10000652 Ram Bhaman Singh P At-Purani Bazar P.o+P.S- Bihar Arwal NULL Private ITI Arwal Bihar Arwal PNB ARWAL ARWAL PR10000677 Sukhdeo Institute Of P Kurtha, Arwal Bihar Arwal NULL Tecnology Private ITI, Bihar Arwal PNB ARWAL ARWAL PR10000707 Dr. Rajendra Prasad P Mubarkpur, Kurtha Arwal Bihar Arwal NULL Private ITI, Bihar Aurangabad PUNJAB DAUDNAGAR DAUDNAGAR PR10000027 New Sai Private ITI- P Aurangabad Road, Bihar Aurangabad NULL NATIONA Bhakharuan More, , Tehsil- L BANK Daudnagar , , Aurangabad - 824113 Bihar Aurangabad PUNJAB AURANGABAD AURANGABAD PR10000064 Adharsh Industrial P Josai More Udyog Bihar Aurangabad NULL NATIONA Training Centre Pradhikar Campus L BANK Bihar Aurangabad MADHYA DAUDNAGAR DAUDNAGAR PR10000108 Sardar Vallabh Bhai P Daudnagar Bihar Aurangabad NULL BIHAR Patel ITC, Daudnagar GRAMIN BANK Bihar Aurangabad MADHYA DAUDNAGAR DAUDNAGAR PR10000142 Adarsh ITC, P AT-,Growth centre ,Jasoia Bihar Aurangabad NULL BIHAR Daudnagar More Daudnagar GRAMIN BANK Bihar Aurangabad PUNJAB RATANUA RATANUA PR10000196 Progresive ITC P At-Growth Center Josia Bihar Aurangabad NULL NATIONA More L BANK Bihar Aurangabad MADHYA DAUDNAGAR DAUDNAGAR PR10000199 Arya Bhatt ITC P Patel Nagar, Daud Nagar Bihar Aurangabad NULL BIHAR GRAMIN BANK Bihar Aurangabad PUNJAB OLD GT RD.
    [Show full text]
  • Annexure-V State/Circle Wise List of Post Offices Modernised/Upgraded
    State/Circle wise list of Post Offices modernised/upgraded for Automatic Teller Machine (ATM) Annexure-V Sl No. State/UT Circle Office Regional Office Divisional Office Name of Operational Post Office ATMs Pin 1 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA PRAKASAM Addanki SO 523201 2 Andhra Pradesh ANDHRA PRADESH KURNOOL KURNOOL Adoni H.O 518301 3 Andhra Pradesh ANDHRA PRADESH VISAKHAPATNAM AMALAPURAM Amalapuram H.O 533201 4 Andhra Pradesh ANDHRA PRADESH KURNOOL ANANTAPUR Anantapur H.O 515001 5 Andhra Pradesh ANDHRA PRADESH Vijayawada Machilipatnam Avanigadda H.O 521121 6 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA TENALI Bapatla H.O 522101 7 Andhra Pradesh ANDHRA PRADESH Vijayawada Bhimavaram Bhimavaram H.O 534201 8 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA VIJAYAWADA Buckinghampet H.O 520002 9 Andhra Pradesh ANDHRA PRADESH KURNOOL TIRUPATI Chandragiri H.O 517101 10 Andhra Pradesh ANDHRA PRADESH Vijayawada Prakasam Chirala H.O 523155 11 Andhra Pradesh ANDHRA PRADESH KURNOOL CHITTOOR Chittoor H.O 517001 12 Andhra Pradesh ANDHRA PRADESH KURNOOL CUDDAPAH Cuddapah H.O 516001 13 Andhra Pradesh ANDHRA PRADESH VISAKHAPATNAM VISAKHAPATNAM Dabagardens S.O 530020 14 Andhra Pradesh ANDHRA PRADESH KURNOOL HINDUPUR Dharmavaram H.O 515671 15 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA ELURU Eluru H.O 534001 16 Andhra Pradesh ANDHRA PRADESH Vijayawada Gudivada Gudivada H.O 521301 17 Andhra Pradesh ANDHRA PRADESH Vijayawada Gudur Gudur H.O 524101 18 Andhra Pradesh ANDHRA PRADESH KURNOOL ANANTAPUR Guntakal H.O 515801 19 Andhra Pradesh ANDHRA PRADESH VIJAYAWADA
    [Show full text]
  • Pradhan Mantri Gram Sadak Yojana CUCPL - Comprehensive Up-Gradation Cum Consolidation Priority List
    Pradhan Mantri Gram Sadak Yojana CUCPL - Comprehensive Up-gradation cum Consolidation Priority List State : Bihar District : All Districts Block : All Blocks Sr.No. State District Block Plan CN Plan Road Name Plan Road Route Educati Medical Veterin Transp Market Administ Populatio Total Score Per Avg PCI Road No. Length Priority onal Faciliti ary ort and Faciliti rative n Score Unit Services es Facilitie Commu es Centres Length s nicatio n Infrastr ucture 1 Bihar Arwal Arwal MRL01 Walidad, T01 To Khamhaini 10.835 M 12 0 0.00 0.00 0.00 1 68 81.00 7.48 1.00 2 Bihar Arwal Banshi MRL02 Manjhiyama to Khatangi 9.465 M 16 8 0.00 9.00 0.00 1 77 111.00 11.73 1.00 Surajpur 3 Bihar Arwal Banshi MRL03 Kharasi to Belaura 14.943 M 22 8 0.00 3.00 0.00 1 89 123.00 8.23 1.00 Surajpur 4 Bihar Arwal Banshi MRL01 Khatangi senari RD to Mobarakpur 10.860 M 9 4 0.00 3.00 0.00 1 42 59.00 5.43 1.00 Surajpur 5 Bihar Arwal Kaler MRL01 Sohasa Road L037 To Masadpur 21.676 M 10 6 0.00 6.00 0.00 1 54 77.00 3.55 1.00 6 Bihar Arwal Karpi MRL02 Imamganj Deokund Road,T04 To Jonha 7.365 M 22 8 3.00 11.00 9.00 2 91 146.00 19.82 1.00 7 Bihar Arwal Karpi MRL01 Karpi Barahmile Road, T03 To Salarpur 12.365 M 18 6 0.00 9.00 7.00 2 104 146.00 11.81 1.00 8 Bihar Arwal Karpi MRL03 Arwal Jehanabad Road, T02 To Aiyara 16.787 M 7 0 0.00 0.00 7.00 1 52 67.00 3.99 1.00 9 Bihar Arwal Kurtha MRL02 Salarpur L042, To Dhamaul 15.238 M 9 4 0.00 3.00 7.00 2 88 113.00 7.42 1.00 10 Bihar Arwal Kurtha MRL01 Pinjrawan to Manepaker 9.456 M 8 2 0.00 0.00 0.00 1 55 66.00 6.98 1.00 11 Bihar Aurangabad
    [Show full text]
  • Aurangabad, Bihar
    DISTRICT HEALTH SOCIETY AURANGABAD , B IHAR District Health Action Plan 2012-2013 Prepared By: Sagar (District Programme Manager) Ashwini Kumar (District Accounts Manager) Rajeev Ranjan (District Monitoring & Evaluation Officer) B.B. Vikrant (District Planning Coordinator) Rahul Kumar Singh (District Community Mobilizer, ASHA) Under the able Guidance of: Dr. Parshuram Bharti Mr. Abhay Kumar Singh (IAS) Civil Surgeon cum Member Secretary District Magistrate cum Chairman District Health Society, Aurangabad District Health Society, Aurangabad District Health Society, Aurangabad Page -1- Table of contents Foreword Table of Contents Topics Page CHAPTER 1 INTRODUCTION 01-05 CHAPTER 2 DISTRICT PROFILE 06-14 Introduction 06 Geography 06 Demography 07 Physiography 07 History 08 Administrative Setup 09-11 Communication Map of the district 12 Health Facilities Map of the district 13 Population Details 14 CHAPTER 3 SITUATIONAL ANALYSIS 15-29 Gaps in Infrastructure 15-18 Aurangabad at a Glance 19 Health Facilities 20 Human Resource 21-22 ASHA Status 23 MAMTA Status 24 Bed Availability 25 Basic Facilities at Rural Institutions 26 District Hospital 27 Indicators of RCH 28 CHAPTER 4 SETTING OBJECTIVES AND SUGGESTED 30-36 PLAN OF ACTION Introduction 30 Targeted Objectives and Suggested Strategies 30-36 (Maternal Health, FRUs, RCH Services, VHSND, JBSY, IMNCI, Caesarean, JSY, Institutional Delivery, NPSGK, NRC) CHAPTER 5 BUDGET 37 -48 District Health Society, Aurangabad Page -2- Foreword It is very rightly said that Health is Wealth. The Importance of Health in the process of economic and social development and improving the quality of life of our citizens, cannot be denied. Recognizing the importance of Health, the Government of India has launched the National Rural Health Mission on 12 th April 2005 in India.
    [Show full text]
  • S No Atm Id Atm Location Atm Address Pincode Bank
    S NO ATM ID ATM LOCATION ATM ADDRESS PINCODE BANK ZONE STATE Bank Of India, Church Lane, Phoenix Bay, Near Carmel School, ANDAMAN & ACE9022 PORT BLAIR 744 101 CHENNAI 1 Ward No.6, Port Blair - 744101 NICOBAR ISLANDS DOLYGUNJ,PORTBL ATR ROAD, PHARGOAN, DOLYGUNJ POST,OPP TO ANDAMAN & CCE8137 744103 CHENNAI 2 AIR AIRPORT, SOUTH ANDAMAN NICOBAR ISLANDS Shop No :2, Near Sai Xerox, Beside Medinova, Rajiv Road, AAX8001 ANANTHAPURA 515 001 ANDHRA PRADESH ANDHRA PRADESH 3 Anathapur, Andhra Pradesh - 5155 Shop No 2, Ammanna Setty Building, Kothavur Junction, ACV8001 CHODAVARAM 531 036 ANDHRA PRADESH ANDHRA PRADESH 4 Chodavaram, Andhra Pradesh - 53136 kiranashop 5 road junction ,opp. Sudarshana mandiram, ACV8002 NARSIPATNAM 531 116 ANDHRA PRADESH ANDHRA PRADESH 5 Narsipatnam 531116 visakhapatnam (dist)-531116 DO.NO 11-183,GOPALA PATNAM, MAIN ROAD NEAR ACV8003 GOPALA PATNAM 530 047 ANDHRA PRADESH ANDHRA PRADESH 6 NOOKALAMMA TEMPLE, VISAKHAPATNAM-530047 4-493, Near Bharat Petroliam Pump, Koti Reddy Street, Near Old ACY8001 CUDDAPPA 516 001 ANDHRA PRADESH ANDHRA PRADESH 7 Bus stand Cudappa, Andhra Pradesh- 5161 Bank of India, Guntur Branch, Door No.5-25-521, Main Rd, AGN9001 KOTHAPET GUNTUR 522 001 ANDHRA PRADESH ANDHRA PRADESH Kothapeta, P.B.No.66, Guntur (P), Dist.Guntur, AP - 522001. 8 Bank of India Branch,DOOR NO. 9-8-64,Sri Ram Nivas, AGW8001 GAJUWAKA BRANCH 530 026 ANDHRA PRADESH ANDHRA PRADESH 9 Gajuwaka, Anakapalle Main Road-530026 GAJUWAKA BRANCH Bank of India Branch,DOOR NO. 9-8-64,Sri Ram Nivas, AGW9002 530 026 ANDHRA PRADESH ANDHRA PRADESH
    [Show full text]
  • Ministry of Road Transport & Highways
    Ministry of Road Transport & Highways Government of India Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of (i) Stretch from Bihar- Jharkhand Border – Raniganj – Imamganj – Sherghati of Daltonganj (on NH-39, new) – Sagalim – Tarhasi – Manatu – Chak - Raniganj – Imamganj – Sherghati road & (ii) stretch from Dangwa (Bihar-Jharkhand Border) – Nabinagar – Barun (NH-02) of Chhatarpur (NH-98) – Japla – Dangwa - Nabinagar – Barun (NH-02) road in Bihar on EPC Mode REQUEST FOR PROPOSAL (RFP) (International Competitive Bidding) July, 2016 1 INDEX Sl. No. Contents Page No. 1 Notice for inviting the proposals for Consultancy services 1 2 Letter of Invitation 2-15 3. Annex - I : List of Project along with Package Nos. 16 4. Data Sheet 17-22 5. Appendix - I : Terms of Reference 23-66 6. Supplement -I: Additional Requirements for Hill Roads 67-69 7. Supplement - II: Additional Requirements for Bridges 70-74 8 Supplement – III: Additional requirement for safety audit 75-77 9. Enclosure - I : Manning Schedule 78 10 Enclosure - II : Qualification Requirements of Key Personnel 79-82 11. Enclosure - III : Schedule for Submission of Reports and Documents 83 12. Appendix - II : Formats for Proof of Eligibility 84-90 13. Appendix - III : Formats for Technical Proposals 91-103 14. Appendix - IV : Formats for Financial Proposals 104-110 15. Appendix - V : Draft Contract Agreement 111-148 2 Ministry of Road Transport & Highways Government of India MORT&H intends to take up the Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of (i) Stretch from Bihar- Jharkhand Border – Raniganj – Imamganj – Sherghati of Daltonganj (on NH-39, new) – Sagalim – Tarhasi – Manatu – Chak - Raniganj – Imamganj – Sherghati road & (ii) stretch from Dangwa (Bihar-Jharkhand Border) – Nabinagar – Barun (NH-02) of Chhatarpur (NH-98) – Japla – Dangwa - Nabinagar – Barun (NH-02) road in Bihar on EPC / PPP Mode.
    [Show full text]
  • Old College New College Colle Attach Ge College Name Course Hon's Subject Colleg Attach College Name
    OLD COLLEGE NEW COLLEGE COLLE ATTACH GE COLLEGE NAME COURSE HON'S SUBJECT COLLEG ATTACH COLLEGE NAME 208 PAYHARI MAHARAJ JI COLLEGE, ARA, BHOJPUR B.A. PASS/HON'S 201 HARPRASAD DAS JAIN COLLEGE, BHOJPUR 208 PAYHARI MAHARAJ JI COLLEGE, ARA, BHOJPUR B.COM PASS/HON'S 201 HARPRASAD DAS JAIN COLLEGE, BHOJPUR 208 PAYHARI MAHARAJ JI COLLEGE, ARA, BHOJPUR B.SC PASS/HON'S 201 HARPRASAD DAS JAIN COLLEGE, BHOJPUR 208 PAYHARI MAHARAJ JI COLLEGE, ARA, BHOJPUR B.A. HOME SCIENCE 205 MAHANTH MAHADEVANAND MAHILA MAHAVIDYALYA, ARA 208 PAYHARI MAHARAJ JI COLLEGE, ARA, BHOJPUR B.A. ANCIENT HISTORY 302 SHRI SHANKAR COLLEGE, SASARAM, ROHTAS 208 PAYHARI MAHARAJ JI COLLEGE, ARA, BHOJPUR B.A. SOCIOLOGY 302 SHRI SHANKAR COLLEGE, SASARAM, ROHTAS 219 KUNWER SINGH COLLEGE ,ARA B.A. HOME SCIENCE 205 MAHANTH MAHADEVANAND MAHILA MAHAVIDYALYA, ARA 219 KUNWER SINGH COLLEGE ,ARA B.A. SOCIOLOGY 302 SHRI SHANKAR COLLEGE, SASARAM, ROHTAS 219 KUNWER SINGH COLLEGE ,ARA B.A. PASS/HON'S 202 MAHARAJA COLLEGE , ARA 219 KUNWER SINGH COLLEGE ,ARA B.SC PASS/HON'S 202 MAHARAJA COLLEGE , ARA 219 KUNWER SINGH COLLEGE ,ARA B.COM PASS/HON'S 203 S.B. COLLEGE, ARA 214 S.T.S.M.COLLEGE PANWARI,BHOJPUR B.A. HOME SCIENCE 205 MAHANTH MAHADEVANAND MAHILA MAHAVIDYALYA, ARA 214 S.T.S.M.COLLEGE PANWARI,BHOJPUR B.A. L.S.W. 303 SHERSHAH COLLEGE SASARAM ,ROHTAS 214 S.T.S.M.COLLEGE PANWARI,BHOJPUR B.A. SOCIOLOGY 302 SHRI SHANKAR COLLEGE, SASARAM, ROHTAS 214 S.T.S.M.COLLEGE PANWARI,BHOJPUR B.A. PRAKRIT 203 S.B.
    [Show full text]
  • School with School Code.Xlsx
    blkname schcd schname schmgt_desc schcat_desc Department SASARAM 10320100101 P S BANSA Primary only with grades 1 to 5 of Education Private SASARAM 10320100102 DEDICATED PUBLIC SCHOOL Secondary with grades 1 to 10 Unaided Department SASARAM 10320100301 P S DURGAPUR Primary only with grades 1 to 5 of Education Department SASARAM 10320100401 M S AMRA TALAB Upper Primary with grades 1 to 8 of Education Private SASARAM 10320100402 JEMS D . C . C SCHOOL KARBANDIYA Upper Primary with grades 1 to 8 Unaided Private SASARAM 10320100403 R.B.S PUBLIC SCHOOL Upper Primary with grades 1 to 8 Unaided Un- SASARAM 10320100404 DAYA NIDHI INTERNATIONAL SCHOOL Upper Primary with grades 1 to 8 Recognised THE MANAV BHARTI PUBLIC SCHOOL Un- SASARAM 10320100405 Upper Primary with grades 1 to 8 AMRA TALAB Recognised Un- SASARAM 10320100406 J.P MISSION SCHOOL Upper Primary with grades 1 to 8 Recognised NEW BAL VIKASH ENGLISH SCHOOL Un- SASARAM 10320100407 Upper Primary with grades 1 to 8 AMARA Recognised Department SASARAM 10320100501 URDU P S AMARI Primary only with grades 1 to 5 of Education Department SASARAM 10320100502 NEW P S AMARI Primary only with grades 1 to 5 of Education Department SASARAM 10320100601 UPGRADED H S DAWANPUR (2013-14) Higher Secondary with grades 1 to 12 of Education Un- SASARAM 10320100602 BABA KIDS GARDEN SCHOOL Upper Primary with grades 1 to 8 Recognised Department SASARAM 10320100702 NEW P S KARMA Primary only with grades 1 to 5 of Education Department SASARAM 10320101001 P S ADAMAPUR Primary only with grades 1 to 5 of Education
    [Show full text]
  • Adolescents Health and Development Program in Bihar
    Request for Proposal CSO/NGO partner agency Project Name: “Adolescents Health and Development Program in Bihar Engender Health Deadline for receipt of proposals: 10th September 2020 1 Contents 1. RFP NOTICE ................................................................................................................. 1 2. OUR MISSION ............................................................................................................... 3 3. ORGANIZATIONAL BACKGROUND ............................................................................. 4 4. PROJECT GOALS AND OBJECTIVES ......................................................................... 4 5. SCOPE OF WORK ........................................................................................................ 4 6. SUBMISSION OF PROPOSALS .................................................................................... 5 7. OTHER REQUIREMENTS ............................................................................................. 6 8. EVALUATION OF THE PROPOSAL .............................................................................. 6 9. DISCUSSIONS AND AWARD ........................................................................................ 7 10. OFFER VERIFICATION ............................................................................................. 7 11. FALSE STATEMENTS IN OFFER .............................................................................. 7 12. RESERVED RIGHTS ................................................................................................
    [Show full text]
  • List of PMGSY Works Pending Due to Forest Land Road Sanctione Road Length Expendit District Name of Package Sanctione Work Stage of Sr.No
    List of PMGSY Works pending due to Forest Land Road Sanctione Road Length Expendit District Name of Package Sanctione Work Stage of Sr.No. Block Name Road Name Length d Cost Completed ure Contractor Name Remarks Name Division No. d Year Type Progress (Kms) (in Lakh) Till Date (in Lakh) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 Aurangabad Aurangabad Kutumba BR02R593 2016-17 ROAD L081-T03 DEO 1.7 98.28 1.7 30.29 Surface SRI RAMANDAN 700 mt Forest Bat-I AMBA ROAD Course / BT SINGH [15 Dec 2016] Land TO CHANDAUL Stage (TRACK81) 2 Aurangabad Aurangabad Deo BR02R588 2016-17 ROAD L059-T04 TO 3.05 158.82 1.5 26.64 Surface SRI RAMANDAN 1.55 Km Forest Bat-I TATARIYA Course / BT SINGH [15 Dec 2016] Land (TRACK59) Stage 3 Aurangabad Aurangabad Deo BR02R586 2016-17 ROAD T09-DEO TO 8.18 449.51 7 243.16 Surface ARVIND SINGH [06 1.18 km Forest Bat-I BHALUAHI Course / BT Jan 2017] Land (VR9) Stage 4 Aurangabad Aurangabad Madanpur BR02R619 2016-17 ROAD L115-T05 12.05 601.21 2 0 Surface SHARWAN & 10.05 Km Forest Bat-I Chilami To Course / BT SUNNY Land Pachrukhiya Stage CONSTRUCTION (TRACK115) P.V.T L.T.D [06 Jan 2017] 5 Gaya Gaya Bodh Gaya BR12R292 2013-14 ROAD L073-Lalpur To 1.617 63.85 0 0 No Progress Forest Land in Batch-I Bangal Bigha Entry Full length (VR73) 6 Gaya Gaya Tankuppa BR12R373 2013-14 ROAD L022-Chamukhap 1.77 68.18 0 15.06 Pending - M/S AADARSH Forest land-1.20 Batch-I road to Khalari Forest CONSTRUCTION Km (TRACK22) Clearance [08 Jan 2014] 7 Gaya Gaya Fatehpur BR-12R- 2013-14 ROAD T04 - 18.794 1,100.02 0 556.5 Pending - M/S Kalyani Forest land-6.00 484 Batch-II FatehpurRajauli Forest Construction [10 Jan Km Road to Patwansh Clearance 2015], M/S Kalyani (VR4) Construction [24 Dec 2014] 8 Gaya Neemchak Manpur BR12R567 2013-14 ROAD L046 - Amra T04 2.035 83.34 0 58.07 Pending - Rajeev Kumar Singh Forest Land in Bathani Batch-II To Bagahi Kala Forest [19 Jun 2014] 536 M length H.
    [Show full text]
  • TACR: India: Preparing the Bihar State Highways II Project
    Technical Assistance Consultant’s Report Project Number: 41629 October 2010 India: Preparing the Bihar State Highways II Project Prepared by Sheladia Associates, Inc. Maryland, USA For Road Construction Department Government of Bihar This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. (For project preparatory technical assistance: All the views expressed herein may not be incorporated into the proposed project’s design. TA No. 7198-INDIA: Preparing the Bihar State Highways II Project Final Report TTTAAABBBLLLEEE OOOFFF CCCOOONNNTTTEEENNNTTTSSS 1 INTRODUCTION .............................................................................................................................. 8 1.1 INTRODUCTION .............................................................................................................................. 8 1.2 PROJECT APPRECIATION............................................................................................................. 8 1.2.1 Project Location and Details 9 1.2.2 Road Network of Bihar 11 1.3 PERFORMANCE OF THE STUDY ................................................................................................ 14 1.3.1 Staff Mobilization 14 1.3.2 Work Shop 14 1.4 STRUCTURE OF THE FINAL REPORT ....................................................................................... 14 2 SOCIO ECONOMIC PROFILE OF PROJECT AREA ..................................................................
    [Show full text]
  • Annual Report 2017-18
    lqjkt At &PO: KARGHAR Distt.: ROHTAS STATE: BIHAR PIN: 821107 Phone : 06184-228416,222319 Email : [email protected] [email protected] Website: www.suraje.org Annual Report -2017-18 SURAJE Programs and Activities A. Child Rights, Child Care, Education and Protection: 1. Child Rights, Care and Protection: We live in present. It is only ‘Present’ who makes future bright and past-memorable. ‘Stacia Tauscher‟ says - “We worry about what a child will become tomorrow, yet we forget that he is someone today.” We strongly advocate our thinking that if we want a Nation to be Educated, Healthy, Prosperous and Peaceful ,we need care and protect a child from all types of Exploitation and leave free in a child friendly environment. Juvenile Justice ( Care and Protection of Children)Act is a best weapon to create a child friendly environment –who will open the door of Suraj and Gram Swaraj. So,we do advocacy and awareness among social influencers, Policy Makers and executive Officers along with Juvenile Justice system. 2. Work Oriented Education to Rural Girls: Since inception of the organization this activity is in continuous run. Our stand on education is very clear. We want equal and quality of education for all. Hence we are not providing school education but we want to people’s movement for change in education system and want to convince policy makers to think on this. We think that quality of education is only remedy of development and the development established by the dint of education will be sustainable. i. Secondary School Education: This year we admitted 45 students only in 9th Class and run 9th and 10th Class.
    [Show full text]