Release / Transfer of Fund Under BADP During 2018-19 Through PFMS

Total Page:16

File Type:pdf, Size:1020Kb

Release / Transfer of Fund Under BADP During 2018-19 Through PFMS GOVERNIVENT OF ARUNACHAL PRADESH FINANCE, PLANNING & INVESTIVIENT DEPARTMENT CIVIL SECRETARIAT : ITANAGAR No.pD/BADP-17 t 2017-18lOctl1 Dated ltanagar the 8th October,2018 To The Deputy Commissioner, West Kameng / East Kameng / Upper Subansiri / Kurung Kumey / West Siang / Upper Siang / Dibang Valley / Anjaw / Tirap and Longding. Arunachal Pradesh. Sub : Release / Transfer of fund under BADP during 2018-19 through PFMS. Sir, I am directed to convey the approval for placement of Rs. 908.28 lakh (Rupees Nine Crore Eight Lakh Twenty Eight Thousand) only under BADP during 2018-19 through PFIVIS for implementation of the approved BADP schemes for the year 20'17-18 and 2018'19. 2. The district wise details of fund to be transferred to the respective bank accounts of the concerned districts are given below :- (Rs. in lakh) SI Name of the BADP Bank Account Details Fund recommended for No District Release / transfer I West Kameng A/C No.36726031121, SBl, Bomdila 149.755 Branch, Code No.001394; IFSC code = SB1N0001394; MICR code = 784002518 2 East Kameng A/C No.36725252777, SBl, Seppa 126 25 Branch, Code No.005738; IFSC code = S81N0005738; MICR code = 784002527 3 Kurung Kumey A/C No.368877 1 1 47 4, SBl, Koloriang 80.00 Branch, Code No.011622; IFSC code = S81N0011622; MICR code = 791002504 4 Upper Subansiri A/C No.36724850653, SBl, Daporijo 25.00 Branch, Code No.005818; IFSC code = S81N0005818; IVICR code = 787002504 5 West Siang A/C No.36880981221, SBl, Aalo Branch, 20.00 Code No.001677; IFSC code = S81N0001677; MICR code = 787002501 6 Upper Siang A/G No.36812207 496, SBl, Yingkiong 1'16.755 Branch, Code No.007228; IFSC code = S81N0007228; MICR code = 787002515 7 Dibang Valley A/C No.35595313776, SBl, Anini Branch, 155.765 Code No.009115; IFSC code = sBtN00091 15; MICR code = 786002501 8 Anjaw A/C No.36782684299, SBl, Hawai 70.00 Branch, Code No.015393; IFSC code = SBlN001 5393; tMICR code 786002536 9 Tirap A/C No.36875006793, SBl, Khonsa 119.755 Branch, Code No.001584; IFSC code = S81N0001584; MICR code = 786002519 10 Longding A/C No.36844163628, SBl, Longding 45.00 Branch, Code No.006013; IFSC code = S81N0006013; tt/lCR code = 78600251 9 Grand Total = 908.28 4. The details of block / schemes against which funds are now transferred is given at Annexure-l. 5. The concerned Deputy commissioners shall further release fund to the implementing agencies through pFMS only after ensuring that the following points are have been strictly complied with :- i. This release in subject to the following : All codal formalities, financial rules and regulations and all conditions laid down in GFR, DFRP etc. financial rules and regulations, circulars, directions & guidelines etc issued by the Govt. of lndia, I\IHA, tMinistry of Gol, CVC and Govt. of Arunachal pradesh from time to time should be followed in letter and spirit without fail in this regard. This shall squarely be resPonsibilitY of the District Administration and implementing department. PFIVS Subsequent release will be Provided upon utilisation of the previous releases through platform only after expenditure sanction through the competent authority Contd....P12 2 ii. The execution of works / schemes / projects and procurement of items / materials, furniture, etc should be done strictly as per the provision of GFR, DFPR etc. financial Rules and regulations the guidelines and directives issued by the Govt. of lndia, Ministry of Finance' Gol / Administrative of Gol, CVC and Govt. of Arunachal Pradesh in this regard from time to time. The process of tendering and competitive bidding should be mandatorily followed and complied with as envisaged in the GFR, DFPR, CPWD Manual etc, all the financial rules and regulations, the guidelines and directives issued by the govt. of lndia, Ministry of Finance, Gol / Administrative Ministry of Gol, CVC and Govt of Arunachal Pradesh in this regard. All the conditions prescribed and specified by the Planning Department, Govt. of Arunachal Pradesh should be followed in letter and spirit without fail. iii. Further, necessary instruction issued by MHA, Gol, Finance and Planning Department from time to time regarding implementation of schemes and specific instruction issued are to be strictly adhered to while implementing schemes at the district level. iv. The Contractors / Suppliers / Vendors payment must be made through Expenditure, Advance & Transfer (EAT) Module and the beneficiary payment through DBT module. The department shall deposit the deductions made to the respective head of accounts through RTGS / Cheque / DD and intimate the same to office concerned for making necessary entries and updating the record. v. Asset Register and Album containing photographs in the three phases as indicated in the guidelines (before, during & after implementation / completion) for all schemes sanctioned under BADP should be taken up properly and maintained for record and future uploading in the software. The date, longitude & latitude should clearly be shown in the photographs. vi. Further, regular monitoring of the schemes by the District Level Committee as mentioned in the guidelines must be carried out and report of the same must be submitted to Planning Department from time to time. The District Level Committee is solely responsible for proper implementation of schemes at the district level. vii. Geo tagging of all projects is compulsory. Change in location of any project will not be permissible. viii. Utilization Certificates and Expenditure Statement must be submitted to Planninq Department immediate lv for further necessary action at this eru! lx No revised estimates/sanction will be entertained and no expenditure outside the scope of the approved scheme is permissible. 6 This issue with the approval of the competent authority. Yours faithful ly, Enclo : As stated above. IShra) Director (Project Co Memo No.PD/BADP -17 I 2017 -18lOcll 1 Dated ltanagar e 8 Octo 18 Copy to :- 1. The PPS to HCM, Govt. of Arunachal Pradesh, ltanagar. 2. The PS to the DCM, Govt. ofArunachal Pradesh, ltanagar. 3. The PS to the HDCM, Govt. of Arunachal Pradesh, ltanagar' 4. The DS to Chief Secretary, Govt. ofArunachal Pradesh, ltanagar. 5. The PS to the Commissioner (Finance), Govt. of Arunachal Pradesh, ltanagar' 6. The Deputy Secretary (Budget), Govt. ofArunachal Pradesh, ltanagar. 7. District Planning Officers, Bomdila / Seppa/ Daporijo / Koloriang / Aalo /Yingkiong /Anini /Anjaw/ Longding and Khonsa, Arunachal Pradesh. 8. The DDO, Planning Department, Govt. of Arunachal Pradesh, ltanagar. ndu Mishra Director (Proj ordin on) Annexure - | (Rs. in lakh) SI Name of the Sector and Location Approved % of fund Fund Sanction Order No Schemes/Project / Village outlay to be now Number transferred transferr ed 1 2 3 4 5 6 7 West Kameng District : Kalaktang CD Block '1 Providing Water supply to Dengzi 20.00 100o/o 20.00 PD/BADP/Scheme-09/1/ Lower Dengzi, Labour 2018-19 dtd 18/09/2018 Camp & Forenri Poctor, Dengzi 2 Cto CC Drain from Club Kalaktang 13.00 100o/o '13.00 PD/BADP/Scheme-09/2/ Building to river bank, 2018-19 dtd 18/09/2018 Kalaktang 3 C/o Girls Hostel at Ankaling 15.00 100o/o 15.00 PD/BADP/Scheme-09/3i Ankaling 2018-19 dtd 18/09/2018 Development of Chingi Model village 4 lmprovement of Chingi 69.75555 100o/o 69.755 PD/BADP/Scheme-01/1/ Kalaktang to Chingi road, 2018-19 dtd20t09t201g R/wall, Breast wall, Surface drain, widening Development of Betchiling Model village 5 C/o Internal CC Steps Betchilling 20.00 lOOo/o 20.00 PD/BADP/Scheme-05/2/ around Betchilling village 2018-19 dtd 29108/2018 (2100 Mtr) 6 C/o Market shed at Betchilling 12.00 100o/o 12.00 PD/BADP/Scheme-05/1/ Betchilling village (39 2018-19 dtd2910812018 sqm) District / Block Total = 149.755 East Kameng District : Chayang Tajo CD Block 7 Cto Guest House (4 Wada 28.00 100o/o 28.00 PD/BADP/Scheme-01/2/ rooms) with water suPP|Y Banagang 2018-19 dtd20t09t2018 and toilet facility (ILCT) Development of Tagampu Model village 8 C/o 5 class rooms SPT Tagampu 20.00 100% 20.00 PD/BADP/Scheme-09/6/ for Govt. Primary School 2018-19 dtd 18/09/2018 Block Sub Total = 48.00 Khenewa CD Block PD/BADP/Scheme-01/3/ 9 C/o Double Story RCC Khenewa 47.25 100o/o 47.25 Tourist Lodge at 2018-19 dtd 20109/2018 Khenewa (Phase - l) Block Sub Total = 47.25 Bameng CD Block 10 C/o Play field (Ground) Lada 31.00 100o/o 31 .00 PD/BADP/Scheme-01/4/ with gallery at Lada Hq 2018-19 dtd20109t2018 Block Sub Total = 31.00 District Total = 126.25 Kurung Kumey District: Damin CD Block 11 Community Vegetable Nisuk 30.00 100% 30.00 P D/BAD P/Scheme-0'1 /5/ 2018-19 dtd20t09t2018 Garden cum mixed farming (piggery, fisherY, banana, kiwi and large cardamom) Development of Cheya Model Village C/o 5 nos ILCT class CheYa 25.00 lOOo/o 25.00 PD/BADP/Scheme-}7121 12 2018-19 dtd 1710912018 room building (82 sqft) Block Sub Tota! = 55.00 Sarli CD Block Development of SaPe Mode! Village 13 C/o 5 nos Semi RCC SaPe 25.00 lOOo/o 25'00 PD/BADP/Scheme-07/1/ 2018-19 dtd 1710912018 class room building (65.60 sqft each Block Sub Tota! = 25.00 Contd....P12 2 Upper Subansiri District : Limiking Taksing CD Block Development of Gelomo Model village 14 C/o Semi RCC Type ll Gelomo 25.00 100% 25.00 PD/BADP/Scheme-05/3/ 2018-19 dtd2910812018 Teacher quarter at Gelomo village (61.16 sqm) District / Block Total = 25.00 West Siang District : Mechuka CD Block Development of Lhallung Model village 15 Construction of 2 Nos CC Lhalung 20.00 100% 20.00 PD/BADP/Scheme-05/4/ culvert (8 Mtr sPan) within 2018-19 dtd 29108/2018 Lhallung village & in between Nangso District / Block Sub Total = 20.00 Upper
Recommended publications
  • Indian Minerals Yearbook 2018
    STATE REVIEWS Indian Minerals Yearbook 2018 (Part- I) 57th Edition STATE REVIEWS (Arunachal Pradesh) (ADVANCE RELEASE) GOVERNMENT OF INDIA MINISTRY OF MINES INDIAN BUREAU OF MINES Indira Bhavan, Civil Lines, NAGPUR – 440 001 PHONE/FAX NO. (0712) 2565471 PBX : (0712) 2562649, 2560544, 2560648 E-MAIL : [email protected] Website: www.ibm.gov.in September, 2019 11-1 STATE REVIEWS earth in Tirap district; graphite in Lohit, East ARUNACHAL PRADESH Siang and Upper Subansiri districts; limestone in Dibang Valley, Lohit, East Siang and Upper Mineral Resources Subansiri districts and quartzite in West Kameng district (Tables-1 and 2). The most important mineral resource of the State is petroleum & natural gas and its chief occurrence is reported in Ningru and Dam Duma Exploration & Development areas. These hydrocarbon deposits are located in Exploration activities carried out by GSI for the Assam Arakan Fold Belt (AAFB) and Upper base metals ( copper & gold) & graphite mineral Assam basin in the State. The State also reports during the year 2017-18 is furnished in Table-3. resources of coal in Namchick Namphuk and National Oil Companies (NOC) continued their Miaobum Coalfields; Copper in East Kameng operations for exploration of oil and gas in the district: dolomite in West Kameng district; fuller's State during 2017-18. Table – 1 : Reserves/Resources of Minerals as on 1.4.2015 : Arunachal Pradesh Remaining resources Mineral Unit Total Total Reserves Indicated Inferred Reconnaissance Total resources (A) STD332 STD333 STD334 (B) (A+B) Copper Ore '000 tonnes - - - 0 .02 0.02 0.02 Metal '000 tonnes - - - 1 0 1 0 1 0 Dolomite# '000 tonnes - 2 0 4 77633 - 77837 77837 Fuller's earth## ton ne - 10700 20000000 - 20010700 20010700 Graphite ton ne - - - 72758257 72758257 72758257 Limestone '000 tonnes - 49220 43 35 75 1 48 27 95 48 27 95 Quartzite# '000 tonnes - - 52 70 - 52 70 52 70 Figures rounded off.
    [Show full text]
  • Government of Arunachal Pradesh Planning Department Itanagar
    GOVERNMENT OF ARUNACHAL PRADESH PLANNING DEPARTMENT ITANAGAR NO. PD/BADP-2/2009-10 Dated Itanagar the 17th June,2009 To The Deputy Commissioner, Tawang/Bomdila/Seppa/Koloriang/Daporijo/Aalo/ Yingkiong/Roing/Anini/Anjaw/Changlang/Khonsa. Arunachal Pradesh. Sub : Submission of Schemes under BADP for the year 2009-10. Sir, With reference to the subject mentioned above, I am directed to inform you that the State Government has decided to draw up schemes for an amount of Rs.58.09 crore, which includes Rs.1.65 crore for specific allocation against 4 (four) districts viz. Tawang, West Kameng, Changlang and Tirap districts during 2009-10 as per allocation communicated by the MHA, GOI. You are, therefore requested to draw up schemes according to the block-wise allocation mentioned at ‘Annexure-A’ against each border block and to submit the same to the Planning Department latest by 30th June,2009 for consideration of the State Level Screening Committee for approval and forward the same to the MHA for their approval and release of fund. However, fund against the newly created CD blocks i.e Zemithang – Dudungkhar in Tawang and Wakka in Tirap district will only be released after formal inclusion of these two blocks in the BADP. The DC, Tawang and DC, Tirap should submit necessary proposal for inclusion of these two blocks with details of villages, population, distances from the international border floating in a sketch map immediately. 2. Further, the schemes are to be selected strictly in accordance with the revised guidelines (February, 2009) of BADP and as per the illustrative list of schemes / projects mentioned at ‘Annexure-I’ in the revised guidelines.
    [Show full text]
  • Histrical Background Changlang District Covered with Picturesque Hills Lies in the South-Eastern Corner of Arunachal Pradesh, Northeast India
    Histrical Background Changlang District covered with picturesque hills lies in the south-eastern corner of Arunachal Pradesh, northeast India. It has an area of 4,662 sqr. Km and a population of 1,48,226 persons as per 2011 Census. According to legend the name Changlang owes its origin to the local word CHANGLANGKAN which means a hilltop where people discovered the poisonous herb, which is used for poisoning fish in the river. Changlang District has reached the stage in its present set up through a gradual development of Administration. Prior to 14th November 1987, it was a part of Tirap District. Under the Arunachal Pradesh Reorganization of Districts Amendment Bill, 1987,the Government of Arunachal Pradesh, formally declared the area as a new District on 14th November 1987 and became 10th district of Arunachal Pradesh. The legacy of Second World War, the historic Stilwell Road (Ledo Road), which was constructed during the Second World War by the Allied Soldiers from Ledo in Assam, India to Kunming, China via hills and valleys of impenetrable forests of north Burma (Myanmar) which section of this road is also passed through Changlang district of Arunachal Pradesh and remnant of Second World War Cemetery one can see at Jairampur – Nampong road. Location and Boundary The District lies between the Latitudes 26°40’N and 27°40’N, and Longitudes 95°11’E and 97°11’E .It is bounded by Tinsukia District of Assam and Lohit District of Arunachal Pradesh in the north, by Tirap District in the west and by Myanmar in the south-east.
    [Show full text]
  • Changlang District the ICT Initiatives in the Land of Bio-Diversity
    District Informatics Changlang District The ICT initiatives in The Land of Bio-diversity Edited by KAVITA BARKAKOTY he Changlang District, which is one of the easternmost districts of India, is located in the During the Covid-19 pandemic Tsouth-eastern corner of Arunachal Pradesh, having an international boundary with Myanmar period ICT services of the (Burma) in the east and the south. It has an area of National Informatics Centre, 4,662 sq. Km and a population of 1, 48,226 persons as per the 2011 Census. Changlang District was created Changlang District Centre became as the 10th District of the Arunachal Pradesh on 14 November 1987 by carving out part of Tirap District. all the more important. The NIC District Centre, Changlang District Centre in collaboration With its inception in July 1989, NIC Changlang district Centre started its journey with just one NIC with the State Centre officer and a single 386 machine with a handful of Changlang NIC Website has become a implemented various services, terminals. However, the modest resources did not come in their way towards providing ICT support to the single-window platform for accessing var- which facilitated the emergency district administration and in the implementation of ious citizen services, certificate applica- ICT-based citizen services and government schemes tions, Tender notices, Beneficiary details movement of people and goods. in the district. Being one of the remotest districts of Government schemes, and tourism-re- of the country with no other ISPs, in the early years lated information & services. Support was also provided to NICNET played a pivotal role in providing Internet 24x7 IVR helpline for public grievanc- es, e-passes, and online portal for goods help the District Administration in services to the district administration and other departments in the district.
    [Show full text]
  • Download Full Report
    P�R�E�F�A�C�E� 1.� This�Report�has�been�prepared�for�submission�to�the� Governor under Article 151 of the Constitution.� 2.� Chapters�I�and�II�of�this�Report�respectively�contain�Audit� observations�on�matters�arising�from�examination�of� Finance�Accounts�and�Appropriation�Accounts�of�the�State� Government for the year ended 31 March 2010.� 3.� Chapter�III�on�‘Financial�Reporting’�provides�an�overview� and�status�of�the�State�Government’s�compliance�with� various�financial�rules,�procedures�and�directives�during� the current year.� 4.� Audit�observations�on�matter�arising�from�performance� audit�and�audit�of�transactions�in�various�departments� including�the�Public�Works�department,�audit�of�stores�and� stock,�audit�of�autonomous�bodies,�Statutory�Corporations,� Boards�and�Government�Companies�and�audit�of�revenue� receipts for the year ended 31 March 2010 are included in a� separate Report.� 5.� The�audit�has�been�conducted�in�conformity�with�the� Auditing�Standards�issued�by�the�Comptroller�and�Auditor� General of India. CHAPTER I Finances of the State Government Pr o f i l e of th e St a t e Area-wise, AR U N A C H A L PR A D E S H , which became a full-fledged state on February 20, 1987, is the largest state in the north-eastern region. Till 1972, it was known as the North- East Frontier Agency (NEFA). It gained the Union Territory status on January 20, 1972 and was renamed as Arunachal Pradesh. The State, being one of the Special Category State, is dependent on central assistance for plan investment because of poor resource base.
    [Show full text]
  • Work Wise Details (RIDF State Share)
    GOVERNMENT OF ARUNACHAL PRADESH PUBLIC WORKS DEPARTMENT SPECIAL ASSISTANCE PACKAGE (SAP) ANNUAL OPERATING PLAN 2007-2008 VOLUME – E COMMUNICATION SECTOR R.I.D.F. (NABARD) STATE SHARE I N D E X RURAL INFRASTRUCTURE DEVELOPMENT FUND (RIDF) Page No. Sl. No. Name of Division From To 12 34 FORMATS CSS-I (PART-I) 1 3 CSS-II (PART-I) 1 5 1. Tawang 1 2. Bomdila 2 3. Bameng 3 4. Seppa 4 5. Ziro 5 6 6. Sangram 7 9 7. Basar 10 8. Mariyang 11 9. Yingkiong 12 10. Roing 13 11. Jairampur 14 12. Khonsa 15 13. Longding 16 Page 1 FORMAT : CSS-I SPECIAL ASSISTANCE PACKAGE (SAP) ANNUAL OPERATING PLAN : 2007-2008 RURAL INFRASTRUCTURE DEVELOPMENT FUND (NABARD) (Rs. in lakh) Sl. Name of the Scheme Pattern of sharing Estimated Cost (State Share)Cummulative Expenditure Balance Proposed Outlay Remarks No. Expenditure during 9th & 10th Plan Estimated Cost 2007-2008 between Centre and period till March,2007 State Original Revised Total State State Share State Share 1 2 3 5 14 17 19 1 Ring Road at Zemithung (10.80 Km) in Centre - 80% 205.41 205.41 205.41 85.40 S/Culvert-20 Nos & Tawang District State - 20% R&B Wall-300 mtr Non-Divertable 2 Dirang-Tawang BRO Road to Sangti Centre - 80% 169.34 169.34 121.50 47.84 47.85 B/Topping-2.72 Km & Khali Bok via Khaso (14.50 km). State - 20% Steel Bridge-100% Non-Divertable 3 Road from Seppa-Chayangtajo to Centre - 80% 50.89 50.89 50.89 50.90 F/Cutting-3.50 Km Bameng (15.00 Km) in East Kameng State - 20% Non-Divertable District 4 Road from PWD IB to Bali in Seijosa Centre - 80% 252.47 252.47 252.47 100.45 F/Cutting-4.60 Km & (14.60 Km) in East Kameng District State - 20% S/Culvert-10 Nos Non-Divertable 5 Yazali-Mangio Road, (65.00 Km) Centre - 90% 281.99 142.60 424.59 242.36 182.23 82.25 S/Culvert-20 Nos & SH: F/C, Culverts, R&B Wall, State - 10% SBC-85.00 Km Sol, WBM, B/Topping i/c Bridges.
    [Show full text]
  • District Report EAST KAMENG
    Baseline Survey of Minority Concentrated Districts District Report EAST KAMENG Study Commissioned by Ministry of Minority Affairs Government of India Study Conducted by Omeo Kumar Das Institute of Social Change and Development: Guwahati VIP Road, Upper Hengerabari, Guwahati 781036 1 ommissioned by the Ministry of Minority CAffairs, this Baseline Survey was planned for 90 minority concentrated districts (MCDs) identified by the Government of India across the country, and the Indian Council of Social Science Research (ICSSR), New Delhi coordinates the entire survey. Omeo Kumar Das Institute of Social Change and Development, Guwahati has been assigned to carry out the Survey for four states of the Northeast, namely Assam, Arunachal Pradesh, Meghalaya and Manipur. This report contains the results of the survey for East Kameng district of Arunachal Pradesh. The help and support received at various stages from the villagers, government officials and all other individuals are most gratefully acknowledged. ■ Omeo Kumar Das Institute of Social Change and Development is an autonomous research institute of the ICSSR, New delhi and Government of Assam. 2 CONTENTS BACKGROUND....................................................................................................................................8 METHODOLOGY.................................................................................................................................9 TOOLS USED ......................................................................................................................................10
    [Show full text]
  • Gazetteer of India Tirap District
    Gazetteer of India ARUNACHAL PRADESH Tirap District GAZETTEER OF INDIA ARUNACHAL PRADESH TIRAP DISTRICT ARUNACHAL PRADESH DISTRICT GAZETTEERS TIRAP DISTRICT Edited by S. DUTTA CHOUDHURY GOVERNMENT OF ARUNACHAL PRADESH 1980 Published by Shri R.N. Bagchi Director of Information and Public Relations Government of Arunachal Pradesh, Shillong Printed by N.K, Gossain & Co. Private Ltd. 13/7ArifFRoad Calcutta 700 067 © Government of Arunachal Pradesh First Edition: 1980 First Reprint Edition: 2008 ISBN--978-81-906587-1-3 Price: Rs. 225/- Reprinted by M/s Himalayan Publishers Legi Shopping Con^jlex, BankTinali,ltanagar-791 111. FOREWORD I am happy to know that the Tirap District Gazetteer is soon coming out. This will be the second volume of District Gazetteers of Arunachal Pradesh — the first one on Lohit District was published during last year. The Gazetteer presents a comprehensive view of the life in Tirap District. The narrative covers a wide range of subjects and contains a wealth of information relating to the life style of the people, the geography of the area and also developments made so far in various sectors. The Tirap District Gazetteer, 1 hope, would serve a very useful purpose as a reference book. Raj Niwas R. N. Haldipur ltanagar-791111 Lieutenant Governor, Arunachal Pradesh May 6. 1980 PREFACE The present volume is the second in the series of Arunachal Pradesh District Gazetteers. The publication of this volume is the work of the Gazetteers Department of the Government of Arunachal Pradesh, carried out persistently over a number of years. In fact, the draft of Tirap District Gazetteer passed through a long course of examinations, changes and rewriting until the revised draft recommended by the Advisory Board in 1977 was approved by the Government of Arunachal Pradesh in 1978 and finally by the Government of India in 1979.
    [Show full text]
  • Req of Fund for Completion of Ongoing Projects
    Target for completion of ongoing projects and requirement of fund from NLCPR. (Rs. in Crore) Sl. Name of Project Approved Year of Total Requirement of fund for the year Total No. cost Sanction Release 2009-10 2010-11 2011-12 1 2345678 PH&WS: 1 Water Supply scheme at Along. (West Siang District) 3.370 1999-2000 3.021 0.349 0.000 0.000 3.370 2 Water Supply scheme at Pasighat (East Siang District) 5.050 1999-2000 4.850 0.180 0.000 0.000 5.030 3 Water Supply scheme at Roing (Lower Dibang Valley District) 4.050 1999-2000 3.829 0.197 0.000 0.000 4.026 4 Water Supply Project for Daporijo town, (Upper Subansiri District). 3.970 2002-03 3.666 0.28 0.000 0.000 3.946 5 Naharlagun- Nirjuli Water Supply scheme. (Papum Pare) 11.730 2002-03 11.040 0.302 0.000 0.000 11.342 6 Bomdila Water Supply Scheme. (West Kameng District) 17.090 2002-03 15.435 0.448 0.000 0.000 15.883 7 Improvement and extension of water supply at Lumla township. 4.883 2006-07 4.266 0.129 0.000 0.000 (Tawang). 4.395 8 Providing Potable Drinking Water Supply scheme for villages of Sille, 17.424 2006-07 10.490 5.192 0.000 0.000 Rani, Sikabamin, Sika Tode, Oyan at Sille. (East Siang District) 15.682 9 Providing/Augmentation of Water Supply facilities to all the 12.772 2007-08 8.000 3.495 0.000 0.000 administrative HQs and it’s villages under 14th Doimukh Assembly Constituency.
    [Show full text]
  • Tentative Allotment of Funds During 2007-08 Under RIDF
    GOVERNMENT OF ARUNACHAL PRADESH STATEMENT SHOWING BALANCE FUND REQUIREMENT BOTH UNDER RIDF LOAN AND STATE SHARE & TENTATIVE ALLOCATIONS UNDER RIDF LOAN DURING 2007-08 Page No. : 1 STATEMENT SHOWING BALANCE FUND REQUIREMENT BOTH UNDER NABARD AND STATE SHARE (Financial figures Rs. in lakh) Sl. Name of the SchemeYear of Sanction Cost Cummulative Expenditure upto Balance as on 03/2007 Proposed Outlay 2007-2008 Remarks No. Sanction 03/2007 NABARD State Total NABARD State Total NABARD State Total NABARD State Total 1 2 3 4 56 7 8 9 10111213141516 Under RIDF-V 1 C/o Permanent Bridge over river 96-97 166.79 187.01 353.80 38.36 215.23 253.59 128.43 -28.22 100.21 Site Siyom at Menchung abandoned 2 C/o Permanent Motorable Bailey 94-95 342.90 48.80 391.70 343.34 57.33 400.67 -0.44 -8.53 -8.97 Completed type Suspension Bridge over river Siyom to connect villages Mechuka on right bank with Mechuka HQ(Span 360 ft.) 3 C/o Bailey Suspension Bridge over 97-98 283.36 43.64 327.00 354.20 109.68 463.88 -70.84 -66.04 -136.88 Completed river Subansiri near Taliha in Upper Subansiri District (Span 97.56 mtrs.) 4 C/o Motorable Suspension Bridge 96-97 395.76 262.16 657.92 422.90 422.47 845.37 -27.14 -160.31 -187.45 Completed over Lohit river to connect Chequenty and Hawai. 5 C/o Road from Itanagar to Pappu 99-00 345.60 38.40 384.00 345.60 38.40 384.00 0.00 0.00 0.00 Completed Nallah via Jully village (12 km).
    [Show full text]
  • Statistical Abstract
    STATISTICAL ABSTRACT OF ARUNACHAL PRADEStt 2004 DIRECTORATE OF ECONOMICS & STAtlSTtCS OOVERlSMENT OF ARUNACHAL PRAbESH ITANAGAR-791 113 PREFACE The formats as recommended by the working group on national level standardisation of the publication, constituted by the Central Statistical Organisation, Ministry of planning, Govt, of India had been used for the Statistical Abstract of Arunachal Pradesh -2004. The publication incorporates the latest available data up to March -2004. I hope this will be useful to the planners, educational Institutions, research Scholars, Policy makers etc. in capturing the rapidly changing socio-economic scenario of the state. This Directorate is grateful to the various Government departments and organisations, for their continued and generous co-operation in making the Statistical data available for this publication. The publication has been compiled and shaped under the guidance of ShriK.Mamai,Research Officer and assisted by Shri Taw Takur, Sub-Inspector of Statistics,Shri A.Jirdo,Sub Inspector of Statistics had computerised the publication in very short time. I avail this opportunity to put in records their sincere services. Any suggestions for the improvement o f the scope, layout and utility o f this Publication shall be gratefully accepted. Place : IT AN AGAR. Sd/^Duyu Pussang Date : 29^^ April,2005 Director Directorate of Economics and Statistics Govt of Arunachal Pradesh Ita na qa r j x ^ <•’ «=< J . ) " g i s s r g ^ ' CONTENTS Table ITEM Page No. No. ADMINISTRATIVE SET UP SHOWING DISTRICTS, SUB-DIVISIONS, BLOCKS & CIRCLES IN ARUNACHAL PRADESH AS ON 31-03-2004. I-III Notional Map of Arunachal Pradesh 1. AREA AND POPULATION 1.1 District/ circle wise population of A.
    [Show full text]
  • Annual Operating Plan 2009-10 Outlay and Expenditure of Centrally Sponsored Schemes Including Fully Funded by Govt
    GOVERNMENT OF ARUNACHAL PRADESH ANNUAL OPERATING PLAN 2009 - 10 INDEX SL.NO CONTENTS PAGE-NO. 1 Basic features i - v 2 Abstract of Outlay and Expenditure 1 - 2 3 Outlay and Expinditure on Direction and Administration under Plan 3 4 Specific schemes with various components 4 5 District wise break up of Outlay 5 6 Physical Targets and Achievement 6 7 District wise break up of Physical targets and Achievement 7 8 Achievement of tenth Plan and Targets for Annual plan 2009-10 8 9 Statement of staff strength of the Department 9 - 10 10 Statement on proposal for New Posts 11 - 12 11 Expenditure and Outlays for salaries and wages 13 12 Statement on Vehicles 14 13 Details of on going scheme 15-35 14 Proposal for new schemes / services 36-70 15 Outlay & Expenditure of loan linked schemes 71-74 16 Earmarked schemes by Planning Commissioning 75-78 17 Centrally Sponsored Schemes (Financial) 79-83 18 Centrally Sponsored Schemes (Physical) 84-89 19 Furnishing information relaeted NEC, NLCPR scheme 90-92 20 On-going incomplete Projects funded under PM's Package 93-97 21 Details of Assets 98-99 GOVERNMENT OF ARUNACHAL PRADESH DEPARTMENT OF POWER ANNUAL OPERATING PLAN FOR 2009 – 10 BASIC FEATURES The Plan Outlay of the Department of Power as allocated by State Planning Department for the financial year 2009-10 is Rs 5000.00 lakh (Rupees Five Thousand Lakh ) only including the earmarked schemes. The projected minimum resource requirement of the Department of Power for 2009-10 is Rs.37079.04 (Rupees Thirty Seven Thousand Seventy Nine Lakh and Four Thousand) only.
    [Show full text]