Zephir 300 Installed at UK Round 3 Dogger Bank Site with Forewind Consortium for Wind Resource Assessment July 2011

Total Page:16

File Type:pdf, Size:1020Kb

Zephir 300 Installed at UK Round 3 Dogger Bank Site with Forewind Consortium for Wind Resource Assessment July 2011 ZephIR 300 installed at UK Round 3 Dogger Bank site with Forewind consortium for wind resource assessment July 2011 Leading wind resource assessment lidar ZephIR 300, a Natural Power product, has been deployed offshore by Forewind to provide wind measurement data for the Dogger Bank wind farm. The system has been installed successfully on RWE Dea UK’s gas platform 125km from shore and will provide wind speeds at heights from just 10m to 200m throughout the four‐year deployment. The Forewind consortium (RWE npower renewables, SSE, Statoil and Statkraft) have selected Natural Power’s ZephIR 300 to provide the first high‐quality wind data measurements in close proximity to the Dogger Bank Zone – the largest of the UK’s Round 3 zones with the potential for up to 13GW of installed capacity. The first of various consents required for the Dogger Bank project is anticipated around late 2014. Forewind Head of Engineering and Supply Chain, Mark Legerton said that the ZephIR 300 lidar will give data on the local wind characteristics for use in early site design activities. “It will also improve the evaluation of the overall project wind resource by enhancing the validation of local wind modelling,” Dr Legerton said. “The ZephIR 300 was chosen because it is a proven, reliable and safe technology, able to economically provide high quality wind data in an offshore environment,” he added. “The Dogger Bank project relies on innovative flexible solutions and close cooperation with suppliers. This successful lidar deployment is an example of this ‐ only made possible through Natural Power’s responsiveness and an excellent working partnership with the platform operator RWE Dea UK.” Ian Locker, ZephIR MD within Natural Power commented: “We are delighted to be supporting Forewind on this Round 3 project providing them with the quality wind data they require for taking the project through design and consent. Our qualified offshore ZephIR engineers aided with the deployment of ZephIR on RWE Dea UK’s gas platform and data is already being gathered from the site.” For more information [email protected] or visit www.yourwindlidar.com Contact details: Notes for Editors: Alex Woodward Natural Power provides Practical Consulting, Management Services and Product Innovations across the Product Development Manager wind, wave, tidal and biomass arena. Employing over 220 people worldwide, the company has worked on more than 25GW of client projects across Europe and the Americas, whilst also providing extensive Natural Power due diligence services on portfolios and projects on behalf of major lenders, investors and financial [email protected] institutions. The group includes offshore experts SeaRoc and Turkish based consultancy re‐consult and has offices across the UK, France, Turkey, Chile and the US. See www.naturalpower.com for more information. Natural Power – “the international turn‐to experts in renewable energy.” ZephIR wind lidar provides remote resource measurements of wind quality and characteristics from just 10 metres (30 ft) up to 200 metres (650ft) from ground level. Data is transmitted over all types of communications networks and can be accessed 24/7/365 through Natural Power’s secure web portal vuWind. ZephIR has amassed over 2 million operational hours and over 7 years field experience across 450 system deployments. Each system is subject to an industry approved validation process including correlations against the UK’s lidar and sodar IEC standard test site. See www.yourwindlidar.com for more information. ZephIR – “designed by wind engineers for wind engineers.” .
Recommended publications
  • RWE-Geschaeftsbericht-2011.Pdf
    geschäFtsbericht 2011 finanzKalenDer 2012 /2013 2011 geschäftsbericht eCKDaten 2011 auf einen bliCK. RWE • Hohe Ergebnisbelastung durch beschleunigten Kernenergieausstieg in Deutschland 19. April 2012 Hauptversammlung • Betriebliches Ergebnis: 5,8 Mrd. € • Dividendenvorschlag: 2,00 € je Aktie 20. April 2012 Dividendenzahlung • Erste Maßnahmen zur Stärkung der Finanzkraft umgesetzt • Prognose 2012: Betriebliches Ergebnis trotz Desinvestitionen auf Vorjahreshöhe 10. Mai 2012 Zwischenbericht über das erste Quartal 2012 RWE-Konzern 2011 2010 + /− in % 14. August 2012 Zwischenbericht über das erste Halbjahr 2012 Außenabsatz Strom Mrd. kWh 294,6 311,2 − 5,3 Außenabsatz Gas Mrd. kWh 322,2 395,4 − 18,5 14. November 2012 Zwischenbericht über die ersten drei Quartale 2012 Außenumsatz Mio. € 51.686 53.320 − 3,1 EBITDA Mio. € 8.460 10.256 − 17,5 5. März 2013 Bericht über das Geschäftsjahr 2012 Betriebliches Ergebnis Mio. € 5.814 7.681 − 24,3 Ergebnis vor Steuern Mio. € 3.024 4.978 − 39,3 18. April 2013 Hauptversammlung Nettoergebnis /Ergebnisanteile der Aktionäre der RWE AG Mio. € 1.806 3.308 − 45,4 Nachhaltiges Nettoergebnis Mio. € 2.479 3.752 − 33,9 19. April 2013 Dividendenzahlung Return on Capital Employed (ROCE) % 10,9 14,4 - Kapitalkosten vor Steuern % 8,5 9,0 - 15. Mai 2013 Zwischenbericht über das erste Quartal 2013 Wertbeitrag Mio. € 1.286 2.876 − 55,3 Betriebliches Vermögen (Capital Employed) Mio. € 53.279 53.386 − 0,2 14. August 2013 Zwischenbericht über das erste Halbjahr 2013 Cash Flow aus laufender Geschäftstätigkeit Mio. € 5.510 5.500 0,2 Investitionen Mio. € 7.072 6.643 6,5 14. November 2013 Zwischenbericht über die ersten drei Quartale 2013 In Sachanlagen und immaterielle Vermögenswerte Mio.
    [Show full text]
  • Triton Knoll Offshore Wind Farm Limited TRITON KNOLL
    Triton Knoll Offshore Wind Farm Limited TRITON KNOLL ELECTRICAL SYSTEM Environmental Statement Volume 1 Chapter 1: Introduction April 2015, Revision A Document Reference: 6.2.1.1 Pursuant to: APFP Reg. 5(2)(a) Triton Knoll Offshore Wind Farm Ltd Triton Knoll Electrical System Environmental Statement - Volume 1 Copyright © 2015 Triton Knoll Offshore Wind Farm Limited All pre-existing rights reserved. Triton Knoll Offshore Wind Farm Limited Triton Knoll Electrical System Liability In preparation of this document Triton Knoll Offshore Wind Farm Limited (TKOWFL), a joint venture between RWE Environmental Statement Innogy UK (RWE) and Statkraft UK, subconsultants working on behalf of TKOWFL have made reasonable efforts to Volume 1: Chapter 1 – Introduction ensure that the content is accurate, up to date and complete for the purpose for which it was prepared. Neither TKOWFL nor their subcontractors make any warranty as to the April 2015 accuracy or completeness of material supplied. Other than any liability on TKOWFL or their subcontractors detailed in the contracts between the parties for this work neither TKOWFL or their subcontractors shall have any liability for any loss, damage, injury, claim, expense, cost or other Drafted By: GoBe Consultants Ltd consequence arising as a result of use or reliance upon any information contained in or omitted from this document. Approved By: Kim Gauld-Clark Any persons intending to use this document should satisfy themselves as to its applicability for their intended purpose. Date of Approval April 2015 Where appropriate, the user of this document has the Revision A obligation to employ safe working practices for any activities referred to and to adopt specific practices appropriate to local conditions.
    [Show full text]
  • Triton Knoll Offshore Wind Farm Limited Triton Knoll Electrical System …………………………………………………
    Triton Knoll Offshore Wind Farm Limited Triton Knoll Electrical System ………………………………………………… Appendix 22: Updated Statement of Reasons – Comparison of Revision C with Revision B Date: 24th February 2016 Appendix 22 of the Applicant’s Response to Deadline 7 Triton Knoll Offshore Wind Farm Limited Triton Knoll Electrical System Triton Knoll Offshore Wind Farm Limited Triton Knoll Offshore Wind Farm Limited 4th Floor One Kingdom Street Triton Knoll Electrical System Paddington Central London W2 6BD Appendix 22: Updated Statement of Reasons – T: 0845 026 0562 Comparison of Revision C with Revision B Email: [email protected] www.rweinnogy.com/tritonknoll Appendix 22 of the Applicant’s Response to Deadline 7 Date: 24th February 2016 Drafted By: TKOWFL Approved By: Kim Gauld-Clark Date of Approval: 24/02/2016 Revision: BC Triton Knoll Offshore Wind Farm Limited Copyright © 2015 RWE Innogy UK Ltd All pre-existing rights reserved Triton Knoll Offshore Wind Farm Ltd Triton Knoll Electrical System Statement of Reasons CONTENTS Field Code Changed CONTENTS .................................................................................................................. 1 1 INTRODUCTION ...................................................................................................... 1 Field Code Changed Introduction ............................................................................................................... 1 Field Code Changed 2 THE APPLICATION .................................................................................................
    [Show full text]
  • Facts & Figures
    RWE INNOGY FACTS & FIGURES – OFFSHORE WIND & GWYNT Y MÔR OFFSHORE WIND FARM Strong growth off the coast RWE Innogy is a market leader in the development, construction and operation of offshore wind farms in Europe. We have already gained significant experience through the delivery and operation of our existing wind farms – North Hoyle and Rhyl Flats off the Welsh coast, and Thornton Bank off the Belgian coast. Our first German project – Nordsee Ost – is due to start construction next year, some 22 miles off the island of Helgoland. In addition, we aim to be using our own construction vessels from 2011 onwards. RWE Innogy has major plans for the future for offshore development and for helping tackle climate change through its pipeline offshore wind portfolio . A list of current projects: RWE Innogy’s Offshore Wind Projects In operation: North Hoyle 1) (UK/60 MW) Dogger Bank 5) (9.000 MW) Rhyl Flats (UK/90 MW) Triton Knoll (1.200 MW) Thornton Bank 2) (Belgium/30 MW) North Hoyle 1) (60 MW) Nordsee Ost (295 MW) Under construction: Innogy Nordsee 1 Greater Gabbard 3) (UK/504 MW) Gwynt y Môr 4) (576 MW) (about 1.000 MW) Investment/construction decision granted: Rhyl Flats (90 MW) Tromp Binnen (300 MW) Nordsee Ost (Germany/295 MW) Atlantic Array (1.500 MW) 4) Gwynt y Môr (UK/576 MW) Thornton Bank 2) (30 MW) 3) Project pipeline: Greater Gabbard (504 MW) Thornton Bank 2 & 3 (Belgium/295 MW) Galloper 3) (500 MW) Innogy Nordsee 1 (Germany/approx. 1,000 MW) Projects in operation or under construction Triton Knoll (UK/1,200 MW) Projects consented or in development 3) Galloper (UK/500 MW) 1) North Hoyle offshore windfarm (60 MW) is owned by Zephyr Investments Ltd.
    [Show full text]
  • Sofia Ground Model Developed by NGI Not Confidential
    EV108 Sofia ground model developed by NGI Not confidential Sofia Offshore Wind Farm Limited 154 - Synthetic CPTs from Intelligent Ground Models based on the integration of geology, geotechnics and geophysics as a tool for conceptual foundation design and soil investigation planning CF Forsberg, T Lunne and M Vanneste Norwegian Geotechnical Institute, Oslo, Norway L James Forewind, UK/RPS, UK TI Tjelta Forewind, UK /Statoil, Norway A Barwise Statkraft UK Ltd. / RWE Innogy UK Ltd C Duffy Forewind, UK/Statkraft UK Ltd. Abstract Early phase soil investigation campaigns do not as a rule include all the locations where infrastructure is to be placed on the seafloor. However, background information on geology, bathymetric and seismic data may be available across the area at an early stage. The combination of these datasets thus provides the basis for devel- oping a ground model of the development area. The inclusion of geotechnical data in such ground models is not always straightforward since geotechnical properties may vary laterally and with depth. In this paper we present an "Intelligent Ground Model", developed at NGI, and used at several large wind farm projects. The model combines interpreted seismic horizons with geological understanding and acquired CPTU data to allow synthetic CPTUs to be generated at any location within the investigated area. In the Dogger Bank wind farm area, synthetic CPTUs were generated at numerous locations to guide initial evaluations of foundation require- ments and to group locations with similar synthetic profiles. The model was tested by removing known CPTU data from the database and comparing them to synthetic results from the same locations.
    [Show full text]
  • World's Largest Wind Farm
    client | Forewind “Having worked so thoroughly on our offshore Tranche A projects, the team from Royal HaskoningDHV is now able to build on the learning and knowledge gleaned so far for our next phase of Tranche B projects and put into practice its expertise to assist Forewind in its delivery objectives for the Dogger Bank Zone.” Gareth Lewis, Head of Offshore Development World’s largest wind farm The Dogger Bank wind farm zone, located in the In June 2010, Royal HaskoningDHV was awarded the North Sea off the coast of East Yorkshire, is potentially roles of ‘Offshore Environmental Impact Assessment the world’s largest offshore wind project. If fully (EIA) Coordinator’ for Tranche A and ‘Onshore EIA Co- developed, the 8,660km2 area could contain more ordinator’ for the first project application, via a competitive than 2,000 wind turbine generators and provide an tender. In October 2011, a framework was agreed for immense 13GW of electricity – enough to supply ten Royal HaskoningDHV to provide complete EIA services up per cent of the UK’s electricity requirements. to, and including, the final project in Tranche B, covering projects up to 6GW of capacity. Given the size of the development, the zone will be developed in a series of ‘Tranches’, each containing a Robert Staniland, Technical Director of Offshore Wind, number of projects with an overall capacity of around Royal HaskoningDHV, said: “We are naturally incredibly 3GW in each Tranche. proud for the team to be working on such a prestigious project”. The plans for the Dogger Bank zone are being developed by Forewind, a four-company consortium comprising “Royal HaskoningDHV has an enviable and proven track SSE, RWE npower renewables, and Norwegian energy record in the offshore wind market, having seen projects companies Statoil and Statkraft.
    [Show full text]
  • Environmental Statement – Chapter 1 Introduction October 2011 Document Reference – 5.2.1
    Galloper Wind Farm Project Environmental Statement – Chapter 1 Introduction October 2011 Document Reference – 5.2.1 Galloper Wind Farm Limited Document title Galloper Wind Farm Project Environmental Statement – Chapter 1 Introduction Document short title Galloper Wind Farm ES Document Reference 5.2.1 Regulation Reference APFP Regulations, 5(2)(a) Status Final Report Version 11 Date October 2011 Project name Galloper Wind Farm Project Client Galloper Wind Farm Limited Royal Haskoning 9V3083/R01/303424/Exet Reference Drafted by Royal Haskoning Checked by Peter Gaches Date/initials check PG 30.08.2011 Approved by Dr. Martin Budd (Royal Haskoning) Date/initials approval MB 15.10.11 GWFL Approved by Kate Harvey (GWFL) Date/initials approval KH 01/11/11 Galloper Wind Farm ES - i - 9V3083/R01/303424/Exet Final Report October 2011 CONTENTS Page 1 INTRODUCTION 1 1.1 Environmental Statement 1 1.2 Application for Development Consent 1 1.3 The Applicant 2 1.4 Round 2.5 Extension Projects 2 1.5 The Galloper Wind Farm Project 3 1.6 Structure of the Environmental Statement 11 1.7 Document Availability 14 Galloper Wind Farm ES 9V3083/R01/303424/Exet Final Report - iii - October 2011 1 INTRODUCTION 1.1 Environmental Statement 1.1.1 Galloper Wind Farm Limited (GWFL) is proposing to construct an offshore wind farm in the Outer Thames Estuary including associated infrastructure to facilitate export of power to the national electricity transmission system. The proposed development is known as Galloper Wind Farm (GWF). This document constitutes the Environmental Statement (ES) for the project, and presents the findings of the Environmental Impact Assessment (EIA) process.
    [Show full text]
  • RWE-Annual-Report-2016.Pdf
    ANNUAL REPORT 2016 POWERING. RELIABLE. FUTURE. WE REPRESENT SECURE ENERGY SUPPLY AS THE BACKBONE FOR SECURITY OF SUPPLY IN OUR CORE REGIONS… …we provide grid stability and security of supply based on the largest flexible power station fleet in Germany and highly efficient power stations in the UK and the Netherlands, making us a partner for Europe’s energy transition. AS A RELIABLE, FLEXIBLE PROVIDER OF AFFORDABLE AND SECURE ENERGY SUPPLY… …we operate a broad power station portfolio which includes gas, hard coal, lignite, nuclear, hydro and biomass, making us resilient to the market risks of single energy sources. AS A LEADING ENERGY TRADER IN THE MAJOR EUROPEAN AND INTERNATIONAL MARKETS… …we are active in global trading markets for energy and associated commodities such as power, gas, coal and oil. Liquid markets guarantee efficient security of supply for the European economy. AS A PARTNER FOR OUR CUSTOMERS, PROVIDING TAILOR-MADE SOLUTIONS FOR THEIR ENERGY SUPPLY… …we provide security and predictability for industrial customers as well as for trading partners and municipalities, along with innovative, customised solutions to meet their energy needs. CONTENTS To our investors Interview with the CEO 3 The Executive Board of RWE AG 6 Supervisory Board report 8 RWE on the capital market 13 1 Combined review of operations 17 3 Consolidated financial statements 91 1.1 Business model and strategy 18 3.1 Income statement 92 1.2 Innovation 23 3.2 Statement of comprehensive income 93 1.3 Economic environment 26 3.3 Balance sheet 94 1.4 Political
    [Show full text]
  • The Future UK Wind Energy
    Perspective The Future UK Wind Energy Wind energy trends Wind energy projects in the UK are entering a new phase. Turbines are getting larger, capacity greater, associated infrastructure more complex, regulations more challenging, and – for offshore developments – waters deeper. Royal HaskoningDHV has been working at the forefront of the wind industry since its inception, from early onshore wind farms and Round 1 offshore projects, to the giant offshore farms planned as part of Round 3. The UK currently leads the world in offshore wind development. Royal HaskoningDHV has expanded and shaped its experienced renewables team to handle the demands of this fast-paced wind industry. We make our experience count, and we offer an unrivalled service covering a wealth of specialist skills. Working alongside developers, from early site prospecting through to the construction and operational phase, has equipped Royal HaskoningDHV with the knowledge to provide expert solutions for challenging issues such as consenting, transport and logistics, health and safety – and many more. We are flexible, experienced, responsive, and ready to tackle new challenges as more ground-breaking projects are taken forward. Royal HaskoningDHV is working on onshore and offshore wind energy sites culminating in the realisation of major headline projects: n Providing a range of consultancy support from n EIA Co-ordinator for offshore and onshore Contents project inception to completion of the Thanet elements of the first project development Offshore Wind Farm, currently the world’s phase of the Dogger Bank and Firth of Forth Wind energy trends 3 largest operational wind farm; Round 3 Zones; Dealing with EIA and consents 4 n Lead Environmental Impact Assessment (EIA) n To see just some of Royal HaskoningDHV’s Managing risk offshore 6 consultant for the up to 560MW Dudgeon Wind Energy achievements turn to page 16.
    [Show full text]
  • Triton Knoll Humber Skills Strategy Not Confidential
    EV044 Triton Knoll Humber Skills Strategy Not confidential Sofia Offshore Wind Farm Limited Humber Skills Strategy April 2016 1 Objectives • Build a robust programme of actions and Contribute to a Winning Supply commitments that demonstrate a genuine and Chain Plan deep-rooted determination to maximise local and UK employment in the project. • Ensure there are sufficient professional and De-risk the Supply of Key vocational skills to support project delivery in an Resources area where there will be significant competition between projects for the best people. • Promote employment and re-skilling opportunities Maximise Local Content in the communities most closely associated with the development of the project to maximise the local content in the project. • Optimise the use of existing local and national Build on Local Infrastructure education and skills infrastructures and add value to these where possible. Title of document Importance of Skills in the Supply Chain Plan Supply Chain Plan Scoring What DECC Expects to see…. What TK has to do…. S1. An assessment of the future skills Competition requirements at each stage of the project (Score out of 100) Actions (design, construction- including the major undertaken or supply components, and operation and TK must complete a committed maintenance of the life of the project) Skills Audit S2. An assessment of whether these skills are Impact of currently in place and what, if any, gaps there Skills Actions on (Score out of 100) are Supply Chain S3. A set of actions that will provide Wider Impact investment in skills and training in order to on the Low meet the future needs of the project- as estimated at each stage Innovation Carbon Market TK must develop a (Score out of 100) S4.
    [Show full text]
  • Rwe Innogy Gwynt Y Môr Offshore Wind Farm Ltd
    RWE INNOGY GWYNT Y MÔR OFFSHORE WIND FARM LTD Facts & figures – offshore wind. Strong growth off Europe coast RWE Innogy is a market leader in the development, construction and operation of offshore wind farms in Europe. We have already gained significant experience through the delivery and operation of our existing wind farms – North Hoyle and Rhyl Flats off the Welsh coast, and Thornton Bank off the Belgian coast. Our first German project – Nordsee Ost – is starting construction some 22 miles off the island of Helgoland. In addition, we aim to be using our own construction vessels to reduce the risk of construction bottle-knecks. RWE Innogy has major plans for the future for offshore development and for helping tackle climate change through its pipeline offshore wind portfolio . A list of current projects: RWE Innogy’s Offshore Wind Projects In operation: North Hoyle 1) (UK/60 MW) Dogger Bank 5) (9.000 MW) Rhyl Flats (UK/90 MW) Triton Knoll (1.200 MW) Thornton Bank 2) (Belgium/30 MW) North Hoyle 1) (60 MW) Nordsee Ost (295 MW) Under construction: Innogy Nordsee 1 Greater Gabbard 3) (UK/504 MW) Gwynt y Môr 4) (576 MW) (about 1.000 MW) 4) Gwynt y Môr (UK/576 MW) Rhyl Flats (90 MW) Tromp Binnen (300 MW) Investment/construction decision granted: Atlantic Array (1.500 MW) Nordsee Ost (Germany/295 MW) Thornton Bank 2) (30 MW) 3) Project pipeline: Greater Gabbard (504 MW) Thornton Bank 2&3) (Belgium/295 MW) Galloper 3) (500 MW) Innogy Nordsee 1 (Germany/approx. 1,000 MW) Projects in operation or under construction Triton Knoll (UK/1,200 MW) Projects consented or in development 3) Galloper (UK/500 MW) 1) North Hoyle offshore windfarm (60 MW) is owned by Zephyr Investments Ltd.
    [Show full text]
  • Renews Offshore Drag Factor
    TM Networkers TM International PLC Offshore Wind Recruitment Specialists over 250 experts providing +44 (0)2020 8315 9400 a one stop shop for full lifecycle offshore project development > re News GLOBAL OFFSHORE REPORT 2012 CHALLENGES AND COSTS • A big ask in the age of austerity • Global industry breaks the 5GW barrier • Industrialisation answer to the costs conundrum • Demo sites for new technology in short supply PAGE 2 UK AND IRELAND • Careful drivers steering Round 3 into slow lane • EMR adds extra wrinkle to the search for finance • Quick thinking keeps construction on track • Builders add megawatts and experience in 2012 • Developers fear bill for shared grid • Road opens for a cavalcade of Scottish farms • Bell rings for new territorial round • A tale of two markets in Ireland PAGE 5 CONTINENTAL EUROPE • German uncertainty spooks investment • Blame game for grid chaos • Rich French subsidy comes with risks • InControl lives up to its name off Belgium • Giant strides at Thorntonbank 2 • Financing slog to concertina Netherlands build PAGE 17 Offshodrag factorre SCANDINAVIA • Danes dragging their feet near and far • Dong delivers the goods at 400MW Anholt • Eon puts Sweden back in the game • Technology keeps Norwegian hopes afloat • Project trial run to fill in picture for Finns PAGE 30 Shaky ring of confidence: a bubble curtain dampens the noise of subsea AMERICAS AND ASIA installation work at Trianel’s first • Tipping point within reach for US players phase 200MW Borkum West 2 wind • Brazil mega-farm navigates bureaucratic jungle farm off Germany Photo: Trianel • Political class across Canada turns a blind eye • Hong Kong awaits starting orders Installed offshore wind capacity is growing in the • Post-Fukushima Japan joins new wave in Asia industry’s heartlands of Europe while potentially • Samsung brings scale to South Korea hot-spot major new markets, such as the US, are getting ever PAGE 38 nearer to their first megawatts.
    [Show full text]