Greater London Authority, Transport for London, Wandsworth Council and Lambeth Council Vauxhall Nine Elms Battersea Development Infrastructure Funding Study Final report October 2010 ROGER TYM & PARTNERS Fairfax House 15 Fulwood Place London WC1V 6HU t (020) 7831 2711 f (020) 7831 7653 e
[email protected] w www.tymconsult.com This document is formatted for double-sided printing. Disclaimer This document has been prepared by Roger Tym & Partners (RTP), Peter Brett Associates and GVA Grimley. The project has been led by RTP. RTP accepts no responsibility or liability for the consequence of this document being used for a purpose other than the purposes for which it was commissioned. Any person using or relying on the document for such other purpose agrees, and will by such use or reliance be taken to confirm his agreement to indemnify RTP for all loss or damage resulting there from. It has been necessary to base much of this analysis on data collected by third parties. This has been independently checked whenever possible. RTP, Peter Brett Associates and GVA Grimley accepts no liability for any loss or damage suffered by clients or others, whether contractual or tortious, stemming from any conclusions based on data supplied by parties other than RTP, Peter Brett Associates and GVA Grimley used in preparing this report. Author/Amended by: Authorised by Date: Version: A.Clarke/ team C Howick 14 Oct VNEB final 141010.docx P2024 CONTENTS 1 INTRODUCTION .................................................................................................................