Environmental Monitoring Report

Project Number: 48373-007 October 2019 Part A: Main Report (Pages 1 – 95) and Annexures

Period: October 2018 – December 2018

IND: New Ganga Bridge Project

Submitted by Bihar State Road Development Corporation Limited,

This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

1

Environmental Monitoring Report

Fourth Quarter Report (October–December 2018) April 2019

IND: Bihar New Ganga Bridge Project Greenfield Six-lane Extra-dosed Cable Bridge (Length of the project 22.76 km including 9.76 km bridge length) over river Ganga near Shukulpur village in District Patna on NH-30 to near Bidupur in District on NH-103 in the state of Bihar.

Prepared by AECOM & Rodic Consultants for the Bihar State Road Development Corporation Limited, Bihar and the Asian Development Bank.

This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area

Fourth Quarter Report (October-December 2018)

Loan No- 3396 IND

Top view of ROW at Well foundation site

Greenfield Six-lane Extra-dosed Cable Bridge (Length of the project 22.76 Km including 9.76 km bridge length) over river Ganga near Shukulpur village in District Patna on NH-30 to near Bidupur in District Vaishali on NH-103 in the state of Bihar.

Prepared By: ( AECOM-RCPL JV) A joint venture between Aecom & Rodic Consultants Pvt. Ltd

AECOM – RCPL -JV

2

CURRENCY EQUIVALENTS (As of 31st December 2018)

Currency unit - Indian Rupee (INR) INR 1.00 = $ 0.01434 $1.00 = INR 69.69

ABBREVIATIONS ADB - Asian Development Bank ADF - Asian Development Fund RDC - Road Development Corporation EMES - Environment Management & Environment Safeguard ES - Environmental Specialist PMAE - Project Management Authority Engineers EMP - Environmental Management Plan EA - Execution Agency EIA - Environmental impact Assessment EARF - Environmental assessment and review framework ESMS - Environmental and social management system EMR - Environmental Monitoring Report SPCB - State Pollution Control Board IWAI - Inland Waterways Authority of CPCB - Central Pollution Control Board IPP - Indigenous People Plan BNGBP Bihar New Ganga Bridge Project. BSRDCL - Bihar State Road Development Corporation Limited PAM - Project Administration Manual PCAG - Public Consultation and Addressing of Grievances MoEF& CC - Ministry of Environment Forest & Climate Change EHS - Environment Health Safety Management Plan SPS - Safeguard Policy Statement

WEIGHTS AND MEASURES

km - Kilometer m - Meter

NOTES In this report, "$" refers to US dollars

This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website.

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Environmental Monitoring Report (October-December 2018) 1

CONTENTS

Executive Summary ______3 1.Introduction ______6 A. Project Objective ______6 B. Project Description______6 C. Location and Features of the Proposed Project______6 2. Components of The Project ______7 C. Objective of the Report ______9 D. Project Implementation Arrangement (Administrative Details) ______9 E. Project Implementation Progress ______11 ii. Compliance to Safeguards Provisions ______18 A. Compliance to Loan Agreement ______18 B. Compliance to Project Administration Manual ______21 C. Compliance to the Civil Works Contract Agreement______25 iii A.Compliance to the Environmental Management Plan ______51 I. Findings and Recommendations ______69 C. Corrective actions required. ______70 IV. Environmental Monitoring ______72 A . Summary of Inspection Activities ______72 B . Summary of training and awreness programme ______73 B. Noise Monitoring ______75 C. Air Quality ______80 D Water Quality ______86 V Public Consultations and addressing of Grievances ______93 E. Public Consultations ______93 F. Complaints and Requests Received______94 VI Conclusion ______95 A Summarize the overall Progress of Implementation of safeguard Measures ______95 B Problems Identified and Actions Recommended ______95 Appendix 1: Photograph of work Progress ______97 Appendix 2: EHS meeting &Training ______105 Appendix 3: Sample format of Monthly EHS report ______106 Appendix 4: Environment Monitoring Report ______108 Appendix 5: CONSENT to Establish for Batching Plant ______115 Environmental Monitoring Report (October-December 2018) 2

Appendix 6: Consent to Operate for Batching Plant ______121 Appendix 7: List of SICK PATIENT during the period OCTOBER-DECEMBER 2018 __ 127 Appendix 8: Tree cutting permission for sabalpur & raghopur ______129 Appendix 9: CGWA application for ground water withdrawl ______134 Appendix 10: STP (Sewage Treatment Plant) ______136 Appendix 11: Environmental Clearance from SEIAA, Bihar ______137 APPENDIX 12: BOCW REGISTRATION ______141 Appendix 13: Labour Liscence from ______142

LIST OF FIGURES

Figure 1. Location Map of the Project Site on Google earth Image- 07 Figure 2. BNGBP Project Alignment Map 08 Figure 3: Organization Structure of Safeguards Cell of BSRDCL- 10 Figure 4: Map showing monitoring locations- 74

List of Tables Table 1: Project Overview 03 Table 2: Details of the Project 06 Table 3: Status of Construction Works as of December 2018 11 Table 4: Status of Compliance to Environmental Provisions of the Loan Agreement 18 Table 5: Compliance to PAM 21 Table 6: Compliance to the safeguards Clauses of the Civil Work Contract 25 Table 7: Compliance to EC 47 Table 8: Status of statuary Clearances/approvals 51 Table 9: Status of Compliance to the EMP (as per the contractual document & EIA) 53 Table 10: Noise Monitoring Results 75 Table 11: Air Quality Monitoring Results 80 Table 12: Ground Water Quality Monitoring Results 88 Table 13: Surface Water Quality Monitoring Results 89 Table 14: Soil Analysis Report 92 Table 15: Status of Actions suggested by BSRDCL 93

Environmental Monitoring Report (October-December 2018) 3

EXECUTIVE SUMMARY

1.This report is the sixth quarterly report of its kind and covers the fourth quarter of 2018 on environmental safeguards compliance of the Bihar New Ganga Bridge Project. It covers the period from October-December 2018. The aim of this project is to construct a new road bridge (New Ganga Bridge Project), across the Ganga River and an integrated approach roadway network in the state of Bihar. It will improve transport connectivity between north and south Bihar, which is divided by the Ganga River, and a better link to Patna, the state capital city, and the surrounding areas. The main bridge structure is of 9.76 kilometers (km) in length and is expected to become the longest river bridge in India, is supported by the Regional Cooperation and Integration Strategy of the Asian Development Bank (ADB).

The environmental safeguards of the project are being implemented in compliance with the loan covenants, project agreement and contractor is complying with the proposed mitigation measures described in the Environmental Management Plan (EMP); Environment, Health & Safety (EHS) Manual and the contract specifications. The implementation of environmental safeguards are being done by the contractor [Daewoo – L&T (JV)] and monitored by Project Management Authority Engineers [Aecom- Rodic (JV)] . With minor exception of few issues the project is being implemented in compliance with project requirements.

2.The Bihar New Ganga Bridge Project is a new six lanes Extra dosed (Curved deck soffit) cable Stay

3.Bridge to be built over the River at Patna in the State of Bihar.

The projects full alignment has a total length of 22.76 Km of which 9.76 Km are the main bridge, the remaining length is the roads and approach viaducts. The Bihar Government has funding for this project from the Asian Development Bank and the State Government of Bihar acting through the executive agency Bihar State Road Development Corporation Limited (BSRDCL).

4. For the most part the project passes through cultivated land and across two rivers which discharge into the Ganges. This area is a flat alluvial plain devoid of significant growth. The area does however contain an existing road network with junctions to the NH-30, Mehnar Road (SH-93) and the NH- 103.

Project Overview – Presented in table 1.

Table 1: Project Overview ITEM DESCRIPTION / LOCATION 2. Construction of Greenfield 6 Lane Extradosed Cable 1. Contract Description Stayed Bridge at Patna in the State of Bihar on EPC basis

4. BIHAR STATE ROAD DEVELOPMENT 3. Name of Client CORPORATION LIMITED (A Government of Bihar Undertaking)

5. Name of Contractor 6. Daewoo – Larsen & Toubro (L&T) JV

7. EPC Agreement Signed 8. 10th February 2016

9. Appointed Date (AD) 10. 16th January 2017

Environmental Monitoring Report (October-December 2018) 4

11. Duration of Contract 12. 48 months from AD (Total 1,460 days)

13. Scheduled Completion Date 14. 14th January 2021 (SCD)

15. Contract Price (CP) 16. INR 31,15,00,00,000 (Original Contract Sum)

17. Authority Engineer 18. AECOM - RODIC Consultants Pvt. Ltd. (JV)

19. Appointment Date of Authority 20. 8th April 2016 Engineer

21. Total Length of Project 22. 22.760 Km.

23. Length of Highway on 24. 6.282 Km. Embankment

26. 2-Lane (0+000 to 0+0876) Near Patna – Bakhtiyarpur Bypass

27. 2-Lane (Ch:1+000) to & from Patna – Ganga Path 25. Ramps/ Loops 28. 2 nos. (Ch: 4+574) 2-way 4-Lane, at Raghopur Diara/Island

29. 2/4 Lane Ramp/Loops/Slip Roads, NH-103, Chak Sikandar

31. 9.76 Km (from Ch: 1+270 to 11+029) 6-Lane, Well 30. Length of Main bridge foundation

33. Ch: 12+812, 1x36m span, 2-lane two nos. loops & 32.y Fl -Over 2-lane four nos. Slip Roads. At Mehnar Road

35. 6-Lane Start (Ch: 15+777.22 End Ch: 15+799.640 Ghagra River 34. Bridge over River other than Ganga 36. 6-Lane Start (Ch: 19+249.709 End Ch: 19+289.878 Ghagra River

38. 6-Lane (Ch: 16+845) At Chandpur Village

37. VUP 39. 6-Lane (Ch: 17+019) At Chak Sikandar Village

40. 6-Lane (Ch: 18+756) At Lakhanpur Village

42. 8 Nos. 43. Length (m)

44. 2-Lane (Ch: 45. 280 m (240m viaduct & 41. Grade Separated Interchange 0+0876) embankment)

46. 2-Lane (Ch: 47. 495 m (400 m viaduct & 0+876 ) embankment)

Environmental Monitoring Report (October-December 2018) 5

48. 2 – Lane (Ch: 49. 1627 m (280 m viaduct & 0+262) embankment)

50. 2 – Lane ( Ch 51. 1245 m (510 m viaduct & : 1+000 embankment )

52. 4 – Lane ( Ch 53. 2*1000 m =2000 : 4+543 m(viaduct)

55. 1*36 m Flyover with 54. 2- Lane (Ch approach embankment (RE 12+812) Wall)

57. Two loops (each 500m 56. 2 -Lane (Ch including 280 m viaduct 12+812) +embankment ) &Slip roads (each 500 m embankment)

59. 1. With 2* 3-lane provision as/Railway/RDSO requirement (At Ch: 0+8085) Near Bakhtiyarpur Railway Station 58. ROB 60. 2. With 6-lane provision as/Railway /RDSO requirement (At Ch: 18+050) Near Chap Sandra

61. Toll Plaza 62. 2 No (At Km 4+543 & Km 12+500)

64. 0.015%of the Contract Price (CP) for each day 63. Amount of Bonus for Early which the project completion date precedes the SCD, Completion but subject to a maximum of 3% (three per cent) of the CP

65. Defects Liability Period 66. 5 (five) years from the date of completion certificate.

68. Interest-free advance payment equal to 10% of the 67. Advance Payment CP in two installments (5% + 5%) on provision of an unconditional guarantee from a bank for 110% of the

Advance Payment-5% already paid

69. Retention 70. 6% of IPC up to 5% of CP

71. Liquidated Damages 72. Up to 10% of CP

Environmental Monitoring Report (October-December 2018) 6

1.INTRODUCTION

A. Project Objective

1.The proposed greenfield project comprises a new six-lane suspension type bridge across Ganges River from Deedargunj in Patna on NH-30 to Chak Sikandar in on NH- 103, consisting of six lane bridge structures of 9.760 kilometers, approach viaduct and roads of 1.5 kilometers from south and 8.5 kilometers from north, tolling and service facilities, and widening 3 kilometers of NH-103. The proposed location of the bridge is about 10 km downstream of existing in Patna.

B. Project Description

Location and Features of the Proposed Project

2.The proposed project is a greenfield project aimed at development of connectivity between Patna and Vaishali district of Bihar through construction of a 6-lane road bridge across river Ganges. The proposed bridge will take off from Deedargunj (from NH-30) in Patna district at a distance of about 18 kilometers from Patna Railway station and it will terminate at Bidupur (at NH-103) in Vaishali district to provide an alternative to the Mahatma Gandhi Setu and reduce the travel time, overcome traffic congestion, provide smooth connectivity.

Table 2: Details of the Project

Total Road Name of the Project Project Components Districts State Length (km) Construction of a new six- x Main bridge 22.76 Patna and Bihar lane suspension type bridge x Viaducts Vaishali across Ganges River from x Approach Roads Deedargunj on NH-30 to x Toll gates and service Chak Sikandar in Vaishali facilities. district on NH-103.

C. Location and Features of the Proposed Project

3.The project lies between NH-30 (near Deedarganj in Patna District) and NH-103 (near Bidupur in Vaishali district). The proposed bridge traverses between 25033’27.63” N, 85015’27.87” E (Ch.0+000) to 25041’17.82” N, 85022’49.65” E (Ch 22+76) at an average elevation of about 53 meters above mean sea level. The new bridge will be located about 10 kilometers downstream (east) from the existing bridge (Mahatma Gandhi Setu) to help decongest Patna and to provide all weather connectivity for communities living in Raghopur diara (river island) situated between two streams (the North and the south channel) of the Ganges river. The Raghopur diara, has a very high potential for development as a future satellite town of Patna. However, the diara is prone to seasonal flooding but remains inhabited and cultivated during most part of the year. There is only one seasonal road link (pontoon bridge) connecting it to Patna apart from boats & the pontoon bridge remains opertional only from January mid to June mid of the year while during remaining months Raghopur Diara remain cut from the other parts of Bihar.

4.The alignment of the proposed bridge spans over the entire width of the Ganges River including the river island and connect with national highways (NH-30 in Patna district & NH-103 in Vaishali district) on both sides of banks, improving connectivity and substantially reducing travel time between Patna and its surrounding areas. The approved alignment of the proposed project is shown in Figure 1 (on Google earth image).

Environmental Monitoring Report (October-December 2018) 7

5.Surrounded by the Ganges on all sides, Raghopur consists mainly of alluvial soil. There is only one road link through a pontoon bridge that connects it to . Boats are also used to reach Raghopur diara & vice versa.

Every year Raghopur diara area gets submerged by water due to flood in the Ganges. This has been helpful to Raghopur in way that flood also brings new layer of soil that makes this area verry fertile but on other way cuts the road connection of Raghopur diara area to nearby Patna city as pontoon bridge becomes unoperation from June to December every year. For the above reason the proposed project is very important as it will be the only bridge providing connectivity to Raghopur Diara (two existing bridges Mahatma Gandhi Setu & JP setu connecting Patna to Vaishali district of Bihar doesnot provide passage to Raghopur Diara).

Figure 1: Location Map of the Project Site on Google earth Image

2. Components of The Project

6. The project consists of the following key components:

i. Main 6-Lane Bridge length- 9.76km ii. Approach Length - 10.00 Km (South Approach-1.5 Km, North Approach-8.5 Km) iii. Widening of NH-103- 3.0 Km iv. Roadways- (a) Main Bridge Approach Embankments and Viaducts with 6 lane divided carriageway,configurationas per IRC Standard. (b) Connecting road to Diara portion is a 4-lane divided carriageway configuration as per IRC standard. v. Approach Roads including viaducts (about 1.5km at Kachhi Dargah – South Side and 8.5 km at Bidupur – North Side) and associated structures; vi. Widening of 3.0 km of existing road NH103 on the southern side; vii. Two ROB; viii. Eight underpasses and bridges; ix. Five junctions; x. Two Toll Plazas; and xi. Associated service facilities.

Source: BSRDCL Figure 2. BNGBP Project Alignment Map Environmental Monitoring Report (October-December 2018)

9

C. Objective of the Report

7. The objective of this report (environmental monitoring report) is to allow ADB and the Bihar State Road Development Corporation Limited (BSRDCL) to gather information to:

i) Evaluate the environmental management plan (EMP) progress by establishing compliance status. ii) Detect and correct non-conformances. iii) Identify unanticipated impacts and implement necessary mitigation measures, and iv) Provide evidence to support enforcement of penalty provisions of the civil works contract to deter non-compliance. 8. Environmental monitoring and disclosure of quarterly or semi-annual monitoring reports is an ADB requirement for environmental category-A projects like BNGBP. Environmental monitoring is part of project implementation process to be complied by both ADB and BSRDCL. The preparation and submission of the quarterly or semi-annual monitoring reports is the responsibility of BSRDCL while supervision to provide guidance is the role of ADB.

9. As eco sensitive location exist near the above the project alignment and it was agreed during project preparation that quarterly environmental monitoring reports will be prepared and disclosed for this project. However, since the well sinking and pier construction inside the main channel of river Ganges which is the key activity that poses risk to the eco senstivie location Inside water body till not started, it was agreed with ADB that one monitoring report will be submitted for every three month period.This report is the sixth quarterly environment report for reporting period October to December 2018. The details of the quarterly Monitoring report submitted till date are as follows:

S. Report Report Period Status for uploading on No. no. ADB website 1 Quarterly Environmental 1 July to Uploaded Monitoring report September 2017 2 Quarterly Environmental 2 October to Uploaded Monitoring report December 2017 3 Quarterly Environmental 3 January to March Uploaded Monitoring report 2018 4 Quarterly Environmental 4 April to June Uploaded Monitoring report 2018 5 Quarterly Environmental 5 July to Uploaded Monitoring report September 2018 6 Quarterly Environmental 6 October to Under review Monitoring report December 2018

D. Project Implementation Arrangement (Administrative Details)

10. The Government of Bihar acting through the RCD (Road Construction Department) and Bihar State Road Developmnet Corporation Limited (BSRDCL) is the executing agency of the Project. BSRDCL has established an environment safeguard cell to look after implementation and monitoring of the safeguard measures associated with the Project. It constitute four officials of BSRDCL. Organization structure of Safeguards Cell is show in Figure 3.

Environmental Monitoring Report (October-December 2018)

10

Project Implementation Unit

Project Management Project Authority Engineer

Contractor

Figure 3: Organization Structure of Safeguards Cell of BSRDCL Environmental Monitoring Report (October-December 2018)

11

E. Project Implementation Progress

11. As of December 2018, the status of various construction activities is provided in the Table 1.Photo log demonstrating the progress of works is provided in Appendix 1.

Table 3: Status of Construction Works as of December 2018 S.N. Activities Projected Status 1 Earthworks: Main work Location Estimated Location % quantity (in Completion cum) Sabalpur 4.149 L cum Sabalpur 0 Bidhupur 9.681 cum Bidhupur 0

2 Soils Disposal: ¾ Soil disposed at different Location Estimated disposal sites during the quantity reporting period is as under: *(in cum) Piling - 16000 cum Location Estimated Sabalpur quantity (in Piling - 16000 cum cum) Bidupur Piling - Sabalpur 5583.15 Well 794218 Piling - Bidupur Work not foundation cum – Started 136378 Grabbing material -- cum i.e. being used in low 7.44L lying area inside Grabbing 3.5 lacs ROW or filling for material being access road within used in low ROW lying area inside ROW or filling for access road within ROW

3 Vegetation and Plant Clearing: x Location of the trees as per Details of trees cut or transplanted survey which are to be cut or is as under: Some trees are coming in the located as under: Bridge alignment. These trees Location Trees Location Trees are to be cut or relocated with the Sabalpur - Patna 114 Sabalpur - Patna 58 prior approval of District Raghopur 15 Raghopur 8 Collector / forest department. Bid upur 473 Bid upur 60

Environmental Monitoring Report (October-December 2018)

12

S.N. Activities Projected Status 4 Utility Shifting: x Location of the electric ples Status during reporting period is as as per survey which are to be under: relocated are as under: Underground electric cables and Location Poles Location Poles telecom lines are to be realigned Sabalpur - Patna 100 Sabalpur - Patna 5 Raghopur 41+8 Raghopur 41+8 Bidupur 16+ yet Bidupur 6

to estimated

5 Traffic Management and Plan submitted with site layout -- Diversion: 6 Segment casting: -- -- 7 Establishment of construction Zero point- Zero Point camp: Fabrication Yard, Completed Rebar Yard, Completed Pre casting Yard Not Completed Number of 3*2 Number of 3*2 blocks STORIED blocks STORIED LABOUR Labour Completed STAFF Total Camp 13 acre / Staff Completed Area / residing Workers staying 750 area Staff staying 110 Capacity labour 750 staff 115 Facilities to be provided Facilities installed Bathing room 20 Completed 20 Dining room 24 Completed 24 Urinal& toilet 20 Urinal& toilet 20 Bathroom & 75 Bathro om & 75 toilet (attach) toilet (attach) Drinking water RO Drinking water RO with cooling with cooling facility facility Sewage 1 Sewage 1 Treatment Capacity - Treatment Plant Capacity - Plant 87 KLD 87 KLD playground / 300 SQM/ Playground / Completed recreation 162 SQM recreation Raghopur Raghopur Fabrication Yard Completed Rebar Yard Completed Casting Yard Completed Number of 12*2 + 1*1 Number of blocks STORIED blocks LABOUR 9 block LABOUR 9 block STAFF 20 rooms Staff 20 rooms Total Camp 40RE AC Total Camp 40 ACRE Area Area Capacity 3000 Capacity 3000 LABOUR 180 LABOUR 180 STAFF STAFF Facilities to be provided Bathing room 300 Environmental Monitoring Report (October-December 2018)

13

S.N. Activities Projected Status Bathing room 320 Kitchen room 160 Kitchen room 162 Urinal& toilet 300 Urinal& toilet 320 Bathroom & 20 Bathroom & 20 toilet (attach) toilet (attach) Drinking water RO Drinking water RO with cooling with cooling facility facility Sewage 1 Sewage 1 Treatment Capacity - Treatment Capacity - Plant 273 KLD Plant 273 KLD Playground Completed

Playground 600 SQM

8 Other Facilities: Following facilities are provided at casting Yard, Zero Point & Completed. Raghopur. ¾ Batching Plant, Item Capacity ¾ Laboratory, Batching CP 30 – 1nos. ¾ RO Plant Plant M1(60CUM) –2 ¾ Diesel Generating Set nos. ¾ Electricity connection Quality Sabalpur – 1 from State Electricity Control No.; Board Laboratory Raghopur -1 No.; RO Plant Sabalpur – 1 No. 3000 LPH Raghopur -1 No. 5000 LPH Diesel 125 kva; 62.5 Generating kva; 30 kva in Set nos in well locations and in infra facility. Electricity 3 MVA at connection Zero Point from State (completed) Electricity 1 MVA at Board Raghopur

Environmental Monitoring Report (October-December 2018)

14

S.N. Activities Projected Status 9 Establishment and operation Construction materials Volume of the material consumed is of quarry/ borrow area: requirement projected are as as under: under: For the construction work Material Quantity following material is sourced: Material Quarry / (MT) borrow area Sand 156631.32 ¾ Sand Sand 623000 mt Aggregate 235491. 6 ¾ Aggregate Aggregate 964209 mt ¾ Cement Cement 38986.33 ¾ Steel Cement 357115 mt Steel 7756.07

Steel 91500 mt GGB S 39469.94

Environmental Monitoring Report (October-December 2018)

15

Well Foundation and Lower Pylon Progress strip chart for the Quarter of October-December 2018

Lift of Well Steining Sl. Well Cutting Well Chainage No. No. Edge Curb 1st 2nd 3rd 4th 5th -A 5th -B 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 1st Bottom Sand Mid Well Lift of Height of REMARKS individual 4.66m 2.55m 2.55m 2.55m 2.55m 0.91m 1.64m 2.55m 2.55m 2.55m 2.55m 2.55m 2.55m 2.55m 2.55m 2.55m 2.55m 2.55m 2.55m 1.485m 1.505m Plug Filling Plug Cap Lower

Lift Pylon

Cumulative Height/ 4.66m 7.21m 9.76m 12.31m 14.86m 15.77m 17.41m 19.96m 22.51m 25.06m 27.61m 30.16m 32.71m 35.26m 37.81m 40.36m 42.91m 45.46m 48.01m 49.50m 51.00m

Depth

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26) (27) (28) (29) (30) (31)

1) MP01 1+270.00

2) MP02 1+349.50 4

3) MP03 1+499.50 4) MP04 1+649.50 2 2 2 2 2 2 2 2

5) MP05 1+799.50 2 2 2 2 2 2 2 2 2 2 2 2 2

6) MP06 1+949.50 2 2 2 2 2 2 2 2 2 2 2 2 2 4

7) MP07 2+099.50 2 2 2 2 2 2 2 2 2 2 2 2 2 4 4

8) MP08 2+249.50 2 2 2 2 2 2 2 2 2 2 2 2 2 4

9) MP09 2+399.50 2 2 2 2 2 2 2 2 2 2 2 2 2 4

10) MP10 2+549.50 11) MP11 2+699.50

12) MP12 2+849.50 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 3 4 4

13) MP13 2+999.50 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 4

14) MP14 3+149.50 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 4

15) MP15 3+299.50 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 3 4 16) MP16 3+449.50 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1

17) MP17 3+599.50 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 3 4 4

18) MP18 3+749.50 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 3

19) MP19 3+899.50 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3

20) MP20 4+049.50 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 4 4

21) MP21 4+199.50 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 4

22) MP22 4+349.50 23) MP23 4+499.50

24) MP24 4+649.50

25) MP25 4+799.50

26) MP26 4+949.50 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1

27) MP27 5+099.50 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 4 4 4 28) MP28 5+249.50 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

29) MP29 5+399.50 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 4

30) MP30 5+549.50 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 4 4

31) MP31 5+699.50 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 4 4

32) MP32 5+849.50 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

33) MP33 5+999.50 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 3 4

34) MP34 6+149.50 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 3 4 35) MP35 6+299.50 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 4

36) MP36 6+4490 .5 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 4 4 4

37) MP37 6+599.50 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 4 4

38) MP38 6+749.50 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 3 4 4

39) MP39 6+899.50 2 2 2 2 2 2 2 2 2 2 2 2 1 1 3 4 40) MP40 7+049.50 2 2 2 2 2 2 2 2 2 1 1 3 3 4 4

41) MP41 7+199.50 2 2 2 2 2 2 2 2 2 1 1 3 3 4 4 4

42) MP42 7+349.50 2 2 2 2 2 2 2 2 1 1 3 3 3 4 4 4 Environmental Monitoring Report (October-December 2018)

16

43) MP43 7+499.50 2 2 2 2 2 1 1 1 3 3 4 4 4

44) MP44 7+649.50 2 2 2 2 2 1 4 4 4

45) MP45 7+799.50 2 2 2 2 2 1 1 1 1 3 3 4 4 4

46) MP46 7+949.50 2 1 3 4

47) MP47 8+099.50 2 4 48) MP48 8+249.50 2 1 4

49) MP49 8+399.50 2 4

50) MP50 8+549.50 2 1 3 4 4

51) MP51 8+699.50 2 3 4

52) MP52 8+849.50 2 53) MP53 8+999.50 2 4

54) MP54 9+149.50 2 4 55) MP55 9+299.50 3 3 4 4

56) MP56 9+449.50 3 4 4

57) MP57 9+599.50

58) MP58 9+749.50

59) MP59 9+899.50 60) MP60 10+049.50

61) MP61 10+199.50

62) MP62 10+349.50

63) MP63 10+499.50

64) MP64 10+649.50 65) MP65 10+799.50

66) MP66 10+949.50

67) MP67 11+029.00

Work Done in the Month of Upto Sep-2018 Oct-2018 Nov-2018 Dec-2018 Well in Water Well in Water (Rainy Well in Land (All Season) Colour Symbol 2 1 3 4 Season)

Environmental Monitoring Report (October-December 2018)

17

Environmental Monitoring Report (October-December 2018)

18

II. COMPLIANCE TO SAFEGUARDS PROVISIONS

A. Compliance to Loan Agreement

12. The environmental safeguard requirements are explicit provided in the Loan Agreement 3393-IND between ADB and State of Bihar through the Road Construction Department (RCD) and Bihar State Road Development Corporation (BSRDCL). These loan agreement provisions and compliance status are provided in Table 3.

Table 4: Status of Compliance to Environmental Provisions of the Loan Agreement

Description Status of Compliance/ Schedule Remarks BSRDCL shall not award the Works contract until: Schedule (a) The State’s Environment Impact EC granted by SEIAA, Bihar on 4 Assessment Authority has granted final 29.01.2016. Para. 5 approval of the EIA; and (b) BSRDCL has incorporated the relevant The relevant provisions as per provisions from the EMP into the Works the EMP of EIA report is clearly contract. mentioned by BSRDCL in the contract agreement. The Borrower, State and BSRDCL shall ensure BSRDCL is monitoring the Schedule that the preparation, design, construction, status of the compliance to all 5 implementation, operation and decommissioning applicable laws, State EHS rules Para. 4 of the project facilities comply with (a) all & laws apart from all measures applicable laws and regulations of the Borrower listed in the EIA & EMP reports. and State relating to environment, health, and safety; (b) the Environmental Safeguards; and (c) all measures and requirements set forth in the EIA and EMP, and any corrective or preventative actions set forth in a Safeguards Monitoring Report. Schedule The Borrower, State and BSRDCL shall ensure Updated EIA & EMP have been 5 that no Works under paragraphs 2(a) and 2(b) of submitted to ADB by BSRDCL. Para. 5 Schedule 1 to this Loan Agreement are Updated EIA has also been commenced until the EIA and EMP have been uploaded on ADB website. updated and cleared by ADB after the finalization of the detailed design for the Works. The Borrower and State shall ensure or cause The contractor is complying with Schedule BSRDCL to ensure that all bidding documents and all measures listed in the 5 contracts for Works contain provisions that require EIA/EMP report which is being Para. 10 contractors to: monitored by PMAE. (a) comply with the measures relevant to the contractor set forth in the EIA and the EMP (to the extent they concern impacts on affected people during construction), and any corrective or Environmental & social budget preventative actions set forth in a Safeguards have been included in the civil Monitoring Report; contract budget.

Environmental Monitoring Report (October-December 2018)

19

(b) make available a budget for all such PMAE is regularly monitoring environmental and social measures; the measures taken by the contractor as per the EIA/EMP (c) provide the Borrower with a written notice of any report & if any discrepancies unanticipated environmental, resettlement risks or found is reported in the form of impacts that arise during considered in the EIA and written document to the the EMP; contractor. The conditions of the road & other infrastructure facilities are taken into consideration before the start of any transportation & (d) Adequately record the condition of roads, construction activities. agricultural land and other infrastructure prior to starting to transport materials and construction;

Schedule The Borrower and State shall do the following or 5 cause BSRDCL to do the following: Para. 11 (a) submit (i) quarterly Safeguards Monitoring Five Quarterly & two semiannual Reports for environmental impacts; and (ii) monitoring report are submitted semi-annual Safeguard Monitoring Reports to ADB via BSRDCL & uploaded for resettlement and other social impacts to on the website. ADB and disclose relevant information from such reports to affected persons promptly upon submission; No such impacts have been anticipated on our site till date. (b) if any unanticipated environmental and/or The project has completed 5 social risks and impacts arise during million safe manhours of work. construction, implementation or operation of the Project that were not considered in the EIA, the EMP and the RP, promptly inform ADB of the occurrence of such risk or EMES have been awarded the impacts, with detailed description of the contract as external monitor & event and proposed corrective action plan; are working on this project since September (c) No later than six months after the award of 2017. the work contract, engage qualified and experienced external experts under a selection process and terms of reference acceptable to ADB, to verify information No such breach has been produced through the project monitoring reported till date on the site. process and facilitate the carrying out of any verification activities by such external experts;

(d) Report any actual or potential breach of compliance with the measures and requirements set forth in the EMP or the RP Promptly after becoming aware of the breach. Environmental Monitoring Report (October-December 2018)

20

Schedule The Borrower and BSRDCL shall ensure that Works The contractor is following all 5 contracts under the Project follow all applicable applicable labor laws as per the Para. 13 labor laws of the Borrower and State and that these State & Central norms.

further include provisions to the effect that

contractors: (a) carry out HIV/AIDS awareness programs for Awareness programmes have labor and disseminate information at worksites been carried out jointly by PMAE on risks of sexually transmitted diseases and & contractor in presence of HIV/AIDS as part of health and safety measures BSRDCL staffs on World st for those employed during construction; and HIV/AIDS day conducted on 1 December 2018. (b) Follow and implement all statutory provisions Daewoo-L&T JV is complying with all statuary provisions on on labor (including not employing or using children labour, health safety, welfare as labor, equal pay for equal work), health safety, sanitation and working welfare sanitation and working conditions. Such conditions. On regular basis contracts shall also include clauses for termination observation on the compliance in case of any breach of the stated provisions by the status of the same is made. contractors.

Environmental Monitoring Report (October-December 2018)

21

B. Compliance to Project Administration Manual

13. The Project Administration Manual (PAM), describes how the BSRDCL will implement the project and deliver the results on time, with quality, within budget, and in accordance with government and Asian Development Bank (ADB) policies and procedures. The PAM is mandatory and serves as the main document describing implementation details. The status of implementing the safeguards requirements set out in PAM are provided in Table 5.

Table 5: Compliance to PAM

SN Details Compliance Status 1. Section VII.

Safeguards

Environmental Safeguards 47. The project is classified as category A in Complied. accordance with the ADB’s SPS due to the presence of the Gangetic Dolphin (Platanistagangetica), the Ganges soft shell turtle (Nilssoniagangetica) and potential presence of the Gharial (Gavialisgangetica) in the project area which are listed as endangered, vulnerable and critically endangered respectively under the IUCN red list and under schedule I of the Wildlife Protection Act of India. In addition the large project scope requires substantial resources including the transport and storage of significant quantities of construction materials and equipment and a large labor force. An EIA report has been prepared and disclosed on the ADB website. The EIA includes an Environmental Management Plan (EMP) and an Environmental Monitoring Plan (EMOP) and a Biodiversity Conservation Plan (BCP). All three plans include budget estimates. 2. 48. The EMP is a plan for mitigating all anticipated EMP and EMoP has already been environment impacts during project construction and submitted by contractor and approved operation. Specific mitigation measures with details by PMAE. The contractor has engage on location, time and responsible agency for the NABL/MoEF&CC approved implementation is given in the EMP. The EMOP is a agency M/s Green circle for carrying plan for monitoring various environment quality out Environmental monitoring for parameters and checking the effectiveness of the different environmental parameters EMP. It comprises of activities on testing the quality such as air, water, noise etc on of air, water, noise through laboratory tests and quarterly basis. The contractor & physical monitoring of problems of soil erosion, tree PMAE physically monitors the soil plantations and occupational health and safety erosion, tree plantation & occupational issues. The BCP is a plan for establishing the health safety issues on regular basis. biodiversity baseline in the project area, monitoring changes in the local biodiversity during project The BCP has also been submitted by construction and early stages of project operation EMES. Monthly biodiversity and implementing biodiversity conservation Environmental Monitoring Report (October-December 2018)

22

SN Details Compliance Status activities to ensure that there will be no “net loss” of monitoring is being carried by biodiversity as a result of the project. contractor/PMAE/external monitors.

49. Implementation arrangements for Environment Safeguards. The responsibilities of various agencies and parties for implementing environment safeguards are provided below. 50. BSRDCL. BSRCL will be responsible for BSRDCL team from HQ (through visit ensuring the implementation of environment on regular basis) as well as PIU office safeguards under the project as required in the EIA (are present on the site) to insure the and EMP and in accordance with the ADB SPS and implementation of the environmental environmental regulations of the Government of safeguard of the EIA & EMP as well as India. in accordance of SPS & environmental regulations of Govt. of India. BSRDCL will ensure timely processing and securing Environmental clearance & tree of all statutory clearances and permits such as the cutting permission had already been environmental clearance, tree cutting permits and obtained. The compliance of the others. Environmental Clearances are being submitted on half yearly basis to SEAC, Bihar.

The PIU will include 2 Managers (technical) who will Mr. Suresh Kumar (HQ, GM, also be responsible for overseeing day to day BSRDCL), Mr. Sidarth Kumar (For implementation of social and environmental Environment& Socio, North Zone) & safeguards on site. Mr. Amarjeet Kumar (for Environment & Socio, South Zone) have been deputed for the same.

All environmental assessment reports, EMPs, and The updated EIA report, 5 quarterly environmental monitoring reports submitted by the Environmental Monitoring report & 2 PMAE and External Monitor for Environment semiannual Environmental Monitoring Safeguards (EMES) will be reviewed and endorsed report have been submitted & and forwarded to ADB for disclosure on the ADB uploaded on ADB website. website. BSRDCL authorized civil works for BSRDCL will authorize civil works for construction of construction of the main bridge and the main bridge and approach roads to begin on site approach roads only after clearance only after ADB approval of the revised EIA that will from ADB on submission of updated be prepared by the contractor based on detailed EIA report by contractor which has design. already been published on ADB website.

BSRDCL will coordinate with and seek technical BSRDCL have seek technical support support and guidance from relevant government & guidance from NHAI (National agencies such as the Forestry Department, Patna Highway Authority of India), IWAI University, Zoological Survey of India and others as (Inland Waterways Authority of India), needed. Department of Irrigation, Govt. of Bihar, Forest Department & Zoological Survey of India as & when required. Environmental Monitoring Report (October-December 2018)

23

SN Details Compliance Status 51. PMAE. The PMAE will be responsible for The EMP & EMoP implementation is supervising implementation of the EMP and EMOP being supervised by PMAE’s by the contractor. Environment & Biodiversity Specialist. Environmental Specialist- Mr. Rajeev The PMAE team will include an Environmental Chandra, Biodiversity Specialist- Prof. Specialist and a Biodiversity Specialist who will be Pradeep Srivastava are continuously responsible for supervision and monitoring on supervising & monitoring the implementation of environment safeguards on site. implementation of Environmental Safeguard on site.

The updated EIA report based on detailed design, The updated EIA report based on supplementary environmental assessments (if detailed design, updated EMP and required), updated EMP and EMOP prepared by the EMOP prepared by the EPC EPC contractor will be reviewed and approved by contractor has been approved by the PMAE. PMAE.

The final detailed design prepared by the EPC All precautionary measures are being contractor will be reviewed to ensure that all efforts adopted to avoid adverse impact on have been made to avoid and mitigate adverse the local biodiversity. The habitat of impacts on the local biodiversity in particular the the Gangetic Dolphin & Ganges turtle Gangetic Dolphin and the Ganges turtle. does not lie within project line of alignment. All sub-plans such as construction camp layout plan, The construction camp layout plan, waste management plan, borrow area management waste management plan, traffic plan, traffic management plan, tree plantation plan management plan, tree plantation and others prepared by the contractor will be planplan have been reviewed and reviewed and approved by the PMAE. approved by PMAE except borrow area management plan as borrow area is yet to be identified and finalized. 52. Quarterly Environmental Monitoring Reports on So far 5 nos. of Quarterly implementation and monitoring of environment Environmental Monitoring Reports & 2 safeguards will be prepared by the PMAE and nos. of semiannual report have been submitted to BSRDCL for their endorsement and submitted & published on website of further forwarding to ADB for disclosure on the ADB ADB. website.

The PMAE will also carry out capacity building PMAE make arrangement of different activities on implementation of environment types of training & workshop for safeguards through training workshops and on-site BSRDCL & the contractor. training for relevant staff of BSRDCL and the contractor. 53. Contractor. In accordance with the provisions of The contractor have appointed the EPC Contract the contractor will provide a relevant experts in their EHS team of relevant experts such as environmental, Department headed by Mr. Abhay ecological and occupational health and safety Singh (EHS Incharge), Mr. Anjani specialists in order to ensure proper Kumar (Environment Expert), Mr. implementation of the EMP. These personnel will Dinesh Kr. Gupt (Biodiversity Expert) have presence in all construction and camp-sites & other team members who have and active construction fronts. marked their presence in all Environmental Monitoring Report (October-December 2018)

24

SN Details Compliance Status construction and camp-sites and active construction fronts. 3. 54. The contractor will update the EIA report based The contractor has updated the EIA on the detailed design, conduct supplementary report on the basis of detailed design environmental assessments (if necessary) and and submitted to PMAE for approvals. update the EMP and EMOP based on the final The EIA report has been approved detailed design for review and approval by the and is disclosed on the ADB web site. PMAE. The EMP and EMOP is being Thereafter the contractor will implement the EMP implemented by contractor on the site and EMOP. The EMP will be implemented which is being supervised & monitored throughout the construction stage and during the by PMAE. five-year defects liability period during the operation stage. Environmental Monitoring for air, Quality testing of air, water and noise as required in surface water, ground water, drinking the EMOP may be outsourced by the contractor to water, ambient noise, DG stack, muck recognized and approved laboratories, while sample, STP sludge sample is being physical monitoring activities will be carried out by outsourced by contractor from NABL PMAE and EMES where applicable. /MoEF&CC recognized laboratories i.e. M/s Green circle on quarterly basis while physical monitoring is being carried out by PMAE/EMES team. 4. 55. External Monitor for Environment Safeguards External Monitor (EMES) team (EMES). The External Monitor will be responsible for comprising of Ecological expert (Mr. conducting third party monitoring of the K.K. Mohapatra) and Environmental implementation and supervision of environment expert (Mr. S. Prasad) were appointed safeguards by the EPC contractor and PMAE in august 2017 and are regularly respectively. The External Monitor will comprise an monitoring the implementation and Environmental Expert and an Ecological Expert. The supervision of environment Ecological Expert will be responsible for updating the safeguards by the EPC contractor and Biodiversity Conservation Plan (BCP) and thereafter PMAE respectively. EMES have implementing the BCP. For implementing the BCP updated the EIA & BCP and submitted close coordination will be carried out with relevant to BSRDCL. Final BCP is to be local agencies and institutions such as the Patna submitted by EMES. EMES is carrying University, Forestry Department, Zoological Survey out close coordination with local of India and others if required. agencies & institutions. 5. 56. The External Monitor will prepare semi-annual Being complied. The EMES Team are monitoring reports during the project construction conducting periodic monitoring on site stage on third party monitoring activities and and preparing semi-annual monitoring implementation of BCP for submission to BSRDCL reports. So far 2 semiannual who will further forward the reports to ADB for Environmental Monitoring report have disclosure on the ADB website. The External Monitor been submitted and uploaded on the will carry out monitoring activities for three years ADB website. during project operation to check the effectiveness of the BCP, GHG emissions, and effectiveness of mitigation measures implemented. Annual monitoring reports will be prepared during project operation and submitted to BSRDCL for further submission to ADB.

Environmental Monitoring Report (October-December 2018)

25

C. Compliance to the Civil Works Contract Agreement

14. The contractor is liable to comply with the safeguards clauses included in the contract agreement. Table 6. below provides an update on the status of safeguards compliance by the civil works contractor.

Table 6: Compliance to the safeguards Clauses of the Civil Work Contract

S.N. Description Compliance Status 1 Safety Procedures The Contractor shall: a) comply with all applicable safety Contractor is complying with all required regulations, updated EHS regulations e.g. Building and Other Construction Workers’ (Regulation of Employment and Conditions of Service) Act, 1996, Petroleum Act 1934 & Petroleum Rules 2002, The Public Liability Insurance Act 1991 and Rules 1991 etc. & resulted no any noncompliance notice is received from statutory officials till date.

b) take care for safety of all persons entitled To take care of safety of entire workforces to be on the Site, contractor has a full proof system i.e. screening for competency, EHS induction, pre-employment medical test, distribution of PPE’s, pre start verification talk by site engineer at exact locations before start of work activities, EHS training on periodical basis, on the job EHS training time to time, round the clock EHS observations by site EHSO as well as execution officials. Safe work method & hazard identification & risk assessment (HIRA) is religiously followed at site to avoid or prevent any unwanted incident at site.

c) use reasonable efforts to keep the Site and It is ensured all the time by concerned site Works clear of unnecessary obstruction so officials safe work method & HIRA should as to avoid danger to these persons, be in place & religiously followed. Round the clock EHS observations are made & rectification on observed points are complied within time frames as well as sometime, if any danger is anticipated entire work activities are stopped & restarted only after compliance.

d) provide fencing, lighting, guarding and Fencing of camp area is already watching of the Works until completion completed & at working area/ROW MS and board fencing are provided & on regular basis if work area increases due consideration is taken for fencing , regular area lightning, illumination testing is made Environmental Monitoring Report (October-December 2018)

26

S.N. Description Compliance Status on random basis, to satisfy the concerned area lightning condition. Without job supervisor no work should be started it is the commitment of contractor’s higher management. e) Provide any Temporary Works (including For any temporary works including roadways, footways, guards and fences) roadways and others, all safety which may be necessary, because of the precautions are taken prior to start of work execution of the Works, for the use and activities i.e. area barrication, deployment protection of the public and the owners of trained flagmen/signalmen, required and occupiers of adjacent land. safety signage’s, are provided and one responsible senior official, so that no disturbances should be there to adjacent landowner, general public etc. 2 Health and Safety The contractor has engaged two nos. of The Contractor shall at all times take all permanent resident doctor with four reasonable precautions to maintain the health numbers full time first aiders with and safety of the Contractor's Personnel. In necessary medicines and ambulance (with collaboration with local health authorities, the 24X7 availability) at three location namely Contractor shall ensure that medical staff, first Zero point camp, Raghopur Camp and aid facilities, sick bay and ambulance service Sabalpur site office. For any serious are available at all times at the Site and at any accident the contractor has tie up with accommodation for Contractor's and nearby hospital. Apart from this, the Employer's Personnel, and that suitable rescue boat has been deployed by arrangements are made for all necessary contractor in the river to be used at the welfare and hygiene requirements and for the time of emergency. Regular inspection of prevention of epidemics. workmen camp are done to improve the hygiene & create awareness about hygiene among the workmen. Being complied.

The Contractor shall appoint an accident Contractor has full-fledged EHS prevention officer at the Site, responsible for department headed by Dy. GM EHS, maintaining safety and protection against under his guidance strong competent accidents. This person shall be qualified for required EHS team members are there to this responsibility, and shall have the authority take care of entire area EHS activities. to Issue instructions and take protective Contractor is taking adequate measures measures to prevent accidents. Throughout as per the provision of EHS plan, which is the execution of the Works, the Contractor also a part of bidding document. shall provide whatever is required by this . person to exercise this responsibility and authority.

The Contractor shall send, to the Engineer, The contractor has interim method of details of any accident as soon as practicable reporting an accident and maintaining the after its occurrence. The Contractor shall records. maintain records and make reports concerning health, safety and welfare of persons, and damage to property, as the Engineer may reasonably require. Environmental Monitoring Report (October-December 2018)

27

S.N. Description Compliance Status Safety Procedures and Health & Safety

“The Contractor shall throughout the execution of the Works including the carrying out of any testing, commissioning (including Integrated Testing and Commissioning), or remedying of any defects:

(a) take full responsibility for the adequacy, With due consideration of IMS certificate stability, safety and security of the Works, there is standard procedure of deployment Plant, Contractor's Equipment, Temporary of new machineries as well proper Works, operations on Site and methods of periodical inspection of each & every manufacture, installation, construction and equipment /machinery at site & the transportation; contractor are following religiously the same to prevent any sorts of incident.

(b) have full regard for the safety of all persons on or in the vicinity of the Site To take care of unauthorized entry into the (including without limitation persons to project area Daewoo-L&T JV is having full whom access to the Site has been allowed proof Induction process. Apart from that by the Contractor), comply with all relevant there is Daily pep talk during which the safety regulations, including provision of workforces are checked for EHS safety gear, and insofar as the Contractor induction card and those person who are is in occupation or otherwise is using areas found without EHS induction are removed of the Site, keep the Site and the works (so from the site & strict action are taken far as the same are not completed and against the subcontractors. So, there is a occupied by the Employer) in an orderly full proof system for controlling the state appropriate to the avoidance of injury unauthorized entry into the work premises.

to all persons and shall keep the Employer indemnified against all injuries to such persons; (c) provide and maintain all lights, guards, Adequate no of guards & watchman has fences and warning signs and watchmen been provided an entire project site for the when and where necessary or required by protection of work activity & public the Engineer or by laws or by any relevant convenience of the public and all persons authority for the protection of the Works on or in the vicinity of the Site.EHS and for the safety and convenience of the awareness & warning signage are public and all persons on or in the vicinity displayed in local language at prominent of the Site; and locations. (d) where any work would otherwise be HPSV (High pressure Sodium Vapor) light carried out in darkness, ensure that all and Light Mast have been deployed at different working locations to provide the parts of the Site where work is being carried out are so lighted as to ensure the adequate illumination. Regularly safety of all persons on or in the vicinity of illumination checking is done in order to the Site and of such work. better understand the illumination level of the working area as per the internal Contractor is required to take note of all the condition. necessary provisions in Employer’s Adequate Environment, Health and Environment, Health and Safety Manual (EHS Safetymeasures are being implemented Manual) and the Contractor’s price shall be as per the provision of EHS plan. Time to inclusive of all the necessary costs to meet the time review is made the EHS plan as per prescribed safety standards. the requirement. Contractor’s price is inclusive of all the necessary costs Environmental Monitoring Report (October-December 2018)

28

S.N. Description Compliance Status required to meet the prescribed safety standards.

The Contractor's Site Safety Plan shall be EHS manual has been prepared as per developed from his Outline Safety Plan as per site condition by the contractor and has Employer's Requirements and EHS Manual of been submitted to PMAE and approved. the Employer. The Contractor shall appoint a Contractor has full-fledged EHS member of his staff at the Site to be department headed by Dy. GM EHS, responsible for maintaining the safety, and under his guidance strong competent protection against accidents, of personnel on required EHS team members are there to the Site. This person shall be qualified for his take care of entire area EHS activities. work and shall have the authority to issue instructions and take protective measures to prevent accidents.

Safety Precautions

Within 8 weeks of the date of Notice to Contractor has submitted site specific Proceed, the Contractor shall submit a detailed EHS manual which includes detailed and comprehensive contract-specific detailed policies, procedures and Site Safety Plan based on the Employer’s regulations which, when implemented with Environmental Health and Safety Manual General Conditions of Contract as per the (EHS Manual). The Contractor is required to contract specific requirement and the make himself aware of all the requirements of same have been approved by PMAE. The the Environmental Health and Safety Manual conditions mentioned in the EHS manual in this regard and comply with them. The Site is being complied by the contractor which Safety Plan shall include detailed policies, is being monitored by PMAE. procedures and regulations which, when implemented, will ensure compliance with General Conditions of Contract. Protection of the Environment The Contractor shall take all reasonable steps The contractor has taken several to protect the environment (both on and off the precautionary measures to minimize the Site) and to limit damage and nuisance to impact on Environment. Environmental people and property resulting from pollution, Monitoring by NABL/MoEF&CC laboratory noise and other results of his operations. (M/s Green circle) is being done on quarterly basis for different environmental components such as ambient air, noise, drinking water, surface water, ground water soil, muck sample, STP sludge on quarterly basis in and around the project area. If any parameters found to be exceeding the permissible limit then instant action is taken. The Contractor shall ensure that emissions, For controlling emissions (from stationary surface discharges and effluent from the sources) in Batching plant area silos, dust Contractor's activities shall not exceed the collector & covered conveyer have been values indicated in the Employer's provided while for controlling vehicular Requirements, and shall not exceed the emissions PUC(Pollution Under Control) values prescribed by applicable laws. certificates & fitness certificate has been mandatory. Both at zero point camp & Environmental Monitoring Report (October-December 2018)

29

S.N. Description Compliance Status Raghopur camp the domestic effluent are being treated by the use of STP (sewage treatment plant). In spite of the above, plantation all around the Batching plant area and camp area have been done. Regular quarterly Environmental monitoring is also being done to access the Environmental scenario all in and around the project site. Protection of the Environment The Contractor shall be responsible and liable The contractor fulfills all the statutory for any stoppage, closure or suspension of the requirement as per the state & central works due to any contravention of statutory government laws & regulations. requirements relating to the protection of the environment and shall identify and keep indemnified the Employer in this regard.

The Contractor's Site Environmental Plan Environmental Management Plan have shall be developed from his Employer’s prepared & approved by PMAE. The Environmental Health and Safety Manual contractor follows all the norms as per the (EHS Manual), as per the Employer's EMP/EHS plan which is regularly Requirements and Special Conditions of monitored by PMAE. Contract. Nothing extra shall be payable to the Contractor on this account and his Bid price shall be inclusive of expenditure required to be incurred for working as per EHS Manual.

Outline Environmental Plan means the EHS & EMP plan have been prepared by environmental plan forming part of the Tender, Daewoo-L&T JV & approved by PMAE. setting out, in summary form, the Contractor's Environmental Management plan include proposed means of complying with his detailed policies, procedures and obligations in relation to environmental quality. regulations which, when implemented & Site Environmental Plan means the site compliance to these are insured from environmental plan including all supplements contractor’s end. Different types of training thereto, or any amended or varied version are organised to make the employees & thereof, as submitted by the Contractor in workforces aware of the EMP/EHS/EMoP accordance with Employer’s Safety, Health procedures. and Environmental Manual (SHE Manual), this Clause and which has received the Engineer’s consent. The Site Environmental Plan shall include detailed policies, procedures and regulations which, when implemented, will ensure compliance with this Clause. The Contractor is required to make himself aware of all the requirements of the Employer’s SHE Manual in this regard and comply with them.

Environmental Monitoring Report (October-December 2018)

30

Supporting forms & format for Compliance to the Civil Works Contract Agreement

Screening and Induction Procedure

Environmental Monitoring Report (October-December 2018)

31

Screening Form:

Environmental Monitoring Report (October-December 2018)

32

Environmental Monitoring Report (October-December 2018)

33

Pre medical health check-up Form:

Environmental Monitoring Report (October-December 2018)

34

EHS Induction Card is issued to each and every one:

Environmental Monitoring Report (October-December 2018)

35

Daily Prestart Verification and Briefing:

Environmental Monitoring Report (October-December 2018)

36

Environmental Monitoring Report (October-December 2018)

37

Environmental Monitoring Report (October-December 2018)

38

Inspection and Activity Plan:

Environmental Monitoring Report (October-December 2018)

39

Environmental Monitoring Report (October-December 2018)

40

Environmental Monitoring Report (October-December 2018)

41

Risk Assessment and Safe Work Method Procedure:

Environmental Monitoring Report (October-December 2018)

42

Environmental Monitoring Report (October-December 2018)

43

Environmental Monitoring Report (October-December 2018)

44

Risk Assessment and Safe Work method covered following every and each Activity

Environmental Monitoring Report (October-December 2018)

45

Environmental Monitoring Report (October-December 2018)

46

Emergency Response Layout Displayed on the site:

Environmental Monitoring Report (October-December 2018)

47

D. Compliance to condition of the Environmental Clearances.

15. The Environmental clearance (EC) issued by the state Environmental Impact assessment Authority (SEIAA), Bihar includes 13 specific conditions during the construction stage and 7 general conditions. The contractor is liable to comply with the conditions of Environmental clearances, which is obtained by BSRDCL prior to start of the project. The compliance to the condition of Environmental Clearance is submitted to SEIAA, Bihar on six monthly basis. The latest compliance submitted to SEIAA, Bihar from July to December 2018 is mentioned below in Table no-7. Table: 7. Compliance of EC S. No. EC points Compliance Status 1. Specific Conditions I Construction Phase (i) All necessary clearance as applicable to the It is being complied from time project shall be obtained from the concerned to time as per the site authorities before initiating the project. requirement. (ii)Necessary mitigative measure against adverse Sewage at the both the camp impact to the water bodies that are to be affected area is being treated through shall be provided. STP (Sewage treatment plant). No any construction water is allowed to be dumped in and around the river area. Washing of vehicle in & around the river is restricted. For prevention of soil erosion near the bank of river Ganges silt barrier has been provided & jetty has been constructed. (iii) There shall be no disposal of solid and liquid No disposal of solid and liquid wastes into the water body. The solid waste shall wastes is being done into the be properly collected, segregated and disposal as water body. All municipal solid per the provision of Solid Waste (Management and wastes is being segregated, Handling) Rules, 2000. collected, transported, treated and disposed as per provisions of the Solid waste Management Rules, 2016. The sewerage is being treated with the help of Sewage Treatment Plant (STP) installed at both the camps. Washing of vehicle in & around the river is restricted. For prevention of soil erosion near the bank of river Ganges silt barrier has been provided & jetty has been constructed. (iv) Installation and operation of DG set, if any Main source of power in the shall comply with the guidelines of CPCB. project area is through Power grid supply while DG is being Environmental Monitoring Report (October-December 2018)

48

used as power backup. DG set with only acoustic enclosures has been installed on concrete platform along with proper stack height. Regular stack monitoring of the DG set is being done on quarterly basis by NABL/MoEF&CC accredited laboratory. Proper care is being taken for storage & disposal of lubricant being used in DG. (v) Provision shall be made for the housing of Housing of construction labor construction labour with all necessary infrastructure has been developed in the and facilities such mobile toilets, mobile STP, safe form of temporary structure drinking water, medical health care, etc. The (prefab panel) with all housing may be in the form of temporary structures necessary infrastructure to be removed after the completion of the Project. facilities developed such as RO for drinking water, STP for treatment of sewage water, first aid center with first aid facilitates (resident doctor- 2nos. , male nurses-4 nos., ambulance-3 nos., medicine etc.) 24X7 availability. (vi) All the top soil evacuated during Top soil evacuated (if any) is construction activities should be stored for use in being stored for use in horizontal/landscape development within the plantation in & around the project site. camp area, turfing and approach road at camp entrance. (vii) Disposal of muck during construction phase Disposal of muck is not being should not be created any adverse effort on river done inside the river. The and the neighbor communities and the disposal off muck first being tested for taking the necessary precautions for general safety presence of any hazardous/ and health aspects of people, only in approved sites toxic materials (from with the approval of competent authority. NABL/MoEF&CC accredited laboratory) than being used for filling of low lying areas within the ROW. (viii) Vehicles hired for bringing construction All the vehicles being used for material to the site should be in good condition and the construction activities and should have a pollution check certificate and should transportation of construction conform to the applicable air and noise emission materials is being checked for standards and should be operated only during non- fitness certificate as well as peak hours. PUC (Pollution under control certificate) and is being operated during non-peak hours. Environmental Monitoring Report (October-December 2018)

49

(ix) Under the provisions of Environment Environmental clearance for (Protection) Act, 1986, legal action shall be initiated the project has already been against the project proponent if it was found that obtained from SEIAA, Bihar construction of the project has been started without and the construction has been obtaining environmental clearance. initiated there after. (x) Necessary permission for tree felling, if any, Permission of tree felling for from the concerned department shall be obtained Sabalpur, Raghopur and before commencement of the project work and Bidupur has been obtained copies of the same shall be submitted to this Office from Forest Department, Minimum of three times the number of trees to be Bihar. Voluntary plantation cut shall be planted. It shall be ensured that the containing local species is trees planted as a part of the afforestation shall be being carried out by the looked after by the proponent. Tree plantation shall contractor near the camp be of the same species/local species and survival areas and survival of the tree shall be monitored Transplantation of trees shall be is being looked after by the carried out wherever possible. expert member. (xi) During construction phase noise pollution The work inside the main should be minimized in the river for the safety of the stream of river Ganges has Gangetic dolphins because they are very sensitive not been started till date. All to noise pollution. the precautionary measures will taken care of while working inside the river Ganges. (xii) On both flanks of the bridge fencing at Shall be complied with. suitable height by proper mesh should be provided so that garbage and other unwanted materials are not thrown in the Ganges. (xiii) Number of pillars should be minimum so as to The gap between the pillars is minimize siltation in Ganga, of course without 150 m as per the design comprising with structural design. concern. II. Operation Phase (i) Noise barriers shall be provided at The project is a greenfield appropriate locations particularly in the areas where project and most part of the the alignment passes through inhabited areas so as alignment passes through to ensure that the noise levels do not exceed the uninhabited area. Most of the prescribed standards. work activities are intermittent in nature resulting short term effect. Beside this speed limit for earth moving equipment’s inside the project site has been kept at 10-20km/hr. Noise monitoring by NABL/MoEF&CC approved laboratory is being carried on quarterly basis in order to access the noise level in and around the project ROW. 2. General Conditions Environmental Monitoring Report (October-December 2018)

50

(i) In the event of any change in the project Shall be complied with. profile, a fresh reference shall be made to SEIAA, Bihar. (ii) SEIAA reserves the right to revoke this Will be taken care of. clearance, if any, of the conditions stipulated are not complied with to the satisfaction of SEIAA. (iii) SEIAA may stipulate any additional Will be taken care of. conditions subsequently, if deemed necessary, for environmental protection, which shall be complied with. (iv) Full support should be extended to the Will be taken care of. officers of Bihar State Pollution Control Board by the project proponents during their inspection for monitoring purposes. (v) All other statutory clearances shall be Being complied from time to obtained, as applicable by project proponents from time as per the site the respective competent authorities. requirement. Details given in table 8. (vi) The project Proponent should advertise in at Complied & details are least two Newspapers widely circulated in the attached in the first region, one of shall be in the vernacular language compliance report. informing that the project has been accorded Environmental Clearance and copies of clearance letter are available with the Bihar State Pollution Control Board. (vii) The Project proponent shall also submit six The six monthly compliance monthly reports on the status of compliance of the report is being submitted for stipulated condition including results of monitored January-June & July- data (both in hard copies as well as the stipulated December. condition including results of monitored data ( both in hard copies as well as by e-mail) to SEIAA, Bihar and regional office , Ranchi.

Environmental Monitoring Report (October-December 2018)

51

III A.COMPLIANCE TO THE ENVIRONMENTAL MANAGEMENT PLAN

16. TheEnvironmental Management Plan (EMP) for the project was provided in Annexure of the EIA report and also attached to the contract documents. As per EMP, following environmental management activities were required to be implemented during the design and construction stage. The following Table 9 lists out the status of activities during the construction stage as of between October-December 2018.

B. STATUS OF CLEARANCES AND PERMITS.

17. As Per GOI (, MoEF & CC) our project categorization falls in category- ’B’ and ADB SPS-2009, it falls in Category-’A’. So as per above condition following is the applicable statuary requirements status in Table-8.

Table : 8 Status of Clearances/approvals as per Environmental regulation of India

S.No. Applicable statuary Requirements Status Validity/Remark 1. Environmental Clearance from SEIAA,Bihar Obtained on -- 29.01.2016. 2. Clearance fron Inland Waterways Authority of Obtained on -- India,(MoS) Ministry of Shipping. 11.02.2016 3. Tree cutting permission from Forest department, Obtained -- Bihar for Sabalpur. 20.01.2018. 4. Tree cutting permission from Forest department, Obtained on -- Bihar for Raghopur. 08.08.2017. 5. Tree cutting permission from Forest department, Obtained on -- Bihar for Bidupur. 30.07.2018. 6. Consent to Establish for batching plant at chainage Obtained on -- 0+00 07.06.2017. 7. Consent to Operate for batching plant at chainage Obtained on Valid upto 0+00 06.09.2017. 31.05.2022. 8. Consent to Establish for batching plant at Raghopur Obtained on -- chainage 4+500 23.06.2017. 9. Consent to Operate for batching plant at Raghopur Obtained on Valid upto chainage 4+500 06.09.2017 31.05.2022. 10. Consent to Establish for batching plant-2 at Obtained on -- Raghopur chainage 4+500 from BSPCB. 23.03.2018. 11. Consent to Operate for batching plant-2 at Raghopur Obtained on Valid upto chainage 4+500 from BSPCB. 15.06.2018. 28.02.2023. 12. Permission for withdraw of groundwater for Zero Under Query response Point from central Ground water Authority progress. submitted on 26.11.2018. 13. Permission for withdraw of groundwater for Under Query response Raghopur from central Ground water Authority progress. submitted on 26.11.2018. 14. Statutory approval for aggregate Procured -- from third party having Environmental Monitoring Report (October-December 2018)

52

all statutory approval. 14. Statutory approval for sand Mines Procured -- from third party having all statutory approval.

Status of compliance with labor regulations of India

Sl. No. Applicable statuary requirements Status Responsibility 1 Labor License Obtained Contractor 2 Registration under BOCW (Building and other Obtained Contractor Construction worker) Environmental Monitoring Report (October-December 2018)

53

Table 9: Status of Compliance to the updated EMP

Environmental Remedial Measure Reference to Location Monitoring Monitoring Mitigation Institutional Responsibility Issue/Component laws/guideline indicators (MI)/ Methods Costs Implementation Supervision Performance Target (PT) A. Design and Pre-construction Stage 1. Diversion of Forest Land and Cutting of Trees 1.1 Need for cutting of ƒ Geometric adjustments made to Forest Throughout the MI : Number and Review final Budget for Contractor BSRDCL/P trees. minimize tree cutting. Conservation Act, corridor location of design. compensatory MAE/Forest ƒ Obtain tree cutting permission from 1980 Tot al number of geometric Compensatory afforestation Department forest department. affected trees= adjustments plantation is to be deposited to ƒ Provision for mandatory Additional made to avoid done by Forest Forest compensatory afforestation (1:2) for Plantation near tree cutting, Department while Department, deposit of payment to Forestry sensitive budget amount physical Bihar while Department receptors, river allocated for inspection voluntary ƒ Provision for additional banks, borrow compensatory needed for plantation is to compensatory plantation on 1: 2 areas afforestation to voluntary be done by basis to be implemented by Forest plantation. contractor. contractor. Department and additional plantation.

PT: Unnecessary tree felling on forest land avoided. Budget allocation is adequate, 2. Shifting of Utilities Environmental Monitoring Report (October-December 2018)

54

Environmental Remedial Measure Reference to Location Monitoring Monitoring Mitigation Institutional Responsibility Issue/Component laws/guideline indicators (MI)/ Methods Costs Implementation Supervision Performance Target (PT) 2.1 Disruption of utility ƒ All telephone and electrical poles/wires Project Throughout the MI : Number of Interaction with Cost to be Contractor BSRDCL/P services to local and underground cables should be requirement ROW complaints from concerned utility borne by MAE community shifted before start of construction local people, authorities BSRDCL. ƒ Necessary permission and payments number, timing and local public should be made to relevant utility and type of service agencies to allow quick shifting notifications and restoration of utility services issued to local ƒ Local people must be informed through people, time appropriate means about the time of taken to shift shifting of utility structures and potential utilities disruption of services if any PT: No. of complaints should be 0. Effective and timely notification. Minimal time for utility shifting

B. Construction Stage 1. Air Quality 1.1 Dust Generation ƒ Transport, loading and unloading of MORT&H Throughout project MI : PM10 level Standards Included in Contractor BSRDCL/P due to construction loose and fine materials through Specifications for corridor measurements CPCB methods civil works MAE activities and covered vehicles. Road and Bridge Complaints from Observations, cost transport, storage and ƒ Paved approach roads. works locals due to dust Public handling of ƒ Storage areas to be located downwind Air (P and CP) Act consultation construction materials of the habitation area. 1974 and Central PT: PM10 level< ƒ Water spraying on earthworks, Motor and Vehicle 100 Review of unpaved haulage roads and Act 1988 ug/m3Number of monitoring data other dust prone areas. complaints maintained by ƒ Provision of PPEs to workers. should be 0. contractor Environmental Monitoring Report (October-December 2018)

55

Environmental Remedial Measure Reference to Location Monitoring Monitoring Mitigation Institutional Responsibility Issue/Component laws/guideline indicators (MI)/ Methods Costs Implementation Supervision Performance Target (PT) 1.2 Emission of air ƒ Regular maintenance of The Air Batching plant, MI : Levels of Standards Included in Contractor BSRDCL/P pollutants (SO2,NOX machinery and equipment. (Prevention and ,DG sets locations SO2, NO2. CPCB methods civil works MAE etc) from vehicles due ƒ Only crushers licensed by the PCB Control of Status of PUC cost to traffic congestion shall be used Pollution) Act, certificates Review of and use of equipment ƒ Shifting from the DG source as power 1981(Amended monitoring data and machinery. to Power grid supply. 1987) and Rules PT: SO2 and maintained by ƒ DG sets with stacks of adequate height 1982 NO2 levels are contractor and use of low sulphur diesel as fuel. both less than 3 ƒ LPG should be used as fuel source in 80ug/m . PUC construction camps instead of wood certificate of ƒ Ambient air quality monitoring equipment and ƒ Contractor to prepare traffic machinery is upto management and dust suppression plan date duly approved by.

2. Noise 2.1 Disturbance to local ƒ All equipment to be timely serviced Legal requirement Throughout project MI : day and night As per Noise rule, Included in Contractor BSRDCL/P residents and sensitive and properly maintained. Noise Pollution section especially Noise levels. 2000 civil works MAE receptors due to excessive ƒ Construction equipment and (Regulation at construction Number of costs noise from construction machinery to be fitted with silencers and Control) sites, residential complaints from Consultation with activities and operation of and maintained properly. Rules, 2000 and identified local people local people equipment and machinery ƒ Only IS approved equipment shall be and amendments sensitive locations. used for construction activities. thereof PT: Zero Review of noise ƒ Timing of noisy construction activities + Refer Table IV-11 complaints or no level monitoring shall be done during night time and Clause No 501.8.6. of IEE for repeated data maintained weekends near schools, MORT&H information on complaints by by contractor ƒ Implement noisy operations Specifications for sensitive receptors. local people. intermittently to reduce the total Road and Bridge Average day and Observation of noise generated works night time noise construction site ƒ Manage existing traffic to avoid traffic levels are within jams and accumulation of noise permissible limits beyond standards. for work zone areas ƒ Restrict construction near residential,

built up and forest areas construction to day light hours. ƒ Initiation of multi-layered plantation ,to serve as mitigation option for operation phase ƒ Honking restrictions near sensitive areas ƒ PPEs to workers ƒ Noise monitoring as per EMoP. Environmental Monitoring Report (October-December 2018)

56

Environmental Remedial Measure Reference to Location Monitoring Monitoring Mitigation Institutional Responsibility Issue/Component laws/guideline indicators (MI)/ Methods Costs Implementation Supervision Performance Target (PT) 3. Land and Soil 3.1 Land use Change ƒ Non-agricultural areas to be used as Project Throughout the MI: Borrow pit Review borrow Included in Contractor BSRDCL/P and Loss of borrow areas to the extent possible. requirement project section and locations area plan, site civil works MAE productive/topsoil ƒ If using agricultural and, top soil to borrow areas visits cost be preserved and laid over either on Top soil storage the embankment slope for growing Land identified for area vegetation to protect soil erosion. camp, storage ƒ Land for temporary facilities like areas etc. PT: Zero construction camp, storage areas complaints or etc. shall be brought back to its disputes original land use. registered ƒ Environmental clearance of the against borrow area to be taken before the contractor by use of the soil. land owner

3.2 Slope failure and ƒ Turfing of embankments to protect IRC: 56 -1974 Throughout the MI: Occurrence Review of design Included in Design consultant BSRDCL/P Soil erosion due to slopes. recommended entire project road of slope failure or documents and civil works and Contractor, MAE Construction ƒ Slope protection by providing practice for erosion issues site observation cost activities, earthwork, frames, dry stone pitching, treatment of and cut and fill, jetties, planting of grass and trees. embankment PT: No slope stockpiles etc. ƒ Side slopes of all cut and fill areas slopes for erosion failures. Minimal will be graded and covered with control Clause No. erosion issues stone pitching, grass and shrub as 306 and 305.2.2 predesign specifications. Care MORT&H should be taken that the slope Specifications for gradient shall not be greater than Road and Bridge 2:1. works Guidelines ƒ The earth stock piles to be provided IX for Soil erosion with gentle slopes to soil erosion.

Environmental Monitoring Report (October-December 2018)

57

Environmental Remedial Measure Reference to Location Monitoring Monitoring Mitigation Institutional Responsibility Issue/Component laws/guideline indicators (MI)/ Methods Costs Implementation Supervision Performance Target (PT) 3.3 ƒ Obtain EC from SEIAA before opening IRC Guidelines Borrowsiteslocati MI : Existence of Review of design Included in Contractor BSRDCL/P Borrow any new borrow area. on borrow areas on borrow areas in documents and civil works MAE area management ƒ Comply to EC conditions and for inappropriate site observations cost ƒ Non-productive, barren lands, quarries(Environ unauthorized upland shall be used for borrowing mentalprotection locations. Compare site earth with the necessary ActandRules,198 Poor borrow conditions with permissions/consents. 6;WaterAct,AirAc area EC conditions by ƒ Depths of borrow pits to be regulated t)+Clause305.2.2 management SEIAA and sides not steeper than 25%. MORTH practices. ƒ Topsoil to be stockpiled and protected Specifications for Number of for use at the rehabilitation stage. Road and accidents. ƒ Transportation of earth materials Bridgeworks Complaints from through covered vehicles. Guidelines for local people. Borrow Areas ƒ Borrow areas not to be dug management PT: No case of continuously. non -compliance ƒ To the extent borrow areas shall be to conditions sited away from habitated areas. stipulated by Borrow areas shall be leveled with SEIAA in salvaged material or other filling clearance letter. materials which do not pose contamination of soil. Else, it shall be converted into fishpond.

Environmental Monitoring Report (October-December 2018)

58

Environmental Remedial Measure Reference to Location Monitoring Monitoring Mitigation Institutional Responsibility Issue/Component laws/guideline indicators (MI)/ Methods Costs Implementation Supervision Performance Target (PT) 3.4 QuarryOperations ƒ Aggregates will be sourced from ClauseNo.111.3 Quarry area MI: Existence of Review of design Included in Contractor BSRDCL/P existing licensed quarries. MORT&H locations licenses for all documents, civil works MAE ƒ Copies of consent/ approval / Specifications for quarry areas contractor cost rehabilitation plan for a new quarry or Road and Bridge from which documents and use of existing source will be works Guidelines materials are site observation submitted to BSRDCL. VI for Quarry being sourced Compliance to Areas EC conditions in Management Existence of a case of opening Environmental quarry new quarries Protection Rules redevelopment plan

PT: Quarry license is valid.: No case of non- compliance to consent /permit conditions and air quality meets the prescribed limit 3.5 Compaction of soil ƒ Construction vehicles, machinery, and Design Parking areas, MI: Location of Site observation Included in Contractor BSRDCL/P and impact on quarry equipment to be stationed in the requirement Haulage roads approach and civil works MAE haul roads due to designated ROW to avoid compaction. and construction haulage roads cost movement of vehicles ƒ Approach roads/haulage roads shall yards. Presence of and equipment be designed along the barren and destroyed/comp hard soil area to reduce the acted compaction. agricultural land ƒ Transportation of quarry material to or land which the dumping site through heavy has not be vehicles shall be done through restored to its existing major roads to the extent original possible to restrict wear and tear to condition the village/minor roads. ƒ Land taken for construction camp and PT: Zero other temporary facility shall be occurrence of restored to its original conditions destroyed/comp acted land and undestroyed land

Environmental Monitoring Report (October-December 2018)

59

Environmental Remedial Measure Reference to Location Monitoring Monitoring Mitigation Institutional Responsibility Issue/Component laws/guideline indicators (MI)/ Methods Costs Implementation Supervision Performance Target (PT) 3.6 Contamination of ƒ Construction vehicles and Design Fuelling station, MI: Quality of soil Site observation Included in Contractor BSRDCL/P soil due to leakage/ equipment will be maintained and requirement construction sites, near storage civil work MAE spillage of oil, refueled in such a fashion that oil/diesel and construction area cost. bituminous and non spillage does not contaminate the soil. camps and Presence of bituminous debris ƒ Fuel storage and refueling sites to be disposal location. spilled oil or generated from kept away from drainage channels. bitumen in demolition and road ƒ Unusable debris shall be project area construction dumped in ditches and low lying areas. ƒ To avoid soil contamination Oil- Interceptors shall be provided at wash PT: Soil test down and refueling areas. conforming to no ƒ Waste oil and oil soaked cotton/ cloth –contamination. shall be stored in containers labeled No sighting of ‘Waste Oil’ and ‘Hazardous’ sold off to spilled oil or MoEF/SPCB authorized vendors bitumen in ƒ Non-bituminous wastes to be dumped construction site in borrow pits with the concurrence of or camp site landowner and covered with a layer of topsoil conserved from opening the pit. ƒ Bituminous wastes will be disposed off in an identified dumping site approved by the State Pollution Control Board.

4. Water Resources 4.1 Sourcing of water ƒ Requisite permission shall be obtained CGWA Guidelines Throughout the MI: Approval Checking of Included in Contractor BSRDCL/P during Construction for abstraction of groundwater from Project section from competent documentation civil works MAE Central Groundwater Authority. authority cost ƒ Arrangements shall be made by Complaints from contractor that the water availability Check Dam at local people on Talk to local and supply to nearby communities suitable locations water availability people remain unaffected. ƒ Water intensive activities not to be PT: Valid undertaken during summer season. approval from ƒ Provision of water harvesting structure competent to augment groundwater condition in authority. Zero the area complaints from local people. Environmental Monitoring Report (October-December 2018)

60

Environmental Remedial Measure Reference to Location Monitoring Monitoring Mitigation Institutional Responsibility Issue/Component laws/guideline indicators (MI)/ Methods Costs Implementation Supervision Performance Target (PT) 4.2 Disposal of water ƒ Provisions shall be made to connect ClauseNo.1010E Throughout the MI : Condition of Standards Included in Contractor BSRDCL/P during construction road sided rains with existing nearby PAct1986MORT& Project section drainage system methods civil works MAE natural drains. HSpecificationsfo in construction Site observation cost rRoadandBridgew site. and review of orks documents Presence/absen ce of water logging in project area.

PT: Existence of proper drainage system. No water logging in project area 4.3 Alteration in ƒ Existing drainage system to be Design Near all drainage MI : Proper flow Review of design Included in Contractor BSRDCL/P surface water maintained and further enhanced. requirement, channels, of water in documents civil works MAE hydrology ƒ Provision shall be made for adequate ClauseNo river/nallah existing streams cost size and number of cross drainage 501.8.6. crossings etc. and rivers Site observation structures esp. in the areas where MORT&H land is sloping towards road Specifications PT: No complain alignment. for of water ƒ Road level shall be raised above HFL Road and Bridge shortage by level wherever road level is lesser downstream than HFL. communities. No ƒ Culverts reconstruction shall be done record of during lean flow period. In some overtopping/ cases these minor channels may be water logging diverted for a very short period (15-30 days) and will be bring back to its original course immediately after construction.

Environmental Monitoring Report (October-December 2018)

61

Environmental Remedial Measure Reference to Location Monitoring Monitoring Mitigation Institutional Responsibility Issue/Component laws/guideline indicators (MI)/ Methods Costs Implementation Supervision Performance Target (PT) 4.4 Siltation in water ƒ Embankment slopes to be modified Design Near all water MI: Field observation Included in Contractor BSRDCL/P bodies due to suitably to restrict the soil debris requirement, bodies/waterway Presence/absen civil works MAE construction entering water bodies. ClauseNo501.8. ce of siltation in cost activities/earthwork ƒ Provision of Silt fencing shall be made 6.MORT&H rivers, streams, at water bodies. Specifications ponds and other ƒ Silt/sediment should be collected and for Road and water bodies in stockpiled for possible reuse as Bridge works project area. surfacing of slopes where they have Turbidity test to be re-vegetated. Worldwide best levels ƒ Earthworks and stone works to be practices prevented from impeding natural flow PT: No records of rivers, streams and water canals or of siltation due to existing drainage system. project activities. ƒ Retaining walls at water bodies Surface water /ponds to avoid siltation near ponds quality tests confirm to turbidity and TSS limit 4.5Deterioration in ƒ No vehicles or equipment should be The Water Water bodies, MI: Water quality Conduction of Included in Contractor BSRDCL/P Surface water quality parked or refueled near water-bodies, (Prevention and refueling stations, of ponds, streams, water quality civil works MAE due to leakage from so as to avoid contamination from Control of construction rivers and other tests as per the cost vehicles and fuel and lubricants. Pollution) Act, camps. water bodies in monitoring plan equipment’s and ƒ Oil and grease traps and fuelling 1974andamendm project waste from platforms to be provided at re-fuelling entsthereof. Field observation construction camps. locations. Presence of oil ƒ All chemicals and oil shall be stored floating in water away from water and concreted bodies in project platform with catchment pit for spills area collection. ƒ All equipment operators, drivers, and PT: Surface water warehouse personnel will be trained in quality meets immediate response for spill freshwater quality containment and eventual clean-up. standards Readily available, simple to prescribed by understand and preferably written in CPCB the local language emergency response procedure, including reporting, will be provided by the contractors ƒ Construction camp to be sited away from water bodies. ƒ Wastes must be collected, stored and taken to approve disposal site only. ƒ Water quality shall be monitored

Environmental Monitoring Report (October-December 2018)

62

Environmental Remedial Measure Reference to Location Monitoring Monitoring Mitigation Institutional Responsibility Issue/Component laws/guideline indicators (MI)/ Methods Costs Implementation Supervision Performance Target (PT) 5. Flora and Fauna 5.1 Vegetation loss due ƒ Restrict tree cutting upto toe line ForestConservati Throughoutproject MI : ROW width Review of Mandatory Mandatory BSRDCL to site preparation and considering safety to road users. onAct1980 corridor Number of trees relevant Compensato Compensatory /PMAE construction activities ƒ Roadside trees to be removed with + for felling documents – tree ry plantation by and prior approval of competent authority. IRCSP:21andIR Estimated No. of Compensatory cutting permit, afforestation forest ƒ Mandatory compensatory plantation at CSP:66 affected plantation plan compensatory cost is Department and 1:2 basis to be done by Forestry tree=2457 Number of trees plantation plan. included in Additional Department replanted. Meeting with project costs plantation by ƒ Additional compensatory plantation Additional JFM Committee under contractor in 1:2 as per the IRC guidelines to be Plantation near PT: Additional members BSRDCL. partnership with carried out by contractor in partnership Sensitive compensatory Additional respective local with respective village JFM receptors, river afforestation Field compensator JFM Committee Committee. Local villagers to be banks, borrow done on a 1:2 observations y employed for afforestation activities. areas basis by afforestation Employment preference to be given to contractor costs women through JFM. included in ƒ Regular maintenance of all trees Number of trees civil works planted. planted is double costs ƒ Provision of LPG in construction camp the number of as fuel source to avoid tree cutting. trees removed. Tree survival ƒ Plantation of trees on both sides of the rate is at least road where technically feasible. 70%. ƒ Integrate vegetation management (IVM) with the carriage way completely clear of vegetation. ƒ Additional plantation near sensitive receptors, river banks to minimize noise & air pollution, and to check erosion. ƒ Controlled use of pesticides/ fertilizers 6. Construction Camps Environmental Monitoring Report (October-December 2018)

63

Environmental Remedial Measure Reference to Location Monitoring Monitoring Mitigation Institutional Responsibility Issue/Component laws/guideline indicators (MI)/ Methods Costs Implementation Supervision Performance Target (PT) 6.1 Impact associatedƒ All camps should be established Design All construction MI: Location of On site Included Contractor BSRDCL with location with prior permission from PCB. Requirement camps campsites and observation incivil works /PMAE Camps to maintain minimum distance The Water distance from cost from following: (Prevention and habitation, forest Interaction with # 500 m from habitation Control of areas, water workers and local # 500 m from forest areas where Pollution)Act,197 bodies, through community possible 4and its traffic route and # 500 m from water bodies where amendments construction possible thereof camps # 500 m from through traffic route PT: Distance of campsite is less than 500m from listed locations 6.2Worker’sHealthinco ƒ The location, layout and basic facility TheBuildingandO Allconstructioncam MI: Camp health Camp records Part of the Contractor BSRDCL nstructioncamp provision of each labor camp will be therConstruction ps records civil works /PMAE submitted to PMAE and approved b workers(Regulati Site observation costs EA. The contractor will maintain onofEmployment Existence of necessary living accommodation and andConditions proper first aid kit Consultation with ancillary facilities in functional and oservice)Act1996 in camp site contractor hygienic manner. and workers and local ƒ Adequate water and sanitary latrines The Complaints from people living with septic tanks with soak pits shall Water(Prevention workers. nearby be provided. andControlofPoll ƒ Preventive medical care facilities in ution)Act,1974an PT: No record of camp. damendments illness due to ƒ Waste disposal facilities such as dust thereof unhygienic bins must be provided in the camps conditions or and regular disposal of waste must be vectors. Zero carried out. cases of STD. ƒ The Contractor will take all Clean and tidy precautions to protect the workers camp site from insect and pest to reduce the risk conditions. to health. This includes the use of insecticides which should comply with local regulations. ƒ No alcoholic liquor or prohibited drugs will be imported to, sell, give and barter to the workers of host community. ƒ Awareness raising to immigrant workers/local community on communicable and sexually transmitted diseases. 7. Management of Construction Waste/Debris Environmental Monitoring Report (October-December 2018)

64

Environmental Remedial Measure Reference to Location Monitoring Monitoring Mitigation Institutional Responsibility Issue/Component laws/guideline indicators (MI)/ Methods Costs Implementation Supervision Performance Target (PT) 7.1 Selection of Unproductive/wastelands shall be Design At all Dumping MI : Location of Field survey and Included in Contractor. BSRDCL Dumping Sites selected for dumping sites away from Requirement and Sites dumping sites interaction with civil works /PMAE residential areas and water bodies MORTH Number of public local people. cost. ƒ Dumping sites must be having guidelines complaints. Review of adequate capacity equal to the consent letter amount of debris generated. PT: No public ƒ Public perception and consent from complaints. the village Panchayats has to be Consent letters obtained before finalizing the location. for all dumping sites available with contractor 7.2 Reuse and ƒ The existing bitumen surface shall be MORT&H Throughout theMI: Percentage of Contractor Included in Contractor. BSRDCL disposal of utilized for paving of cross roads, guidelines project corridor reuse of existing records civil works /PMAE construction and access roads, and paving works in surface material cost. dismantled waste construction sites and camps, Field temporary traffic diversions, and Method and observation haulage routes. location of ƒ All excavated materials from roadway, disposal site of Interaction with shoulders, verges, drains, cross construction local people drainage will be used for backfilling debris Contractor embankments, filling pits, and records landscaping. ƒ Unusable and non-bituminous debris materials should be suitably disposed PT: No public off at pre-designated disposal complaint and locations, with approval of the consent letters for concerned authority. The bituminous all dumping sites wastes shall be disposed in secure available with landfill sites only in environmentally contractor or PMAE accepted manner. For removal of debris, wastes and its disposal MORTH guidelines should be followed. ƒ Unusable and surplus materials, as determined by the Project Engineer, will be removed and disposed off-site. 8. Traffic Management and Safety Environmental Monitoring Report (October-December 2018)

65

Environmental Remedial Measure Reference to Location Monitoring Monitoring Mitigation Institutional Responsibility Issue/Component laws/guideline indicators (MI)/ Methods Costs Implementation Supervision Performance Target (PT) 8.1 Management of ƒ Temporary traffic diversion shall be Design Throughouttheproj MI: Traffic Review traffic Included in Contractor BSRDCL existing traffic and planned by the contractor and requirement and ectcorridorespecia management management civil works /PMAE safety approved by the ‘Engineer’. IRC: SP: 27 - llyatintersections. plan. Presence/ plan cost. ƒ The traffic control plans shall contain 1984,Report absence ofsafety Field observation details of diversions; traffic safety Containing signs, clear traffic of traffic arrangements during construction; Recommendation demarcations, management and safety measures for night time traffic of IRC Regional flag men etc. on safety system and precautions for transportation of Workshops on site. Complaints hazardous materials. Traffic control Highway Safety from road users. Interaction with plans shall be prepared in line with IRC:SP: 32 -1988 Number of traffic people in requirements of IRC’s SP 55 Road Safety for accidents vehicles using document’. Children the road ƒ The Contractor will ensure that the PT: No diversion/detour is always maintained (5-12 Years Old) com plaints. No in running condition, particularly during IRC:SP: 44 -1994 accidents due to the monsoon to avoid disruption to Highway Safety poor traffic traffic flow. Code IRC: SP: 55 - management. ƒ On stretches where it is not possible 2001Guidelines for Traffic signs, to pass the traffic on the part width of Safety demarcation existing carriageway, temporary paved lines etc. present diversions will be constructed. in Construction in appropriate ƒ Restriction of construction activity to Zones locations on site only one side of the existing road. The Building and ƒ The contractor shall inform local other Construction community of changes to traffic workers Act 1996 routes, and pedestrian access and Cess Act of arrangements with assistance from 1996 Factories Act 1948 “Engineer”. ƒ Use of adequate signage’s to ensure traffic management and safety. Conduct of regular safety audition safety measures. Environmental Monitoring Report (October-December 2018)

66

Environmental Remedial Measure Reference to Location Monitoring Monitoring Mitigation Institutional Responsibility Issue/Component laws/guideline indicators (MI)/ Methods Costs Implementation Supervision Performance Target (PT) 8.2 Pedestrians, ƒ Temporary access and diversion, with Same as above Near habitation on MI : Presence/ Field observation Included Contractor BSRDCL animal proper drainage facilities. both sides of absence of Interaction with incivil works /PMAE movement ƒ Access to the schools, temples and schools, temples, access routes for local people cost. other public places must be hospitals, pedestrians. maintained when construction takes graveyards, Road signage place near them. construction sites, Number of ƒ Fencing wherever cattle movement is haulage roads, complaints from expected. diversion sites. local people ƒ Large number of box culverts with has been proposed. .All structures having PT: Easy access vertical clearance above 3m and not to schools, catering to perennial flow of water may temples and serve as underpass for animals public places. Zero complaints 8.3 Safety of Workers ƒ Contractors to adopt and Same as above Construction sites MI: Availability of Site observation Included Obligation BSRDCL and accident risk from maintain safe working practices. Safety gears to incivil ofContractor /PMAE construction activities ƒ Usage of fluorescent and retro workers Review records workscost refectory signage, in local language on safety training at the construction sites Safety signage and accidents ƒ Training to workers on safety Training records procedures and precautions. on safety Interact with ƒ Mandatory appointment of safety construction officer. Number of safety workers ƒ All regulations regarding safe related accidents scaffolding, ladders, working platforms, gangway, stairwells, PT: Zero fatal excavations , trenches and safe accidents. Zero means of entry and egress shall be or minor non-fatal complied with. accidents. ƒ Provision of PPEs to workers. ƒ Provision of a readily available first aid unit including an adequate supply of dressing materials. ƒ Thecontractorwillnotemployanypers onbelowtheageof18years ƒ Use of hazardous material should be minimized and/or restricted. ƒ Emergency plan (to be approved by engineer) shall be prepared to respond to any accidents or ƒ Accident Prevention Officer must be appointed by the contractor. ƒ emergencies. Environmental Monitoring Report (October-December 2018)

67

Environmental Remedial Measure Reference to Location Monitoring Monitoring Mitigation Institutional Responsibility Issue/Component laws/guideline indicators (MI)/ Methods Costs Implementation Supervision Performance Target (PT) 8.4 Accident risk to ƒ Restrict access to construction sites Same as above Construction sites MI: Safety signs Site inspection Included in Contractor BSRDCL local community only to authorized personnel. and their civil works /PMAE ƒ Physical separation must be location Consultation with cost provided for movement of vehicular local people and human traffic. Incidents of ƒ Adequate signage must be provided accidents for safe traffic movement ƒ Provision of temporary diversions Complaints from and awareness to locals before local people opening new construction fronts. PT: Zero incident of accidents. Zero complaints. 9. 9.0 Site restoration and rehabilitation 9.1 Clean-up ƒ Contractor will prepare site restoration Project Throughout the MI: Condition of Site observation Included in Contractor BSRDCL Operations, plans, which will be approved by the requirement project corridor, camp sites, civil works /PMAE Restoration and ‘Engineer’. construction camp construction Interaction with cost. Rehabilitation ƒ The clean-up and restoration sites and borrow sites and borrow locals operations are to be implemented by areas areas. the contractor prior to demobilization. Presence/absen Issue completion ƒ All construction zones including river- ce of certificate after beds, culverts, road-side areas, camps, construction restoration of all hot mix plant sites, crushers, batching material/debris sites are found plant sites and any other area after completion satisfactory used/affected by the project will be left of construction clean and tidy, to the satisfaction of works on the Environmental officer. construction site. ƒ All the opened borrow areas will be rehabilitated and ‘Engineer’ will certify PT: Clean and tidy sites. No trash or debris left on site. Site restored and leveled.

A: Executing Agency, BSRDCL :Bihar State Road Development Corporation Limited, ES: Environmental Specialists , IRC: Indian Road Congress, PMAE: Project Managemnt Authority Engineers CPCB: Central Pollution Control Board, SEIAA-State Environmental Impact Assessment Authority

The “Project engineer” or “the engineer” is the team of Project Management Authority Engineers (PMAE) responsible for approving the plans, engineering drawing, release of payments to contractor etc. on behalf of the employer (BSRDCL). It is usually the team leader of the PMAE that takes the responsibility of signing approval documents on behalf of the PMAE team. The “Environmental Specialists” under the PMAE who is responsible for providing recommendations to the PMAE team leader for approving activities specific to environment safeguards on behalf of PMAE.

Environmental Monitoring Report (October-December 2018)

68

EMP Compliance Status

EMP Compliance Status: FC=full compliance, PC=partial compliance, NC=non compliant

S/N Item No. Description Status: 31.12.18 Compliance Category FC PC NC 1.0 Design & Preconstruction 1 1.1 Design within ROW 1 2 1.2 Transport of Materials 1 3 1.3 Env Clauses in Contract 1 4 1.4 EMP Documentation 1 5 1.5 Design with Env Conditions 1 2.0 Construction Period 2.1 Natural Environment 6 2.1.1 Hydrology & Flood Pattern 1 7 2.1.2 Drainage Congestion 1 8 2.1.3 Erosion & Silt Deposition 1 9 2.1.4 Landscape 1 10 2.1.5 The EMWS 1 2.2 Ecological Environment 11 2.2.1 Tree Felling 1 12 2.2.2 Fisheries, Fish habitat, etc 1 13 2.2.3 Wildlife 1 2.3 Environmental Pollution 14 2.3.1 Surface Water 1 15 2.3.2 Ground Water 1 16 2.3.3 Air Pollution 1 17 2.3.4 Noise and Vibration 1 18 2.3.5 Soil Contamination 1 2.4 Health and Safety 19 2.4.1 Loss of Navigation Route 1 20 2.4.2 Work Force Camp Conditions 1 21 2.4.3 Waste Management 1 22 2.4.4 Health & Safety 1 23 2.4.5 Vector-borne diseases 1 24 2.4.7 Env. Completion Report 1 25 2.4.8 Waste Materials 1 Score 19 5 1 Percent Compliance 76 20 4 Not Applicable (NA)

EMWS- Environmental Management Implementation Works Schedule

Environmental Monitoring Report (October-December 2018)

69

EMP Compliance of mitigation measures S.N Mitigation Measure FC PC NC 1 1.1 Recycle 1 1.2 Hazardous waste 1 1.3 Waste Disposal 1 2 2.1 Cut and fill NA 2.2 Erosion Plan 1 3 3.1 Noise and Vibration Plan 1 3.2 Time restriction 1 4 4.1 Proper diesel maintenance 1 4.2 Reduce dust 1 4.3 Watering 1 5 5.1 First aid 1 5.2 PPE 1 5.3Training 1 5.4Clean drinking water 1 5.5 Public safety 1 5.6 Safe access 1 5.7 Drainage 1 5.8 Septic tank & STP 1 5.9 SW collection 1 6 6.1 Hazardous waste storage 1 6.2 Spills 1 6.3 Disposal sites NA 6.4 Hazardous waste management plan 1 6.5 Water pollution 1 6.6 Waste containers 1 6.7 Toilets 1 7 7.1 Vegetation 1 7.2 Green Belt 1 7.3 Tree Planting 1 Total 12 15 0

I. FINDINGS AND RECOMMENDATIONS

1. Compliance to environmental safeguards requirements. Full compliance was achieved on the loan covenant, domestic environmental laws. The EMP implementation for achieved a 76% compliance rate and the non-compliances were limited to camp management and occupational health and safety. The non-compliance was mainly due to the diversified nature of the word activities & impacts on site. Given the small scale of works no adverse environmental impacts were observed on the Project site.

Environmental Monitoring Report (October-December 2018)

70

C. Corrective actions required.

18. Based on the partial and non-compliant measures in section A, Status of permits and clearance in section B and the status of compliance with the EC the following table lists the key corrective action required. Sl. Corrective Action Responsibility Time line Action to be taken No. by contractor 1. HIV/AIDS Awareness PMAE/ Immediate Daewoo-L&T JV to Camp required to be Contractor organize the camp. organized for workforces.

World HIV/AIDS days was clebrated on the site with medical camp Environmental Monitoring Report (October-December 2018)

71

Previous (July-September 2018) corrective actions status

Sl. Corrective Action Responsibility Time line Status No. 1. Fumigations and PMAE/ Contractor Immediate Fumigation and use of bleaching spreading of Bleaching powder in and powder is to be done around water logged on large scale. area after the receding of flood water. 2 Rectification of PMAE/ Contractor Immediate Road rectification is to approach road after be done on priority flood water recedes. basis.

Fumiogation carried out during day time& night time

Rectification of approach road

Environmental Monitoring Report (October-December 2018)

72

IV. ENVIRONMENTAL MONITORING

A . Summary of Inspection Activities

19. Field inspection is being carried out on regularly basis. Further details on the inspections carried out and key findings are provided in Table -9.During the Field inspection the Environmenttal specilist form PMAE & contractor carried out the following activites. x Check whetherthe workers are wearing adequate occuptional heaith and safety gears. x Check the status of planted trees by contractor. x Check whether the first aid kit is properly equiped with nesessary items and visible to workers. x Check the quaility and hygine of prepared food in worker’s canteen . x Check the condition and availibity of ambulance by mock drill. x Check the availibility of Emergency response team. x Monitor the complaint register and maintain the grivances register. x Check the status of flag-man on junction and diversion points. x Ensure the speed limit of vehicle on haul road or on project site. x Check the adequate faclites of sanitation for workers in camp area. x Check the majors taken by contractor to avoid the outbreaks of malaria,typhoid,cholera etc.amongst the labour force. x Check whether proper fumigation and sparying of bleaching powder is being done after the receiding of flood water. x Check to avoid siltation in the river due to the project activities. x Check the majors taken for conservation of aquatic organisms (such as Dolphin, Ghariyal, Soft sheel turtle and other species around the costruction site.) x Muck Management x Check the majors taken to avoid dust emission. Contractor (Daewoo-L&T JV) oragnises monthly committee meeting as well as weekly site meeting on regular basis to discuss the matters related to EHS internally while Fortnightly seperate meeting is organised at PIU, BSRDCL on 15th and 30th of every month to discuss EHS related issues in which the participants are contractor, PMAE, EMES and BSRDCL representatives under the chairmanship of DGM (Tech.), BSRDCL. Environmental Monitoring Report (October-December 2018)

73

B . Summary of training and awreness programme

During the reporting period following training programmes/awareness programme were oraganised:

S. No. Training/ awareness programme Target Audience

1. Mass pep talk –being organised by Represntatives of BSRDCL, contractor on first week of every month PMAE, contractor and from October-December 2018. workmen.

2. World Wildlife week 2018 (2nd October- Represntatives of BSRDCL, 8th Octopber 2018). PMAE, contractor and workmen.

3. World AIDS day 01st December 2018 Represntatives of BSRDCL, PMAE, contractor and workmen.

4. National Pollution Control Day 2018 on Represntatives of BSRDCL, 2nd December 2018 PMAE, contractor and workmen. Environmental Monitoring Report (October-December 2018)

74

Figure 4: Map showing monitoring locations Environmental Monitoring Report (October-December 2018)

75

B. Noise Monitoring

20. Noise level survey was conducted by 3rd party Green circle Laboratory(NABL &MoEF&CC approved)at all project sitesi.e. Zero Point, Sabalpur, Raghopur& Bidupur apart from the nearby villages.

21. It has been observed from the results that no noise level exceedance was recorded at any site both for day& night time. During October, 2018noise monitoring was done during the day and night time both. In the month of October, 2018 the noise level near NH-30 crossingnear Didarganj [value 73.5 db(A)] during the day time and [value 69.4 db(A)] during night time were found marginally higher side. The noise level data for sensitive receptors (Jamalpur school & Himmatpur school) were much below the standard limit because both the locations are away from our working area.Results are summarised in Table 10 graphical representation of results are also given below. Complete monitoring reports are provided in Appnedix 7.

Table 10: Noise Monitoring Results

Environmental Monitoring Report (October-December 2018)

76

Noise Monitoring results for October 2018 Sr. No. Location Results (dB)A (Day Time) CPCB Standard (Night Time) CPCB Standard 1. Nr. Batching Plant Raghopur 60.3 75.0 58.2 70.0 2. Nr. Zero Point NH30 Crossing 70.8 75.0 64.9 70.0 3. Nr. zero point Labor Colony 58.1 75.0 50.3 70.0 4. Nr. Deedarganj crossing 73.5 75.0 69.4 70.0 5. Nr. Sabalpur Near Old NH (On road ) 69.1 75.0 62.3 70.0 6. Nr . Jamalpur School 58.6 75.0 51.7 70.0

7. On Sabalpur J0Jetty 63.5 75.0 61.1 70.0 8. On Barge In Running Condition 59.2 75.0 53.4 70.0 9. On Wooden Boat 55.7 75.0 48.6 70.0 10. Nr. MP12 Raghopur 58.4 75.0 55.4 70.0 11. Nr. Himmatpur School 53.5 75.0 47.8 70.0 12. Nr. Labor colony Raghopur 57.6 75.0 51.1 70.0 13. Nr. MP19 Crossing –towards batching 68.6 75.0 65.2 70.0 14. Nr. MP 32 Raghopur 55.4 75.0 50.3 70.0 15. Nr. MP 52 Karmapur Village 51.3 75.0 45.3 70.0 16. Nr. Karmapur school 49.5 75.0 42.7 70.0 17. Nr. Bidupur Office 62.5 75.0 57.1 70.0 18. Nr. Mathurapur Village 61.8 75.0 58.3 70.0 19. Nr. Sarmastpur Village 51.8 75.0 47.2 70.0 20. Rescue boat 59.2 75.0 52.6 70.0 21. Nr. Saidpur 56.6 75.0 50.7 70.0 22. Piling Area 61.9 75.0 58.6 70.0

Environmental Monitoring Report (October-December 2018)

77

Noise results October 2018

80 70 60 50 40 30 20 10 0

(Day Time)dBA CPCB Standard dBA (Night Time) dBA CPCB Standard dBA

Environmental Monitoring Report (October-December 2018)

78

Comparative noise results for different monitoring seasons S. No. Location June October October January January May May August August October October 2017 2017 2017 2018 Day 2018 Night 2018 2018 2018 2018 2018 2018 Day time Day time Night time time time Day time Night Day time Night Day time Night time time time 1. Zero Point 62.2 52.3 47.1 0 0 58.3 44.3 58.5 56 58.1 50.3 2. Sabalpur 64.2 49.8 44.8 58.6 42.3 53 41.9 59.4 49.8 69.1 62.3 3. Raghopur MP 12 0 56.6 50.9 66.6 58.6 61 55.6 71.1 59.7 58.4 55.4 4. Raghopur Batching 72 70.1 63.1 65.2 56.2 69.5 52.7 55.1 47.4 60.3 58.2 plant 5. Raghopur MP-32 (on 0 56.6 50.9 61.3 54.6 57.8 53.4 68.9 60.4 55.4 50.3 Sukha river) 6. RaghopurLabour 0 52.1 46.9 51.3 47.1 59.3 45.1 58.5 53.1 57.6 51.1 colony 7. Raghopur MP 52 0 50.8 45.7 45.5 41.3 49 43 54.6 47.2 51.3 45.3 8. Saramastpur 69.8 49.9 44.9 42.5 40.8 47.9 41.1 59 40.1 51.8 47.2 9. Saidpur 0 52.3 47.1 48.5 44.2 49.7 42.8 56.3 44.2 56.6 50.7 10. Bidupur 0 55.4 49.9 66.6 59.2 70.1 54.5 62.6 54.2 62.5 57.1 11. Mathurapur 70.3 52.3 47.1 59.2 54.6 53 51.6 57.5 51.4 61.8 58.3 12. Zero pint NH 30 79.8 64.8 58.3 59.4 49.2 73.4 54.6 64.2 62.1 70.8 64.9 Crossing 13. Deedarganj Crossing 0 62.2 56 67.2 61.3 70.1 52.1 72.1 631. 73.5 69.4 14. Sabalpur near old NH 73.8 60.4 54.4 68.3 58.2 71.8 45.6 71.8 64.5 69.1 62.3 15. On jetty (Sabalpur) 0 72.3 65.1 67.2 44.2 64.3 48.6 58.9 46.3 63.5 61.1

16. On each Barge in 0 72.9 65.6 65.5 62.3 71.7 45.9 68.2 65.2 59.2 53.4 running condition 17. Wooden boat 0 69.8 62.8 51.2 51 72 53.1 73.2 65 55.7 48.6 18. Rescue boat 0 68.4 61.6 0 0 73.3 54.1 57.1 49.2 59.2 52.6 19. Himmatpur School* 0 43.3 39 43.4 36.2 48.5 50.3 48.7 46.9 53.5 47.8 20. Karmopur School* 0 42.8 38.5 44.1 42.8 50.1 40.4 49.6 47.8 49.5 42.7 21. Crossing near MP -19 0 63.3 57 55.2 48.2 55.1 44.7 59.2 59.2 68.6 70.0 22. Pilling Area 0 0 0 0 0 0 0 61.6 50.4 61.9 58.6 Standard as per CPCB 75 75 70 75 70 75 70 75 70 75 70 Environmental Monitoring Report (October-December 2018)

79

Comparative results for different monitoring seasons

80

70

60

50

40

30

20

10

0

June-17 Daytime October-2017 Daytime October 2017 Night time January 2018 Day time January 2018 Night time May 2018 Day time May 2018 Night time Aug-18 Day time Day time Aug-2018 Night time Oct-2018 Day time Day time Oct-18 Night time

Environmental Monitoring Report (October-December 2018)

80

C. Air Quality

22. The ambient status of four major air pollutants viz. Suspended Particulate Matter (PM10); Fine Particulate matter (PM2.5) ; Sulphur Dioxide (SO2) and Oxides of Nitrogen (NOx) representing the quality of pollution level have been assessed by monitoring air quality at 11locations. The air quality monitoring results indicate that PM10 concentration not exceeds the limits specified by CPCB for all sites for the monitoring conducted during August 2018. The highest concentration of PM10 was recorded at Sabalpurof concentration 80.1 µg/m3, highest concentration of PM2.5 was recorded at Bidupur of concentration 37.3 µg/m3 ,while the maximum conc. of SO2& NOx was recorded at Saidpur of 10.3 & 16.4 µg/m3 respectively. The reason for higher concentration could be due to soil excavation, movement of construction machineries& vehicles and internal roads which are unpaved.

23 Testresults are summarised in Table 11. Complete monitoring reports are given in Appendix4.

Table-11: Air Quality Monitoring Results

Environmental Monitoring Report (October-December 2018)

81

Ambient air quality results for October 2018 Labour MP52 Batching MP 32 Sabal Zeropoi Bidupu Mathurap Saidpu Saramastp Permissibl Parameter MP12 Colony (Karmapur Plant (Raghop pur nt r ur r ur e Sr. No. Unit s (Raghopur) (Raghopur ) (Raghop ur) Limit as ) ur) per CPCB Particulate µg/ 1. Matter 100 m3 73.6 70.1 67.9 63.4 65.8 62.5 77.6 58.9 55.1 61.7 63.7 (PM10) Particulate 60 µg/ 2. Matter 27.6 28.6 27.6 25.2 26.3 25.0 31.0 23.5 22.3 24.6 25.4 m3 (PM2.5) Oxides of µg/ 3. 3 80 Sulpur (SO2) m 8.1 7.5 8.0 6.3 7.2 5.6 8.3 6.2 6.4 5.6 8.0 Oxides of µg/ 4. Nitrogen 12.9 11.9 80 m3 16.7 (NOx) 12.8 10.1 11.5 8.96 13.2 9.92 10.2 8.9

Environmental Monitoring Report (October-December 2018)

82

Ambient air quality results for October 2018

100

90

80

70

60

50

40

30

20

10

0 (Raghopur) Limit as per CPCB MP12 (Raghopur)Labour ColonyMP52 (Karmapur)Batching Plant (Raghopur)MP 32 (Raghopur)Sabalpur Zeropoint Bidupur Mathurapur Saidpur SaramastpurPermissible

Particulate Matter (PM10) µg/m3 Particulate Matter (PM2.5) µg/m3 Oxides of Sulpur (SO2) µg/m3 Oxides of Nitrogen (NOx) µg/m3

Environmental Monitoring Report (October-December 2018)

83

PM-10 The monitoring results for all the 11 locations w.r.t. the last five seasons shows that all the results are within the permissible limit of CPCB. The highest value for PM10 was obtained atSabalpur of conc. 80.1 µg/m3 in August 2018 due to the nearby mining activities, vehicular movement & burning of firewood.

S. Location Jun-17 Oct-17 Jan -18 May-18 Aug- Oct- No. 2018 2018 1 Zero Point 54.4 54.2 68.2 71.8 65.1 77.6 2 Sabalpur 60.7 58.4 67.2 61.8 80.1 62.5 3 Raghopur MP 12 NA 0 76.9 66.3 71.2 73.6 4 RaghopurLabour colony NA 68.4 68.8 62.4 68.7 70.1 5 Raghopur. Batching plant 65.9 69.7 74.9 75. 1 71.5 63.4 6 Raghopur MP-32 NA 64.9 76.4 63.4 67.5 65.8 7 Raghopur MP 52 (Karmapur village) NA 0 57.2 68.7 62.1 67.9 8 Bidupur NA 75.4 56.3 74.2 78.4 58.9 9 Mathurapur 75.3 0 46.2 67.2 62.1 55.1 10 Saramastpur 62.4 52.2 52.4 57.6 61.5 63.7 11 Saidpur NA 60.2 54.2 66.9 60.1 61.7

PM 10

100 90 80 70 60 50 40 30 20 10 0

June.2017 October.2017 January.2018 May.2018 August.2018 Oct-18

Environmental Monitoring Report (October-December 2018)

84

PM-2.5 The monitoring results for all the 11 locations w.r.t. the last five seasons shows that all the results are within the permissible limit of CPCB. The highest value for PM2.5 was obtained at Bidupur of conc. 37.3 µg/m3 in August2018 due to the burning of fossil fuel.

S. No. Location Jun-17 17t -Oc Jan-18 May-18 August Oct-18 2018 1 Zero Point 21.7 19.4 24.3 28.7 26.4 31.0 2 Sabalpur 24.2 17.9 17.9 24.7 32.4 25.0 3 Raghopur MP 12 0 0 28.2 26.5 29.5 27.6 4 RaghopurLabour colony 0 24.8 24.8 24.9 27.4 28.6 Raghopur. Batching 26.3 24.3 26.6 36 28.6 25.2 5 plant 6 Raghopur MP-32 0 24.2 26.4 25.3 27.1 26.3 Raghopur MP 52 0 0 18.2 27.4 24.8 27.6 7 (Karmapur village) 8 Bidupur 0 30.3 21.4 29.6 37.3 23.5 9 Mathurapur 30.2 0 14 26.8 24.8 22.3 10 Saramastpur 24.6 24.2 18.1 23 24.6 25.4 11 Saidpur 0 19.4 18.4 26.7 24.4 24.6

PM2.5

60 50 40 30 20 10 0

June.2017 October.2017 January.2018 May.2018 August.2018 Oct-18

Environmental Monitoring Report (October-December 2018)

85

SO2 The monitoring results for all the 11 locations w.r.t. the last five season shows that all the results are within the permissible limit of CPCB. The highest value for SO2 was obtained at Zero point of conc. 21.7 µg/m3 in June 2017.

S. Location Jun-17 17t -Oc Jan-18 May-18 August Oct- No. 2018 18 1 Zero Point 21.7 8.8 11.4 8.2 7.1 8.3 2 Sabalpur 7 7.8 21 7.4 9.1 5. 6 3 Raghopur MP 12 0 0 12.9 8.1 9.7 8.1 4 RaghopurLabour colony 0 9.7 15.3 7.9 8.3 7.5 5 Raghopur. Batching plant 8.9 9.4 11.6 9.9 10.6 6.3 6 Raghopur MP-32 0 8.9 14.3 6.4 7.6 7.2 7 Raghopur MP 52 (Karmapur village) 0 0 3.8 8.2 7.3 8.0 8 Bidupur 0 8. 9 4.6 7.2 9.6 6.2 9 Mathurapur 11.6 0 7.4 6 6.8 6.4 10 Saramastpur 9.3 9.2 9.4 8.9 7.5 8.0 11 Saidpur 0 8.2 4.2 10.3 7.2 5.6

SOx

25

20

15

10

5

0

June.2017 October.2017 January.2018 May.2018 August.2018 Oct-18

Environmental Monitoring Report (October-December 2018)

86

NOx The monitoring results for all the 11 locations w.r.t. the last five season shows that all the results are within the permissible limit of CPCB. The highest value for NOx was obtained at Sarmastpur of conc. 20.5 µg/m3 in June 2017 due to the movement of vehicles.

S. Location Jun-17 17t -Oc Jan- May- August Oct-18 No. 18 18 2018 1 Zero Point 6.2 11.7 14.6 13.1 11.3 13.2 2 Sabalpur 15.9 14.4 14.8 11.9 14.5 8.96 3 Raghopur MP 12 0 0 16.9 12.9 15.5 12.9 4 RaghopurLabour colony 0 17.8 17.8 12.7 13.2 11.9 5 Raghopur. Batching plant 16.9 18.4 12.8 14.2 16.9 10.1 6 Raghopur MP-32 0 16.9 12.5 10.2 12.1 11.5 Raghopur MP 52 (Karmapur 0 0 8 13.1 11.6 12.8 7 village) 8 Bidupur 0 19.4 9.5 11.4 16.1 9.92 9 Mathurapur 15.9 0 11.5 9.6 10.8 10.2 10 Saramastpur 20.5 10.2 10.6 14.2 12.0 16.7 11 Saidpur 0 8.2 8.2 16.4 11.5 8.9

NOx

80 70 60 50 40 30 20 10 0

June.2017 October.2017 January.2018 May.2018 August.2018 Oct-18

24 Air Pollution Control: The mitigation measures, which have been adopted to reduce the air pollution are: transportation of construction materials should be covered, suppression of fugitive dust by water sprinkling (by the use of pipeline & water tanker) and restriction of speed limit to maximum 20 km/hrs at site.

D Water Quality

25 Water samples were collected from in and around ground water sources and both channels of Ganga river to check the quality of the water. Quarterly water analysis Environmental Monitoring Report (October-December 2018)

87

results are compared with IS 10500:2012 and found within permissible limited. Results are summarised in Table 12&13and monitoring reports are provided in Appendix 4.

Observation of the ground water quality (August 2018) :The pH value of drinking water is an important index of acidity or alkalinity.pH value of the sample vary from 6.51 to 7.56 in all locations. TDS vary from 266-662 mg/L which is within permissible limit. The total hardness is an important parameter of water quality. The hardness values in ground water of the study area ranges between 160-466 mg/l. The hardness values are well within the desired limit in all location. No biological and metallic contamination has been found in any of the ground water sample of the study area. All the parameters in ground water sample were well within the permissible limit of Indian Standard IS: 10500-2012. Surface water: The river Ganga is a perennial river. Being a perennial river there is availability of water in all the seasons of the year. Eight surface water samples were collected from the surface water sources of the project area. Four samples of Southern stream of Ganges river (two from upstream and two from downstream) and three sample of Northern channel of river Ganges (one from upstream & one from downstream on the southern side, one sample from northern side i.e. Bidupur side) while one sample from Sukha river (which remain mostly dry except in rainy season) were collected as per the standard method. Samples for bacteriological analyses were collected in sterilized bottles. The water samples were examined for physico-chemical parameters and bacteriological parameters. Samples were analyzed for various parameters using the CPCB’s DBU Criteria. Observation of the Surface Water Quality (October 2018): The river water quality parameters are compared with BDU Criteria of CPCB. No metal contamination has been found in surface water samples. Overall the surface water quality of river is meeting the Class C of DBU (Designated Best Use) Criteria of CPCB means may be used as drinking water source after conventional treatment and disinfection.

Observation of the Surface Water Quality (Comparative results for four season): The river water quality parameters are compared with BDU Criteria of CPCB. No metal contamination has been found in surface water samples. Overall the surface water quality of river is meeting the Class C of DBU (Designated Best Use) Criteria of CPCB means may be used as drinking water source after conventional treatment and disinfection. Environmental Monitoring Report (October-December 2018)

88

Table 12: Ground Water Quality Monitoring Results (October 2018) Sr. Parameters Unit Zero Point Sabalpur MP12 Raghopur RaghopurLabour MP 32 MP-52 Bidupur Mathurapur Saidpur sharmastpur Permissible No. Batching Colony (Karmopur Limits as Plant per IS 10500:2012 1. pH --- 7.47 7.21 6.92 7.34 7.56 7.03 7.19 7.36 6.51 7.01 6.98 6.5-5 8. 2. Taste - Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable 3. Temperature oC 26 27.3 26 27.5 27.3 27 28 27.6 26.5 26.5 27.2 40 4. Tu rbidity NTU <2 <2 <2 <2 <2 <2 <2 <2 <2 <2 <2 5 5. Color Hazen <5 <5 <5 <5 <5 <5 <5 <5 <5 <5 <5 15 6. Odor - Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable

7. TDS mg/L 398 286 410 266 310 310 470 569 362 662 568 2000

8. Sulphate mg/L 11.1 10.5 22.4 20.1 12.8 9.9 19.7 27.6 2.5 18.9 14.4 400 9. Chloride mg/L 2.0 1.0 2.0 2.0 1.0 2.0 5.0 23.1 26.9 9.0 11 1000 Total 10. mg/L 242 196 354 228 266 268 284 317 160 460 466 600 Hardness Calcium as 11. mg/L 43.2 53.7 85.7 50.5 72.9 65.7 92.1 45.6 4.0 124.2 88.9 200 Ca 12. Alkalinity mg/L 250 260 400 240 280 290 310 425 30 380 320 600 13. Copper mg/L 0.18 0.31 0.14 0.48 0.20 0.22 0.23 0.14 0.20 0.25 0.30 1.5 14. Zinc mg/L 0.72 0.26 0.20 0.35 0.14 0.33 0.13 0.22 0.10 0.54 0.26 15 Nitrate as 15. mg/L BDL 2.5 17.6 8.6 3.1 6.7 10.9 12.8 4.5 11.8 5.6 45 NO3 16. Iron mg/L <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 0.3 17. Lead mg/L <0.01 <0.01 <0.01 <0.001 <0.01 <0.01 <0.01 <0.001 <0.01 <0.001 <0.001 0.01 18. Cadmium mg/L <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 0.003 Phenolic 0.002 19. mg/L ND ND ND ND ND ND ND ND ND ND ND Compound 20. Fluoride as F mg/L 0.25 0.71 0.52 0.24 0.51 0.54 0.44 0.69 0.4 0.47 0.60 1.5 21. Arsenic mg/L ND ND <0.01 ND ND ND ND ND ND ND ND 0.01 Dissolved 22. mg/L <0.01 <0.01 ND <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 N.S. Oxygen Environmental Monitoring Report (October-December 2018)

89

MPN/100 23. Coliform test Absent Absent Abst en Absent Absent Absent Absent Absent Absent Absent Absent Absent ml

Table 13: Surface Water Quality Monitoring Results

Surface Water quality results for October 2018 Sr. No. Parameters Unit Southern Southern Southern Southern Sukha Northern Northern Bidupur Channel Channel Channel Channel River Channel Channel side (100- 200 (100- 200 m) (500- 1000 (500- 1000m) (100-200 (100- 200 Ganga m)Upstrream Downstrream m)Upstrream Downstrream m)Upstrream m)Downstrream River 1. pH --- 7.59 7.49 7.45 7.89 7.32 7.89 7.32 7.45 2. Conductivity at 250C µs/cm 300 300 423 400 700 300 300 200 3. Color Hazen <5 <5 <5 <5 <5 <5 <5 <5 4. Total Dissolved Solid mg/L 162 157 325 368 318 165 163 178 5. Sulphate mg/L 16.8 7.7 8.0 14.2 17.6 26.5 46.8 7.1 6. Chloride mg/L 3.0 3.0 15.7 4.0 2.0 3.0 4.0 2.0 7. Nitrate as NO3 mg/L BDL 4.9 BDL BDL 8.4 16.7 7.6 11.5 8. Iron mg/L <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 9. Lead mg/L <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 10. Fluoride as F mg/L BDL BDL 0.33 0.44 BDL BDL BDL BDL 11. Dissolved Oxygen mg/L BDL 4.0 4.0 4.0 4.0 4 4.0 4.0 MPN/100 12. Total Coliform 4.0 104 140 70 120 140 110 ml 110 13. Boron mg/L 110 3.0 3.0 3.0 BDL BDL 3 3.0 14. Free ammonia mg/L 3 BDL BDL BDL 0.01 BDL BDL BDL Biochemical Oxygen 15. mg/L BDL BDL BDL BDL 3.0 0.1 BDL BDL Demand 16. Arsc eni mg/L BDL 0.24 0.07 0.13 BDL 5.1 0.34 0.25 Sodium Absorption 17. - 0.10 10.4 7.9 8.6 6.7 4.0 8.1 7.6 Ratio

Environmental Monitoring Report (October-December 2018)

90

Southern Channel Ganga (Comparative results) Sr. Parameters Unit June 2017 October 2017 January 2018 May 2018 August-18 Oct-18 Standard No. 1. pH --- 7.48 7.22 7.69 6.9 7.26 7.49 6.55 -8. 2. Taste - Agreeable Agreeable - Agreeable -- -- Agreeable 3. Temperature oC 32.1 28 0 27.6 -- -- 40 4. Turbidity NTU <3 <3 -- <3 -- -- 5 5. Color Hazen <8 <8 <5 <8 <5 <5 15 6. Odor - Agreeable Agreeable -- Agreeable - -- Agreeable 7. Total Dissolved Solid mg/L 317 340 235 336 195 157 2000 8. Sulphate mg/L 20.35 5.65 15.45 11.7 6.9 7.7 400 9. Chloride mg/L 22 15 22 38 2.0 3.0 1000 10. Total Hardness mg/L 118 122 -- 152 -- -- 600 11. Calcium as Ca mg/L 28.05 35.27 -- 32.8 -- -- 200 12. Alkalinity mg/L 116 160 -- 168 -- -- 600 13. Copper mg/L <0.1 <0.1 -- <0.1 -- -- 1.5 14. Zinc mg/L <0.1 <0.1 -- <0.1 -- -- 15

15. Nitrate as NO3 mg/L 0.025 0.84 2.73 0.64 3.6 4.9 45 16. Iron mg/L <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 0.3 17. Lead mg/L <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 0.01 18. Cadmium mg/L <0.003 <0.003 0 <0.003 -- -- 0.003 19. Phenolic Compound mg/L ND ND 0 ND -- -- 0.002 20. Fluoride as F mg/L BDL BDL BDL BDL BDL BDL 1.5 21. Dissolve Oxygen mg/L 9 9 7.5 4.9 4.0 4.0 N.S. 22. Coliform test MPN/100 ml - - - 150 150 104 Absent

Environmental Monitoring Report (October-December 2018)

91

Northern Channel Ganga River(Comparative results) Sr. Parameters Unit June 2017 October 2017 January 2018 May 2018 August-18 Oct-18 Standard No. 1. pH --- 7.57 7.08 7.88 6.78 8.09 7.32 6.55 -8. 2. Taste - Agreeable Agreeable - Agreeable -- - Agreeable 3. Temperature oC 32.1 28 - 27.5 -- - 40 4. Turbidity NTU <3 <3 -- <3 -- -- 5 5. Color Hazen <8 <8 <5 <8 <5 <5 15 6. Odor - Agreeable Agreeable -- Agreeable - - Agreeable 7. Total Dissolved Solid mg/L 280 318 333 328 180 163 2000 8. Sulp hate mg/L 15.35 6.25 1.95 18.2 58.7 46.8 400 9. Chloride mg/L 17 15 6 40 3.0 4.0 1000 10. Total Hardness mg/L 102 116 -- 112 -- -- 600 11. Calcium as Ca mg/L 25.65 32.86 -- 32.86 -- -- 200 12. Alkalinity mg/L 104 150 -- 155 -- -- 600 13. Copper mg/L <0.1 <0.1 -- <0.1 -- -- 1.5 14. Zinc mg/L <0.1 <0.1 -- <0.1 -- -- 15

15. Nitrate as NO3 mg/L BDL BDL BDL 10.1 6.32 7.6 45 16. Iron mg/L <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 0.3 17. Lead mg/L <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 0.01 18. Cadmium mg/L <0.003 <0.003 -- <0.003 <0.1 -- 0.003 19. Phenolic Compound mg/L ND ND -- ND <0.01 -- 0.002 20. Fluoride as F mg/L BDL BDL BDL BDL BDL BDL 1.5 21. Dissolve Oxygen mg/L 9.8 9 7.5 6.2 4.0 4.0 N.S. 22. Coliform test MPN/100 ml - - - 140 130 140 Absent

Environmental Monitoring Report (October-December 2018)

92

Table 14: Soil Analysis Report (October 2018)

Sr. No. Parameters Unit Karmapur Village Raghopur Batching Plant Sabalpur Zero point Bidupur Saramastpur (MP 52) 1. - pH (40% Solution) 7.96 8.10 7.69 8.5 8.22 7.02 2. µs/cm Electrical Conductivity 0.6 0.3 0.3 0.2 0.5 0.2 3. - Texture Silt loam Silt loam Silt Sand Silt Silt Sand Silt 4. g/cm3 Bulk Density 200 278.6 341 327 225 319 5. mg/kg Sulphate 236 214 53.4 167 44.2 103 6. mg/kg Chloride 157 187 72.1 88.6 148 155 7. Calcium (as Ca) mg/kg 66.6 132.1 133.0 77.3 71.3 74.3 8. mg/kg Sodium 25.9 43.5 65.2 45.2 30.9 28.4 9. mg/kg Total Kjeldahl Nitrogen (TKN) 456 ND 787 356 459 463 10. mg/kg Potassium 52.7 63.7 70.5 59.1 52.6 75.1 11. Magnesium (as Mg) mg/kg 165 125.5 165.1 67.5 76.7 100.1 12. % Organic Matter 1.67 1.47 0.66 0.47 0.77 1.89 13. % Organic Carbon 2.56 1.14 2.02 0.72 1.57 2.14

Environmental Monitoring Report (October-December 2018)

93

V PUBLIC CONSULTATIONS AND ADDRESSING OF GRIEVANCES

E. Public Consultations

26. In accordance with ADB’s Safeguard Policy Statement (SPS) 2009 and Environment Impact Assessment Notification of GoI (2006), extensive consultations and public participations are continuously being made by the BSRDCL &AECOM RODIC (JV) until the time of report writing. Consultations have been undertaken with project beneficiaries, local/ government officials, community leaders, non-government organizations (NGO’s), stakeholders in the corridor of impact and people likely to be effected due to the project on various issues affecting them. Various measures have been incorporated pertaining to environmental issues based on the responses from the people.

1. Objectives of Consultations

27. The process of public participation/ consultations was taken up as an integral part of the project in accordance with environmental assessment requirements. The objectives of these consultations are:

x To inform and educate the common public, specially potentially impacted communities/ individuals and stakeholders about the proposed project activities; x To familiarize the people with technical, environmental, social and economic issues of the project for better understanding; x To solicit the opinion of the affected communities/ individuals on environmental issues and assess the significance of impacts due to the proposed development; x To foster cooperation among officers of BSRDCL, the communities and the stakeholders to achieve a cordial working relationship for smooth implementation of the project; x To identify the environmental issues relating to the bridge and approach roads construction work; x Assess the views of the beneficiary communities and their willingness to participate in the project in a bottom up planning and decision making process; x To secure people’s inputs in respect of project planning, selection of mitigation measures and monitoring strategies; x To inculcate the sense of belongingness among the public about the project.

2. Methodology used for Consultations

28. The informal modes of consultations were used in the public consultation process for the project. In addition, focused ground discussions (FGDs) and personal discussions with officials, on-site discussion with project affected stakeholders, and reconnaissance visits have also been made to the project area. Attempts were made to encourage participation in the consultation process of the government officials from different departments that have relevance to the project. Same way, local people from different socio economic backgrounds in the villages as well as urban areas along the proposed approach road alignment, women, residents near the proposed alignment, local commuters, and other concerned were also consulted.

29. The experts emphasized the need to formulate appropriate action plan for the following: Environmental Monitoring Report (October-December 2018)

94

i. Avoid siltation in the river ii. Conservation of aquatic organisms (such as Dolphin, Ghariyal, Soft sheel turtle) iii. Muck Management iv. Used cement Bag management v. Dust emission

F. Complaints and Requests Received

30. An integrated grievance and redress mechanism (GRM) for environmental and social action plans is established for the project. The GRM provides a system for receiving, evaluating and facilitating the resolution of affected people’s concerns, complaints, and grievances about the project’s social and environmental performance.

31. During the period of reporting (October-December 2018) two written grievances and requests application was received from the local people through PMAE representatives in the project area regarding EHS issues.

S. No. Grievances received Action to be taken

1. Temporary sheds required to Temporary shed/rest shelter were constructed near to the well construted by Daewoo-L&T JV to save along the alignment to prevent the workforces from severe cold wave. the workforces from severe cold.

Temporary shed/rest shelter were constructed by Daewoo-L&T JV

Environmental Monitoring Report (October-December 2018)

95

VI CONCLUSION

A Summarize the overall Progress of Implementation of safeguard Measures

32. The implementation of environmental management measures in this project face some difficulties but it can be concluded that the overall progress of implementing environmental safeguard measures show a satisfactory level.

B Problems Identified and Actions Recommended

33. The PMAE and Contractor were advised to perform their works to comply with environmental regulations and to the mitigation measuresand then proper supervision has been given wherever needed by BSRDCL.

34 As a result, during the current monitoring period, it has been observed that necessary statuory approvals work was expedited.

Table 15: Status of Actions suggested by BSRDCL

S. No. Status of action Recommended by Measures Taken Remarks BSRDCL 1 Medical Camp/Help for Puja PMAE/Contractor devotees on the bank of river Ganges.

Medical Camp with doctor/male nurses/ ambulance organised by Daewoo-L&T JV on both the bank of river Ganges at Sabalpur & Raghopur for medical emergency of Chhath puja devotees.

S. No. Action Recommended by BSRDCL Measures Taken Remarks 1 Medical Camp is required to be organized by contractor for tetanus vaccination for PMAE/Contractor worker forces engaged in rebar work. Accrding to the field observations and investigations it was able to identify that the most of the environmental requirements are being complied with regulations. The points related to EHS are discussed by contractors internally in their monthly and weekly committee meetings while remaining issues related to EHS are discussed at fornightly meeting at PIU, BSRDCL where the represenatives from PIU, EMES, PMAE and contractor are also present. Environmental Monitoring Report (October-December 2018)

96

Appendix 1. Photograph

2. Record of EHS Training

3. Sample format of Monthly EHS report

4. Environment Monitoring Report

5. Consent to Establish for Batching Plant at Zero Point & Raghopur

6. Consent to Operate for Batching Plant at Zero Point & Raghopur

7. List of sick patient during the period October to December 2018

8. Tree cutting permission for Sabalpur, Raghopur & Bidupur Area

9. CGWA application for ground water withdrawal

10. Sewage Treatment Plant (STP)

11. Environmental Clearance from SEIAA, Bihar

12. BOCW registration

13. Labor License from Government of Bihar

Environmental Monitoring Report (October-December 2018) 97

APPENDIX 1: PHOTOGRAPH OF WORK PROGRESS

Pre -cast Yard, Raghopur

Ambient air Quality Monitoring DG stack monitoring Environmental Monitoring Report (October-December 2018) 98

Noise Monitoring

Water Sampling

Muck Sampling Soil Sampling Environmental Monitoring Report (October-December 2018) 99

World AIDS Day-2018 Celebration

World AIDS Day-2018 Celebration

Mass pep talk organized fist day of every month at Raghopur& second day at Zero Point area. Prizes with certificates are distributed to best safety conscious workers & best housekeeping award are given followed by sweets distribution to all.

Environmental Monitoring Report (October-December 2018) 100

EPIC Teambuilding training program for Project Staff of contractor

Quality Week Celebration-2018 Environmental Monitoring Report (October-December 2018) 101

Dolphin day Celebration at Site National Pollution Control Day

Tree planation during visit of ADB team

Training on Fall prevention & Protection safety Environmental Monitoring Report (October-December 2018) 102

Health well being intiatives

Medical Camp during Chhath Puja at Sabalpur&Raghopur Jetty by BNGB Team

Training related to reporting of accident, incident and their classification

Training on Environmental Management

Environmental Monitoring Report (October-December 2018) 103

Training was conducted on Material lifting & shifting safety aspects

Training on Height Work Safety

Training on proper use of PPEs

Environmental Monitoring Report (October-December 2018) 104

Training was conducted on material handling

Resident doctors deployed at Zero point & Raghopur Camp

Health awareness camp along with health checkup

Environmental Monitoring Report (October-December 2018) 105

APPENDIX 2: EHS MEETING &TRAINING

Details of EHS training conducted in the month from October-December, 2018

Monthly EHS Committee meeting with section heads

EHS Weekly Site committee meeting with working staff and Sub contractors

Environmental Monitoring Report (October-December 2018) 106

APPENDIX 3: SAMPLE FORMAT OF MONTHLY EHS REPORT