TABLE OF CONTENTS

Pages 1. COMPOSITION OF THE SUBJECT COMMITTEE - I (ii) 2. INTRODUCTION (iii) NAME OF DEPARTMENTS DEMAND NO. i. Sports & Youth Programme [ 42 ] 1-11 ii. Power [ 14 ] 12-23 iii. Transport [ 11 ] 24-32 iv. Co-operation [ 12 ] 33-38 v. Education (School) [ 40 ] 39-46 vi. Education (Higher) [ 39 ] 47-52 vii. Forest [ 30 ] 53-57 viii. Health & Family Welfare [ 16, 52 ] 58-64 ix. Social Welfare & Social Education [ 41 ] 65-75 x. Public Works ( R & B ) [ 13 ] 76-81 xi Public Works (D.W.S.) [ 51 ] 82-89 xii. Public Works (Water Resources ) [15 ] 90-101 xiii. Animal Resources Development [ 29 ] 102-112 xiv. Agriculture [ 27 ] 113-125 xv. Horticulture [ 28 ] 126-131 xvii. Fisheries [ 26 ] 132-140

(i)

COMPOSITION OF THE COMMITTEE ( 2015 - 2017 )

CHAIRMAN

Shri Sudhan Das

MEMBERS

2. Shri Narayan Chandra Choudhury.

3. Shri Manindra Chandra Das.

4. Shri Keshab Deb Barma.

5. Shri Ramendra Narayan Deb Barma.

6. Shri Shyamal Chakraborty.

7. Shri Jitendra Sarkar.

8. Shri Pranajit Singha Roy.

9. Shri Anjan Das.

SECRETARIAT

Shri B. Majumder Secretary

Shri P. Chakma Additional Secretary

Smt. L. Deb Barma, Smt. S. Deb Barma, Joint Secretary Under Secretary Shri S. Chakraborty, Shri S. Debnath, Office Superintendent Head Assistant Shri Suman Ch. Saha, Shri M. Deb Barma. Sr. Computer Asstt. U.D. Assistant

(ii)

INTRODUCTION

I, the Chairman of the Subject Committee-I having been authorised by the Committee to present the Thirteenth Report of the Committee on the Demands for Grants for the Financial Year 2016-2017 relating to the following Departments of the State Government. Demands for Grants relating to the Departments of Sports & Youth Programme,Power, Transport, Cooperation, Education(School),Education(Higher), Forest, Health & Family Welfare, Social Welfare & Social Education, Public Works(Road & Building, Drinking Water & Sanitation, Water Resources)/Animal Resources Development, Agriculture, Horticulture and Fisheries Departments.

2. In pursuance Rule 300A(1) of the Rules of Procedure and Conduct of Business in the Legislative Assembly, the Committee was constituted by the Hon’ble Speaker for a two-year period 2015-2017 tenure which will expire on 25.04.2017.

3. The Subject Committee-I plays a very important role in streamlining the proposed Demands of the Departments in the Budget and its Recommendations in the Report helps to utilize the fund in developmental and welfare programme to a very realistic and great extent.

4. The Committee examined the Demand Nos. 42, 14,11, 12, 40, 39, 30, 16, 52, 41, 13, 51, 15, 29, 27, 28 and 26 for Grants for the Financial Year 2016-2017 in its Sittings held on the 31st March, 1st, 2nd & 4th April, 2016.

5. In the Sitting held on the 4thApril, 2016 the Committee considered the draft Report on these Demands for Grants and adopted the same with Recommendations for presentation to the House on the 6th April, 2016.

6. The Committee placed on record its thanks to the Principal Secretary, Special Secretary, Secretaries, other Officers of the Government Departments, the Additional Secretary and other officers of the Finance Department of the State Government and the Secretary, Additional Secretary, Officers and Staff of the Assembly Secretariat for their sincere and tireless service rendered to the Committee during the examination of Demands for Grants and preparation of this Report.

Sd/- Shri Sudhan Das Dated, , Chairman, the 4th April, 2016. Subject Committee-I Tripura Legislative Assembly

(iii) THE REPORT ON THE DEMAND NO. 42 OF THE SPORTS & YOUTH PROGRAMME DEPARTMENT FOR THE FINANCIAL YEAR 2016-2017.

The Budget proposal under Demand No. 42 relates to the Sports & Youth Programme Department, Government of the Tripura for the Financial Year 2016-2017 and the Revised Budget for the Financial Year 2015- 2016 are as follows :- ( Rs. in Lakh )

Particulars Revised Budget Estimates For 2016 - 2017 Estimates Demand Fund For 2015 - 2016 Total T.S.P S.C.P a) Non Plan 5661.40 6317.00 -- -- 6317.00 b) Plan 1219.07 1050.41 684.18 413. 41 2148.00 c)CASP/Other 934.70 6383.91 3889.30 2184.20 12457.41 than CASP Total 7815.17 13751.32 4573.48 2597.61 20922.41

Now, the aforesaid Budget proposal is under examination of the Subject Committee-I of Tripura Legislative Assembly for recommendations to the Demands for Grants. The Committee in its meeting held on the 31st March, 2016 examined the Budget proposals in details having discussion with the Principal Secretary of the Department who appeared before the Committee as summoned.

First of all, the Secretary informed the Committee about the action taken in respect of the recommendations made by the Committee during the year 2015-2016 and stated as follows :- SL Recommendation Reply of the Government on the NO of the committee Relevant recommendations SL No/Page No (1) (2) (3) i. For over all Development In pursuance of recommendations of the of Dasharath Deb Sports Subject Committee-I, 2014-15 the State Complex (DDSSC), the Govt. has decided to construct a mega Department is to continue sports stadium in the Dasharath Dev its persuasion for fund to State Sports Complex (DDSSC). Tripura Housing & Construction Board (THCB)

Subject Committee-I - 1 - be provided by the ONGC, has been chosen as the executing agency THCB and State Govt. for the construction work consisting of Government and to ensure the following components:- execution of works in time – frame. The mega sports stadium shall have five SL. 1. Page – 67 levels (G + 4 level) and will include 22,000 spectator capacity gallery, 9-lane synthetic athletic track, FIFA standard football ground, cover shade for the entire gallery, residential facilities for 500 players below the gallery, modern floodlight system, dressing rooms, coaches rooms, uninterrupted water supply, drainage system, sports laboratory, car parking facility, conference hall (small /big) etc. Construction shall be taken up in 4/5 phases and the total project cost shall be kept within Rs. 160.00 crores.

THCB has engaged Kapoor & Associates, New Delhi as the consultant for preparation of DPR. Accordingly, the DPR has been prepared and submitted by Kapoor & Associates to THCB. THCB has informed that the NIT for the entire project will be floated within the 1st week of April, 2016 within the cost limit of Rs.160.00 crores.

Regarding funding, it is to be stated that, ONGC, Tripura Asset, has committed to provide Rs. 24.32 crores in phased manner. The remaining fund will be provided by the State Government from sources like SPA/NLCPR/NEC/MPLED/ MLA etc.

Subject Committee-I - 2 - 2. For Construction of The State Government has taken decision District Sports Complex at for creation of new sports complexes in Dharmanagar, the newly established Districts. In this Bishramgang, Dhalabil, regard, the YAS Deptt requested PWD ( R Iswarchandra Vidyasagar & B) for preparation of DPR for sports Mahavidyalaya Play complexes at Dharmanagar (North), Ground at Belonia. The Dhalabil (Khowai) & Bishramganj Department is to write to (Sepahijala). THCB shall prepare DPR for the P&C Department after sports complex at Iswar Chandra getting DPR from THCB/ Vidyasagar Mahavidyalaya Play Ground, PWD. Belonia (South). The DPRs are under SL. 2. Page – 67 preparation. After preparation of DPRs is complete, proposals will be sent to P&C Deptt. for further action. 3 The Department is to The State Government has given approval ensure creation of posts of for filling up 139 Nos. vacant posts of Jr. Junior Physical Physical Instructors under Education Instructors and to pursue (Youth Affairs & Sports) Department. sanction of 139 vacant Recruitment to the above mentioned posts of Jr. Physical posts is under process. Instructors. The Finance Deptt. is to accord The YAS Department had approached the concurrence / approval Finance Department for creation of 1000 accordingly. The posts. But this could not be done this Department is also to take year because of budgetary constraints. initiatives for creation of The proposal shall be sent to the Govt. at least 1000 posts and again in the next financial year. the Finance Department is to consider the proposal for the same in phased manner. SL NO.3 Page -67. 4. For Creation of Out Door The State Government has sent a and Indoor Stadiums for proposal to the Ministry of Youth Affairs all Blocks under RGKA, & Sports (MoYAS), Govt. of for The Department is to take creation of creation of indoor sports initiatives for the same in complexes in 12 nos. Blocks under RGKA phase manner accordingly. during, 2014-15. SL NO.4 Page -67. The MoYAS has approved the proposal but necessary fund has not been released yet by GoI.

Simultaneously, the R.D. Department has taken initiative for construction of outdoor playgrounds in the said 12 nos. Blocks through MGNREGA under supervision of concerned DM & Collector.

Subject Committee-I - 3 - 5 The Department is to YAS department has prepared action organize Junior Basic plan for annual sports meets in football, School Level Annual athletics, yoga, kho-kho etc. through the Sports Meet including Tripura School Sports Board (TSSB), Football, Yoga, Athletics which will be implemented during 2016- and others in a calendar 17 by covering all Blocks, Municipal programme in Councils, Nagar Panchayats including collaboration with Agartala Municipal Corporation. The Panchayat PRIs. meets shall be conducted in collaboration Sl no. 5 , P- 67 with Panchayet PRIs bodies and Local Administration.

Yoga programme for primary level students have been started in 100 schools under Secondary Education Deptt. For this, 100 teachers were recently trained in yoga by experts from YAS Deptt. Other schools shall be taken up in subsequent phases. 6. Department is to The State Govt. is providing necessary construct swimming pool funds (in phased manner) to the YAS at NSRCC Complex, Deptt. under different schemes for up- Agartala under RGKA gradation of Netaji Subash Regional scheme and complete the Coaching Centre (NSRCC) which includes work in a time frame. swimming pool with diving facility. Sl no.6, P- 67 7 The Department is to The YAS Department has taken provide residential and initiatives for creation of coaching centers non-residential Coaching in every Block for Yoga, Football, Centers (Block level) for Naturopathy etc. Yoga, Football, Naturopathy and others. Both residential and non-residential Sl. no.7, P- 67 coaching camps are organized every year in collaboration with PRI bodies, Tripura Sports Council & Tripura School Sports Board. State teams are sent to National meets and coaching camps outside Tripura. 8 Swimming Facilities Existing water bodies are being identified (Swimming Platform) be in the Blocks for creating swimming provided in each Block. facilities under RGKA outdoor sports Sl. no.8, P- 67 infrastructure fund.

A model drawing & estimate for Rs. 12.50 lakhs has been prepared by R.D. Deptt. Construction of swimming pools in Blocks will be taken up when fund is available under RGKA.

Subject Committee-I - 4 -

The Budget Proposal Under Demand No :- 42 relates to the Youth Affairs & Sports Department, Government of Tripura for the Financial Year 2016-17 and Revised Budget for the year 2015-16 are as Follows :- (Rs. in lakh) Particulars Revised Budget Estimate for 2016-17 Estimate Non Plan Fund for Plan Total 2015-16 Demand Demand T.S.P S.C.P 42 42 19 20 Non Plan 5661.40 6317.00 - - 6317.00 Plan 0 i) Div Pool 674.13 0 699.41 469.18 293.41 1462.00 ii) Non Div 1479.64 0 6734.91 4104.30 2304.20 13143.41 Pool of Which a) SDS 544.94 0 351.00 215.00 120.00 686.00 b) SPA 465.00 0 1116.60 700.00 380.00 2196.00 c) SCA 51.51 0 266.00 165.00 95.00 526.00 d) RGKA 00 0 518.10 310.00 170.00 998.10 (PYKKA) e)N.S.S 83.10 0 56.44 34.00 19.00 109. 44 f) NLCPR 335.09 0 2637.64 1580.00 870.00 5087.00 g) NEC 00 0 1788.63 1100.00 650.00 3538.63 h) OTACA 0 0 0.50 0.30 0.20 1.00 Total of 7815.17 6317.00 7434.32 4573.48 2597.61 14605.41 Plan Grand Total Non Plan & Plan 20922.41

Achievement made during the year 2015-16 with the following budgetary provision (Rs. in lakh) (as on date o31.12.2015)

BUDGET POSITION AT A GLANCE Particulars Ceiling R.E. 2015-16 Expenditure up to December 2015 PLAN NON-PLAN PLAN NON-PLAN Salary 6.00 5606.00 4.90 4070.18 Non-Salary 668.13 55.40 484.86 27.50 SDS 544.94 00 544.93 ACA 1.00 00 0.00 0.00 SPA 465.00 00 232.49 0.00 SCA 51.51 00 51.50 0.00 RGKA(PYKKA) 00 00 00 NSS 83.10 00 82.08 0.00 NLCPR 335.09 00 335.06 0.00 NEC 00 00 0.00 0.00 Total 2153.77 5661.40 1746.82 4097.68

Subject Committee-I - 5 - Infrastructure development: Department took much initiative for over all development of infrastructure as indicated below:-

A. The following Major/Minor works have been completed during 2015- 16 (up to 31st January ’16) 1. Unakoti District Sports complex Kailashahar is in operational now it open for all. 2. Construction of Gallery, Grand Stand with Press Box, Drainage System of Swami Vivekananda Maiden (Astable ground), Agartala with Mukta mancha is in operational. 3. Up-gradation of Regional College of Physical Education - Construction of Academic Building, Indoor Hall and IRP System at Panisagar, North Tripura building is in operational. 4. Development of Play Ground with Earth Filling opposite to Bholagiri Ashram, Agartala now the play ground is in use . 5. Construction of 2 nos Swimming Pool at Umakanta Academy, Agartala it open for use for Talented swimmer and trainees.

B. Sports persons of Tripura have bagged medals in various National level Sports competitions like as :- North East Sports Competition / National School Games / Rajib Kandhi Khel Abhiyan (RGKA) , in various National Meet & national Games During the year 2015-16. Name of Competition Gold Silver Bronze Total Asian Gymnastic Championship 00 00 01 01 Asian Kick Boxing meet 00 01 02 03 National School games.(Yoga/ Judo./ 04 03 09 16 Thangta ) National Rural Sports Games ( Football, 00 02 01 03 Judo & Badminton ) under RGKA National women Sports under RGKA 00 02 00 02 Gymnastic North East Games at Manipur 09 10 23 42 National Tag of War Championship 00 00 01 01 34th National Yoga Championship at 01 01 01 03 Tamilnadu) National Kick Boxing Championship 01 08 05 14 National Para Olympic ( Disable 04 01 0 05 Swimming Sports) National School 06 06 03 15 games.(Gymnastic/Yoga/ Judo ) Sub Junior National Judo Championship 00 02 01 03 National East India Body Building 00 01 00 01 Championship Total : 25 37 47 109

C. Some remarkable performance has also been done by the Sports Persons & Youths of Tripura, they are as follows:- 1. Tripura has got excellent track record in Games, Sports & Youth Activities during the year 2015-16. Smt. Dipa Karmakar and Sri Samir Barman,

Subject Committee-I - 6 - eminent sports personalities have upheld the name of the state at National and International level. 2. Smt. Dipa Karmakar has bagged Bronze medal for the country in Gymnistic in 6th Asian Rhythmic Gymnastics competition . 3. Sri Samir Barman, a disable swimmer owned 4 Gold Medals in National Para Olympic Swimming Competition held at Indore, Madhya Pradesh. 4. Moreover, Tripura State has bagged Gold medal in the Katthak Dance competition held in National Youth Festival at Raipur, Chattrisgarh. 5. Sri Papan Saha and Sri Sukanta Debnath re-awarded best youth of the country for their social works and youth activities. 6. Sri Sambhu Chakraborty and Smt. Sefali Debnath re-awarded best Yoga Award at National Junior level Yoga Competition.

Yoga at the school level has been introduced during this year for covering 105 Nos. schools. 210 schools teachers have been trained as Master Trainer. During the financial year, 2015-16, there are 2,40,000 students and youths who have participated in the different sports and Games and youth activities from Block to State level and as well as in the National level competition.

D. Youth Service & Youth Activity. E. Name of Competition Gold Silver Bronze Total 21st North East Zonal Sports Climbing 01 03 01 05 Competition National Youth Festival at Raipur , 01 00 01 02 Chatrisgarh

III. The Plan/Programme and any project to be implemented during the year 2016-17 for consideration of the Committee during examination.

The Plan /Programme of the Department is (i) to provide opportunity to the youth to find constructive channel for their unbounded energy, (ii) to improve personalities and character, (iii) to boost up sports and youth activities of the State by providing training for improvement the performances of players of exceptional qualities and (iv) Organization of Regional and National Level Sports and youth activities with a view to exposing the youth of the State in the field of sports and youth activities.

The thrust area of the Department in the outlaying Stations in the field are – (i) Football, (ii) Athletics, (iii) Gymnastics, (iv) Swimming, (v) Yoga and (vi) Judo vi) Yoga etc. Youth Activities & Others .

Subject Committee-I - 7 - The Budget provision under PLAN and NON-PLAN of the Education (YAS) Department during the year 2016 are as follows:-

Demand No :-42 (Rs. in lakh) BUDGET POSITION AT A GLANCE UNDER PLAN /NON-PLAN Agreed B.E. 2015 - 16 under Demand 42. PL AN NON-PLAN Divisible Pool 1462.00 Salary 0.00 Salary / Wages 6211.00 Non-Salary 1462.00 Non-Salary. 106.00 Of Which Of Which Grant to TSC 130.00 Electricity Charges 30.00 Electricity Charges 6.00 State Share 712.00 Scholarship / Stipend 15.00 Major works 100.00 Minor Works 5.00 Transfer to TTAADC 50.00 Cost of Ration 190.00 Sports Equipment 50.00 Youth Welfare Prog. 35.00 Games & Sports 60.00 Promotion of Yoga 25.00 Others 35.00 Others 75.00 Non-Divisible Pool 13143.41 State Plan Non-Divisible 686.00 Pool i) Spl Development Scheme 686.00 (SDS) CSS Under CASP 12457.41 i) SPA 2196.00 ii) SCA 526.00 iii) Rajiv Gandhi Khel 998.10 Abhiyan (Renamed of PYKKA) iv) NSS 109.44 v) NLCPR 5087.64 vi) NEC 3538.63 vii) ACA ( OTACA) 1.00 0 Total (Div + Non Div ) 14605.41 6317.00

The following are the continuing Plan Scheme of the State:- a) Physical Education. b) Youth Welfare Programme for Students (Scouts & Guides activities). c) Youth Welfare Programme for Non-Students (Youth Festival and other Youth Activities). d) Sports and Games Organization of various sports programme (For School students Primary to H/S level).

Subject Committee-I - 8 - e) Promotion of Yoga throughout the State from Block to State level f) Rural Sports Festival g) Grants-in-aid (Grants for Tripura Council, Tripura School Sports Board ( TSSB) and TTAADC & Games & Sports). h) Centrally Sponsored Scheme (NSS & RGKA). i) Development & Creation of Infrastructure. j) B. The Deptt will continue execution of the following ongoing projects during 2016-17 (Under State Plan & / SPA/ NLCPR/NEC).

1. Up-gradation of Regional College of Physical Education (RCPE), Panisagar - Construction of Men Hostel. 2. Development of Playground with earth-filling and Drainage System at RCPE, Panisagar. 3. Up Gradation of NSRCC Construction of Indoor and Gymnasium at NSRCC Complex at Agartala . 4. Up Gradation of NSRCC Construction of Sports Building for different activities like Judo, Weight Lifting, Yoga and Table Tennis (Ph-II) and Construction of Badminton Hall at NSRCC Complex at Agartala . 5. Up Gradation of NSRCC, Agartala i) Renovation of Ground Floor, First Floor & Vertical Extension of 2nd Floor for Hostel, & Change Room of Boys & Girls iii) Construction of Gate. 6. Up Gradation of NSRCC, Agartala Construction of Swimming Pool (Ph- II). 7. Construction of three storied (G+2) Building for Sports Office at the Eastern side of Swami Vivekananda Maiden (Astabal Ground). 8. Construction of Lawn Tennis court at Dasarath Dev Sports State Complex. Badharghat . 9. Construction of District Sports Complex at Udaipur. Gomati Dist. 10. Construction of District Sports Complex at Ambassa, Dhalai Tripura. 11. Development of Playground opposite to Bholagiri Ashram for construction of Gallery & Drainage System), Agartala. 12. Construction of Existing outer Structural face of Mukta Manch at Vivekananda Maiden (Astable ground) Agartala. 13. Construction of Sub-Divn. YAS Office, Santirbazar. 14. Construction of Semi permanent Structure for Sports Hall at BBI Complex, Dharmanagaar. 15. Construction of Yuba Awas at Dhalai District Ambassa.

Subject Committee-I - 9 - C. The following projects have been sent to the P & C Department for consideration. 1. Construction of Mega Sports Complex at at Dasarath Dev State Sports Complex. Badharghat. 2. Up gradation of State Adventure Institute, Melaghar. 3. Construction of State Head quarter Training Center for Scouts & Guides and Office Building for Arundhutinagar. 4. Construction of District Sports Complex at Dharmanagar ,North District. 5. Construction of District Sports Complex at Dhalabil, . 6. Construction of District Sports Complex at Bishramganj, Sepahijala District. 7. Construction of District Sports Complex at Belonia, South Tripura. 8. Up gradation of Regional College of Physical Education, Panisagar ( Phase – II) for the construction of Staff Quarter, Principal Quarter & accommodation of the Staff. 9. Up-gradation of Tripura Sports School, Panisagar - Construction of Boys Hostel. 10. Construction of District Yuva Awas at North, Khowai, Sepahijala Gomati, Unakoti, , and South District. 11. Proposal will be initiated for sanction of fund in connection with construction of newly created District and Sub-Divisional YAS Office. a. Construction of District YAS Office at Sepahijala. b. Construction of Sub-Div. YAS Office, Karbook. c. Construction of Sub-Div. YAS Office, Teliamura d. Construction of Sub-Div. YAS Office, Kumarghat e. Construction of Sub-Div. YAS Office, Jirania. f. Construction of Sub-Div. YAS Office, Mohanpur.

After examination of the Budget proposal and appreciation of submission placed by the Secretary of the Department, the Committee made the following recommendations:-

1. The Department is to expedite the ongoing construction work for the project for overall development of Dasharath Dev State Sports Complex (DDSSC), the Department is to continue its persuasion for fund to be provided by the ONGC and State Government and to ensure execution of works in a phased manner.

2. For construction of District Sports Complex at Dharmanagar, Bishramganj, Dhalai should be taken up. For construction of playground of Iswarchandra Vidyasagar Mahavidyalaya, the Department is to write to the P&C Department after getting DPR from THCB/PWD and take further action to start the project work accordingly.

Subject Committee-I - 10 - 3. The Department is to ensure creation of posts of Junior Physical Instructors and to pursue sanction of 139 vacant posts of Jr. Physical Instructors. The Finance Department is to accord concurrence / approval accordingly. The Department is also to take initiatives for creation of at least 1000 such posts and the Finance Department is to consider the proposal for the same in phase manner, continue the necessary endeavour to fulfill the recommendation of creation of posts of Jr. Physical Instructors in the Financial Year 2016-17, create one post of coach for every Block.

4. For creation of Outdoor and Indoor Stadiums for remaining Blocks under RGKA, the Department is to take initiatives for the same in phase manner accordingly.

5. The Department is to organize Junior Basic School level Annual Sports meet including Football, Yoga, athletics & others in a Calendar Programme in collaboration with PRIs and it is to be continued in the Financial Year 2016-17.

6. The Department is to construct swimming pool at NSRCC Complex, Agartala under RGKA Scheme and complete the work in a time bound manner. The Department is to expedite completion of the whole work in the Financial Year 2016-17.

7. The Department is to provide Residential and Non-Residential Coaching Centres (Block level) for Yoga, Football, naturopathy and others and create 100 (hundred) post of coach and new creation of 70 (seventy) posts of youth organizer for the department. Sanction of Finance Department is to be obtained for the same.

8. Swimming facilities (Swimming Platform) be provided to each Block. The Department is to Implement the recommendation during the Financial Year 2016-17 with proper follow up action.

After examination of the Budget proposals and appreciation of submission of the representative of the Department, the Committee recommends the Budget proposals under Demand No. 42 for grants by the House alongwith the recommendations.

Sd/- Shri Sudhan Das Dated, Agartala, Chairman th the 4 April, 2016. Subject Committee - I Tripura Legislative Assembly

Subject Committee-I - 11 -

THE REPORT ON THE DEMAND NO.14 OF THE POWER DEPARTMENT FOR THE FINANCIAL YEAR 2016-2017.

The Budget Proposal under Demand No.14 relates to Power Department, Govt. of Tripura for the Financial Year 2016-2017 and the revised Budget for the Financial Year 2015 -2016 are as follows :-

( Rs. in Lakh )

PARTICULARS REVISED BUDGET ESTIMATES FOR 2016 - 2017 ESTIMATES DEMAND FUND FOR 2015 - 2016 TOTAL T.S.P S.C.P a) Non Plan 8537.50 10104.50 -- -- 10104.50 b) Plan 2958.16 261.00 155.00 85.00 501.00 c)CASP/Other 4877.20 1040.00 620.00 340.00 2000.00 than CASP

Total 16372.86 11405.50 775.00 425.00 12605.50

Now, the aforesaid Budget Proposal is under examination of the Subject Committee-I of the Tripura Legislative Assembly for recommendation to the House for Grants.

The Committee in its meeting held on 31st March, 2016 examined the Budget Proposals in details having discussion with the Principal Secretary of the Department who appeared on the part of the Department on summoned. First of all, the Principal Secretary of the Department informed the Committee about the action taken in respect of the recommendations made by the Committee during the year 2015-16 and stated as follows :-

Relevant Para No. / Sl. Recommendations of the Implementation / Page No. No Committee action taken on the recommendations of the report 1 2 3 4 1 Page - 60 The Department is to ensure Initiatives have been taken to expand the IT Point - 1 implementation of IT enabled enabled Centralized Metering, Billing and system across the state Collection System including online payment including remote areas to facility to balance electrical Sub Divisions not

Subject Committee-I - 12 - facilitate timely energy billing covered under R-APDRP Scheme. Approached to service. Power Finance Corporation (PFC) for providing funding support under Integrated Power Development Scheme (IPDS) for 9(nine) towns (i.e. Mohanpur, Bishalgarh, Jirania, Melaghar, Santirbazar, Sabroom, Ambassa, Kamalpur and Panisagar) which are recently covered under the IPDS. For covering balance area beyond the scope of both R-APDRP & IPDS Scheme TSECL trying to arrange fund for extending above IT enabled facility. 2 Page - 60 The Department is to continue Frequent raids by Vigilance Squad and Point - 2 frequent raids by vigilance inspection by departmental staffs and officials are squad and inspection by continuously done. departmental staff to check Vigilance Wings of TSECL is conducting power stealing and book the raids throughout the State for bringing in book the miscreants who indulge in theft miscreants who indulge in theft of electricity by of electricity. hooking or by passing the energy meter. During the period 2,754 nos raid have been conducted, 11,098 nos. Hook-lines have been removed, 229 nos. FIR have been lodged, 5 nos. arrest have been made and Rs.1.19 Cr. have been realized as penalty for un-authorized consumption of electricity. 3 Page - 60 The Department is to continue For better consumer service 11 nos. Point - 3 its endeavor to upgrade the Electrical Sub Division Offices have been open status of Call Centre, Section (enclosure). Moreover, complaints / calls are Office and Bill Collection attended daily in the Call / Section Offices. Centre etc. for prompt Officials and Staff of TSECL always remain attending of complaints. conscious in this regard so that no calls left un- attended. Presently there are 30 nos. Section Offices and 165 nos. Call Centers are situated in different corner of the State for registering calls / complaints and prompt attending calls etc. Moreover, for early redressal of consumer complaints a “Customer Care Centre” has been established at Agartala for receiving calls, prompt attending the complaints and feedback to the consumers for functioning round the clock. 4 Page - 60 Extending of 3(three) phase Three phase connection have been extended Point - 4 line especially to all Hospitals, to all Hospitals, PSs and Blocks from whom PSs and Blocks be provided. requisition for 3 phase connection have been received / submitted. There is no pending requisition of such offices for 3 Phase connection till date. 5 Page - 60 The works relating to The works relating to Transmission Projects Point - 5 Transmission Projects undertaken from Surjyamaninagar to Rukhia and undertaken from augmentation of P.K. Bari Sub-station with 132 Surjyamaninagar to Rukhia KV bay for termination of 400 KV line are in and augmentation of P.K. Bari progress and are expected to be completed by

Subject Committee-I - 13 - Sub-station with 132 KV bay April, 2016. for termination of 400 KV line It is also expected that the works relating to and the work relating to NLCPR and SPA will also be completed by June, NLCPR, RGGVY and SPA 2016 etc. be completed in a time frame. 6 Page - 60 The Department is to organise The Department is organizing awareness Point - 6 Awareness Programme for program for consumers as well as user of consumers. electricity. During the year awareness program on Demand Side Management (DSM) was conducted. Awareness program were also made involving teachers and students of 5 nos. Govt. Colleges and 12 nos. Schools. Moreover, awareness program among the consumers are being done regularly in all GP/VC/Block level meetings and in administrative camps 7 Page - 60 The Department is to ensure Ministry of Power, Government of India has Point - 7 implementation of RGGVY sanctioned for continuation of Rajiv Gandhi Projects under 12th Plan Gramin Vidyutikaran Yojana (RGGVY) in 12th sanctioned for 8(eight) PLAN for electrification of un-electrified village Districts of Tripura State. and habitation, partially electrified villages and habitations and rural APL and BPL households in Tripura and has communicated sanction of Rs.316.22 Cr. for 8 (eight) Districts. The Project of 2 (two) Districts (Sepahijala and South Tripura) is implemented by NEEPCO and balance 6(six) Districts (North Tripura, Unakoti, Dhalai, Khowai, West Tripura and Gomati) are implemented by TSECL. It is expected that total work will be completed by December, 2017. 8 Page - 60 The Department is to ensure The maintenance of electric lines and sub- Point - 8 MTc of electric line and to stations are carried out throughout the year with check low voltage to avoid due gravity to check electrical accidents and accident and interruption of smooth power supply to the consumers power supply. 9 Page - 60 The Department is to examine In view to make the payment of bills more Point - 9 the feasibility of extending of convenient after 5 PM, arrangement for 24 hrs. time for payment of bill by online bill payment has been introduced in 16 consumers in Agartala and towns of the State. Gradually, all consumers of the Sub-Division Towns after 5 State will be brought under covering of such P.M. Faulty power meters to be facility. Moreover, faulty power meters are being repaired or replaced with new replaced with new one on regular basis. During one as early as possible. 2015-16 (up to Feb, 2016) total 76,943 nos. defective meter have been replaced so far.

Subject Committee-I - 14 -

Achievements during 2015-16. Department of Power Transmission Schemes

Sl. Name of Scheme/ Present Status No Work Sanctioned Release of UC issued Remarks Cost Fund by up-to- FD date Rs. In Lac. 1. Transmission Project 7995.79 4830.148 4830.148 a) 132 / 33 KV switchyard are (Phase – I) : 400 KV in operation from July 2012. Sub-station at b) Communication System (132 Surjamaninagar (to be KV) is in progress and charged at 132 KV) and anticipated to be completed infrastructure by March 2016. development, West c) Residential Colony, Non- Tripura District. Residential and Infrastructure Development Works are in progress and anticipated to be completed by March 2016.

2. Transmission Project 950.81 926.906 774.64 a) Line completed and (Phase – I) : 132 KV commissioned on 17th May, Double Circuit 2014. Transmission Line from 132 KV Sub-Station b) Work for Residential Building Surjyamaninagar to 132 is in progress. Target date of KV 79 Tilla Grid Sub- completion is April 2016. station including Feeder bay and site development, West Tripura District. 3. Transmission Project 738.53 663.95 663.95 (Phase – I) : 132 KV Work completed and Double Circuit commissioned on 12th Transmission Line from September 2012. 132 KV Sub-Station Surjyamaninagar to 132 KV Bodhjungnagar Sub-Station including Feeder bay and site development, West Tripura District. 4. Transmission Project 1261.00 907.176 889.58 a) 132 KV D/C line work is in (Phase – I) : 132 KV progress. Out of 85 nos. tower, Double Circuit i) Foundation casted: 62 nos. Transmission line from ii) Tower erected: 39 nos. Surjamaninagar to iii)Stringing completed : 2.18 Rokhia (30 Km and site Km. development and Fdr. Bay at Rokhia) b) Work for Feeder Bay is in progress.

Subject Committee-I - 15 - Target date of completion is April 2016.

5. Augmentation of P. K. 400.59 158.631 144.21 80 % materials reached at site. Bari Sub-station with 2 (two) no. 132 KV bay ii) Civil works for equipment for termination of 400 foundation completed. KV line. iii) Erection works in progress.

Target date of completion is April 2016.

A. NLCPR

Sl. Name of Scheme/ Present Status No Work Sanctioned Release of UC issued Remarks Cost Fund by up-to- FD date Rs. In Lac. 1. Construction of 132 KV 2803.00 2803.00 973.19 1) Work is in progress. Double Circuit Transmission line from i) Total no. of tower in the line:150 nos Surjamaninagar 132 ii) Tower foundation casted : 63 nos. KV Sub-station to iii) Tower erection completed: 42 nos. Monarchak. iv) Stringing completed :12.11 Km. 2) Target Date of completion is June 2016.

2. Construction of 132 KV 371.00 371.00 186.09 Commissioned on 19th January, 2014. Double Circuit Transmission line from 1 X 15 MVA, 132/66 KV ICT and 132 KV Rabindranagar Transformer Oil have been proposed to sub-station to be procured with the savings of the Monarchak. Project. Tender have already been invited. B. SPA

C. NEC Sl. Name of Scheme/Work Yr. of Approved Fund Actual Expen- Presnt Status No Sanction cost Released Fund diture received up-to- by date TSECL Rs. In Lac. 1 Augmentation of Sub- 2011- 442.00 442.00 355.49  Work station capacity by addition 2012 442.00 completed on of 1 X 20/25 MVA, 132/33 Sept. 2014. KV Transformer along with  1X8 MVA, associated Civil work at 33/11 KV Ambassa, Dhalai District, Power Tripura. Transformer has been proposed to be procured with

Subject Committee-I - 16 - the savings of the Project. Tender invited.

2 Augmentation by addition 2011- 382.42 382.42 382.42 305.53  Work of 132/33 KV, 1 X 20/25 2012 completed on MVA Transformer along Sept. 2014. with associated equipments  Protection and Civil works at 132 KV equipments Mission Tilla Sub-station, have been Dharmanagar, Tripura. proposed to be procured with the savings of the Project. Tender invited. 3 Augmentation by addition 2011- 288.84 288.84 288.84 Work completed of 132/11 KV, 1 X 12.5/15 2012 360.98 on Aug 2015. MVA Transformer along with associated equipments at 132 KV Udaipur S/S, Tripura. 4. Construction of 132 KV 2012- 1207.00 0.00 0.00 - Work will now Single Circuit line from 13 commence for Ambassa 132 KV Sub- the portion from station to 33 KV Sub- Ambassa to station at Gandacherra Harincherra, where final approval of the forest clearance received. 5. Construction of 2X10 2014- 1392.24 500.00 500.00 0.00 LOA issued on MVA, 132/33 KV and 15 30.12.2015. 2X10 MVA, 33/11 KV sub- Work in station including LILO at progress. Bishramganj, Sepahijala District, Tripura.

Subject Committee-I - 17 - E. TSECL OWN SOURCE

Name of Approved Sl. No. Work Status Remarks Scheme /Work Cost Rs. In Lac. 1. Construction of i) The Project of Rs. 13.11 132 KV Single 1311.00 Line commissioned in Cr. was initially planned to Circuit March, 2015. be implemented from equal Transmission sharing of TSECL & State line from P. K. Govt. Funding Source Bari 132 KV ii) TSECL has already paid Sub-station to 33 Rs. 6.55 Cr. on account of KV Sub-station material procurement, part at Kanchanpur. erection, Forest Compensation, RoW issues etc. iii) Balance Fund support from State Govt. for Rs. (13.11 - 6.55) Cr. = Rs. 6.56 Cr. has already been processed to the Finance Deptt., GoT.

2. Construction of Out of 108 nos. towers Anticipated completion is by 132 KV Single 359.86 (line length – 30.4 KM) 30th April, 2016. Circuit i) Tower Foundation Transmission casted: - 108 nos. line from 132 ii) Tower erected: - 106 KV Sub-station, nos. Gamaitilla, iii) Stringing completed: - Teliamura to 132 24.336 Km. KV Sub-station iv) Balance work is in at Dhalabil, progress. Khowai. 3. Supply (with transportation, Work completed. Power loading & Transformer energized. unloading), Erection, Testing & Commissioning of 1 (one) no. 174.61 20/25 MVA, 132/33 KV, Power Transformer at Bodhjungnagar 132 KV Sub- station, West Tripura District. 4. Augmentation 260.24 Work completed. Source of fund: - Rs.1.00 by capacity Crore from BRGF Fund addition of Support, balance from 132/11 KV, 1 X TSECL own source. 10 MVA Transformer with Bay at

Subject Committee-I - 18 - Garodtilla 132 KV Sub-station, Kamalpur, Dhalai District, Tripura.

F. NEW PROJECT TO BE IMPLEMENTED.

Considering the present status of Power Generation and increasing demand of power in the State, a World Bank Assisted Project for construction of 9 (nine) nos. 132 KV Sub Station, 34 (thirty-four) nos. 33 KV Sub Station, 470 Km. 132 KV Line and 770 Km. 33 KV Line including capacity augmentation of existing Sub Stations and re-conductoring of existing lines has been taken up through Power Grid Corporation of India (PGCIL) at cost of Rs.1.367 Cr. This will strengthen the Transmission and Sub-Transmission System in the State and ensure delivery of quality power supply to the consumers.

RGGVY / DDUGJY Project in Tripura

10th & 11th Plan – RGGVY Project (1st Phase)

4 nos. projects under RGGVY were sanctioned by MOP, Govt. of India for electrification of un- electrified villages, partially electrified villages having population above 100. Out of these 4 projects, 2 projects are implemented by TSECL and other 2 by PGCIL. Again out of 4 projects, 1 project namely Dhalai was sanctioned in 10th Plan & other 3 were sanctioned in 11th Plan. Total project sanction cost for RGGVY project is Rs.197.29 Crores, fund received Rs.173.94 Crores and expenditure incurred Rs.178.53 crore. Progress of works under RGGVY Scheme upto January-2015 is given below :

RGGVY Target & Achievement Item Target Achievement up to January-2015 66/11 KV sub-station(Nos.) 2 2 66 KV Transmission Line (Km) 3.9 3.9 33/11 KV Sub-station (Nos.) 6 6 33 KV Line (Km) 107.62 102.50 11 KV Line (Km) 925.00 871.92 11/0.4 KV DT (Nos.) 1844 1825 LT Line (Km) 1704.40 1879.54 BPL service connection (Nos.) 1,07,174 1,06,329

Subject Committee-I - 19 - 12th Plan – RGGVY Project (2nd Phase)

Ministry of Power, Government of India vide Office Memorandum F.No.44/10/2011-RE/ dated 2nd September,2013 has issued sanction for continuation of Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY) in 12th Plan. DPR for 8 (eight) District as per guideline have been prepared out of which 2 (Two) DPRs (for Sepahijala & ) have been prepared by NEEPCO and balance 6 (Six) nos. (for North Tripura, Unakoti, Dhalai, Khowai, West Tripura & Gomati District) have been prepared by TSECL. The Chief Manager, REC Ltd., Kolkata has communicated sanction of DPRs for 8 (Eight) District of Tripura State for implementation of 12th Plan RGGVY project and sanctioned amount are given as below :- Project implementation Sl.No Name of District Scheme Code No Sanctioned amount For Project implementation by TSECL (Rs. In Lac) 1 North Tripura P:RHhE-C category (Code No-8098) 4703.30 2 Unakoti P:RHhE-C category (Code No-8099) 2405.71 3 Dhalai P:RHhE-C category (Code No-8095) 4833.33 4 Khowai P:RHhE-C category (Code No-8097) 4413.66 5 West Tripura P:RHhE-C category (Code No-8100) 3366.24 6 Gomati P:RHhE-C category (Code No-8096) 3128.54 Total amount 22850.78 For Project implementation by NEEPCO 1 Sipahijala P:RHhE-C category (Code No-8101) 4084.07 2 South Tripura P:RHhE-C category (Code No-8102) 4687.50 Total amount 8771.57 Grand Total of 8(eight) RGGVY Project = Rs.31622.35 lac P PHYSICAL TARGET OF 8 (Eight) NOS. 12th PLAN RGGVY SCHEME, TRIPURA. Sl. No. Detail Unit Total 1 Un-electrified Habitation Nos. 532 2 BPL Service connection Nos. 75,432 3 H.T. Line Km 1489.20 4 L.T. Line Km 2283.88 5 Distribution Sub-Station Nos. 1719 6 33 KV Sub-Station No 2 7 33 KV Line Km 20 8 33 KV Bay No. 2 9 Sanction amount Rs. in Lac. 31622.35

PRESENT STATUS OF HABITATION 1. Total Habitations  9080 Nos. 2. Total Fully Electrified Habitations as on February, 2016  2158 Nos. 3. Total Partially Electrified (PE) Habitations  6366 Nos. 4. Total Un-Electrified (UE) Habitations as on February, 2016  556 Nos.

Subject Committee-I - 20 - DDUGJY : In order to power supply to all consumers and strengthening & augmentation of sub- transmission and distribution infrastructure in rural areas including meter at distribution transmission feeder and consumer end DDUGJY (Deendayal Upadhyaya Gram Jyoti Yojana) has been introduced and required DPR as per guidelines of DDUGJY has submitted for an amount of Rs.903.02 Cr. Amount sanctioned so far for the Scheme an amounting to the Rs.74.12 Cr. only as below. The works will be taken up soon. Rs. in Cr. Total Cost Sl. Name of Access to System Total PMA Metering incl PMA No. District RHhs Strengthening Cost Charges Charges

1 Dhalai 4.25 3.40 0.82 8.47 0.04 8.50881

2 Gomati 3.78 3.36 2.24 9.38 0.05 9.42786

3 Khowai 3.42 4.98 0.70 9.11 0.05 9.15442

4 North 4.08 3.33 0.92 8.33 0.04 8.36986

5 Sepahijala 6.35 4.05 1.03 11.43 0.06 11.49044

6 South 5.36 4.31 0.85 10.51 0.05 10.56489

7 Unakoti 3.45 1.80 0.95 6.20 0.03 6.22677

8 West 5.90 3.40 1.02 10.32 0.05 10.37569

Total 36.59 28.63 8.53 73.75 0.37 74.11875

Budgeted Programme during 2015-16 Rs. in Cr. for above works. Rs. In Cr.

Revised Estimate Fund Received 2015-16 2015-16 1. Plan (incl. SPA)  33.92 33.92 2. NLCPR  22.61 15.72 3. NEC  2.96 NIL

4. SCA (Un-Tied)  NIL NIL Total  58.00 49.64 T & D Losses

Feeder metering of electrical energy upto the level of 11 KV in the entire State have been completed. Most of the consumers have been provided with functioning energy meters. Defective meters are being replaced in a continuous process. All the Kutirjyoti connections are gradually being metered for proper energy accounting. All new connections including special drive connections to BPL families are now being extended with meters.

Subject Committee-I - 21 - Computerized Energy Billing System has already been undertaken in the State. This system shall provide information with regard to the total energy sold to consumers total energy billed and total energy for which Utility has been paid for. This system when fully operationalized shall identify the commercial loss for non-billing and non-realization of billed amounts. In this State out of a total consumers strength of 7.25 Lakh we have already covered 7.10 lacs in the Computerized Energy Billing System. The T&D Loss for last 3 years in Tripura are as below:: 2012-13 - 31.59% 2013-14 - 31.72% 2014-15 - 30.08% TSECL proposes to reduce AT&C losses to 22% by end of twelfth Plan period The T&D losses along with commercial losses collectively known as AT&C losses. In order to reduce the technical loss the following actions have been taken:  Strong anti-pilfer measures are being taken with the help of Vigilance Squad operating in all Districts of the State.  8 nos. Special Courts have been set up by the State Government to deal with the matters relating to theft of electricity. There is a downward trend in AT&C losses which of course requires to be further reduced.  Vigilance Wing of the Corporation is conducting raids throughout the State for bringing into book the miscreants who indulge theft of electricity by hooking and/or bypassing the energy meters. 2,754 Nos. raids have been conducted in the year 2015-16(Feb,2016) and 229 Nos. F.I.Rs has been lodged. The State Government has already set up 8 Nos. Special Courts for trying offences under the Electricity Act, 2003.  Re-structured Accelerated Power Development and Reforms Programme (R-APDRP): Tripura received sanction for Part-A and Part-B of R-APDRP Schemes for 16 Towns having 10000 populations as per 2001 census. Sanctioned project value is Rs.35.19 Crores for Part-A Schemes and Rs. 165.10 Crores for Part-B Schemes. TCS has been appointed for implementation of IT infrastructure in the entire NE States including Tripura as Common IT Implementing Agency. Common Data Centre has been established at and is operational. Construction of common Disaster Recovery Centre at Agartala is in progress. System metering in all the 16 Project Areas have been completed which includes Boundary metering, Feeder metering and Distribution Transformer metering. GIS Asset and Consumer Indexing have been completed in the entire 16 Project Area/town. Base Line AT&C Loss has been finalized for all 16 Project Area/town and approved by PFC/MoP, GOI. All the Applications like Metering – Billing – Collection (MBC), Meter Data Acquisition System (M- DAS) and Energy Audit are operational. IT System under Part-A of R-APDRP Schemes is operational in all the 16 Towns. Part-A projects has been completed in all the 16 towns and declared “Live” as per guideline of R-APDRP. Facilities like On Line Payment, bill information through sms has already extended to all the consumers of R-APDRP Project Areas. Regarding Part – B (i.e. strengthening of regular distribution system), work has been completed in 5 Towns namely Amarpur, Gandhigram, Sonamura, Kumarghat & Udaipur (except 33 KV Sub-Station). Work is in progress in balance 11 towns and expected to be completed by Dec’2016. In order to facilitate all the consumers of TSECL with modern IT enabled services, coverage of all the billing and collection systems under centralized IT System of Part-A of R-APDRP Schemes is required. For this TSECL require financial assistance/support to upgrade/ modernize its entire Energy Billing System matching the present day requirement. Hence, it is proposed to assist TSECL with necessary funding for immediate replacement of existing Old EBS.

Subject Committee-I - 22 -

After careful examination of the Budget proposal and appreciation of submission placed by the Principal Secretary of the Department, the Committee made the following recommendations :-

1. The Department is to ensure implementation of IT enabled system across the state including remote areas to facilitate timely energy billing service to cover the rest of the areas.

2. The Department is to continue frequent raids by vigilance squad and inspection by departmental staff to check power stealing and book miscreants who indulge in theft of electricity. The Department is to continue awareness programmes in the Financial Year 2016-17 to desist people from stealing power by dint of hook line and also initiate administrative measures to stop electricity stealing.

3. The Department is to continue its endeavour to upgrade the status of call centre, section office and bill collection centre etc. for prompt attending of complaints. Ensure current billing and providing the bill to consumer in time in every month.

4. Extending of 3(three) phase line specially to all Hospitals, PSs and Blocks be provided. Implement 3-Phase power connection in rural areas where it is needed.

5. The Department is to organise awareness programme for consumers and continue in the financial year 2016-17 with more emphasis.

6. The Department is to ensure maintenance of electric line and to check low voltage to avoid accident and interruption of power supply and take steps for repairing / replacing old electric lines to avoid accident, also maintenance to ensure service to people (consumers).

7. The Department is to examine the feasibility of extending of time for payment of bill by consumers in Agartala and Sub-Division Towns after 5 P.M. Faulty power meters to be repaired or replaced with new one as early as possible and increase of bill collection centres specially in rural areas to facilitate consumers in payment of bills. Extend call centre service to people.

After examination of the Budget proposals and appreciation of submission of the Representative of the Department the Committee recommends the Budget proposals under Demand No. 14 for Grants by the House alongwith the Recommendations.

Sd/- Dated, Agartala, Shri Sudhan Das Chairman the 4th April, 2016. Subject Committee – I Tripura Legislative Assembly

Subject Committee-I - 23 - THE REPORT ON THE DEMAND NO. 11 OF THE TRANSPORT DEPARTMENT FOR THE FINANCIAL YEAR 2016-2017.

The Budget Proposal under Demand No.11 relates to the Transport Department, Government of Tripura for the Financial Year 2016-2017 and the Revised Budget for the Financial Year 2015-2016 are as follows :-

(Rs. in lakh) Particulars Revised Budget Estimates for 2016-2017 Estimate Demand Fund for Total 2015-2016 T.S.P. S.C.P. a) Non-Plan 2407.00 2005.00 ------2005.00 b) Plan 1475.30 847.06 514.58 299.93 1661.57 c) CASP/ 1639.05 442.00 263.50 144.50 850.00 Other than CASP Total 5521.35 3294.06 778.08 444.43 4516.57

Now, the aforesaid Budget proposal is under examination of the Subject Committee-I of the Tripura Legislative Assembly for recommendation to the Demands for Grants.

The Committee in its meeting held on the 31st March, 2016 examined the Budget proposals in details having discussion with the Secretary of the Department who appeared before the Committee as summoned.

First of all, the Secretary informed the Committee about the action taken in respect of the recommendations made by the Committee during the year 2015-16 and stated as follows:-

1. Setting up of CNG refilling As per report of TNGCL, the following CNG stations are stations in the District presently functioning in Tripura:- Headquarters be completed in i. A.D. Nagar, ii. Krishnagar, iii. Khayerpur, iv. Abhoynagar & phase manner. v. Bhramhabari(Udaipur). TNGCL has planned to set up CNG Mothers station in Chandrapur (Agartala). Depending on Mother station the following Daughter Booster Station will be set up. ,I).Bishalgarh, ii). Teliamura, iii. Khowai. Further, TNGCL has planned to set up a CNG Mother station in Udaipur. Depending on the mother station the following Daughter Booster Station will be set up. i.Santirbazar ii.) Amarpur iii) Belonia in the first phase.

2. For earmarking of Lay-Bye, As per report of the Chief Engineer, PWD(NH), Govt. of the Department is to take up Tripura the National Highways Infrastructure Development

Subject Committee-I - 24 - the matter with PWD and Corporation Ltd(NHIDCL)a Central Govt. undertaking, has BRO. been engaged for construction of 2-lane road of NH from Amtali to Sabroom. As reported by the General Manager(Project), NHIDCL, they will construct 8(eight) Nos. of lay-bye on the said road as per DPR and the locations will be finalized in consultation with the State Govt. In respect of portion from Agartala to Churaibari, there are 4(four) Nos. of lay-bye already exist at Churaibari, Pecharthal, Manu & Chakmaghat. The PWD(NH)has submitted DPR to the Ministry of Road Transport & Highways, GOI for construction of double laning of the road from Panisagar-Dolubari to Mongiakami where Another lay-bye is proposed to be constructed at Atharamura. 3. The Department is to steps to In order to ensure display of the fare chart as per Memo. ensure display of fare-chart of No.F.2(8)-Trans/2014, dated, 25th February, 2015 in all passengers to all Auto- categories of commercial vehicles across the state, all rickshaws, Jeeps, Bus and District Magistrate & Collectors, Sub-Divisional alike vehicles as early as Magistrates, Block Development Officers and all other possible. TCS officers, POLICE PERSONAL, Joint Transport Commissioner, District Transport Officers, Motor Vehicle Inspectors are directed to inspect the vehicles and to ensure compliance of proper display of rate charts among other e.g. payment of road tax, fitness certificate, Pollution under Control certificate, Insurance and route permit vide No.F.2(8)-Trans/2014 dated 25th February,2015 & in our official website:-http://tsu.trp.nic.in/transport. 4. The Department is to continue Kanchanpur, Khumulwng and Sonamura Motor Stands are setting up new Motor Stands opened for public use, while the construction of Kalacherra in uncovered areas. Setting-up & Dhanapur motor stand is in progress. Department has of Motor Stands at Rajnagar, entrusted to PWD(R&B), Teliamura Division for Golaghati, Jatanbari, construction of Motor Stand at Teliamura and Tripura Melagarh and Madhupur be Housing and Construction Board(THCB) for Integrated given priority. The Finance Parking Complex at Khowai puran bazaar during this year. Department is to consider For setting up of Motor Stands at Rajnagar, Golaghari, allocation of required fund Jatanbari, Melagarh and Madhupur, Department has during Revised Estimates requested the concerned offices and present status as 2015-16. following:- Regarding Melaghar Motor Stand:- DM, SPJ has been requested to prepare a concept paper for this Motor Stand. Accordingly, DM, SPJ has requested to CEO, Melaghar for intimation the requirement of fund for execution. Requisition of fund is yet to be received. Regarding Jatanbari Motor Stand:- SDM, Karbook has informed that 0.98 acres land has been identified which belongs to PWD, Jatanbari at Mouja-Lebacharra for setting up of Motor Stand. Engg-in-Chief, PWD has been requested to issue NOC for setting up the motor stand on the identified land. NOC of the said land has not yet been received till date.

Subject Committee-I - 25 - Regarding Golaghati Motor Stand:-DM, SPJ has been requested to submit DPR for placement of fund. Accordingly, DM, SPJ has informed that Revenue Deptt. has conveyed approval towards utilization of land measuring 1.60 acres in favour of Transport Department. DM, SPJ has requested to EE, RD, Bishramganj to prepare a DPR of the said Motor Stand. DPR is yet to be received. Regarding Rajnagar Motor Stand:- DM, South Tripura has been requested to purchase the land measuring 1.60 acres through SDLPC of Belonia. Accordingly, SDM, Belonia has been requested for the same. Regarding Madhupur Motor Stand:- On request, DM, SPJ has requested to SDM, Bishalgarh for identification suitable land preferably khas land in the traffic populated area of Madhupur for setting up of a Motor Stand. Report for identification of land has not yet been received. 5. Proper conveyance through A revised Project Estimate for development of Ferry inland waterways for journey Services in Dambur Water areas(Rs.17.71 Crores) prepared from Raisyabari to by Chief Engineer, PWD(WR) has been submitted to the Gandachhera and Mandirghat to Gandachhara be arranged Ministry of Shipping, Government of India in CSS format for as early as possible. consideration of development of IWT under 100% Central Sector Scheme.

6. The Department is to continue At present total Number of vehicles in Tripura 3,45,315 checking of smoke level of and total Number of vehicles having PUC certificate vehicles to check pollution of 1,31,912. Total number of LMV is 2635 connecting to atmosphere. Nagerjala, Radhanagar, Chandrapur and Auto Rickshaws with Agartala. Regular enforcement drives are being conducted through out the State. Transport Department has already issued license to the eligible candidates to establish Pollution Testing Centers in almost all Sub-Divisions of the State. 7. Permit to small vehicles to run As per report of Joint Transport Commissioner that to from its last point of route to avoid the congestion of traffic since 2008 no permit for Agartala and back be auto rickshaw being issued within the Agartala Municipal provided. Corporation area. Only 100 nos. of metered Auto Rickshaw permit were issued on the basis of Order passed by the Hon’ble High Court of Tripura. 8. The Department is to continue As per report of FCS & CA Department and request to this setting up of toilets and Department to issue necessary instruction to the left out waiting room/shed in all R/O Dealers carrying on POL Business for providing clean Petrol/Diesel stations for toilet facilities and waiting rooms/sheds in their Retail passengers in consultation outlets. with Food & Civil Supplies Department. 9. The Department is to continue Road signs and hoarding are already erected in the major efforts to reduce vehicular roads accident prone areas by Traffic Police. State accident by organizing Transport Authority giving priority and encouraging awareness programmes for interested applicants to purchase Public Service Vehicle Drivers and public. Bus instead of small vehicle. Road safety awareness

Subject Committee-I - 26 - campaigns with discussion, quiz, street dram, a health camps for motor workers etc. are being conducted in various motor stands, public places, Schools and Colleges throughout the year to reduce vehicular accidents.

Rather than, as per instruction of Supreme Court Committee on Road Safety constituted by Hon’ble Supreme Court, a State Level Road Safety Council under the Chairmanship of Hon’ble Minister, Transport and a Lead Agency with high level officials has been constituted to look after whole traffic system in the State. Initiative has already been taken to create a separate Road Safety Fund from the collections on account of road accident, fees, fines etc. Initiative also taken to identify the black spots on accident prone areas and to remove those black spots on the National Highways. 10. The Department is to issue Permits are being issued without interruption to loanees of permit giving priority to the SC/ST/Minorities/OBC/Swabalamban etc. in all viable loanees of SC, ST, Minorities roads of the state except inside the Agartala Municipal and OBC in Agartala and Corporation area. other areas. 11. Ongoing process for A. Two DPRs for development of river Gumti(Rs.12.60 development of Howrah and cr.) and river Haora(Rs.11.20 cr.) prepared by RITES Gomati rivers be expedited. LTD. were submitted to the Ministry of Shipping for fund under 100% CSS. B. Ministry of Shipping approved the DPR for Gumti river and requested the State Government to submit fund requirement details with detailed bifurcation alongwith set physical target to achieve the project to be completed within the scheduled time frame period based on the DPR prepared by RITES Ltd.

C. Fund requirement details with detailed bifurcation alongwith set physical target to achieve the project to be completed within the scheduled time frame period has been prepared by CE (WR), GOT and sent to the Ministry of Shipping, Government of India. Ministry of Shipping has sanctioned Rs.12.58 crores for the project with 3 year phasing w.e.f.2015-16. They have already released Rs.2 crore for the project in 2015-16 out of the sanctioned amount of Rs.12.58 crores and the Transport Department is going to place the said fund to the Chief Engineer (WR) on his authorized

Subject Committee-I - 27 - Executive Engineer (WR) in WR Division. It is Rs. 6(six) crores earmarked for the cost of one dredger and the rest amount of funds are earmarked for execution of dredging activity, bank protection, construction of terminals, aid to navigation etc. Chief Engineer (WR) mentioned that the cost of dredger of the required specification would be Rs.10 crores resulting which the project cost would be increased to Rs.16.58 crores. The enhanced cost of the project was also intimated to the Ministry. The Ministry clarified that enhanced cost may not be considered under CSS. D. A meeting was taken by Chief Secretary on 16th February, 2016 in connection with development of IWT on Gumati river. After detailed discussion with the officials of Transport Department and PWD(WR)Division, the following decisions were taken:- i. Major component of the project is the procurement of dredger which will have to be subsequently shifted to Agartala for dredging of Howrah River as per guidelines. Moreover continuous dredging would also be necessary even after making capital investments. It is no denying that the Water Resource Department does not have experience of dealing with such IWT Project in the State of Tripura. Therefore, the best option shall be outsourcing only. ii. Professional Agency may be engaged by PWD (WR) on turnkey basis under suitable terms & conditions in line with Government of India guidelines for the said project implementation. PWD (WR) may also examine whether the work would be executed by

Subject Committee-I - 28 - engaging Project Management Consultant (PMC) through open bid. The PMC if necessary may be entrusted with the responsibility of engaging agency(s) for procurement of dredger, dredging activity, bank protection, construction of terminals etc. through open tender under the guidance of the PWD (WR) within the frame work of Agreement with the PMC. iii. Chief Engineer, Water Resource or any other senior Engineer of Water Resource Department and one Senior Officer of Transport Department may jointly visit one IWT project under the Ministry of Shipping for getting ideas and knowledge for implementation of IWT on Gumati Project. E. After completion of the Gumati river as a pilot project, the Ministry may consider developmental proposal of Howrah river also.

Major Achievement of Transport Department during the year 2015-16  Mega Block for broad gauge conversion of Badarpur – Kumarghat – Agartala station has commenced with effect from 1st October, 2015 with the commissioning target by 31st March, 2016 together with broad gauging of railway line up to Udaipur within the same time line. While first broad gauge train entered into Agartala Railway Station on 13-01-2016, first commercial goods train had reached Jirania station on 22-02-16. It is expected that passenger train service on regular basis will run on BG track up to Udaipur from April, 2016. Moreover, works are going on in full swing on 70 km stretch of new BG line of Udaipur – Sabroom section and the same it is also targeted to be commenced within March, 2018.  Modernization of Agartala Airport Project has been taken up by the Airport Authority of India (AAI). 75.726 acres of land have been handed over by the

Subject Committee-I - 29 - State Govt. to the AAI for development of Agartala Airport meeting in full the actual requirement of land demanded by the AAI.  The State Govt. had given clearance to the proposed elevated corridor for the revised Agartala – Akhaura Railway Link Project. It is being vigorously pursued with the Govt. of India for placing fund to the State Govt. on account of land acquisition so that land acquisition process may be initiated without further dealay.  Newly constructed of motor stands at Kanchanpur, Sonamura and Khumulwng are opened for public use, while the construction of Kalacherra and Dhanpur motor stands are in progress. Steps have already been taken for construction of Motor Stand at Teliamura and integrated Parking complex at Khowai Town area. An Institute of Driving Training and Research Centre is being set up under Public Private Partnership mode near NIT at Jirania and the works are in progress. During 2016-17 the Department would take steps for construction of motor stand at Santirbazar, DTO office at Kailashahar and Inter State Truck Terminus at Dharmanagar, 34 new buses have been procured by the Tripura Urban Transport Company Ltd. 66 more buses for the urban transport are scheduled to be delivered by March, 2016. This will help in increasing frequency level of urban bus service for the benefit of the passengers. Agartala – Kolkata via Dhaka Volvo Bus service has been started from 16th October, 2015 for the benefit of the people of Tripura.

Plan Programme and Projects to be implemented during 2016-17 financial year  Construction work of railway line from Udaipur – Sabroom (44.00 km -118 km) is in full swing. The project is targeted to be completed by 2018 as per report of the N.F.Railway.  As requisitioned by AAI, State Govt. has acquired and handed over total 75 .726 acres of land to Airport Authority of India (AAI) free of cost for construction of new terminal building and widening of the runway of Agartala Airport for development of the airport. The State Govt. has requested AAI to start construction work of new terminal building immediately in the acquired land.

 Truck Terminus :- Construction of a modern Inter State Truck Terminus at Madhavbari under Jirania Sub-Division with Financial assistance of NEC is completed and opened for public use. However, Department will take up some additional components during the year 2016-17 for which NEC has sanctioned revised cost of Rs.24.79 crore and balance fund of the revised cost will be placed to the State Govt. for execution. Department would take steps for construction of another Inter State Truck Terminus at Dharmanagar, North Tripura.

Subject Committee-I - 30 -  Development of motor stands :- Department would take steps for construction of motor stands at Santirbazar under South Tripura, Telimaura under Khowai District & Ompi under Gomati District.

 Construction of District Transport Office at Kailashahar, Unakoti District:- Construction of District Transport Office at kailasahar, Unakoti District would be taken up. Construction of District Transport Office at Udaipur under Gomati District and Dharmanagar under North Tripura are in progress.

 Institute of Driving Training & Research Centre:-Institute of Driving Training and Research is being set up on PPP mode. Government of India has sanctioned Rs.14.00 crores for this institute. Land has been identified near NIT in Barjala, Jirania. Construction work is in progress.

 Government of India. Very recently, Ministry of Shipping, GOI, approved the project at an estimated cost of Rs.12.59 Crores and released Phase-1(2015-16) installment of Rs.2.00 Crores only for the Gumati river as a pilot project, the Ministry may consider developmental proposal of Howrah river also after the completion of the Gumati river project.

 TNGCL has planned to set up CNG Mothers station and depending on the mother station planned to set up Daughter Booster station in other District which are as follows:- i.Chandrapur,ii.Bishalgarh, iii. Teliamura, iv. Khowai, v. Khilpara, Udaipur, vi. Santirbazar & vii. Melaghar.

After examination of the Budget proposal and appreciation of submission placed by the Secretary of the Department, the Committee made the following recommendations:-

1. Setting up of CNG refilling stations whereever feasible including in Sonamura and Jampuijala.

2. The Department is to continue setting up new Motor Stands in uncovered areas. Setting-up of Motor Stands at Rajnagar, Golaghati, Jatanbari, Melaghar, Madhupur, Sonamura and Charilam be given priority. The Finance Department is to consider allocation of required fund during Revised Estimates 2016-17.

3. For earmarking of Lay-Bye, the Department is to continue pursue the matter with PWD and BRO during the financial year 2016-17 and extend the awareness activity in Sub-Divisions too.

4. The Department is to take steps to ensure display of fare-chart of passengers to all Auto-rickshaws, Jeeps, Bus and alike Vehicles without further delay.

5. The Department is to continue checking of smoke emission level of vehicles to check pollution of atmosphere and extend the awareness activity in Sub-Divisions too.

Subject Committee-I - 31 -

6. The Department is to continue setting up of toilets and waiting room/shed in all Petrol/Diesel stations for passengers in consultation with Food & Civil Supplies Department.

7. The Department is to continue efforts to reduce vehicular accident by organizing awareness programmes for Drivers and Public and extend the awareness activity in Sub-Divisions too by regular announcement through microphones from Motor Stands.

8. The Department is to issue permit giving priority to the loanees of SC, ST, Minorities and OBC in Agartala and other areas and it is to be continued in the financial year 2016-17.

9. Ongoing process for development of Howrah and Gomati rivers for inland water ways be expedited and to be continued in the financial year 2016-17.

After examination of the Budget proposals and appreciation of submission of the representative of the Department,the Committee recommends the Budget proposals under Demand No. 11 for Grants by the House alongwith the recommendations.

Sd/- Shri Sudhan Das Dated, Agartala, Chairman the 4th April, 2016. Subject Committee- I Tripura Legislative Assembly

Subject Committee-I - 32 - THE REPORT ON THE DEMAND NO.12 OF THE CO-OPERATION DEPARTMENT FOR THE FINANCIAL YEAR 2016-2017.

The Budget proposal under the Demand No.12 relates to the Co- operation Department, Government of Tripura for the Financial Year 2016-2017 and the Revised Budget for the Financial year 2015-2016 are as follows :-

(Rs.in lakhs)

Particulars Revised Budget Estimates for 2016 - 2017 Estimates Demand Fund For 2015 - 2016 Total T.S.P S.C.P a) Non Plan 2074.73 2343.00 ------2343.00 b) Plan 1115.19 772.00 471.00 261.00 1504.00 c) 265.05 0.00 - - 0.00 CASP/Other than CASP Total 3454.97 3115.00 471.00 261.00 3847.00

Now, the aforesaid Budget proposal is under examination of the Subject Committee-I of the Tripura Legislative Assembly for recommendation to the Demands for Grants. The Committee in its meeting held on the 31st March, 2016 examined the Budget proposals in details having discussion with the Special Secretary of the Department who appeared before the Committee as summoned.

First of all, the Special Secretary informed the Committee about the action taken in respect of the recommendations made by the Committee during the year 2015- 2016 and stated as follows :-

Sl. Recommendations of the Action taken Report on the Recommendations made by No. Subject Committee-I Subject Committee - I 1. Computerization of the 1. So far, the Deptt of Cooperation has provided 18 nos of Deptt be continued. computers in its effort towards computerization of the Deptt. Procurement of 21 nos. of more computer are in process for distribution to various DRSC/ARCS office as approved by Finance Deptt. For ICDP, South 51 societies are going to be provided with computer. To cover all LAMPS/PACS, a proposal is being sent to GOI shortly. More nos of computers would be provided to various offices upon receipt of fund. 2. Soft loans be provided to 2. Eligible LAMPS & PACS are provided KCC loans with interest uncovered societies @ 4% per annum. Capital infusion to the tune of Rs. 291.64

Subject Committee-I - 33 - lakhs has been taken by TCARDB Ltd. during the year 2015- 16 in order to strengthen the lending activities of TCARDB Ltd. 3. For improvement of the 3. For improvement of the position of LAMPS/PACS, the financial position of Department of Cooperation provides Grant-in-aid. An amount of LAMPS/PACS , the Deptt. Rs. 100.00 lakhs has been provisioned as Grant-in-aid to is to provide Grant-in-aid to LAMPS/PACS during the year 2015-2016. For the year 2016- increase their profit. 2017, an amount of Rs. 110.00 lakhs has been earmarked. Transfer fund to TTAADC is also provided for meeting up the administrative expenses of the LAMPS. An amount of Rs. 20.48 lakhs has been provisioned as transfer fund to TTAADC during the year 2015-16. During 2016-17, an amount of Rs. 21.00 lakhs has been provisioned. This apart, training is provided to LAMPS/PACS by TSCU on Business Development Plan for augmentation of its business profile. 4. Selling of Fertilizer through 4. TMARKFED deals in fertilizer business and distributes LAMPS & PACS be fertilizers through LAMPS/PACS & PMCS Infusion of sufficient strengthened fund will strengthen the business activities. Keeping in view, an amount of Rs. 150.00 lakhs has been provisioned as share capital to marketing cooperatives including PMCS for the year 2015-16. An amount of Rs. 200.00 lakhs has been provisioned during the year 2016-17 under Marketing Sector.. 5. Participation of women in 5.In order to encourage participation of women in the LAMPS & PACS be cooperative societies an amendment of the Tripura cooperative ensured by amending the societies Act, has been passed in the TLA & now pending for relevant Act Governor’s consent. 6. The Department is to 6.Tripura State Cooperative Union provides awareness/ training continue imparting of programme with the Manager, Board of Directors, Managing training & awareness Directors, President and Secretary etc. of the Cooperative programme to Managers, Societies. In this financial year (2015-16), TSCU conducted 38 Board Members & Other nos of training awareness/ programme. involving 891 nos. of members of LAMPS & trainees . TSCU will also targets to conduct 30 no.of training PACS programme during 2016-17 with an estimated 750 nos. of participants . 7. The Department is to 7. National Cooperative Development Corporation (NCDC). has ensure implementation of sanctioned three ICD Projects for Dhalai,Unokoti & North Integrated Cooperative Tripura District with a total project outlay of Rs.26.61 crores. Development Projects Finance Deptt. has also provisioned an amount of Rs.150.00 lakhs (2016-17) for implementation of ICD Projects in the stated districts. The constitution of Project Implementation Team (PIT) is under process. TSCB Ltd has been identified as Project Implementing Agency (PIA).

ACHIEVEMENT FOR THE YEAR 2015-2016 OF THE DEPARTMENT OF COOPERATION UNDER STATE PLAN: . (Rs. in Lakhs) Sl.No Name of the Scheme Financial Physical Outlay Achievement (under (No. of Demand Coops..) No.12/19/20) 1. Credit Cooperatives 185.48 226 2. Consumer Cooperatives 200.00 1 3. Marketing Cooperatives 193.50 68 4. Direction & Administration 41.75 - 5. Education, Research & Training 46.77 1 6. Other Cooperatives 35.00 81 7. Special Plan Assistance(SPA) for 313.95 1 construction of 100 seated Hostel

Subject Committee-I - 34 - 8. Genousodhi 69.00 10 nos of counters 9. Capital Infusion to TCARDB 291.64 1 10. Construction(Minor Works) 3.15 1 Total :- 1380.24 390

CREDIT SECTOR :

The Coop. Credit Sector comprising of TSCB Ltd, TCARDB Ltd, ACUB Ltd, LAMPS & PACS has been extending services towards disbursement of loan at low rate of interest to the members. Most of them get finance from TSCB Ltd. Besides, LAMPS, PACS & FSS contribute towards supply of Agri-inputs and procure Agri and minor forest produces in their respective areas. Further, the Banks namely TSCB Ltd, TCARDB Ltd & ACUB Ltd have been functioning as financing agencies for grass root Cooperative Societies in the State primarily in terms of lending Short & Long term loans.

In Annual Plan for the year 2015-16,. an amount of Rs.185.48 lacs has been provisioned as Share capital to ACUB & TCARDB Ltd. , Grant-in-aid to LAMPS & PACS and Transfer fund to TTAADC

EDUCATION TRAINING AND RESERCH

The Tripura state Cooperative union imparts education and training to the general members, elected representatives and employee of various Cooperatives as well as Govt officials so that they can contribute effectively to the development of Cooperatives. The Tripura State Cooperative Union performs this function through field functionaries of the Cooperative Training Institute. The Union also conducts exhibition, propaganda, seminar, workshop & Cooperative Week with financial assistance from state Govt. & from National Cooperative Union of India (NCUI), New Delhi. In the Annual Plan 2015-16, an amount of Rs.46.77 lacs has been provisioned as Grant-in-aid to TSCU.

MARKETING SECTOR :

T-MARKFED is functioning as a lead society for procurement of Potato and minor forest produce at the village level through PACS/LAMPS. An amount of Rs.150.00 lacs has been earmarked in the Revised Estimate for the year 2015-2016 to T MARKFED and 14 PMCS respectively in the form of Share capital during the year 2015-16. With this financial assistance, an attempt has been made for strengthening the T MARKFED & 14 PMCS in the State. For repairing of godown an amount of Rs. 43.50 lakhs has been envisaged in RE 2015-16.

CONSUMER SECTOR :

The Tripura State Coop. Cons. Federation Ltd (TSCCF) has been functioning as an Apex Level Society in the Consumer Sector. The TSCCF deals in Consumer articles, distribution of LPG, supply of medicines at whole sale and retail rates and stationery article in different Govt, offices. During the financial year 2015-16, an amount of Rs.200.00 lacs has been provided in the form of Share Capital to TSCCF.

OTHER COOPERATIVES

Other Cooperatives include Rickshaw Puller Cooperative Societies, Labour Cooperatives, Press Cooperatives, Housing Cooperatives, and Cobbler Cooperatives etc. who are financially supported by the Department for economic amelioration of their members. An amount of

Subject Committee-I - 35 - Rs.35.00 lacs has been sanctioned as Share capital to other cooperative which including other Women cooperatives for the year 2015-16. . DIRECTION & ADMINISTRATION

An amount of Rs.41.75 lacs has been provisioned in the RE for the year 2015-16 towards expenditure involving Salary of staff ,travel expenses; electricity charges, rent, cost of fuel etc.

Special Plan Assistance :

An amount of Rs. 313.95 lakhs has been provisioned in the Revised Estimate for the year 2015-2016 for construction of 100 seated Hostel in the premises of TSCU. The work is nearing completion and is expected to be completed by May, 2016.

GENOUSODHI:

T MARKFED has received an amount of Rs. 69.00 lakhs for introduction of generic medicine counters and for procurement of generic medicines in various hospitals of the State.

Capital Infusion to TCARDB Ltd.

Fund to lthe tune of Rs. 291.64 lakhs has been provided to TCARDB Ltd. in order to strengthen the lending activities of the Bank.

ANNUAL PLAN OF THE DEPARTMENT OF COOPERATION FOR THE YEAR 2016-2017 UNDER STATE PLAN In the Annual Plan 2016-17, an amount of Rs 1504.00 lakhs has been provisioned which includes Schemes like Direction & Administration, Grant-in-aid to PACS, Grant-in-aid to LAMPS, Transfer fund to TTAADC, Grant –in-aid to TSCU, Share capital to TSCCF/ Primary Consumers, Share capital to TCARDB, Share capital to ACUB, Share capital to T MARKFED, share capital to PMCS, Share capital to Other Cooperatives, and ICD Project in Dhalai,North & Unokoti Tripura District. The Budget Estimate for the year 2016-17 is detailed below in terms of Sectoral Outlay :- . (Rs. in Lakhs) Sl.No Name of the Scheme Financial Physical Outlay Targets ( in nos. of Coops) 1. Credit Cooperatives 231.00 270 2. Consumer Cooperatives 220.00 1 3. Marketing Cooperatives 259.00 75 4. Direction & Administration 90.00 - 5. Education, Research & Training 74.00 1 6. Other Cooperatives 30.00 100 7 Capital Infusion 50.00 1 8. ICDP in Dhalai, North & Unokoti 150.00 3 9. NABARD(State Share for 400.00 268 Computerization of LAMPS & PACS) Total :- 1504.00 719

The Credit Cooperatives such as LAMPS/PACS/TSCB/TCARDB Ltd. /ACUB Ltd. provide opportunities for becoming self-reliant and thus help in getting gainful employment. The institutional credit advanced by the credit societies are mainly in the form of agri and non-agri loan to its members. During the year 2016-17, an amount of Rs. 110.00 lakhs has been provisioned as Grant-in-aid to Credit Cooperatives. Share capital assistance to TCARDB &

Subject Committee-I - 36 - ACUB Ltd. an amount of Rs. 100.00 lakhs has been provisioned and an amount of Rs. 21.00 lakhs has been provisioned as transfer fund to TTAADC.

Under Consumer Sector, Share capital to TSCCF Ltd. /Primary Consumers has been earmarked for an amount of Rs. 220.00 lakhs during the year 2016-17. Consumer Cooperatives deal in consumer goods, distribution of LPG, S.K.Oil, medicines and other items at a reasonable rate. Provision of share capital to consumer cooperatives act as a fillip to the furtherance of its business activities.

Marketing Societies procure Potato and Minor Forest Produce for distribution.. An amount of Rs. 259.00 lakhs has been envisaged as share capital to marketing societies which includes share capital to T MARKFED & 14 PMCS in the State. This also includes repairing of godowns and Genousodhi.

For meeting the Salary and other administrative expenses of the Department such as cost of fuel, T.A., D.A. etc. an amount of Rs. 90.00 lakhs has been provisioned in the budget estimate for the year 2016-17.

Training and awareness programme form a vital element for development of human resources and can hardly be ignored. Tripura State Cooperative Union undertakes the responsibility of imparting cooperative education and training (CCMT). During the year 2016-17, an amount of Rs.74.00 lakhs has provisioned as grant in aid to Tripura State Cooperative Union for the above stated purpose.

Other Cooperatives such as rickshaw pullers Cooperative, Cobbler Cooperatives, Labour Cooperatives, Women Cooperatives, and Multi-purpose Cooperatives suffer due to lack of funds. This financial constraint act as a deterrent to furtherance of their business activities. In realization of the above, an amount of Rs. 30.00 lakhs has been provisioned in the budget estimate for the year 2016-17

This apart, special attention has been given to provide financial assistance to Women Cooperatives in the State under the scheme share capital to other cooperatives / primary consumer cooperatives.

Provision for Capital Infusion for the year 2016-17 has been made in order to repay the NABARD’s Dues. Fund from NABARD is taken in order to strengthen the lending activities of TCARDB Ltd. An amount of Rs 50.00 lakhs has been provision as capital infusion to TCARDB ltd in BE 2016-17.

The innovative programme of Integrated Cooperative Development Project (ICDP) introduced by National Cooperative Development Corporation (NCDC) is a project meant for socio-economic upliftment of small and marginal farmers and weaker section of the society focusing on a district based integrated approach through cooperatives in the rural backdrop.

ICD Projects has been introduced in Dhalai North & Unokoti districts with a total project outlay of Rs 26.61 Crore wherein Rs 658.00 lakhs has been envisaged for 1st year allocation. In BE 2016-17, an amt of Rs 150.00 lakhs has been provisioned for implementation of ICDP in Dhalai, North & Unokoti District.

Provision is also made for Computerization of LAMPS & PACS during the financial year 2015-16. in the connection, necessary fund will provide by Govt of India(through NABARD), State Govt and respective society itself with as ratio of 55:45:5. For this purpose, an amount of

Subject Committee-I - 37 - Rs 400.00 lakhs has been provisioned in BE 2016-17 as State Share for Computerization of LAMPS & PACS.

After examination of the Budget proposal and appreciation of submission placed by the Special Secretary of the Department, the Committee made the following recommendations:-

1. Computerization of the Department be continued.

2. LAMPS and PACS are to be provided with Grants-in-aid for increasing their profit and for improving their financial condition.

3. Selling of fertilizer to the farmers through LAMPS and PACS be increased.

4. The Department is to take more initiative for implementation of Integrated Co-operation Development Projects.

5. The Department is to take steps to increase the amount of honorarium of Managers of PACS.

6. Government is to consider to purchase goods of Departments through the PACS / LAMPS.

7. The Department is to arrange more loan to farmers who have KCCs.

After examination of the Budget proposal and appreciation of submission of the representative of the Department, the Committee recommends the Budget Proposals under Demand No. 12 for Grants by the House alongwith the recommendations.

Sd/- Shri Sudhan Das Dated, Agartala, Chairman the 4th April, 2016. Subject Committee-I Tripura Legislative Assembly

Subject Committee-I - 38 - THE REPORT ON THE DEMAND NO. 40 OF THE SCHOOL EDUCATION DEPARTMENT FOR THE FINANCIAL YEAR 2016-2017.

The Budget Proposal under Demand No. 40 relates to School Education Department, Government of Tripura for the Financial Year 2016-2017 and the Revised Budget for the Financial Year 2015-2016 are as follows :-

(Rs. in Lakh) Particulars Revised Budget Estimates for 2016-2017 Estimates Demand Fund for Total 2015-2016 T.S.P. S.C.P. a) Non-Plan 107300.50 65573.00 ------65573.00 b) Plan 27572.88 8322.31 3960.45 1976.24 14259.00 c) 38340.50 1693.38 2307.01 1486.74 5487.13 CASP/other than CASP Total 173213.88 75588.69 6267.46 3462.98 85319.13

Now, the aforesaid Budget Proposal is under examination of the Subject Committee-I of the Tripura Legislative Assembly for recommendation to the Demands for Grants.

The Committee in its meeting held on the 01-04-2016 examined the Budget proposals in details having discussion with the Principal Secretary of the Department who appeared before the Committee as summoned.

First of all, the Principal Secretary informed the Committee about the action taken in respect of the recommendations made by the Committee during the year 2015-16 and stated as follows :- Sl. Recommendations Action taken No. 1. Boundary wall of 3(three) schools namely During the year 2015-16, P & C Department has (a) Talkajala (b) Monaipathar and (c) sanctioned fund for boundary wall of fund for Kalshi High School (d) No.2 Pathaliaghat construction of boundary wall of MTB Girls H.S S.B. School be taken-up and completed in School, Netaji Subhash Vidyanitekan, Prachya a time frame. The Girl’s schools be Bharati H.S School, Shahid Khudiram H.S School and the work of the which is going on and will be covered in phase manner accordingly. competed within the time frame. Another 10 (ten) proposal for construction of boundary wall were submitted by the Department to the P & C Department under any suitable scheme during the year 2015-16 which is yet to be sanctioned.

In Annual Work Plan and Budget , 2016-17 the State SSA Mission proposed for sanction of fund

Subject Committee-I - 39 - for construction of 35743 mts of boundary wall of 130 schools (some of the girl schools are included) of Tripura for which @ Rs. 8224/- per mtr a total of Rs. 2945.18 lakhs will be required. The proposal is yet to be considered by MHRD, Govt of India. 2. The department is to find out the names of The matter of construction of Hostel building, boundary the Hostels where Boundary wall around wall, toilet etc. of SC & ST hostel are being looked after by the SC & ST Welfare department. In the budget o the Hostels is repaired and to send plan school Education Department, 2015-16 there were no and estimates for taking further steps in provision for any kind of construction wall such hostel. the matter. So School (Education ) Department could not provide any fund for the said purpose. All the DEOs have been requested to trace out the names of the hostels were boundary wall are required and also send the proposal and estimates for the same to the SC & ST Welfare department for taking further steps by them 3. Construction of 50 type–III quarters under In all SC ST hostels Superintendent have been NEC for which an amount of Rs.189 lakhs appointed. during 2013-14 has been reallocated to During the year 2012-13,the department of School P.W.D. (R&B) be taken-up in a time Education has taken up a scheme under NEC for frame and to ensure quality of works construction of 50 Type-III Quarters for Hostel Superintendent. The State PWD (R&B) were thereof. entrusted with the work. The fund for an amount of Rs. 210.00 lakhs (Rs. 189.00 lakhs - Central share + Rs. 21.00 lakhs- state share) during the year 2013-14. The work of 10 quarter out of 14 taken up by them (phase-I) is being completed. They have already submitted UCs for Rs. 106.00 lakhs. The release of next installment by NEC is awaited for submission of UC of Rs. 104.00 lakhs by PWD. The Engineering Cell of the Department are supervising the said work to ensure quality of the works. 4. Recruitment of new post of Inspector of 33 new posts of Inspector of schools have already Schools be made in a time frame and been created and procedure for recruiting the same Inspector of Schools be engaged Bloc- no. of Inspector of schools is going on. The wise alongwith its offce as early as selection procedure are being taken by the TPSC. As soon as the selection procedure will be possible. completed 33 nos. of Inspector will be engaged blockwise. 5. The department is to continue with For upliftment of quality Education there is already frequent visit of schools by Inspector of a system of regular school inspection every month Schools, Deputy Director and other bloc by Inspectors, Dy. Directors and block level level officers to stimulate upfiftment of officers with target nos. of inspection in a month. In Block level the Dy. Inspector of Schools are also quality of education. inspecting the schools regularly. The regular inspection report submitted by the officer are being monitored in state level fortnightly. Prompt action used to be taken by the directorate on the observation and recommendations made by the inspecting officers for betterment and upliftment of the quality education in the state. 6. The department is to ensure recruitment of 81 posts of Group-D (Night Guard & Class-IV night guards and Group-D staff under employee) has been created during the year 2015- School Education Directorate. 16. For filling up the above post the Directorate of Higher Education Tripura has been requested to sponsor the names of selected persons being the

Subject Committee-I - 40 - sponsoring authority of the Education Department. The Secondary Education Department will take necessary steps for providing Night Guard and Class-IV staff to all High and Higher Secondary schools where there are no such employees are available at present immediately after receipt of the names of selected persons from the Directorate of Higher Education of Tripura. 7. The department is to consider the The list of 80 nos schools (10 nos. schools from feasibility of construction of Dining Room each district) has been submitted to RD Department under MGNREGA and out of to construct Dining Halls. MP/MLA/LAD fund and to ensure receipt Two separate plans for construction of Dining Hall of proposals from DEOs for Bi-cycle of seating capacity 100 and 60 nos. students has prepared and submitted to RD Department. stand and to ensure regularisation of This year only one proposal has received from Cook-cum Machhalchi and other staff DEO, Gomati for construction of bi-cycle stand accordingly. and the required fund has already re-allocated to the concerned HO &DDO. No proposal has been received from any other district so fund not provided. All steps are being taken for regularization of cook cum masalchi and other staff in hostel. Meanwhile file has been processed towards Finance Department for regularization of 131 staff. 8. The Department is to ensure recruitment The Directorate of Secondary Education has of new Teachers and to ensure rational already started necessary works for recruitment of distribution of teachers to all schools. teacher through TET and rational distribution of teachers amongst the schools. During last few months a good number of teachers have been posted to the schools having shortage of teacher by transfer from the schools where there were excess of such teacher to ensure rational distribution of teacher. The work of rational distribution of teacher amongst the schools is a continuous process and the department will also continue this work. 9. The Department is to take initiatives for There were no budgetary provision for construction construction of quarters for the H.M. of of quarters for HM of HS schools of muffswall H/S. Schools of Muffswall under under SCA/SPA/NEC during the year 2015-16. SCA/SPA/NEC in the next financial year The same proposal was placed with MoDONER, NER for sanction of fund under NEC but was not (2015-2016). approved. As the scheme of SCA/SPA is closed the department will submit proposal for the same for sanction under any other suitable scheme once again. 10. For opening of English Medium Schools For opening of English Medium Schools proposal be placed for clearance by the initiative under process for clearance from Finance Deptt. and Cabinet after getting ARD, FD. After getting approval the matter the approval of the Deptt. for according will be placed to the Cabinet for approval for 50% of Grant from the Government for according 50% of Grant from the Government private English Medium Schools at least for private English Medium Schools at least one such school at Bloc level. one such school at Block level. 11. The Department is also to set up at least During the year 2015-16, proposal for setting up of 1(one) English Medium Schools at Block 14 nos new English medium JB schools were level each and to consider the feasibility submitted to the appropriate authority and out of & Construction of English Medium this proposal 6 nos. of new English medium

Subject Committee-I - 41 - School at District Headquarters of sanctioned and schools has already being opened at Bishramganj. following 5 block headquarters: 1. Panisagar 2. Chowmanu 3. Kadamtala 4. Killa 5. Kakraban

The new English medium JB school at Ampi block will be started soon. 12. The Department is to consider the Fund R@Rs. 19.26 lakhs has been sanctioned to 33 feasibility of construction of Madrassa SPQEM Madrassas for infrastructural development Schools in Muslim dominated areas. during 2013-14. These Madrasas have executed work in 2015-16. Proposal for infrastructural development of 8 (eight) SPQEM Madrassas during 2015-16 have been sent to the Minority Welfare Department, fund yet to be received. During 2015-16 fund Rs. 30.28 lakhs has been released for completion of incomplete work in 13 Madrassas. During 2015-16, fund Rs. 26.70 lakhs have been sanctioned in 3 (three) SPQEM Mdrassa As per devions of “ state Level Madrassa Advisory Committee” held on 23-03-2015, 25 SPQEM Madrssas will be brought under GIA. The matter is under process. Till date out of 51 GIA Madrassas, 48 GIA Madrassas have been allotted fund for construction.3 (three) remaining GIA Madrassas may be allotted fund for infrastructure development. Out of 129 SPQEM Madrassas, 83 have been allotted fund for infrastrucrue development. Fund may be stationed in the remaining 46 SPQEM Marassas.

2. The achievement made during the year 2013-14, Basic information:

Total no. of schools run by School Education 4349 Department Total no. of Madrassa run by School Education 180 Department :- (GIA-51, SPQEM-129)

No. of Teachers- Govt. + TTAADC + GIA-41,118

No. of Students- Govt. + TTAADC + GIA-6,61,329

1. Following are some of the activities of the School Education Department during 2015-16

 SDS-22 nos school sanctioned , Fund allocated Rs.5311.18 lakhs . Printing and supply of text books to the childrens of Class-I to VIII on the date of publication of Annual exam result(Summative Assessment 2) . . Reintroduction of 02 year D.EL.Ed courses in the 04 DIETS.

Subject Committee-I - 42 - . Development of Syllabus for 02 year D.EL.Ed (both regular and ODL mode) and Diploma in Pre-school Education course (face to face mode). . Development of curriculum and syllabus for yoga of class I to VIII. . Organization workshops / seminars on CCE, research Methodology, preparation of TLM, Activity Based Learning, Question pattern development, science and mathematics etc. . Conduct of National Achievement Survey and State Level Achievement surveys. . Organization of State level Science fair in collaboration with TSCST. . Organization of District Level and State Level Exhibition under INSPIRE Scheme. . Preparation of teacher training modules for RMSA. . Preparation of PINDICS (Performance Indicator of Teacher) for elementary teachers under SSA.  100% Coverage of School & children: 100% of enrolled children, that is, 3,20,618 children in 4472 Primary units and 1,85,747 children in 2084 Upper primary units ( Total : 5,06,365 children in 6556 school units ) in all Govt.& Govt. aided schools, Madrassa/ Muqtab institutions have been covered under the Mid-Day-Meal Scheme. Cooking cost & State’s contribution:

Presently the cooking cost is Rs.3.97 per child per day at primary level out of which State contribution is Rs.0.50 per child per day, which is Rs.0.14 more than the minimum mandatory State’s contribution fixed by the GoI and at Upper primary level it is Rs.5.78 per child per day in which state’s contribution is Rs.0.58 per child per day. Weekly menu:

The weekly menu for the cooked mid day meal has been introduced in consultation with the dietician of the State Govt. considering the food value and taste of variety. The common uniform menu presently served to the children is as follows:- . Rice & vegetable curry 2 days in week . Rice & egg (full) curry 2 days in week (i.e 2 full eggs in a week) . Khichudi 2 day in a week

Provision of Dinning hall:

The School Education Department, Govt. of Tripura has initiated to construct Dinning halls with seating arrangement for taking the mid day meal in the school premises. 35 dinning hall have already been constructed in different school premises so far. More over initiative has been taken to construct additional 80 nos dinning halls, which will be completed during 2016-17.

Kitchen Devices:

Kitchen devices are available in all schools where MDM is being served. 400 school units has been facilitate with LPG based cooking during the year 2015-16. Kitchen Shed:

All eligible school units have been covered with kitchen sheds. Provision of Safe Storage Facility: At least two safe & good quality storage bins for storage of rice has been provided in all school units where MDM is implementing.

Subject Committee-I - 43 - School Inspection : The School inspection mechanism for monitoring the implementation of the programme has been strengthened for better implementation of the programme. Training of Cook-cum-Helpers: Total 5320 cook-cum-helpers have been provided training on safety & Hygienic up-to 20th February 2016. Moreover the department has taken initiative to train additional 3200 cook-cum-helpers during 2016-17. Interactive Voice Response System for MDMS: A Memorandum of Understanding (MOU) has been signed between GoI and State Government for implementation of Interactive Voice Response System for MDMS. Distribution of IFA Tablet: IFA Tablets are supplying among the children under School Health Programme in convergence with NHM. The average consumption rate of IFA Tablets is 84%.

Kala Utsav at district and state level has been concluded successfully and selected team of the state level completion has participated in the National Level Kala Utsav in New Delhi. Debate & Quiz competition at District and State level in the form of mock parliament to commemorate the birth anniversary of Dr. B.R. Ambedkar. No new scheme has been introduced during the year 2015-16 under Intergrated RMSA. . Joint bench ( High & H.S Schools) 3835 Nos. . Opening of new English Medium J.B.School – 05(Five) . Up-gradation of S.B. To High school – 23 (including RMSA scheme) . Up-gradation of High School to H.S School – 13 . Science stream introduced in H.S School – 17 . Commerce stream introduced in H.S School - 02 . During this Financial Year(2015-16) 20,000 Girl Students reading in class –IX having family income 1.25 lakhs/Annum will be provide Bi-cycles free of cost. Financial involvement in this regard will be Rs. 6,48,60,000/-. . There are 02 Centrally Sponsored Schemes on online system under ‘National e- scholarship portal’as stated below, introduced (new) in the year 2015-16. . The Language is gradually extended up to Degree Course Level. It is also mentioned here that Other Minority Languages also implemented in various School where majority population speaks these. . During the year 2015-16 the Directorate of Kokborok & Other Minority Languages has already published near about 33,500 Nos Text Books, Magazine etc. in 7 (Seven) Nos. Languages for Development of these languages. . Recruitment of non-gazetted staff - LDC (Fixed pay basis )-58 posts Group D(Fixed pay basis )-18 posts . New Appointment under Grant-in-Aid School – 07 Nos . New School building constructed in Grant-in-Aid School – 05 Nos . New Scheme Launched for Equivalency Programme upto Standard IV level covering 18,256 learners and involving 1056 literacy centers. . Major achievements of Adult Literacy Programme –

Basic Literacy Equivalency(Std,III) Skill Development level Programme Target 6254 42688 12368 Achievement 5688 32674 9563

Subject Committee-I - 44 -

. 38 SPQEM teachers has been allowed higher pay of honorarium. . 13 Madrassa (half done) has been completed by the Minority Welfare Department. . Posts filled-up by direct recruitment of Headmaster & Headmistress of H.S School – 39 . Posts filled-up by direct recruitment of Assistant Headmaster & Assistant Headmistress of H.S School – 45 . Posts filled-up by direct recruitment of Headmaster & Headmistress of High School – 80 . Up-gradation of primary school to upper primary – 15 . Construction of Additional classroom – 148 Completed & 209 In-progress . CWSN friendly toilet – 105 completed & 51 In-progress . Major repair ( Primary & Upper primary) - 34

2. Plan/Programme and any project to be implemented during the year 2016-17 for consideration of the Committee during examination:-

 Budget estimates for 2016-17 Secondary Education-Rs.21487.13 lakh . Elementary Education – Rs.45723.12 Lakhs . . Introduction of Yoga in class I to VIII in selected 100 schools, covering all blocks and NPS of Tripura. . Setting up of Technology cell for the purpose of ICT based teacher training . . Revision of existing curriculum and syllabus of class I to VIII. . Launching of Diploma course in Preschool Education in the 04 DIETS. . Science stream introduced in H.S School – 03 . Commerce stream introduced in H.S School – 03 . Target for providing 20,000 girls’ Bi-cycle . Directorate of Kokborok & Other Minority Languages has decided to be implement Garo teaching in various schools where majority population speak Garo Language. . New scheme for Equivalency Programme - Standard V level is to be launched . . Posts to be filled-up by direct recruitment(Inspector of Schools) – 33 . Posts to be filled by promotion of Headmaster & Headmistress of H.S School, Assistant Headmaster & Assistant Headmistress of H.S School , Headmaster & Headmistress of High School – 61.

After careful examination of the Budget proposal and appreciation of submission placed by the Principal Secretary of the Department, the Committee made the following recommendations:-

1) Construction of boundary wall for all the schools should be completed giving priority to the schools which are situated on roadside. The Girl’s schools be covered in phase manner accordingly.

2) Boundery walls should be raised around the school hostels which do not have such walls attaching priority to the hostel located on road side.

3) Construction of 50 nos. of type–III quarters for Superintendents under NEC for which an amount of Rs.189.00 lakhs during 2013-14 has been reallocated to P.W.D. (R&B) be taken up in a time frame and to ensure quality of works thereof. Also adding of

Subject Committee-I - 45 - Sutarmura High School with it. Quarters for remaining hostels should also be taken up for construction.

4) Recruitment of new posts of Inspectors of Schools may be made in a time frame and office building of new Inspectorate of Schools should be constructed.

5) The department is to continue with frequent visit of schools by Inspector of Schools, Deputy Director and other block level officers to stimulate upliftment of quality of education.

6) The Department is to ensure recruitment of new Teachers and to ensure rational distribution of teachers to all schools and steps to be taken seriously to maintain priority in transferring and posting of teachers in schools district-wise.

7) The Department is also to set up at least 1(one) English Medium School at each Block and to consider the feasibility & construction of English Medium School at District Headquarters of Bishramganj.

After examination of the Budget proposals and appreciation of submission of the Representative of the Department, the Committee recommends the Budget proposals under Demand No. 40 for Grants by the House alongwith the recommendations.

Sd/- Shri Sudhan Das Dated,Agartala, Chairman the 4th April, 2016. Subject Committee- I Tripura Legislative Assembly

Subject Committee-I - 46 - THE REPORT ON THE DEMAND NO. 39 DEPARTMENT OF THE HIGHER EDUCATION FOR THE FINANCIAL YEAR 2016-2017.

The Budget Proposal under Demand No. 39 relates to the Higher Education Department, Government of Tripura for the Financial Year 2016-2017 and the Revised Budget for the Financial Year 2015-2016 are as follows :-

(Rs. in Lakh) Particulars Revised Budget Estimates for 2016-2017 Estimates Demand Fund for Total 2015-2016 T.S.P. S.C.P. a) Non-Plan 11881.40 13677.00 -- -- 13677.00 b) Plan 2977.58 944.19 609.06 325.00 1878.25 c) 4152.29 2547.09 1518.46 832.70 4898.25 CASP/Other than CASP Total 19011.27 17168.28 2127.52 1157.70 20453.50

Now, the aforesaid Budget Proposal is under examination of the Subject Committee-I of the Tripura Legislative Assembly for recommendation to the Demands for Grants.

The Committee in its meeting held on the 1st April, 2016 examined the Budget proposals in details having discussion with the Secretary of the Department who appeared before the Committee as summoned.

First of all, the Secretary informed the Committee about the action taken in respect of the recommendations made by the Committee during the year 2015- 16 and stated as follows :-

Sl. Recommendations Action Taken No. 1. The Department is to Complete i. The Department of Higher Education sent requisition the process of filling up 150 posts to TPSC in the month of February, 2014, herein the of Asstt. Professors, 9(nine) posts Commission advertised the post and interviewed the of principals and 2(two) posts of candidates and recommended 113 candidates in statistical officers and to confirm different subjects for appointment to the posts in the action taken in the matter. month of September, 2015 (16-09-2015). At the same time one Smt. Bijaya Bhattacharjee and other five ST candidates preferred writ petition before the Hon’ble High Court of Tripura by challenging of the selection / recommendation of the TPSC. The Hon’ble High Court passed interim order by staying the recruitment on the recommendation of the TPSC. Thereafter, the Hon’ble

Subject Committee-I - 47 - High Court passed final judgement on 26-02-2016 by clubbing all writ petitions and has set-aside the entire selection process. The Hon’ble High Court has directed the State Government to review the reservation / dereservation of the candidate in question. The Hon’ble High Court has further directed the TPSC for conducting the interview of the eligible candidates afresh after following the UGC guideline regarding recruitment of Asstt. Professors. The recruitment shall be made on said 150 vacant posts of Asstt. Professors after receiving the fresh recommendation from the TPSC. ii. The proposal for direct recruitment of 6 vacant posts of Principals for Govt. General Degree Colleges was sent to TPSC. The posts could not be filled up due to non-availability of suitable candidates. On the other hand the proposal for conducting DPC meant for 6 (six) vacant posts of Principal, Govt. General Degree Colleges by promotion has been sent to the TPSC. The appointment by promotion to the said posts would be made on the recommendation of the Class-I DPC to be held on 22.03.2016 at TPSC. iii. The requisition for filling up of 2 (two) posts of Statistical Officer under Education Department (Higher) was sent to the TPSC and the Commission advertised the post. But, the Commission is yet to hold interview for the purpose. The Department would fill up the posts based on the recommendation of the TPSC. 2. Construction of Quarters at The Department of Higher Education already initiated Gomati District Polytechnic at construction of Quarters at Gomati District Polytechnic Fulkumari, Udaipur, Dhalai, at Fulkumari and Dhalai District Polytechnic at Ambassa etc. be taken up and Ambassa. complete the same in a time In this regard it is stated that 4 nos. of Type-II frame and the Department is to Quarters, 6 nos. of Type-III Quarters & 1 no. of Type-IV ensure construction of Quarters Quarter at Gomati District Polytechnic, Fulkumari and and By-cycle stand etc. At 6 nos. of Type-II & 6 nos. of Type-III Quarters at Dhalai Karbook, Panisagar and Jampui. District Polytechnic, Ambassa are in the stage of completion. All those Quarters are likely to be handed over by June, 2016. 3. The Department is to ensure All the Districts have been covered with either Bio opening of science Department at Science or Pure Science or both. All colleges under least colleges in District Districts with science courses have been provided with Headquarters with laboratories adequate laboratory facilities and minimum faculties. along with required Nos. of Government is of considered opinion to set up faculties and Hostel facilities. The colleges in each Sub-Division rather than setting up of stipend of boarders be enhanced. Hostels so that students may get admission locally. Post Metric Scholarship to SC / ST / OBC / Minority students are given by Govt. of India. Students studying in professional courses are offered NEC scholarship. Rest of the students eligible as per the criteria are given State Stipend which has been revised.

Subject Committee-I - 48 - 4. Religious minority department is One 50-seated Minority Girls’ Hostel has been to consider the issue of setting up constructed at Ramkrishna Mahavidyalaya, Kailasahar Minority Girls’ Hostel (50-seated). which has been started functioning from the academic The Department is also to year 2016-17. consider construction of Hostel for The Department has also constructed a 4 storyed the students of B.P.L. families at Hostel for the 125 seated Boys’ students of Religious Agartala. Minorities namely, Nazrul Chhatrabas at Agartala. On availability of fund the Department may consider for construction of Hostel for BPL college students at Agartala. 5. The Department is to approach The Tripura University has already introduced P.G. the Tripura University, Agartala for courses in Kok-Borak from the academic year 2015-16 introducing P.G. Course in Kok- on demand of the students as well as from the Higher Borak. Education Department.

(ii) Achievements made during the year 2015-16

In the Budget of 2015-16 provision was made for Rs.9957.80 lakhs under plan in Demand No.39/19/20. The table below will indicate the provisions proposed in R.E. 2015-16 corresponding to provisions to B.E.2015-16.

(Rs. in lakhs) Demand Particulars B.E. 2015-16 Proposed Proposed B.E. No R.E. 2015-16 2016-17 39 DIVISIBLE POOL 1377.00 1321.62 1649.00 A. Salary 350.00 163.65 349.00 B. NON-SALARY 1027.00 1157.97 1300.00 of which i. Supplies & Materials 200.00 200.00 200.00 ii. Electricity Charges 50.00 50.00 80.00 iii. State Share / State's Contribution 510.00 690.34 800.00 iv. Scholarship / Stipend 125.00 93.77 100.00 v. Major Works 1.00 0.00 0.00 vi. Minor Works 20.00 12.83 20.00 vii. Govt. Museum 0.00 0.00 0.00 viii. Land acquisition 1.00 11.00 0.00 ix. RRRLF / Socities 50.00 50.03 50.00 xii. Others 70.00 50.00 50.00

NON-DIVISIBLE POOL 8580.80 5806.25 5127.50 of which a) State Plan Non Divisible Pool 1.00 1653.96 229.25 i. TFC / 14th FC 1.00 293.96 0.00 ii. Special Development Scheme (SDS) 0.00 1360.00 229.25 b) CSS under CASP 6968.55 3831.88 4762.60 i. SPA 1738.00 2181.01 1526.00 ii. SCA 244.33 344.32 0.00 iii. Rastriya Ucchatar Shiksha Abhiyan 3000.00 320.00 2248.00 iv. NLCPR 1470.00 843.67 738.60

Subject Committee-I - 49 - v. NEC 515.22 142.88 250.00 vi. ACA (OTACA) 1.00 0.00 0.00 c) CSS - Other than CASP 1611.25 320.41 135.65 i. Community Development through 1150.00 0.00 0.00 Polytechnics ii. IASE (Stipend) 1.25 14.41 15.65 iii. TEQIP (World Bank) 460.00 306.00 120.00

Total (Div + Non-Div) 9957.80 7127.87 6776.50

The Finance Department has released Rs.6948.28 lakhs during 2015-16 (upto February, 2016) against State Plan Budget provision of Rs.9607.80 lakhs. The amount released does not include the fund for Salary components.

The fund released by Finance Department against approved on-going State funded projects has been placed with the Implementing Agencies for execution of the projects.

Fund allocated to implementing agencies against approved on-going Plan Projects are indicated below: Financial Year 2015-16

(Rs. in lakhs) Sl. Funding Budget Fund released by Fund placed No Source provision Finance Deptt. with agencies 1. TFC 1.00 Rev. 293.96 293.96 2. ACA 1.00 Rev. 4.32 4.32 3. SPA 1738.00 Rev. 697.45 2180.97 Fresh 1483.52 Total: 2180.97 4. SCA 244.33 344.32 344.32 5. CSS-RUSA 3000.00 320.00 320.00 6. NLCPR 1470.00 Rev. 450.75 843.63 Fresh 392.88 Total: 843.63 7. NEC 515.22 158.26 158.26 Total:- 6969.55 4145.46 4145.46

MAJOR ACHIEVEMENTS AND INITIATIVES OF HIGHER EDUCATION DEPARTMENT DURING 2015-16

 College of Teacher Education at Kumarghat started functioning from the academic session 2015- 16 with an intake capacity of 100 students per year.  An act has been passed by the State Legislature for setting up of State University namely Maharaja Bir Bikram University at MBB College campus.  National Assessment & accreditation Council (NAAC) has accreditated the following colleges: . NSM, Udaipur – Grade B . RKM, Kailasahar – Grade C

Subject Committee-I - 50 - . Ambedkar College – Grade C . DDMC, Khowai – Grade B . GDC Dharmanagar – Grade B

iii. The Plan / programme and any projects to be implemented during the year 2016-17 for consideration of the Committee during examination

During 2016-17 the following activities are targeted:-

 Polytechnic Institute at TTAADC HQ will be started from the academic session 2016-17 on approval from AICTE.  All efforts are being made to start the MBB University from the academic session 2016- 17.  Construction of new Science Block at Ramkrishna Mahavidyalaya, Kailasahar.  Construction of Administrative building at Netaji Shubhas Mahavidyalaya, Udaipur.  Setting up of two new General Degree College at Udaipur, and Dharmanagar, North Tripura District.  Vertical as well as horizontal expansion of academic and administrative building (1st & 2nd floor) of Dasarath Deb Memorial College, Khowai.  Vertical expansion of Academic cum Administrative building of Ambedkar College, Fatikroy.  Construction of Tripura Institute of Technology (TIT), Narsingarh (Phase-II) to be completed.  Expansion of GDC, Santirbazar, LT Valley, Kanchanpur by developing infrastructure by availing fund under RUSA for Model Degree College scheme.

To achieve the above goal following provisions are proposed in the B.E. 2016-17 under Plan in Demand No. 39 / 19 / 20. (Rs. in lakhs) Demand Particulars Proposed R.E. Proposed B.E. No 2015-16 2016-17 39 DIVISIBLE POOL 1321.62 1649.00 A. Salary 163.65 349.00 B. NON-SALARY 1157.97 1300.00 of which i. Supplies & Materials 200.00 200.00 ii. Electricity Charges 50.00 80.00 iii. State Share / State's Contribution 690.34 800.00 iv. Scholarship / Stipend 93.77 100.00 v. Major Works 0.00 0.00 vi. Minor Works 12.83 20.00 vii. Govt. Museum 0.00 0.00 viii. Land acquisition 11.00 0.00 ix. RRRLF / Societies 50.03 50.00 xii. Others 50.00 50.00

Subject Committee-I - 51 -

NON-DIVISIBLE POOL 5806.25 5127.50 of which a) State Plan Non Divisible Pool 1653.96 229.25 i. TFC / 14th FC 293.96 0.00 ii. Special Development Scheme (SDS) 1360.00 229.25 b) CSS under CASP 3831.88 4762.60 i. SPA 2181.01 1526.00 ii. SCA 344.32 0.00 iii. Rastriya Ucchatar Shiksha Abhiyan 320.00 2248.00 iv. NLCPR 843.67 738.60 v. NEC 142.88 250.00 vi. ACA (OTACA) 0.00 0.00 c) CSS - Other than CASP 320.41 135.65 i. Community Development through Polytechnics 0.00 0.00 ii. IASE (Stipend) 14.41 15.65 iii. TEQIP (World Bank) 306.00 120.00 Total (Div + Non-Div) 7127.87 6776.50

After examination of the Budget proposal and appreciation of submission placed by the Secretary of the Department, the Committee made the following recommendations :-

1. The Department is to complete the process of filling up 150 of posts of Asstt.Professors, 9(nine) posts of Principals and 2(two) posts of Statistical Officers .

2. Construction of Quarters at Gomati District Polytechnic at Fulkumari, Udaipur, Dhalai, Ambassa etc. should be completed. The Department is to ensure construction of quarters at Panisagar.

3. The Department is to ensure opening of science Department with laboratory facilities along with required number of faculties in colleges located in district headquarters.

4. Religious minority department is to be persuaded by the department to consider the issue of setting up 50- seated minority girls’ hostel at Agartala.

5. The amount of stipend for boarders should be increased.

After examination of the Budget proposals and appreciation of submission of the Representative of the Department the Committee recommends the Budget proposals under Demand No.39 for Grants by the House alongwith the recommendations.

Sd/- Shri Sudhan Das Dated, Agartala, Chairman the 4th April, 2016. Subject Committee- I Tripura Legislative Assembly

Subject Committee-I - 52 - THE REPORT ON THE DEMAND NO. 30 OF THE FOREST DEPARTMENT FOR THE FINANCIAL YEAR 2016-2017.

The Budget Proposals under Demand No.30 relates to Forest Department, Government of Tripura for the Financial Year 2016–2017 and Revised Budget for the Financial Year 2015 – 2016 are as follows:- (Rs. in Lakh) Particulars Revised Budget Estimates for 2016-2017 Estimate Demand Fund for Total 2015-2016 T.S.P. S.C.P. a)Non-Plan 5968.82 6352.00 -- -- 6352.00 b) Plan 1426.34 612.98 283.73 137.29 1034.00 c) CASP/Other 7471.33 3255.22 2228.17 1401.21 6884.60 than CASP Total 14866.49 10220.20 2511.90 1538.50 14270.60

Now, aforesaid Budget Proposals is under examination of the Subject Committee-I of the Tripura Legislative Assembly for recommendations to the Demands for Grants.

The Committee in its meeting held on the 1st April, 2016 examined the Budget proposals in details having discussion with the Principal Chief Conservator of Forest of the Department who appeared before the Committee as summoned.

First of all, the Principal Chief Conservator of Forest informed the Committee about the action taken in respect of the recommendations made by the Committee during the year 2015-16 and stated as follows :-

Observation Reply The Department is to continue The Tripura forest is very rich with different plantation of Bamboo of Special species of bamboo. There has been Species. gregarious flowering of Muli and other bamboos in the state since 1995-2005. As a result most of our bamboo forest had to be regenerated. The department has taken special effort to regenerate the bamboo forest during the period 2007-08 to 2015-16. So far over 53000 ha are raised under bamboo. During the current financial year also there is a plan to raise more area with bamboo (around 1550 ha) under different schemes. The productivity of bamboo in Tripura is

Subject Committee-I - 53 - about 0.8 MT to 0.9 MT per hectare per year, which is also the all India average. This is however, much below the global average under good conditions, which is 10 MT per ha per year as in China. With a view to boost bamboo productivity, experimental plantation is being tried in the field with local valuable species and also incorporating Chinese Moso Bamboo, along with fertilizer inputs etc. During the current financial year, it is planned to raise bamboo plantation in industrial mode with better productivity. The Department is to continue A total number of 2619 SHGs have been training to SHGs of un-covered established in the department, which areas for developing their includes those under JICA & IGDC project. capacity The members of the SHGs have been given training on Income Generation Activities (IGA) like Agarbatti stick making, Mushroom cultivation, Piggery, Goatery, Fishery, Duckery, Floriculture etc. Govt of Tripura has provided revolving fund to the tune of Rs. 10.0 Crore for boosting the activities of SHGs. In addition, under the JICA project, Rs. 1.0 Lakh has been provided to each JFMC Revolving Fund to support their IGA activities. The Department is to arrange A total of 31 Eco-parks are being maintenance of existing Eco- maintained by Tripura Forest Department. Parks intending to attract the These Eco-parks provide valuable services tourists. Finance Department is for ecotourism in the state. Besides, they to allocate fund for the same. also provide areas for leisure and entertainment to the local communities, in addition to serving as areas for the conservation of the forests and biodiversity of the state. During the current financial year, total Rs. 64.85 Lakhs has been generated as revenue from these Eco-Parks. The department is to continue Forest Department is actively promoting development of food source plantation of grasses, bamboos and fruit inside deep jungle for elephants, trees that serve as food sources for wildlife monkeys. including elephants and monkeys. While raising plantations, the fruit bearing trees species like Ficus, Chamal, Jamun, Wild Banana etc are being retained as food base

Subject Committee-I - 54 - for the wildlife. Department has submitted project for Rs. 304.0 Cr to the Govt of India for development of habitat for the Wildlife. The protected areas like Gomti, Sepahijala, Trishna are managed according to the Wildlife Management Plan, which provides for the preservation and development of areas of wild banana, bamboo and various fruit bearing forest trees which are the favourite food base for the elephants and monkeys etc. Department is to continue The department has taken steps to raise plantation of Teak, Karai, Gamar economic plantations of Teak, Karai and etc which are to be planted in Gamar etc mixed with other species to earn suitable forest lands. more revenue for the state. The department is raising Teak planting stock and has targeted collection of 10,000 kg of Teak seed for raising adequate teak nursery beds during the year. The Department is to continue Noted. Training for members of JFMCs and training for members of JFMCs Eco-Development Committees in and Eco-Development handicrafts, specially those of Sepahijala, Committees in handicrafts Trishna, Kalapania, Tepania etc. is being specially those of Sepahijala, Trishna, Kalapania, Tepania etc. undertaken with the assistance of JICA including uncovered areas. project. The Department is to create a Butterfly park has already been created at new Botanical garden along with Trishna Wildlife Sanctuary with the Butterfly Park at Bordush under assistance from JICA project. A botanical Trishna and Botanical Garden at conservation area has also been established Sardu Karkari (New Taidu). The Finance Department is to at Trishna WLS under assistance from JICA allocate fund for the same. Project. In addition, botanical gardens have already been established at Kailashahar, Sepahijala and MBB College, Agartala. The Department is to take The Forest Department has taken initiative initiative for creation of new eco- for development of an eco-tourism spot park at Chandicherra under under Taibandal Gaon Panchayat. For this Taibandal GP under Mohanbhog purpose, department has already submitted Block as early as possible. project for Rs. 10 Crore for funding under Special Plan Assistance (SPA).

Subject Committee-I - 55 - Point No (ii) Achievement made during the year 2015-16 up to 28th February 2016 (Rs.in lakhs) Financial Major outputs Major/Minor Head Approved outlay Fund released Financial of Accounts BE RE by Fin. Dept Achievement during during 2015-16 2015-16 (Provisional) 2406- Forestry & 605.00 822.22 821.30 800.00 Administrative cost, celebration Wildlife (State Plan) of vanamohatsava, preparation 2406-13th Finance 0 0 604.12 590.00 and provision of work plan Commission (Revalidated) instigated fund to TTAADC, th Animal food etc., Improvement 2406-14 Finance 1.00 604.12 0 0 of Zoo, Development of Wild Commission Life Sanctuaries and National 4406- Externally 5000.00 4000.00 4000.00 4000.00 Parks etc. Aided Project(JICA) 4406- Externally 1500.00 1000.00 1000.00 1000.00 Creation of plan – 6102.0 ha Aided roject(IGDC) Bamboo nursery 16.66 lakh Total of State Plan: 7106.00 6426.34 6425.42 6390.00 Mise Nursery 67.3 lakh cost of POL, OE etc. Dev. of Howrah Catchment area & other CASP-National development works including Afforestation 2500.00 1500.00 790.18 780.00 maint. of older constructions programme Green etc. India Mission CSS-Project Tiger Recoupment fund for Externally 15.00 0.00 0.00 0.00 (Elephant) Aided Project(JICA), Creation CSS-Project of Agro-Forestry plantation- 0 31.01 30.64 30.64 Elephant 2196 ha & SHG/IGA works etc.

CASP-Development Recoupment fund for Externally of Sepahijala Zoo 0 29.62 26.70 26.70 Aided Project(IGDC), (CZA) Plantation & SHG works etc. CASP-Medicinal plant Board of 50.00 10.70 10.70 10.70 Tripura CASP-Integrated dev. of wildlife 50.00 0.00 0.00 0.00 habitat. CASP-SPA 1000.00 900.00 900.00 880.00 Total of CSS 3615.00 2471.33 1758.22 1728.04

NEC 25.00 0.00 0.00 0.00

Point-(III): The plan/programme and any project to be implemented during the financial year 2015-16 for consideration of the committee during examination

The earlier CSS Projects like National Afforestation Programme (NAP), Intensification of Forest Management (IFM), River Valley Project (RVP), National Bamboo Mission (NBM),

For last two years no schemes have been sanctioned under NEC, though the Projects have been submitted from Forest Department through Planning & Coordination Deptt.

Subject Committee-I - 56 - The following projects were submitted to NEC. 1. Catchment erosion control of Howrah River - Rs. 599.00 lakhs. 2. Development of IT infrastructure in Forest Deptt. - Rs. 77.00 lakhs. 3. Common facility centre for value addition (TFDPC) - Rs. 495.00 lakhs. 4. Establishment of bamboo mat unit (TFDPC) - Rs. 1099.00 lakhs

After examination of the Budget proposals and appreciation of submission of the Principal Chief Conservator of Forest of the Department, the Committee made the following the recommendations:-

1. The Department is to take steps to employ permanent labourers for the Eco- Parks all over the state. The Finance Department is to allocate fund for the same.

2. The Department is to take effective measure for control of monkeys and elephants from causing damages to locality.

3. The Department is requested to consider programme for development of medicinal plants cultivation in our state.

4. The Department is to continue plantation of Bamboo of special species both in forest land and patta land.

5. The Department is to continue programme of training to SHGs of uncovered areas for improving their capacity.

6. Plantation of Teak, Karai, Gamai etc in forest lands may be increased.

7. The Department is to expedite the creation of Eco Tourism spot under Taibandal Gaon Panchayat.

8. The Department is to conside of creation of a botanical garden in Trishna Sanctuary.

After examination of the Budget proposals and appreciation of submission of the representative of the Department, the Committee recommends the Budget proposals under Demand No. 30 for Grants by the House alongwith the recommendations.

Sd/- Shri Sudhan Das Dated, Agartala, Chairman the 4th April, 2016. Subject Committee- I Tripura Legislative Assembly

Subject Committee-I - 57 - THE REPORT ON THE DEMAND NOS. 16 AND 52 OF THE HEALTH & FAMILY WELFARE & PREVENTIVE MEDICINE DEPARTMENT FOR THE FINANCIAL YEAR 2016-2017.

The Budget Proposal under Demand Nos.16 and 52 relating to the Health & Family Welfare Department, Government of Tripura for the Financial Year 2016-2017 and the Revised Budget for the Financial Year 2015-2016 are as follows:-

Demand No. 16 ( Rs. in Lakh ) Particulars Revised Budget Estimates for 2016-2017 Estimates 2015-2016 Demand Fund for Total T.S.P S.C.P a) Non-Plan 13234.18 15772.00 ------15772.00 b) Plan 17578.14 9054.89 4025.60 3384.51 16465.00

c) 8907.34 433.63 2051.48 470.71 2955.82 CASP/Other than CSP Total :- 39719.66 25260.52 6077.08 3855.22 35192.82

Demand No. 52 ( Rs. in Lakh ) Particulars Revised Budget Estimates for 2016-2017 Estimates 2015-2016 Fund for Total Demand T.S.P S.C.P a) Non-Plan 27854.51 9486.00 ------9486.00 b) Plan 10314.21 6159.65 4532.29 2471.06 13163.00 c) 12921.01 6575.00 4823.00 2502.00 13900.00 CASP/Other than CSP Total :- 51089.73 22220.65 9355.29 4973.06 36549.00

Now, the aforesaid Budget Proposal is under examination of the Subject Committee-I of the Tripura Legislative Assembly for recommendations to the Demands for Grants.

The Committee in its meeting held on the 1st April, 2016 examined the Budget proposals in details having discussion with the Principal Secretary of the Department who appeared before the Committee as summoned.

Subject Committee-I - 58 - First of all, the Principal Secretary informed the Committee about the action taken in respect of the recommendations made by the Committee during the year 2015-2016 and stated as follows :-

Sl. Relevant Recommendations of the Reply of the Government on the No. Para/ Page Committee. recommendations. No. of the 2015-16 Recommendation Report 1 Para-1 of The Department is to ensure Order for procurement of MRI Machine for Page No.33 purchase of MRI Machine for Dr. BRAM Hospital has been issued and Dr. BR Ambedkar Hospital likely to be received within next three and installing of the same as months. Terms & conditions are same as early as possible. AGMC and GBP Hospital. 2 Para-2 of Cardiac wing and Nephrology AGMC & GBP Hospital: Page No.33 Unit for AGMC and Dr. B. R. Ambedkar Hospital & up- At present there is no Cardiology and gradation of Spine Surgery be Nephrology Department in AGMC & GBP ensured. The Department is to Hospital. Diagnostic facilities like ECG, pursue the proposal submitted Echocardiography and TMT for cardiac patients to the Govt. of India for and biochemistry as well as Ultrasonography for sanction for introducing 11 Renal Patients are presently available in AGMC & Super Speciality Disciplines GBP Hospital. In addition cardiac pacing unit and under PSSY-III for which the Dialysis Unit are functional as therapeutic drawing has been prepared by measure for cardiac patients and renal patients CPWD. respectively. Moreover, there is a 10-bedded ICU with all required equipments for treatment of cardiac & renal patients under Medicine Department.

Up-gradation of these two units to the level of Cardiology and Nephrology Department, presence of Cardiologists, Cardio-thoracic Surgeons, Nephrologists, Urologists & Anesthesiologists with experience in management of these two super-speciality disciplines are required, in addition to requirement of additional space and equipments with supporting Medical & Para-medical staff with training in those two disciplines.

A project proposal has been submitted to Govt. of India for sanction to introduce 11-Super Speciality Disciplines including these two under PSSY-III. The drawing has been prepared by CPWD, the approved agency of H & FW Department, Govt. of India. This is pursued regularly. DR. BRAM Hospital Cardiology: Cath Lab will be started within 6 (six) months. One Cardiologist namely Dr. Rabin Chatterjee has been engaged in this matter.

Subject Committee-I - 59 - Nephrology: 4 (four) machines has already been procured and installed and will be operationalised within a month.

Spine Surgery: Dr. Salil Saha is doing the Spine Surgery.

3 Para-3 of Engagement of Doctors to old 4 (four) nos. Health Sub-Centre namely Page No.33 Dispensaries like Asharambari, Kishnapur, Charilam & Asharambari, Krishnapur, Radhanagar are covered by AYUSH Charilam & Radhanagar be Medical Officers once in a week vide order considered early. No. F. 1 (210)-AYUSH/ DHS/ 2012/ 1728, dated 19/10/2013 4 Para-4 of The Department is to ensure Installation of CC TV to other District Page No.33 installation of CC Camera to Hospitals (North District Hospital, Dhalai other District Hospitals after District Hospital, Unakoti District Hospital, arrangement of fund. Gomati District Hospital & South District Hospital) is under process. 5 Para-5 of At least minimum 2(two) In all 24X7 PHCs 2 (two) Medical Officers Page No.33 medical officers be posted to are posted. If available one Sr. MO is given. new PHCs one of them should be senior in service. 6 Para-6 of The Department is to ensure Action has already been taken vide Order Page No.33 physical check-up of students No.F.3(5-2781)-FWPM/SHFWS/2013/Sub-I staying in SC and ST Hostels. dated 30-04-2014. A Medical Officer is regularly visiting SC & ST Hostels. 7 Para-7 of Required Specialists be posted At present the Department is running with Page No.33 in all Sub-Divisional acute shortage of specialist Medical Officer. Hospitals. As per availability, posting of specialist Medical Officer to all Sub-Divisional Hospitals is not possible at this stage. 8 Para-8 of The Department is to consider Under the scheme “Rastriya Swasthya Bima Page No.33 extending the facility of Smart Yojana” Healthcare services are provided to Card to every PHC in the Smart Card holders through 56 collaboration with Labour empanelled Health institutions. Department. Proposal has already been initiated for empanelment of 30 more Health institutions to provide healthcare services to the Smart Card holders.

Approval for empanelment of 30 more Health institutions (29 PHC & 1 CHC) by Ministry of Labour & Employment is still awaited. 9 Para-9 of The Department is to consider Action has already been taken vide Order Page No.34 the demands of patients and No.F.4(3-81)-DFWPM/GNL/AQ/2006 dated instruct the concerned Doctors 13-04-2015. All doctors are instructed to to inform the family members follow the matter. of patients about the condition of patients after allotment of time.

Subject Committee-I - 60 - PHYSICAL TARGET AND ACHIEVEMENT DURING 2015-16

Target Achievement 1 Completion of 3 (three) nos. new 3 New PHCs have been commissioned. 19 PHCs are PHC during financial year (2015- under construction. Up-gradation of 2 PHCs to 16) CHCs have been taken up. Construction of 3 District Training Centres have been taken up.

2 Completion of up-gradation Up-gradation works of both the Hospitals are near works of Kanchanpur Sub- completion. divisional Hospital and Amarpur Sub-divisional Hospital. 3 Starting construction of Sub- (a) Fund for Jirania and Kumarghat S.D. Hospitals divisional Hospitals at Panisagar, have been sanctioned under RIDF and Kumarghat, Jirania, Mohanpur, Administrative approval and Expenditure sanction Jampuijala and Karbook Sub- issued to PWD. (b) DPR for Jampuijala and divisions. Panisagar S. D. Hospitals have been submitted to Government of India under NLCPR. Projects are yet to be sanctioned. (c) DPR of Karbook S.D. Hospital has been submitted under NEC. Project is yet to be sanctioned. (d) Up-gradation works of Mohanpur Hospital is in process.

4 Starting construction works of DPR is under preparation by PWD for submission to Sipahijala District Hospital at Government of India under NLCPR. Bishramganj. 5 Completion of up-gradation Construction works at IGM Hospital for all the works of IGM Hospital: (i) G+7 buildings are in good progress and are likely to be Building on Western Side, (ii) completed by September 2017. Administrative Block, (iii) Nursing Training Institute, and (iv) Kitchen, Canteen and Laundry Block. 6 Completion of construction works Construction works of New Teaching Hospital- of New Teaching Hospital-Block- Block-II of AGMC is in progress and is likely to be II of AGMC and Central Blood completed by September 2017. Construction works Bank at GBP Hospital Complex. of Central Blood Bank at GBP Hospital Complex is nearing completion. 7 Completion of construction works Construction works of B+G+5 Building of Cancer of B+G+5 Building of Cancer Hospital is in good progress and is likely to be Hospital. completed by September 2017.

8 Procurement of Machinery & MRI Machine has been procured and installed at Equipment, Medicine and GBP Hospital. Digital X-ray machines have been Furniture etc. installed at IGM Hospital and 6(six) District Hospitals. 3 Mobile Digital X-ray machines have been procured. Most of the essential medicines are procured. Required furniture and machinery & equipment are procured and supplied to different Hospitals on submission of requirement.

Subject Committee-I - 61 - 9 Accreditation of Health facilities National Accreditation Board for Hospital and with NABH. Health Care Providers (NABH) is constituent Board of Quality Council of India, set up to establish and operate accreditation and allied programmes for Healthcare Organization. The Board is structured to cater to much desired needs of the consumers and to set bench marks for the progress of Health Industry. The Board while being supported by all stake holders including Industry, Consumer, Government has full functional autonomy in its operation. But in Tripura no Hospital has been accredited with NABH standard. While IGM Hospital is accredited by ISO 9001:2008 (International Hospital for standardization 9001:2008) and they are maintaining those standards. Government of India lunched the National Quality Assurance Standards (NAQS) on 2013 for improving the quality standard of public health facilities in the country. The standards have been developed by compiling NABH, ISO and IPHS Standards. Not only that all the National Health Programmes running in the Public Hospitals have been incorporated with in this National Quality Assurance Standards (NAQS). In our State baseline assessment against these NAQS Standards had been conducted by the consultants from RRC-NE at 2 (Two) Hospitals which are Khowai District Hospital and Belonia Sub-divisional Hospital. Khowai District Hospital and Belonia Sub-divisional Hospital scored 45.03% and 47.19% against those NAQS Standards respectively. Planning has been done that the upcoming financial Year gap filling will be almost completed in the above said two Hospitals and apart from that baseline assessment and gap filling will be carried out at least 2 ( two ) Hospitals (IGM Hospital and Gomati District Hospital.) As NAQS standards laid down by Government of India comprises almost all the standards NABH and ISO, so to maintain the uniformity no separate planning for NABH accreditation has been done yet.

10 To fill up the vacancies in all Post for 66 Medical Officers, 169-Nurses, 19 GDAs, categories of Healthcare Staff. 8 Sweeping & Cleaning Assistants and 7 Ministerial Staffs have been filled up. Process is going on for filling up of other vacant post.

Other major achievement during 2015-16: (i) New Teaching Hospital-Block-I at GBP Hospital has been commissioned, (ii) A total of 140 patients got the benefit under Tripura Health Assurance Scheme for the Poor (THASP) from 1st April, 2015 to 30 December 2015, (iii) 22 New Health Institutions have been empanelled under Rashtriya Swasthya Bima Yojana (RSBY) and total 108215 patients got benefit under the Scheme upto December 2015, (iv) Medical Education

Subject Committee-I - 62 - Service has been introduced (v) Skill training for Doctors, Nurses, Para-medics and GDA started, (vi) Achievement of De-worming Programme is 80%, (vi) Seek New Born Care Unit and New Born Stabilization Units have been established in 60 PHCs, (vii) Under Rashtriya Bal Suraksha Karyakram (RBSK) 190 Nos. of children suffering from cleft lip /or cleft palate and 75 Nos. Congenital Deafness were treated at TMC. 39 Nos. Congenital Cataract &-Retinopathy of Prematurity (ROP) were treated at IGM hospital. 81Nos.Congenital Heart Diseases and 1No of Hydrocephalus were treated at ILS Hospital. 103 Nos. of children suffering from Club foot were treated in AGMC in the year 2015 (viii) total number of Final MBBS Students passed during 2015-16 academic year from AGMC is 77 and from TMC is 50.

PHYSICAL TARGET FOR 2016-17

 Completion of 19 PHCs under construction and to take up construction works of 4 more new PHCs.  Completion of 4 District Training Centres.  Starting construction of Sub-divisional Hospitals at Panisagar, Kumarghat, Jirania, Mohanpur, Jampuijala and Karbook Sub-divisions.  Completion of up-gradation works of IGM Hospital: (i) G+7 Building on Western Side, (ii) Administrative Block, (iii) Nursing Training Institute, and (iv) Kitchen, Canteen and Laundry Block.  Completion of construction works of New Teaching Hospital-Block-II of AGMC and Central Blood Bank at GBP Hospital Complex.  Completion of construction works of B+G+5 Building of Cancer Hospital.  To provide benefit to more people under Tripura Health Assurance Scheme for Poor (THASP).  Procurement of Machinery & Equipment, Medicine and Furniture etc.  To fill up the vacancies in all categories of Healthcare Staff.

After examination of the Budget proposal and appreciation of submission placed by the Principal Secretary of the Department, the Committee made the following recommendations :-

1. The Department is to expedite installation of MRI Machine for Dr. B.R. Ambedkar Hospital.

2. Cardiac Wing, Upgraded Spine Surgery Unit and Nephrology Unit for A.G.M.C. and Dr. B.R. Ambedkar Hospital should be set up. The Department is to pursue the proposal submitted to the Government of India for sanction for introducing 11 Super Specialty Disciplines under PSSY–III for which the drawing has been prepared by CPWD.

3. The Department is to ensure installation of CC Camera in other District Hospitals after arrangement of Fund.

4. At least 2(two) medical officers be posted to new PHCs, one of them should be senior in service and 24 hours service should be made available.

5. The Department is to continue health check-up of students staying in SC and ST Hostels.

Subject Committee-I - 63 - 6. Required number of Specialists be posted in all Sub-Divisional Hospitals in phase manner.

7. The Department is to consider extending the facility of Smart Card to every PHC. Regular supply of medicines should be ensured. Grievance Cell also be provided in order to register complaint.

After examination of the Budget proposals and appreciation of submission of the representative of the Department, the Committee recommends the Budget proposals under Demand Nos. 16 and 52 for Grants by the House alongwith the Recommendations.

Sd/- Shri Sudhan Das Dated, Agartala, Chairman the 4th April, 2016 Subject Committee- I Tripura Legislative Assembly

Subject Committee-I - 64 - THE REPORT ON THE DEMAND NO. 41 OF THE SOCIAL WELFARE & SOCIAL EDUCATION DEPARTMENT FOR THE FINANCIAL YEAR 2016-2017.

The Budget Proposal under Demand No.41 relates to Social Welfare & Social Education Department, Government of Tripura for the Financial Year 2016-2017 and the Revised Budget for the Financial Year 2015 -2016 are as follows :-

( Rs. in lakh ). Particulars Revised Budget Estimate for 2016-17 Total Estimate Demand Fund For 2015-16

T.S.P. S.C.P.

a) Non-Plan 12973.57 16513.74 ------16513.74 b) Plan 18958.04 9617.72 9050.02 3487.82 22155.56

c) 24515.97 10612.40 8746.56 4304.40 23663.36 CASP/Other than CASP Total:- 56447.58 36743.86 17796.58 7792.22 62332.66

Now, the aforesaid Budget Proposal is under examination of the Subject Committee–I of the Tripura Legislative Assembly for recommendations to the Demands for Grants.

The Committee in its meeting held on the 1st April, 2016 examined the Budget Proposals in details having discussion with the Special Secretary of the Department who appeared on the part of the Department as summoned.

First of all, the Special Secretary informed the Committee about the action taken in respect of the recommendations made by the Committee during the year 2015-16 and stated as follows :- Sl. Relevant Recommendation Reply of the Government on No. Para/Page of the Committee the recommendations No.of the ( 2015-2016) Report 1 Point No.1 The Department is to The Status of construction of following Page No.45 complete construction of 5(five) number CDPO office buildings are given below: CDPO office Mohanpur – completed & inaugurated. building at Mahanpur,Padmabill. Padmabil - completed & inaugurated.

Subject Committee-I - 65 - Tulashikhar,Kalyanpu Tulashikhar – completed upto roof level. r and Pecharthal under ICDS project Kalyanpur – completed upto roof level. and construction of Pecharthal- completed upto Plinth level of 4(four )CDPO office at double storage. Kamalpur,Bishalgarh, Boxanagar, and Boxanagar - completed up to plinth level. Melaghar under ICDS Melagarh – Site selected at Nalchar. Project which were taken during 2013-14 Bishalgarh - site selected in a complex of and 2014-15 PWD at Bishalgarh. respectively. Kamalpur NP- Site yet to be selected. 2. Point No.2 The Department is to There are 5(five) no Anganwadi Workers Page No.45 continue the training Training Centre (AWTCs) in the state of Programme under the Tripura. Out of 5 AWTCs, 4(four) are run by action plan to improve the Department of Social Welfare & Social the quality and for Education which are situated in 4(four) Districts better implementation and 1(one) AWTC is running by a NGO namely of ICDS services . Tripura Council for Child Welfare. There is no Middle Level Training Centre (MLTC) in our state.

To reduce the huge backlog of untrained AWWs the Department has taken the following action.

1. 135 no Block Level Induction Training Programmes have been organized during 2015-16. 2. The Ministry of Women & Child Development, GoI has sanctioned Rs.126.93 Lakhs for ICDS Training Programme during 2015-16. In State Training Action Plan (STRAP) of the financial year 2015-16, Block Level Induction Training Programmes have been proposed. Accordingly, the Block Level Induction Training Programmes are being organized to all CDPOs, Supervisors & Anganwadi Workers under ICDS MIS. 3. To reduce huge backlog of untrained Supervisors, NIPCCD, Guwahati has been requested to organize Job Course Training Programmes only for Tripura.

4. To improve the quality and better implementation of ICDS the Departmrnt

Subject Committee-I - 66 - has taken the following action

(a) Various CDs on pre-school activities under ICDS in regional language have been developed. (b) Rhymes have been translated into local language and supplied to all AWCs. © CDs on Hygiene & Behavioral practices and other social customs have been developed. (d) Charts/ flex have been developed in convergence with NRHM on different awareness programmes. (e) Early Childhood Care & Education (ECCE) Curriculum will be introduced shortly in the Anganwadi Centres. (f) The syllabus has been developed for the age group of 3-4 years, 4-5 years and 5-6 years separately.

5. Present Training Status of CDPO, Supervisors, AWWs & AWHs:

Category In Position Trained Un-trained R e m a r k s 1 2 3 4 5 CDPO – Job 46 42 4 CDPO - Refresher 46 16 30 Supervisor – Job 325 171 154 Supervisor – Refresher 325 158 167 AWW – Job 9911 8423 1488 AWW – Refresher 9911 8759 1152 AWH – Orientation 9911 6742 3169 AWH – Refresher 9911 9145 766

3. Point No.3 The Department is to For setting up of 234 Anganwadi Centres in the Page No.45 ensure setting up of uncovered areas sanctioned by the Ministry of new AWC’s in the Women & Child Development, GoI, the file has uncovered areas after been moved to the Finance Department getting the approval of (General Branch) for concurrence & creation of the Finance 234 posts of Anganwadi Workers & 234 posts Department . of Anganwadi Helpers. 234 Anganwadi Centres would be set up after getting concurrence of Finance Department.

Subject Committee-I - 67 -

4. Point Outgoing inmates be The D.M. & Collector, of concerned District have No.4 provided with been requested Page houses along with No.45 allowance for arrangement of IAY house, khas land and BPL card irrespective of etc to the over aged BPL/APL. inmates of the homes run by the Department. The matter is under examination in the District. However, rehabilitation grant for the over aged has been sanctioned to 11 (eleven) nos over aged inmates @ Rs.50,000/- during 2015-16. 5. Point The Department is The recommendation of the Subject committee is under No.5 to continue its examination of this Department. Page persuasion about No.45 the proposal for sanction of pension to 1318 Unmarried Women above 45 years of age who are unemployed(APL) @ Rs.500/- per month and ensure implementation of the said proposal. 6. Point The Department is No.6 to ensure The old building of Pura Sishu Bhawan located at 79Tilla Page construction of No.45 house(s) for the ,Agartala has been renovated with the intention of running a mentally day care centre for Mentally Retarded Children given the disordered persons constraint of funds for construction of a full fledged home. And to take appropriate action Experienced NGOs have been invited for running the day care for construction of centre. However, an NGO run home for Mentally retarded project to be children is already functioning at Gakulnagar with a capacity of started in the Pura Sishu Bhawan 50 children, presently having 36 inmates. located at 79Tilla ,Agartala .

Subject Committee-I - 68 - For creation of 9 (Nine) posts of Supervisors 7. Point The Department is to sanctioned by the Ministry of Women & Child ensure creation of No.7 Development, GoI, the file has been moved to the Page new post of Finance Department (General Branch) for No.45 Supervisors and to complete concurrence. The concurrence is yet to be received construction and from Finance Department. maintenance of 138 AWC The Department had placed Rs.846.68 Lakhs with the D.M. & Collectors for construction of 188 New Anganwadi Centre buildings @ Rs. 4.50 Lakhs and Rs.23.98 Lakhs for repairing & maintenance of 124 Anganwadi Centres during 2015-16. The construction, repairing & maintenance works are going on. 8. Point The Department is to Adhoc and Enlisted BPL families are also provided No.8 continue survey for social security pension @ Rs.500/- per month.. Page the families having No.45 old age farmer/Jumia/ labourers having no Government job or BPL card for providing some kinds of Social pension or other benefit.

MAJOR ACHIEVEMENTS MADE BY THE EDUCATION (SOCIAL WELFARE & SOCIAL EDUCATION) DURING 2015-16.

1. 2.9 lakhs beneficiaries are being covered under various pension and Social security schemes. 4(four) new pension scheme namely Domestic Worker Pension scheme, Transgender Pension scheme, Leprosy Patient Pension schemes and HIV/AIDS Patient Pension schemes have been introduced from the month of August’2015. 2. Pension/One time financial benefit to the AWW and AWH who have attained 60 years of age and put in continuous minimum 10 years of service has been introduced w.e.f. 1st August 2015. The rate of monthly Pension for the retired AWW’s is Rs.500/- per month and for the AWH’s Rs.350/- per month. Alternatively the retiring AWW and AWH can opt for one time financial benefit of Rs.50,000/- and Rs.30,000/-, respectively. There is a provision of providing one time financial benefit to the legal heir of deceased AWW/AWH who put at least 5years continuous service before death @ Rs.50,000/- and Rs.30,000/- ,respectively.

Subject Committee-I - 69 - 3. The Department is running 56 ICDS Projects with 9911 AWC in which about 3.5 lakhs children and 0.80 lakhs pregnant and lactating women are enrolled.

4. 98,621 Adolescent girls have been covered under Rajiv Gandhi Scheme for Empowerment of Adolescent Girls (SABLA) Schemes by providing supplementary nutrition and imparting life skills.

5. 6,534 pregnant women have been provided financial assistance @ 6000/- each under Indira Gandhi Matritva Sahayug Yojana (IGMSY) schemes.

6. Under Incentive to Girl Child scheme, 41,531 Girl children have been given financial benefit @ Rs.300/- P.M. 7. 910 families have been provided financial assistance @Rs.20000/- per family under National Family Benefit Schemes.

8. 11 Over aged inmates of Homes have been provided one time financial assistance @ Rs.50000/- for their Rehabilitation.

9. Construction of Pensioner’s Awaas viz. “Ashray” for housing retired overnment servants with a capacity of 104 beds has been completed at a cost of about Rs.9.7 crore. 10. Construction of building for Tripura Commission for Women (1stphase) at Melarmath will be completed by March’2016.

11. Construction of ground floor of the hostel for Institute for Visually Challenged Persons at Narsingarh has been completed.

12. Construction of building for the destitute women at Abhoynagar is nearing completion.

13. 1 one stop centre (OSC) is being setup to provide basic first- aid, hospital assistance, support for lodging FIR, psycho-social support, counseling for the women affected by violence etc.

Subject Committee-I - 70 - NON-PLAN PROGRAMME OF THE DEPARTMENT FOR THE FINANCIAL YEAR 2016-17 (Rupees in lakh) Sl.No. Particulars Page No. of the Demand wise Physical target for 2016-17 Budget Book provision in 2016-17 2016-17 (Rs. In lakh)

1 3 4 5 For Payment of Salary to the staff (Group-A=9, Group-B=9, Group- 1 Salary SOCIAL 7157.00 C=1093, Group-D=1057, ALT=263, PTI=141 employees) For payment of electricity of 2 Electricity Charges SOCIAL 38.00 departmental offices and 9 Homes. For maintenance of departmental office building 3 Minor Works SOCIAL 0.00 and boundary wall of AWTC & Home etc. For payment of pension to 4086(BHP)/155 (Bidi shramik)/35(Unemployment 4 Social Pension SOCIAL 546.67 Allowance)/3384 Domestic worker/61 leprocy patient/55 trancgender/887 HIV(AIDS) patients Establishment cost of TCW 50% State Share of TSSWB. For running 9 Homes namely ISR, IVH Grants to PSUs/ 5 SOCIAL 500 (Boys), Girls Unit-I & II, Boards/Homes/Bodies Mahila Ashram, Infirmary, Ramnagar Home, Khilpara Home, Foundling Home Pension to 60% Disable For payment of pension to 6 SOCIAL 347.16 Persons 5786 nos benef. Pension to Widow & For payment of pension to 7 SOCIAL 3754.18 Deserted Women 52141 nos benef Deserted Women For payment of pension to 8 Pension Scheme of APL SOCIAL 175.41 2436 nos benef families (New Scheme) Pension to Persons who For payment of pension to 9 SOCIAL 87.42 lost 100% eye sight BPL 728 nos benef Tripura Cobblers For payment of pension to 10 SOCIAL 4.57 Pension Scheme 63 nos benef Tripura Rickshaw For payment of pension to 11 SOCIAL 36.48 Pullers Pension Schema 506 nos benef Tripura Incentive for Girl For payment of pension to 12 SOCIAL 2199.68 Child Scheme 45826 nos benef Pension to Unmarried For payment of pension to Women of 45 years & 1243 nos benef 13 SOCIAL 89.56 above belonging BPL families

Subject Committee-I - 71 - Pension to Persons who For payment of pension to 15 lost 100% eye sight of SOCIAL 54.88 571nos benef APL families Pension to 80% and For payment of pension to 16 above Disabled SOCIAL 128.95 1790 nos benef Persons of APL families For payment of pension to 17 State Old Age Pension SOCIAL 543.94 7557 nos benef For payment of pension to 18 Motor Shramik Pension SOCIAL 42.69 592 nos benef For payment of pension to 19 Laundry Worker Pension SOCIAL 28.47 395 nos benef For payment of pension to 20 Barber Worker Pension SOCIAL 36.16 502 nos benef Handloom Worker For payment of pension to 21 SOCIAL 57.71 Pension 801 nos benef For payment of pension to 22 Fishermen Pension SOCIAL 84.81 1177 nos benef State Widow Pension For payment of pension to 23 SOCIAL 40.00 Scheme 555 nos benef Pension to Cancer For payment of pension to 24 SOCIAL 500.00 Patient 6944 nos Cancer Patient For cost of fuel of the departmental vehicles,office expenses, 25 Others SOCIAL 60.00 house rent, travel expenses and payment of teleanted inmates of Fundling Home etc. TOTAL 16513.74

STATE PLAN Programme of the Department for the financial year 2016- 2017 (Rupees in lakh) SL.No. Particular Page No Demand No. Total Physical Target for s of the 2016-17 Budget 41 19 20 Book 2016-17 1 2 3 5 6 7 8 9 For payment of state part honorarium to 9911 1 Salary SOCIAL 3020.92 3429.01 1321.07 7771.00 AWW's and 9911 AWH's For payment of Electricity 2 SOCIAL 24.00 1.00 0.0 25.00 electricity charges of Charges departmental offices . Indira For payment of pension Gandhi to 161882 nos benef National 3 Old Age SOCIAL 3520 3173.11 1250.40 7943.51 Pension (State Share)

Subject Committee-I - 72 - Pension to For payment of pension Persons to 1042 nos benef. who lost 4 100% eye SOCIAL 55.52 49.06 21.42 126 sight under IGNDPS (State) Transfer For development works 5 Grant to SOCIAL 0.00 135.00 0 135.00 under TTAADC TTAADC Being 10% State Share State under ICDS(General), Share/Stat SNP, ICDS training , 6 e's SOCIAL 2375.09 1928.92 755.99 5060 ICPS, NMEW and 50% Contributio State share under n Sabla(Nutrition) For payment of State Honorarium to the Commissio Chairpersons and n for Members of the 7 SOCIAL 17.00 0.00 0.00 17.00 Protection Commission, and salary of Child to staff and Other Rights Expenditure of the Commission. For payment of Juvenile 8 SOCIAL 50.00 0.00 0.00 50.00 establishment cost of Fund CWC. For payment of Scholarshi 9 SOCIAL 0.5 0.00 0.00 0.50 scholarship to disabled p/Stipend students For maintenance of departmental office Minor 10 SOCIAL 55.00 0.00 0.00 55.00 building and boundary Works wall of AWTC & Home etc. Indira For payment of pension Gandhi to 19879 nos benef. National Widow 11 SOCIAL 302.15 291.80 121.60 715.55 Pension Scheme (State Share) Indira For payment of pension Gandhi to 2167 nos benef National Disability 12 SOCIAL 23.04 20.12 8.84 52.00 Pension Scheme ( State Share) Capacity For training on capacity 13 Building for SOCIAL 55.00 0.00 0.00 55.00 building the Women Capacity For training on capacity Building for building the 14 SOCIAL 35.00 0.00 0.00 35.00 Physically Challenged Persons Pension/O ne time Payment of financial Pension/One time 15 benefit to SOCIAL 20.00 21.50 8.50 50.00 financial benefit to the the AWW's/AWH's after AWW's/AW retired H's

Subject Committee-I - 73 - For cost of fuel,O.E, Marriage grant , Rehabilitation of Overaged inmates, payment of wages of security guards, Observance of Anti 16 Others SOCIAL 64.50 0.50 0.00 65.00 Dowry Week, International Older Person Day,World Disabled Day, International Women day, Republic day, Independence day, different Melaas etc. Total Divisible 9617.72 9050.02 3487.82 22155.56 poole

For payment of pension to 161882 nos benef.. under IGNOAPS,,payment of pension to 19879 nos beneficiaries (IGN 18 NSAP SOCIAL 2909.11 1474.36 1200.74 5584.21 WPS) , Payment of pension to 3209 nos benef (IGNDPS) & payment of financial assistant to 1181 nos familes under NFBS including 3% adm.cost For payment of salary and honorarium to the 19 ICDS SOCIAL 6657.63 6167.22 2175.15 15000.00 ICDS staff/AWW,AWHs and SNP. KSY training etc. National For creation of barrier - Programm free environment for e for persons with disabilities. 20 Persosn SOCIAL 51.98 31.02 17.00 100.00 with Disabilitie s For providing maternity benefit to the Pregnant 21 IGMSY SOCIAL 186.16 252.98 60.86 500.00 mother & nursing mother For running of 22 ICPS SOCIAL 792.25 472.30 259.00 1523.55 Integrated Child Protection Services. For providing training benefit to the adolescent girls i.e life skill 23 RGSEAG SOCIAL 457.39 348.68 149.53 955.60 education,vocational training Nutrition & health education, health check-up etc. Total non- 11054.52 8746.56 3862.28 23663.36 Divisible poole Grand Total 20672.24 17796.58 7350.10 45818.92 (Div.+Non Div)

Subject Committee-I - 74 - After examination of the Budget proposals and appreciation of submission of the Special Secretary of the Department, the Committee made the following recommendations:- 1. The Department is to start constructing CDPO office at Sonamura on priority basis in addition to completing the process of construction of CDPO offices at Pecharthal, Boxanagar, Melaghar, Bishalgarh, Kamalpur etc. which are under construction. 2. The Department is to continue the Training Programme under the action plan to improve the quality and for better implementation of ICDS services. 3. The Department is to ensure that new AWCs are set up in the uncovered areas after getting approval of the Finance Department for which department is to pursue. 4. Outgoing inmates should be provided with dwelling houses alongwith allowance irrespective of BPL/APL. IAY house may be considered for this purpose. 5. The Department is to take initiative to sanction pension in favour of approximately 1318 unmarried and unemployed women (APL) aged above 45 years. 6. The Department is to pursue to obtain Finance Department’s concurrence regarding creation of nine new posts of supervisor and to complete construction and maintenance of 138 AWCs. 7. The Department is to identify poor old aged persons who are not covered by BPL / Ad-hoc BPL etc. and to initiate proposal for them for sanction of old aged pension. 8. Department is to submit revised model estimate for construction of AWC with provisions of kitchen, study room, toilet etc. 9. Department is to ensure that signature of the Pradhan or Chairman of the concerned Gaon Panchayat or ADC village committee as the case may be, to be obtained in the adjustment of the feeding bills being submitted by the AWCs.

After examination of the Budget proposals and appreciation of submission of the representative of the Department, the Committee the Budget proposals under Demand No 41 for Grants by the House alongwith the recommendations.

Sd/- Shri Sudhan Das Dated, Agartala, Chairman the 4th April, 2016. Subject Committee- I Tripura Legislative Assembly

Subject Committee-I - 75 - THE REPORT ON THE DEMAND NO. 13 OF THE PUBLIC WORKS (R & B) DEPARTMENT FOR THE FINANCIAL YEAR 2016-2017.

The Budget Proposal under Demand No.13 relates to Public Works ( R & B ) Department, Government of Tripura for the Financial Year 2016-2017 and the Revised Budget Estimates for the Financial Year 2015-2016 are as follows :- (Rs.in Lakh) Particulars Revised Budget Estimates for 2016-17 Estimates Demand Fund for Total 2015-2016 T.S.P. S.C.P. a) Non-Plan 45265.01 51961.00 -- -- 51961.00 b) Plan 36881.59 11804.52 7702.31 3859.17 23366.00

C)CASP/Other 39799.62 16900.52 10075.31 5525.17 32501.00 than CASP ------Total 121946.22 80666.04 17777.62 9384.34 107828.00

Now, the aforesaid Budget proposals are under examination of the Subject Committee– I of the Tripura Legislative Assembly for recommendations to the Demands for Grants.

The Committee in its meeting held on 02-04-2016, examined the Budget proposals in details having discussion with the Principal Secretary and Chief Engineers of the Department as summoned.

First of all, the Principal Secretary and Engineer-in-chief informed by the Committee about the action taken in respect of the recommendations made by the Committee during the year 2015-16 stated as follows :-

Sl. Relevant Recommendation of the Reply of the Government on the Recommendation No. Para/Page Committee of 2015-16 No. of the Report 1 Para 1/ For 40% upgradation of The provision of BE-2015-16 for the same head Page 138 roads under PMGSY, to was Rs. 50 Crores where as the RE of 2015-16 was enhance the Budget curtailed to Rs. 35 Crores though the demand of provision, the department the department was Rs. 55 Crores. to take up with the Finance Department during Revised Estimates 2015-16.

Subject Committee-I - 76 -

2. Para 2 / The department to take all The status of the roads is given below: Page 139 endeavour to get rest numbers of 1. Khowai to Manik Bhander : Road be completed satisfactorily Completed

2. Manik Bhandar to Kailashahar :

Completed

3. Barkathal to B.G.Hospital :

Completed

4. Killa to Ompi :

Completed

5. Road from Fire Brigade to Kalibari connecting Airport Road via Durga Choumuhani :

The road at present is of intermediate lane in few stretches and PWD has a plan to improve the entire stretch by 2-lane standard road.

6. Road from Bholagiri to Durga Choumuhani Airport Road : The road has been improved by PWD as recommended by the Committee and now fit for smooth movement of traffic. 3 Para 3 / Quarters at Sub-Division & More than 100 quarters have been Page 139 Block Headquarters of important completed during the year and at present Departments be constructed on works in progress for 124 Type-I, 180 priority basis and for that Type-II, 74 Type-III and 2 Nos. Type-IV Finance Department to release Quarters at different locations in the state. adequate fund. The departments for whom those quarters have been taken up includes, Health, Police, Judicial, PWD including General Pool at Agartala.

In addition to that, 74 Type-I, 88 Type-II, 50 Type-III and 12 Nos. Type-IV Quarters are planned for which tender process are on. 4. Para 4 / Fund for construction of New Work order issued and work is expected Page 139 MLAs’ Hostel be allocated in to start by April, 2016 for which Revised estimate Budget for completion time is fixed two years. taking it up on urgent basis. Budget provision for the same project has been kept in BE of 2016-17. Subject Committee-I - 77 - -77- 5. Para 5 / Maintenance of Roads in The provision of BE of 2015-16 on Page 139 frequent interval is necessary in maintenance of Roads and Bridges was the atmosphere of the state & Rs. 120 Crores but in the RE of 2015-16, heavy traffic and for that the it was curtailed and finally Finance Deptt. Department to give top priority could release Rs. 112.33 Crores though on the same. The Finance the demand of the Department was Rs. Department to allocate sufficient 176.79 Crores. In addition to that, Rs. 10 fund during Revised Estimates Crores has been released for PMGSY 2015-16. roads maintenance and Rs. 10 Crores for NH maintenance. The BE of 2016-17 has been kept to Rs. 158 Crores which requires further enhancement in RE of 2016-17 to upkeep the maintenance work of roads, as large number of PMGSY roads are being handed over to PWD. 6. Para 6 / The Department is to take Out of 58 blocks, the road connectivity Page 139 initiative for improvement of from Block Hqtrs to nearest Sub Division/ roads from Block Head Quarters District Hqtrs. of 23 blocks are of single to Sub-Divisions. Finance lane and remaining block Hqtrs. are Department is to provide fund either intermediate lane or fallen on NH. during R.E. 2015-16 for the For improvement of those roads, no same. separate fund is allocated by FD but it is met out of the fund available against OTPMGSY (Major works) or from maintenance head. 7. Para 7 / Road from Bishramganj to 1. Bishramganj to Sonamura via Page 139 Sonamura via Taksapara and the Taksapara: road from Melaghar to The length of the road from Sonamura through bye-pass Bisramgunj to Sonamura via avoiding Melaghar market be Taksapara id 22.5 KM and the road constructed. was completed under PMGSY 40% renewal scheme with existing formation width 6 Metres and carriageway width 4 metres To improve the road portion from Taksapara to Sonamura for a length of 14.5 KM, DPR has been processed for sanction under NEC scheme.

2. Road from Melaghar to Sonamura through bye-pass avoiding Melaghar market: One road alignment was surveyed for a length of 3.34 KM from Bisramgunj-Sonamura road at Melaghar PWD Chowmuhani to Kundaraghat of Bisramgunj- Sonamura road to construct a Bypass avoiding Melaghar market. Out of 3.34 KM, a length of 2.61 KM has been constructed by NBCC under

Subject Committee-I - 78 - PMGSY New connectivity. An estimate costing Rs. 3.51 Crores has been processed by Circle-IV for sanction but to complete the road, land acquisition for about 9.50 Kani is required which involves huge amount.

PHYSICAL TARGET OF DIFFERENT SCHEMES VIS A VIS ACHIEVEMENT DURING THE YEAR 2015-16 (UPTO DECEMBER, 2015) UNDER STATE PLAN

Major/M Name of Physical inor Physical Achievement during 2015- Schemes/ Target for Head of Components Unit Target 16 Projects/Ite TSP and Depart (2015-16) (Upto December, 2015) ms SCCP ment

Total in TSP SCCP TSP SCCP State 5054 Imp of State CO on OTPMGSY Roads roads KM 200 80 35 54 31 140 Imp of roads under 40%

renewal of PMGSY KM 140 50 30 12 7 35 Box/ Slab

Culverts Nos 10 5 2 3 1 8 4059 Building Buildin Building functional gs Nos 4 1 0 0 0 0 Residential Accommodatio 4216- Housing n (Staff Buildin Quarters, gs Barrack etc) Nos 40 16 8 12 11 36 5054 CO on NABARD Major Bridges roads Nos 35 14 8 2 1 6 Minor Bridges/

Culverts Nos 10 5 2 3 2 11

ACTION PLAN OF PWD (R&B) AGAINST DIFFERENT SCHEMES FOR THE YEAR 2016-17 UNDER STATE PLAN OF DEMAND-13 Major/Minor Name of Physical Head of Schemes/ Components Unit Target Physical Target Department Projects/Items (2016-17) TSP SCCP 5054 CO on Imp of State OTPMGSY raods Roads KM 250 85 50

Subject Committee-I - 79 - Imp of roads under 40%

renewal of PMGSY KM 30 9 2 Box/ Slab

Culverts Nos 10 3 2 Building 4059 Building Buildings functional Nos 4 1 0 Residential Accommodation Housing 4216- (Staff Quarters, Buildings Barrack etc) Nos 50 16 10

5054 CO on NABARD Major Bridges Roads Nos 25 14 6 Minor Bridges/

Culverts Nos 15 5 3

After careful examination of the Budget proposal and appreciation of submission placed by the Principal Secretary and Chief Engineers of the Department, the Committee made the following recommendations:-

1. The Department is to continue with the work for 40% upgradation of roads under PMGSY and should move the Finance Department for release of necessary fund during R.E. 2016-17.

2. The Department is to take endeavour to get the road connecting from Melaghar to Sonamura completed. The Finance Department is to provide fund during R.E. 2016-17.

3. Government quarters at sub-division & block headquarters of important Departments like PWD, Health, District Administration, Police etc. should be set up attaching priority to the uncovered blocks and sub-divisions, for which Finance Department is to release adequate fund.

4. Maintenance of roads at regular intervals should be done by the Department, as new roads are being added to the road networks of the department. The Department should take up with the Finance Department to increase fund as much as possible in the revised estimates of 2016-17 for maintenance.

5. The Department is to continue to convert single lane roads into double lane road leading from block head quarters to sub-division head quarters. Finance Department is to provide adequate fund for this purpose. From Barapathari point of the Belonia-Sonamura road to Chottakhola should be under consideration during R.E. 2016-17.

Subject Committee-I - 80 - 6. Road from Bishramganj to Sonamura via Taksapara and the road from Melaghar to Sonamura through bye-pass avoiding Melaghar market be constructed.

After examination of the Budget proposals and appreciation of submission of the representative of the Department, the Committee recommends the Budget proposals under Demand No.13 for Grants by the House alongwith the recommendations.

Sd/- Shri Sudhan Das Dated, Agartala , Chairman the 4th April, 2016. Subject Committee- I Tripura Legislative Assembly

Subject Committee-I - 81 - THE REPORT ON THE DEMAND NO. 51 OF THE PUBLIC WORKS ( D.W. & S. ) DEPARTMENT FOR THE FINANCIAL YEAR 2016-2017.

The Budget Proposal under Demand No.51 relates to the Public Works ( D.W & S ) Department, Government of Tripura for the Financial Year 2016- 2017 and the Revised Budget for the Financial Year 2015 -2016 are as follows :-

(Rs.in lakh) Particulars Revised Budget Estimates for 2016-17 Estimates Demand Fund for Total 2015-2016 T.S.P. S.C.P. a) Non-Plan 4389.00 5069.00 ------5069.00 b) Plan 14472.04 9977.24 5947.97 3261.79 19187.00 c) 11303.32 6592.04 3929.87 2155.09 12677.00 CASP/Other than CASP Total 30164.36 21638.28 9877.84 5416.88 36933.00

Now, the aforesaid Budget Proposal is under examination of the Subject Committee-I of the Tripura Legislative Assembly for recommendations to the Demands for Grants. The Committee in its meeting held on the 02-04-2016, examined the Budget proposals in details having discussion with the Principal Secretary & Chief Engineer of the Department as summoned.

First of all, the Principal Secretary informed the Committee about the action taken in respect of the recommendations made by the Committee during the year 2015-16 stated as follows :- Relevant Para / Sl. Page Recommendation of the Reply of the Govt. on the No. No. of committee recommendation the report 1. 1/Page The Department is to The Department has taken up a 146 continue Installation & good number of Mini Deep Tube commissioning of Mini Wells in different schemes Deep Tube Wells in the during the year 2015-16, such uncovered areas and to as under NRDWP – 874 nos., complete the work under MSDP– 52 nos. out of undertaken under the total targeted 926 nos. Mini Scheme in a time- DTW, 268 nos. have already

Subject Committee-I - 82 - frame. been commissioned, 123 nos. are ready for commissioning and works for 175 nos. are in progress. Balance 110 will be taken up by DWS and 250 nos. will be taken up by RDD, which was handed over to that department vide this office U.O. no. 426/CE/DWS/16, dated 05- 01-2016 due to fund constrain of DWS. 2. 2/Page The Department is to Maintenance of Machines of 146 continue maintenance of DTWs as wells as Mini DTWs Machines of Deep tube has been given on top most wells and Mini Deep tube priority in drinking water wells and to ensure scarcity area. Necessary payment of electric agreements for repairing and charges for Rural areas rewinding of pumps & motors from P.D.F. and the are made well in advance by Department is to take up each DWS Division. the matter with Panchayat Maintenance team for urgent Department. repairing of DTW schemes is also kept ready in each DWS Sub-Division. DWS Department is very much vigilant about the matter. Instruction has already been communicated to all field level officers to response regarding maintenance of DTW & Mini DTW schemes within 48 hours. Department initiated a proposal to the Principal Secretary, RDD & Panchayat, Govt. of Tripura for payment of electricity bill for operation of Mini DTW to be made from PDF fund through PRI bodies vide U.O. No. 958/CE/DWS/14, dated 19-11-2014 and U.O. No. 1063/CE/DWS/14, dated 09- 01-2015 but decision yet to be received. The Chief Secretary, Tripura also issued a letter to the Principal Secretary, RD (Panchayat) vide no. F. 2(1)- CS(Power) /2014, dated 08-08- 2014 with instruction to the Panchayat to pay the electricity

Subject Committee-I - 83 - bills of SBDTWs from out of the 13th Finance Commission award money or Grants given by State Finance Commission/ Panchayat development fund. 3. 3/Page The Department is to The Department has already 146 continue supply of water considered supply of Drinking through pipelines to a water through pipeline to all uncovered areas. uncovered areas of habitants of the State. At present 80% population of the state is covered through supply of drinking water through pipeline. During 2015-16 department has targeted for laying of pipeline 1799 km & out of which 559.09 km has already been completed & 82.55 km is in progress. Target for 2016-17 is 1549 km for which necessary initiative also taken to procure required quantity of pipes. 4. 4/Page 1(one) Deep tube well be Included in Action Plan 146 installed at Promodnagar village under Jumpuijala R.D. Block. 5. 5/Page The Department is to Maintenance of Water 146 continue maintenance of Treatment Plant including IRPs water treatment plant is continuous process. This including their IRPs and to Financial year 2015-16, no. of ensure fitting of new IRPs maintenance of IRPs has taken in uncovered deep tube up is 117, completed 36 and 81 wells. Removal of old pipe on progress. Total nos. of new and damaged pipelines be IRPs / GWTPs taken up is 209, ensured and Finance Completed is 93, on progress is Department is to provide 63. adequate funds R.E. 2015- Removal of old pipes & 16. damaged pipeline is taking up regularly manners as & when required. Due to fund constraint more numbers of IRP could not be taken up.

Under NRDWP fund received was Rs. 25.63 crore, Government has released fund Rs. 68.68 crores from SDS and advance Central Share.

Subject Committee-I - 84 - 6. 6/Page The Department ensure Proper maintenance of water 146 the proper maintenance of treatment plants including IRPs water treatment plants in the state is a regular and including their IRPs in the routine work of the state including Department. The normal 15% maintenance of the plant of NRDWP programme fund is installed near Bholagiri (by not sufficient to repair 49 nos. the side of Capital SWTP & 885 nos. IRPs in the Complex). State. To expedite the progress of repairing of IRPs, department has instructed to all concerned field officials to take up the maintenance work on priority basis. IRP at Bholagiri (by the side of Capital Complex) is not functioning at present. If water is supplied through IRP, the whole area of the scheme cannot be covered due to low water pressure. As per demand of locality, water is being supplied directly bifurcating IRP. UDD has taken up one ground water based water treatment plant at Barjala – II and after commissioning of the plant, the area will be covered from that scheme.

FINANCIAL ACHIEVMENT OF PWD (DWS) FOR THE YEAR 2015-16 (Rs. in Lakh) Revised Estimates for 2015- Expenditure Budget 16 Fund upto Estimate received February, Particulars D. No. D. No. Total for during 16 (figure D. No. 51 19 20 2015-16 (General) 2015-16 before (TSP) (SCP) reconciliation) a) Non- 4113.20 4389.00 0.00 0.00 4389.00 2210.00 1750.72 Plan b) Plan 9557.00 7525.46 4486.33 2460.25 14472.04 8272.95 6746.96 c) CASP 16002.00 5739.99 3421.92 1876..53 11038.44 10769.92 10339.12 d) N.E.C 0.00 0.00 0.00 0.00 0.00 0.00 0.00 e) C.S.S 1.00 111.62 66.54 36.49 214.65 214.65 214.65

Total 29673.20 17766.07 7974.79 4373.27 30114.13 21467.52 19051.45

Subject Committee-I - 85 -

PROPOSED PHYSICAL TARGET DURING THE YEAR 2016-17

A. Rural Water Supply : Sl. Annual Plan Unit Description of Items No. 2016-17 (in Nos.) 1. Sinking of Deep tube wells 132 Nos. with replacement 2. Commissioning of Deep tube 199 Nos. well 3. Sinking & Commissioning of 274 Nos. Small Bore Deep tube well 4. Construction of Iron removal 82 Nos. plant 5. Construction of Spot Source 112 Nos. 6. Construction of Surface water 16 Nos. treatment plant 7. Laying & remodeling of 1549 Km. pipeline 8. Coverage of habitation PC-FC=850 Nos. quantity wise 9. Coverage of Habitation Quality NC-PC=450 Nos. wise PC-FC=396

B. Swachh Bharat Mission (Gramin) :

Sl. Annual Plan Description of Item Unit No. 2016-17 1. Individual Household Latrine 80964 Nos. (APL) 2. Individual Household Latrine 115063 Nos. (BPL) 3. Sanitary Complex 58 Nos.

Schedule of works for PWD (DWS) – 2016-17 : Schedule of works for PWD (DWS) – 2016-17 has been prepared and likely to be laid before the House in time.

Subject Committee-I - 86 - PHYSICAL ACHIEVEMENT DURING 2015-16 & TARGET FOR 2016-17 STATUS OF WORKS AS ON 31.01.2016 DRINKING WATER AND SANITATION (WING OF PWD) STATUS TARGET ACHIEVEMENT TARGET SL. AS ON (2015 - 16) DURING ITEM OF WORKS REMARKS FOR NO. 31.01.2016 (2015 - 16) 2016-17

1 Sinking of DTW _ Abondoned-28 Nos, (a) Rural 274 Nos 114 Nos 107 Nos In Progress = 19 Nos. Commissioning 2 of DTW In Progress = 62 (a) Rural 1511 Nos 235 nos 123 Nos 199 Nos Nos (b) Urban 158 Nos _ _ _ _ Iron Removal 3 Plant Rural - NRWDP/ (a) 810 Nos 169 Nos 93 Nos In Progress = 25 Nos 42 Nos RWS (b) Urban 75 Nos _ _ _ _ Ground Water 4 Treatment Plant _ Nos.In Progress = 38 (a) Rural 3 Nos 40 Nos 40 Nos Nos Over Head 5 Tank (a) Rural 84 Nos _ _ _ _ (b) Urban 57 Nos 3 Nos _ In progress = 3 Nos. 3 Nos Surface Water 6 Treatment Plant (a) Rural 30 Nos 15 Nos 2 Nos In Progress = 13 Nos. 16 Nos (b) Urban 17 Nos 3 Nos 1 No In Progress = 2 Nos. 2 Nos (c ) NLCPR (Urban) _ 1 No _ In Progress = 1 Nos. 1 No Small Bore 7 Tube Well In Progress = 150 (a) Rural 3353 Nos 874 Nos 336 Nos 274 Nos Nos (b) Urban 64 Nos _ _ _ _ 8 Spot Sources (a) Rural 27806 Nos 423 Nos 401 Nos In Progress =80 Nos. 112 Nos (b) Urban 2127 Nos _ _ _ _ Laying of Pipe 9 Line 9760.50 1799.00 In Progress =82.55 1518.59 (a) Rural 559.09 KM KM KM KM K.M. 1350.40 In Progress = 6.60 (b) Urban 40.00 KM 13.65 KM 30.00 K.M KM KM Rural 10 Habitation

Subject Committee-I - 87 - Coverage

NC-PC - NC-PC -3, FC - 4990, (a) Quantity 4, PC-FC NC-FC -1, _ PC-FC 850 PC - 3733 -977 PC-FC-119 NC - 2127, NC-PC - NC-PC-17, NC-PC- (b) Quality PC-2835, 231, PC- NC-FC-26, _ 450, PC- FC-3743 FC-329 PC-FC-37 FC-396 School & AWC 11 Coverage School & (a) 4765 Nos 130 Nos 95 Nos In Progress = 32 Nos. 25 Nos Madrassas Anganwadi (b) 9824 Nos 171 Nos 114 Nos In Progress = 44 Nos. 80 Nos Center

After careful examination of the Budget proposal and appreciation of submission placed by the Principal Secretary & Chief Engineer of the Department, the Committee made the following recommendations :-

1. The Department is to continue Installation & commissioning of mini- deep-tube wells in the uncovered areas and to complete the works undertaken under the scheme in a time-frame.

2. The Department is to continue maintenance of deep-tube- wells and mini deep-tube-wells and to ensure payment of electricity charges for rural areas from P.D.F and the Department is to take up the matter with NABARD, Panchayat, Rural Development Departments etc wherever necessary.

3. The Department is to continue supply of water through pipe lines to all uncovered areas. The Finance Department is to release necessary fund during R.E. 2016-17.

4. 1(one) deep tube well should be installed at Promodenagar village under Jampuijalla R. D. Block.

5. The Department is to continue maintenance of water treatment plants including revised IRPs and to ensure fitting of new IRPs in uncovered deep wells. Removal of old pipe and damaged pipelines is to be ensured and Finance Department is to provide adequate funds during R.E. 2016- 17.

6. The Department is to ensure the proper maintenance of water treatment plants including revised IRPs in the state including maintenance of the plant installed near Bholagiri (by the side of Capital Complex).

Subject Committee-I - 88 - 7. The Department is to ensure speedy construction of treatment plants, IRPS, shrinking of deep tube wells, mini deep tube wells etc. The Department is to take immediate steps for getting the damaged plants repaired.

8. The Department is to engaged for running big and mini water treatment plants & IRPs at several points under DWS and posts for Laboratory Technicians should also be created. The Finance Department should have to provide necessary fund for the purposes.

After examination of the Budget proposals and appreciation of submission of the representative of the Department, the Committee recommends the Budget proposals under Demand No.51 for Grants by the House alongwith the recommendations.

Sd/- Shri Sudhan Das Dated, Agartala , Chairman the 4th April,2016. Subject Committee- I Tripura Legislative Assembly

Subject Committee-I - 89 - THE REPORT ON THE DEMAND NO. 15 OF THE PUBLIC WORKS (WATER RESOURCES) DEPARTMENT FOR THE FINANCIAL YEAR 2016-2017.

The Budget Proposal under Demand No. 15 relates to P.W. (Water Resources) Department, Government of Tripura for the Financial Year 2016-2017 and the Revised Budget for the Financial Year 2015-2016 are as follows :- (Rs. in lakh) Particulars Revised Budget Estimates for 2016-2017 Estimates Demand Fund for Total 2015-2016 T.S.P. S.C.P. a) Non-Plan 7587.66 8316.00 -- -- 8316.00 b) Plan 3219.76 1771.00 1034.73 570.27 3376.00

C)CASP/ 1731.93 104.52 62.31 34.17 201.00 Other than CASP Total 12539.35 10191.52 1097.04 604.44 11893.00

The aforesaid Budget Proposal is under consideration and examination of the Subject Committee-I of the Tripura Legislative Assembly for recommendations to the Demands for Grants.

The Committee in its meeting 02-04-2016 examined the Budget proposal in details having discussion with the Principal Secretary & Chief Engineer of the Department as summoned.

First of all, the Chief Engineer informed the Committee about the action taken in respect of the recommendations made by the Committee during the year 2015-16 stated as follows :-

Sl. Relevant Para/ Recommendations Reply of the Government No. page No. of the of the Committee on the recommendations report 1. Page -152 S.L. No- The department is to Currently PWD(WR) is having 1592 1 of the continue maintenance of nos. Lift Irrigation , 241 nos. DTW , 45 recommendations. machines of existing nos. Diversion, 4 nos. pick-up weir and 7

nos. HPLI , 3 nos. Medium irrigation irrigation schemes and the schemes serving a command area 78653 finance department is to ha. 3678 nos. of pump motor sets consider allocation of fund alongwith accessories, 110 nos. of gate , for the same.

Subject Committee-I - 90 -

6384.438 km of pipe line 70045 nos. of hydrant etc. machineries and equipments are being maintained by the Department for the existing irrigation schemes. Government of India is pursuing a policy for collecting water charge for irrigation to meet up the cost of operation and maintenance. State Govt. has taken a strategy to collect water charges for irrigation for Rs. 50.00 per kani per crop to meet part of the cost of repair, to engage pump operator by local panchayet with monthly incentive @ Rs.3400.00 per month, to meet the cost of power consumption from panchayet fund, to do the minor repair works costing less then Rs.5000/- by the gram panchayet and to do the remaining major work of repairs by PWD(WR). Accordingly the maintenance of irrigation schemes are being continued by PWD(WR). For managing the annual repair cost reasonable estimate for the existing installations is for about Rs.12.00 crores. Current year budget provision is Rs. 6.00 crores for flood protection and irrigation . Additional assistance to meet up the actual cost of maintenance is required at least to the extent of Rs.6.00 crores.

2. The department is to Page -152 S.L. No- PWD(WR) has examined the 2 of the complete scrutiny of project report. It was found that the recommendations. project report submitted by DPR made provision for maintaining IWWA for achieving navigability in the river for 150 days

Subject Committee-I - 91 - depth of Howrah river and in a year during monsoon by to prepare master plan for maintaining depth of water for 2 mtr.

other important rivers also. by taking resort to dredging.

Similarly another DPR was prepared for Gumti river. In land Waterways Authority of India suggested that at the first phase

implementation of Gumti project may

be taken up by the state. Howrah project may be considered afterwards on the basis of experience of Gumti project.

Accordingly transport department has decided implementation of Gumti project. PWD(WR) has been assigned with job of implementation of the DPR. At the present stage, implementation or preparation of DPR for other rivers is not considered before experience of Gumti river project. It may be mentioned here that due to shortage of flow in the rivers dredging project for creating water depth in the river is not suitable except for 150 days span of monsoon period as is evident from evaluation of technical parameters during preparation of DPR of Howrah / Gumti rivers. Catchment area treatment projects initiated by Forest Department and storage project in

Subject Committee-I - 92 - upper catchment initiated by PWD(WR) would improve the water availability in stream in dry months when implemented. 3. Page -152 S.L. No- The Department is to Department has given emphasis for 3 of the continue utilization of rain utilization of rain water for irrigation by recommendations. water for irrigation. constructing minor irrigation storage

projects. Storage projects are dependant

on consent of people towards allowing

land for submergence. It is cost intensive

also. Under this constrains Department

has started construction of 17 nos of such

projects by this time to bring 3049 ha. of

land under irrigation coverage. Further

action will be taken in due course on the

basis of experience of the projects

already in progress.

4. Page -152 S.L. No- The wages of pump Recent past honorarium of the pump 4 of the operators be enhanced. operator has been increased from recommendations. Rs.2250.00 per month to Rs.3400.00 per month. However, Department is not in a position to regularize their services immediately. The monthly

remuneration of pump operators have

been fixed under consideration of their part time service in consideration of whole of the year. However, Government is sympathetic to the demand of operators and would review time to time.

Subject Committee-I - 93 -

5. Page -152 S.L. No- The Department is to Department has been maintaining 5 of the construct water reservoirs closed co-operation with the Forest recommendations in active collaboration Department for its on going projects

with the Forest and investigating appropriate sites for

Department throughout the suitable project in Forest area. Forest

State. Department is doing check Dams in

good numbers in forest land to facilitate recharge.

6. Page -152 S.L. No- The Department to ensure Department will manage the 6 of the maintenance of irrigation maintenance of existing irrigation recommendations schemes and Finance schemes. Budget estimate during

Department is to consider 2016-2017 has been made for Rs.

allocation of Fund during 6.00 crores. Department will persuade

RE 2015-2016. Finance Department to allocate more

funds to meet up the actual

expenditure for maintenance works

alongwith clearing up of 2015-2016

year ending liability for Rs. 5.00

crores. Additional fund during RE

will be demanded at least for Rs. 6.00 crores.

List of M.I Storage Schemes Work is in Progress.

1. M.I Storage Scheme over Gudam Cherra under Kathalia Block. 2. M.I Storage Scheme over Naldhepa Cherra under Kathalia Block. 3. M.I Storage Scheme over Kurulia Cherra under Kathalia Block 4. M.I Storage Scheme Over Sonai Cherra under Kathalia Block. 5. M.I Storage Scheme over Brahma Cherra under Matabari Block 6. M.I Storage Scheme over Icha Cherra under Karbook Block . 7. M.I Storage Scheme over Kasari Cherra under Rajnagar Block. 8. M.I Storage Scheme over Doaga Cherra under Rajnagar Block. 9. M.I Storage Scheme over Karma Cherra under Rupaicharri Block. 10. M.I Storage Scheme over Wakthai Cheera under Rupaicharri Block. 11 M.I Storage Scheme over Sukna chari under Shilacharri Block. 12. M.I Storage Scheme over Bet Cherra under Kumarghat Block.

Subject Committee-I - 94 -

LIST OF DTW SCHEMES WORK IN PROGRESS

Name of Block:- Jirania

1 D.T.W Scheme at Near the House of Anabik Dey

Name of Block:- Old Agartala

2 D.T.W. Scheme at Kalinagar Market

Name of Block:- Hezamara

3 DTW scheme Near the House of Samriti

4 DTW scheme Near the House of Tanini Debbarma

Name of Block:-Dukli

5 DTW scheme at Dukli

Name of Block:- Kalyanpur D.T.W. Scheme at Purba Kalyanpur near the Satsangha Ashram 6 (Madhya Kalyanpur G.P) Name of Block:- Tulashikhar

7 DTW scheme at Binanhazari J.B School under Laxmichera

Name of Block:- Padmabill

8 DTW scheme at Sri Ramthakur Para

9 DTW Scheme at Paglabari

Name of Block:-Nalchar

10 DTW Scheme at Rampadapara ADC Village.

Name of Block:-Boxanagar

11 DTW scheme at Uttarmath

Name of Block:- Jampuijala.

Subject Committee-I - 95 - 12 DTW scheme at Gamanthakur para

13 DTW Scheme at Duigharia under Ratanpur ADC Village.

Name of Block:-Kathalia

14 DTW Scheme at Barmura.

Name of Block:-Bishalgarh

15 DTW scheme at East Kasba.

Name of Block:- Kakraban

16 DTW scheme at Kalacherra (Near Masjid.

17 DTW Scheme at Batkhet F-I.

Name of Block:- Sathchand 18 DTW Scheme at South Bhuratali Near Bazar. 19 DTW Scheme at Indiranagar near the land of Amal Datta. 20 DTW scheme at Taichama cherra near panchayet office.

Name of Block:- Hrishyamukh 21 DTW scheme at Rajnagar(Matai).

23 DTW Scheme at U.B.C Nagar.

Name of Block:-Ambassa 24 DTW Scheme at Dhanaban reang Para Para. LIST OF DIVERSION SCHEMES IN COMMISSIONING STAGE

1) Diversion Scheme over Monai Cherra under Padmabill Block

2) Diversion Scheme over Maharani Cherra at Mendi under Salema Block.

LIST OF DIVERSION SCHEMES WORK IN PROGRESS

1) Diversion Scheme over Sonai Cherra under Hezamara Block.

2) Diversion Scheme over Saida Cherra under Kumarghat Block .

3) Diversion Scheme at South Padmabill over Deo Cherra under Panisagar Block .

Subject Committee-I - 96 -

List of Schemes Commissioned During the year 2015-2016 as on 29.02.2016

S.L Name of Scheme Name of Name of Date of No /Work District Panchayet/Village Commissioning

1. L.I Scheme at Mailak Gumti District Purba Malbasa Commissioned on under Amarpur Block. V.C 15.01.2016

2. DTW Scheme at Shephahijala Rajibnagar G.P Commissioned on Rajibnagar Math under District August, 2015 Nalchar Block.

Physical Achievements during 2015-2016(upto February, 2016):  1 no. LI , 1 no. D.T.W scheme have been commissioned.2 nos. Diversion schemes, 5 km new length of canal in Muhari irrigation project and 8 km new length of Gumti right bank canal is in a stage of commissioning.

 Good progress has been made in other 24 nos. DTW, 5 nos. Diversion and 12 nos.

M.I storage schemes.

 The work of the Khowai Medium irrigation project is completed.

 The works of Gumti project progressed near to completion.

 The remaining work of Manu Irrigation project being progressed slowly due

to reluctance of land owners to part with land.  In total 1245 ha. would be brought under irrigation by the PWD(WR) during 2015- 16.  500 mtr. of anti-erosion work has been completed and progress has been made for more 1000 mtr.

Subject Committee-I - 97 -

Annual plan for 2016-17:  To complete the continuing 41 nos. schemes of 2015-2016.

 To take up new 14 nos. LI, 50 nos. DTW and 49 nos. Minor Irrigation Storage schemes.

 Action Plan for new irrigation coverage during the year is 4500 Ha.  2.0 Km of new anti-erosion works would be done.

Subject Committee-I - 98 -

Subject Committee-I - 99 -

Subject Committee-I - 100 - After careful examination of the Budget proposal and appreciation of submission placed by the Principal Secretary & Chief Engineer of the Department, the Committee made the following recommendations :-

1. The Department may approach NABARD for some new construction of irrigation schemes and for maintenance. Finance Department is to consider allocation of additional fund during R-E 2016-2017. Department is to take step to prevent soil erosion and shrinkage of agricultural land.

2. The department is to complete scrutiny of project report submitted by IWWA for achieving depth of Howrah River and to prepare master plan for other important rivers also.

3. The Department is to continue utilization of rain water for irrigation.

4. The Department may examine the matter of enhancing wages etc. of Pump Operators of W.R and DWS department whenever DA is enhanced by the Finance Department for staff of other departments.

5. The Department is to continue to create big water reservoirs in active collaboration with the Forest Department for irrigation purpose.

6. The Department is to propose to Finance Department for allocation of fund during R-E 2016-2017 in respect of ongoing projects, whenever necessary.

After examination of the Budget proposals and appreciation of submission of the representative of the Department, the Committee recommends the Budget proposals under Demand No.15 for Grants by the House alongwith the recommendations.

Sd/- Shri Sudhan Das Dated, Agartala , Chairman the 4th April, 2016. Subject Committee- I Tripura Legislative Assembly

Subject Committee-I - 101 - THE REPORT ON THE DEMAND NO. 29 OF THE ANIMAL RESOURCES DEVELOPMENT DEPARTMENT FOR THE FINANCIAL YEAR 2016-2017.

The Budget Proposal under Demand No.29 relates to the Animal Resources Development Department, Government of Tripura for the Financial Year 2016-2017 and the Revised Budget for the Financial Year 2015-2016 are as follows :- ( Rs. in lakh) Particulars Revised Budget Estimates for 2016-17 Estimate Demand Fund for Total 2015-2016 T.S.P. S.C.P.

5150.00 5705.00 5705.00 a) Non-Plan -- --

3417.26 1672.20 1050.77 574.03 3297.00 b) Plan c)CASP/Other 1832.05 745.98 487.19 285.42 1518.59 than CASP Total 10399.31 8123.18 1537.96 859.45 10520.59

Now, the aforesaid Budget proposal is under examination of the Subject Committee-I of Tripura Legislative Assembly for recommendations to the Demands for Grants.

The Committee in its meeting held on the 2nd April, 2016 examined the Budget proposals in details having discussion with the Special Secretary of the Department who appeared before the Committee as summoned.

First of all, the Special Secretary informed the Committee about the action taken in respect of the recommendations made by the Committee during the year 2015-2016 and stated as follows :-

Sl. Relevant para/page Recommendation Reply of the Government on the No No. of the report of the Committee recommendations. The Department is State Govt. has decided to cover each 01. Page No.130 & to continue Gao- Panchayat with a vety. Sub-Centre Recommendation establishment of to ensure animal health coverage and No.i Veterinary Sub- sanctioned a proposal in this regard. centre at all During 2013-14 Rs 243.00 lakh was Panchayat & released in the Ist phase for construction Village level. of 25 nos. new Vety. Sub Centre and works for 24 subcentres are completed work for the rest one will be started soon. Again during 2015-16 Rs 297.00 Lakh

Subject Committee-I - 102 - was released for construction of 29 subcentres and Work of these sub- centers are in progress and will be opened once the construction is completed. Page No.130 & The Department is The Department of ARDD is continuing Recommendation to continue artificial insemination activities in the 02. No .ii Artificial state. During the year 2015-16 total insemination in the number of A.I. done up-to December is tribal areas and to 1,11,759 nos. & anticipated achievement organize awareness during the year is 1.60 lakh. Target for AI camps. for the year 2016-17 is 1.80 lakh To encourage artificial insemination in TTAADC areas Dept, is organizing awareness camps, fertility camps and also supplying calf growth meal at subsidized rate to cross bred female calves born out of artificial insemination. Department has extended A.I facility to Laxmipati in Gomoti District in TTAADC area during 2015-16. Moreover, 25 nos of crossbred bulls distributed in TTAADC area for natural service during 2015-16. Also, ARDD, TTAADC is providing incentives to owners and motivators for each AI and calf born. Page No.130 & The Department is Department is coordinating & sponsoring 03. Recommendation to set up 5 (five) setting up of Mini dairy linking with bank No.iii nos of Mini- loan by unemployed youths. Out of 136 Dairies with supply nos. cases were sponsored during 2015-16 of adequate green and 39 cases have been sanctioned up-to fodder for each December, 2015. block. Finance Department to consider allocate fund for the same. Page No.130 & The Department is 48 nos DSWAI trained during 2015-16 for 04. Recommendation to continue to engaging in un covered places and out of No. iv engage Door step this 5 nos are from ADC areas. Refresher A.I workers in training is being organized for reviving other vacant places the earlier A.I workers. and to revive the earlier A I workers. Page No.130 & The Department is Under NEC scheme department received 05 Recommendation to continue its approval for Rs 360.00 lakh for providing No. v efforts towards 400 nos. of Crossbred pregnant heifer production of milk procured from outside the state to farmers & egg by for increasing milk production in the state. establishing more 80 nos pregnant heifers have already been farms including distributed in the 1st phase. goatery . During 2015-16, 38 nos new Block level

Subject Committee-I - 103 - brooder houses (BLBH) have been sanctioned under MGNREGS to enhance egg production in the state. Department received Rs 20.00 lakh during 2014-15 and Rs 20.00 Lakh during 2015- 16 for strengthening of Devipur goat breeding farm under CSS – IDSRR.

DRAFT ANNUAL PLAN, 2016-17

Summary: During 2014-15 total annual production of milk, meat & egg was 1,41,430 MT, 34,815.74 MT & 19.79 crores respectively. The state has achieved self sufficiency in meat production. The per capita availability of Meat, Milk & egg have been 9.08 Kg per year, 101.00 gm/day, and 52 nos./year respectively. At the end of the financial year 2015-16, the production level of milk, meat and egg is anticipated to reach up-to 1,54,159 MT, 38,190 MT and 22.00 Crore respectively with per capita availability of 108.60 gm milk per day, 9.82 kg meat per year and 56 nos eggs per year. Utilizing the total released fund during 2015-16 the Department would provide health coverage to 6.55 lakh animals, 61.90 Lakh vaccination, 1.60 lakh artificial insemination, supplied balanced ration to 3554 nos heifers under Heifer rearing scheme, implemented 1272 units of beneficiary oriented piggery scheme, conducted 100 nos calf rallies and 1000 nos animal health cum awareness camp besides development of 4758 fodder plots.

1. Background:

The Animal Resources Development Department promotes production of Animal origin food i.e. Milk, Meat & egg to meet the requirement of the people of the state. The Department undertakes up-gradation of the local low yielding stock of all species of economically important domesticated animals through Artificial Insemination & other breeding practices apart from supply of high yielding variety of livestock & birds from its breeding farms. It also renders Veterinary services for Curative & Preventive health care for animals & birds through its intensive network of Veterinary Hospitals, Veterinary Dispensaries, Veterinary Sub-Centres, Disease Investigation Laboratories etc. for protection of Livestock health of the state.

The livestock sector plays a vital role in the rural economy and supports small and marginal farmers both economically and nutritionally. In recent years, considerable interest has been developed among both rural and urban people in taking up modern A.H. practices with high yielding variety of livestock and birds as subsidiary as well as main economic activity, in spite of hurdles in respect of high feed cost and scarcity of improved variety of Animal Husbandry inputs. With the support of the State Govt. in creating gainful employment avenues based on animal resources under different rural development programme, Animal Resources Sector has taken a momentum for further development. The State is facing a number of challenges in boosting up productivity of milk. To mitigate the gap between requirement and availability of milk, it is considered essential to introduce special drive for augmenting productivity of cattle as well as production of milk. As per the Livestock Census 2012, total bovine population of the state is 9.61 lakh,

Subject Committee-I - 104 - out of which 1.35 lakh (14%) is crossbred cattle whereas 8.26 lakh are non-descript cattle. The non-descript cattle are very poor milk yielder – about 1.43 liters/day during 200 days of lactation. The state is trying to enhance the production by increasing the productivity through crossbreeding.

2.1. Year wise Targets & Achievements in Perspective Plan and after: The yearwise targets & achievements of Milk, Meat & Egg production since starting of perpective Plan is shown below:

Year Physical Milk (in MT) Meat (in MT) Egg (in Crore) Target Achievement Target Achievement Target Achievement 2002-03 81,000 80,605 7,394 7,500 11.99 9.95 2003-04 88,000 82,672 8,353 8,400 12.84 10.05 2004-05 85,000 85,519 20,690 8,900 10.56 10.71 2005-06 95,000 87,000 22,070 12,151 12.63 11.00 2006-07 1,10,000 88,683 22,840 12,637 18.06 11.93 2007-08 91,340 91,312 14,153 14,098 13.36 13.20 2008-09 95,910 95,598 16,134 19,226 15.36 13.89 2009-10 1,02,623 1,00,640 18,715 21,102 18.12 14.42 2010-11 1,07,476 1,05,366 25,765 23,436 18.40 15.70 2011-12 1,15,986 1,10,300 33,646 25,000 20.56 16.50 After Perspective Plan 2012-13 1,15,594 1,18,042 26,875 31793 17.49 15.65 2013-14 1,21,259 1,29,699 29,025 33,132 18.63 17.94 2014-15 141373 141430.67 35158.36 34815.74 20.45 19.79

2.2. Target & achievement during11th plan period (2007-08 to 20011-12) in respect of various monitoarable parameters:

Item Unit 11th Plan Target Achievement Animal Health Coverage Lakh Nos. 32.00 25.37 Vaccination Lakh Nos. 100.00 257.11 Artificial Insemination Lakh Nos. 9.30 5.28 Credit Link Dairy Demo. unit Nos. 600 538 Fertility Camp Nos. 1500 1321

3. Approach to 12th Five Year Plan and Annual Plan 2015 pertaining to Animal Resources Sector: Vision: To bridge the gap between demand and supply of animal origin food through augmentation of production and productivity of livestock and birds.

Subject Committee-I - 105 -

3.1. Constraints in various sectors: 3.1.1 Milk Sector: 1. Inadequate availability of buffalo & other High yielding varieties of cow/cross-bred cow. 2. High cost of balanced cattle feed. 3. Traditionally N.D. cattle are reared for production of male calves for agricultural Operation especially in rural areas. 4. Because of religious sentiment, villagers do not object to presence of stray bulls which causes natural services & scope of upgrading through artificial Insemination is minimized. 5. Price of milk is not remunerative in remote parts of the state.

3.1.2 Meat Sector:

1. Less emphasis on selective breeding and management of Goat as well as early slaughtering resulting in reduced carcass yield 2. Instead of processed meat, people mostly prefer to take fresh fleshes. 3. Broiler sector is totally dependent on outsourcing of inputs. 4. Ingredients for pig feed are not readily available in the state. 5. Tapioca, a substitute for pig ration is also shared by human beings.

3.1.3 Egg Sector:

1. Organized Layer Farm is not profitable as production cost of egg is higher than imported eggs due to high cost of feed. 2. Lack of awareness among the poultry farmers for vaccination of their birds against Poultry diseases. 3. Performance of Khaki Campbel Ducks in the field is not up-to their potential.

4. Strategy to overcome the bottlenecks:

The sector wise specific strategies were chalked out based on the constraint identified and as per recommendation of the Sub-Committee of Tripura Planning Board, the sector wise strategies are as follows:

4.1. Milk sector: 1. Genetic up-gradation of local cattle there by enhancement of productivity. 2. Improving reproductive health of female cattle. 3. Improving Artificial Insemination infrastructure. 4. Prevention and control of animal diseases. 5. Fodder development to minimize the input cost. 6. Castration of local bull to increase number of calf born through Artificial Insemination. 7. Massive awareness programme to popularize AI & CB cow rearing and vaccination. 8. Marketing arrangement of milk and milk by-product.

4.2. Meat Sector:

1. Slaughter of male goats at appropriate age to increase carcass yield. 2. Popularization of exotic piggery through beneficiary oriented scheme. 3. Strengthening of Govt. Pig breeding Farm to increase supply of exotic germ-plasm to the farmers.

Subject Committee-I - 106 - 4. Entrepreneurship development in pig sector. 5. Technical support to private broiler farmers.

4.3. Egg sector:

1. Increase coverage of Rural backyard Poultry farming. 2. Strengthening of govt. poultry farms to supply required number of germ-plasm to the BLBHs. 3. Providing subsidy for promotion of Layer Farming. 4. Massive awareness for control of diseases in backyard poultry.

5. Thrust Areas:

5.1. Milk Sector

. Massive awareness for Artificial Insemination and CB cow rearing. i. Fertility camps for improving conception rate. ii. Induction of high yielding crossbred and indigenous cattle. iii. Supply of subsidized feed for CB heifers. iv. Mass De-worming programme & supply of Mineral Mixture. v. Popularization of castration through providing incentives to farmers. vi. Incentivizing Door- step AI Workers for calf born and survival. vii. Holding of Milk yield competition, calf rally. viii. Mastitis control programme. ix. Capacity building of farmers in management of CB cows & calves. x. Development of Pasture land in each block. xi. Growing fodder crops during intercropping period.

5.2. Meat Sector

xii. Setting up of piggery units under RKVY. xiii. Strengthening of Govt. Pig Breeding Farms. xiv. Strengthening of Govt. goat breeding farm at Devipur. xv. Tapioca cultivation in farmers land under MGNREGA for rearing pigs.

5.3. Egg Sector

xvi. Setting up of new BLBH under RKVY. xvii. Strengthening of existing BLBH. xviii. Strengthening of infrastructural facilities in Govt. Poultry Farms. xix. Control of major poultry diseases through mass vaccination.

5.4. Veterinary Service Sector:-

xx. Expansion of Veterinary service network to ensure one vety. centre in each Gram panchayet / ADC villages. xxi. Strengthening of infrastructure of veterinary College to its highest standard, to facilitate research and human resources development.

Subject Committee-I - 107 - 6. Women Component: xxii. Respecting the ongoing national campaign on gender equality, due emphasis is given on empowerment of women by targeting financial allocation for women. In order to ensure active involvement of women in animal resources based activities and in accordance with 28 Point Action Plan for empowerment of women, it has been planned to involve at least one third woman beneficiaries in all the development activities of the department like promotion of rural backyard poultry, breed up gradation of cattle, beneficiary oriented schemes for development of fodder and piggery etc. xxiii. By and large, the livestock farming in Tripura is mainly in the hands of poor marginal and small farmers where house-hold farming is practiced. Since individual land holdings are small, the unit size of livestock and birds are also small. Even the landless farmers are keeping some poultry birds, goats and pigs which are mainly maintained by the womenfolk. They not only provide food and shelter to the domestic animals and birds but also attend the veterinary institutions rendering health care facilities for treatment and prophylaxis of pets when their male counterpart is away for earning the livelihood through other means. Thus, they are the actual rearer of most of the livestock and birds. During 2010-11, actual expenditure incurred towards women component is around 185.00 lakhs and the anticipated expenditure during 2011-12 is 190.00 Lakhs. xxiv. During 2015-16, provision for an amount of Rs 350.00 lakh was kept under women component. During 2015-16, around 35,237 nos. of women beneficiaries were covered under animal health care facilities including treatment, vaccinations, 2965 women beneficiaries were trained in scientific management of livestock and birds. In addition, around 55 nos girl students have been sponsored for undergoing B.V.Sc. & A.H courses in various Veterinary Colleges of the country and provided with scholarship for the last 5 years up-to 2015. In the annual budget of 2016-17 Rs 450.00 lakh has been proposed under women component.

7.Physical targets in respect of Key indicators: milk, meat & egg: Achievement during 12th Plan Period Parameters 2012-13 2013-14 2014-15 2015-16 2016-17 Projected human - 37.80 38.33 38.88 39.43 Population (In Lac) Milk production (in MT) 118042 1,29,700 1,41,430 1,54,097 1,67,965 Per Capita 86.82 94.01 101.00 108.47 116.50 Availability(gram/day) Meat production (in MT) 31793 33168.27 34815.74 37,267 39,503 Per Capita 8.53 8.77 9.08 9.56 10.00 Availability(Kg/year) Egg production (in Crore) 15.65 17.94 19.79 23.31 26.58 Per Capita 42 47 52 60 67 Availability(Nos./Year)

Subject Committee-I - 108 - 8. Physical Target of 12th plan period in respect of various monitorable parameters: Item Unit 12th Plan Target 2012-13 2013-14 2014-15 2015-16 2016-17 Total Animal Health Lakh 7.00 7.00 7.00 7.00 7.00 35.00 Coverage Nos. Vaccination Lakh 60.00 60.00 60.00 60.00 60.00 300.00 Nos. Artificial Lakh 1.60 1.70 1.80 1.90 2.00 9.00 Insemination Nos. Credit Link Dairy Nos. 150 150 150 150 150 750 Demo. unit Fertility Camp Nos. 200 200 200 200 200 1000

9. Physical Target and Achievement of 2013-14, 2014-15 and Physical Target 2015-16:

Sl. Item Physical Achievem Target Achievem Achievemen Propose No Target ent ent Target t ( upto Jan, d Target 16) 2013- 2013- 2014- 2014- 2015- 2015-16 2016- 14 14 15 15 16 17 1 Animal Health 7.00 6.38 7.0 6.45 7.00 5.05 Coverage(in Lakh) 2 Vaccination (in 80.00 66.95 80.00 64.77 80.00 60.31 80.00 Lakh) 3 Artificial Insemination(in 1.70 1.44 1.70 1.55 1.70 1.29 1.80 Lakh) 5 Fertility 400 400 400 276 400 400 400 Camp(Nos.) 6 Strengthening/Esta blishment of Block Level Brooder - - 10 10 70 38 50 House (BLBH) for rearing of Chicks(No.) 7 Beneficiaries to be covered under Rural Backyard 5400 5400 9000 - 2500 3000 3000 poultry scheme (Nos.) under CASP 8 Supply of Calf Growth Meal@ 1020 kg/calf up to 28 month of age 5000 2662 5000 3169 5000 3554 5000 at 50% support price

Subject Committee-I - 109 - 9 Implementation of beneficiary - oriented piggery 137 69 137 68 - -

scheme(No.) (RKVY) 10 Setting up of beneficiary oriented Pig 323 323 1200 715 1200 1272 1272 breeding unit for Patta holders 10 Development of 5500 2542 5700 2231 5700 4758 5700 fodder plots(Nos.) 12 Conducting Calf rallies & milk yield 100 100 100 100 100 100 100 competition 13 Conducting Animal health-cum 1000 1000 1000 1000 1000 1000 1000 awareness camps, under CASP

Financial Achievement under CSS/ NEC schemes during 2014-15 & 2015-16 and proposed activities to be taken up during 2016-17

Financial Target Achievement Sl. Proposed Schemes Achievement (in Upto Dec, Remarks No. Target (in Lakh) Lakh) 2015 CSS- 2014-15 2015- 2015-16 2016-17 16 1. National Plan for Funds Dairy 642.17 600 550.70 600.00 utilized by Development Tripura livestock Dev Agency (TLDA) 2. National 243.90 420.59 Fund under Livestock Health 68.81 420.59 CSS- ASCAD. & Disease Control 3. National 403.55 400.00 Fund Livestock 400.00 includes Management Rural Programme Backyard poultry, Piggery, Fodder etc. NEC 1. Distribution of CB - 288.20 129.60 Project pregnant heifer sanctioned

Subject Committee-I - 110 - during 2013- 14 2. Establishment of 6.974 Broiler Duck Breeding farm at R.K.Nagar 3. Modernization & Retained by Strengthening of 246.60 67.90 101.00 NEC, REPBF, Nalkata Sanction awaited 4. Strengthening of EPBF, B.C.Manu 139.90 5. Strengthening of Project Veterinary sanctioned Healthcare 210.60 - - during 2011- Service through 12 Development of Infrastructure SPA/SCA i) Establishment of New Veterinary Sub-centre for extending - Veterinary Health 1 care Service. 225.00 297.00 iii) Establishment of Vety College 250.00 600.00 ii) Vertical extension of VTI, 98.00 R.K.Nagar Establishment of 2 126.00 126.00 - - 10 nos BLBH

After examination of the Budget proposal and appreciation of submission placed by the Special Secretary of the Department, the Committee made the following recommendations:-

1. The Department is to continue establishment of Veterinary Sub-centres at all Panchayets & Village Committees attaching more priority to those having larger cattle population.

2. The Department is to continue artificial insemination in the Tribal areas and to organize awareness camps.

Subject Committee-I - 111 - 3. The department is to continue to implement construction of mini dairies with supply of adequate green foder for each block.

4. The Department is to continue to engage DSWAI in other vacant places.

5. The Department is to continue its efforts towards increasing its production of milk and eggs by establishing more farms including goatery.

After examination of the Budget proposals and appreciation of submission of the representative of the Department, the Committee recommends the Budget proposals under Demand No. 29 for Grants by the House alongwith the recommendations.

Sd/- Shri Sudhan Das Dated, Agartala, Chairman the 4th April, 2016. Subject Committee- I Tripura Legislative Assembly

Subject Committee-I - 112 - THE REPORT ON THE DEMAND NO. 27 OF THE AGRICULTURE DEPARTMENT FOR THE FINANCIAL YEAR 2016-17

The Budget proposal under Demand No. 27 relates to Agriculture Department, Government of Tripura for the Financial Year 2016-2017 and the Revised Budget for the Financial Year 2015-2016 are as follows :- (Rs. in Lakhs)

Budget Estimates For 2016 - 2017

Particulars Revised Demand Fund for Estimates 2015 - 2016 Total T.S.P S.C.P 1) Non Plan 12803.89 14204.80 ------14204.80 2) Plan 11676.80 6845.24 4565.85 2555.41 13966.50 C)CASP/Other 8948.62 3972.00 2551.24 1377.76 7901.00 than CASP Total 33429.31 25022.04 7117.09 3933.17 36072.30

Now, the aforesaid Budget Proposal is under examination of the Subject Committee-I of the Tripura Legislative Assembly for recommendations to the Demands for Grants.

The Committee in its meeting held on 02-04-2016 examined the Budget Proposals in details having discussion with the Secretary & Director of Agriculture of the Department who appeared as summoned.

First of all, the Secretary informed the Committee about the action taken in respect of the recommendations made by the Committee during the year 2015-16 and stated as follows :-

Relevant Recommendation of Sl. Para/ Page the committee Reply of the Department on the recommendation No No. of the (2015-2016) Report

- There are 649565 nos. of farmers in the state as

I, I, P Kissan Credit Card - per 2011 census. Since inception of KCC in the (K.C.C) Scheme to 1 year 2000-2001, 568725 nos. farmers have been

be extended to rest benefitted through KCC in the state up to March; I, Subject

92 92 to 111. uncovered families. Committee

Subject Committee-I - 113 - 2015. In the year 2015-16 the target was 50,000 KCC including issuance of new KCC and renewal of old KCC and 48853 nos new KCC have been issued and 21,182 nos KCC have been renewed upto 31st December, 2015. It is expected that by 2016-17 rest uncovered families may be brought under the scheme. A major numbers of KCC have become defaulter till now. At present only 2,86,024 nos of

KCC are active. It is being regularly pursued to bring the defaulters or inactive (282701 nos) KCC holders under regular loaning. The target for KCC during 2016-17 has also been kept at 50,000 nos. The State Government is providing all kind of supports to banks in organizing awareness campaign etc throughout the State to bring all uncovered families under the scheme. Farm power availability in the State is increased to 1.03 kw in 2014-15 as against 0.93 kw in 2013-14 and trying to reach up to the National levelof 1.25 kw within a few years. In spite of different limitations like small size of holding, purchasing capacity of farmers, the Department of Agriculture is always trying to bring new farm machineries suitable for the State to reduce the The Department is cost of cultivation as well as to make the farmers to continue its for timely sowing of crops thereby making performance profitability of farmers. Keeping such mandate of towards the department, demonstration of following 2 introduction of improved small machine & equipments have been modern machine done during 2015-16 in Mohanpur, Jirania, for agriculture, Teliamura and Bishalghar Agri. Sub-Division. training and Apart from these, demonstration in Melaghar, demonstration. Khowai and Teliamura Agri. Sub-Division will be done very shortly. 1. Power Tiller below 8 B.H.P. 2. Seed Treatment Drum. 3. Paddle Operated Seed Grader. 4. Tree Pruner. 5. Chain Saw. 6. Power Paddy Weeder.

The prime objective of the Department is to The Department is ensure availability of Seeds to the farmers of the to continue supply 3. State well in time and accordingly Agriculture of seeds to farmers in time department is always taking all out efforts to supply seeds of different crops to the farmers prior to every season. Keeping in view, following

Subject Committee-I - 114 - are some of the actions are taken by the department. a. Department of Agriculture is catering the need of different Agricultural Crop Seeds to the farming community in time through own seed production programme as well as procuring from outside State. b. Seeds, produced from own Seed Production Programme are being distributed in time to the farmers well ahead of the season. c. About 81% of Agricultural seeds are being produced in the State through Registered Seed Growers Programme and the State has to depend for only 19% of seeds from outside sources, out of the total requirement. d. An action plan for production of rest of the requirement of seeds has been also been chalked out to reduce dependency of seeds from outside. e. Further, seeds procured from outside State sources are also being distributed in time to the farmers except in few situations like:- 1. Transportation problems. 2. Delay in getting beneficiaries list. 3. Replacement of seed where there is report of less germination.

Therefore, Department of Agriculture is trying to distribute seeds well in time of cropping season to the farmers.

It may be mentioned here that, since last few years department is producing surplus quantity of HYV Paddy and Mustard seed which are being marketed through National Seed Corp. Ltd. to out side States.

Subject Committee-I - 115 -

The Department is To disseminate the Agricultural technology at the to arrange setting doorstep of the farmers, setting up of Agri Sub- up of officers of the Divisions conterminous with Block is the priority Superintendent of of the Department. To keep parity with this Agriculture with objective, with the limited resources, the posting of required department has decided to open following 15 staff on priority (Fifteen) nos. new Agri. Sub Divisions in addition basis at Blocks to previous 22 nos. and 9(Nine) nos. of these which are new Agri Sub-Division have already started their uncovered still. functioning.

Sl. Name of New Agri. Block to be Remarks No. Sub-Division covered 1. Damcherra Damcherra & Started Jampui Hill functioning 2. Gaurnagar(H.Q. at Gaurnagar & Kailasahar) Chandipur

3. Ambassa Ambassa & Started Ganganagar functioning 4. Durgachowmuhani Durgachowmuhani

92 to 111. 92 (H.Q. at Kamalpur) -

5. Kalyanpur Kalyanpur I, P I, - 6. Padmabil Padmabil Started 4 functioning 7. Hezamara Hezamara Started functioning 8. Jampuijala Jampuijala Started functioning 9. Mohanbhog Mohanbhog I, Subject Committee 10. Kathalia Kathalia Started functioning 11 Hrishyamukh (H.Q. Hrishyamukh & Present at Belonia) Belonia MC S.A.Rajnagar Office will be renamed as S.A. Hrishyamukh and S.A. Rajnagar office with H.Q. at Rajnagar has started its functioning covering Rajnagar & Uttar Bharat Chandra Nagar

Subject Committee-I - 116 - Blocks. 12. Karbook Karbook & Started Silachari functioning 13. Ampi Ampi 14. Killa Killa Started functioning 15 Kakraban

The Department is always making it’s best efforts in transferring modern technologies to the farmers in production of crops for profitability of the farmers in the State. Adverse effects of aberrant weather, such as erratic and scanty rainfall and draught are very common in the State. Under this aberrant weather situation dependence on one or two crops are always risky. Keeping in mind of this weather situation For production of following are some of the strategies followed by specific Agri. the department. Products 1. Exploitation of ground water potential and throughout the conservation of surface water through year, the installation of Small Bore Deep Tube Well 5 Department is to continue (SBDTW). introduction of 2. For increasing foodgrain production modern scientific vertically, Hybrid Paddy cultivation has method for the been taken up in a large scale. same. 3. Low input base paddy cultivation through System of Rice Intensification (SRI). 4. Production and distribution of Organic Fertilizer, Bio-fertilizer, Organic Manure, Vermi Compost. 5. Bringing more area under Pulses and Oilseeds by utilizing seasonal rice fallows. 6. Varietal replacement in major crops. 7. Farm Mechanization 8. Technology transfer.

A. Agricultural Markets:- There are about 554 nos. markets in the State out of which 21 nos. are Regulated Market

The Department is controlled by the Agriculture Department. The 92 to 111. 92

- to continue department is developing new market shades, I, P I,

- operation of sale sale halls and other market infrastructures markets, cold regularly in every year under schemes like RIDF, 6 storage and cold RKVY and NEC etc as per availability of fund. chambers in the uncovered Beside this, routine maintenance and repairing of important markets. market infrastructures is also being taken up in every year under state plan or as per availability

of fund in any other scheme. I, Subject Committee

Subject Committee-I - 117 - B. Cold Storage :-

Up to the year 2015-16 ,9(nine) nos. departmentally run cold stores are in operation with the storing capacity of 15000 MT, out of which 2(Two) nos. cold stores (Udaipur- 2000 MT, & Ambassa – 1000 MT) have come into operation from this season. Works of 2(Two) more cold stores one at Bagbasa(Dharmanagar) and another at Khowai are in progress. Another cold store at Machmara with the capacity of 1000 MT will also be constructed in the next financial year. It is found that till now maximum76% cold store space could be utilized with potato. As more three nos government cold stores are going to be added, increasing total space up to 18000 MT under government sector and alongside private storage capacity of 19,000 MT (Sherwali-5000MT, Chechuria-4000MT, Haflong-5000MT, Harina- 5000MT), it is necessary to reassess actual requirement of cold storage space in the state, before conceiving any new project on new cold storage.

C) Cool Chambers:- 5 nos Cool chambers are being constructed in Bishramganj, Sekerkot, Khayer pur, Sonamura and Nalua( for betel leaf),one in each location. One cold store at Bishramganj had been completed and others would also be completed shortly. But it was seen that, in no case any market committee, Panchayat body or any other agency came forward for taking the responsibility of operation and maintenance as per provision of the project.

So, it would be judicial to take up project on more new cool chambers after assuring successful utilization of these cool chambers,

Subject Committee-I - 118 - HIGHLIGHTS OF IMPORTANT ACHIEVEMENTS OF THE DEPARTMENT DURING FINANCIAL YEAR 2015-16:

A. PHYSICAL PROGRAMME-2015-16

Being Agriculture is the leading sector of the economy in the state and more than 70 percent of the population in the state are directly or indirectly involved in agricultural activities for their livelihood, the Agriculture department had implemented a long term Perspective Plan, due to which achievement in the food front, particularly in paddy, has been spectacular. Improved methods of cultivation including the adoption of new technologies like SRI have been able to raise the yield of crops. The present level of cropping intensity is 189%(Prov.) which indicates that the farmers in plain land take at least two crops in a year; in some cases it is more than two, where assured irrigation facilities are existing.

The farming communities of Tripura are intelligent and very quick in receiving new technology in their small piece of land for ensuring bigger harvest. The benefits of Perspective Plan has still been continuing and led to the increase of food grain production from 5.13 lakhs MT during 1999-2000 to 7.62 lakh ton in 2014-15. The anticipated production during 2015-16 is 8.12 lakh M.T.

Major works in progress during 2015-16 include cultivation of Hybrid Paddy and HYV Paddy through System of Rice Intensification ( SRI), Installation of Small Bore Deep Tube Wells(SBDTW), Establishment of Farmers’ Knowledge Centre, Construction of Cold Storages and Fertilizer Godowns, Establishment of Mini Modern Rice Mill in Unokoti and Gomti District. Special emphasis has also been given to increase area under Hybrid Paddy cultivation for increasing production, productivity and profitability of the farmers. Action plan for utilizing seasonal fallow land under ‘Crop Diversification’ programme mainly with suitable pulse and oilseed crops has also been implemented with greater thrust and an anticipated 26000 ha area will be covered during the current financial year as against 15058 ha in 2014-15. Mission Organic Value Chain Development for North Eastern Region to cover 2000 ha area under organic farming, installation of 2000 nos. Small Bore Deep Tube

Subject Committee-I - 119 - Wells(SBDTW) with assistance from MG-NREGA are among few new initiatives taken by the Department. A Master Plan for increasing production and productivity of agriculture and allied sectors has been prepared for implementation in the land vested to the inhabitants in the RoFR under Forest Right Act, 2006. Special initiatives have been taken for a period of five years for increasing livelihood opportunities in 10000 ha. areas. Department has taken initiatives for establishment of Mini Modern Rice Mill in Unokoti and Gomati District to minimize milling loss from paddy to rice which is about 10 to 15 % at present for enhancing scope of marketing as well as profitability of the farmers in those districts. Agriculture Department has been taking active role in issuance of Kisan Credit Cards to all eligible farmers also sanction of required loan through their cards for higher investment and return from agricultural practices. According to the report of Lead Bank of the State, i.e United Bank of India 29143 Nos. farmers have been provided crop & term loan under Agriculture up to September, 2015 with the involvement of Rs. 9901.92 Lakhs as against the target of fifty thousand.

Initiatives have been taken to improve the infrastructure support Primary Rural Markets with the financial support from NABARD. To increase the Cold Storage capacity in the state, 3 new cold storages with 4000 MT additional capacity are coming up at Khowai, Bagbassa (Dharmanagar) and Machmara of Unokoti District.

Target and anticipated Achievements during 2015-16

Crop Area in Lakh Ha. Area in Lakh MT Target Anticipated Ach. Target Anticipated Ach.

Rice 2.833 2.718 8.492 7.997 Maize 0.144 0.084 0.194 0.115 Pulses 0.31 0.22 0.257 0.141 Oilseeds 0.15 0.117 0.146 0.096 Cotton 0.01 0.008 0.016 0.013 Jute & Mesta 0.014 0.011 0.151 0.095

* Production target of Cotton is in bales of 170 kg per bale # Production target of Jute and Mesta is in bales of 180 kg per bale

Subject Committee-I - 120 - IMPORTANT PROGRAMMES PLANNED TO BE IMPLEMENTED IN 2016-17

Proposed Target for 2016-17 Crop Area Target Production Target (in Lakh hectares) (in Lakh tons) Rice 2.90 8.76 Maize 0.19 0.27 Pulses 0.32 0.28 Oilseeds 0.20 0.20 Cotton 0.01 0.02 Jute & Mesta 0.02 0.17

* Production target of Cotton is in bales of 170 kg per bale # Production target of Jute and Mesta is in bales of 180 kg per bale

To achieve these targets following strategies will be adopted during 2016-17 to sustain the development of agriculture in Tripura:

A. Continued Programme:  Bringing more area under Hybrid Paddy Cultivation.  Promotion of SRI in paddy cultivation in both HYV and Hybrid Paddy.  Production of quality certified seeds of paddy, pulses and oilseeds.  Varietal replacement of different crops would be continued.  Issuing Soil Health Card for Soil Health Management.  Promotion of organic farming in cluster basis.  Promotion of Integrated plant Nutrient Management (optimum use of chemical fertilizers, bio- fertilizers and micronutrients etc).  Besides above, other interventions will also be initiated to increase the productivity as well as to improve net economic return of each farm household level through scientific use of current seasonal fallow land and integration of several available and recently developed technologies .These are as follows:  Crop diversification in seasonal rice fallow through which area expansion in pulses, oilseeds and other crops would be done.  Timely sowing /transplanting of Boro paddy.  Application of lime for amelioration of acid soils

Subject Committee-I - 121 -  Installation of Mini Modern Rice Mill (2 ton/hour) supported with boiling of 16 ton paddy per day capacity Partially Boiling unit in selected locations in phased manner to minimize milling loss, which is at present 10-15 %(paddy to Rice).  Convergence with Integrated Watershed Management project and Forest Department activities for efficient use of water area created- for promotion of pulses and oilseed cultivation  Promotion of farm mechanization to the farmers on subsidy.  Introduction of stress tolerant varieties of paddy for flood prone/flash flood areas.  Strengthening of agricultural market infrastructure and network.

B. Additional/ Invigorated Programme:  Tapping of groundwater potential through installation of Small Bore Deep Tube Wells (SBDTW) with assistance from MG-NREGA.  Production of Hybrid Paddy Seeds in Departmental farms.  Production and distribution of Bio-fertilizer will be up scaled at District and Agri Sub-Divisional level by way of reviving 3 nos. Bio-fertilizer production laboratories at district level and 10 nos. Mini Bio-fertilizer production centres at Agri. Sub- Division level.  District Irrigation Plan (DIP) will be prepared for the entire eight District for bringing more area under irrigation by way of water use efficiency in the State.  On line technology transfer to the farmers will be arranged up to the Block level.  Improved method of soil testing where in status of 13 elements will be tested against 9 element earlier.  One modern soil testing van will be purchased for arranging soil testing at farmer’s door step level.  Introduction of Pradhan Mantri Fasal Bima Yojana.  In situ Seed processing and storage facilities will also be made by way of installation of Seed processing plants and construction of Seed godowns at farm level to encourage the Registered Growers. Scheme wise Proposed outlay during 2016-17:

A. State Plan (Divisible pool): An amount of Rs. 11526.50 lakhs has been provided under State Plan (Divisible Pool) for implementation of Crop Husbandry including administrative cost like Salary and Wages, cost of fuel, stationary articles, electricity charge, publication etc. In respect of development activities,

Subject Committee-I - 122 - Major Development programme taken are Subsidy on sale of fertilizer and seeds of different crops, internal carrying of Agri inputs, Bonus for seed production programme through Registered Growers, Running cost of existing cold storage, dehumidified Godown and seed processing plant etc, State share of CSS schemes, participation in different exhibition/fair/mela, cost of equipments for soil testing laboratories including mobile soil testing van, glassware and chemicals for different laboratories, stipend market development and maintenance of existing building of Agriculture. Rs. 450.00 lakhs has been kept as transfer of fund to TTAADC for implementation of different development programme, renovation of existing V.L.W. Stores including market development in TTAADC areas.

B. NABARD: An amount of Rs. 2100.00 Lakhs have been kept under NABARD loan for development of markets, agriculture input store, installation of Small Bore Deep Tube Well (SBDTW) to improve marketing facilities, agri input distribution facilities as well as bringing more area under irrigation.

C. SDS: An amount of Rs. 340.00 Lakhs have been kept under SDS for Construction of Cold Storage at Machmara of Unokoti District.

D. RKVY (Plan): Rs. 4000.00 Lakhs: Department of Agriculture is the Nodal department in respect of RKVY Scheme. Department of ARDD, Fisheries, Horticulture TTAADC. KVKs are also implementing agency. Fund placed to the different implementing agencies as required according to their programme approved by the SLSC.

E. SPA: An amount of Rs.500.00 Lakhs have been kept under SPA for development of Markets, installation of Small Bore Deep Tube Well (SBDTW) to improve the marketing and irrigation facilities in the State.

F. Central Assistance to State Plan: An amount of Rs.3401.00 lakhs has been kept for implementation of different schemes like National Mission for sustainable Agriculture , National Mission on Oil Seed and Oil Pam, National Mission on Agriculture Extention and Technology, National Food Security Mission,

Subject Committee-I - 123 - Paramparagat Krishi Vikash Yojana (PKVY), Pradhan Mantri Krishi Sinchayee Yojana (PMKSY), Pradhan Mantri Fasal Bima Yojana (PMFBY), Accessible India Campaign, Improvement of Agri. Statistics (EARAS) and NEC etc.

G. Non-plan: An amount of Rs 13870.00 Lakhs has been kept under Non- plan during the year 2016-17 for salary and wages components. Beside this, an amount of Rs.334.80 Lakhs has been kept been kept as other than Salary and Wages during the year 2016-17 for other activities.

H. Suspense Account: An amount of Rs. 6000.00 lakhs. has been kept for procurement of fertilizer and seed etc. as revolving fund, but the actual expenditure is incurred on the basic of release of fund by the F.D. on support of treasury challan which are realized by the department.

After careful examination of the Budget proposal and appreciation of submission placed by the Secretary & Director of Agriculture of the Department, the Committee made the following recommendations :-

1. Kishan Credit Card (K.C.C) Scheme should continue to be extended to the rest uncovered families.

2. The Department is to continue to introduce modern machines for agriculture, training and demonstration.

3. The Department is to continue supply of seeds to farmers in time.

4. The Department is to arrange setting up of offices of the Supdt. of Agriculture with posting of required staff on priority basis at Blocks which are still uncovered. The Department will take follow up action.

5. The Department is to continue introduction of modern scientific method for agri. products.

6. The Department is to continue to operate sale markets, cold storage and cold chambers in the uncovered important markets.

7. Agri regulated markets should be enlisted by the Department for effective monitoring and cold chambers should be placed at the disposal of committee concerned.

Subject Committee-I - 124 - 8. Markets located at block headquarters and other agri dominated markets like Manubazar, Teliamura, Radhanagar, Rajnagar, Panbazar etc. should be enlisted and covered by cold chambers for which feasibility may be explored.

After Examination of the Budget proposal and appreciation of the Budget proposals and appreciation of submission of the representative of the Committee recommends the Budget proposals under Demand No. 27 for Grants by the House alongwith the recommendations.

Sd/- Shri Sudhan Das Dated, Agartala, Chairman the 4th April, 2016. Subject Committee- I Tripura Legislative Assembly

Subject Committee-I - 125 - THE REPORT ON THE DEMAND NO. 28 OF THE AGRICULTURE (HORTICULTURE) DEPARTMENT FOR THE YEAR 2016-17.

The Budget proposal under Demand No. 28 for Grants for the Financial Year 2016-2017 and the Revised Budget for the Financial Year 2015-2016 relates to the Horticulture & Soil Conservation Department, Government of Tripura are as follows :- ( Rs. in Lakh ) Particulars Revised Estimatet Budget Estimates for 2016-2017 for 2015-2016 Demand Fund for Total T.S.P S.C.P . a) Non-plan 3714.00 4114.00 ------4114.00 b) Plan 1936.59 583.89 592.44 172.67 1349.00 c) 4154.54 2480.40 1478.70 810.90 4770.00 CASP/Other than CASP Total 9805.13 7178.29 2071.14 983.57 10233.00

Now, the Budget proposal is under examination of the Subject Committee-I of Tripura Legislative Assembly for recommendations to the Demands for Grants. The Committee in its meeting held on 02-04-2016 examined the Budget proposals in details having discussion with the Secretary & Director of Horticulture of the Department who appeared before the Committee as summoned. First of all, the Secretary informed the Committee about the action taken in respect of the recommendations made by the Committee during the Financial Year 2015-16 and stated as follows :-

Relevant Para/ Sl. Recommendations Page No. of the Reply of the Government on the Recommendations No. of the Committee Report An area of 970 ha of old and senile plantation has been Rejuvenation with rejuvenated during 2015-16 by the Department. But no improved variety suitable SHGs & Growers society are coming forward to plants activities of take up rejuvenation in their old & unproductive i Page No. – 120 Department be plantation though consultations are underway for increased involving involving suitable SHGs/Growers’ Societies in the SHG and Growers’ production programme of orchards. Society.

Subject Committee-I - 126 - The Department is still continuing production of The Department is Horticulture items under the land of Forest Dwellers. to continue The Department has decided to bring minimum 20% of production of the land of Forest Dwellers (Patta Holders) under Horticultural Plantation. In order to extend additional ii Page No. – 120 Horticulture items source of income to the Patta Holders, 1595 ha of land under the land of has been brought under plantation with Horticultural Forest Dwellers in crops during 2015-16 with the fund assistance of Large scale. MGNREGA & this benefitted 7975 Nos. of Patta Holders. The Department is to continue With a view to attract tourists towards aesthetic Horticultural gratification through Horticultural activities the Development Department is underway to support Horti-Tourism. activities under During 2015-16 the Department has taken massive iii Page No. – 120 Horti-Tourism programme to beautify New Secretariat Complex, Raj Scheme and the Bhavan, Rabindra Kanan, Horti Research Complex, Finance Nagicherra through Horticultural activities to attract Department is to tourists. consider allocation of fund The Department is accordingly. It is a normal part of Departmental activities to restore to continue unused land for Horti Plantation every year. During iv Page No. – 120 restoration of 2015-16, 350 ha of unused land has been brought unused land for under Horticultural Plantation throughout the state. Horti Plantation.

The Department is to engage at least The matter is centrally looked after by the Directorate 1(one) VLW against of Agriculture. This matter has been brought to the v Page No. – 120 2(two) Nos. of GPs notice of the Director of Agriculture for taking for proper necessary action in this regard. implementation of Horti activities.

A: MAJOR PHYSICAL & FINANCIAL ACHIEVEMENT UNDER STATE PLAN/CSS/NON PLAN PROGRAMME DURING 2015-16. To boost up the Horticultural & Soil Conservation activities, a sum of Rs. 9808.53 lakh has been earmarked in the Revised Estimate (R.E) for 2015-16 under State Plan /Non Plan /CSS State Plan : Rs. 1936.59 Lakh Non Plan : Rs. 3714.00 Lakh CSS : Rs. 4154.54 Lakh

1. Direction & Administration (Plan) : An amount of Rs. 260.00 lakh was kept for Salary (Rs. 200.00 Lakh ) & non Salary etc.( Rs. 60.00Lakh) under the Scheme for Direction & Administration under 2401 & 2402 Head of Account. Out of which Rs186.68 lakh expenditure was booked under salary and Rs. 60.00 Lakh spent under Non-salary.

2. Horti Research Activities: An amount of Rs. 120.00 lakh was spent out of total provision of Rs 120.00 Lakh for production of hybrid true potato seeds, studies on

Subject Committee-I - 127 - green house production of vegetables, trials on vegetables, for introduction, acclimatisation etc, production & distribution quality Mushroom spawn, production of quality planting materials, training of field functionaries etc.

3. Production of elite planting material and Development of progeny Orchards: An amount of Rs. 100.00 lakh was spent to produce 13.00 lakh of quality planting materials in the Departmental orchards, improvement & development of 8 Nos. identified Govt. Orchards etc. 4. Horti Development Activities : An amount of Rs 660.00 lakh was utilized out of Rs. 660.00 lakh earmarked for the following major activities: a. 202000 Mango grafts have been distributed @ 4 Nos. per family for backyard plantation throughout the state with a theme “Mango for All”. This benefited 50500 families. b. 22500 Nos. quality coconut seedlings have been distributed @ 10 Nos. per family throughout the state, which extended benefit to 2250 Nos. of coconut growers of the state. c. Distribution of 600 MT tuberlet to the potato growers for production of table potato at 50% subsidy. This additionally covered 1000 ha of land. d. Assistance was provided to the betel vine growers for creation & maintenance of Pan Boroj @ Rs. 10000/- per 0.04 ha. This benefited 500 Nos. of growers. e. Seed minikit worth Rs. 3000/- per kit for an area of 0.04 ha against off-season watermelon was distributed among 1600 Nos. of beneficiaries to encourage production of off-season watermelon. f. Establishment of State Centre for Betel Vine with a view to production of quality planting materials is going to be established at HRC, Nagicherra. g. Farmers training on package & practices of fruits & vegetables at Agri Sector level has been organized benefiting 16800 Nos. of farmers. h. Agri/Horti Sub-Division level Horticultural Growers Forum cum Show has been organized with a view to encourage farming communities to adopt new technology in Horticulture. i. 18907 Nos. Mushroom spawn has been distributed to the Mushroom growers at minimum rate.

5. Soil and water Management: An expenditure of Rs 60.00 lakh has been made for run off management through vegetative barrier/peripheral channel (200 ha), sand removal & reclamation of marshy land (150 ha) & conservation of soil moisture by planting minor fruits ( 200 ha). 6. Centrally Sponsored Schemes:

i. Mission for Integrated Development of Horticulture (MIDH) erstwhile Horticulture Mission for NE & Himalayan Region ( HMNEH): An amount of Rs 2705.00 lakh has been received till date though Rs. 5500.00 lakh is the approved budget during the year 2015-16.The activities earmarked for the year 2015-16 include creation of Private & Public sector nurseries-41 Nos ,area expansion under Fruits-1404 ha. , vegetable-3000 ha, flower-225 ha & spices-360 ha, Rejuvenation of old orchards-1500 ha,

Subject Committee-I - 128 - creation of water source-1522 Nos ,promotion of INM/IPM- 950 ha, Vermi compost unit-505 Nos, Pollination support through Bee keeping- 1704 Nos. and Farm mechanization- 1990 Nos, Human Resource development-2150 Nos etc.

ii. Integrated Watershed Management Progrmme (IWMP): An amount of Rs.1350.00 Lakh has been released by GOI till date out of approved allocation of Rs. 5072.00 lakh for different activities like- creation of rain water harvesting structure – 231 Nos., renovation/ restoration of old WHS – 118 nos, additional area brought under irrigation – 256 ha, plantation including afforestation and Horticulture- 182.69 ha, assistance to Self Help Groups (SHG)- 33 Nos. & providing livelihoods to households- 1236 Nos.

PROPOSED ACTION PLAN FOR 2016-17 To boost up the Horticultural & Soil Conservation activities, a sum of Rs.10233.00 lakh has been earmarked in the budget estimate for 2016-17 under State Plan, CSS & Non Plan.

State Plan : Rs.1349.00 Lakh CSS : Rs. 4770.00 Lakh Non Plan : Rs. 4114.00 Lakh 1. Direction & Administration (Plan) : An amount of Rs.268.00 Lakh has been kept for Salary/Wages ( Rs. 204.00 Lakh) and non Salary including electricity (Rs. 64.00 Lakh) under the Scheme for Direction & Administration.

2. Non-Plan Activities: An amount of Rs. 4114 Lakh is earmarked for different component of non plan viz. salary, non salary, minor work, subsidy, others etc under 2401 & 2402 during 2015-15. 3 Production of elite planting material and Development of progeny Orchards: An amount of Rs. 30.00 lakh has been earmarked to produce 5.00 lakh of quality planting materials in the Departmental orchards & improvement & development of Govt. Orchards etc. 4. Horti Development Activities : Rs. 235.00 lakh has been earmarked for the following major activities: a. 32000 Mango grafts have been targeted to be distributed. This will benefit 8000 families. b. 8000 Nos. of quality coconut seedlings will be distributed @ 10 Nos. per family, which will extend benefit to 800 Nos. of coconut growers of the state. c. Assistance will be provided to the betel vine growers for creation & maintenance of Pan Boroj @ Rs. 10000/- per 0.04 ha. This will benefit 100 Nos. of growers. d. Seed minikit worth Rs. 3000/- per kit for an area of 0.04 ha against off-season watermelon has been targeted to be distributed among 378 Nos. of beneficiaries to encourage production of off-season watermelon. e. Farmers training on package & practices of fruits & vegetables at Agri Sector level will be organized to extend benefit to 5000 Nos. of farmers. f. Subsidy limited to Rs. 20000/- per ha for cultivation of potato using tuberlet will be provided to cover 300 ha of land.

Subject Committee-I - 129 - g. Procurement & distribution of 142 MT certified seed potato at 50% subsidy will be provided to the potato growers. h. Agri/Horti Sub-Division level Horticultural Growers Forum cum Show will be organized with a view to encourage farming communities to adopt new technology in Horticulture.

5. Soil and water Management: An amount of Rs 6.00 lakh has been targeted to continue the programme like run off management through vegetative barrier/peripheral channel, sand removal & reclamation of marshy land & conservation of soil moisture by planting minor fruits.

6. Central Sector/Centrally Sponsored Scheme: i. Mission for Integrated Development for Horticulture (MIDH) erstwhile Horticulture Mission for NE& Himalayan Region ( HMNEH): Rs 3000.00 Lakh has been proposed during the year 2016-17 for different activities like setting of Private & Public sector nurseries-24 Nos. area expansion under Fruit Crops-483 ha, vegetable - 2924 ha, flower-297 ha & spices-345 ha, Rejuvenation of old orchards-195 ha, promotion of INM/IPM-475 ha, Horticulture Mechanization-1000 Nos. Human Resource Development- 1684 Nos. seminar etc.

ii. Integrated Watershed Management Programme (IWMP) : An amount of Rs.1500.00 Lakh has been proposed to GOI for different activities like, creation of water bodies (2065 Nos.), Renovation / excavation of old WHS (654 Nos.), plantation including afforestation & Horticulture- 2085 ha, livelihood support system to SHG- 220 Nos. Micro enterprise & production system-9496 Nos.

After careful examination of the Budget proposal and appreciation of submission placed by the Secretary & Director of Horticulture of the Department the Committee made the following recommendations :-

1. Rejuvenation of horticultural activities with seed / seedlings of improved variety should be done involving SHG and Growers’ Society.

2. The Department is to continue production of Horticulture items under the land of Forest Dwellers in Large Scale.

3. The Department is to continue Horticulture Development activities under ‘Horti-Tourism’ Scheme and the Finance Department is to consider allocation of fund accordingly.

4. The Department is to continue restoration of unused land for Horti Plantation.

5. The Department is to engage at least 1(one) VLW against 2(two) nos. of GPs/ Village Committees for proper implementation of Horti activities.

Subject Committee-I - 130 - 6. Number of VLW stores should be increased as per requirement and activated for which, if necessary, vacant posts of VLWs / Agri Assistants against the sanction posts should be filled in.

7. Cultivation of some vegatables should be so encouraged as to remain available throughout the year. If necessary, off season cultivation should be encouraged to cater to the requirement of people throughout the year.

After examination of the Budget proposals and appreciation of submission of the Representative of the Department the Committee recommends the Budget proposals under Demand No. 28 for Grants by the House alongwith the Recommendations.

Sd/- Shri Sudhan Das Dated, Agartala, Chairman the 4th April, 2016. Subject Committee- I Tripura Legislative Assembly

Subject Committee-I - 131 - THE REPORT ON THE DEMAND NO. 26 OF THE FISHERIES DEPARTMENT FOR THE FINANCIAL YEAR 2016-2017.

The Budget proposal under Demand No.26 relating to the Fisheries Department, Government of Tripura for the Financial Year 2016-2017 and the Revised Budget for the Financial Year 2015-2016 are as follows :- (Rs in lakh) Particulars Revised Budget Estimates for 2016-2017 Estimates 2015- Fund for Total 2016 Demand T.S.P S.C.P a) Non-Plan 2466.14 2416.00 ------2416.00 b) Plan 3330.22 1086.36 809.52 404.12 2300.00 c)CASP/Other 783.01 64.00 61.40 249.60 375.00 than CASP Total :- 6579.37 3566.36 870.92 653.72 5091.00

Now, the aforesaid Budget Proposal is under examination of the Subject Committee-I of the Tripura Legislative Assembly for recommendations to the Demands for Grants. The Committee in its meeting held on the 2nd April, 2016 examined the Budget proposals in details having discussion with the Special Secretary of the Department who appeared before the Committee as summoned. First of all, the Special Secretary informed the Committee about the action taken in respect of the recommendations made by the Committee during the year 2015-2016 and stated as follows :- Sl . Relevant Page Recommendation Action taken by the Deptt on the No. No. 27 & 28 of of the Committee Recommendation the report. 1 2 3 4 1) 1st Point of the The Department is Training to educated youths & fish recommendatio to continue its farmers/ SHGs/JFMCs members on n at Page 27 efforts for various commercial fish farming arranging expert technology is one of the priority training to fish programme of the Deptt. being farmers /SHGs implemented in the State on regular /JFMCs for basis . During 2015-16, covered 21935 commercial fish farmers/SHGs/JFMC members under culture and effective training on commercial

Subject Committee-I - 132 - cultivation farming ,farm management etc. including motivation programe organized at block level in the form of ‘Workshops”. Side by side, twenty-five fish farmers sent to outside State for exposure visit during 2015-16 with the fund procured under central assistance to state . 2) 2nd Point of the Construction of Construction work of wholesale fish recommendatio cold storage in the market at M. G Bazar & wholesale- n at Page 27 M.G. Bazar and cum -retail fish market at Bishalghar Bishalgarh market have already been taken up by the be undertaken and Deptt with the fund sanctioned under the department is NFDB and out of the aforesaid works, to ensure construction work of M.G.Bazar market completion of is running in full-swing . The work of works in a time – Bishalghar is delayed due up-gradation frame. of old market done by us for facilitating shifting of the existing fish market. However, the Deptt would try its best to complete execution of both the works during the next F.Y.2016-17. 3) 3rd point of the The Department is As per recommendation of the recommendatio to ensure increase Committee, the Deptt. has already n at Page 27 of honorarium of given due importance to increase managers of managerial subsidy/ wages against the Matsyajibi Samabai appointed Manager of MSS Ltd. to Samity shall not be support to the extent about 30- 40 % below the rate of of minimum basic wages as adopted for the wages notified PMCS / PACS based on the guide line by the State of Labour Deptt. as to wages. Government and Accordingly, correspondences & Finance persuasions are being made with department is to Finance Deptt (FD). Side by side, all release fund for the concerned Fishermen Cooperative implementation for Societies having water bodies are also the same. encouraging for production of fish /fish seed through scientific culture and thus to accommodate the balance fund in excess to the managerial support extend by the Deptt for payment of basic wages required as adopted for PMCS / PACS.

Subject Committee-I - 133 - Based on the recommendation of the 4) 4th Point of the To use all the water Committee, the Deptt. has approached recommendatio bodies in the state Planning & Coordination and Finance n at Page 28 for fish culture Deptt for providing adequate fund for adequate fund is to facilitating coverage of more area be provided by the under pisciculture for development of Finance fish sector and accordingly, Planning Department. & Coordination Deptt has accorded sanction for an additional amount of Rs. 100.00 lakhs under Special Development Scheme(SDS) during 2015-16 and the same has been utilized for the purpose of pisciculture based activities during 2015-16. 5) 5th Point of the ‘’PONA BAZAR’’ at This year construction work of recommendatio Agartala either be Pona Bazar at Udaipur has been under n at Page 28 protected or shifted taken by the Deptt. and work is in progress . However ,the said recommendation of Subject Committee has been noted down for taking necessary action for up gradation & extension of the existing ‘’PONA BAZAR’’ at Battala ,Agartala in the coming years by procuring required fund under RKVY or other sources. 6) 6th Point of the The Department is As per the recommendation of Recommendatio to consider 5/6 Subject Committee ,the activity on n at Page 28 ponds identified “Demonstration programme on feed under Fisheries based intensive fish culture” in the Superintendent for farmers tank have been implemented highest production in good numbers i.e @ 3 units in each of fish in order to block of the State during 2015-16 to create instance as create instance as a model with an a model and for involvement of Rs 85.00 lakhs. It is that follow up ‘Fish expected that the envisaged minimum Mela’ may be productivity target of 6000 Kg /ha ( i.e organized at the 960 kg/kani) would be achieved Block level through application of increased rate annually in one of feeding and multiple stocking of day for three or stunted fingerlings due to four hours. implementation of the same. As the aforesaid demonstration programmes are implemented in the farmers tank by Fishery Assistant’s under the closed supervision of Fishery Officer’s of the concerned Block and overall supervision of Superintendent of Fisheries ,it is observed that the culture are progressing satisfactorily in all the Blocks and most of the concerned farmers are confident enough of producing around one ton of fish from

Subject Committee-I - 134 - their pond by May –June,2016. The proposal for organizing “ Fish Mela” is under examination of the Deptt. 7) In Principal As per the recommendation of 7th Point of the approval for the Subject Committee, a proposal for Recommendatio fund under according approval of fund under n at Page 28 SCA/SPA for SPA/SDS has been initiated to fishery input may Planning and Coordination Department given well in for according approval of fund in advance by advance thus to facilitate Planning and implementation of fishery input based Coordination programme in proper time. Department so that Accordingly , Planning and the Department Coordination Department also can plan communicated sanction & release of accordingly. fund of Rs 10.00 crores under SDS with in time. 8) 8th Point of the District wise and Considering the fact that there is huge Recommendatio Block wise reward nos of vacant post among field staff in n at Page 28 to the fishery one hand and most of the officers/staff Assistant be given are overloaded with additional charges for their of work of nearby achievement. Every circles/blocks/subdivisions/districts Fishery officers and etc. along with their normal activities Fishery Asstt. be on the other hand, the allotted at least one recommendation of the Committee for water-body for rewarding Fishery Asstt. on the basis of direct supervision performance in different Distt in 2015- which should have 16 as well as allotment of at least one demonstrative water-body for demonstration under effect. their direct supervision , is under examination of the Deptt.

9) 9th Point of the The Department is Based on the per hector productivity Recommendatio to ensure achieved during 2014-15, the blocks n at Page 28 identification of which are lagging behind in fish blocks which are production have been indentified by the lagging behind in Deptt., these are viz. Jampai hill , fish production and Ganganagar, Rajnagar, Rupaicharri & allocate fund for Satchand blocks. As per scheme to improve recommendation of the committee, it. efforts have been taken by the Deptt. to enhance production of fish in those areas through encouraging farmers under Government assistance in the form of inputs , technical guidance and training etc.

2. Major achievements made during the year 2015-16. The Fishery sector of the State continued to show high rate of growth in 2014- 15.The total fish production of 65163.51 tons could be achieved exhibiting 6.37% growth as against production of 61259.10 M.T. during 2013-14. The per ha. productivity of fish from culture resources & per capita availability of fish from local production could also be

Subject Committee-I - 135 - increased to 2647 kg as and 17.61 kg respectively during 2014-15, as against 2581 kg & 16.81kg in 2013-14. With the limited state plan budgetary fund including the fund received from Central sources, the Deptt. continued its efforts on implementation of various developmental schemes in 2015-16 and as a result, the expected production of fish would cross 68,000 ton with availability of 18.20 kg/capita fish at the end of this Financial year 2015-16 . The statistical data in detailed regarding production of fish & fish seed etc. for the year 2015-16 would be available after door to door survey to be conducted by the Deptt. in the month of May-june,2016.

Amongst other, some of the achievements made during 2015-16 are as follows :- i) Extended benefit in the form of seed & input support to 19887 fish farmers towards intensification of scientific fish culture in small water bodies.

ii) Demonstration of various fish culture technologies have been provided to 2474 farmers for scientific utilization of culture resources for optimal production.

iii) Encouraged 888 farmers for use of their non perennial water bodies in scientific manner.

iv) 21935 Nos. farmer covered under effective training programme on various pisci- culture technologies and 20 farmers on preparation of value added products for their skill development. Site by site 30 nos. officials covered under refreshes training programme inside State and four Officials sent to out site State intuitions.

v) 187 nos. big water bodies having an area of 589.83 ha. (2 ha. & above area each)have been brought under extensive fish culture.

vi) Basic inputs for fish culture have been provided to 439 fisheries based SHGs covering an area of 140.86 ha towards entrepreneurship Development in pisciculture activities.

vii) Stocked 98.62 lakhs fingerlings in open water bodies of Dumbur reservoir and other lakes, rivulets etc. and cage culture adopted being introduced in Dumbur Reservoir for enhancement of production as well as productivity of open water bodies.

viii) Benefit in the form of prawn seed have been extended to 1520 farmers towards popularization of prawn culture in the State. Side by side , major part of the Pabda fish seed produced in Government hatcheries have been distributed among 740 farmers in free of cost towards popularizing its culture with other carps.

ix) Assistance being provided to 28 MSS Ltd. in the form of Managerial Subsidy. Besides, provided basic inputs to 50 nos. of Societies for adoption of fish culture in 65.12 ha. area.

x) For quantum increase in fish productivity through use of “Aerator” in high tech fish culture, 100 nos. aerator are being supplied among the farmers .

Subject Committee-I - 136 - xi) 453.10 ha. additional water areas have been brought under scientific pisciculture including the water areas in forest land involving fish farmers/JFMC/SHGs/Patta holders.

xii) About 600 ha. (provisional) water bodies are created/reclaimed towards resource development under MGNREGA.

xiii) 8 nos. IMC, FRP hatcheries are being installed in the land of fish seed growers of 8 District for facilitating production of quality fish seed by replacement of happa hatcheries.

xiv) Construction work of 12 nos. inputs storage Centre taken up in 2014-15 have been completed during 2015-16, besides another 13 project works of inputs storage Centre have been taken up in newly Constructed blocks during 2015-16 and these are under progress.

3. The plan/programme and projects to be implemented during the year 2016-17 for consideration of the committee during examination. a) Activities proposed: In the next financial year 2016-17 implementation of major fish production oriented scheme would be continued with emphasis on the following to increase the production of fish to 71000 tons with the per capita availability of fish @ 19 kg.

 Promotion of feed based intensive fish culture for optimum increase in productivity.

 Popularizing use of aerator in fish culture for higher fish production from a unit area.

 Utilization of big water bodies beyond 2 ha. area under scientific culture.

 Feed & seed support for semi-intensive fish culture.

 Utilization non–perennial water bodies for fish production on scientific line.  Supply of basic inputs for scientific fish culture in small water bodies.

 Fish culture in newly created & reclaimed water bodies.

 Production of seed of high value fish & its culture.

 Mass training & motivation programme for the farmers.

 Diversification of aqua culture & qualitative improvement of fish seed.

Subject Committee-I - 137 -  Encouraging seed growers to install FRP hatchery by replacement of happa hatcheries for production of quality seed.

 Distribution of fishing materials to the fishermen.

 Establishments of basic infrastructures for production and marketing of fish.

 Reclamation of existing water bodies &construction of new tanks in private sector.

4) Proposed demand wise budget provision 2016-17 : State plan budget including central assistance to state plan is the major source of fund to implement the programme of the Deptt. The development of the sector is thus mostly dependent on State plan budget . Based on the ceiling limit of fund, the Deptt. hereby proposing for favour of consideration of grant of the under mentioned budget estimate against Demand no. 26 -relating to Fishery Deptt during 2016-17 as per detailed given in the table below :- (Rs. in lakhs) Sl. Particulars RE -2015-16 BE -2016-17 No. 26 19 20 Total 1. Plan : A) Divisible Pool i) Salary 530.00 420.00 59.00 32.00 511.00 ii) Non Salary iii) Electric charges 6.50 7.00 0.00 0.00 7.00 iv) Transfer to TTAADC 145.00 147.00 0.00 147.00 v) State Share 58.72 48.88 42.12 59.00 150.00 vi) Pisciculture 1000.00 435.05 371.07 193.88 1000.0 Development. 0 vii) Minor works 0.00 0.00 0.00 viii) Advertisement 5.00 2.00 2.00 1.00 5.00 ix) Grants-in-Aid 100.00 34.25 37.85 27.90 100.00 x) Others 80.00 39.18 20.48 20.34 80.00 Total of A 1925.22 986.36 679.52 334.12 2000 B) Non Divisible pool i) SCA 0.00 0.00 0.00 0.00 0.00 ii)SPA 450.00 0.00 0.00 0.00 0.00 iii) NABARD 405.00 100.00 130.00 70.00 300.0 0 iv) NSWS (CSS) 75.00 0.00 20.40 54.60 75.00 v) N.E.C. 0.00 0.00 0.00 0.00 0.00 vi) SDS 1000.00 0.00 0.00 0.00 0.00 vii) NFDB (CSS) 183.38 34.00 11.00 180.00 225.0 0 vii) Dev. Of Inland 74.63 30.00 30.00 15.00 75.00 Fisheries & Aquaculture (CSS) Total of B 2188.01 164.00 191.40 319.60 675.0

Subject Committee-I - 138 - 0 Total of State Plan (A+B) 4113.23 1150.36 870.92 653.72 2675. 00 2 Non Plan 2155.00 2416.00 00 00 2416. 00 Grand Total :- 6268.23 3566.36 870.92 653.72 5091. 00

It is thus requested that the budget proposed above may kindly be accepted by the Committee for grants.

After careful examination of the Budget proposal and appreciation of submission placed by the Special Secretary of the Department, the Committee made the following recommendations :-

1) The Department is to continue its efforts for arranging expert training to fish farmers/SHGs/JFMCs for commercial fish culture and cultivation.

2) Construction of cold storage in the M.G. Bazar and Bishalgarh market be undertaken and the department is to ensure completion of works in a time-frame.

3) The Department is to ensure increase of honorarium of managers of Matsyajibi Samabai Samiti which shall not be below the rate of the wages notified by the |State Government and the Finance Department is to release fund for implementation for the same.

4) To use all the waterbodies in the state for pisciculture adequate fund is to be provided by the Finance Department.

5) ‘PONA BAZAR’ at Battala in Agartala should be developed.

6) The Department is to consider 5/6 ponds identified under Fisheries Superintendent for highest production of fish in order to create instance as a model and for that a follow up ‘Fish Mela’ may be organized at the Block level annually in one day for three or four hours. ‘Fish Mela’ at Melaghar, Gandacherra etc. where local fish is abundantly available should be organized.

7) The Department is to take step to increase fish production in the blocks like Jampuihills, Damcherra, Ganganagar, Rajnagar, Rupaichari & Satchchand Blocks where fish production is low and such blocks should be identified for production of fish.

8) The Department is to continue the process of construction of 7 (seven) fish markets funded by NABARD and markets like Chebri, Madhupur etc. may be taken into consideration while preparing next action plan.

Subject Committee-I - 139 - 9) The Department is to persuade Finance Department after consultation with Planning and Coordination Department for allocation of required fund for the sake of effective implementation of fish production schemes.

10) Fish Market-Sheds should be constructed at Dhanpur, Murashingpara, Barapathari, Baikhora, Lalsinghmura, Karbook, Shamukcherra in the Financial Year 2016-17.

After examination of the Budget proposals and appreciation of submission of the Representative of the Department, the Committee recommends the Budget proposals under Demand No.26 for Grants by the House alongwith the Recommendations.

Sd/- Shri Sudhan Das Dated, Agartala, Chairman the 4th April, 2016. Subject Committee- I Tripura Legislative Assembly

Subject Committee-I - 140 -

Published by the Authority of the Tripura Legislative Assembly Secretariat

Subject Committee-I - 141 -