35 011 12 13 141516171819 10 2 9 20 8 7 1 REST HOUSE(4059-01-051-86) 23456 1 PLAN/NABARD/ LAC-ADS/MLASDF/MPLAD/DEPOSIT/13thFCWORKS/MUZ SL. NO

P.37/257 P.33/263 Budget page No. / Budget Provision in L A Constituency PWD PWD Department Kodungallur PWD RestHouse, office cumrestroomin Conference halland Construction of house, Thrissur. building ofPWDRest Renovation ofHeritage

Name of Project

25L 100L Estimate Amount GO(RT)No. GO(RT)No. A S No. , Date & 1237/2014/PWD 1388/2014/PWD dtd Amount PWD BUILDINGSDIVISIONTHRISSUR dtd TVM,1.9.14 TVM,8.10.14 FOR FOR 25 LAKHS 100 LAKHS BUDGET WORKS 87/14-15/EE B 100/14-15/EE B TSR TSR dtd 10.12.14 DTD 7.2.15 FOR T S No. , Date & for 28.75L 100L Amount 2017. 71/15-16/EE B 46/15-16/EE B TSR TSR DTD DTD 10.9.15 Agreement No. & 13.11.2015 Date IRIS/TOURISM/SC -ST-ProgressofworksasonFebruary

C.V. Siddarthan Raghuram.K.G Name of Contractor

2871301 9049403/- Estimate PAC

378260/- Rs.9710009 Agreed PAC

Period of 9months 12months completion in 18-11-2015 23.11.2015 Site Handed Over Date 17-08-2016 22.11.2016 Dt. Of Completion as per agreement Extended D O C

Actual D O C completion nearing progress. good Work in Present Stage 95% 95% Physical Progress 3 Construction of Second kitchen 60% Floor to addl. Block at portion F.F. PWD slab casted 03/2016

PWD Rest House, 85/2015- P.41/291 15months Chalakkudy - Phase II 10.3.2016 Chalakudy VP Antony 16424355/- 14780277/- G.O.(Rt) No. G.O.(Rt) dated 12.11.2015 1656/20159/PWD 1656/20159/PWD 16/SE/BCC/TSRDT.2/ for Rs.1.95 Crores Rs.1.95 for PUBLIC WORKS (4059-01-051-86)

4 Construction of Govt. partition cker h office complex at 240L work DTD: PWD 10-11 10-11 2.9.12 6214 completed.tr 97% 30.9.13 30.7.12

Wadakkanchery 240 Rs 31.12.13 G.O.(Rt) G.O.(Rt) uss work BCC TSR 12months 24730540 32614636

(Stimulus package) Dt.17.8.10 14.7.09 for 14.7.09 for PWD dated PWD Wadakkanc T.A.Abooba started No.1047/09/ for Rs 274L 33/12-13/SE 33/12-13/SE 99/CE/BL/20 5 Construction of Mini Closure over at Methala, agreemen all 170L PWD

31.3.14 t executed 50% P.19/67 Kodungallur (Stimulus 29.10.10 28.04.12 23582951

package) 18 months 18866360.8 Kodungallur G.O.(Rt) No. G.O.(Rt) 28.10.12- work work 28.10.12- dtd: 20.10.2010 C.Balachandran 14.1.10 for 195L 14.1.10 for 1184/09/PWD dated 1184/09/PWD 14.8.09 for Rs.170 L Rs.170 14.8.09 for 51/CE/B&LW/10-11 dt 51/CE/B&LW/10-11 51/10-11/SE B CC Tsr Tsr B CC 51/10-11/SE terminated on 16 9 2015 6 2016-17 Balance work Agreemen

for new building of .25L t executed Kodakara Civil Station 3months 1257089 Revenue Pudukkad 1257089/- 1080919/- 2016 Rs.25 L 2016 Rs.25 Dtd. 10.2.2017 Dtd. N Viswanathan N 1963/2016-17 (Price) (Price) 1963/2016-17 TSR/2016/6714/ CE B CE TSR/2016/6714/ TVM Dt.03-11-2016 Rs Rs Dt.03-11-2016 TVM 107/2016-17/EE B TSR B TSR 107/2016-17/EE 3510/2016-2017 dt21-12- 3510/2016-2017 7 2016-17Finishing works Agreemen to new building for t executed Kodakara Civil Station 6months 1257089 865322/- 656310/- Revenue Pudukkad 2016 Rs.25 L 2016 Rs.25 dtd. 13/2/2017 N Viswanathan N 110/16-17/EE(B) TSR TSR 110/16-17/EE(B) 10-2016 Rs .918492/-) Rs 10-2016 1908/2016-17 (PRICE) (PRICE) 1908/2016-17 (TSR/2016/7179 Dt.27- (TSR/2016/7179 3509/2016-2017 dt21-12- 3509/2016-2017 REGISTRATION (4059-01-051-95) 6 Construction of Work Registration complex at terminate 175L 175 L

P.7/ 12 Thrissur. 4059-01-051- d. Thrissur 19.05.11 18.11.12

95 stamps & registration 19746530 Balance 18 months T.G.Sajeev 206,35,124 Registration work arranged and work COMPLE TED 69/10-11/SE(B) Tsr dt.1.10.12 Tsr 69/10-11/SE(B) 71/CE/10-11 dt.29.07.10 for Rs. 200 L Rs. dt.29.07.10 for 71/CE/10-11 GO(RT)no. 294/ 10/TD dt.31.03.10 for Rs. Rs. dt.31.03.10 for 294/ 10/TD GO(RT)no.

FIRE AND RESCUE (4059-60-051-85) 7 Construction of Fire and Civil work #### rescue service training completed 275L Home

centre at Viyyur and 24.3.03 23.3.05 15.7.12 . Ready to Thrissur 31.12.08

construction of 29291436 hand over

Swimming pool 22531873.85 P.K.Beefathu Extension applied Extension 13/2002-03/SE/B & LCC, Tsr Dtd: 14.3.2003 Dtd: Tsr & LCC, 13/2002-03/SE/B 133/2133/01/CE/B&LW/02-03 dt.24.10.02 for dt.24.10.02 for 133/2133/01/CE/B&LW/02-03 G.O.(MS) 132/05/Home dt 11.5.2005 Rs.620L dt 11.5.2005 Rs.620L 132/05/Home G.O.(MS) REVENUE DEPARTMENT 8 Construction of two up to Lintel 15% Residential quarters for level 18/16- 60.32L

Amballur Village office 18.6.16 P.66/15 MU Ravi Revenue Pudukkad in 3116787/- 3908139/- 12 months 12.2.2014 - 12.2.2014 - 13.11.13 for 13.11.13 for for this work) this for Rs 3464000/ (B)TSR dated (B)TSR 105/13-14/ EE 105/13-14/ 13/RD dt. TVM 13/RD dt. TVM 17/EE(B)TSR Dtd. Dtd. 17/EE(B)TSR G.O.(Rt). No 6069/ No G.O.(Rt). Rs.60.32L(3464000 Rs.60.32L(3464000 9 Construction of two Work Residential quarters for started 1.1.16 60.32L

Aloor Village office in 1.10.16 but P.66/16 MU Ravi Revenue this work) 9 months Pudukkad Thrissur District 3163607/- 3797594/- stopped

13.11.13 for 13.11.13 for due to Rs.3408400/- dated 22.4.15 13/RD dt. TVM 13/RD dt. TVM public

dated 12.2.2014 - dated 12.2.2014 - protest G.O.(Rt). No 6069/ No G.O.(Rt). 04/15-16/ EE (B)TSR EE (B)TSR 04/15-16/ 104/13-14/ EE (B)TSR EE (B)TSR 104/13-14/ Rs.60.32L(3408400 for for Rs.60.32L(3408400 10 M Construction of Indoor Stadium at 400L

PWD Gallaery Kunnamkulam P.368/5 South side 2011 for 2011 for Rs.400L 29.12.15

05.01.2018 50% 24months

K P Sunny concreting 05.01.2016 42959594/- 54562980/- G.O.(Rt). No G.O.(Rt). CC TSR dtd. completed 66/15-16/SE B 66/15-16/SE dt. TVM 20-05- dt. TVM 728/2011/PWD 728/2011/PWD KUNNAMKULA JUDICIAL WORKS (4059-60-051-98) 11 Construction of court AR drawing is to be

complex at Irinjalakuda DTD

Home revised HOME P.35/27 O 9.11.2015 GO(RT)NO Irinjalakuda .2872/2015/ VETERINARY SCIENCE & ANIMAL HEALTH(4403-00-101-99) 12 Construction of Work in 60% Laboratory Building at good progress District Veterinary Thrissur id P.567/79 Veterinary Veterinary

Centre, Thrissur M.K Rajan 12 months 31.3.14 for 31.3.14 for 17569721/- 17569721/ 12933341/- 15108729/- 23.10.14 for 23.10.14 for CC TSR dtd 17/14-15/SE B 17/14-15/SE 014/AD dtd TVM dtd TVM 014/AD Rs.1,75,69,721/- GO(RT)No:714/2 13 Animal Husbandry Agreemen department - t executed 39.50L 39 50L Construction of new 39.5L/- id P.518/ 9 9months 3458898/- 3763281/- Veterinary Veterinary Building for Veterinary Dispensary,Killannur, Dtd. PRICE of Director for for of Director 2150/2015-16 2150/2015-16 Thrissur B 30/16-17/EE 19.12.15 for Rs. Rs. 19.12.15 for Wadakkanchery KV Sarathkumar TSR DTD 4.8.16 dtd TVM,16.5.15 dtd TVM,16.5.15 M2/5287/2015/Plg M2/5287/2015/Plg 14 Animal Husbandry Nearing 90%

department - 40L completion Construction of new 12months 40Lakhs 18-04-2015 17-04-2016

Building for Veterinary 3621443/- 4439165/-

Dispensary, 29.9.15 DTD dtd 2.5.14 for dtd 2.5.14 for E.G.Sijil kumar Perinjanam,dilhlth Thrissur Kaipamangalam 5/14-15/EE B TSR B TSR 5/14-15/EE Veterinary services M2.897/2014/Plg dt M2.897/2014/Plg 60/15-16/EE B TSR B TSR 60/15-16/EE 28/01/14 for Rs. 40L Rs. 28/01/14 for 15 Animal Husbandry Nearing 90% department - completion

Construction of new 49.90L 9months 4887655 5690208 Building for Veterinary 49.9L for 49,90,000/- Irinjalakuda

Hospital,Vellangallur, Davis Anto.P of Director for for of Director

Thrissurdilhlth 84/2014/15/EE B g dtd TVM,5.9.14 g dtd TVM,5.9.14 TSR Dtd. 22.1.16 Dtd. TSR M2/19267/2014/Pl 116/2015-16/EE B 116/2015-16/EE Veterinary services services Veterinary TSR DTD 29.10.14 DTD TSR HOME DEPARTMENT 16 Ho High security prison - LOA issued. 10L me Finishing works to 10L Agreement 904390 803275

Rs. 10L to be

Administrative building 2months Thrissur located at Viyyur jail executed compound, Thrissur K Balakrishnan TSR/2016/5132 1.10.2016 for Rs. 2702/2016-17 dtd dtd. 11.7.2016 for

HEALTH DEPARTMENT Medical College 17 H&FWD –MES-Govt. Finisghing 86% PP works in Collegelf of Nursing , 250L progress

Thrissur – Construction 15.7.15 16.1.14- P.432/18 of nursing college 18months 23345197/- 23345197/- GO(RT) No. GO(RT)

building (Part 2 of dd. TVM WD 250L(EL 16L) 250L(EL Tsr Dtd. 1.6.13 Tsr Rs. 26146621/- Rs. Wadakkanchrty

Health & Family Health & Family Phase-2) , South - East 1116/2013/ H&F 1116/2013/ H&F 8.11.13 for 250L 8.11.13 for Tsr Dtd. 1.6.13 for Dtd. 1.6.13 for Tsr Kunjumuhammed, Kunjumuhammed,

block at MG kavu (B) 21/2013-14/SE (B) 21/2013-14/SE 18 H&FWD-Medical Column 27% Education Service- Casting 340L

7.1.16 works for Construction of GF for one 6.7.2017 Rs.3.4Cr.

Multistoried Residential 30714461 42441242 18 months building and

flats for Under Mathew Roy the

Wadakkanchrty Graduates and Post centering Graduates in work for Govt.Medical College Ground floor Roof slab in CE/BL/TSR/7808/2013 CE/BL/TSR/7808/2013 Health & Family welfare Health & Family progress dt.1.11.2013 for Rs. 350L Rs. dt.1.11.2013 for GO(Rt)No.2763/2013/H&F WD dtd TVM 31.7.2013 for 31.7.2013 for dtd TVM WD 19 H&FWD - Medical Finisghing 80% works in Educationlf Service -

21/14- progress Construction of Guest 27.8.2016 115Lakhs House (10 Room) with 10575709 13155547 27.4.2016 12 months all facilities in Govt. 28.04.2015 Mijoy Mammu 115L(EL 7.5 L) 115L(EL Dtd.31.10.2014 Wadakkanchrty

Health & Family Health & Family Medical College, 15/SE/BCC/TSR

Thrissur BCC 42/13-14/SE 19/11/13 for 1Crore 19/11/13 for TSR dtd: 12.2.14 for dtd: 12.2.14 for TSR GO(RT)No.3837/201 3/H& FWD Dtd. TVM Dtd. TVM 3/H& FWD 20 H & FWD - Medical Earth Work 3% for

Education Service - TVM foundation Consrtuction of MBBS completed P.432/20 18months students Hostel in 33007704 42233358 18.11.2015 17.05.2017

Government Medical 3.09Crores/- 309L(EL 25 L) 309L(EL dtd.12.11.2015 Gibu P Mathew Gibu Wadakkanchrty College, Thrissur 23/11/13 for Rs. Rs. 23/11/13 for TS no. 16/2014-15 TS no. 16/2014-15 H& FWD Dtd. TVM Dtd. TVM H& FWD Date: 30.5.14 of CE 30.5.14 of CE Date: 39/2015-16/SE/TSR 39/2015-16/SE/TSR GO(RT)No.3922/2013/ Health & Family welfare Health & Family 21 H & FWD - Medical SF roof 48% Education Service - casting 492L

7.1.16 completed.

Consrtuctionwelfare of P.431/8 Crores/- 22.10.17 68/2015-

Payward Block in 52244943 21 m onths 21 m 44339254/-

Government Medical Mathew Roy Dtd.29.12.2015 Wadakkanchrty

Health & Family Health & Family College, Thrissur 16/SE/BCC/TSR 499.28L (EL 48 L) 499.28L (EL H& FWD Dtd. TVM Dtd. TVM H& FWD 23/11/13 for Rs. 4.90 Rs. 23/11/13 for 26/CE/BL/13-14 FOR FOR 26/CE/BL/13-14 GO(RT)No.3920/2013/ 22 H&FWD-Medical Pile capin 20% progress Educationlf Service- Construction of 09.03.2016 08.09.2018

Residential Quarters for Span M/S 30 months 96735267/- Dtd.01.03.2015 Post Graduate students 108575664/- Constructions 10.10.2013 for 10.10.2013 for Rs.12.81Crore Wadakkanchrty

Health & Family Health & Family in Govt.Medical College H&FWD dtd TVM 1281lakhs(EL 373L) 1281lakhs(EL 83/2015-16/SE/BCC/TSR GO(Rt)No.3460/2013/ 23 MCTCR-Development Finishing 72% Construction of a works in Crore progress. Central ware house for for 300L for P.433/27 05.12.2015 04.12.2017

all Departments of Govt. 28034640 18 months 31429635/- Medical College, dtd.27.11.2015 345L(EL 45L) 345L(EL Constructions Constructions &FWD Dt.Tvm Dt.Tvm &FWD

Wadakkanchrty Thrissur 22.8.2014 for Rs.3 Rs.3 22.8.2014 for 48/2015-16/SE/BCC/TSR 252/14-15/ dtd 6.3.15 252/14-15/ K.J Joseph, Kuriekkal GO(Rt)No:2862/2014/H Health & Family welfare Health & Family 24 H & FWD - Medical Earth work 12% Education Service - excavation 150L 132L in progress. P./442 Consrtuction of MBBS Crores students(Girls) Hostel in 44/2015- 12 months 30.11.2015 29.11.2016 12195066/- 13280427/-

Government Medical N.T.Poulose dtd.24.11.2015

Wadakkanchrty College, Thrissur 16/Se/BCC/TSR GO(RT) No. 2444/ No. GO(RT) 2014/ H&F WD dd. WD 2014/ H&F DTD 28.11.15 for RS. RS. 28.11.15 for DTD TVM 19.7.14 for 1.150 19.7.14 for TVM 22/14-15/SE B CC TSR TSR B CC 22/14-15/SE Health & Family welfare Health & Family 25 H&FWD-MES- ) Slab 35% Construction of staff concreting 960L works of projects

quarters(Type-I&II-3welfare 86127303 92061475

24 months three flats in blocks each) at 19.02.2016 18.02.2018 progress. GO(RT)No: GO(RT)No: Govt.Med.College,Thris dtd.17.06.2016 I=465L, Type- I=465L, Wadakkanchrty

Health & Family Health & Family sur K.J.Joseph, Kuriyikkal Kuriyikkal K.J.Joseph, dtd8.4.15 for Rs. 9.60L Rs.9.6 Crore(Type- 2801/2014/H&FWD 2801/2014/H&FWD P.431/1 & p. 432/22 P.431/1 & p. 15/2016-17/SE/BCC/TSR dtd TVM,14.8.14 FOR FOR dtd TVM,14.8.14 13/2015-16/CE/Bldgs/TVM 26 h& fwd - Medical Agreement Education Service - executed Development of Internal Road, Safety Pathways connecting residentia, Viju Abraham

Wadakkanchrty hospital and Academic sectors and bus waiting areas and construction Health & Family welfare Health & Family of compound wall and 990L(EL 67 L) Electron 75 L) gates for security needs

at Govt. Medical GO(RT) no. 2124/2015/H&FWD dtd TVM 08/07/2015 for Rs. 9.90 Crores college, Thrissur 27 H&FWD-MES- GO(RT)NO. Retaining 45% wall Developmentlf and 2836/2015/ 150L concreting

Levelling of college play H&FWD 05/2016- 14998600 13350254

10 months and drain 27.05.2016 26.03.2017 Joji Joseph

ground at DTD 9447708584 construction

Govt.Med.College, TVM,3.9.15 dtd.24.05.2016 works in 17/SE/BCC/TSR

Wadakkanchrty consprogres

Health & Family Health & Family Thrissur for 150L s 28 Lecture Theatre Work

Complexlf and tendered 100L Auditorium for Govt. after

Rs. 100L Rs. completing 12months Medical College, 4999757/- 9069537/-

Thrissur No. GO(RT) the GF 100L(EL 3.50L) 100L(EL Wadakkanchrty Health & Family Health & Family Dtd. 17.12.2015 for 17.12.2015 for Dtd. 3232/2015/H&FWD 3232/2015/H&FWD 2107/2015-16 PRICE PRICE 2107/2015-16 Dtd. 3.10.2015 for Rs. Rs. 3.10.2015 for Dtd. 29 H&FWD- ## Centering 35% roof slab Govt.Med.College-lf progressing Construction of Lecture P.443/3 61/2015- 12months hall complex 18490460 20237808 14.01.2016 13.01.2017 GO(RT)No: GO(RT)No: 12 MONTHS dtd.16.12.2015 Wadakkanchrty 16/SE/BCC/TSr 16/SE/BCC/TSr Health & Family Health & Family 2767/14/H&FWD 2767/14/H&FWD FOR 2 Crore only 2 Crore FOR DTD TVM,12.8.14 TVM,12.8.14 DTD 30 H&FWD- Govt.Medical 20 centering for 50% College,Tsr- 0L Second floor 200L slab Construction of Multi- (EL

P. 444/3 progressing 45/2015-

storied Residential 22 17506441 and solid 24.11.2015 30.11.2015 29.11.2016 19222072/- 12MONTHS Quarter for PG Students L) N.T.Poulose block for Rs.2 Crore for

Wadakkanchrty masonry in GF and FF

Dtd. 30.3.15 for Rs. Rs. 30.3.15 for Dtd. progressing FWD,Tvm Dt: 12.8.14 Dt: FWD,Tvm GO(Rt)No.2768/14/H& 16/SE/BCC/TSR dated 16/SE/BCC/TSR 34/14-15/SE B CC TSR TSR B CC 34/14-15/SE Health & Family welfare Health & Family 31 H&FWD - AP - Budget Plstering 68% works in 2013-14lf - 250L

60/15- Ground and Implimentation of 17.12.205

18 months first floor in 16.12.15 10/2014- 16.06.2017 Planning Scheme - 22385938/- 26207218/- progress.. Construction of Building 250L(EL 26L) 250L(EL David Mangan David Wadakkanchrty

Health & Family Health & Family for starting New Drug Testing Lab at Rs. 23.9.2014 for H& FWD Dtd. TVM Dtd. TVM H& FWD 11.2.14 for Rs. 250L Rs. 11.2.14 for 16/SEBCC/TSR Dtd. 15/SE/BCC/TSR dtd. 15/SE/BCC/TSR

GMC,Thrissur GO(RT)No.471/2014/ a 32 Urgent maintenance Agreement works in X-ray room, 10L executed ORDER

pharmacy and ECG room 6months 904929/- 994371/- K.J.Rajan in old Medical college 9-07-2016 hospital at Govt. medical College, Thrissur 1830/2016-17 dtd. 29.7.16 for Rs. 10L No.TSR/2016/4414 Dated:23-06-2016 of Wadakkanchrty ORDER No.TSR/2016- 2017/2016/4414Dated:2 Chief Engineer,Buildings Health & Family welf Health & Family e 33 Providing toilet facilities Agreement 10L executed and additional works in Chief Binoj C ORDER

medicine ICU and 6months 904812/- 985084/-

specialty ICU of NMCH 28-07-2016 Block, Govt.medical dtd. 25.10.16 college, Thrissur Engineer,Buildings No.TSR/2016/4398 Dated:28-06-2016 of Wadakkanchrty Health & Family w Health & Family 48/2016-17/EE B TSR 2017/2016/4398Dated: ORDER No.TSR/2016- l 34 Urgent repairs to the work 10L tenderedSN various damaged roads in Chief to be issued Govt. Medical College ORDER 904740/- 764957/-

Campus. 10-08-2016 dtd. 26.10.16 David Mangan Engineer,Buildings No.TSR/2016/5579 Dated:29-07-2016 of Wadakkanchrty 49/2016-17/EE B TSR 2017/2016/5579Dated: ORDER No.TSR/2016- Health & Family we Health & Family r 35 Urgent maintenance work works in Transfusion 10L tenderedSN to be issued ORDER Medicine Department and 07-2016 904958/- 995004/- Blood bank at New Medical College Hospital, Govt. Medical College, Dated:28-06-2016 No.TSR/2016/4413 Thrissur. Joy John Parappilly Wadakkanchrty ORDER No.TSR/2016- 2017/2016/4413Dated:29- Health & Family welfa Health & Family 36 Waste treatment facilities Agreement

in Govt.Medical College - 50 L executed Setting up of Incinerator 6 Months G O (RT) O G Pisharady 4999757/- 4999757/- 29/11/2016 Sri.A.P.Narayana 23/1/2016 Rs.50L Dt.1/7/2015 Rs50 L 2803/15-16/PRICE Dt No.2040/2015/H&Fwd 65/16-17/EE (B)TSR Dt. 75 Civil works of the plastering 40% work in proposedlf Drugs Testing 250L progress Laboratory at Thrissur 14295810 16455907 12 months 13.06.2016 12.06.2017 dated TVM dated TVM David Mangan G.O(Rt) No. G.O(Rt) Dtd.06.06.2016 250L(EL 105 L) 250L(EL Wadakkanchrty Health & Family Health & Family 08.07.2014 for Rs Rs 08.07.2014 for 2319/2014/H&FWD 2319/2014/H&FWD 12/2016-17/SE/BCC/TSR

l & 36 Lecture Hall Complex in S N Issued L

GMCTCR- Providing 1 -

wooden Gallery in the H&FWD 9 months (El

L 16567745/- 15822196/- GO(Rt) No. Newly Constructed 30-09-2016

Lecture Halls at Academic Electron- 20 L) 200 T.S.Jayaprakash Block of Govt. Medical 1806/16/H&FWD dtd.28.06.2016 Of College Thrissur. Wadakkanchrty 2017/2016/2915Dated: ORDER No.TSR/2016- Health & Family we Health & Family DIRECTOR OF HEALTH SERVICES (4210-01-110-93) 37 Construction of Modern Centering 35% Psychiatry Ward for work is 400L

Infrest completed Govt. Mental Health Thrissur H&FWD for one part

Centre, Thrissur. 18months of Ground 36729247/- 39483941/- GO(RT) no. GO(RT) M/S Ancher Ancher M/S WD dt. 8.14 WD for Rs. 400 L Rs. for

2980/14/H&F floor roof slab and 38 Construction of new Plastering 80% building for District completed 200L 200L 5.6.15

Homeo Hospital, 6.12.13 (G /F and Thrissur H&FWD P.343/37

Thrissur 20473353 FF) GO(Rt)No. GO(Rt)No. Babu Antony 18 Months 18 Months Rs. 19988135/- 19988135/- Rs. for Rs. 230 Lakhs Rs. for dt.TVM 5.12.12 for 5.12.12 for dt.TVM 36/13-14/SE (B) CC CC (B) 36/13-14/SE CC (B) 38/13-14/SE TSR dtd: 10.10.2013 TSR dtd: 29.11.2013 TSR 3396/2012/ H& FWD FWD 3396/2012/ H& 39 H & FWD - Health plastering 85% Service - Annual Plan - completed 126L Shafi

15/14- dt. Tsr Tile work to

2013-14 - Forensic 1.10.15 Thrissur H&FWD be started Ward in Mental Health 126 L Rs 12 months 22.09.2016 12664358/- 14798302/- 23-09-2015 Muhammed Muhammed 23 10 14 for 16.11.13 for 16.11.13 for 15/SE(B)CC 15/SE(B)CC

Centre, Thrissur 23/2013/H&F CC TSR DTD WD dtd TVM- WD GO(RT)No:38 32/15-16/SE B 32/15-16/SE 40 H & FWD - Health plastering 75%

90L completed Service - Annual Plan - 90 L

2013-14 - New Kitchen Rs 90L Thrissur H&FWD dtd TVM-

Block in Mental Health 8043036/- 9973365/- 12 months B TSR dtd. B TSR 20.11.2015 27-11-2015 26-11-2016 M.A.Usman Centre, Thrissur 04.03.14 for 121/2013-14/ 121/2013-14/ EE(B) Tsr dtd: Tsr EE(B) GO(RT)No:382 16.11.13 for Rs Rs 16.11.13 for 82/2015-16/ EE 82/2015-16/ 3/2013/H&FWD 3/2013/H&FWD 41 Asset maintenance fund- Work Reconstruction of tendered, 191 L LMR damaged and collapsed Thrissur H&FWD submitted compound wall of for tender Mental Health Centre, approval Thrissur. 42 H&FWD - Annual Plan Ground Floor slab 2012-13 - Implementation lakhs of the scheme women & completed. 64/2015- 725 lakhs Thrissur H&FWD

18 months First Floor TVM dated 23.12.2015 22.01.2016 21.07.2017 children Hospitals - 83375000/- 72411471/- 77118217/- slab 50% Viju Abraham

Executing civil works for dtd 18.7.14 for completed. W&C Hospitals, Thrissur Second 1070/2013/H&FWD 16/SE/BCC/TSR dt. 25.03.2013 - Rs.725 A.S. No.G.O.(Rt) No. Floor 9/CE/BLDGS/2014-15 110 Renovation of District Detailed Hospital, Thrissur. Phase estimate II submitted 183.00 L

Thrissur for AS. 111 Providing leak proofing Detailed

work with GI roofing to the 30 L estimate existing building for K.R. submitted Thrissur Chummar Memmorial for AS. Govt. Ayurveda Hospital, Anthikad.

43 H&FWD-AP-14-15- Awaiting for f

55L TS estimate

Providing additional FOR floors to newly H&FWD constructed building for

Kodungallur THQ Hospital ,

Kodungallur dtd 14/H&FWD &fwd DTD 30.6.14 DTD &fwd GO(RT)No.2191/14/h 55L(Go(rt)no.3839/20 44 Construction of new To be Building for Ayurveda tendered Hospital, Santipuram, H&FWD

Kodungallur GO(RT)NO. Kodungallur TVM,16/8/16 FOR 35L 2256/2016/H&FWD DTD

45 Providing leak proofing EW work with GI roofing to excavation 800L for site the existing building for 20/1/2016 19/9/2017 H&FWD clearance K.R. Chummar 800 L Rs 20 months started 79261461/- 91515283/- 14 for 919L 14 for Irinjalakuda Memmorial Govt. Varghese K J Varghese Ayurveda Hospital, 013/H&FWD dtd 013/H&FWD TVM-16.11.13 for for TVM-16.11.13

Anthikad. GO(RT)No:3823/2 22/PWD/BLDS/13- 46 Construction of Tender 42L Compound wall for 42L sanction General Hospital- D, dtd not P.350/7 H&FWD 4497199

Irinjalakuda TSR DTD obtained. Irinjalakuda 6 MONTHS GO(RT)NO: GO(RT)NO: EG SijilKumar 150/14-15/EE B 150/14-15/EE TVM,28.6.14 for for TVM,28.6.14 2137/2014/H&FW 12.11.14 FOR 42L 12.11.14 FOR 47 Construction of new Agreemen building for Ayurvedha t executed 100L 100L 100L 4.7.16 Hospital, Irinjalakuda 24/16- H&FWD ND Jose 18months 9980582/- H& FWD - - H& FWD 10868854/- Irinjalakuda 1818/2015 dtd. 1127/15-16 dtd. 1127/15-16 17/EE(B)TSR Dtd. Dtd. 17/EE(B)TSR 16.06.2015 for Rs. Rs. 16.06.2015 for Rs. 15.09.2015 for 48 H&FWD-HS-AP Budget- G.F. Roof 60% 14-15-Construction of slab casted 500L 500L crore

HRD Training 1.20-15 P.391/2 H&FWD 40/2015-

Institute(Health sector) 46760884 18 months Chalakudy 21/11/2015 45443036/- GO(RT)No: GO(RT)No: in Gandhi Gram C.A. Ashraf Hospital of

Dermatology,Koratty 31.3.15 FOR DTD 44/CE/BLDS/14-15 44/CE/BLDS/14-15 2140/2014/H&FWD 2140/2014/H&FWD dtd TVM,28.6.14 for 5 for dtd TVM,28.6.14 16/SE/CC/TSR.Dt.13.1 49 Institute of Human T S Resource Devilpt. In Estimate submitted Health Sector in Gandhi H&FWD

Gram Hospital of 5 crore for Chalakudy Dermatology, Koratty in GO(RT)No: Thrissur Dt - Phase 2 dtd TVM,18.12.15 dtd TVM,18.12.15 4032/2015/H&FWD 4032/2015/H&FWD 50 Renovation and Agreement Electrification of the Executed

existing X-Ray room 78.61L G.O.(Rt) G.O.(Rt) 6760349 8558602 71/2016- H& FWD WD TVm and extension of Lab.at 9 months Mental Health dt.07/12/2016 Dt.06/12/2013 2017/EE(B)Tsr 2017/EE(B)Tsr

centre,Thrissur 22/05/2014 DT. Ansif Muhammed Muhammed Ansif No.4064/2013/H&F 10/14-15/EE(B)TSR 10/14-15/EE(B)TSR 51 MLA ADS 2015-2016 Agt.execute

Kodungallur 60L d. Retaining wall under

constituency.Constructi /PRICE P.C.Joy construction 5260010 4494031 on of Out Patient Block 75/2016- 12 months 016 Rs 60L 016 Rs Kodungallur for PHC Kuzhur Dt.11/08/2016 Dt.09/12/2016 2017/EE(B)TSR 2017/EE(B)TSR 2099/2016-2017 2099/2016-2017 GO(RT0No.633/201 5/H&FWDDt.25/02/2 52 H & FWD - Health Service work started 5% 800L

- Annual Plan - 2013-14 - 800 L New Block of THQH, 20 months 79261461/- 91515283/- Irinjalakuda 20-01-2016 19-09-2017 VargheseJ K 22/PWD/BLDS/13-14 for 919L Irinjalakuda 59/2015-16/SE BCC TSR Dtd. 14.12.2015 GO(RT)No:3823/2013/H&FWD dtd TVM-16.11.13 for Rs

EDUCATION GENERAL EDUCATION DEPARTMENT-4202-01-201- 50 Higher secondary

education-AP-14-15- DTD 150L 150L

G. Edn Infrastructure Devt-

12months nearing 14296915 16259881 80% Govt.Girls completion Gopakumar Kodungallur HS,Kodungallur 2015/GL.Edn tvm,13.1.15 for for tvm,13.1.15 GO(RT)No.152/ 51 G. Edn Dept- Higher Nearing 90% Secondary Edn. - completion 108L

G. Edn annual plan 13-14 - 9months 9851677 for 108 L for Rs. 108L Rs. 03-05-2016 12-04-2016

Guruvayur Infrastructure Devlpt. Of 13079086/- Govt. HSS, Kochannur, GO(RT)No. Chavakkad, Thrissur Ansif Muhammed Muhammed Ansif 4780/13/ Gl. Edn. 4780/13/ Gl. 47/13-14/SE(B)CC 47/13-14/SE(B)CC Dtd. TVM 12/11/13 TVM Dtd. Tsr dt. 18.02.14 for dt. 18.02.14 for Tsr 52 Higher Secondary Edn- up to plinth 10% AP 15-16- Infrastructure level 160L 160L

G. Edn Development of GHSS Pudukad (Works)- Sarvodaya dtd,TVM, HSS, Thrikkur GP GO(RT)No. 16.1.2016 for 16.1.2016 for 176/2016/Gl.Edn 176/2016/Gl.Edn 53 General Education work 100%

Department- 60L completed G. Edn

Costruction of school 26.8.14 25.8.15 26.08.14 Lyon MV 60/2013- 12months Pudukkad 4686999/- 5572842/-

building for Government Est. PAC : TSR dated TSR 18/12/2012 HSS, Meladoor in Lakh Rs.60 14/EE(B)TSR 14/EE(B)TSR Annamanada 19/14-15/EE (B) (B) 19/14-15/EE dated 27.7.2013 G.O.(Rt).6063/12/ G.Edn Dated Tvm Tvm G.Edn Dated 54 General Education Work is in 50L 50L Department- 50L progress 26/16- G. Edn

construction of school 11.7.16 Thrissur P.303/ 4 9months

building for Government 4999409/- 5751820/- Dn TSR dtd. HSS, Chembuchira dtd 4/Gl.Edn 24.12.14 for Rs. Rs. 24.12.14 for 90/14-15/EE (B) (B) 90/14-15/EE TVM,16.10.14 for for TVM,16.10.14 Ansif Muhammed Muhammed Ansif GO(RT)No.4213/1 Dtd. 17/EE(B)TSR HIGHER EDUCATION DEPARTMENT (4202-01-203-96) 55 Construction of NCC Block A and 75% Complex, Kuttanelloor- B 400L Hedn completed.B Rs.4Cr 16.7.13 Thrissur

dtd TVM dtd TVM lock C is P.323/60 32242960 P.M.Aliyar 18 months 18 months 30227775- partiallly 26.07.2013 25.03.2015 Rs.4Crores CC Tsr Dtd: 26.11.12 for 26.11.12 for completed 5/2012/H.Edn 5/2012/H.Edn dt. 27.3.13 for dt. 27.3.13 for GO(RT)No.253 91/CE/BL/12-13 91/CE/BL/12-13 21/13-14/SE (B) (B) 21/13-14/SE 56 H.Edn Dept.AP-15-16, No land

Construction of 35L available Hedn

courtyard and back yard Rs.35L Thrissur landscaping in Govt Law College, Thrissur 015/H.Edn dtd 015/H.Edn TVM 25.7.15 for 25.7.15 for TVM GO(RT)No.1918/2 57 H.Edn Dept.AP-15-16, Estimate 40L

Construction of canteen TVM to be Hedn in Govt Law College, submitted Thrissur

Thrissur dtd H.Edn 25.7.15 for 25.7.15 for 1918/2015/ GO(RT)No. 58 Higher Education Dept- . Work in 65%

Annual Plan 2014-15- 500L good Hedn progress P.310/41

Construction of Science 500Lakh Thrissur 42149885 24 months 23.7.14 for 1733/2014/ dt 01/10/15 01.10.2015 30.09.2015 45652541/- GO(RT)No. GO(RT)No. block in Govt. College Saraswathy for Rs. 500 L constructions 220/14-15/CE . 4202-01-203- Blds/ 20.01.15 Agt.no 31/2015- H.Edn dtd,TVM,

83 16/SE/B/CC/TSR 59 Higher education NEW AS department-AP-2016-17- 60L Hedn Construction of building Thrissur for Canteen with all GO(RT)NO. GO(RT)NO. accessories and amenities in Govt Law 2186/2016/H.EDN

College.Thrissur DTD 17.8.2016 FOR 60 Higher education 15-16- Agreement 10L Drinking water facility - 10L Executed Hedn

Construction of Open well 6months 90/2016- 716719/- 716719/- FOR 10L Thrissur M.Cherian

& Pump house for Govt Sri.Paulson GO(RT)NO. GO(RT)NO. Law College.Thrissur Dtd.5/1/2017 2017/EE(B)TSR DTD 25.07.2015 1918/2015/H.EDN 2904/2016-17 dtd. 25.10.2016 for Rs. 61 Higher education 15-16- Awaiting for Setting up of sports 20L TS Estimate Hedn

room/Gymnasium Govt DN DTD FOR 20L Thrissur

Law College.Thrissur 25.07.2015 GO(RT)NO. GO(RT)NO. 1918/2015/H.E 62 HED - Collegiate Finishing 90% Education - work in 200L Hedn progress Construction of a New & P.325/1 29.5.2015 28.1.2016 2170810/- 18 months Modern Library Building 27293595/- Abdul Latheef dated. TVM dated. TVM Kodungallur at KKTM Govt. College, No. G.O.(Rt) 200L (crores)

Pullut - (Lab& Library 230L Rs. TS for TSR Dtd. 20.5.2015 06/2015-16/SE BCC 30.7.2013 for Rs. Rs. 30.7.2013 for

Construction) 1624/2013/ H.Edn 63 Higher Education Dept- TS Agt.no.62/2 F.Floor Roof 50% Annual Plan 2014-15- no.37/P 015- slab casted Hedn and brick

P300/5 Construction of Indoor WD/bldg 16/SE/BCC work in 23.12.15 500 lakhs stadium,Ist Phase s/2013- /TCR dtd 23.6.2017 progress 49303329/- 55727553/- GO(RT)No: GO(RT)No: Kodungallur

KKTM College, 14 22.12.2015 KJ Varghese 18 MONTHS For 500 Lakhs For Kodungallur 2099/14/H.Edn datd.21. DTD tvm,30.8.14 tvm,30.8.14 DTD 2 2015 64 Higher Edn.- Collegiate Nearing 90%

Edn. Dept. 70L completion 100L Hedn Implementation of Rs.100L Rs.100L G.O.(Rt) G.O.(Rt) P.320/19 12months schemes under CQIP - 6299817/- 6868060/- Chalakudy LibraryBuilding,(PM G) Jerrin George Jerrin

Govt college Chalakudy 29/2015-16/EE dtd. 2.5.14 for Rs. dtd. 2.5.14 for No.846/2014/ H.Edn H.Edn No.846/2014/ 74/14-15/EE (B)TSR (B)TSR 74/14-15/EE dated TVM 2.5.14 for 2.5.14 for dated TVM (B)TSR dtd. 9.7.2015 (B)TSR 65 LAC-Ads 2015-2016 Agreement Executed Construction of a 30 L Rs.30L

Retaining wall and side Go(RT) 2830065 2235713 63/2016- protection works for 9 months Chelakkara 2074/2016-

GHSS Pazhayannur 2017/PRICE Dt.22/01/2016 Dt.22/01/2016 Dt.10/08/2016 Dt.24/11/2016 2017/EE(B)TSR 2017/EE(B)TSR No.227/2016/G Edn No.227/2016/G Muhammed Basheer Muhammed POLY TECHNIC (4202-02-104-99)

65 Construction of Dining AS

Hall & Class Room for TVM accorded

Nattika SRGPTC , Thriprayar Edn Dtd. 12/08/16 GO(RT)No. GO(RT)No. 180 Lakhs 2127/2016/H

Higher Edn - Technical - Construction of solid block 66 Workshop Block, Govt. --masonry 75% 150L Hedn Polytechnic College, ongoing P.349/125 11968570 12831503 KM Abbas KM 18 months chelakkara 01.06.2017 GO(RT)No. GO(RT)No. 01-12-2015 for Rs. 150L Rs. for Chelakkara No.67/2015- dtd 29-12-2015 16/SE/BCC/TSR dtd. TVM 19.5.15 dtd. TVM 1084/2015/H.Edn 1084/2015/H.Edn 69 Gov. Polytechnic College, Chelakkara - plinth 783L Hedn beam work Construction of Lab Crores of lab 2&3. Siju Jose - - Block Building & 18Months 15% chelakkara 71366736/- 68711893/- GO(RT)No. GO(RT)No. Foundation for Rs. 7.83 for Additional Internal Road for Lab 1 in 30.12.2017 22-07-2016 Progress. dtd. TVM 29.6.15 dtd. TVM 1634/2015/H.Edn 1634/2015/H.Edn 70 Construction of Golden Flooring 93% completed

Ollur Jubilee Memorial 500L Hedn

Electronic Block - Govt. 27.6.15 P.351/1 Rs.500L 26.12.16 4.8.14 for 4.8.14 for 43398422

Women's PTC, Thrissur Jose Palal 18 months 18 months Edn dtd Tvm Edn dtd Tvm 23.04.2014 for 23.04.2014 for 12/CE/BL/14-15 dtd 12/CE/BL/14-15 electrical=6519302/ 500L(Civil=43398421/- 500L(Civil=43398421/- GO(Rt)No.808/2014/H. 72 Construction of internal Agreemen

roads and retaining wall 60 L t executed H.Edn at Govt.Poly technic 6months TSR Dtd. KP sunny 15/2/2017 5639183/- 4512527/-

College Kunnamkulam Rs.60L for GO(RT)No: GO(RT)No: dt.25/12/2016 3572/2016-2017 3572/2016-2017 KUNNAMKULAM 2127/2016/H.Edn 2127/2016/H.Edn dated 09/11/2016 111/2016-17/EE B 111/2016-17/EE ENGINEERING COLLEGE ( 4202-02-105-99) 72 Construction of setting out Academic complex in work

H Edn completed Govt. Engineering Thrissur M/S GM GM M/S College, Tsr Rs.480L 18 months dated TVM dated TVM 44578615/- 49954797/- GO(RT)No: GO(RT)No: 23.4.2014 for 23.4.2014 for 480L(El -32 L) -32 480L(El 253/14-15 dtd. 253/14-15 6.3.15 for 480L 6.3.15 for 800/2014/H.Edn 800/2014/H.Edn Gibu P Mathew - - P Mathew Gibu

73 Education dept - Technical - work 30% Renovation of Hostel& strated.Cha H Edn Nadar

Construction of Quarters,of (Rt) Go nging of tile EL-9 L EL-9 24/2016- Thrissur Govt. Engineering College, roof of

Thrissur. 12months Men's D.Devanesan 12683597/- 27-08-2016 26-08-2017 Dt.28/05/2015 Dt.25/08/2016 Amt. 145 lakhs

Ph:9446123387 Hostels to 17/SE/BCC/TSR 1213/2015/H.Edn G.I.Trafford sheet ork 74 Higher Edn.-Tech- awaiting for Construction of new building T.S H Edn

for Dept.Of Mechanical (Rt) Go Thrissur Engineering at Govt.Engg.College,tsr Rs.299.7588L 1342/2016/H.Edn Dt.16/01/2016 for 75 Higher Edn.-Tech- awaiting for Construction of Civil Engg lab T.S H Edn extension at Thrissur Govt.Engg.College,tsr 15/H.Edn for RS.300l dated01.09.2015 Go(RT)No:2264/20 76 Higher Edn.-Tech-Asset Agreement maintenance to main building executed H Edn at Govt.Engg.College 1.2.2017 Thrissur 15/H.Edn

Thrissur 9months 14.12.2016 for RS.250l K M Lukose BCC TSR dtd BCC TSR dtd 20123839/- 15742495/- 33/2016-17/SE dated02.10.2016 3430/2016-17/SE Go(RT)No:2673/20 LABOUR DEPARTMENT-ITI ( 4202-02-800-95) 77 Construction of Cherpu ITI 475 Soil

L 475L Investigation to be done Nattika Dtd. TVM GO(RT)No. GO(RT)No. 12/08/16 for 1032/2016/LBR 78 Construction of a finishing building for ITI work ongoing.SE 299.5L Labour

Chelakkara, 30.3.12 inspected P.330/52

Desamangalam 31382488 30164847 overall chelakkara site and

for Rs299.5L for directed to 87% Rs.34442500 2.4.15 4.4.12 3.4.14 send notice for Agmt No. 79/2011- No. Agmt 12/ SE(B) Tsr. Dtd. Tsr. 12/ SE(B) P.H.Muhammed Ali P.H.Muhammed 64/11 dt.19.1.12 for 64/11 dt.19.1.12 for terminating LBR Dated 5-2-2011 5-2-2011 Dated LBR CE/BLDGS/TCR/115 24months 24months G.O(MS)No.17/2011/ the 79 Construction of Main L Solid block 75% Building for ITI Manalur work is in 130L progresscon Labour

Manalur dition 07/2014- Nissar KA 13628094 12 months 05-12-2015 04-12-2016 17318581.86 15/SE/BCC/TSr 15/SE/BCC/TSr dated 27/11/2015 GO (RT) No. 1531/ No. GO (RT) 51/2015/16/SE/TSR 51/2015/16/SE/TSR 2013/ LBR Dtd. TVM TVM Dtd. 2013/ LBR 2/9/2013 for Rs. 130L Rs. 2/9/2013 for 18/07/2015 for Rs. 149 Rs. 18/07/2015 for 80 Industrial Training Dept. finishing 90% - Construction of work in 115L progress Labour Second floor over the 12-10-2015 11-08-2016 administrative block in 10Months Chalakudy 1.15Crores 14693024/- Govt. ITI, Chalakudy A.A.George 12.3.2014 for Rs. Rs. 12.3.2014 for 12027688/- (Civil) 12027688/- GO (RT) No. 366 / No. GO (RT) 47/15-16/SE B CC B CC 47/15-16/SE TSR DTD 27.11.15 DTD TSR 2014/ LBR Dtd. TVM TVM Dtd. 2014/ LBR

81 K Karunakaran finishing 85%

Memmorial Govt. ITI, 50L 50L work in progress Labour Mala- Costruction of 18months Liyon M.V M.V Liyon Practical & Theory 4949481/- 5444429/- Chalakudy Dtd. 13.6.16 Dtd. Blocks No. GO (RT) 16.9.2015 for Rs. Rs. 16.9.2015 for 1151/2015-16 dtd. 1151/2015-16 16/16-17/EE(B)TSR 16/16-17/EE(B)TSR 1654/2013/LBR dtd. 1654/2013/LBR TVM 25.9.13 for 50L 25.9.13 for TVM 82 - Structure completed . Plastring Construction of Model in

Residential school, - - Progress 72% 590L 590L

Chelakkara CSTDD for 12-2015 P.452/3a SCST DD SCST 04-01-2016 No.65/2015-

56152248.17 dormitory CHELAKKARA Suresh Gopinath Suresh block and GO(MS)No.100/2014/S DTD,tvm,27.12.14 FOR FOR DTD,tvm,27.12.14 16/SE/BCC/TSR Dtd 29 solid 84 Agreemen SC/STDD painting and t executed reflooring work to class room block,dormitory building,Hostel building

,Kitchen and toilet block 45 L Rs.45L 4072275 3024795 6 months SCST DD SCST of Model Residential chelakkara C.T.Sakheer Dt.29/11/2016 School,Thiruvilwamala /Dt.06/10/2016 Dt.23/05/2016 for for Dt.23/05/2016

at Wadakkanchery Edn C1-25120/15(3) 64/2016-17/EE(B)TSR 64/2016-17/EE(B)TSR 2745/2016-2017/PRICE 2745/2016-2017/PRICE MUZIRIS

83 Tourism - Muziris Agreemen

Heritage Project - 19L t executed Additional works of on E.O.Joy Tourism

Muziris Research & 1884424/- 2135052/- 29.9.15- 3 MONTHS Kodungallur 492/2015-16 492/2015-16 (PRICE) dtd. DTD 29.9.15 DTD Convention centre at of Rs.19L for work in Tourism, TVM Tourism,

KKTM college, Or.No:P8-9135/ progress Director, Dept of Director, Kodungallur 15.7.15 for Rs. 19L Rs. 15.7.15 for 2015 dtd 30.6.2015 58/15-16/EE B TSR B TSR 58/15-16/EE

SOCIAL JUSTICE DEPARTMENT 84 Social Justice The first 80% floor works SJD Department-Prathyasa completed Bhavan-Thrissur- 81.90L GO(RT) GO(RT) Thrissur and the 9242261 Rs.81.9L Siju Jose 7244287/- Extension and 81.90L for 15 months commissioni 28.10.2014 27.01.2015

Renovation to the dtd 18.10.14 ng of the building of Prathyasa same is 79/13-14/EE (B) (B) 79/13-14/EE TSR Dtd: 13.9.13 Dtd: TSR Bhavan No:274/2013/SJD awaiting for 31/14-15/EE B TSR B TSR 31/14-15/EE dtd TVM 14.6.13 for 14.6.13 for dtd TVM electrical 85 SJD-15-16-Construction Work in

13L good SJD of building for progress anganwadi No: 96under Thrissur 4months

Cherpu ICDS Project at 1239386/- 1348353/-

Vallachira GP DTD 12.8.16 24.8.15 FOR 13L 24.8.15 FOR 3634/2015-16 dtd. 3634/2015-16 26.2.16 for Rs. 13L Rs. 26.2.16 for Paul Ponmanissery Paul 32/16-17/EE B TSR B TSR 32/16-17/EE ICDS-A7-7755/15 DTD DTD ICDS-A7-7755/15 86 SJD-Thrissur-Asha Structural 50% work SJD Bhavan-woman- 240L completed,

Construction of first 31.3.15 Thrissur floor to the new building Siju Jose TVM,19.12.14 for for TVM,19.12.14 during this financial financial this during the construction works works the construction 325L(85L is allotted for for allotted is 325L(85L )/GO( ) / / S 46/CE/Blds/2014-15 dtd: 46/CE/Blds/2014-15 GO(Rt)No.761/14/SJD dtd GO(Rt)No.761/14/SJD 87 SJD-Construction of

SJD District Early 300L 300L 330L Intervention Centres agreement Wadakkanchery executed 19.6.15 for 19.6.15 for 9/2015/SJD 9/2015/SJD DTD TVM dtd GO(RT)No.38 Wadakkanche 88 SJD-15-16-Construction Tendered

SJD of building for on /price/ /price/ anganwadi No: 174 11.66L 11.66L 5/1/2017 under Wadakkanchery ICDS Project at Mundathikodu GP dt.29/11/2016 Wadakkanchery 3309/2016-2017 3309/2016-2017 DTD 3.3.15 FOR 3.3.15 FOR DTD ICDS-A7-18498/14 ICDS-A7-18498/14 C 89 SJD-15-16-Construction Agreeemt

13L Executed SJD of building for anganwadi No: 135 91/2016- ICDS-A7- 1099999/- 1172453/- for Rs 13L

under Kodungallur 09 Months 3310/2016- Kodungallur 2017/PRICE 2017/PRICE

ICDS Project at Dtd.9/1/2017 7756/15 DTD 7756/15 DTD

Kodungallur municipality dtd.29/11/2016 2017/EE(B)TSR 2017/EE(B)TSR Sri Abdul Jaleel. Abdul Sri 23.6.15 FOR 13L 23.6.15 FOR 90 SJD-15-16-Construction 13L SJD of building for

anganwadi No: 78 in P K Joy 12months Pudukkad ward no. V, 1246981/- 1371679/- finishing dtd. 23.616 Pathukulangara (under work under 90% Kodakara Additional progress 04-06-2016 ICDS Project) at 13L 24.8.15 FOR 08/02/2016 dtd. 13L 21/16-17/EE(B) TSR TSR 21/16-17/EE(B) Mattathoor GP dtd: 3165/2015-2016 ICDS-A7-7755/15 DTD DTD ICDS-A7-7755/15 91 SJD-15-16-Construction N agreemen 13L 13L 13L SJD of building for t executed anganwadi No: 56 6.9.16 ,work to 9months 1082842 2016 dtd: ICDS-A7- TSR DTD Pudukkad under Kodakara ICDS 1106377/- be started 3755/2015-

Project at 24.8.15 FOR 7755/15 DTD 7755/15 DTD 41/16-17/EE B 41/16-17/EE V.L.POLACHA

Nenmanikkara GP 01.03.2016 dtd. 92 Social Justice Dept.- Inviting 20L 20L SJD Upgradation of Existing Quotation Anganwadi (No. 36) to (each) by AEE. P.547/2 9 months Pudukkad for20Lakh for20Lakh Model Anganwadi in 1848052/- No 17.10.2013 3.3.2014 for 3.3.2014 for Mullassery Panchayath (B) TSR dtd: response 114/13-14/EE 114/13-14/EE /2013 SJD dtd /2013 SJD GO(RT)NO:520 93 Social Justice Dept.- finishing 80% 8L work in SJD Construction of a progress Anganwadi Building in P.545/8 741971/- 988010/- Irinjalakuda - 6 months Irinjalakuda Parappukkara Panchayath NO. RT) GO ( TVM 11.2.2014. TVM 32/14-15/EE (B) (B) 32/14-15/EE TSR dtd: 10.7.14 TSR 99/2014/SJD dtd. 99/2014/SJD TSR dtd: 1.7.2015 TSR 24/2015-16/EE (B) (B) 24/2015-16/EE f( Order No. ICDS/A 7- No. ICDS/A 7- Order 662/14 dtd. 03.03.14 M.V. Aravindakshan M.V. 94 SJD-Thressiamma work 100% V.P 25L completed SJD

memorial Hospital- Baiju Renovation works to 1.10.2016 (PRICE) 08-10-2015 07-10-2015

existing pond and 2199844/- 2285198/- 12 months dtd 29.9.15 Irinjalakuda

installation of filtration GO(MS) No.

plant 25L 21.3.13 for 25/13/S.J.D dtd. 25/13/S.J.D 332/2015-16 dtd: 332/2015-16 27.6.15 for Rs. 25L Rs. 27.6.15 for 59/15-16/EE B TSR B TSR 59/15-16/EE

95 SJD-Coonstruction of ) Awaiting 25L SJD sensory garden at TS RIPMR estimate 23.7.15 for 23.7.15 for Irinjalakuda 5/2015/SJD 5/2015/SJD DTD TVM dtd GO(RT)No.45 25L (Civil work work 25L (Civil

96 SJD-Balance work of R work started 10%

SJD the construction of 130L 130L building for TVM dtd TVM 74/2016- Rs 130L 12months RIPMR,Irinjalakuda 6469679/- 4852856/- 23.7.15 for 23.7.15 for Irinjalakuda Sri.M.L.Shaju 2773/2016-17 2773/2016-17 Dtd.8/12/2016 dtd. 7.10.2016 2017/EE(B)TS 2015/SJD DTD DTD 2015/SJD of BCC TSR for of BCC TSR for GO(RT)No.453/ 97 SJD- Installation of Soil investigation SJD hydrotherapy unit at 200L work RIPMR

for 200L for arranged Irinjalakuda 015/SJD DTD DTD 015/SJD TVM dtd 11.6.15 TVM GO(RT)No.357/2 98 SJD-14-015- Work in 85% good SJD

Ollur Construction of building progress 11.66L 11.66L

for anganwadi No: 134 4 months 03.12.2015 02.04.2016 P. 606/28

at () 1165948/- 1282543/- GO(RT) No. GO(RT)

Panchayath Ashokan AM dtd. 25.11.2015 700/2014/SJDd. 700/2014/SJDd. 27.11.14 for 12L 27.11.14 for dtd 8.12.14 FOR dtd 8.12.14 FOR 79/14-15/EE B TSR B TSR 79/14-15/EE B TSR 90/15-16/EE 99 SJD - Construction of Agreement executed SJD new Building for 6months

anganwadi No.111 at 999807 946266/- 999807/- Mulamkunnathukavu in ICDS A8- 29/11/2016 18498/2014 Avanoor Grama Rs.1166000 Rs.1166000

Pnachayath DT.23/07/2016 Wadakkanchery KV Sarathkumar 103/2016-17/EE B 103/2016-17/EE TSR Dtd. 2.2.2017 Dtd. TSR 3309/2016-2017 Dt. Dt. 3309/2016-2017 100 Construction of new .Agreement

20L executed SJD building for model

Anganwadi of Rs.20L 12Months 85/2016- 518/2013

Mullassery 1803729/- 1631228/- 3113/2016- 2017/PRICE 2017/PRICE dtd.3/1/2017 C.V.Santhosh Dt.15/11/2016 2017/EE(B)TSR 2017/EE(B)TSR Dt.17/10/2013 For For Dt.17/10/2013

101 Construction of new Agreement executed SJD building for Anganwadi 13 L

No.133 at Arimboor L Rs.13 Thrissur 12months

Grama Panchayath 1085131/- 1003746/- MT Sebastian MT Dt.25/12/2016 DT.23/11/2016 DT.23/11/2016 3573/2016-2017 3573/2016-2017 106/2016-17/EE B 106/2016-17/EE TSR Dtd. 10.2.2017 Dtd. TSR ICDS A7-3187/2016 A7-3187/2016 ICDS 101 Construction of Agreement executed SJD Nirbhaya shelter Home - 26.50L 6months

Balance work ( 26.50 L Thrissur KJ Rajan

Finishing & compound 2495337/- 2029013/- Rs. 26.50L Rs. wall works) GO(RT)No. 3649/2016-2017 3649/2016-2017 105/2016-17/EE B 105/2016-17/EE TSR Dtd. 4.2.2017 Dtd. TSR Dt.3.1.2017 for Rs. Rs. for Dt.3.1.2017 dtd. 22/11/2016 for dtd. 22/11/2016 for 540/2016/SJD TVM TVM 540/2016/SJD NABARD WORKS RIDF XVII 99 NABARD –RIDF XVII d Excavtion of 39% H&FWD Setting up of Rain water Harvesting Water treatment plant GO(RT) GO(RT) pond and

and alternate sources 58976140 24 months Drinking 18.09.2015 18.09.2017 57914570/- for effective supply of water pond 675 L(EL 30 L) 675 L(EL

Wadakkanchrty water to Govt. Medical Completed. Construction College , MG Kavu 58976140 EPAC= of pump

13.3.12 for Rs.675.5 L Rs.675.5 13.3.12 for House -No.1 Health & Family welfare Health & Family

No.922/2012/H&FWD dt No.922/2012/H&FWD Completed M/S SPAN Constructions SPAN M/S and 25/2015-16/SE/BCC/TSR dt 25/2015-16/SE/BCC/TSR construction 100 H&FWD NABARD-RIDF- AGREEMEN XVII- CONSTRUCTION T PWD EXECUTED OF SUB STATION 21.63L 9months BUILDING IN 2038008 1708825 Rs. 21.63L Rs. ACADEMIC BLOCK

Wadakkanchrty BUILDING OF GMC A.P.NARAYANA PISHARODY A.P.NARAYANA 51/16-17/EE(B)TSR Dtd. 27.10.2016 Dtd. 51/16-17/EE(B)TSR 2512/2016-17 DT.9.9.2016 for Rs. 21.63L Rs. for DT.9.9.2016 2512/2016-17 GO (RT) No.1336/2013/PWD DT19.10.2013 for for DT19.10.2013 No.1336/2013/PWD GO (RT) RIDF XIII 101 H&FWD-NABARD RIDF- DPR

XIII.lf Construction of PG submitted Students Quarters in 1464L for AS Govt.Medical College,TCR Wadakkanchrty Health & Family Health & Family 102 H&FWD-NABARD RIDF- RCC 13%

XIII.lf Construction of Footing hostel building for casting /H&FWD /H&FWD

female students in 115Lakhs progressin Govt.Medical g 132 L (EL 10 L) 132 L (EL Wadakkanchrty

Health & Family Health & Family College,TCR Dtd.19.07.2014for Dtd.19.07.2014for GO(Rt)No.2444/2014 RIDF XXI 103 Infrastructure works like Agreement classrooms etc. in to be Lakhs Gedn Pazhayannur GP Higher executed 228.25 L 18Months

Secondary School, Rs.228.25 Dated Tvm 26/12/2015 Pazhayannur, Chelakkara 19643359/- 16327774/- Chelakkara G.O.(Rt)No.60 Sreekumar.C.K 21/2015/Gl.Edn STIMULUS PACKAGE 104 Construction of Govt. office complex at 240L

PWD Partition Wadakkanchery 7.8.12 work Rs.274L P.19/ 64 G.O.(Rt) G.O.(Rt) 18months 18months (Stimulus package) 24730540 32614636 completed.tr 97% uss work

Rs 240 Lakhs Rs started Wadakkanchrty 99/CE/BL/2010- T.A.Aboobacker 11 Dt.17.8.10 for for 11 Dt.17.8.10 dated 14.7.09 for dated 14.7.09 for No.1047/09/PWD No.1047/09/PWD 6.2.14 LAC - ADS WORKS LAC ADS 2012-13 WADAKKANCHERY CONSTITUENCY,Sri.C.N.Balakrishnan,Hon'ble Minister -2012-13 1 Health & Family welfare lf

Dept-LAC -ADF- Lakhs 12.07.16 Construction of 13-01-15 plastering 18 months Casuality and ICU Block 28.05.2015 work 80% of Thaluk Headquarters ongoing T A Aboobacker Agt. No. 08/2015- EPAC-23479952/- Wadakkanchrty

Health & Family Health & Family hospital at APAC-26985509/- H&FWD Dated Tvm dtd 23.9.14 for 250L 11/04/2013 Rs.250 Wadakkanchery 16/SE/ BCC/TSR dt. G.O.(Rt)No.1309/2013/ 11/14-15/SE /BCC/ TSR KAIPAMANGALAM CONSTITUENCY-Sri.V.S.Sunil Kumar MLA -2012-13 1 Construction of roof slab 25% Auditorium for casted G.Edn Rs.95L

HSS,Edavilangu 11.8.16 GO(RT) GO(RT) 12.02.13 95 Lakhs TSR DTD 12 Months Edn/Tvm Dtd: Dtd: Edn/Tvm 87/114-15/EE, 87/114-15/EE, 31/16-17/EE B 31/16-17/EE BDn., TSR Dtd: EPAC-9178149 No.628/2013/G. Kaipamangalam 10.12.14 for 95L 10.12.14 for Abdul Jaleel C A C Jaleel Abdul KUNNAMKULAM CONSTITUENCY- Sri.Babu.M.Palissery,MLA -2012-13 CHALAKKUDY CONSTITUENCY,B.D.Devassy,MLA -2012-13 LAC ADS 2013-14 THRISSUR CONSTITUENCY - Sri. Therambil Ramakrishnan MLA 13-14 1 Construction of Gallery in work in good 90% 65L TSR Nethaji Ground progress.Bal for 65L Aranattukara,Thrissur 14.3.16 14.3.17 ance 20m TSR DTD TSR DTD 12months 6488659/- 7631312/-

PWD Bldgs gallery work

Corporation 19.12.2015 is completed M.K Shammy TVM,15.11.14 10.12.14 FOR 85/14-15/EE B 101/15-16/EE B GO(RT)NO:159 and 0/2014/PWD dtd 2 LAC-ADS Construction of .Agreement 50L TSR new building Sub executed Registrar Office 84/2016- 9 Months 4449831/- 4037798/-

,Anthikkad 3111/2016- Dtd.3/1/2017 2017/PRICE/ C.V.Santhosh Dt.14/11/2016 2015/PWD dtd 2017/EE(B)TSR 30.01.15 for 50L GO(RT)NO:154/ 3 LAC-ADS Construction of Agreement TSR JMJ JMJ new building forGovt.H S 50 L Executed School ,Kattilapoovam 12months 10.2.2017 4216835/- 3757135/- B TSR Dtd.

Madakkathara,Thrissur ForRs.50 L GO (RT)No. (RT)No. GO Constructions Dt 27/12/2016 1320/2015/Ged n.Dt.31/03/2015 108/2016-17/EE 3609/2016-2017 WADAKKANCHERY CONSTITUENCY,Sri.C.N.Balakrishnan,Hon'ble Minister -2013-14 1 Construction of Building for Thekkumkara PHC, 100L Veerolippadam 8986178 H& FWD

dtd: TVM dtd: TVM finishing 12 months - -

11867147/- work 87% GO(RT) No. GO(RT) DTD 18.9.15 DTD ongoing 100L (PRICE) P.C.DEVASSY 30.9.2015 29.9.2016 wadakkanchery 772/2014/H&FWD 772/2014/H&FWD 04.03.2014 for Rs. Rs. 04.03.2014 for dtd: 28.5.14 for Rs. Rs. dtd: 28.5.14 for 52/15-16/EE B TSR B TSR 52/15-16/EE 14/14-15/ EE (B) Tsr Tsr EE (B) 14/14-15/ 2 Development works for Play Ground of GBHS, LSGD Construction of Gallary, site not 28.7.2015 WKY 9992627/- handed 12446816/- GO(RT)No: GO(RT)No: over.bounda

wadakkanchery ry to be T.A.Aboobacker demarcated 7.6.14 for Rs.100L 7.6.14 for 16/EE(B) TSR dtd: 16/EE(B) dtd 4.3.14 for 100L dtd 4.3.14 for (Agmt No. 32/2015- No. (Agmt 1183/2014/LSGD,TVM 1183/2014/LSGD,TVM 42/14-15/ EE (B) Tsr dtd: Tsr EE (B) 42/14-15/ 3 Construction of Plastering 80% Building for GUPS, completed 100L Gedn Varadiyam Sunil TO 12months 9499983/- 23/12/2015 22/12/2016 10964880/- GO(RT) No. GO(RT) DTD 15.12.15 DTD Wadakkanchery 100/15-16/EE B TSR B TSR 100/15-16/EE 103/14-15/EE B TSR B TSR 103/14-15/EE 5113/2014/G.Edn dtd: DTD 7.2.15 FOR 100L 7.2.15 FOR DTD TVM 19.11.2014 for Rs. Rs. 19.11.2014 for TVM 4 Construction of Building Agreement for CHC in Tholur GP executed 100L 9249960 72/2016- H& FWD 12months 12months 10585654 H&FWD, dtd H&FWD, TVM,25.11.14 DT.07/12/2016 2017/EE(B)TSR 2017/EE(B)TSR Wadakkanchery 104/14-15/ EE (B) Tsr Tsr EE (B) 104/14-15/ PS Mohammed Yoonus PS Mohammed GO(RT)No.3802/2014/ dtd: 11.03.2015 for Rs. Rs. dtd: 11.03.2015 for 5 LAC ADS 2015-2016- LOA issued. Construction of Class Agreement

G.Edn to be room block for 71.30L 71.30L executed 6159157/- 5284565/-

GVHSS,Desamangalam 18 Months 24/12/2016 Chelakkara MA Abdullakutty MA Edn Dt.4.3.16for Edn Dt.4.3.16for 3569/2016-2017 Dt Dt 3569/2016-2017 GO(RT)No992/2016/G. KODUNGALLUR CONSTITUENCY-Sri.T.N.Prathapan MLA -2013-14 1 Construction of new Plastring 85% building for V K Rajan work in

GEdn progress Memorial Govt Higher 12 months 12-02-2016 11-02-2017

Secondary School 6844606/- Rs. 82,60,071 Kodungallur Pullut EG Sijil kumar TSR dtd. 8.2.16 G.Edn. dtd TVM G.Edn. dtd TVM 125/2015-16/EE(B) 125/2015-16/EE(B) 76/14-15/EE(B) TSR TSR 76/14-15/EE(B) dtd. 28.11.14 for 75 L dtd. 28.11.14 for 30.6.2014 for 75LAKH 30.6.2014 for GO(RT)No:2559/2014/ 2 Construction of Brick work 60% AD Community Health and plastering Centre, Puthenchira 62L for work in 12months 5799924/- 6812591/- progress dtd. 30.5.16 Kodungallur Babu Antony 1.12.14 for Rs.62 L Rs.62 1.12.14 for 08/16-17EE(B) TSR TSR 08/16-17EE(B) ADdtd TVM 31.7.2014 TVM ADdtd 77/14-15/EE (B)Tsr dt. (B)Tsr 77/14-15/EE GO(RT)No:2595/2014/ 3 New building for class work started 20% rooms in SF of HSS reached up Gedn to roof slab boys, Kodungallur level 7405132 12months 7439381/- Kodungallur DTD 23.8.16 DTD V.P.ANTONY .Edn. dtd TVM .Edn. dtd TVM 06.05.2014 for 78L 06.05.2014 for 38/16-17/EE B TSR B TSR 38/16-17/EE 30/14-15/ EE (B) Tsr Tsr EE (B) 30/14-15/ dtd: 5.7.14 for Rs. 78L dtd: 5.7.14 for GO(RT)No:1729/2014/G 4 H&FWd Asset .Agreeme

Maintenance fund 2016- 35L nt

2017 Renovation work Rs.35L executed H&FWD P.C.John

of Taluk Head Quarters 3166141/- 2412969/- 12 months Kodungallur

Hospital,Kodumgallur Dtd.6/1/2017 3251/2016-2017 3251/2016-2017 Dt.16/08/2016 For For Dt.16/08/2016 2256/2016/H&FWD 2256/2016/H&FWD /PRICE/ Dt 24/11/2016 Dt /PRICE/ 87/2016-2017EE(B)TSR 87/2016-2017EE(B)TSR KAIPAMANGALAM CONSTITUENCY-Sri.V.S.Sunil Kumar MLA -2013-14 1 SCST Dept - Sunshade 40% 50L Construction of new 50L level building for ITI, 9months SCSTDD

Edathiruthy 4736194/- 6066117/- for Rs. 50L for DD dt TVM GO(RT)No. GO(RT)No. 07-08-2015 PA Sajeevan 16/EE B TSR 16/EE B TSR 17.3.14 for Rs. Rs. 17.3.14 for dtd: 31.7.2015) Tsr dtd: 29.5.14 Tsr 554/2014/SCST Kaipamangalam 19/14-15/ EE (B) EE (B) 19/14-15/ (Agmt no. 31/15- (Agmt NATTIKA CONSTITUENCY-Smt.Geetha Gopi,MLA -2013-14 1 Construction of a Fire Roof slab 65% Station at Nattika, completed,B 200L Home

52/15- rick and Nattika Valappad 2 crore plastering 17328942 12 months work dt.27/11/15 02-12-2015 01-12-2016 21262612/- nearing

Johny Thomas completion 16/SE/BCC/TSR / Home dtd TVM, dtd TVM, / Home 26/14-15/SEBCC 26/14-15/SEBCC 14.10.14 for 200L 14.10.14 for GO(MS)No.201/2014 TSR dtd. 29.11.15 for dtd. 29.11.15 for TSR 2 Construction of New OP painting 70% Block for Govt. Hospital, work started 55/15- Nattika Thriprayar 2 crore H&FWD /H&FWD /H&FWD 200Lakhs dt.8/12/15 17206415 13/12/216 12 months Joji Joseph 19787377/- 14-12-2015 16/SE/BCC/TSR dtd,TVM,7.7.14 for for dtd,TVM,7.7.14 dtd. 31.3.15 for 200L dtd. 31.3.15 for GO(RT)No:2297/2014 39/14-15/SEBCC TSR TSR 39/14-15/SEBCC GURUVAYUR CONSTITUENCY-Sri.K.V.Abdulkhader MLA -2013-14 1 Construction of New Plastering 65%

Buildings for Dialysis 90L nearing completion Unit at Taluk Hospital, H&FWD 90 lakhs 8177708/-

Guruvayur Chavakkad D dtd: TVM dtd: TVM D 10302277/- 07-10-2015 06-04-2016 6 MONTHS GO (RT) No. GO (RT) 61/15-16/EE B 61/15-16/EE Santhosh Jack 20.5.14 for 90L 20.5.14 for TSR DTD 1.10.15 DTD TSR dtd.5.7. 14 for Rs. Rs. dtd.5.7. 14 for 1625/2014/H&FW 29/14-15/EEB TSR TSR 29/14-15/EEB 2 Construction of Roof slab 65% Additional Class Room completed,

G Edn 50/15- Brick work in GHSS Manathala and 9724768/- 107 Lakhs Guruvayur 15 months plastering 11183483/- 06-11-2015 05-11-2016 nearing

TSR FOR 107L FOR TSR completion DTD 27.11.2015 DTD 16/SE/BCC/TSR 15/GL.EDN DTD P.P. Sunil kumar P.P. Sunil 682/2015-16 DTD DTD 682/2015-16 21.3.15 FOR 107L 21.3.15 FOR GO(RT)NO.1123/20 30.7.15 OF SE BCC 30.7.15 OF SE BCC 3 Construction of Dining F.F.Column 40% hall and Conference work started

G Edn room in Edakkazhiyoor 50 lakhs FOR 50L FOR 29/02/2016 28/02/2016 4668432/- 5297270/-

Guruvayur G.L.P School 12 months 488/2015-16 488/2015-16 (PRICE) dtd: TVM, 17.3.2015 TVM, 015/G.EDN DTD P.P. Sunil kumar P.P. Sunil TSR Dtd. 23.2.16 Dtd. TSR 135/2015-16/EEB 135/2015-16/EEB GO(RT)No.1029/2 15.7.15 for Rs. 50L Rs. 15.7.15 for CHELAKKARA CONSTITUENCY,K.Radhakrishnan,MLA-13-14 1 Construction of

Academic Block for P S plinth Hedn dn Dtd.

Govt.Arts & Science 255/14- beam for 100L

Rs. 100L 55% 12months 12months 9373454/- college Chelakkara at 126/2015- work Chelakkara 10660429/- 15/(PRICE) Muhammed Muhammed 30.12.14 for 30.12.14 for GO(RT) No. GO(RT) Dtd. 12.2.16 Dtd. Killimangalam 16/EEB TSR ongoing 3054/2014/H.E dtd: 09.03.2015 2 Construction of class Rroof room for GHSS- 100L 100L

Gedn slabslab Varavoor copmleted 29.02.2016 28.02.2017 12months

9481855/- HDS Block 65% Chelakkara 10761906/- masonry 29.7.15 for Es. 29.7.15 for 89.4.15 for Rs. Rs. 89.4.15 for work is in Mohammed.T.A

663/2015-16 dtd. 663/2015-16 progress TSR Dtd. 26.2.16 Dtd. TSR GO(RT)NO.1381/ 137/2015-16/EEB 137/2015-16/EEB 2015/G.EDN DTD 3 Construction of school room for GLPS , Gedn Varavoor 1year

29.02.2016 28.02.2017 Plastering 2993277/- 3292605/- for Rs. 30L for Chelakkara work is in 85% progress Mohammed.T.A TSR Dtd. 26.2.16 Dtd. TSR 138/2015-16/EEB 138/2015-16/EEB 1267/2015-16 dtd. 1267/2015-16 5/G.EDN DTD 9.4.15 GO(RT)NO.1397/201 23.9.2015 for Rs. 30L Rs. 23.9.2015 for PUDUKAD ,Prof.C.Raveendranath,MLA -2013-14 OLLUR CONSTITUENCY-Sri.M.P.Vincent MLA -2013-14 1 Construction of Building Foundation 15% work in

Ollur for Puthoor Govt. Gedn progress Higher Secondary 50L for 5739246 6 months V.P.Baiju. School 4598963/- for Rs.50 L for 53/14-15/EE 53/14-15/EE 014/G.Edn dtd 42/16-17/EE B 42/16-17/EE TSR DTD 6.9.16 TVM 06.05.2014 TVM GO(RT)No:1765/2 (B)Tsr dt. 23.08.14 (B)Tsr 2 Construction of Work

Ollur Nadathara Panchayath tendered Gedn

Jubily memorial Hall at 50L Rs. on PAGUPS, 9months 16.3.15, Moorkkanikara, Thrissur 24.4.15, Quotation invited on 10.6.15 - TVM 1.7.2014 for 50L 1.7.2014 for TVM no response - Instructed AEE for GO(RT)No:2589/2014/G.Edn dtd GO(RT)No:2589/2014/G.Edn collecting

99/14-15/EE(B) TSR dtd. 7.2.2014 for dtd. 7.2.2014 for TSR 99/14-15/EE(B) the MANALUR CONSTITUENCY-Sri.P.A.Madhavan.MLA -2013-14 1 Proposed Public office painting 65%

complex at Vadanappilly 65L work started PWD 4.3.16 5.3.16 4.3.17 for 65L for 150/15- Manalur 65 lakhs 12months 5836559/- 7730522/- GO(RT) no. GO(RT) 125/2013-14/ 125/2013-14/ EE(B) Tsr dtd: Tsr EE(B) Johny Thomas 263/2014/PWD 263/2014/PWD 11.03.14 for Rs. Rs. 11.03.14 for 16/EEBTSR Dtd. Dtd. 16/EEBTSR dtd. TVM 20/2/14 dtd. TVM 2 Construction of New Brick work in 75%

Building for PHC at 50L progress

4.3.16 condition for 50L for

Arimbur 149/15- Manalur H&FWD 9months 11-3-2016 4465817/- 5396047/- 11.12.2016 Johny Thomas 73/14-15/EE(B) 73/14-15/EE(B) TVM 7.10.14 for 7.10.14 for TVM 014/H&FWD dtd 014/H&FWD 16/EEBTSR Dtd. Dtd. 16/EEBTSR TSR dtd. 17.11.14 TSR GO(RT)No.3298/2 CHALAKKUDY CONSTITUENCY,B.D.Devassy,MLA -2013-14 1 Construction of New work 100%

building for Koratty 30L completed

Village Office 5.8.15) Revenue FOR 30L FOR 26.10.2016 9 months 27.1.2016 2685257/- 2945727/- Chalakudy 2014/RD DTD DTD 2014/RD Agrt no:33/15- Agrt 42/14-15/EE B 42/14-15/EE TVM 31.5.14 for 31.5.14 for TVM TSR dtd 19.8.14 TSR GO(RT)No:2360/ 16/EE B TSR dtd 16/EE B TSR Gangadharan VK Gangadharan LAC ADS 2014-15 THRISSUR CONSTITUENCY - Sri. Therambil Ramakrishnan MLA -2014-15 1 Construction of new Site hand building for Public overed. PWD Library, Thrissur Thrissur 15 months for Rs.160L for GO(RT)NO.125/201 5/ PWD dtd 24.1.15 5/ PWD 2 LAC-Ads 2015-2016 Agreement Construction of a /16 Executed Educational Building for 8898411 7967868

CMGHSS Office block 18 Months 2703/2016- 11-07-2016

Kuttur,Thrissur 6/G.Edn dtd Sri.E.B.Shibu 27.2.16 for Rs.100L 27.2.16 for GO(RT)NO.838/201 2017/PRICE/Dt.2/10 WADAKKANCHERY CONSTITUENCY,Sri.C.N.Balakrishnan,Hon'ble Minister -2014-15 1 Construction of work to Convention centre at be PWD 1Crore

Vazhani in Thrissur VE Loyi started.sit 6months

9008180/- 9852244/- e to be handed over from Dtd. 01.01.2016 Dtd. Wadakkanchery 772/2015-16Dtd. 772/2015-16Dtd. irrigation dtd TVM,15.5.15 for for dtd TVM,15.5.15 departme 31.7.2015 for Rs. 100L Rs. 31.7.2015 for 104/2015-16/EE B TSR B TSR 104/2015-16/EE nt.permiss

GO(RT)No.658/2015/PWD GO(RT)No.658/2015/PWD ive 2 ADS-2014-15 Awaiting Construction of new TS 100L building for estimate H&FWD Govt.Ayurveda Hospital

at wadakkanchery GO(RT)NO. (Vishavaidya) Wadakkanchery 2565/2015/H&FWD 2565/2015/H&FWD dtds TVM,6.8.15 for for dtds TVM,6.8.15

KODUNGALLUR CONSTITUENCY-Sri.T.N.Prathapan MLA -2014-15 1 Beautification works to stage roof 55% Kunjikuttan Thamburan casted PWD 116 L

Chathuram ( Square) in GO RT /TSR Dt 12months 13509734 WD DTD 11598330 16/7/2015

Kodungallur 116L FOR Kodungallur K.J.Varghese TVM,15.11.14 TVM,15.11.14 TSR Dt 27/1/2016 508/2015-16/SE 508/2015-16/SE 73/2015-16/SE/BCC NO:1589/2014/P

2 Construction of Agreement

Additional Floor to the 65L 65L to be Gedn executed newly constructed

building of VK Rajan 5382513/- 5920764/- 12 months Kodungallur Memmorial Govt. HSS, GO (RT)No. Pullut 1461/2015/G.Edn dtd 17.4.15 for Rs Rs dtd 17.4.15 for 1163/2015-16 dtd. 1163/2015-16 16.09.2015 for Rs. Rs. 16.09.2015 for Muhammed Habeeb Muhammed 3 Construction of nearing 85% Additional Floor to the completion Gedn newly constructed 20/16- Rs. 100L Rs. 22.06.2018 6months 23-06-2016 KP Sunny building of Govt HSS , 9329355/- 9867659/- dtd TVM,dtd dtd TVM,dtd 22.6.16 Dtd.

Kodungallur Karuppdanna 16.9.2015 for 16.9.2015 for 96/15/G.EDN 17/EE(B)TSR 17/EE(B)TSR GO(RT)NO.16 1149/15-16 dtd 1149/15-16 7.5.15 for 100L 7.5.15 for 4 Beautification works to SN

Kunjikuttan Thamburan 69L issued PWD Projects Chathuram ( Square) in 4883264 18months Kodungallur - Phase 2 estimate rate For Rs. 69L Rs. For Kodungallur GO (Rt) NO: GO (Rt) 842/2015-16 842/2015-16 (PRICE) dtd: Rs.718536/-below 877/2015/ PWD 877/2015/ PWD 11.08.15 for Rs. Rs. 11.08.15 for DTD TVM,25/6/15 TVM,25/6/15 DTD Sri. Shaju Mohan, Olivia KAIPAMANGALAM CONSTITUENCY-Sri.V.S.Sunil Kumar MLA-2014-15 1 Providing additional Plastering 60%

floors to new block in 90L work in Gedn progress MARM HSS,Santipuram 90L for 8540723 08.03.2016 07.03.2017 21months 7764294/- 2015/G.Edn Abraham Paul Abraham 35/16-17/EE B 35/16-17/EE 1150/15-16 dtd 1150/15-16 dtd,TVM, 3.6.15 dtd,TVM, Kaipamangalam 16.9.2015 for Rs. Rs. 16.9.2015 for GO(RT)NO.2156/ TSR DTD 23.8.16 DTD TSR NATTIKA CONSTITUENCY-Smt.Geetha Gopi,MLA -2014-15 1 Construction of new painting 65%

building for pharmacy to 50L 50L work started HEdn 3.3.16 2.3.17 Nattika CH Centre, Valapad. 12Months 4649783/- 4621884/- Johny Thomas 142/15-16/EE B 142/15-16/EE TSR Dtd. 29.2.16 Dtd. TSR 2527/2015-16dtd. 2527/2015-16dtd. 14.1.2016 for 50L 14.1.2016 for 015/H&FWD,TVM 015/H&FWD,TVM DTD 25.4.15 FOR 25.4.15 FOR DTD GO(RT)NO.1270/2 C 2 Construction of 2880/20 Agreement SR SR

40L Executed

laboratory block in the DTD 16- Hedn Nattika

first floor of college of 2017/PRO 3506989 78/2016- Edn,TVM Edn,TVM 12Months applied science, Nattika ICE 3325173/- 02.02.2016 GO(RT)NO. GO(RT)NO. 346/2016/H. 346/2016/H. Abdul Jaleel. Abdul DTD.23/ 2017/EE(B)T 10/2016 Dt.15/12/2016 3 Construction of Sub- old building Registrar Office at to be PWD auctioned Nattika Anthikkad GP P..66/17 9months 4660087/- for Rs. 50L for dtd,TVM, 30.1.15 for 50L 30.1.15 for dtd,TVM, 3633/2015-16 dtd. 26.2.16 3633/2015-16 GO(RT)NO.154/2015/PWD GO(RT)NO.154/2015/PWD . 4 Construction of smart Plinth beam 10% class-room for completed Gedn Nattika Ammadam 15L for 6months 1486547

Govt.L.P.School 1422533/- 2015/G.Edn C.S.VISHNULAL 39/2016-17/EE B 39/2016-17/EE dtd,TVM, 22.5.15 dtd,TVM, GO(RT)NO.1938/ 3241/2015-16 dtd 3241/2015-16 5 LAC-ADS 2015-16 Letter CONSTRUCTION OF submitted PLAY GROUND AND to 100.00L STAGE FOR Fisheriese 2016/F&PD 2016/F&PD FISHARIES SCHOOL, Dt:05/07/17 ctor to NATTIKA deposit G.O.(Rt)No:142/ the fund 6 Construction of Social- LSGD/TSR/8 Estimate

welfare club library at 50L 654/14 dt. amonting LSGD

Nattika Vadakkumury in 10.11.14 to Rs.50L Thanyam GP submitted to Govt by 7 LAC-ADS 2015-16 WorkCE vide to be CONSTRUCTION OF tendered

F&PD after

Nattika PLAY GROUND AND

100.00 L depositing

STAGE FOR FISHARIES Dt:05/07/17 /2016/F&PD amount to SCHOOL, NATTIKA

G.O.(Rt)No:142 PWD. CHELAKKARA CONSTITUENCY,K.Radhakrishnan,MLA-2014-15 1 GVHSS-Thiruvilluamala- Construction of class 100L Gedn room block Column Rs. 100L Rs. - - 9498415/- KM Abbas KM casting 15% Chelakkara 489/2015-16 489/2015-16 (PRICE) Dtd. ongoing Rs. 9107080/- Rs. 15.7.15 for Rs. Rs. 15.7.15 for 12 months 05.08.2016 05.08.2017 dtd. 13.11.2015 TVM 30.3.15 for 30.3.15 for TVM 015/G.EDN DTD GO(RT)NO.1279/2 73/15-16/EEB TSR TSR 73/15-16/EEB 2 Construction of first and Tendered second floor for on 100L Hedn Academic block of 10.3.16 - Govt.Arts and Science 9months No Chelakkara college Chelakkara at response -

Killimangalam 15/H.EDN DTD To be

3682/2015-16 dtd. 3682/2015-16 retendere GO(RT)NO.5168/20 TVM, 31.12.15 FOR FOR 31.12.15 TVM, 27.2.16 for Rs. 100L Rs. 27.2.16 for d on after 3 Purchase of land for DD Chelakkara Govt.Arts DRAWN Hedn and Science college IN OC FAVOUR Chelakkara OF 4/H.EDN DTD DIRECTO 014/H.EDN DTD DTD 014/H.EDN

27.6.14 FOR 1CR 1CR 27.6.14 FOR R,COLLE &GO(RT)NO.2985/2

GO(RT)NO.1399/201 GIATE 4 LAC -Ads 2015-2016 e Agreemen

Construction of 30 L t Hedn GO RT

retaining wall wall and 30L Rs. Exexcuted 63/2016- 2830065/- 2235713/-

side protection works for 09 Months Chelakkara GHSS pazhayannur 17/EE(B)TSR 17/EE(B)TSR Dtd.24/11/2016 dtd: 25.10.2016 for dtd: 25.10.2016 for 22/1/2016FORs 30L 22/1/2016FORs NO:227/2016/G Edn NO:227/2016/G Sri.Muhammed Bash Sri.Muhammed 2902/2016-17/PRICE 2902/2016-17/PRICE PUDUKAD ,Prof.C.Raveendranath,MLA -2014-15 1 Construction of Thanal work 100%

Auditorium and 55L completed PWD

anganwadi at GO RT 20.11.15 20.11.16 5129784 TSR dtd. TSR FOR 55L FOR Pudukkad Nenmanikkara GP,TCR 5854110/- 12 months for Rs. 55L for 20.11.2015 Vishnulal CS Vishnulal 107/14-15/EE(B) 107/14-15/EE(B) 81/2015-16/ EE B 81/2015-16/

DTD TVM,10.12.14 TVM,10.12.14 DTD TSR dtd: 13.3.2015 TSR NO:1715/2014/PWD NO:1715/2014/PWD 2 Construction of building G.F.roof 40% for slab Gedn partially PRICE Kannattupadam,GHSS GO RT

VP Baiju casted FOR 60L FOR Pudukkad 5688775/- 6257653/- 12 months Dtd. 7.6.16 26.8.15 through 26.8.15 through 925/2015-16 dtd 925/2015-16 15/16-17/EE(B)TSR 15/16-17/EE(B)TSR NO:1930/2015/G.ED N DTD TVM, 22.5.15 TVM, DTD N 3 Construction of Dialysis Nearing 95% unit & NCD Clinic at completion

Pudukad Govt. Hospital 13.8.16 9months 13.11.15 Pudukkad 2338468/- NT Paulose NT H&FWD dtd DTD 13.11.15 DTD 98/14-15/EE B TSR B TSR 98/14-15/EE B TSR 70/15-16/EE Est PAC: 2018879/- 2018879/- Est PAC: DTD 7.2.15 FOR 25L 7.2.15 FOR DTD GO(RT)No.3904/2014/ TVM,5.12.2014 for 25L for TVM,5.12.2014 Health & Family welfare welfare Health & Family 4 SJD - Construction of work 100%

28L completed SJD anganwadi cum Thanal 28 L

Auditorium at 15.1.16 15.1.17 Paul P P Pudukkad 2594884/- 2509483/-

Vattanathra in 12 Months

Alagappanagar 15.1.16 DTD /SJD dtd TVM, /SJD dtd TVM, GP(under ICDS 28L 22.5.15 for 16.9.2015 for Rs. Rs. 16.9.2015 for

Project),TCR dtd. 1152/2015-16 GO(RT)No.280/2015 106/15-16/EE B TSR B TSR 106/15-16/EE 5 Construction of school work 100%

building for GHSS- 50L completed G Edn

Chembuchira-Mattathur GO RT FOR 50L FOR ML Shaju ML 12months Pudukkad Panchayath (First Floor) 4498928/- 4948821/- Dtd. 13.6.16 Dtd. 01/2015-16/EE(B) 01/2015-16/EE(B) TSR dtd. 1/4/15 for TSR dtd. 1/4/15 for DTD TVM,17.11.14 TVM,17.11.14 DTD 17/16-17/EE(B)TSR 17/16-17/EE(B)TSR NO:5019/2014/G.EDN NO:5019/2014/G.EDN 6 Construction of new Finishing 90% building for Govt.Girls work in Gedn progress HSS, Chettiparambu, GO (RT) GO (RT) TA Davis

Irinjalakuda 12months 21995190/- 25507822/- Irinjalakuda for 200LAKH for DT.6.11.2011 for for DT.6.11.2011 N dtd: TVM 5.7.14 N dtd: TVM TSR/2014-15/1112 TSR/2014-15/1112 Rs.230L of SE TSR Rs.230L No.2656/2014/G.ED 7 LAC-ADS 2015-2016 Agreement

Construction of first 80L executed

G.Edn floor class room block 10/2016 80LAKH GO (RT) GO (RT) 93/2016- 6719072/- 6208633/-

for SMTHSS 18 Months Chelakkara Chelakkara 2903/2016- Balakrishnan.K Dtd.13/01/2017 dtd: 11.2.16 for dtd: 11.2.16 for 2017/EE(B)TSR 2017/EE(B)TSR 2017/PRICE/DT.25/ No.568/2016/G.EDN No.568/2016/G.EDN 8 LAC-ADS 2015-2016 Agreement Construction of class executed 100L /Gedn G.Edn room block for GHSS 10/2016 Rs.100L

Chavakkad 8724720/- 7756273/- 12 months 2776/2016- P.P.Sunilkumar Dt.27/02/2016 For For Dt.27/02/2016 101/2016-17/EE B 101/2016-17/EE 2017/PRICE/DT.08/ TSR Dtd. 25.1.2017 Dtd. TSR GO(RT)No.844/2016 9 LAC-ADS Construction Agreement

of Family Health welfare 30L executed

sub centre building at Rs.30L H&FWD 82/2016- 9 Months

Kundannur,Erumappett 2769182/- 2535222/- 28/12/2016 16/H&FWD

y Panchayath P.C.Devassy Dt.19/11/2016 3201/2016-2017 3201/2016-2017 Dt.29/8/2016 For For Dt.29/8/2016 GO(RT)NO.2425/20 2017/EE(B)TSR Dtd Dtd 2017/EE(B)TSR IRINJALAKUDA CONSTITUENCY - Sri. Thomas Unniyadan MLA -2014-15 1 Construction of building finishing 80% for Govt. Model Boys work in Gedn progress HSS, Irinjalakuda 24months 19948477 19288182 for 200L for TSR/15- 11-03-2016 10-03-2018 Order NO. Order Irinjalakuda Bos Thomas /2015/G.Edn 16/2015/2985 TSR Dt.4/03/2016 dtd,TVM, 9.6.15 dtd,TVM, GO(RT)NO.2246 dtd 1/10/2015 for 93/2015-16/SE B CC OLLUR CONSTITUENCY-Sri.M.P.Vincent MLA -2014-15 1 Construction of building Tender Land

Ollur for Vyloppily Govt.Arts document not 100L GEdn College,Ollur s to be trans 9223185/-

FOR 100L FOR submitted ferre 11067822/- Land Kerala after d to TVM,31.12.14 TVM,31.12.14 4.12.15 for Rs. Rs. 4.12.15 for 2014/Edn DTD 2014/Edn DTD getting Colle GO(RT)NO:3064/ Reforms & devlpt. Reforms 1897/2015-16 dtd. 1897/2015-16 LMR for ge. 2 Construction of stadium TS estimate submitted

Ollur to Panchayath G edn School,Pananchery Edn DTD GP,Thrissur 25L 5 For 318/2015/G. TVM,31.03.1 GO(RT)NO:1 3 Construction of Building Estimate

Ollur for GHSS, not Gedn Kattilapuvam, submitted, Madakkathara GP 50L FOR since the Phase 1 work not tendered due to

Edn DTD TVM,31.03.15 TVM,31.03.15 Edn DTD hindrance GO(RT)NO:1320/2015/G. GO(RT)NO:1320/2015/G. in MANALUR CONSTITUENCY-Sri.P.A.Madhavan.MLA -2014-15 1 Construction of GF for AS the proposed new approved ,

Home proposed

building to the police 40L Rs. Manalur 40 lakhs site in paddy station vadanappally in field.Hence Chavakkad Thaluk. No. GO(RT) letter sent to police 679/2016/Home 679/2016/Home authorities for hand Dtd.TVM 26.2.16 for 26.2.16 for Dtd.TVM overing site. KUNNAMKULAM CONSTITUENCY- Sri.Babu.M.Palissery,MLA -2014-15 1 Construction of class room building for 100L Gedn 1year Govt.GHSS,Kunnamkul Foundation (PRICE) Jose VK Rs. 100L Rs. TSR Dtd. work is in 12.9.2016 12.9.2017 9476044/-

am 100L FOR 30.11.2015 8825988/- progress TVM,29.5.15 TVM,29.5.15 Kunnamkulam 914/2015-2016 914/2015-2016 dtd. 24.8.15 for dtd. 24.8.15 for 2015/G.EDN dtd 2015/G.EDN 95/2015-16 EE B 95/2015-16 GO(RT)NO.2088/ 2 Construction of 20% classroom block for 100L 100L GEdn Column up 16.8.16 Govt.HSS(Higher Yoonus 22.08.2017

TSR DTD to roof slab 12months 10360225 9691511/-

secondary block), 100L FOR

Mohammed Mohammed completed 947/2015-16 947/2015-16 TVM,28.5.15 TVM,28.5.15 Erumapetty (PRICE) Dtd. Kunnamkulam 22.08.2016 33/16-17/EE B 33/16-17/EE 01.09.15 for Rs. Rs. 01.09.15 for 2015/G.EDN dtd 2015/G.EDN GO(RT)NO.2081/ 3 Construction of Staff 40L room on first floor to 40L Gedn

27/16- Finishing

GVHSS(Boys), 11.7.16 Habeeb

9months work work 08.02.2016 08.02.2017

Kunnamkulam 3996416/- 4535334/- 92% is in 519/2015-16 519/2015-16 (PRICE) Dtd. progress Kunnamkulam 17.7.15 for Rs. Rs. 17.7.15 for PS Mohammed PS Mohammed 2015/G.EDN dtd 2015/G.EDN GO(RT)NO.2042/ TVM,27.5.15 FOR FOR TVM,27.5.15 17/EE(B)TSR Dtd. Dtd. 17/EE(B)TSR CHALAKKUDY CONSTITUENCY,B.D.Devassy,MLA -2014-15 1 Construction of new nearing 95%

building for Melur village 40L completion office TSR dtd. TSR Revenue 9 months 27-11-2015 26-08-2016 3528643/- 3951730/- Chalakudy 18.11.2015 Sebastian Jose Sebastian 13.2.15 FOR 40L 13.2.15 FOR 15/RD DTD TVM, 77/2015-16/EE(B) 77/2015-16/EE(B) 02/2015-16/EE(B) 02/2015-16/EE(B) GO(RT)NO.921/20 TSR dtd. 1/4/15 for TSR dtd. 1/4/15 for 2 New building for work 100%

Govt.HS, 50L completed Gedn Vijayaraghavapuram, 12months 3.10.2016 Chalakudy 4447822/- 5039827/- Chalakudy 30.12.2015 29.12.2016 316/2015-16 316/2015-16 (PRICE) Dtd. Babu Thomas 15/G.EDN DTD TSR dtd. 21.12.15 TSR 102/2015-16/EE B 102/2015-16/EE GO(RT)NO.890/20 TVM, 13.3.15 FOR 13.3.15 FOR TVM, 25.6.15 for Rs. 50L 25.6.15 for 3 New building for Roof slab 40%

Govt.Boys HS, 50L casted Gedn KODAKARA 4499430 4995717 12months Chalakudy 190/2015-16 190/2015-16 (PRICE) Dtd. DAVIS ANTO DAVIS 15/G.EDN DTD TSR dtd. 22.1.16 TSR 5.6.15 for Rs. 50L Rs. 5.6.15 for 115/2015-16/EE B 115/2015-16/EE GO(RT)NO.890/20 TVM, 13.3.15 FOR 13.3.15 FOR TVM, THRISSUR CONSTITUENCY - Sri. Therambil Ramakrishnan MLA 15-16 1 Renovation to Corporation Request

stadium at 245L submitted Thrissur for master Revenue Rs. 245L Rs. plan G.O(Rt.) No. 1098/2016/LSGD dtd. Tvpm. 03.03.2016 for 03.03.2016 for dtd. Tvpm. 1098/2016/LSGD No. G.O(Rt.)

WADAKKANCHERY CONSTITUENCY,Sri.C.N.Balakrishnan,Hon'ble Minister -2015-16 1 LAC-ADS 2015-2016 Agreement Construction of a executed 100L 100L Gedn work to be Educational building for started TSR dtd. TSR Rs. 100L Rs. dtd, TVM, dtd, TVM, E B Shibu 2.11.2016 CMGHSS Office Block 8898411/- 7967868/- 18 months

Kuttur, Thrissur. 2016/G Edn 27.2.2016 for 27.2.2016 for 2703/2016-17 2703/2016-17 dtd 2.10.16 for dtd 2.10.16 for 61/16-17/EE B 61/16-17/EE GO(RT)No.838/ Wadakkanchery 2 Construction of bus . Agreemen

waiting shelter at 10L t executed PWD

Govt.Med.College,Thris 10L Rs. work to be 4months 999915/-

sur 1098907/- started. Site not

Wadakkanchrty finalised KA Krishnankutty by the

TVM, 1.10.15 for 10L 1.10.15 for TVM, Medical College authorities . GO(RT0No.1500/2015/PWD dtd, GO(RT0No.1500/2015/PWD 129/2015-16/EE B TSR Dtd. 20.2 Dtd. B TSR 129/2015-16/EE 2114/2015-16 dtd: 17.12.2015 for dtd: 17.12.2015 for 2114/2015-16

KODUNGALLUR CONSTITUENCY-Sri.T.N.Prathapan MLA -2015-16 1 Construction of open nearing 80%

auditorium in Govt. 65L 65L completion Gedn Samithi Higher 12months secondary School, 5997489/- 5397740/- For Rs. 65L Rs. For GO(RT)NO. GO(RT)NO. Kodungallur

Meladoor 17-06-2016 3446/2015-16 3446/2015-16 30.12.15 FOR 30.12.15 FOR DN DTD TVM, VT Mathachan Dtd. 20.2.2016 Dtd. 6063/2015/G.E d

2 Construction of Out R 60L

Patient block of Primary 60 L Agreement Health Centre, Kuzhur Joy PC H&FWD

75/2016- executed 12months 5260010/- 4494031/- GO(RT)NO. GO(RT)NO. Kodungallur 25/2/16 FOR 25/2/16 FOR WD dtd. TVM dtd. TVM WD Dtd.9/12/2016 633/2016/H&F 2017/EE(B)TS 2099/2016-17 2099/2016-17 3 Construction of first plastering 50% work in floor for govt. Higher 60 L Gedn progress Secondary School, 12months Iranikulam 5499074/- 6047332/- GO(RT)NO. GO(RT)NO. Kodungallur Dtd. 15.7.16 Dtd. 25-07-2016 3681/2015-16 dtd. 3681/2015-16 27.2.16 for Rs. 60L Rs. 27.2.16 for 28/16-17/EE(B)TSR 28/16-17/EE(B)TSR Lonappan Kattookaran 6001/2015/G.EDN DTD DTD 6001/2015/G.EDN TVM, 22.12.15 FOR 60L 22.12.15 FOR TVM, 4 Construction of stage in Agreement

25L executed Karupadanna GHSS 25 L Gedn FOR 25L FOR 18months KP Sunny 1808095/- 2106766/- Kodungallur TVM, 11.1.16 TVM, 016/G.EDN DTD 27.1.2017 for Rs. Rs. 27.1.2017 for TSR Dtd. 15/2/17 Dtd. TSR GO(RT)NO.113/2 112/2016-17/EEB 112/2016-17/EEB 3938/2016-17 dtd. 3938/2016-17 . 5 K Karunakaran Nearing 95% 50L memorial Govt.ITI Mala- 50L completion Labour Construction of 50L for

Practical & Theory 5641913/- Liyon . M. V Liyon . M. Kodungallur

Blocks G O (RT)No. 1654/2013/lbr 1654/2013/lbr dtd.tvm 25.09.13 dtd.tvm 115/2015-16dtd16 P T 6 Construction of New Agreement

13L executed. SJD building for Anganwadi- Work to be

Centre N.135 in Rs.13L

9Months started

Kodungallur Muncipality 1172453/- 1099999/- Kodungallur IDS/A7-7756/15 IDS/A7-7756/15 Abdul Jaleel.C.A Abdul 91/2016-17/EE B 91/2016-17/EE Dt.23/06/2016 For For Dt.23/06/2016 3310/2016-2017 / 3310/2016-2017 KAIPAMANGALAM CONSTITUENCY-Sri.V.S.Sunil Kumar MLA -2015-16 a

1 Construction of R Agreemen dtd.

Concrete basketball 20 L t Hedn

court for Govt.KKTM 20L Rs. Rs 20L Executed 6months 1517311 76/2016-

College, Pullut 1885009/- 142/2016/H 142/2016/H Kodungallur GO (RT) No. GO (RT) 18.1.2016 for 18.1.2016 for Edn Dtd TVM TVM Edn Dtd 2916/2016-17 2916/2016-17 Dtd.9/12/2016 2017/EE(B)TS 26.10.2016 for 26.10.2016 for Sri.Ashif Ashar Sri.Ashif GURUVAYUR CONSTITUENCY-Sri.K.V.Abdulkhader MLA 2015-16 1 Construction of Class Tender

room for GHS school 100L arranged on Hedn ,Chavakkad 1 crore 7.11.2016 8724720 16G-Edn 12months 27.2.2016 .Letter

Guruvayur submitted to H.M to 2776/2016-17 dtd: GO(RT)No.844/20 08.10.2016 for Rs. dismantl the CHELAKKARA CONSTITUENCY,K.Radhakrishnan,MLA -2015-16 1 Construction of new GALLERY 85%

gallery for SMTGHSS, 65L STEPS Gedn CASTED for 65L for

Chelakkara 65L Rs. Jayan VP 24months 6497676/- 7082466/- Chelakkara GO (RT) No. GO (RT) 2478/2015/G.Edn 122/2015-16/EE B 122/2015-16/EE TSR Dtd. 2.2.2016 Dtd. TSR dtd. 11.11.2015 for dtd. 11.11.2015 for dtd. TVM 20.6.2015 dtd. TVM 1606/2015-16 PRICE PRICE 1606/2015-16 2 Construction of new agreemen

building for GUPS, 50 L

Gedn t 5.9.16 Mullurkkara executed. 4133892 18months 4563234/- for Rs. 50L for

Chelakkara site to be GO (RT) No. GO (RT) obtained after

18.2.16 for Rs 50L Rs 18.2.16 for demolishi

K.HARINARAYANAN ng the old 40/16-17/EE B TSR DTD DTD B TSR 40/16-17/EE

3751/2015-16 dtd. 1.3.16 3751/2015-16 building 675/2016/G.Edn dtd. TVM 675/2016/G.Edn dtd. TVM 3 Construction of Rest Footing

room at Police station 14 L work on Gedn Chelakkara going 2016409 1396942/- 12 months for Rs. 14L for Chelakkara GO (RT) No. GO (RT) DTD 23.9.16 DTD vasudevan U 678/2016/Home 678/2016/Home dtd. TVM 26.2.16 dtd. TVM 3938/2015-16 dtd. 3938/2015-16 46/16-17/EE B TSR B TSR 46/16-17/EE 04.03.16 for Rs.14L 04.03.16 for 4 Construction of Tender

retaining wall and side 30 L arranged Gedn protection work for on FOR 30L FOR GHSS, Pazhayannur 9 months 07.11.201 DTD TVM, for Rs. 30L for 22.01.2016 Chelakkara 13-06-9648

2016/G.EDN 2016/G.EDN 6 2902/2016-17 2902/2016-17 dtd. 25.10.2016 GO(RT)NO.227/ 5 LAC - ADS Construction Retender 80L

of first floor of 80 L arranged Gedn SMTGHSS Chelakkara on FOR 80L FOR 18months 6719071/- 7.11.2016 Chelakkara TVM, 11.02.16 TVM, 16/G.EDN DTD 25.10.16 for Rs. Rs. 25.10.16 for 2903/2016-17 dtd. 2903/2016-17 GO(RT)NO.568/20 6 LAC - ADS Construction Agreemen 50L

of first floor class room 50 L t executed Gedn

block for GHSS Panjal 50L Rs. Sunil TO 47/2016- 18months 4488570/- 4690556/- DTD TVM, Chelakkara 19.1.16 FOR 19.1.16 FOR /2016/G.EDN /2016/G.EDN 17/EE(B)TSR 17/EE(B)TSR 3482/2015-16 3482/2015-16 dtd. 23.9.2016 dtd 22.2.16 for dtd 22.2.16 for GO(RT)NO.212 .

7 Construction of buds R Agreemen

school at Kondazhy 15 L t xecuted Gedn panchayath ,Chelekkara Rs. for 73/2016- FOR 15L FOR 12months 1499935/ 1254263/- 1188029/- DTD TVM, 05.02.2016 Chelakkara dtd. 25.10.16 /2016/G.EDN /2016/G.EDN 2910/2016-17 2910/2016-17 Dtd.7/12/2016 2017/EE(B)TS GO(RT)NO.452 Sri.Surendran.V PUDUKAD ,Prof.C.Raveendranath,MLA -2015-16 1 H&FWD - LAC - ADS- agreement Construction of New executed ,work to be Building for PHC

H&FWD started FOR 25L FOR 9 Months Justin KP 2016291/- 1677188/- Pudukadu subcentre, Eravakkad in Nenmanikkara GP, TCR 26/12/2017 TVM,04.03.2016 TVM,04.03.2016 16/H&FWD DTD 102/2016-17/EE B 102/2016-17/EE TSR Dtd. 1/2/2017 Dtd. TSR GO(RT)NO:785/20 3579/2016-2017 dt 3579/2016-2017 2 Construction of Thanal agreement 25L executed SJD Auditorium and anganwadi at Nenmanikkara GP,TCR ,work to be 2357799 2224940 12months Pudukadu - Balance work T.L.ANTO started SJD DTD TVM, Dtd. 30.10.2016 2.3.2016 FOR 25L 1.9.2016 FOR 25L 2898/2016-17 DTD 52/16/17/EE B TSR GO(RT)NO:133/2016/ IRINJALAKUDA CONSTITUENCY - Sri. Thomas Unniyadan MLA -2015-16 1 MLA-ADF.2015- AS

16.Irinjalakuda 30L 30L obtained D.dtd. D.dtd. LSGD Constituency.Constructi TS on of community hall at estimate GO (Rt) No GO (Rt) Irinjalakuda vellanchira in Aloor submitted 10/09/2015 for 10/09/2015 for

Grama Panchayath 2766/2015/LSG 2 MLA-ADF.2015- GF Roof 16.Irinjalakuda slab level 100L 100L

Constituency.Constructi 20.8.16 H&FWD 9420111 8008623 TSR DTD on of new building for 18months GO (Rt) No GO (Rt) Irinjalakuda 2.3.16 FOR 2.3.16 FOR &FWD DTD DTD &FWD

primary health centre at George Jerin WD .dtd. TVM .dtd. TVM WD 731/2016/H&F 34/16-17/EE B 34/16-17/EE 443/2016-17/H 443/2016-17/H Aloor 100L 2.3.16 for 3 MLA-adf.2015- LOA 50L 16.Irinjalakuda 50L issued. Gedn Constituency.Constructi Agreemen 4716669/- 3707302/-

on of auditorium 12 Months t to be GO (Rt) No GO (Rt) Irinjalakuda building for Scouts & executed Bose Thomas Guides at Dt. Head Dt.24/12/2017 3570/2016-2017 3570/2016-2017 quarters Irinjalakuda d. 18/02/2016 for 681/2016/G.Edn.dt OLLUR CONSTITUENCY-Sri.M.P.Vincent MLA -2015-16 1 Construction of work in good No. 50L dtd. V G progress

Ollur Eravimangalam library LSGD 4.3.16 for Rs 16.2.16 hall at Nadathara GP 151/15- 16/EE B G.O(Rt.) G.O(Rt.) 5/LSGD; 5/LSGD; 5-16 dtd. 5-16 TSR Dtd. 2991/201 3311/201 Chandran 12months 4599710/- 4360526/- KUNNAMKULAM CONSTITUENCY- Sri.Babu.M.Palissery,MLA -2015-16 1 Mediation centre Agreemen AM building and office room 60L 60L t executed Home for Advocate clerks in ME DTD 6months 29.11.16 FOR 60L TSR DTD

Kunnamkulam JFCM 5501337/- 4834407/- V.M.Azees 4.3.16 FOR 4.3.16 FOR GO(RT) NO: GO(RT) court compound 19.9.16 DTD 871/2016/HO 2533/2016-17 2533/2016-17 KUNNAMKUL 66/16-17/EE B 66/16-17/EE 2 Construction of Class AGREEM

room block for Govt. 50L 50L ENT Gedn RSRVHSS, Veloor EXECUT 4698760 FOR 50L FOR 12months 4848281/- ED JOY JOHN GO(RT)NO. GO(RT)NO. PARAPULLY 43/16-17/EE B 43/16-17/EE 26.2.16 for Rs. 26.2.16 for TSR DTD 7.9.16 114/2016/G.EDN KUNNAMKULAM DTD TVM, 11.1.16 TVM, DTD 3635/ 2015-16 dtd. 3635/ 2015-16 T E

3 M Construction of Class AGREEM 50L room block for Govt. 50L ENT Gedn

GHSS Kadavallur 50L Rs. EXECUT 4488778 12months 4849777/- ED GO(RT)NO. GO(RT)NO. N DTD TVM, 16.1.16 FOR 16.1.16 FOR 3632/2015-16 3632/2015-16 K.V.MOHAMM 45/16-17/EE B 45/16-17/EE 172/2016/G.ED Dtd. 26.2.16 for 26.2.16 for Dtd. KUNNAMKULA 7 4 Construction of Class Agreemen 50L

LAM Room Block for t executed TVM, Gedn 16 Dtd. 16 Dtd.

Kunnamkulam Govt. O Rs 50L 11.02.16 4971844 EDN DTD V.K.JOSE Model Girls HSS 4869922/- 12 months 26.2.16 for 26.2.16 for 3637/2015- GO(RT)NO. GO(RT)NO. 570/2016/G. 89/2016-201 KUNNAMKU e

R Agreement 5 M Construction of Jawahar

60L Executed

square gallery at DTD LSGD Kunnamkulam roofing 9months 5631491 4723695 70/2016- FOR 60L FOR balance work,wooden FOR 60L 26.10.2016

flooring and finishing NO. GO(RT) D DTD 1.3.16 DTD D 2017/EE(B)TS 944/2016/LSG 2915/2016-17/ 2915/2016-17/ Davood Chakk Davood DT.07/12/2016

KUNNAMKULA work LOA 6 M LAC ADS 2015-2016

WD Issued.Ager Construction oif pay 10 L eement to ward -Taluk

H&FWD be executed R Dtd.19 94/2016- FOR 10L FOR 9127994/- 8154820/-

hospital,Knnamkulam Go(rt) NO. 12 months 2977/2016- Dt.26.02.16 Dt.26.02.16 2017 /PRICE 2017 /PRICE Dt.29/10/2016 657/2016/H&F 2017/EE(B)TS Balakrishnan.K KUNNAMKULA CHALAKKUDY CONSTITUENCY,B.D.Devassy,MLA -2015-16 1 ADS 2015-2016 Agreement Chalakudy consituenty- executed . 100L 100L 100L Gedn site not Construction of school Stephen

GO (RT) GO (RT) identified 12months buildings for Modal 9385893/- 8331857/- Chalakudy Boys hss Chalakudy 25.2.16 for Rs. Rs. 25.2.16 for dtd. 11/2/16 for dtd. 11/2/16 for 3603/15-16 dtd. 3603/15-16 10/16-174/EE B 10/16-174/EE TSR Dtd. 3.6.16 No.557/2016/GEdn No.557/2016/GEdn 2 Construction of New work 100% completed building for Meloor 35 L PWD 4.8.16

Ksheerolpadaka 10L for 996493/- 936354/- TSR DTD Sahakana Sangam , 12months Chalakudy

Meloor No. GO (RT) 3552/2015-16 3552/2015-16 dtd. 24.2.2016 dtd. 12.2.2016 James Joseph 29/16-17/EE B 29/16-17/EE 343/2016/PWD 343/2016/PWD MPLAD WORKS 1 MP-LADS-15-16- WORK 6L THRISSUR-MP.sri. COMPLETE D -

MPLAD C.N.Jayadevan- ORDER Thrissur ADDITIONA order no. order Construction of open 97/14/15- 1070/CNJ- L WORKS

auditorium for prisoners - Dated:02 02 REQUIRED 16/RO2/DPM 16/RO2/DPM No.TSR/2015- RE dtd. 06.01.2016 Sub Jail, Viyyur 2016/2016/770;

2 SUBMITTE 2 MPLADS_2015-16- Agreement ALATHUR-Construction of executed on

35.84 L 14/12/2016.

Culvert across the 6months KV Suku

3334641/- 2754293/- Sanction Irrigation canal in front of Rs. 35.84L from the Govt.Chest Irrigation Hospital Chemo Day Care Department Centre in Govt.Chest could not ORDER No. 1717(10) Hospital available fot District Collector,Thrissur District

Wadakkanchery Mulamkunnathukavu and rhe Health & Family welfare Health & Family completion works of new constuction /15/AD/DPM dtd.09.09.2016 of 2768/2016-17 dtd. 7.10.2016 for

outer road 77/2016-2017/EE(B)TSR Dt.14/1 of culvert 3 MP-LADS-2014-15- 25%

DPM ALATHUR-Sri.P.K.Biju 125L Pedestal MP-Construction of concreting Rs. 125L Rs.

12months upto bottom 11165273 10434835 Chelakkra building for Chelakara --

CHC-new block in V Rajagopal of plinth completed 30.08.2017 23-08-2016 3561/15-16/SE 3561/15-16/SE Order no. 1717 Order dtd. 19/2/16 for dtd. 19/2/16 for BCC TSR DTD. Chelakara GP /15/AD/DPM (1) TSRDtd. 28.6.16 TSRDtd. 24.2.16FOR 125l 24.2.16FOR 19/16-17/SE BCC BCC 19/16-17/SE o 4 MP LADS (2016-2017) Construction of Estimate Ayurveda Hospital submitted to Building at the District Kunnamkulam Collector For Rs.50 L KUNNAMKULAM 50 L(AS obtained obtained 50 L(AS 13th FCA HOME (PRISON) Department 1 13th FCA - High Awaiting for 50% security Prison, Viyyur the RE 285L

Home approval no:M4-

Phase 2 - Additional 3crores Thrissur

works for the proper / 18 months 25.04.2015 24.10.2016 29868981/- 29122256/- GO(MS) no. 217/2014-15 217/2014-15 functioning of the (PRICE) dtd. 15.1.15 for Rs. Rs. 15.1.15 for K Balakrishnan institution L(Order Rs.300 /Tsr dtd: 16.4.15 /Tsr 137/14/ home dt. 137/14/ home Tvm 30.06.14 for 30.06.14 for Tvm 2/15-16/SE/ BCC BCC 2/15-16/SE/ 2 High security Prison, Agreement executed Finishing works to 10 L Home 904390 803275

Administrative building L Rs.10 /PRICE/ Thrissur

located at Viyyur Jail 02 Months compound Thrissur DTD 23.11.16 DTD Dt.01/10/2016 K Balakrishnan TSR /2016/5132 TSR 2702/2016-2017 62/16-17/EE/TSR 62/16-17/EE/TSR Dt 11/07/2016 For 11/07/2016 For Dt HEALTH DEPARTMENT

1 MCTCR - Devt. - 13TH Works 85% FCA- Construction of stands still 150L condition. ( 29.11.15

Centre for Geriatric 30.1.15 due to the 29.03.2016

Care Training & 13195308 10 months 10 months non 15705056/- Research Building in availability of DTD 31.10.14 DTD MIJOY MAMU

Wadakkanchrty Govt. Medical College decision from the Thrissur-1st phase dd. TVM H&F WD Medical College dtd 3.3.14 for Rs. 150L Rs. dtd 3.3.14 for 22/14-15/SE/BCC TSR TSR 22/14-15/SE/BCC Health & Family welfare Health & Family 13.09.13 for 1.50 Crores 13.09.13 for 49/13-14/SE(B) CC,TSR CC,TSR 49/13-14/SE(B) GO(RT) No. 3215/ 2013/ 3215/ No. GO(RT) Authorities) 2 H&FWD-HS-AP-14-15- Awaiting

Strengthening of 55L for TS institutions under DHS- estimate, H&FWD 13TH FCA-Setting up of Decision Kodungallur

sewage treatment plant 30.6.14 FOR pending 4/h&fwd DTD DTD 4/h&fwd in Thaluk Hospital- from 2014/H&FWD dtd 2014/H&FWD

Kodungallur GO(RT)No.2191/1 HMC. 55L(Go(rt)no.3839/ 3 H& FWD - AP 2013-14 - finishing 85%

Implimentation of Plan 30L work in

6.6.16 progress scheme - Strengthening H&FWD VP Baiju 6months Pudukad

of Diagnosis Services in 2685687/- 3155682/- District Taluk Hospitals and Community Health Centre Labs - Purchase of Equipments - THQ - 13.3.2015 for Rs. 30L Rs. 13.3.2015 for Pudukad, Thrissur - 1000L) AS Amt.- (Total 12/16-17/EE(B)TSR Dtd. Dtd. 12/16-17/EE(B)TSR 108/14-15/EE (B) TSR dtd: TSR (B) 108/14-15/EE

Construction of New H& 4064/2013/ GO(RT)No.

Clinical Lab & Xray 30L 6.12.13 for dt.TVM FWD 4 H& FWD - Health - AS

Services - AP 2013-14 - 60L obtained. Implimentation of Plan Suitable H&FWD Schemes - place not Chalakudy Strengthening of found for Institution under DHS - environme waste management & nt-friendly Sewage Tretment Plant - disposal THQH, Chalakudy of effluent from treatment 261/2014/H&FWD dtd: 24.1.14 261/2014/H&FWD

6.12.13 for Rs 60 L / GO(RT)No. Rs 60 L / GO(RT)No. 6.12.13 for plant.Matt er

GO(RT)No:4066/13/H&FWD dtd TVM GO(RT)No:4066/13/H&FWD informed 3 H& FWD - 13th FCA - Agreemen

Construction of 15m3 50L 50L t executed Bio Gas Plant at New H&FWD 15/2/2017 Medical College, MG 4716562/- 4146013/- 09 months

Kavu, Thrissur Kumar P Anil Wadakkanchery 3523/2016-17 dtd: 3523/2016-17 23.12.2016 for Rs. 50L Rs. 23.12.2016 for GO(RT)No. 534/2015/ H& H& 534/2015/ GO(RT)No. 116/16-17/EE(B)TSR Dtd. Dtd. 116/16-17/EE(B)TSR FWD dt.TVM 05.02.2015 for 05.02.2015 for dt.TVM FWD TOURISM 2 1 RIDF XVII NABARD WORKS 123456 78910111213141516171819 2021222324 H&FWD 4 3 SL. NO PLAN/NABARD/LAC-ADS/MLASDF/MPLAD/ Budget page No. / Budget Provision in Kodungallur Chalakudy Knklm L A Constituency

Education Education Health Department at Govt.Medical MBBS LadiesHostel Construction of XXII 2016-2017 _NABARD_RIDF College,Thrissur Science Block Pullut,Kodungallur- XVIII-Govt. College- NABARD-RIDF- building cum Multi-gym Chalakkudy- Library XVIII-Govt. College, NABARD-RIDF- Erumapetty New BlockofCHC NABARD- Extension

Name of Project

1500L 500L 325L 477 lakh Estimate Amount A S No. , Date & T S No. , Date &

Amount [WORKS AWAITINGADMINISTRATIVESANCTION] Agreement No. & Date DEPOSIT/13thFCWORKS/MUZIRIS/TOURISMworksason/SC-ST-Pr Name of Contractor BUILDINGS DIVISIONTHRISSUR

Estimate PAC Agreed PAC Period of completion in Site Handed Over Date Dt. Of Completion as per agreement Extended D O C Actual D O C for AS Aubmitted Estimate Detailed 3.11.12 (H.Edn) on Secretary Principal AS to submitted for DPR AS submitted for DPR submitted on AS estimate 9-03-2015 Present Stage

Physical Progress Electrifi Stages cation of

Exp. Up to current ogress ofFebruary2017 month

Amount requird up to this financial year

Remarks 5 NABARD RIDF Detailed XXII(2016- Estimate 2017)Extension of 1320L Aubmitted ground floor & First for AS floor Construction of 2 nd ,3rd &4th floor of Day care Chemo Therapy Ward for chest Hospital in Govt.Medical College Thrissur 6 NABARD RIDF Detailed XXII(2016- Estimate 450L 2017)Extension to Aubmitted the new block of for AS CHC Erumapetty

7 NABARD RIDF Detailed XXII(2016- Estimate 200L 2017)Construction Aubmitted of class room block for AS for GHSS Erumapetty RIDF XIII 1 H&FWD-NABARD DPR RIDF-XIII. submitted for Construction of PG 1464L AS Health & Health Students Quarters in Govt.Medical Family welfare

Wadakkanchrty College,TCR 2 H&FWD-NABARD DPR RIDF-XIII. submitted for 1100L

Constructionwelfare of AS on hostel building for 28.5.12 for male students in 1100L(Estim Wadakkanchrty

Health & FamilyHealth Govt.Medical ate prepared College,TCR as per 2010 SOR) 3 H&FWD-NABARD DPR RIDF-XIII. submitted for 400L

Constructionwelfare of AS on Employees Hostel 26.1016 for (Gents),Employees 400L(Estimat Wadakkanchrty

Health & FamilyHealth Hostel (Ladies) at e prepared Govt.Medical as per 2014 college Thrissur DSR) 4 Providing toilet Detailed

facilities and 10L estimate

additionalwelfare works in submitted for medicine ICU and AS Speciality ICU of Wadakkanchrty

Health & FamilyHealth NMCH Block at Govt.Medical college Thrissur RIDF XXI 1 NABARD-RIDF XXII (2016-2017) AS estimate Construction of class submitted Knklm

room block for 200 lakh PWD Bldgs G.H.S.S Erumapetty. LAC - ADS WORKS LAC ADS 2012-13 WADAKKANCHERY CONSTITUENCY,Sri.C.N.Balakrishnan,Hon'ble Minister -2012-13 KAIPAMANGALAM CONSTITUENCY-Sri.V.S.Sunil Kumar MLA -2012-13

1 m Construction of new Detailed a building for estimate 300L Ayurveda Hospital- submitted for Santhipuram-2nd AS phase Kaipamangal

2 m Construction of Detailed a l

a PHC- estimate

Koolimuttom,Mathila Rs.40L submitted for kam AS Kaipamang

3 m Construction of a Detailed a l

a new building for estimate PHC-Koolimuttom, submitted for Thrissur Rs.120L AS Kaipamang KUNNAMKULAM CONSTITUENCY- Sri.Babu.M.Palissery,MLA -2012-13 CHALAKKUDY CONSTITUENCY,B.D.Devassy,MLA -2012-13 1 Construction of Health study centre cum Conference Hall in Poolani in Rs.100L Chalakudy Meloor Panchayat LAC ADS 2013-14 THRISSUR CONSTITUENCY - Sri. Therambil Ramakrishnan MLA 13-14 WADAKKANCHERY CONSTITUENCY,Sri.C.N.Balakrishnan,Hon'ble Minister -2013-14 KODUNGALLUR CONSTITUENCY-Sri.T.N.Prathapan MLA -2013-14 KAIPAMANGALAM CONSTITUENCY-Sri.V.S.Sunil Kumar MLA -2013-14 NATTIKA CONSTITUENCY-Smt.Geetha Gopi,MLA -2013-14 GURUVAYUR CONSTITUENCY-Sri.K.V.Abdulkhader MLA -2013-14 1 Construction of New Estimate Class Rooms and submitted for 150L Compound Wall in AS

Guruvayur GVHSS, Kadappuram CHELAKKARA CONSTITUENCY,K.Radhakrishnan,MLA-13-14 PUDUKAD ,Prof.C.Raveendranath,MLA -2013-14 OLLUR CONSTITUENCY-Sri.M.P.Vincent MLA -2013-14 MANALUR CONSTITUENCY-Sri.P.A.Madhavan.MLA -2013-14 1 Man Condtruction of 34 AS estimate alur class room for L submitted to Govt.Lower Primary CE school Kechery

KUNNAMKULAM CONSTITUENCY- Sri.Babu.M.Palissery,MLA -2013-14 CHALAKKUDY CONSTITUENCY,B.D.Devassy,MLA -2013-14 LAC ADS 2014-15 THRISSUR CONSTITUENCY - Sri. Therambil Ramakrishnan MLA -2014-15 WADAKKANCHERY CONSTITUENCY,Sri.C.N.Balakrishnan,Hon'ble Minister -2014-15 1 Construction of Work done Mundathikode by Elecrical Indoor stadium wing 25 Lakhs 2 Construction of Detailed building for estimate

Varadiyam IHRD 1 Crore submitted for Technical School in AS to Hedn Avanoor GP Tsr/9893/14 dt. 12.12.14. Wadakkanchery y

3 r Construction of Estimate Football Ground submitted for Gallert in Kolazhy AS

GP 70 Lakhs Wadakkanche KODUNGALLUR CONSTITUENCY-Sri.T.N.Prathapan MLA -2014-15 KAIPAMANGALAM CONSTITUENCY-Sri.V.S.Sunil Kumar MLA-2014-15 NATTIKA CONSTITUENCY-Smt.Geetha Gopi,MLA -2014-15 1 Construction of a AS Estimate

new building for 85L submitted

Nattika Ayurveda hospital Thalikkulam 2 Construction of Estimate

classroom in FF for 38L amonting to

Nattika B.Ed Rs.38L college,Valappad submitted to Govt by CE vide Lr.No: CE/BL/PLG/ LAC- ADS/TSR/64 80/14 dtd 27.8.14 for AS 3 Providing Truss Estimate

work for bus stand 45 L amonting to

Nattika at Thriprayar Rs.45L submitted to Govt by CE vide Lr.No: CE/BL/PLG/ LAC- ADS/TSR/98 89/14 dtd 12.12.14 for AS 4 Construction of Detailed

Doctor's Quarters 35L estimate

Nattika for Anthikkad submitted for Govt.Hospital AS. 5 Consrtuction of Awaiting for

Office Building for 40L Estimate-

Nattika Anthikkad Block Requirement Panchayath s not received from CHELAKKARA CONSTITUENCY,K.Radhakrishnan,MLA-2014-15 PUDUKAD ,Prof.C.Raveendranath,MLA -2014-15 OLLUR CONSTITUENCY-Sri.M.P.Vincent MLA -2014-15 MANALUR CONSTITUENCY-Sri.P.A.Madhavan.MLA -2014-15 KUNNAMKULAM CONSTITUENCY- Sri.Babu.M.Palissery,MLA -2014-15 CHALAKKUDY CONSTITUENCY,B.D.Devassy,MLA -2014-15 LAC ADS 2015-16 THRISSUR CONSTITUENCY - Sri. Therambil Ramakrishnan MLA 15-16 WADAKKANCHERY CONSTITUENCY,Sri.C.N.Balakrishnan,Hon'ble Minister -2015-16

1 y Construction of aquatic complex at

100 L estimate Mundathicode submitted for Gramapanchayat AS wadakkancher

2 y Additional works for

Indira Gandhi Indoor 10 L estimate stadium submitted for Mundathicode AS wadakkancher y

3 r Construction of new e building for GLPS, 50L AS Parlikkad ESTIMATE SUBMITTED wadakkanch 4 Thangalur village The proposal

office. 10L has been submitted to Secretary to Govt., Revenue Wadakkanchery Dept., vide file No.CE/BL/PL G/LAC- ADS/TSR/46 26/15 dtd 11615 y

5 r Construction of Estimate e

h aquatic complex at under c Mundathicode 100 L preparation Gramapanchayat Wadakkan y

6 r Additional works for Estimate e

Indira Gandhi Indoor 10 L under stadium preparation Mundathicode Wadakkanch y

7 r Construction of Detailed e entrance gate Estimate submitted for ,compound wall and 49.91L AS levelling of ground

Wadakkanch for Govt.ITI 8 Construction of new Detailed Estimate building for 40 L Veterinary submitted for AS Dispensary at Mullassery Detailed 9 m Construction of

village office 10L Estimate ,Kunnamkulam submitted for AS Kunnamkula KODUNGALLUR CONSTITUENCY-Sri.T.N.Prathapan MLA -2015-16 1 Construction ofType Detailed III & IV Quarters for Estimate Gov.ITI Mala 27.1 L submitted for AS Kodungallur 2 Construction of 2nd Detailed

floor (balance 80L Estimate portion of class submitted for AS rooms)for ITI mala Kodungallur 3 Construction of Detailed vworkshop cum Estimate Auditorium for 145 L submitted for AS Gov.ITI Mala Kodungallur 4 Construction of Detailed Estimate various labs for 50 L Gov.ITI Mala submitted for AS Kodungallur 5 Extension of Type II Detailed Estimate staff Quarters for 50 L Gov.ITI Mala submitted for AS Kodungallur 6 Finishing works for Submitted for Resub newly constructed AS to Director, mitted 250L THQ Hospital, DHS vide File for No. Rs.170. Kodungallur- Third CE/BL/PLG/LA 70Lakh phase Kodungallur C- s ADS/TSR/PR/3 7 Construction of Submitted to AS

Stadium for 25 L secretery to not Vellangallur Govt,LSGD obtain Panchayath vide File ed No.CE/BL/PL Kodungallur G/LAC- ADS/TSR/PR /3344/15 Dt.26/9/15 for Rs.25L KAIPAMANGALAM CONSTITUENCY-Sri.V.S.Sunil Kumar MLA -2015-16 1 Construction of a Detailed 0% new building for estimate PHC-Koolimuttom, submitted for Thrissur Rs.120L AS Kaipamangalam GURUVAYUR CONSTITUENCY-Sri.K.V.Abdulkhader MLA 2015-16 1 Construction of New AS Estimate building for Vetuva submitted marananandhara 14 Lakhs

Guruvayur samithi Engandiyur 2 CONSTRUCTION OF AS Estimate STADIUM FOR G.H submitted .S.S,CHAVAKKAD. 500.00L Guruvayur 3 Construction of New Detailed

O .P Block for C H C 100L estimate Chavakkad Phase -I submitted for

Guruvayur AS CHELAKKARA CONSTITUENCY,K.Radhakrishnan,MLA -2015-16 PUDUKAD ,Prof.C.Raveendranath,MLA -2015-16 IRINJALAKUDA CONSTITUENCY - Sri. Thomas Unniyadan MLA -2015-16 1 MLA-adf.2015- work to be

16.Irinjalakuda 50L tendered Constituency.Constr uction of auditorium Irinjalakuda building for Scouts & Guides at Dt. Head quarters Irinjalakuda

2 MLA-ADF.2015- AS estimate

16.Construction of 25L submitted new building for through price medical officers on 13/07/15 Irinjalakuda Quarters, Kattoor. 3 Irinj MLA-ADF.2015- 25 AS estimate alak 16.Construction of L submitted uda Open Air Auditorium through price at Mahathma Park, on 05/02/16 Irinjalakuda. to AEE

4 Irinj MLA-ADF.2015- 15 AS estimate alak 16.Construction of 0L submitted uda New building for through price G.H.S.S on 20/02/16 Nadavarambu to AEE

5 Irinj Construction of rad 15 Detailed alak to NGO Quarters L estimate uda building at submitted for Irinjalakuda AS

OLLUR CONSTITUENCY-Sri.M.P.Vincent MLA -2015-16 1 Madakkathara GP- Estimate

Vellanikkara CHC 50L submitted Ollur building

2 Construction of Estimate not Kattilapoovam submitted, 100L Ollur school in since the Madakkathara GP Phase 1 work not tendered due to hindrance in land. KUNNAMKULAM CONSTITUENCY- Sri.Babu.M.Palissery,MLA -2015-16 1 Construction of TS estimate

LAM Payward building in submitted 100L U Kunnamkulam Govt.Thaluk KUNNAMK Hospital 2 Construction of TS estimate 50L

LAM building for Pain submitted U and Paliative care wing in Govt.Thaluk KUNNAMK Hospital Kunnamkul 3 Construction of High work 50L

LAM school building in tendered U Kunnamkulam Govt.Girls HSS KUNNAMK 4 Construction of TS estimate 30L

LAM Kundannur family submitted U welfare sub centre building in KUNNAMK Erumappety 5 Construction of AS estimate 30L

LAM Kundannur family submitted to welfare sub centre CE building in

KUNNAMKU Erumappety CHALAKKUDY CONSTITUENCY,B.D.Devassy,MLAPhth -2015-16 1 MP-LADS-15-16- AS estimate 6L THRISSUR-MP.sri. submitted to Dt. C.N.Jayadevan- Collector on MPLAD Thrissur 17.10.16 for Construction of approval open auditorium for prisoners -Sub Jail, Viyyur - Additional 2 Construction of Detailed

Toilet Block and 20L estimate renovation of old submitted for AS toilets in Gov.ITI Chalakudy

3 Special repairs to Detailed estimate Gov.ITI Staff 20 L Quarters Chalakudy submitted for AS 4 Maintenance to Detailed

Mens Hostel Gov.ITI 30L estimate Chalakudy submitted for AS

5 Special repairs to Detailed MRS estimate 160L NayarangadyChalak submitted for AS udy

S PACKAGE 1 Stimulas package - Detailed 2016-2017 -Casualty estimate Complex for the submitted for 150.00L Thaluk Head Quarters AS Guruvayur Hospital,Chavakkad.

2 Stimulas package - Detailed 2016-2017- estimate Construction of submitted for 150.00L Polyclinic building for AS Guruvayur Thaluk Head Quarters BUDGET WORKS REST HOUSE (4059-01-051-86) PUBLIC WORKS (4059-01-051-86) 1 Construction of Estimate additional block to submitted for A 550L Mini Civil Station, S for Rs. 550L through PRICE Irinjalakkuda (3rd No.2015/5717 Irinjalakuda phase)

2 Construction of new Estimate building for Mini Civil submitted for

Station at Taluk Office 412.36L AS Compound 3 Renovation of Taluk Heritage block at Taluk Office Compound. 4 Construction of Estimate additional block to submitted for A 550L Mini Civil Station, S for Rs. 550L through PRICE Irinjalakkuda (3rd No.2015/5717 Irinjalakuda phase) REGISTRATION (4059-01-051-95) 1 Construction of New Detailed

buildinf Sub Registrar 65 L estimate office, Andathodu. submitted for AS

FIRE AND RESCUE (4059-60-051-85) REVENUE DEPARTMENT JUDICIAL WORKS (4059-60-051-98) 1 Construction of Revised court complex at estimate Chavakad 1600L submitted for P.35/28 AS Guruvayur

2 Providing additional Estimate floor of Court forwarded to building at Lkh the Registrar Kodungallur by Chief

Kodungallur Engineer Accepted PAC-50 PAC-50 Accepted 3 Construction of Estimate court complex at submitted for Chalakudy AS(10

1000lakhs crores) Chalakudy QUARTERS TO JUDICIAL OFFICERS(4216-01-700-93) 1 Construction of Estimate

staff quarters for 57L submitted to Munsiff court Govt. for P.70/27

Guruvayur Chavakkad A.S. for RS..57 2 Construction of Estimate for

quarters for 55L Rs.55lakhs Additional Judicial submitted on Officers .6.2014 Irinjalakuda Irinjalakuda 3 Construction of Estimate Judicial quarters for amounting to 131L Munsiff officer and Rs.131LLakh first class Magistrate s(58L+73L=1 Chalakudy officer, Chalakudy 31L) submitted to SE, JBC, ernakulam on 5.9.14

4 Construction of flat Land type quarters for identified 300L Judicial officers at Detailed P.70/21 Thrissur (Type V) estimate amounting to Rs. 300L submitted to SE, JBC, Ernakulam on 16.8.14 VETERINARY SCIENCE & ANIMAL HEALTH(4403-00-101-99) 1 Construction of a Detailed building for estimate Veterinary submitted for 55 L/30 L

Guruvayur Dispensary at AS. Mullassery. 2 Construction of new Detailed

building for Veterinary 50 L estimate hospital,Valappad submitted for AS HOME DEPARTMENT 1 Proposed new Estimate building for submitted detension center at 395 L Thrissur viyyur jail compound 2 Flood damages and Detailed draught relief- estimate Construcion of pond 100 L submitted for Thrissur for Central Prison, AS. Viyyur, Thrissur.

3 Renovation works to Detailed the Kerala Police estimate

Academy. 86.95 L submitted for Thrissur AS 4 High security prison - AS received Finishing works to 10L Administrative building located at Viyyur jail compound, Thrissur 5 Thri MPLADS 2015-2016 Revised 6 L ssur Fund-Construction of estimate Open Auditorium for submitted Prisoners

OTHER DEPT 1 Construction of first Detailed

floor for Consumer 20 L estimate dispute redressal submitted for Thrissur forum at AS. Ayyanthole, Thrissur. 2 r Construction of a Detailed new building for estimate

Iringappuram 35.00 L submitted for

Guruvayu Village Office AS 3 Construction of first Detailed

floor for Consumer 20 L estimate dispute redressal submitted for Thrissur forum at AS. Ayyanthole, Thrissur. 4 Modification of Work to be existing structure of started. Multipurpose Indoor 287 L Stadium at Kaiparambu gramapanchayath, Wadakkanchery Thrissur. Phase II 5 r Construction of new Detailed building Sub estimate

Registrar office 65.00 L submitted for

Guruvayu ,Andathodu AS 6 Providing and fixing Detailed Lift for Civil estimate Station,Ayyanthole submitted for

5380679/- AS 7 LAC Ads 2016-2017- Detailed

Providing drainage 27L estimate and rain water submitted for Thrissur disposal network in AS the police offices compound ,at Erattachira,Thrissur

8 Renovation works Detailed

2016-2017 -To 44 L estimate Govt.Guest submitted for House,Cheruthuruth AS y 9 Painting works to Detailed

IASe 23L estimate College,Thrissur submitted for AS

10 Providing drain in Detailed the compound of estimate

Traffic Police 12.50L submitted for Thrissur Station,Thrissur AS 11 Construction of Detailed

Village Office 10L estimate Pazhanji in Sy submitted for No.3520 AS

HEALTH DEPARTMENT Medical College

1 ty BW 2013-14 Detailed NIL hr MCTCR - estimate 340L

ConstructionFamily of OBC submitted for

Health & Health AS hostel in Govt.

Wadakkanc Medical College , 2 MCTCR- Dev- ` Detailed Construction of estimate 310L compound wall for submitted for

Health & Health AS Medical College campus Thrissur at Family welfare

Wadakkanchrty MG Kavu. 3 BW 2013-14 Detailed MCTCR - estimate 340L Development - submitted for As to CE Construction of Ladies hostel for

Wadakkanchrty Post Metric Students (MBBS) under Babu

Health & FamilyHealth welfare Jagjeevanram Chathravas Yochana in Govt. Medical College , Thrissur 4 BW-2013-14- Detailed Construction of PG Estimate

1800L submitted for

Studentswelfare quarters in AS to SE in Medical College PRICE campus(8 flats of 12 Wadakkanchrty

Health & FamilyHealth nos each) a 5 c BW 2013-14 MCTCR - Detailed NIL

Construction of OBC 340L estimate hostel in Govt. Medical submitted for College , Thrissur AS Health & F Health Wadakkan m r 6 MCTCR- Dev- ` Detailed

Construction of 310L estimate compound wall for submitted for Medical College AS

Health & Fa Health campus Thrissur at Wadakkanch

w MG Kavu 7 MCTCR- Dev- Detailed estimate

Construction of 310 L compound wall for submitted for Medical College AS campus Thrissur at MG Kavu. Wadakkanchrty Health & FamilyHealth 8 BW 2013-14 MCTCR - Detailed

Development - 340L estimate Construction of Ladies submitted for As hostel for Post Metric to CE Students (MBBS) under Babu Jagjeevanram Chathravas Yochana

Wadakkanchrty in Govt. Medical Health & FamilyHealth welfare College , Thrissur

9 e BW-2013-14- Detailed Construction of PG Estimate 1800L Students quarters in submitted for Medical College AS to SE in campus(8 flats of 12 PRICE nos each) Wadakkanchrty Health & FamilyHealth welfar 10 y Construction of Type-II Detailed

Flat type Quarters in 190L Estimate University of Health submitted for and Allied AS Science,Thrissur at

Wadakkanchrt Mulamkunnathkavu 11 Construction of vehicle Detailed 5 L shed for Taluk Head Estimate Quarters submitted for Hospital,Chavakkad AS 12 Annual Maintenance Detailed for Mental Health Estimate submitted for

Centre,Thrissur for the 1022358 year 2016-2017 AS Thrissur

13 New construction of Detailed

First floor and second 340L Estimate floor for Maternity wing submitted for Taluk Head Quarters AS

Thrissur Hospital at Chavakkad

14 Asset Maintenance Detailed

2016-2017 Re- 215L Estimate construction of submitted for damaged and AS

Thrissur collapsed existing compound wall at DIRECTOR OF HEALTH SERVICES (4210-01-110-93) 1 Asset Maintenance - Detailed

Painting and other 60 L estimate repair works to THQ submitted for Hospital,Chavakkad. AS

2 New Construction of Detailed estimate

First floor and Second 340 L floor for maternity wing submitted for THQ Hospital at AS Chavakkad, Phase-III 3 Renovation of Detailed District Hospital, estimate Thrissur. Phase II 915 L submitted for Thrissur AS. 4 Maintenance works Detailed

to Dist. TB Centre, 18 L estimate Thrissur. submitted for Thrissur AS. 5 Asset maintenance Detailed fund- Renovation estimate works to Ophthalmic submitted for Thrissur block building and 185.50 L AS. providing parking area at Dist. 6 Asset maintenance Detailed fund- estimate Reconstruction of submitted for Thrissur damaged and 183.00 L AS. collapsed compound wall of Mental Health Centre, Thrissur.

7 Construction of Rough cost Administrative block estimate and Teaching block 525 L submitted for Thrissur for Govt. Nursing AS. School, Tsr.

8 ll Phase ICU and FUND Casuality block in NOT district hospital , ALLOTTE Wadakkanchery D BY THE Rs. 650 lakhs Rs. DEPT Wadakkanchery

9 District Hospital FUND NOT Wadakkanchery- ALLOTTED

Construction of 1500 L BY THE meternal & Child DEPT Health wing, Blood Bank, Canteen Wadakkanchery Block 10 Construction of new Detailed Building for estimate 300L Ayurveda Hospital, submitted for Santipuram, AS to SE

Kodungallur Kodungallur 11 Asset maintenance DRAWING fund- OBTAINED Reconstruction of FROM NRHM Thrissur

183.00 L CANNOT BE damaged and EXECUTED AT collapsed SITE.INFORME compound wall of D TO THE Mental Health HOSPITAL Centre, Thrissur. AUTHORITY 12 Providing leak Detailed

proofing work with 30 L estimate

Nattika GI roofing to the submitted for existing building for AS. K.R. Chummar Memmorial Govt. Ayurveda Hospital, 13 ConstructionA thik d of Work tendered, Pharmasy Building LMR submitted in Mental Health 191 L for tender Thrissur approval Centre, Thrissur

14 Renovation of District Detailed estimate

Hospital, Thrissur. 915 L Phase II submitted for AS. 15 Asset maintenance Detailed fund- Renovation estimate submitted for

works to Ophthalmic 185.50 L block building and AS. providing parking area at Dist. Hospital, 16 Construction of Rough cost estimate

Administrative block 525 L and Teaching block for submitted for Govt. Nursing School, AS. T 17 H&FWD-ASSET Detailed MACE FUND- estimate 300L Renovation works of submitted for THQ Hospital, AS to SE

Kodungallur Kodungallur 18 H&FWD-Annual Detailed

Plan-13-14- 30 L estimate

Nattika Construction of submitted for maternity wing at AS. THQ Hospital- Chavakkad, Phase- II 19 Plan Fund 2017- Detailed 2018 -Leak proofing estimate work for Male submitted for Thrissur Forensic ward at AS. Mental Health Centre ,Thrissur 20 Additional works for Detailed Construction of New estimate Kitchen block at submitted for Thrissur Mental Health AS. Centre ,Thrissur

21 Plan Fund 2017- Detailed 2018 -Renovation of estimate sewage lines in submitted for Thrissur Mental Health AS. Centre ,Thrissur

22 Plan Fund 2017- Detailed

2018 -Renovation of 10L estimate water supply submitted for Thrissur System in Mental AS. Health Centre ,Thrissur 23 Budget wroks -2016- Detailed 2017 Construction estimate 150L of Poly Clinic submitted for Building for the AS. Taluk Head Quarters Hospital Chavakkad 24 Asset maitenance- Detailed

Painting and other 67L estimate Repair works to submitted for Taluk Head AS. Quarters Hospital ,Chavakkad 25 Construction of Detailed

Central Sterile and 60L estimate supply Departmrnt submitted for (CSSD) in Second AS. floor of Casuality Complex a tTaluk Head Quarters Hospital ,Chavakkad

26 Budget wroks -2016- Detailed 2017 Causality estimate 150L Complex for the submitted for Taluk Head AS. Quarters Hospital ,Chavakkad

27 Construction of Detailed Trauma Care Unit estimate 350L for Govt.Taluk submitted for Hospital Chalakudy AS. 28 Construction of Detailed human resource estimate 850L development submitted for training institute AS. (Health Sector) in Gandhigram Govt.Hospital of Dermatology Koratty in Thrissur District - 29 Maintenance and Detailed Renovation works to estimate 235L Govt.Children's submitted for Home,Ramavarmap AS. uram

30 Construction of ATM Detailed Counter for Civil 4 L estimate Station Chalakudy submitted for AS.

EDUCATION HIGHER EDUCATION DEPARTMENT (4202-01-203-96) 1 Construction of TS estimate

knowledge centre at 60 L under C. Achuthamenon preperation. Thrissur Govt. college TSR 2 Construction of Detailed building for Deputy estimate Director, Collegiate 100 L submitted for Thrissur Education, Thrissur. AS

3 Construction of Detailed

laboratory block in 28 L estimate

Nattika the first floor of submitted for College of Applied AS Science, Nattika. 4 Flooring with Detailed interlocking tile and estimate Nattika

construction of drain 32.50 L submitted for for College of AS Applied Science, Nattika 5 Construction of Detailed Auditorium & class estimate 200L room in GHSS submitted for

Pudukkad Chemboochira AS

POLY TECHNIC (4202-02-104-99)

1 Providing mosquito Awaiting AS net for opening for

Nattika SRGPTC thriprayar 7.5 lakhs

2 Construction of a Detailed 50 L

Ollur library building at estimate Govt. Women's submitted for Polytechnic College, AS , Thrissur.

3 Construction of Civil Detailed & Mechanical Block estimate 380L for Govt.Polytechnic submitted for College, Chelakkara AS Chelakkara

4 Construction of Detailed Dining hall & Class estimate 180L room for submitted for SRGPTC,Thriprayar AS 5 Construction of Detailed Library building at estimate 140L Govt.Women's Poly submitted for Technic AS College,Nedupuzha

ENGINEERING COLLEGE ( 4202-02-105-99) LABOUR DEPARTMENT-ITI ( 4202-02-800-95) 1 Construction of Detailed Type III and IV Estimate 271L quarters for Govt. submitted for ITI, Mala AS Chalakudy 2 Extension of type II Detailed

staff quarters for ITI 50L Estimate Mala submitted for AS Chalakudy 3 Construction of Detailed

various labs for 50L Estimate Govt. ITI, Mala submitted for AS Chalakudy

4 Construction of Detailed workshop cum Estimate 145L auditorium for submitted for ITI,Mala AS Chalakudy

5 y Construction of 2 nd Detailed floor (balance 80L Estimate portion of class submitted for Chalakud rooms) for ITI,Mala AS

6 y Extension of type II Detailed

staff quarters for ITI 50L Estimate Mala submitted for

Chalakud AS

7 y Construction of Detailed

various labs for 50L Estimate Govt. ITI, Mala submitted for

Chalakud AS GENERAL EDUCATION DEPARTMENT-4202-01-201- 1 Construction of AS estimate

class room block for 113 submitted - Lkh

Kunna GHSS, Panjal amt-113L mkulam 2 Construction of New Detailed building for Estimate 490L Professor Joseph submitted for Mundassery Smarak AS Higher secondary 3 Construction of first Detailed

floor forin the 75L Estimate existing building of submitted for the Higher AS Secondary Block of SC/ST DEPARTMENT

1 Special Repairs of AS Estimate SC and ST submitted to

Development Office, 25.50L MD, KSSC Thrissur Thrissur ST Develpmt

y C

2 r Construction of Estimate to e

Accademic block for 80 L be MRITC Enkakkad resubmitted for AS wadakkanch y

3 r MRS Thiruvilwamala Estimate e

h at Wadakkanchery submitted for c Construction of toilet 23.5 L AS

wadakkan block

4 e Maintanence of old Estimate h c

n block of MRS submitted for a 43.5 L wadak

k wadakkanchery AS y

5 r Maintanance of +2 Estimate e

h block of MRS submitted for c 9.30L

n wadakkanchery AS wadakka y

6 r Construction of Estimate Biogas plant for submitted for 100L MRS AS Wadakkanchery wadakkanche 7 m Painting works to Estimate a computer lab block submitted for & compound wall for 2.06 L AS Govt.I.T.I.Edathiruth y Kaipamangal 8 Industrial Estimate

Development Area- 40 L submitted for Improvement in AS Infrastructure repairing of Interanal Road-DP Athani Thrissur -DIC Road 9 SCSTDD-Providing Estimate

Fencing of MRS 25L submitted for Thiruvilwamala at AS Wadakkanchery Wadakkanchery

10 SCSTDD- Estimate

Renovation of play 10L submitted for ground forModel AS Residential School Thiruvilwamala at Wadakkanchery Wadakkanchery

MUZIRIS SOCIAL JUSTICE DEPARTMENT MPLAD WORKS MLA-SDF WORKS 1 KUNN Construction of Class Estimate AMKU room Block for Govt.UP submitted for LAM School-Korattikkara 23.54L AS. CONS TITUE NCY- BABU. M.PAL LISSE RY

STIMULUS PACKAGE

1 Stimulas package - Detailed 2016-2017 -Casualty estimate Complex for the submitted for 150.00L Thaluk Head Quarters AS Hospital,Chavakkad. 5

2 Stimulas package - 1 Detailed

13th FCA

HOME (PRISON) Department 1 13th FCA- High AS received Security Prison, Viyyur Phase III- . 536 L Thrissur

2 13th FCA - Awaiting for

Construction of New 20L AS Special Sub Jail at Irinjalakuda - 1st Irinjalakuda phase - Barraks - 3 Construction of Estimate New Special Sub- submitted for 800L Jail at Irinjalakuda ( A S for Rs. 2nd phase- 800L through Irinjalakuda barracks) PRICE No.2015/540 8 4 Construction of Estimate 3L New Waste Pit for submitted for District Jail Thrissur A S Thrissur 5 Construction of Estimate Vehicle shed at submitted for District Jail Thrissur 9.50L A S Thrissur 6 Construction of new Estimate Barrack at central submitted for 310L prison Viyyur A S Thrissur Thrissur 7 Sub Jail-Viyyur - Estimate Annual plan for the submitted for

Renovation of 17.60L A S Thrissur Prison -Renovation works to the Kitchen block 8 Renovation works to Estimate Kitchen block at submitted for 200L District A S Jail,Viyyur,Thrissur

HEALTH DEPARTMENT 1 LAC ADS Estimate

Construction of pain 50L submitted for and paliative at A S Bldgstsr Taluk Hospital Kunnamkulam 10 2 1 KERALA KALAMANDALAM-CHERUTHURUTHY 5 4 3 2 1 MEDICALCOLLEGE 9 8 7 6 5 4 3 1 SL. NO 2 Budget page No. / Item No.

3 Budget Provision in lakhs

Wadakkanchrty Wadakkanchrty Wadakkanchrty Wadakkanchrty Wadakkanchrty Wadakkanchery Wadakkanchery Wadakkanchery Wadakkancher Wadakkanchery Wadakkanchery Wadakkanchery Wadakkanchery 4 L A Constituency y Health & Family Health & Family Health & Family Health & Family Health & Family KERALA KERALA KERALA KERALA KALAMANDALAM KERALA KERALA KERALA KERALA KERALA KERALA 5 Department Kerala Kalamandalam Additional workforNalukettu, Kerala Kalamandalam Construction ofKalarifor Kalamandalam Museum ofKerala works) ofPerformingArts special additionalFlooring Partion,False celingand Interior works(Panelingand campus, Cheruthuruthy. wall forKeralaKalamandalam Re Constructionofcompound Kerala Kalamandalam Construction ofKalarifor Kalamandalam Museum ofKerala works) ofPerformingArts special additionalFlooring Partion,False celingand Interior works(Panelingand Kerala Kalamandalam existing schooltoiletblockof Blocks andrenovationof Construction of6nosToilet Kalamandalam Vettikkattiri ofKerala Renovation ofHostelat Cheruthuruthy Kalamandalam, & internalRoadsinKerala Kalaries andNalukettuBldgs Block(Kalaris)-Construction of Construction ofAcademic welfaregate infrontofNMCT Re constructionofentrance Medical collegehospital-TCR- Medical college front ofCasualityinNew welfarepost andcompoundwallin Construction ofPoliceaid Medical collegehospital-TCR- Administrative block welfaremain gateoftheKUHS the securityboothsat KUHS-Remaining worksin Medical College,TSR welfareBuilding IstPhaseinGovt. Child HealthCareService H&FWD-CSS-Construction of College Thrissur Phase) inGovt.Medical Research Building(2nd welfareGeriatric CareTraining& Construction ofCentrefor MCTCR -Devt. KALAMANDALAMCheruthuruthy works atGovtGuestHouse, Dept ofTourism-Renovation KALAMANDALAM KALAMANDALAM KALAMANDAL KALAMANDAL KALAMANDALAM KALAMANDALAM KALAMANDALA KALAMANDALA

6 Name of Project

15L(EL50000/-) 12.75L(EL 50000/-) 18L 42412000/- 100L (EL 7.5 L) 44L 25L 54 L 185L 90 L 54 L 185L 26.06L 14L 360L 7 Estimate Amount 06.2.2016 for54L Kalamandalam dtd. Registrar, Kerala UO/81/2015 of G7/5028/2015 dtd G7/5023/2015 dtd 90/2015/works/KU Order No. GO(RT)No.2191/20 HB -3 - UO No. 145/2016 UO/81/2015 of UO/82/2015 of 484/2015 Kerala 628/2015 Kerala UO/1030/2012 of A S No. , Date & Amount 6.7.15 for 15L 6.7.15 for 12.75L HS dtd TCR 8419/2011/MCTCR 14/H&FWD dtd 13817/2016 Dtd. dtd. 29.2.16 for Registrar, Kerala Registrar, kalamandalam dtd kalamandalam dtd Registrar, Kerala 19.5.15 for 18L Dtd. 26.3.13 ( 30.6.14 for 100L 20/10/2016 for Rs. Rs. 25L Kalamandalam dtd. Kerala 20/5/15 for Rs. 1/7/15 for Rs. 14L Kalamandalam G.O(RT) 44L 06.2.2016 for 54L Kalamandalam 26.60L dtd. 15.12.12 for 8 No.3243/2011/H&F dtd. 06.2.2016 3.65Cr WD Dt.TVM for 90L 12.09.2011 for 4 24 12 000/ ) 615/15-16 616/15-16 (PRICE) 281/15-16 (PRICE) 239/14-15/PRICE 3933/2015-16 Dtd. 3933/2015-16 Dtd. 3753/2015-16 dtd. 3752/2015-16 3753/2015-160d 776/2015-16 dtd. 773/2015-16 dtd. 85/CE/BL/2012-13 (PRICE) DTD DTD 25.7.2015 for DTD 19.06.2015 DTD 13.2.15 FOR 4.3.16 forRs. 44L 4.3.16 forRs. 25L 1.3.16 for Rs. 54L dtd. 1.3.16 for 31.7.15 for Rs. 31.7.15 for Rs. dtd: 25/3/13 for 25.7.2015 for Rs. Rs. 12.75L for 1799208/- 100L Rs.90L 26.60L 14L 360L 9 T S No. , Date & Amount

15L DEPOSIT WORKS-ProgressofworksasonFebruary2017

79/15-16/EE B 93/15-16/EE B TSR 39/15-16/EE B 96/2015-16/EE B 09/16-17/EE(B) 37/16-17/EE B TSR 36/16-17/EE B 72/15-16/EE(B) 66/15-16/EE(B)

TSR DTD Dtd. 28.11.2015 TSR DTD 26.8.15 TSR dtd. TSR Dtd:30.5.16 DTD 23.8.16 TSR DTD TSR dtd. TSR dtd. PWD BUILDINGSDIVISIONTHRISSUR 19.11.15 14.12.2015 23.8.16 11.11.2015 11.11.2015 10 Agreement No. & Date

KV Sarathkumar KA Krishnan kutty M Hassan KJJoseph Mijoy Mammu Jayan VP Abdul Rasheed KA MA Abdulkutty Abdul Rasheed K.A.Abdul Jayan Safa Rasheed Constructions 11 Name of Contractor

1438292/- 1162233/- 1765409 41098906/- 9259235/- 3802923/- 2205365/- 4887236/- 8983059/- 4887236/- 2656740 1399252/- 12 Estimate PAC

1580395/- 1278456/- 1982554 45093720/- 10882379/- 2092891/- 4466934/- 7473905/- 4466934/- 2390800/- 1243937/- 31003066/- Agreed PAC 13

6months 6months 6 Months 12months 09months 6 months 12months 12months 12 months 6 months 18months Period of completion in 14 months

25.7.13 30.5.16 15 Site Handed Over Date

24.1.15 Dt. Of Completion as per 30.11.16- 16 agreement

- - 17 Extended D O C

- - 18 Actual D O C ongoing work foundation d subbmitte estimate AS submitted .final bill completed submitted .final bill completed submitted .final bill completed Work submitted .final bill completed Work submitted .final bill completed Work Medical from the of dicition availability the non ( dueto condition. stands still Works from the decision of availability the non ( dueto condition. stands still Works estimat subbmi agrrem Present started k tobe ed.wor ongoin execut finishing ongoing Stage tted work ent AS e Tendered on g completed 19 25.2.2017 5% 100% 100% . 100% 100%

100% 100% 30% 90% 50% 90% 20 Physical Progress deposite Electrifi electrific nalukett Stages ation of 3 lakhs cation to be d for 21 of

17249341 22 Exp. Up to current month

Amount requird up to this 23 financial year

24 Remarks 6 MCTCR - Devt. -Construction Work 100%

of Consumer Store for New 15L completed .final bill

welfare Medical College Thrissur

9months submitted KJ Rajan 482/15-16 1449577/- 1667014/- for Rs. 15L (PRICE) DTD DTD (PRICE) 15L(EL50000/-) Wadakkanchrty Health & Family 15.7.2015 for Rs. 53/2015-16/EE(B) H Dtd: 17.06.2015 TSR dtd. 22.09.15 G1/4330/2015/MC 7 MCTCR - HDS - Construction Work 100% of New Canteen in Govt. completed .final bill 33.50L welfare Medical College, Thrissur 50000/ ) (PRICE) (PRICE)

35/2015- submitted 12months 3338469/- 2976749/- 3283354/- M Hassan 33.50L(EL dtd. 7.8.15 GO(RT)No- 273/2014-15 683/2015//H& 16/EE(B) TSR TSR 16/EE(B) FWD Dtd. TVM Dtd. TVM FWD Wadakkanchrty Health & Family Dt.25.3.2015 for 23.2.2015 for Rs. 8 Setting of VIP room partitions Work 100% at first floor and providing B6- completed 12.8L .final bill 12.80L welfare entrance door at GF of new submitted

chemo day care building at 1279917/- 1347625/-

Med college chest hospital dtd 25.11.15 Thomas Jacob Wadakkanchrty Health & Family 3months 15days 4549/2015/MCCH 1268/2015-16 dtd. 23.09.2015 for Rs. dtd 9.9.15 for 12.8L 89/15-16/EE B TSR 9 Partition work for setting OP Work 100% 8L in GF of new Chemotherapy completed .final bill

welfare day care building at Med 3months

799965/- 839003/- submitted college chest hospital dtd 25.11.15 Thomas Mani Wadakkanchrty Health & Family dtd 9.9.15 for 8L 1126/2015-16 dtd. 88/15-16/EE B TSR B6-4548/2015/MCCH 15.09.2015 for Rs. 8L 10 Modification and maintenance Work 100% of operaton theatre at med B6- completed .final bill 14.93L 14.93L 14.93L welfare college chest hospital Binoj C

4months submitted 1492832/- 1620768/- dtd 9.9.15 for 92/15-16/EE B Wadakkanchrty Health & Family TSR dtd 28.11.15 4547/2015/MCCH 1132/2015-16 dtd. 16.09.2015 for Rs. 11 Setting up of Bio-medical Site not

wing in GMCTCR D1- handed

25/16- over to 26.25L 26.25L welfare

6months PWD 2624887/- 2582889/- Dtd. 7.7.16 PRICE dtd. dtd. PRICE 17/EE(B)TSR 17/EE(B)TSR 2016/2015-16 for Rs. 26.25L Wadakkanchrty Health & Family 17.12.15 for Rs. CR Dtd. 23.9.15 KV Sarathkumar KV 17366/2015/MCT h 12 y GMCTCR-Devt- Agreem D1- Implementation of plan 50L ent

schemes-Waste Treatment 65/16- execute Rs.50 L CCR Dt: 6months Health &

facilities in GMCTCR-setting 4999757/- 4999757/- d for Rs. 50L up of incinerator dtd. 23.1.16 Dtd. 29.11.16 Narayana Pis 17/EE(B)TSR 17/EE(B)TSR 2803/2015-16 17367/2015/M Family welfare 23.09.2015 for Wadakkanchrt 13 Kerala University of Health Site not Sciences-Construction of handed 180L

welfare staff Quarters Type-IV(1 over to Rs.183L Rs.183L 12months block) for 6 families in 17045669 PWD 22.4.13 for 13.6.13 for 16312705/- University Campus CC Tsr dtd: T.A Abubecker 14/2013-14/SE (B) CC Tsr dtd: KUHS dtd.TSR Wadakkanchrty Health & Family 2.02.13 for 180L 8/2013-14/SE (B) 1023/2011/works/

y Govt. Medical College, Thrissur Site not 14 il - standardization of Maternal & handed am over to F Child Health units in GMCTCR welfare 9972939

16/2016- 10496726 6-01-2016 12 months & PWD K.J.Joseph -Construction of Maternity

lth Annex Building dtd.17.06.2016 dtd.23-09-2015 105.84 L(EL 5L) ORDER No. D1- No. ORDER 17/SE/BCC/TSR 17/SE/BCC/TSR ea H 17368/2015/MCTCR Wadakkanchrty 2016/2015/773Dated:1 ORDER No.TSR/2015- -

y H&FWD-13 th FCA Tendered 15 il Construction of 15 M3 Bio Gas 50L on am 05/01/201 F 12-2016

Plant at New Medical College G O (Rt) welfare

& 7

MG Kavu Thrissur lth Rs.4999999.99 ea H Wadakkanchrty No.534/2015/H&FWD Dt.05-02-2015 Rs 50L 3523/2016-2017 Dt.23 MUSEUM & ZOO 1 Demolishing the existing shed Work

and construction of new rain 6.5L 6.5L 6.5L complet shelters at Museum and ed Thrissur 649017/- 681468/- ZOO,TCR 3 months Sumesh.M 19.03.2015 18.06.2015 Museum & Zoo DTD 10.03.2015 TVM,17.12.14 for DTD 19.1.15 FOR 92/14-15/EE B TSR 80/14-15/EE B TSR MZ(F)2662/2014 dtd 2 Providing tree guards, Work

Zoo replacing the damaged complet 5 dtd 7.85L 902572 connecting posts and green 24.8.15 ed Thrissur TSR dtd 784845/- 3 months garden mesh etc. at Museum Rs. 7.85L Museum & Vijayan NK 31.08.2015 30.11.2015 334/2015-16

and Zoo, Thrissur for Rs. 7.85L 25.2.2015 for dtd. 29.6.2015 MZ(G)243/201 36/15-16/EE B 3 Maintenance works such as work

leak proofing, painting etc. to 32L completed Multipurpose Museum at . Thrissur TSR dtd 25.11.15 FOR 32L 6 months 3196065/- 2741904/- Museum and Zoo, Thrissur Majo Jose for Rs. 32L 02.12.2015 01.06.2016 DTD 10.8.15 1198/2015-16 MZ(E)2750/12 dtd. 18.9.2015 87/15-16/EE B Museum & Zoo

4 Providing 20mm Chipping 6 Complete

Dtd. d Tojo

carpet to the Internal Roads FOR 17.5L &Zoo 17.50L 21.7.15

of Museum & Zoo, Thrissur 141/15- Thrissur 16/EE B 16/EE TSR dtd Museum 3months 2270/15- 1.1.16 for Rs. 17.5L 8/12 DTD MZ(E)222 29.02.201 16 PRICE PRICE 16 1747493/- 1492359/- 5 Construction of a cage for Agreemen 8L t executed

Anaconda at Museum and DTD

Zoo,Thrissur Rs. 8 L Thrissur FOR 8 L 3months 3524/16- 751632/- 681888/- 24.1.2017 B TSR dtd TJ George 02.03.2016 MZ(K)552/15 23.12.2016for 17PRICE Dtd. 99/2016-17/EE Museum & Zoo PRISON

1 Central Jail, Viyyur - 5 6 Work in KJ 50L dtd. Reconstruction of Kitchen M3- good 4 dtd: tti eators 97/15- progress. Rs. 50L Thrissur 16/EE B 16/EE TSR dtd 6months 14.12.15 Order no. 23.12.201 22.06.201 10.2.2015 4396668/- 5056168/- 495/2015- 25029/201 16.7.15 for 16(PRICE) 16(PRICE) for Rs. 50L Thomas,Cr HEALTH DEPARTMENT -

1 H&FWD- Asset Mace Fund- 7 Agreemen 15-16- Renovation works of t executed 17.10L 17.10L WD dtd

Govt.Nursing School, 17/EEB Thrissur H&FWD 3months Baiju VP 10.12.15 28.12.20 15/2/201 6-17 dtd. 015/H&F for 17.1L O.3976/2 TSR Dtd. 3625/201 114/2016 1546094/- 1290075/- GO(RT)N Thrissur 16 for Rs. 2 Urgent special repairs-Leak completed 100% No. proofing work for ward 1 and 26L 26L dtd. R Dtd.

ward 7 at MHC, Thrissur 20.1.16 16 price GO(RT) Thrissur H&FWD 3months Baiju VP 2599769/- 2022100/- 111/2015- for rs. 26L 16/EEBTS 2074/2015/ 11.11.2015 1608/2015- H&FWD for for H&FWD 3 Renovation and Electrification Agreemen

of the Existing x-ray room and 26L t executed extension of the existing lb in Thrissur H&FWD 6760349/- 8558602/- MRL room and renovation of for 78.61L 09 months dtd. 7.12.16 the existing lab at MHC, GO(RT) No. Thrissur AnsifMohammed 71/16-17/EEBTSR 71/16-17/EEBTSR 4064/2013/H&FWD dtd. TVM 6.12.2013 10/14 -15/EE (B) TSR dtd. 22.5.16 for 78.61L 4 SR - Leak proof works to the Tendered

Ward 11 of MHC, Thrissur 26L on 25/2/2017 Thrissur H&FWD 4months 904690/- for 78.61L GO(RT) No. WD dtd. TVM 2423/2016/H&F 10/14 -15/EE (B) TSR dtd. 22.5.16 29/8/2016 for 10L HIGHER EDUCATION 1 Govt. college of Fine Work 8L Arts,Thrissur-Construction of CG cancelled H Edn Kiln room due to Thrissur 6months

694397/- 763837/- non for Rs.8L availability of site. 13.1.15 -Chalan 18.1.16 for Rs 8L 2620/2015-16 dtd Lakshmanakumar no.703 dtd 13.2.15 130/2015*-16/EE B TSR Dtd. 20.2.2016 D4/930/15/DTE DTD 2 HED-Collegiate Edn- TS Centeres of excellence in 10 estimate 300L H Edn colleges incl Heritage submitted Thrissur

concervation-Construction of 300 Lakhs 18 months Knowledge centre at GO(RT)No: Govt.College, Kuttenellur tvm, 23.9.15 For 2509/15/H.Edn DTD S 3 Additional works of Work in

convention centre at KKTM 20L good 2015. H edn College Kodungallur progres E.O Joy 3months

1884424/- 2135052/- s Kodungallur order no.P8- 9135/2015 Dt Agt.NO.58/15- L(deposit work) 30/06/2015 20 16(B)Tsr.dt.29-09- 492/2015-16/EEBT 4 Construction of Ladies Hostel Work

for KKTM Govt. College, 40L started H Edn

Pullut 18.9.15 Rs. 40L 12/KLCA TSR DTD DTD TSR 3871635/- 4249894/- 044/UGC - SWRO dtd. Kodungallur (B) TSR dtd: Vinu Sivadas Bangalore for 3/2/14 of UGC 49/15-16/EE B 03/2015-16/EE WH - 375/2011- 7/4/15 for Rs 40L 5 VITRIFIED FLOORING OF B Work 100% 12L STAFF ROOMS OF 12L completed H edn VARIOUS DEPT. IN KKTM 6months 916235/- AAC DTD DTD AAC COLLEGE, PULLUT 1198790/- Kodungallur Jayaram VR 2522/2015-16 13.10.15 FOR Dt 14/01/2016 147/15-16/EE A4/425/2015/N 6 VITRIFIED FLOORING OF Work 100%

EIGHT CLASS ROOMS OF 13L completed H edn VARIOUS DEPT. IN KKTM & final bill 6months

992789/- submitted. FOR 13L

COLLEGE, PULLUT 1298952/- 14/01/2016 Kodungallur Jayaram VR 148/15-16/EE B P DTD 13.10.15 TSR Dtd. 4.3.16 2524/2015-16 Dt A4/299/2015/CQI 7 LAC -ADS 2015-2016 Agreemen

Construction of Concrete 20L t executed H edn Basket ball Court in KKTM 6months 1885009 1517311 College,Pullut 20 Lakhs 26/10/2016 GO(RT)No: Kodungallur Ashif Asharaf 142/16/H.Edn 76/16-17/EE B 2916/2016-17Dt TSR Dtd. 9.2.16 DTD 18.1.16 For

SCHOOL n E completed 100% 1 EDN-TECH-DTE-THS- M llur No: 32L Vinu TSR TSR DTD DTD Kodungallur-Costruction of DTD NDTD

new computer class room 102/14- 15 FOR PERCH 6/14/DT Sivadas ASE (D) (D) ASE 15/EE B 15/EE 16/EE B 16/EE SECTIO D4/4614 9months 07.02.20 8.7.2015 Educatio 27/2015- Kodunga 3066947/- 2 EDN-TECH-DTE-THS- nearing 85% completio

Kodungallur-Modification of DTD TE of n 48.22L School Ground(PHASE II) 48.22L 6months Order no. Education 3175988/- 2826947/- 4822000/ Kodungallur PERCHASE 22.6.2015 for Dtd. 1.1.2016 (D) SECTION 2274/2015-16 Sivadasan MS D4/16840/15/D 3 EDN-TECH-DTE-THS- Revised Kodungallur-Modification of estimate submitted. School Ground (FIRST 31.78L 6months Order no. Education PHASE) 4794061/- 4155013/- Rs. 31.78L Kodungallur for 3178000/- (D) SECTION 2272/2015-16 Sivadasan MS of PERCHASE of DTD 23.08.2015 Dtd. 1.1.2016 for D4/16837/15/DTE MTI 1 Construction of New Site hand Academic Block - Maharaja's overed. 500L H edn Technichnological Institute, Thrissur Rs.495L (PRICE) P.306/18

Thrissur 24Months Joji Joseph 42205018/- 41740763/- 218/14-15 dtd. 23.04.2014 for H.Edn dtd Tvm 11.5.15 for 500L GO(Rt)No.808/2014/ 2 Construction of Toilet Block Complete 100% at MTI, Thrissur d H Edn 16.20L 26.9.15 dt. Tvm Thrissur VP Baiju VP 1619982 1853907 4 months Technical TSR DTD DTD TSR Education 109/2014- Director of 05.10.2015 04.02.2016 D4/30304/14 Purchase (D) 15/EE(B)TSR 15/EE(B)TSR 29 01 2015 f Section, TVPM TVPM Section, 56/15-16/ EE B dated 20.3.2015 POLYTECHNIC 1 Corporate Social GF slab 26L 26L

Ollur Responsibility Scheme of complet NTPC- Construction of ladies ed. 29.11.14 28.11.15 Order No: Pisharady Education waiting room in Govt. 2259623/- 2259623/- Polytechnic,Nedupuzha 12 months AP Narayana 47/14-15/EE B C2/2202/14 dtd 2.3.14 of District dtd 3.5.14 for 26L TSR dtd 29.11.14 Collector,TCR For For Collector,TCR 6/14-15/EE B TSR 2 Construction of Compound Agreem

Ollur wall for Ladies Hostel, Govt ent 13.5L

Polytechnic College, Koratty 25/5/16 execute TSR dtd Rs. 13.5 9months Education 1339351/- 1134431/- M L Shaju d Work for rs. 13.5 D4-2299(A)

/15/DTE Dtd. to be 34752015-16 25.8.2015 for dtd 22.2.2016 06/16-17/EE B started 3 EDN-DTE-Govt.Polytechnic work 100%

College ,Koratty-Providing 20L complted new gate and name board in 9.9.15 4months CJ Shaju Education Govt.Polytechnic 1968646/- 1850724/- Chalakudy

college,Koratty Purchase(D) dtd 19.5.15 of section for 20L. TSR Dtd. 20.1.16 D4/16225/15/DTE 1032/2015-16 dtd. 108/2015-16/EE B

4 False ceiling work of general nearing 100% KV D4- workshop, Electrical Lab, 10L completio Machine shop, n Rs. 10L 6months 999573/- 797560/- Education Microprocessor Lab & digital 136/2015- Chalakudy for Rs. 10L dtd 26.2.16 PRICE Dtd. Dtd. PRICE 19.12.15 for dtdf. 26.5.15

lab in Govt. Polytechnic, Sarathkumar 16/EE B TSR TSR B 16/EE 2152/2015-16 Koratty 16226/15/DTE

5 y

DTE Agreem Construction of Principal ent Quarter, for 49 L

2017 execute

GPTC.Chelakkara 49lakhs 19.1.2017 4166375/- 3453790/-

12 months d 3525/2016- B TSR Dtd. B TSR Muhammed Basheer KA dt.23/12/2017 TD TVMdated 28.06.2016 for Wadakkancher 95/2016-17/EE D4/14045/16/D

6 y Construction of Parking area

DTE for Govt.PolyTechnic College Agreem Chelakkra ent

2017 execute 10lakhs 940275/- 734024/- KJ Rajan TE dated 12months 104/2016- d 08.06.2016 3518/2016- 17/EE B TSR TSR B 17/EE Dtd. 4.2.2017 Dt.22/12/2016 Wadakkancher D4/14056/16/D 7 Special repairs -Improvement Agreemen

For t executed DTE of open stadium at Govrnment Women's Poly TE Dt Work to PP Paul PP 904838/- 842954/- 999922/- be started 4 months

Technic 119/2016- 07/11/2016 3542/2016- 17/EEBTSR 17/EEBTSR 2017/PRICE

College,Nedupuzha,Thrissur Rs.999922 /- Rs.999770.96 Dtd. 28.2.2017 /Dt.23/12/2016 D4/36583/16/D 8 Construction of retaining wall Agreem

and compound wall back side 30L ent Hedn 7.6.16 13/16- Rs.30L

of the ladies hostel in Govt Yoonus execute 6months

Polytechnic college, 2996878/- 2861719/- d Kunnamkulam 15/DTE dtd 11.2.2016 for 15.9.15 for 30L P S Mohammed KUNNAMKULAM 3242/2015-16 dtd. Or. No: D4/16697/ 17/EE(B)TSR Dtd. Dtd. 17/EE(B)TSR ENGINEERING COLLEGES 1 Edn- Tech- Directorate of Flooring 90%

Technical Education - GEC, 15L tile work H Edn Tsr - Balance works to completed Thrissur , pointing 6 months

Second Floor of Annex Block 1399919/- 1581629/-

15L(El -1L) and section) dtd: of Chemical Engineering 15L (PRICE) clearing (Purchase (D) Department work D4/3127/15/DTE 166/2015-16 dtd. 19.2.2015 for Rs. 31.5.2015 for Rs. 145/15-16/EE (B) pending Abdul Rasheed KA TSR dtd. 03.03.2016 p 2 Edn- Tech- Directorate of work 100%

Technical Education - GEC, 15L completed H Edn Tsr - Construction of first floor Thrissur (PRICE) 1499646

of ladies amenity centre 1689351/- 12 months for Rs. 15L for Rs. 15L 18/11/2016 19.11.2015 (D) section) 19.-11-2015 78/15-16/EE (B) TSR dtd. 292/2015-16 TE (Purchase dtd: 19.2.2015 dtd. 22.6.2015 Joy John Para D4/30300/14/D 3 Education - Technical - DTE- work in 90% an Balance workof first floor of dtd good

H Edn progress. Rs.50L PG block, Govt. Engineering 50L (El Thrissur 222750) Plastering 12months 29/2/2016 28/2/2017 4777250/- 4939677/- College, Thrissur 133/2015- 22.5.15 for

for Rs. 50L of wall Dtd. 22.2.16 17.12.20156 dtd Thrissur,

16/EE B TSR work is 2117/2015-16 Krishnachandr

D4/16969/2015 going on. 4 Education - Technical - DTE- work in 90% good Construction of PG Quarters, 6 for Jacob 16 dtd H Edn progress 225L) Rs.50L 015 dtd Govt. Engineering College, 22.2.16 50L(ElL Rs. 50L Thrissur Thomas 16/EE B 16/EE Thrissur,

2802/15- plumbing TSR Dtd. 12months 01/01/201 29/2/2016 28/2/2017 132/2015- 4774949/- 4617376/-

Thrissur D3/2068/2 23.1.16 for work is 5 Education - Technical - DTE- - - LOA dtd issued. 15 L Govt. Engineering College, 6 for 2016

H Edn Agreemen

Thrissur-Balance work of the Rs.15L Thrissur

6months t to be Joy John Parappilly 31/08/201 1170109/- 1164187/-

first floor of ladies amenity D4/28499/ 3543/2016 E Dt.23-12 2016/ DTE

2017/PRIC executed PWD t 1 Supply of New furnishing in Proposa

new PWD Rest House 10L l for

Chalakudy 29.4.14 letter of credit Chalakudy (B) Tsr dtd: 2.1.14 - 10L CE/BL/TSR/ CE/BL/TSR/ 8429/13 dtd: 04/14-15/EE submitte d to ITI 1 Construction of ITI compound work 100% wall & open well a completed ITI,Chalakudy 14.9L Dept. of Training of Addtl. 6months VP Baiju VP 1411296 1615087 Training, for 14.9L Industrial Industrial 16.6.2015 Director of B TSR dtd B TSR dtd Chalakudy dtd 25.7.14 Tii f E7/6746/05 95/14-15/EE 21/15-16/EE 2 Construction of Transformer work 100% House in ITI Chalakudy( completed 7.60L .

DEPOSIT) 16.5.15 Training Rs. 7.6L 6months 758055/- 890715/- Industrial Rs. 7.60L Chalakudy 28.5.14 for AA George GO (P) No. 1.3.2013for 17/14-15/EE 16/15-16/EE (B) TSR dtd: (B) TSR dtd: 110/2013 dtd: 3 Construction of Rest Room Slab 60%

For Women in Govt. ITI, 15L concreting Mala(DEPOSIT) completed Rs. 15L 6months CL Pinto 1399328/- 1596493/- Chalakudy Industrial Training 24/14-15/EE(B) TSR dtd; 23.6.14 78/14-15/EE(B) TSR dtd; 24.02.2015 GO (RT) No. 383 / 2014/ LBR Dtd. TVM 17.3.2014 for

4 Construction of Compound Work

wall, Gate arch and internal 15L dtd. tendered road for Govt women ITI on Rs. 15L Training

6months 25.2.2017 Industrial

Chalakudy( DEPOSIT) 1314533/- Chalakudy for Rs. 14L 16.02.2017 GO (P) No. 1.3.2013for 110/2013 dtd: 4148/2016-17 SCHOOL 1 EDN-TECH-DTE-THS-TCR- Work 100% Work shop building completed 12.60L Mace,Painting and 12.60L Thrissur 3months Order no. Education 1259690/- 1385659/- interlocking tile work 1260000/- NK Vijayan 25.11.2015 24.02.2016 8.5.2015 for SECTION DTD Dtd. 24.11.2015 18.9.2015 for Rs. D4/14631/15/DTE 1221/2015-16 dtd. of PERCHASE (D) (D) PERCHASE of 86/15-16 EE B TSR 2 Maintenance and renovation Work works at THS, TCR completed 42.9L 42.90L 42.90L Thrissur 4months Baiju VP Education 4284276/- 3903833/- 25.01.2016 24.05.2016 D4/161/15/DTE 109/15-156/EE B 11.11.2015for Rs. TSR DTD 20.1.16 DTD 16.5.15 FOR 1607/2015-16 dtd. 3 Maintenance and renovation Work works at THS, TCR completed 42.90L 42.90L . Baiju VP 4months Thrissur 4284276/- 3903833/- 25.01.2016 24.05.2016 DTD 20.1.16 11.11.2015for Rs. 1607/2015-16 dtd. 16.5.15 FOR 42.9L D4/161/15/DTE DTD 109/15-156/EE B TSR 4 Improvements of facilities in Govt. completed 100% Special Schools - 2013-14 - Deaf -

Kunnamkulam - Construction of 22.80L 6 month Class Room & Office Room 2173904 2541294 Rs. 22.80L Kunnamkulam Joy John Parappilly 37/14-15/EE(B)TSR dtd 14.11.14 37/14-15/EE(B)TSR dtd 23.7.14 for 22.8Lakhs Order No. M1/31921/2011/DPI dtd: 17.3.2012 for 5 RIMPR -Kallettumkara ,Irinjalakuda- Agreemen

Balance work of II nd Floor & Third 130L t executed Floor 6469679 4852856 M.L.Shaju 12 Months 07/10/2016 Irinjalakuda 2773/2016-2017/PRICE DTd GO 453/2015 Dtd 23/07/2015 74/16-17/EE(B)TSR dtd 08.12.16

6 KLGSDP - Financial Assistance for Tender the Strengthening of Directorete of arranged Panchayath - Modification of Office on 2Months Thrissur for the Deputy Director of 2796013/- 2796013/- 2529842/- 25.2.2017 Panchayath at Civil Station, Ayyanthole for Rs. 2796013/- 4166/2016-17 dtd. 16.2.2017 for Rs. 133/2016/KLGSDP (7) Dtd. 4.1.2017

TOURISM 1 Urgent works of old block roof Work

leak proofing and repairs to 28L complet Guest House, Ramanilayam, ed. Thrissur Tourism 4months 2950912 254/2014- Thrissur 2776022/- 19.09.2015 18.01.2016 order no. HB3 Raghuram.K.G 47/15-156/EE B 15/(PRICE) DTD DTD 15/(PRICE) TSR DTD 10.9.15 09.03.15 FOR 28L 18331/2014(1) dtd. 5.2.2015 for Rs. 28L 2 Upgradation and renovation AMT

of work-main block-Guest 88L 88L DEPOSI House,Ramanilayam TED ON Thrissur Tourism P.633/14 16.6.15- pending for TS estimate due to electrica l work is not complet ed GO(RT)NO. 189/2015/TSAM DTD 25.5.15 FOR 3 Tourism-Food Craft Institute- Work

Providing parking space and 40L complet

compound wall to 27.1.15 ed Thrissur Tourism 40Lakhs 26.10.16 FCI,Thrissur 3283256 2849538 10 months Muhammed shafi 64/14-15/EE B TSR DTD 17.1.15 81/14-15/EE B TSR dtd 8.12.14 for 40L GO(RT)No. 6240/2014/ TSM dtd 7.8.14 for 4 Tourism - Muziris Heritage Agreem 19L Project - Additional works of 19L ent Muziris Research & execute E.O.Joy Tourism 2015 dtd 3 Months Rs.19L of

Convention centre at KKTM 1884424/- 2135052/- d on Kodungallur 492/2015-16 college, Kodungallur dtd. (PRICE) 29.9.15- 30.6.2015 for Tourism, TVM 58/15-16/EE B 15.7.15 for Rs.

Or.No:P8-9135/ work in Director, Dept of

TSR DTD 29.9.15 progres 5 SR- urgent repair works to Work Govt.Guest House Guruvayur cancelle d by the Tourism 10 lakhs Tourism Guruvayur dept

SC/ST DEPARTMENT 1 Construction of Compound completed 100%

Wall to Model Residential 65L

School, Thiruvillamala, for 65L 9months SCSTDD

Wadakkanchery 7400591/- for Rs. 65L 65,00,000/- C1- 23812/ 13 Order No: Edn- 14/14-15/EE (B) 05/15-16/EE (B) T.A.Aboobacker Wadakkanchery TSR dtd: 26.5.14 TSR dtd: 24.4.15 dated 26/12/2013 2 Maintenance Works to Plus Agreemen Two Block of Model t Residential School, 9.30L Executed 836391/- 651486/- SCSTDD Thiruvillamala, 06 months

Wadakkanchery for Rs. 9.30L David Mangan Wadakkanchery Order No: Edn- C1- 25120/15(14) dated 23.5.2016for Rs. 9.30L 2098/2016-17 dtd. 11.8.16 3 SC ST DD - Painting &

reflooring works to Class room 45L Agreemen block, dormitory building, Hostel t executed 64/2016-

SCSTDD Building, Kitchen & Toilet block 4072275/- 3024795/- 06 months 29/11/2016

of Model Residential School, CT Sakheer Thiruvillamala, Wadakkanchery Wadakkanchery 2745/2016-17 dtd. 25120/15(3) dated Order No: Edn- C1- 2017/EE(B)TSR Dtd 06.10.16 for Rs. 45L 23.5.2016for Rs. 45L

4 Repair works to Pre - Metric Additional 92%

10L work is to

Ollur Hostel, Chuvannamannu be done. 20.2.15 RS 10L 6months

999886/- RE SCSTDD 1048980/- K.M.Jaffer submitted 21.02.2015 20.08.2015 76/14-15 Dtd. deposited DD Order No. D1- 4844/2011 dtd. 8.2014 SBT) for 20.8.14(Amount 24.11.14 for Rs. No.(718588/28.0 173/2014-15 dtd. 999885/- (PRICE) OTHER DEPT 1 ProvidingTrussed Roof LOA Covering to the Ladies Hostel issued

at Extension Training Centre 14.70L 14.70L Thrissur 3months 837265/-

(ETC) 1137358/- Alan Wilson, Thaliyath Constructions 2746/2016-17 dtd. 06.10.2016 for Rs. 14.70L 4861/JRY3/14/CRD DTD. 26.02.2016 FOR Rs. 2 Ceiling works in KILA, Work completed

KILA MULANGUNNATHUKAVU 8.25L . 795986/- 668629/- 2 months 24.03.2016 25.01.20116 Wadakkanchery K.V Sarath kumar Sarath K.V 1896/2015-16 dtd. 4.12.2015 112/15-16/EE B TSR DTD 21.1.2016 KILA/ AD - 293/2015 Dtd. 4.9.15 for Rs. 3 Construction of Kennels for Agreemen Dog Squard at AR t executed

Camo,Thrissur City 17.80 L Thrissur 12-2016 1578081/- 1279513/- Rs.17.80L 03 months Shammy MK Dt.20-09-2016 DTD 20.2.2017 G2-48323/2016/RC 118/16-17/EE B TSR 3528/2016-2017 Dt.23- 4 Maintenance works like leak Tendered proofing repairing of doors on 05-01- and windows,Plumbing etc. to 7.15 L 2017 Thrissur Survey Range Office,Thrissur 12-2016 2015 for Rs.7.15L 86-11351/14 Dt.16-11- 3546/2016-2017 Dt.24- 5 Construction of open well and 10 Go(Rt)No.1918/20 2904/2016- Paulson Agreem pump house at Govt.Law L 15/Hedn,TVM 2017/PRICE M.Cheri ent college ,Ayyanthole ,Thrissur Dt.25/07/2015 For /Dt.25/10/2016 yan execute Thrissur Rs.10L d