Jubilee Line Timetable Alterations Due to Metropolitan Line Engineering Work Monday to Wednesday Nights and Tuesday to Thursday

Total Page:16

File Type:pdf, Size:1020Kb

Jubilee Line Timetable Alterations Due to Metropolitan Line Engineering Work Monday to Wednesday Nights and Tuesday to Thursday Timetable Notice No. 52/16 Page 1 of 3 JUBILEE LINE TIMETABLE ALTERATIONS DUE TO METROPOLITAN LINE ENGINEERING WORK MONDAY TO WEDNESDAY NIGHTS AND TUESDAY TO THURSDAY MORNINGS, COMMENCING 16th MAY 2016 AND UNTIL FURTHER NOTICE In connection with Metropolitan Line track and drainage renewal work between Baker Street and Finchley Road on Monday to Wednesday nights and Tuesday to Thursday mornings, commencing 16th May, the arrangements shown in this Timetable Notice will apply. The Metropolitan Line train service will be suspended between Wembley Park and Aldgate from approximately 21.55 (southbound from Wembley Park) and 22.50 (northbound from Baker Street) on Monday to Wednesday nights until approximately 05.30 (southbound at Wembley Park) and 05.55 (northbound at Baker Street) on Tuesday to Thursday mornings. In consequence of revised Metropolitan Line stabling and the reversal of trains at Neasden Depot, alterations will apply to Jubilee Line trains in the Wembley Park area. Generally Jubilee Line trains stabling at Neasden Depot after 23.00 will stable via Neasden North route and not via the fly-under. To provide last train connections for Metropolitan Line customers, last Jubilee Line trains will be held at Baker Street (northbound) and Wembley Park (southbound). Jubilee Line train services will be amended as follows:- Monday to Wednesday nights Train 330, 22.45¾ ex Stanmore, will be revised to depart Wembley Park 22.56, Neasden 22A59½, then run as booked. Train 364, 22.01¼ ex Stratford, will be revised on departure Wembley Park at 22c49½, reverse via siding, form 22.58 (empty) Wembley Park (platform 4), Neasden Depot (N) arrive 23.07 and stable. Cancelled via fly- under. Train 361, 22.59¼ (empty) ex Stanmore, will be revised to depart Wembley Park 23a11, Neasden Depot (N) arrive 23.21 and stable. Cancelled via fly-under. Train 304, 23.02¼ ex Stanmore, will be revised to depart Wembley Park 23a14½, then run as booked. Train 335, 23.08¾ (empty) ex Stanmore, will be revised to run to Neasden Depot (N) arrive 23.30 and stable. Cancelled via fly-under. Train 305, 23.18½ ex Stanmore, will be revised to depart Wembley Park 23a30, Neasden 23A33½, then run as booked. Train 370, 23.21¼ (empty) ex Stanmore, will be revised to depart Kingsbury at 23.28¼, Wembley Park 23.32, Neasden Depot (N) arrive 23.41 and stable. Cancelled via fly-under. Train 341, 23.24 ex Stanmore, will be revised to depart Kingsbury at 23.31¼, Wembley Park 23.35, Neasden 23C39½, then run as booked. Train 307, 22.22¼ ex Stratford, will be revised on arrival Stanmore at 23.20¾ to form 23.26¾ (empty), then run ¼ minute earlier than booked to Kingsbury 23.33¼, Wembley Park 23.37, Neasden Depot (N) arrive 23.46 and stable. Cancelled via fly-under. Train 310, 22.25¼ ex Stratford, will be revised on arrival Stanmore at 23.23¾ to form 23.29¾, then run ¼ minute earlier than booked to Queensbury 23.34¼, Kingsbury 23.36¼, Wembley Park 23a40½, Neasden 23B44½, then run as booked. Train 352, 22.38 ex North Greenwich, will be revised on arrival Stanmore at 23.26¼ to form 23.32¼ (empty), Canons Park 23.34¼, Queensbury 23.36¾, Kingsbury 23.38¾, Wembley Park 23.42½, Neasden Depot (N) arrive 23.52 and stable. Cancelled via fly-under. Train 340, 22.57¼ ex Stratford, will be revised on departure Wembley Park at 23b43¾, reverse via siding, form 23.52½ (empty) Wembley Park (platform 4), Neasden Depot (N) arrive 00.02 and stable. Cancelled via fly-under. Train 371, 22.40¼ ex Stratford, will be revised on arrival Stanmore at 23.37½ to form 23.44, Canons Park 23.47, Queensbury 23.49¼, Kingsbury 23.51¼, Wembley Park 23.55½, Neasden 23B59½, then run as booked. Train 323, 23.47 (empty) ex Stanmore, will be revised to depart Wembley Park 23.57½, Neasden Depot (N) arrive 00.07 and stable. Cancelled via fly-under. Timetable Notice No. 52/16 Page 2 of 3 Train 367, 23.50 ex Stanmore, will be revised to depart Canons Park 23.52½, Queensbury 23.54¾, Kingsbury 23.56¾ , Wembley Park 00+00¾, then run as booked. Train 342, 00.02¾ (empty) ex Wembley Park, will be revised to arrive Neasden Depot (N) at 00.12 and stable. Cancelled via fly-under. Train 372, 00.14¼ (empty) ex Wembley Park, will be revised to arrive Neasden Depot (N) at 00.24 and stable. Cancelled via fly-under. Train 344, 00.09 (empty) ex Stanmore, will be revised to arrive Neasden Depot (N) at 00.30 and stable. Cancelled via fly-under. Train 345, 23.31¾ ex Stratford, will be revised on departure Wembley Park at 00b18¼, reverse via siding, form 00B27½ (empty) Wembley Park (platform 4), Neasden Depot (N) arrive 00.37 and stable. Cancelled via fly-under. Train 312, 00.13 ex Stanmore, will be revised on arrival Kingsbury at 00.20 to stand until 00.26 then run as follows:- Wembley Park 00.31 (AB revised connectional note applies), then run 6¼ minutes later than booked to Stratford (platform 15) arrive 01.16¾, form 01.21½ (empty) then run 4½ minutes later than booked to North Greenwich (platform 2) arrive 01.28¾, form 01.33¾ (empty) then run 2¾ minutes later than booked to Stratford (platform 15) arrive 01.42¼, form 01.47 (empty) to Statford Market Depot arrive 01z57 and stable. Cancelled reversing via Stratford platform 13, 01.10 - 01.17. Train 365, 00.34 (empty) ex Wembley Park will be revised to run to Neasden (platform 3) arrive 00.36¾, form 00.44 (empty) to Neasden Depot (S) arrive 00.50 and stable. Cancelled via fly-under. Train 346, 23.47¼ ex Stratford, will be revised on departure Wembley Park at 00b34, reverse via siding, form 00.42 (empty) Wembley Park (platform 4), Neasden Depot (N) arrive 00.51 and stable. Cancelled via fly- under. Train 351, 23.59¼ ex Stratford, will be revised on departure Wembley Park at 00b46½, reverse via siding, form 00.54 (empty) Wembley Park (platform 4), Neasden Depot (N) arrive 01.03, form 01.19 as booked. Cancelled running into depot via fly-under. Train 366, 01.12 (empty) ex Wembley Park, will be revised to arrive Neasden Depot (N) at 01.22 and stable. Train 357, 00.11 ex Stratford, will be revised to depart Baker Street 00J43 (AA revised connectional note applies), then run 2¾ minutes later than booked to Neasden depart 00.58, Wembley Park (platform 3) 01.00¾, then run 1½ minutes later than booked to Stanmore (platform 2) arrive 01.10½, form 01.15½ (empty) to No. 33 road arrive 01.17, form 01.22 (empty) No. 33 road to Stanmore Sidings arrive 01.23 and stable. Tuesday to Thursday mornings Train 350, will be revised to start from Neasden Depot (F) at 05.03 (empty), Wembley Park (platform 4) 05.12½, form 05.22¾ (passenger), then run as booked. Train 323, will be revised to start from Neasden Depot (F) at 05.23 (empty), Wembley Park (platform 3) depart 05j37 (passenger), then run as booked. Train 371, will be revised to start from Neasden Depot (F) at 05.30 (empty), Wembley Park (platform 3) 05.39½, reverse via siding, form 05f59¼ (passenger), then run as booked. Train 336, will be revised to start from Neasden Depot (F) at 05.37 (empty), Wembley Park (platform 3) depart 05j51 (passenger), then run as booked. Train 367, will be revised to start from Neasden Depot (F) at 05.44 (empty), Wembley Park (platform 3) 05f56½, reverse via siding, form 06a08½ (passenger), then run as booked. All the timetable alterations contained in this notice are included on Signal Control Data. Timetable Notice No. 52/16 Page 3 of 3 Advice to Passengers After approximately 21.55 (southbound) and 22.50 (northbound) on Monday to Wednesday nights, and before 05.30 (southbound) and 05.55 (northbound) on Tuesday to Thursday mornings passengers travelling between Wembley Park and Baker Street must be advised to use Jubilee Line train services. Last train connections to all Metropolitan Line destinations have been provided, but passengers must be at Baker Street (northbound Jubilee Line platform) at normal last train times. Last Train Connections to Metropolitan Line destinations via the Jubilee Line Last journey opportunities between Baker Street and Wembley Park and to all northern Metropolitan Line destinations are provided as follows:- Northbound: Amersham branch: (all stations except Chesham) – via northbound Jubilee Line departing Baker Street at 00.14 changing at Wembley Park. Watford branch: (all stations) – via northbound Jubilee Line departing Baker Street at 00.14 changing at Wembley Park and again at Harrow-on-the-Hill. Chesham branch: (all stations except Amersham, Croxley and Watford) – via northbound Jubilee Line departing Baker Street at 00.26 changing at Wembley Park. Uxbridge branch: (all stations) – via northbound Jubilee Line departing Baker Street at 00.43 changing at Wembley Park. Southbound: Between Wembley Park and Baker Street: The normal last Metropolitan Line departure from Wembley Park to Baker Street at 00.29 has been maintained with a later (delayed) Jubilee Line service to Baker Street and central London/Stratford departing Wembley Park at 00.31. This train will connect from the 00.03 Metropolitan Line train departure from Uxbridge, due Wembley Park at 00.29. Revised Connectional Notes The following revised Connectional Notes will apply on Monday to Wednesday nights:- AA - Connects as follows:- Baker Street 00J43 from 00.23 ex Elephant & Castle due 00.37½ and from 23.54 ex Barking due 00.35½ AB - Connects as follows:- Wembley Park 00.31 from 00.03 ex Uxbridge due 00.29 Waterloo 00.56 from 23.59½ ex Edgware due 00.36½ and from 23f54 ex Harrow and Wealdstone due 00b38½ For all other General Notes and Abbreviations, see pages 6 of Working Timetable No.
Recommended publications
  • Uncovering the Underground's Role in the Formation of Modern London, 1855-1945
    University of Kentucky UKnowledge Theses and Dissertations--History History 2016 Minding the Gap: Uncovering the Underground's Role in the Formation of Modern London, 1855-1945 Danielle K. Dodson University of Kentucky, [email protected] Digital Object Identifier: http://dx.doi.org/10.13023/ETD.2016.339 Right click to open a feedback form in a new tab to let us know how this document benefits ou.y Recommended Citation Dodson, Danielle K., "Minding the Gap: Uncovering the Underground's Role in the Formation of Modern London, 1855-1945" (2016). Theses and Dissertations--History. 40. https://uknowledge.uky.edu/history_etds/40 This Doctoral Dissertation is brought to you for free and open access by the History at UKnowledge. It has been accepted for inclusion in Theses and Dissertations--History by an authorized administrator of UKnowledge. For more information, please contact [email protected]. STUDENT AGREEMENT: I represent that my thesis or dissertation and abstract are my original work. Proper attribution has been given to all outside sources. I understand that I am solely responsible for obtaining any needed copyright permissions. I have obtained needed written permission statement(s) from the owner(s) of each third-party copyrighted matter to be included in my work, allowing electronic distribution (if such use is not permitted by the fair use doctrine) which will be submitted to UKnowledge as Additional File. I hereby grant to The University of Kentucky and its agents the irrevocable, non-exclusive, and royalty-free license to archive and make accessible my work in whole or in part in all forms of media, now or hereafter known.
    [Show full text]
  • Re Curriculum for Hinduism
    “The Mandir is so welcoming and it is a real highlight of the year. I will be sure to be booking again for next year.” RE Teacher, Holmewood House Prep School, Kent ENHANCING YOUR RE CURRICULUM FOR HINDUISM KS1 KS2 KS3 KS4 The ‘Neasden Temple’Temple’ in north-west London is a beautiful “It was the best school trip and inspiring place of learning for tens of thousands of we have been on so far.” Year 5, Maple Grove experience of Hinduism as a part of their Religious Primary School, Essex Education curriculum for KS1, KS2, KS3 and KS4. FREE Temple Entry ‘Understanding Hinduism’ Exhibition: £1.50 per student BOOK A VISIT Book your school’s visit using our online form at londonmandir.baps.org/visit-us/booking-form For enquiries, please email [email protected] For more information, please visit londonmandir.baps.org/visit-us/school-visits A typical educational visit can include: • witnessing a traditional Hindu ceremony CONTACT US • worksheets tailored for various age groups BAPS Shri Swaminarayan Mandir • an interactive presentation about key Hindu beliefs, What better place to learn about Neasden, London NW10 8LD, UK practices and values Hinduism than in the country’s 020 8965 2651 • an 11-minute documentary on how the temple was built [email protected] largest traditional Hindu temple? • ‘Understanding Hinduism’ exhibition where you discover londonmandir.baps.org the origins and development of the world’s oldest living faith @neasdentemple “The organisation and general experience could not have been better. The children gained knowledge of Hinduism that could not have been achieved in the classroom.” RE Teacher, Brill Church of England School, Buckinghamshire “Largest traditional built Mandir in the world”.
    [Show full text]
  • Settlement Capacity Study Update
    Chiltern & South Bucks Local Plan 2036 Settlement Capacity Study Page 0 of 122 Chiltern & South Bucks Local Plan 2036 Settlement Capacity Study Introduction Local authorities are encouraged by Paragraph 65 of the National Planning Policy Framework (NPPF) to set out a housing requirement for designated neighbourhood areas as part of their strategic policies. This is to enable neighbourhood plans to provide sufficient housing sites to meet their expected allocation. All currently-designated neighbourhood areas in Chiltern and South Bucks Districts share their boundaries with parish boundaries. It is anticipated that any future designations will also be for town council or parish council areas rather than for areas smaller or larger than these. The purpose of this study is to calculate required housing numbers for each parish within Chiltern and South Bucks. The Planning Practice Guidance1 confirms that there is no set methodology available for doing this, stating “the general policy making process already undertaken by local authorities can continue to be used to direct development requirements and balance needs and protections by taking into consideration relevant policies such as the spatial strategy, evidence such as the Housing and economic land availability assessment, and the characteristics of the neighbourhood area, including its population and role in providing services. In setting requirements for housing in designated neighbourhood areas, plan-making authorities should consider the areas or assets of particular importance (as set out in paragraph 11, footnote 6), which may restrict the scale, type or distribution of development in a neighbourhood plan area”. The NPPF requires the housing requirement figure for a neighbourhood area to reflect the Local Plan’s overall strategy for the pattern and scale of development and any relevant allocations.
    [Show full text]
  • 50 Years Ago – a Postscript
    50 YEARS AGO – A POSTSCRIPT METROPOLITAN MODERNISATION Whilst some of us will recall the late-1950s and early 1960s as the period “when it all happened”, there was a lot going on much earlier. Here is a selection of what happened, details being obtained from the Traffic Circulars of the time. Some items may not be directly relevant but nevertheless are included for interest, if only that London Transport were bringing the Metropolitan Line up to date and ‘in line’ with the rest of the network. Date Brief details 02.01.50 “Stop-and-Proceed” abolished north of Harrow-on-the-Hill and all signals, semi- automatic and automatic, provided with signal post telephones. All trains to receive authority from relevant signalman before passing any signal at danger. Signal boxes affected were Watford Station (JL), Croxley (B), Watford Junction (C), Northwood (E), Pinner (G) and Harrow Station (JB). 01.50 Telephones provided on Chesham line (to signalmen at Chalfont & Latimer and Chesham) at One Mile Post, Two Mile Post and Three Mile Post. 04.06.50 Track slewed on a new alignment 30ft west of present from 1,000ft north of Watford South Junction to 1,500ft south of Watford South Junction, to allow bridges MR78, MR80 and MR81 to be taken out of use. 17.06.50 From midnight, maintenance responsibility for track, works & buildings and signalling between 28½ mile post (Mantles Wood) and 37 miles 195 yards, about ¾ mile south of Aylesbury South Junction, will be transferred from Railway Executive to London Transport. 25.06.50 London Transport to take over responsibility for management of ex-Joint Line from Harrow to Aylesbury South Junction including Watford and Chesham branches.
    [Show full text]
  • London's Rail & Tube Services
    A B C D E F G H Towards Towards Towards Towards Towards Hemel Hempstead Luton Airport Parkway Welwyn Garden City Hertford North Towards Stansted Airport Aylesbury Hertford East London’s Watford Junction ZONE ZONE Ware ZONE 9 ZONE 9 St Margarets 9 ZONE 8 Elstree & Borehamwood Hadley Wood Crews Hill ZONE Rye House Rail & Tube Amersham Chesham ZONE Watford High Street ZONE 6 8 Broxbourne 8 Bushey 7 ZONE ZONE Gordon Hill ZONE ZONE Cheshunt Epping New Barnet Cockfosters services ZONE Carpenders Park 7 8 7 6 Enfield Chase Watford ZONE High Barnet Theydon Bois 7 Theobalds Chalfont Oakwood Grove & Latimer 5 Grange Park Waltham Cross Debden ZONE ZONE ZONE ZONE Croxley Hatch End Totteridge & Whetstone Enfield Turkey Towards Southgate Town Street Loughton 6 7 8 9 1 Chorleywood Oakleigh Park Enfield Lock 1 High Winchmore Hill Southbury Towards Wycombe Rickmansworth Moor Park Woodside Park Arnos Grove Chelmsford Brimsdown Buckhurst Hill ZONE and Southend Headstone Lane Edgware Palmers Green Bush Hill Park Chingford Northwood ZONE Mill Hill Broadway West Ruislip Stanmore West Finchley Bounds 5 Green Ponders End Northwood New Southgate Shenfield Hillingdon Hills 4 Edmonton Green Roding Valley Chigwell Harrow & Wealdstone Canons Park Bowes Park Highams Park Ruislip Mill Hill East Angel Road Uxbridge Ickenham Burnt Oak Key to lines and symbols Pinner Silver Street Brentwood Ruislip Queensbury Woodford Manor Wood Green Grange Hill Finchley Central Alexandra Palace Wood Street ZONE North Harrow Kenton Colindale White Hart Lane Northumberland Bakerloo Eastcote
    [Show full text]
  • The Evolution of Train Services on the Met and Gc Line
    THE EVOLUTION OF TRAIN SERVICES ON THE MET AND GC LINE by Eric Stuart (Readers may find reference to the Four-Tracking article in the July 2018 issue of Underground News helpful) After the Great Central (GC) arrived at Quainton Road and the service south thereof became established, both the GC and the Metropolitan Railway (Met.) provided services. However, the personalities at the heads of the two companies did not enjoy the best of relationships. Matters came to a head when a GC train crashed when failing to reduce speed over the (then) reverse curve into Aylesbury station in 1904. About that time, both the leaders retired and a period of better relations between the companies began. On 2 April 1906, the Metropolitan & Great Central Joint Railway (MGCJR) was created. This latter took over the lines of the Metropolitan Railway north and west of Harrow South Junction, with the exception of the branch to Uxbridge. These included the main line between Harrow-on-the-Hill and Verney Junction and the branch from Chalfont & Latimer to Chesham. The MGCJR was created under the terms of the Metropolitan & Great Central Railway Act, which received Royal Assent on 4 August 1905. At the same time, the Great Central and Great Western Joint Railway was formed, covering the lines south of Aylesbury via Princes Risborough to Northolt Junction. This was the result of a new line that aided the GC by partly avoiding congestion on the Met. and also giving the Great Western a shorter route to Birmingham1. One curiosity was that a Joint Committee was set up to manage a new Aylesbury station, jointly owned by two joint railways! Some points on terminology: The new line was commonly called just ‘The Joint Line’ and, even in later LT days, some staff still belonged to a particular class that made them feel superior to others2.
    [Show full text]
  • Soc 803 Gilbert Henry & Sons, Ballard's Lane, Rabjohn H
    p·- :MIIJI LESEX.] TRADES. soc 803 Gilbert Henry & Sons, Ballard's lane, Rabjohn H. Wellington ter. Harrow SOAP POWDER MANUFRS. North Finchley N Reeve A. T. Coopers la. Potters Bar Camille Simon Limited, Strand-on~ Gill A. W. Harmondsworth, Yiewsley Robbins Wm. High rd. Hayes End the-Green, Chiswick W Girdler Henry, High street, Southall Rogers John, R.S.S. 463 High road, Gould Jame!l, Horn lane, Acton W Tottenham N SOCIAL CLUBS. Grace Henry, Colham green, Uxbridge Rowland T. Station rd. Hendon N W Grace Mrs. Mary, London rd.Brentfd Russell Charles E. Kirkton place, See Clubs-Social. Greenbank Geo. Cranford, Hounslow High road, Whetstone N Haines Thomas, Shepperton Sadler Francis, So South st. I.sleworth SOCIETIES & ASSOCIATNS. Handfo.rd Frederick J-ohn, 323 Fore Saich Henry Joseph, 28a, Avenue rd. Acton Conservative & Unionist Asso- street, Lower Edmonton South Tottenham N ciation (William Edward Pryce, Harrison J.42KewBridge rd.Brentford Shambrook J. D. g8 Uxbridge road, sec.), 7 Rosemont road, Acton W Hawthorn & Mandrell, Hertford road, Hanwell A.cton Liberal &; Radical Association Enfield Wash Shelton John James, 69 Devonshire (Jame.s A. Burn, hon. sec.), 182 Hayden William, 6 Woodberry mews, road, Chiswick W High street, Acton W St. John's road, South TottenhamN Sheppard R. Stanwell road, Ashford A.rcadian Whist Drive &; Dancing Hayhoe T. 45 North rd. Highgate N Shrirnpton Joseph, 2178, High road & Association (T. H. Whitcomb, Hazell Jesse, Harlington, Hounslow 33 Strode road,Willesden Green NW hon. sec.), 439 High rd.Tottenhm N Heal Charles, 128, King st.Twicknhm Simmons Thomas, Leacroft, Staines Boatmen's Institute (Roland Bamher, Hemus F.
    [Show full text]
  • Retro Underground: the Seventies to the Noughties – 3
    RETRO UNDERGROUND: THE SEVENTIES TO THE NOUGHTIES – 3. OTHER EVENTS by Tony Morgan My earliest memories of the Underground are during the Second World War travelling from Kingsbury on the Bakerloo Line into London and sometimes on to Kent on the Southern Railway to visit relations. In 1968, after ten years of driving to North Acton, I started commuting in to Great Portland Street. While I was there the second section of the Victoria Line opened as far as Warren Street. One lunchtime I decided to have a quick trip on it. The 1967 Stock train came in to reverse back. The Train Operator was standing in the cab with his back to the direction of travel as the ATO stopped the train. Maybe this was being done to build confidence in the new control system. Travelling home one day from Great Portland Street I saw the latest LT Magazine on display in the ticket office. I then started buying it on a regular basis. The front cover of that first edition had a photograph of the C69 Stock about to be introduced on the Circle Line on it. From that magazine I found out about ‘The Last Drop’ event at Neasden Depot, on Sunday 6 June 1971 advertised, which celebrated the end of use of steam locomotives for engineers’ operations. There I joined the Society because of their Sales Stand. This was my first organised event. At this event all three remaining locomotives were in steam. L94 hauled a rake of engineers’ vehicles from the City and pulled into one of two Klondyke Sidings in Neasden depot.
    [Show full text]
  • Joint Lines Ref No
    Joint Lines Ref No. F Item Description and Source Notes F1 Documents re closure of Manchester Central F2 The Cheshire Lines Railway - HMRS Jnl, 1967, article F3 Accident at New Mills, report - HMSO, 1961 F4 Index to articles re CLC in RM F5 The Swinton & Knottingley Railway -Ms, D.L. Franks F6 Met. & L.T Lines - Notes F7 Met. Line electrification - Amersham station - MT, 4/59, article F8 The Chesham Branch - RM, n.d., article F9 Quainton Rd.-verney junction - Notes F10 Marple Rail Trails - W.R Burton F11 Manchester Central aerial view - A3 laser copy Donated by Robert Emblin. F12 Manchester Central & Piccadilly - Photographs Donated by Robert Emblin. F13 From Train Shed to Exhibition Centre - The Story of the Manchester Central Station - Original Ms copy Donated by Robert Emblin. F14 The Development of the Central Station site into the G-Mex Centre - N. Spooner, 1/1987 F15 Manchester Central Station - The Engineer, 13/2/80, 27/2/80, 5/3/80, copies F16 Recalling the CLC - P. Hay - Steam World 8/92 F17 Manchester Central Revisited - RW, 5/1983, R.E Rose, copy F18 Manchester Central Remembered - R.E Rose F19 The Rise & Fall of Manchester Central - K. Groundwater, RW, June 1969 F20 Marple - A one time traffic centre of the Midland Railway - BRJ 1994 - W.R. Burton F21 Manchester Central - GN Warehouse - Manchester Evening News, 17/10/95 (article & photo) F22 GCR's Joint Lines - The Rewards of a railway flirt - R. Emblin, B. Longbone F23 GCR joint lines - Data appendix - R. Emblin 2/1994 F24 Gw-GC Joint Line Opening April 1906 copy F25 Inspection of new works Neasden to Prices Risborough July 1904 copy F26 Inspection of new works Northolt to High Wycombe April 1905 F27 book: 'The Metropolitan Railway' by C.Baker.
    [Show full text]
  • IL Combo Ndx V2
    file IL COMBO v2 for PDF.doc updated 13-12-2006 THE INDUSTRIAL LOCOMOTIVE The Quarterly Journal of THE INDUSTRIAL LOCOMOTIVE SOCIETY COMBINED INDEX of Volumes 1 to 7 1976 – 1996 IL No.1 to No.79 PROVISIONAL EDITION www.industrial-loco.org.uk IL COMBO v2 for PDF.doc updated 13-12-2006 INTRODUCTION and ACKNOWLEDGEMENTS This “Combo Index” has been assembled by combining the contents of the separate indexes originally created, for each individual volume, over a period of almost 30 years by a number of different people each using different approaches and methods. The first three volume indexes were produced on typewriters, though subsequent issues were produced by computers, and happily digital files had been preserved for these apart from one section of one index. It has therefore been necessary to create digital versions of 3 original indexes using “Optical Character Recognition” (OCR), which has not proved easy due to the relatively poor print, and extremely small text (font) size, of some of the indexes in particular. Thus the OCR results have required extensive proof-reading. Very fortunately, a team of volunteers to assist in the project was recruited from the membership of the Society, and grateful thanks are undoubtedly due to the major players in this exercise – Paul Burkhalter, John Hill, John Hutchings, Frank Jux, John Maddox and Robin Simmonds – with a special thankyou to Russell Wear, current Editor of "IL" and Chairman of the Society, who has both helped and given encouragement to the project in a myraid of different ways. None of this would have been possible but for the efforts of those who compiled the original individual indexes – Frank Jux, Ian Lloyd, (the late) James Lowe, John Scotford, and John Wood – and to the volume index print preparers such as Roger Hateley, who set a new level of presentation which is standing the test of time.
    [Show full text]
  • 1 a Report by Sawtag Opposing
    A REPORT BY SAWTAG OPPOSING THE CLOSURE OF WATFORD METROPOLITAN STATION AND ITS ASSOCIATED ROUTE. ALL OF THESE ARE TO BE SAFEGUARDED UNDER EXTRACTED GOVERNMENT POLICY. This report opposes the closure of Watford (Metropolitan Line) Station on three major grounds. 1 Retaining peak, football and special traffic, and positively building up traffic. Both the Metropolitan Line and WCML/Watford Suburban Lines serve nearby Wembley Stadium extremely well already. Also, train portion working must be advanced to best practice elsewhere. 2 Facilitating the forming of an extended London Overground network, through the extracted Government Policy of better protection, critical in developing rail infrastructure and interchange. 3 Essential safeguards are to be put in place to protect the truncated alignment through Watford (Metropolitan Line) Station. Firstly , it is essential the latter station is retained at least for continued peak hours services, in view of the steadily increasing peak and general use of both the London Metropolitan Underground and Network Rail West Coast Main Line centered system. Safeguarding is also essential in order to serve during the interim for Watford Football Club traffic attending the Vicarage Road Stadium. Pending the establishment of a new station; immediately South of the Stadium on the new Croxley Link Line; Watford (Met) Station is to be kept open for both peak and Football traffic with requisite direct connecting buses. These connecting buses will run from a retained Watford Metropolitan Station direct to the Stadium. There was a railway triangle immediately South of the Stadium, and Croxley Moor alternatives (reference no. 8) to the Croxley Link Project; investigated both linking the Rickmansworth LNWR branch corridor west to the Rickmansworth (Met) Main Line towards Aylesbury, and generally reinstating the pre-Beeching railway triangle inter alia.
    [Show full text]
  • 232 Bus Time Schedule & Line Route
    232 bus time schedule & line map 232 St Raphael's View In Website Mode The 232 bus line (St Raphael's) has 2 routes. For regular weekdays, their operation hours are: (1) St Raphael's: 5:30 AM - 11:55 PM (2) Turnpike Lane Station: 5:25 AM - 11:55 PM Use the Moovit App to ƒnd the closest 232 bus station near you and ƒnd out when is the next 232 bus arriving. Direction: St Raphael's 232 bus Time Schedule 55 stops St Raphael's Route Timetable: VIEW LINE SCHEDULE Sunday 6:18 AM - 11:55 PM Monday 5:30 AM - 11:55 PM Turnpike Lane Bus Station (S) Langham Road, London Tuesday 5:30 AM - 11:55 PM Coleraine Road (O) Wednesday 5:30 AM - 11:55 PM Walnut Mews, London Thursday 5:30 AM - 11:55 PM Wood Green Shopping City (J) Friday 5:30 AM - 11:55 PM High Road, London Saturday 5:30 AM - 11:55 PM Wood Green Station (H) Wood Green Bus Garage (C) 208 High Road, London 232 bus Info Haringey Civic Centre (BP) Direction: St Raphael's Stops: 55 Nightingale Road (BQ) Trip Duration: 75 min Line Summary: Turnpike Lane Bus Station (S), Arcadian Gardens (BR) Coleraine Road (O), Wood Green Shopping City (J), 314 High Road, London Wood Green Station (H), Wood Green Bus Garage (C), Haringey Civic Centre (BP), Nightingale Road Berkshire Gardens (BS) (BQ), Arcadian Gardens (BR), Berkshire Gardens (BS), Tottenhall Road (T), Palmerston Road (S), Tottenhall Road (T) Pymmes Road (GY), Warwick Road (GQ), Arnos Grove Swimming Pool, Arnos Grove Station (A), Palmerston Road (S) Ravenscraig Road (C), Betstyle Circus (D), New North Circular Road, London Southgate Station (J), Whitmore
    [Show full text]