World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document PROCUREMENT India : Andhra Pradesh Disaster Recovery Project PLAN General Information Country: India Banks Approval Date of the Original Procurement Plan: 2016-08-08 Project Name: Andhra Revised Plan Date(s): (comma delineated, leave blank if none) Pradesh Disaster 2016-12-05 Recovery Project Project ID: P154847 GPN Date: Loan / Credit No: IDA / 56940 Executing Agency(ies): Eastern Power Distribution Company of A.P.Limited, Panchayati Raj Public Disclosure Authorized Department, Roads & Building Department, Revenue (DM) Department, Visakhapatna m Urban Development Authority, Project Implementatio n Unit , GVMC, Andhra Pradesh Forest WORKS Activity Reference No. / Department Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-APEPDCL-212-CW-RFB / UG Single Stage - Two Pending cable network in VSP city IDA / 56940 Resilient electrical network Prior Request for Bids Open - National 19,000,000.00 0.00 2016-11-07 2016-11-12 2016-12-24 2017-03-08 2017-04-12 2018-10-09 Envelope Implementation Package-4 IN-PRD-443-CW-RFB / Road from Perantalapalem to Restoration of connectivity and Single Stage - Two Under IDA / 56940 Post Request for Bids Open - National 488,462.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-07-29 Jogaraopeta and Road from NH shelter infrastructure Envelope Implementation 16 to Jampapalem via Y Tuni IN-PRD-459-CW-RFB / AKP SBM road to Koppaka via Bhatlapudi, Kondupalem Road Restoration of connectivity and Single Stage - Two Under at 1.8 Km to makavaram via IDA / 56940 Post Request for Bids Open - National 938,462.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2019-01-25 shelter infrastructure Envelope Implementation Chinnamakavaram and AKP Public Disclosure Authorized CDM road to AKP SBM road via Mamidipalem and Kondupalem IN-PRD-470-CW-RFB / Gottipalli to Cheemalamettapalem, BN Road to Dibbadipalem, Boni Water Works Road to Gottipalli Kallalu, VZM Sontyam Road to Restoration of connectivity and Single Stage - Two Under IDA / 56940 Post Request for Bids Open - National 750,769.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-08-03 Kothavalasa Via Gidijala, shelter infrastructure Envelope Implementation Vemagottipalem, VZM-STM Road to Kusuluwada via Mukundapuram, Ramunenipeta and NH5 to Yethapeta IN-PRD-473-CW-RFB / T.Nagarapalem BT Road to Gollalapalem via SC Colony, Mulakuddu BT Road to Srinagar Restoration of connectivity and Single Stage - Two Under IDA / 56940 Post Request for Bids Open - National 412,308.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-08-03 Colony upto PMGSY Road, shelter infrastructure Envelope Implementation NH43 to Ramunaidupeta and Nerellavalasa colony to vambay colony via polytechnic college IN-PRD-476-CW-RFB / Potnuru to Kumaram via Gullamajjivarikallalu, Pandrangi Restoration of connectivity and Single Stage - Two Under alamanda R&B road to IDA / 56940 Post Request for Bids Open - National 470,769.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-07-29 shelter infrastructure Envelope Implementation Tunipolem and Pandrangi to sangivalasa via Samayyavalasa and munivanipalem IN-PRD-478-CW-RFB / B.N.Road to Kithampeta, Approach Road to Pedapachila, Restoration of connectivity and Single Stage - Two Under R.Kothuru to Dibbalapalem, IDA / 56940 Post Request for Bids Open - National 484,615.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-07-29 shelter infrastructure Envelope Implementation Kothakota Makavarapalem road to Kannampeta and Thotakurapalem to Pothuluru IN-PRD-480-CW-RFB / Public Disclosure Authorized K.P.Agraharam to Pedamadeena P.R. Road Via Kondapalem, Restoration of connectivity and Single Stage - Two Under IDA / 56940 Post Request for Bids Open - National 443,077.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-07-29 R.T.Road to Karaka and shelter infrastructure Envelope Implementation Pedamadeena P.R. Road to Chinamadeena Page 1 Public Disclosure Authorized IN-PRD-481-CW-RFB / Damunapalli to Mycherlapalem, G.jagannadhapuram to Restoration of connectivity and Single Stage - Two Under P.Kolliveedhi, B.N.Road to IDA / 56940 Post Request for Bids Open - National 347,692.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-02-03 shelter infrastructure Envelope Implementation Balusupalem and J.Naidupalem- Kasireddipalem road to Gurralapalem IN-PRD-483-CW-RFB / Road from Satyavaram to Vommali Restoration of connectivity and Single Stage - Two Under IDA / 56940 Post Request for Bids Open - National 230,769.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-02-03 Kata and Jampena Sivalayam to shelter infrastructure Envelope Implementation Veeranarayanam IN-PRD-484-CW-RFB / Road from Taruva to M.Alamanda and Restoration of connectivity and Single Stage - Two Under IDA / 56940 Post Request for Bids Open - National 404,615.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-07-29 Road from Tenugupudi to shelter infrastructure Envelope Implementation Marepalli IN-PRD-486-CW-RFB / Arjunagiri to Cheedipalli and Restoration of connectivity and Single Stage - Two Under Chodavaram Turuvolu R and B IDA / 56940 Post Request for Bids Open - National 553,846.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-08-03 shelter infrastructure Envelope Implementation road to Pedagogada via Chettupalle IN-PRD-487-CW-RFB / Road from Rongalinaidupalem to Restoration of connectivity and Single Stage - Two Under IDA / 56940 Post Request for Bids Open - National 384,615.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-07-29 Medicherla and Road from shelter infrastructure Envelope Implementation Srungavaram to Pindrangi IN-RBD-492-CW-RFB / Permanent Restoration to Ragolu- Restoration of connectivity and Single Stage - Two Pending IDA / 56940 Post Request for Bids Open - National 1,666,666.00 0.00 2016-11-01 2016-11-06 2016-12-18 2017-03-02 2017-04-06 2018-01-24 Palakonda road from Km 10.00 shelter infrastructure Envelope Implementation to 20.00 in Srikakulam Dist IN-PRD-493-CW-RFB / Road from Kothakota Makavarapalem R B Road 0.0 to Jangallapalem Restoration of connectivity and Single Stage - Two Under IDA / 56940 Post Request for Bids Open - National 558,462.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-07-29 9.0km and Joginadhuinipalem Jn shelter infrastructure Envelope Implementation to Vazragada via Tammayyapalem IN-PRD-495-CW-RFB / Tootipala to to Janakirampuram via Restoration of connectivity and Single Stage - Two Pending IDA / 56940 Post Request for Bids Open - National 1,200,000.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2019-02-03 Adigarlapalem, Pothalooru shelter infrastructure Envelope Implementation ,Tadapala , K,.Tadapala. IN-PRD-497-CW-RFB / Kothuru Junction to K.Ellavaram via Restoration of connectivity and Single Stage - Two Under Kasimi and Providing BT road IDA / 56940 Post Request for Bids Open - National 538,462.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-08-03 shelter infrastructure Envelope Implementation from Karaka R&B road to Jillelupudi IN-RBD-496-CW-RFB / Permanent Restoration to Saluru- Restoration of connectivity and Single Stage - Two Pending Duggeru road (via) Makkuva from IDA / 56940 Post Request for Bids Open - National 2,916,666.00 0.00 2016-11-01 2016-11-06 2016-12-18 2017-03-02 2017-04-06 2018-07-24 shelter infrastructure Envelope Implementation Km 0.00 to 18.725 in Vizianagaram Dist. IN-PRD-499-CW-RFB / Formation of the road from Venkatapuram H.O Salikamallavaram to Kuruwda Road of Nathavaram Mandal, Restoration of connectivity and Single Stage - Two Under IDA / 56940 Post Request for Bids Open - National 676,923.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-08-03 Providing BT road from Nrpm shelter infrastructure Envelope Implementation Devipatnam Road to Kumarapuram via Ch.Nagapuram and Narsipatnam Devipatnam R and B road to Nallanki IN-PRD-501-CW-RFB / Ramannapalem to Masampalli Restoration of connectivity and Single Stage - Two Under IDA / 56940 Post Request for Bids Open - National 661,538.00 0.00 2016-09-01 2016-09-06 2016-10-18 2016-12-31 2017-02-04 2018-08-03 and Approach road to shelter infrastructure Envelope Implementation Chinagolugondapeta IN-RBD-503-CW-RFB / Permanent restoration from Km Restoration of connectivity and Single Stage - Two Pending IDA / 56940 Post Request for Bids Open - National 4,333,333.00 0.00 2016-11-01 2016-11-06 2016-12-18 2017-03-02 2017-04-06 2019-01-24 0.00 to 14.380 of Devada GPY shelter infrastructure Envelope Implementation road in Visakhapatnam Dist IN-RBD-505-CW-RFB / Permanent Restoration from Km Restoration of connectivity and Single Stage - Two Pending IDA / 56940 Post Request for Bids Open - National 2,000,000.00 0.00 2016-11-01 2016-11-06 2016-12-18 2017-03-02 2017-04-06 2018-07-24 0.00 to 6.00 of SKK road in shelter infrastructure Envelope Implementation Visakhpatnam Dist IN-PRD-506-CW-RFB / Nathavaram R B Road to Manyapurtla road via.
Recommended publications
  • Shahezan Issani Report Environment and Social Impact Assessment for Road Asset 2020-03-02
    Draft Initial Environmental Examination Project Number: 53376-001 September 2020 IND: DBL Highway Project Prepared by AECOM India Private Limited The initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. FINAL ESIA Environment and Social Impact Assessment (ESIA) of Road Asset Anandapuram-Pendurthi-Anakapalli Section of NH-16 Dilip Buildcon Limited September 19, 2020 Environment and Social Impact Assessment of Road Asset – Anandapuram – Pendurthi – Ankapalli Section of NH 16, India FINAL Quality information Prepared by Checked by Verified by Approved by Shahezan Issani Bhupesh Mohapatra Bhupesh Mohapatra Chetan Zaveri Amruta Dhamorikar Deepti Bapat Revision History Revision Revision date Details Authorized Name Position 01 23 April 2020 First cut ESIA report without Yes Chetan Zaveri Executive Director monitoring data 02 30 April 2020 Draft ESIA report without monitoring Yes Chetan Zaveri Executive Director data 03 9 July 2020 Final ESIA report with monitoring Yes Chetan Zaveri Executive Director data and air modelling
    [Show full text]
  • Bhimli Assembly Andhra Pradesh Factbook
    Editor & Director Dr. R.K. Thukral Research Editor Dr. Shafeeq Rahman Compiled, Researched and Published by Datanet India Pvt. Ltd. D-100, 1st Floor, Okhla Industrial Area, Phase-I, New Delhi- 110020. Ph.: 91-11- 43580781, 26810964-65-66 Email : [email protected] Website : www.electionsinindia.com Online Book Store : www.datanetindia-ebooks.com Report No. : AFB/AP-020-0118 ISBN : 978-93-5313-506-5 First Edition : January, 2018 Third Updated Edition : June, 2019 Price : Rs. 11500/- US$ 310 © Datanet India Pvt. Ltd. All rights reserved. No part of this book may be reproduced, stored in a retrieval system or transmitted in any form or by any means, mechanical photocopying, photographing, scanning, recording or otherwise without the prior written permission of the publisher. Please refer to Disclaimer at page no. 183 for the use of this publication. Printed in India No. Particulars Page No. Introduction 1 Assembly Constituency at a Glance | Features of Assembly as per 1-2 Delimitation Commission of India (2008) Location and Political Maps 2 Location Map | Boundaries of Assembly Constituency in District | Boundaries 3-9 of Assembly Constituency under Parliamentary Constituency | Town & Village-wise Winner Parties- 2014-PE, 2014-AE, 2009-PE and 2009-AE Administrative Setup 3 District | Sub-district | Towns | Villages | Inhabited Villages | Uninhabited 10-15 Villages | Village Panchayat | Intermediate Panchayat Demographics 4 Population | Households | Rural/Urban Population | Towns and Villages by 16-17 Population Size | Sex Ratio
    [Show full text]
  • Invitation for Bids for the Work of " Restoration And
    BIDDING DOCUMENTS FOR PROCUREMENT OF WORKS IFB No. 01/AP/VMRDA/APDRP/Visakhapatnam/2019-20 Name of Work: Restoration & Redevelopment of 380 Acres Kailasagiri Hill Top park at Visakhapatnam. STEP Activity No. IN-PIU-VMRDA-103847-CW-RFB Project: Andhra Pradesh Disaster Recovery Project. Bid Inviting Authority: Metropolitan Commissioner, VMRDA, Udyog Bhavan, Siripuram Jn.,Visakhapatnam-530003. Country : India Metropolitan Commissioner, VMRDA, 9th Floor, Udyog Bhavan, SiripuramJn.,Visakhapatnam-530003. Telephone:- 0891-2754133/34, 2755155, 9866076925, 7702333584 Email :- [email protected], [email protected], 2 INVITATION FOR BID (IFB) 3 GOVERNMENT OF ANDHARA PRADESH ANDHRA PRADESH DISASTER RECOVERY PROJECT IFB NO: 01/ AP/VMRDA/APDRP/Visakhapatnam/2019-20 NATIONAL COMPETITIVE BIDDING (Two-Envelope Bidding Process with e-Procurement) (FOR ITEM RATE/ADMEASUREMENT CONTRACTS IN CIVIL WORKS) NAME OF WORK : RESTORATION & RE-DEVELOPMENT OF 380 ACRES KAILASAGIRI HILL TOP PARK AT VISAKHAPATNAM DATE OF ISSUE OF IFB : 30-09-2019 AVAILIBILTY OF BIDDING : FROM DATE : 03-10-2019 TIME11.00 HOURS DOCUMENT ON-LINE : TO DATE : 02-11-2019 TIME 15.00 HOURS TIME AND DATE OF : DATE :16-10-2019 TIME: 11.30 HOURS PREBID CONFERENCE LAST DATE AND TIME FOR : DATE :02-11-2019 TIME: 15.30 HOURS RECEIPT OF BIDS ON-LINE LAST DATE FOR SUBMITTING HARD : DATE :02-11-2019 TIME: 15.30 HOURS COPIES BY THE BIDDERS TIME AND DATE OF DATE :02-11-2019 TIME: 16.00 HOURS OPENING OF PART 1 OF : BIDS ONLINE [TECHNICAL QUALIFICATION PART] TIME AND DATE OF OPENING OF PART 2 OF BIDS ONLINE
    [Show full text]
  • OVERVIEW of VUDA, VISAKHAPATNAM the Town Planning Trust (TPT) Was Constituted in 1962 and the Visakhapatnam Urban Development Au
    OVERVIEW OF VISAKHAPATNAM UDA'S ACTIVITIES OVERVIEW OF VUDA, VISAKHAPATNAM The Town Planning Trust (TPT) was constituted in 1962 and the Visakhapatnam Urban Development Authority comes into existence in 1978 under AP Urban Areas (Dev) Act, 1975 for the areas covering Visakhapatnam, Gajuwaka, Bheemunipatnam, Anakapalle and Vizianagaram Municipalities and 287 villages with an extent of 1721 Sq.Kms. The VMR Region has been witnessing tremendous growth and accordingly, the Government vide GO.Ms.No. 525 of MA & UD Dept, dt. 30-7-2008 have extended the jurisdiction of VUDA to 5573 Sq.Kms covering four Districts of Srikakulam, Vizianagaram, Visakhapatnam & East Godavari and Municipalities of Amudalavalasa, Srikakulam of Srikakulam District & Tuni of East Godavari District The Government have constituted the VUDA Bpard with the following members (viic CO.Ms.No. 373, dt 27-8-2011 of MA & UD Department) : 1 The Principal Secretary, MA&UD Department GoAP Chairman 2 The Additional Secretary to Govt, Finance Department Member (W&P) 3 The Member Secretary, Andhra Pradesh Pollution Control Ex-officio Member Board 4 The Managing Director, Andhra Pradesh Industrial Ex-officio Member Infrastructure Corporation 5 The Commissioner & Managing Director, A.P. Eastern Ex-officio Member Power Distribution Corporation Ltd., C< The District Collector, Visakhapatnam Ex-officio Member 7 The District Collector, Srikakulam Ex-officio Member 8 The District Collector, Vizianagaram Ex-officio Member 9 The District Collector, East Godavari Ex-officio Member 10 The Commissioner, Greater Visakhapatnam Municipal Member Corporation 11 The Director of Town & Country Planning Member 12 The Vice Chairman, Visakhapatnam Urban Development Member-Convener Authority At present there are 215 employees working in respect of all cadres, out of the sar-tioned strength of 316.
    [Show full text]
  • LHA Recuritment Visakhapatnam Centre Screening Test Adhrapradesh Candidates at Mudasarlova Park Main Gate,Visakhapatnam.Contact No
    LHA Recuritment Visakhapatnam centre Screening test Adhrapradesh Candidates at Mudasarlova Park main gate,Visakhapatnam.Contact No. 0891-2733140 Date No. Of Candidates S. Nos. 12/22/2014 1300 0001-1300 12/23/2014 1300 1301-2600 12/24/2014 1299 2601-3899 12/26/2014 1300 3900-5199 12/27/2014 1200 5200-6399 12/28/2014 1200 6400-7599 12/29/2014 1200 7600-8799 12/30/2014 1177 8800-9977 Total 9977 FROM CANDIDATES / EMPLOYMENT OFFICES GUNTUR REGISTRATION NO. CASTE GENDER CANDIDATE NAME FATHER/ S. No. Roll Nos ADDRESS D.O.B HUSBAND NAME PRIORITY & P.H V.VENKATA MUNEESWARA SUREPALLI P.O MALE RAO 1 1 S/O ERESWARA RAO BHATTIPROLU BC-B MANDALAM, GUNTUR 14.01.1985 SHAIK BAHSA D.NO.1-8-48 MALE 2 2 S/O HUSSIAN SANTHA BAZAR BC-B CHILAKURI PETA ,GUNTUR 8/18/1985 K.NAGARAJU D.NO.7-2-12/1 MALE 3 3 S/O VENKATESWARULU GANGANAMMAPETA BC-A TENALI. 4/21/1985 SHAIK AKBAR BASHA D.NO.15-5-1/5 MALE 4 4 S/O MAHABOOB SUBHANI PANASATHOTA BC-E NARASARAO PETA 8/30/1984 S.VENUGOPAL H.NO.2-34 MALE 5 5 S/O S.UMAMAHESWARA RAO PETERU P.O BC-B REPALLI MANDALAM 7/20/1984 B.N.SAIDULU PULIPADU MALE 6 6 S/O PUNNAIAH GURAJALA MANDLAM ,GUNTUR BC-A 6/11/1985 G.RAMESH BABU BHOGASWARA PET MALE 7 7 S/O SIVANJANEYULU BATTIPROLU MANDLAM, GUNTUR BC-A 8/15/1984 K.NAGARAJENDRA KUMAR PAMIDIMARRU POST MALE 8 8 S/O.
    [Show full text]
  • Impact of Municipal Solid Waste on Groundwater in the Environs of Greater Visakhapatnam Municipal Corporation Area, Andhrapradesh, India N
    International Journal of Engineering Science Invention ISSN (Online): 2319 – 6734, ISSN (Print): 2319 – 6726 www.ijesi.org Volume 2 Issue 3 ǁ March. 2013 ǁ PP.28-32 Impact of Municipal Solid Waste on Groundwater in the Environs of Greater Visakhapatnam Municipal Corporation Area, Andhrapradesh, India N. Victor Babu1, P. Jagadeeswara Rao2, I.V.R.K.V. Prasad3 1,2,3Department of Geo-Engineering, College of Engineering (A), Andhra University, Visakhapatnam-530 003 ABSTRACT: The study deals with physico-chemical characteristics of groundwater in the environs of Greater Visakhapatnam Municipal Corporation (GVMC), Visakhapatnam district, Andhra Pradesh. The study area covering about 1143 km2 is famous for major industries, often called as Industrial City or Visakha Steel City. Haphazard urbanization, industrialization and improper disposal of solid wastes leading to contamination of groundwater, have been focused in this study. The improper and unscientific solid waste dumps in the unlined sewage drains drive pollutants into the groundwater regime which is an irrevocable loss and literally not possible to bring the quality of groundwater to its original state. In this study, about 25 groundwater samples were collected covering the entire area during August 2011. The water samples were analyzed to identify the parameters of physical, chemical and trace metals on the basis of APHA standard methodology. Trace metals of Al, Mn, Cu, Zn, Se, Rb, Cd, Pb and Co are in high content in areas like Akkireddypalem, Balacheruvu and Lankelapalem. These areas are in the vicinity of industries like Hindustan Zinc Ltd. and Visakha steel plant. Systematic work has not been carried out to discover the reasons for the accumulation of higher toxicants in these areas.
    [Show full text]
  • District Disaster Management Action Plan 2017
    PUDUCHERY DISTRICT DISASTER MANAGEMENT ACTION PLAN 2017 STATE LEVEL EMERGENCY OPERATION CENTER (SLEOC) TOLL FREE NUMBER 1077 / 1070 Off: 2253407 / Fax: 2253408 VSAT - HUB PHONE NO : 81627 e-Mail SLEOC : [email protected] / [email protected] District Collector : [email protected] Collectorate e-Mail : [email protected] NATIONAL DISASTER MANAGEMENT AUTHORITY (NDMA) HELPLINE NUMBER 011-1078 Control Room: 011-26701728 Fax: 011-26701729 E-mail: [email protected] Postal Address: NDMA Bhawan, A-1, Safdarjung Enclave, New Delhi – 110029 Telephone : 011-26701700 Contents 1 CHAPTER..............................................................................................................................1 INTRODUCTION ...........................................................................................................................1 1.1 Objectives of this Action Plan......................................................................................1 2 CHAPTER..............................................................................................................................3 2.1 LOCATION....................................................................................................................3 2.2 CLIMATE ......................................................................................................................3 2.3 TOPOGRAPHY..............................................................................................................3 2.3.1 Puducherry Region ..............................................................................................3
    [Show full text]
  • Concurrent Monitoring - 1
    AP Integrated Irrigation Agriculture Transformation Project Concurrent Monitoring - 1 CTRAN COSULTING Pvt Ltd 2019 Contents Executive Summery ................................................................................................................................. viii Chapter -1 .................................................................................................................................................... 1 Project .......................................................................................................................................................... 1 1.1 Introduction ....................................................................................................................................... 1 1.2 Geographical Coverage ..................................................................................................................... 1 1.3 Project Beneficiary ............................................................................................................................ 2 1.4. Methodology ..................................................................................................................................... 2 Chapter -2 .................................................................................................................................................... 4 Socio-Economic Profile of Stakeholders .................................................................................................... 4 2.0 Introduction ......................................................................................................................................
    [Show full text]
  • ANNEXURE I NOTICE to SALE of IMMOVABLE SECURED ASSETS (Issued Under Rule 8(6) / 9(1) of the Security Interest (Enforcement) Rules 2002)
    Indian Overseas Bank, Kirlampudi Layout Branch, Door No-7-1-75, Ground Floor, Chinna Waltair Main Road, Visakhapatnam-530017, Andhrapradesh. Phone: - 0891-2793544. E Mail:- [email protected] Date: 30.07.2019 ANNEXURE I NOTICE TO SALE OF IMMOVABLE SECURED ASSETS (Issued under Rule 8(6) / 9(1) of the Security Interest (Enforcement) Rules 2002) TO 1 M/S. ISR INFRA PVT LTD Borrower/Mortgagor Rep by its Directors Flat No-28, Sai Ratneswar Residency, Seethamadhara, Visakhapatnam- 530013. 2 Idupulapati Srinivasa Rao, Director1/Borrower/Guarantor s/o. Radha Krishna Murthy Door No-53-16-1/2, Flat No-501 Happy Homes, KRM Colony, Visahapatnam- 530013. 3 Idupulapati Madhavi, Director2/Borrower/Guarantor w/o Idupulapati Srinivasa Rao. Door No-53-16-1/2, Flat No-501 Happy Homes, KRM Colony, Visahapatnam- 530013. Sir/Madam, 1. This has reference to recovery actions initiated against you under the provisions of the SARFAESI Act 2002. 2. Please refer to the possession notice dated 23.10.2017 issued to you regarding taking possession of the secured assets at more fully described in the schedule below and the publication of the said possession notice in The Andhra Jyothi and The New Indian Express on 28.10.2017 by the undersigned for the purpose of realization of the secured assets in exercise of the powers conferred on the bank as secured creditor under the provisions of the Securitization and Reconstruction of Financial Assets and Enforcement of Security Interest Act, 2002 and the rules there under. 3. You the above mentioned Borrower / mortgagors / guarantors have failed to pay the dues in full save and except payments amounting to Rs.35,00,000/- (Rupees Thirty Five lakhs only) after issuance of demand notice dated 07.08.2017.
    [Show full text]
  • ALL INDIA COUNCIL for TECHNICAL EDUCATION 7Th Floor, Chanderlok Building, Janpath, New Delhi 110 001
    ALL INDIA COUNCIL FOR TECHNICAL EDUCATION 7th Floor, Chanderlok Building, Janpath, New Delhi 110 001 82nd Emergent Meeting of the Executive Committee was held on March 19, 2013 at 2.30pm in the Meeting Room, A1CTE Headquarters, 7th Floor, Chanderlok Building Janpath, New Delhi. A. Members present: 1. Prof. S.S. Mantha, Chairman Chairman, AICTE 2. Dr. Avinash S. Pant Vice Chairman Vice Chairman, AICTE 3. Dr. Sitikantha Mishra Member Chairman, AIB-H&TM, AICTE 4. Dr. Ashok A. Ghatol Member Chairman, AIB-VE, AICTE 5. Prof. S.K. Kak Member VC, MTU, Noida 6. Shri Naveen Soi Nominee of Director (Finance-), HRD Joint Secretary & FA., MHRD 7. Dr. K.P. Isaac Member Secretary Member Secretary, AICTE B. Secretary, MHRD; Prof. R.P. Yadav, Chairman, NWRC, AICTE; Prof. D.N. Reddy, Chairman, SCRC, AICTE; Prof. V.N. GupChup, Chairman, AIBPGERT, AICTE; Principal Secretary, TE, Karnataka; Additional Chief Secretary, TE, Madhya Pradesh; Secretary (Hr. & Tech. Education), Maharashtra; Commissioner-cum- Secretary (Hr. & Tech Education) Manipur; Prof. S. G. Dhande, Former Director, IIT, Kanpur; Shri V.P.R. Kadam, Secretary, (Bharti Vidhyapeeth), Pune; Prof. Piyush Trivedi, VC, RGTU, Bhopal; Chairman, UGC, New Delhi; Director General, IAMR, New Delhi; Director General, ICAR, New Delhi; could not attend the meeting due to their other engagements. Chairman, AICTE briefed about the reasons for calling Emergent Meeting and the formal Agenda was taken up and the following matters were considered, deliberated upon and decision taken: Item No.82.01.01 : To consider the recommendations of the concerned Regional Committee on grant of approval or otherwise for i) Category I.
    [Show full text]
  • SC / ST BACKLOG 2020 - TENTATIVE MERIT LIST of JUNIOR ACCOUNTANT DOB Belong Sl
    SC / ST BACKLOG 2020 - TENTATIVE MERIT LIST OF JUNIOR ACCOUNTANT DOB belong Sl. No SNO Name Father Gender District Mandal Village Caste Marks CGPA Remarks (M/D/YY) to Vsp Notification initially issued for the post of Junior Accountant in ST NISANI NISANI 1 10042 3/4/1996 FeMale VISAKHAPATNAM MAHARANIPETA GHNANAPURAM SC Yes 91.50 9.15 (W) category, as you belong to SC POORNIMA GANESH category your candidature is rejected. Notification initially issued for the post of Junior Accountant in ST GURAMPALLI 2 10401 MUTYALU 6/15/1985 Male VISHAKAPATNAM PADMANABHAM POTNURU SC Yes 90.00 (W) category, as you belong to SC SREENU category your candidature is rejected. KORABU KORABU 3 11794 YEDUKONDA 1/9/1997 FeMale VISAKHAPATNAM CHINTHAPALLI CHITHAPALLI Yes 90.00 VARDHINI LA SWAMY JARRA JARRA APPALA 4 12044 6/28/1994 FeMale VISAKHAPATNAM PADERU SUNDRUPUTTU ST Yes 89.00 VASANTHA KONDALARA O Notification initially issued for ST (W) category, as you belong to SC 5 10003 POTLA RAJESH POTLA RAJU 7/12/1995 Male VISAKHAPATNAM GOLUGONDA PAPPUSETTIAPLEM SC Yes 89.00 category your candidature is rejected. Notification initially issued for ST VAKAPALLI VAKAPALLI (W) category, as you belong to SC 6 10114 SATYANARA 6/21/1987 FeMale VISAKHAPATNAM S RAYAVARAM PETTUGOLLAPALLI SC Yes 86.00 GOVINDAMMA category your candidature is YANA rejected. Notification initially issued for ST KOTTHALA SIMHACHAL (W) category, as you belong to SC 7 10551 2/1/1988 FeMale VISAKHAPATNAM SABBAVARAM MALLUNAIDUPALEM SC Yes 85.00 VARALAKSHMI AM category your candidature is rejected. MEDA 8 11970 MEDA MADHAVI 5/20/1998 FeMale VISAKHAPATNAM.
    [Show full text]
  • Handing Over the Open Spaces Covered in VUDA Layouts Falling in the Jurisdiction of GVMC - Regarding
    LT NO 118/2013/L4 SUBJECT NO.26 Sub: VUDA-VSP-PLG- Layouts –Handing over the open spaces covered in VUDA Layouts Falling in the jurisdiction of GVMC - Regarding. *** VUDA was set up for the purposes of planning, co-ordination, supervising, promoting and securing the planned development of the Visakhapatnam Metropolitan Region (VMR). It coordinates the development activities of the Municipal Corporation, Municipalities and other local authorities. VUDA, up to 2008, had its jurisdiction of 1721 sq.km., comprising 5 urban centres viz., Visakhapatnam, Vizianagaram, Ankapalli, Bheemunipatnam and Gajuwaka and 287 villages. It is referred to as Erstwhile Visakhapatnam Metropolitan Region (VMR). Considering the developmental pressure and to further promote planned development, the VUDA vide Government G.O.No.525, dated 30.7.2008, extended its jurisdiction limits By 3852.51 sq.km to 5573 sq.km, with a population of 4.2 million (as per 2001 census).The present VUDA area comprises 1281 villages, 7 Municipalities and 1 Nagar Panchayat in Districts of Srikakulam, Vizianagaram, Visakhapatnam and East Godavari. As a planning apex body, VUDA is playing a vital role in development of the region. So far VUDA has taken up 51 Nos. of Layouts (including Town Planning Trust approved layouts). The layouts were approved as per the then rules in vogue. Till 1986, it was insisted to have 5% of the total layout are a towards the layout open space. Subsequently, while preparing the master plan in the year 1986, it was incorporated in the zoning regulations to have 10% of the reserved open space in all layouts.
    [Show full text]