Kowloon City Section

Total Page:16

File Type:pdf, Size:1020Kb

Kowloon City Section Construction of Kowloon City Section Newsletter To Kwa Wan Station January 2013 The To Kwa Wan Station will have four entrances, of which one will be at Pak Tai Street and another at Nam Kok Road. A new pedestrian subway will connect the station with the existing subway system at Shatin to Central Link Olympic Garden, providing a convenient connection for passengers Information Centre Opens Major changes have been travelling to Kowloon City. To facilitate the construction of the station implemented in Kowloon City district during the past two months. entrance at Nam Kok Road, a TTMS will be implemented in the first The Shatin to Central Link (SCL) Information Centre was opened for public quarter of 2013. Some of the parking meters on both sides of the use in October 2012. Mr Lau Wai-wing, Chairman of the Kowloon City The TTMS has been implemented road will be cancelled. District Council, Mr William Tsui, District Officer (Kowloon City), Ms Li Lin, in Ma Tau Wai Road since 2 Part of the Sung Wong Toi Playground will be closed temporarily Chairman of Traffic and Transport Committee of Kowloon City District December last year. Building a for works site, but the affected facilities will be restored soon after Council, Mr Cheung Yan-hong, Chairman of SCL Working Group, Mr Henry railway and an underground station There will be an the SCL is completed. There are advance works going on at Sung Lam, MTR General Manager (SCL/KTE) and Mr Philco Wong, MTR General in a densely populated community entrance in Nam Kok Wong Toi Road and Olympic Avenue, including the removal of the Manager (SCL), with is a complicated and very challenging project. Since the station Road for To Kwa Wan central reservation plot and erection of hoardings for constructing a about 30 community Station connected by is located beneath Ma Tau Wai Road, stages of the TTMSs pedestrian subway. pedestrian subway. and government guests, have to be implemented progressively during construction. officiated the opening Through proactive negotiations with the local community, Part of the Olympic Garden ceremony. The Centre we strive to retain existing bus stop locations in southbound has been closed for provides a facility for the and part of northbound carriageways wherever possible facilitating construction. public to find information as at their present locations. It is hoped to minimise any Amenity facilities will be and give opinions about inconveniences inflicted on the public. restored soon after the SCL the SCL during its office is completed. hours. The construction is now in full swing as the implementation of the TTMS is in force and heavy construction equipment can be seen at the works sites. Barging Point To provide an additional channel for the public to communicate The Centre provides with us, we have set up an SCL Information Centre in To Kwa a more direct channel A large amount of spoil will be excavated during the construction Wan for details about the construction of the SCL. From this, for residents in we will learn the public’s expectations and opinions to make of the underground Kowloon City Section. To alleviate any impact Kowlon City to find our work better. These echoes the MTR’s “Listening and on traffic brought by the spoil trucks, the excavated materials of the information about SCL will be transported to the barging point in Kai Tak Development the SCL and express Responding” ideal. I have confidence that the construction of Area and shipped by sea. The facility is estimated to be completed by their opinion. the SCL will be smooth in its progress with your solid support. mid-2013 and part of it is already in use. Railway Ma Tau Wai Road Temporary Know It All Philco Wong The yellow silo tanks shown in Traffic Management Scheme General Manager – SCL picture are for the storage of MTR Corporation bentonite. When constructing To facilitate the station’s underground construction in Ma Tau Wai Road, the underground stations, we have first stage of the temporary traffic management scheme (TTMS), which will to use heavy equipment to make last for about one year, took effect on 2 December 2012. The number of lanes deep trenches for the diaphragm of Ma Tau Wai Road, between Chi Kiang Street and Sheung Heung Road has walls. The trenches are then filled with been reduced to one northbound and two southbound; a new pedestrian a thick mixture of bentonite during crossing and a right-turn movement have been ratified at the junction of Tin Shatin to Central Link excavation for supporting the walls. Kwong Road and Kau Pui Lung Road; and Farm Road has been modified as Information Centre After excavation and putting steel an eastbound one-way road. Closed- Shop no. 30A, Chi Kiang Street, To reinforcements into the trench, circuit television cameras have been we extract the bentonite, installed in the vicinity of Ma Tau Kwa Wan, Kowloon which can be reused, and Wai Road to provide real-time traffic fill it with concrete. conditions for monitoring. Variable Office Hours message signs have been placed in a Mondays to Fridays, 2:00 pm - 6:00 pm number of main trunk roads to prompt Saturdays, 10:00 am - 1:00 pm motorists the condition of Ma Tau Wai For enquiries, please call: Office Hours Road for advance route planning. Closed on Sundays and public holidays MTR Projects Hotline Saturday Monday – Friday 8:30am – 1:00pm Phone no.: 8:30am – 6:00pm 2334 2201 2993 3333 (Except public holidays) SCL Website Calls will be connected to a voice mailbox when the lines are busy or after office www.mtr-shatincentrallink.hk hours. Please leave your message and we will contact you as soon as possible. Kowloon City Section Newsletter MTR and the To divert the Tin Kwong Road contractor have eastbound traffic, Farm Road has Construction of distributed fliers about been modified to eastbound one- Ma Tau Wai Station the TTMS and new way road. Additional railings, anti- locations of bus and skid pavement, and a school bus minibus stops. Signage loading bay have been established is displayed in obvious and a section of the road surface locations to prompt has been narrowed to enhance motorists about road road safety in Farm Road. changes. District Councilors visited the site after the TTMS was implemented. They noted that the To allow motorists to use Chi Kiang Street, Kau Pui Lung measures operate Road and Tin Kwong Road as an alternative route of smoothly and the the affected Ma Tau Wai Road, a traffic light, indicating traffic condition was right-turn movement and pedestrian crossing, have been satisfactory. installed at Tin Kwong Road/Kau Pui Lung Road junction. Ma Tau Wai Road Lok Man Sun Chuen Temporary Traffic Management Scheme There are buildings on both sides of Ma Ko Shan Tau Wai Road thereby limiting the space Theatre Ko Shan Road Kau Pui Lung Road Kau Pui Lung Road available for building an underground. Under such circumstances, the Ma Tau Wai Station will adopt a decked platform design. This three-level station will be about 30 metres deep, 22 metres wide Chatham Road North Maid stone Road Maidstone Road and over three hundred metres long. It Farm RoadFarm also spans the underground of six-lane Ma Tau Wai Road. Since the station has Lok Shan Road to be close to the ground surface, cut- Kiang Su Street Tin Road Kwong Chi Kiang Street and-cover construction method is used. Ma Tau Wai Road Ma Tau Wai Road Heavy machines, some 10-metre tall, are needed to construct the station’s Works Site Two-way Traffic diaphragm walls. Tam Kung Road Schools New traffic lights One-way Traffic To Kwa Wan To Kwa Wan Road Government Offices & Market Pau Chung Street Access to petrol New pedestrian stations crossing Petrol station Loading and unloading area for Pedestrian routes trucks Sheung Heung Road San Shan Road Bus and minibus Information of stops along the TTMS and advice on affected section of alternative routes has Ma Tau Wai Road been displayed on had to be relocated. hoardings outside the worksites. Railway Know It All Caring ambassadors are Do you know what is being deployed to help the construction facility students and pedestrians Caring ambassadors shown in picture? help indicate new bus at road crossings at Farm stop locations and assist Road, Ma Tau Wai Road (Find the answer from P.4) passengers lining up for and Kau Pui Lung Road their buses. during peak hours. Construction of Kowloon City Section Newsletter To Kwa Wan Station January 2013 The To Kwa Wan Station will have four entrances, of which one will be at Pak Tai Street and another at Nam Kok Road. A new pedestrian subway will connect the station with the existing subway system at Shatin to Central Link Olympic Garden, providing a convenient connection for passengers Information Centre Opens Major changes have been travelling to Kowloon City. To facilitate the construction of the station implemented in Kowloon City district during the past two months. entrance at Nam Kok Road, a TTMS will be implemented in the first The Shatin to Central Link (SCL) Information Centre was opened for public quarter of 2013. Some of the parking meters on both sides of the use in October 2012. Mr Lau Wai-wing, Chairman of the Kowloon City The TTMS has been implemented road will be cancelled. District Council, Mr William Tsui, District Officer (Kowloon City), Ms Li Lin, in Ma Tau Wai Road since 2 Part of the Sung Wong Toi Playground will be closed temporarily Chairman of Traffic and Transport Committee of Kowloon City District December last year.
Recommended publications
  • Coin Cart Schedule (From 2014 to 2020) Service Hours: 10 A.M
    Coin Cart Schedule (From 2014 to 2020) Service hours: 10 a.m. to 7 p.m. (* denotes LCSD mobile library service locations) Date Coin Cart No. 1 Coin Cart No. 2 2014 6 Oct (Mon) to Kwun Tong District Kwun Tong District 12 Oct (Sun) Upper Ngau Tau Kok Estate Piazza Upper Ngau Tau Kok Estate Piazza 13 Oct (Mon) to Yuen Long District Tuen Mun District 19 Oct (Sun) Ching Yuet House, Tin Ching Estate, Tin Yin Tai House, Fu Tai Estate Shui Wai * 20 Oct (Mon) to North District Tai Po District 26 Oct (Sun) Wah Min House, Wah Sum Estate, Kwong Yau House, Kwong Fuk Estate * Fanling * (Service suspended on Tuesday 21 October) 27 Oct (Mon) to Wong Tai Sin District Sham Shui Po District 2 Nov (Sun) Ngan Fung House, Fung Tak Estate, Fu Wong House, Fu Cheong Estate * Diamond Hill * (Service suspended on Friday 31 October) (Service suspended on Saturday 1 November) 3 Nov (Mon) to Eastern District Wan Chai District 9 Nov (Sun) Oi Yuk House, Oi Tung Estate, Shau Kei Lay-by outside Causeway Centre, Harbour Wan * Drive (Service suspended on Thursday 6 (opposite to Sun Hung Kai Centre) November) 10 Nov (Mon) to Kwai Tsing District Islands District 16 Nov (Sun) Ching Wai House, Cheung Ching Estate, Ying Yat House, Yat Tung Estate, Tung Tsing Yi * Chung * (Service suspended on Monday 10 November and Wednesday 12 November) 17 Nov (Mon) to Kwun Tong District Sai Kung District 23 Nov (Sun) Tsui Ying House, Tak Chak House, Tsui Ping (South) Estate * Hau Tak Estate, Tseung Kwan O * (Service suspended on Tuesday 18 November) 24 Nov (Mon) to Sha Tin District Tsuen Wan
    [Show full text]
  • List of Buildings with Confirmed / Probable Cases of COVID-19
    List of Buildings With Confirmed / Probable Cases of COVID-19 List of Residential Buildings in Which Confirmed / Probable Cases Have Resided (Note: The buildings will remain on the list for 14 days since the reported date.) Related Confirmed / District Building Name Probable Case(s) Islands Hong Kong Skycity Marriott Hotel 5482 Islands Hong Kong Skycity Marriott Hotel 5483 Yau Tsim Mong Block 2, The Long Beach 5484 Kwun Tong Dorsett Kwun Tong, Hong Kong 5486 Wan Chai Victoria Heights, 43A Stubbs Road 5487 Islands Tower 3, The Visionary 5488 Sha Tin Yue Chak House, Yue Tin Court 5492 Islands Hong Kong Skycity Marriott Hotel 5496 Tuen Mun King On House, Shan King Estate 5497 Tuen Mun King On House, Shan King Estate 5498 Kowloon City Sik Man House, Ho Man Tin Estate 5499 Wan Chai 168 Tung Lo Wan Road 5500 Sha Tin Block F, Garden Rivera 5501 Sai Kung Clear Water Bay Apartments 5502 Southern Red Hill Park 5503 Sai Kung Po Lam Estate, Po Tai House 5504 Sha Tin Block F, Garden Rivera 5505 Islands Ying Yat House, Yat Tung Estate 5506 Kwun Tong Block 17, Laguna City 5507 Crowne Plaza Hong Kong Kowloon East Sai Kung 5509 Hotel Eastern Tower 2, Pacific Palisades 5510 Kowloon City Billion Court 5511 Yau Tsim Mong Lee Man Building 5512 Central & Western Tai Fat Building 5513 Wan Chai Malibu Garden 5514 Sai Kung Alto Residences 5515 Wan Chai Chee On Building 5516 Sai Kung Block 2, Hillview Court 5517 Tsuen Wan Hoi Pa San Tsuen 5518 Central & Western Flourish Court 5520 1 Related Confirmed / District Building Name Probable Case(s) Wong Tai Sin Fu Tung House, Tung Tau Estate 5521 Yau Tsim Mong Tai Chuen Building, Cosmopolitan Estates 5523 Yau Tsim Mong Yan Hong Building 5524 Sha Tin Block 5, Royal Ascot 5525 Sha Tin Yiu Ping House, Yiu On Estate 5526 Sha Tin Block 5, Royal Ascot 5529 Wan Chai Block E, Beverly Hill 5530 Yau Tsim Mong Tower 1, The Harbourside 5531 Yuen Long Wah Choi House, Tin Wah Estate 5532 Yau Tsim Mong Lee Man Building 5533 Yau Tsim Mong Paradise Square 5534 Kowloon City Tower 3, K.
    [Show full text]
  • G.N. 2565 Urban Renewal Authority Ordinance (Chapter 563
    G.N. 2565 Urban Renewal Authority Ordinance (Chapter 563) NOTIFICATION OF COMMENCEMENT OF THE KAU PUI LUNG ROAD/CHI KIANG STREET DEVELOPMENT SCHEME BY THE URBAN RENEWAL AUTHORITY Pursuant to section 23(1) of the Urban Renewal Authority Ordinance (‘URAO’), it is hereby notified that the Urban Renewal Authority (‘URA’) will commence the implementation of its project CBS-2:KC Kau Pui Lung Road/Chi Kiang Street (‘the Project’). In accordance with section 23(2) of the URAO, the commencement date of the implementation of the Project shall be the date on which notice of the Project is first published in the Gazette, i.e. 22 May 2020. The Project will be implemented by way of a development scheme under section 25 of the URAO. A draft Development Scheme Plan (‘DSP’) of the Project will be submitted by the URA under section 25(5) of the URAO to the Town Planning Board (‘TPB’) for consideration. The Project covers a gross site area of about 16 473 m2, broadly bounded by a row of buildings at Ma Tau Wai Road to the east, Chi Kiang Street to the south, Kau Pui Lung Road to the west and Lok Shan Road to the north. The Project includes the buildings developed under the Civil Servants’ Co-operative Building Society Scheme at Nos. 59–77, 99–117, 123–133 Maidstone Road (odd nos.), Nos. 82–128 Maidstone Road (even nos.), Nos. 153–175, 181–189 Kau Pui Lung Road (odd nos.), Nos. 1–3, 7–9 Kiang Su Street (odd nos.), Nos. 4–14 Kiang Su Street (even nos.), Nos.
    [Show full text]
  • List of Buildings with Confirmed / Probable Cases of COVID-19
    List of Buildings With Confirmed / Probable Cases of COVID-19 List of Residential Buildings in Which Confirmed / Probable Cases Have Resided (Note: The buildings will remain on the list for 14 days since the reported date.) Related Confirmed / District Building Name Probable Case(s) Eastern Tai On Building 5783 Sai Kung Tower 2, The Beaumount 5787 Kowloon City Loong King Mansion 5788 Central & Western 206 Queen's Road West 5789 Wong Tai Sin Yiu Sin House, Upper Wong Tai Sin Estate 5790 Wan Chai 10 Cloud View Road 5791 Wong Tai Sin Tower 1, Aria 5793 Wong Tai Sin Fu Shun House, Fu Shan Estate 5794 Islands Verdant Court, Peninsula Village 5795 Eastern Block 1, Tanner Garden 5796 Sai Kung Block 4, La Cite Noble 5797 Central & Western Sik On House 5798 Yuen Long Tower 1, Yoho Town 5799 Kowloon City Wong Tung House, Tung Tau Estate 5800 Tai Po Villa Castell, Tai Po 5801 Kwun Tong Block 6, Richland Gardens 5802 Eastern Tower 1, Harbour Glory 5803 Wong Tai Sin Ming Lai House, Choi Wan Estate 5804 Tsuen Wan Keymount Lodge 5805 Sham Shui Po 1 Glee Path, Phase 2, Mei Foo Sun Chuen 5806 Kowloon City Wiltshire Road 5807 Southern South View Garden 5808 Islands Heung Yat House, Yat Tung Estate 5809 Sham Shui Po Block 2, Lai Bo Garden 5810 Sha Tin Sha Tin Tau Village 5811 Tai Po Kam Shan Tsuen 5812 Sha Tin Lucky Plaza, Fung Lam Court 5813 North Fu Tei Pai, Kwan Tei 5814 Sham Shui Po 245 Apliu Street 5815 Sham Shui Po 147 Yee Kuk Street 5816 Sham Shui Po 245 Apliu Street 5816 1 Related Confirmed / District Building Name Probable Case(s) Tuen Mun Chun
    [Show full text]
  • Egn201014152134.Ps, Page 29 @ Preflight ( MA-15-6363.Indd )
    G.N. 2134 ELECTORAL AFFAIRS COMMISSION (ELECTORAL PROCEDURE) (LEGISLATIVE COUNCIL) REGULATION (Section 28 of the Regulation) LEGISLATIVE COUNCIL BY-ELECTION NOTICE OF DESIGNATION OF POLLING STATIONS AND COUNTING STATIONS Date of By-election: 16 May 2010 Notice is hereby given that the following places are designated to be used as polling stations and counting stations for the Legislative Council By-election to be held on 16 May 2010 for conducting a poll and counting the votes cast in respect of the geographical constituencies named below: Code and Name of Polling Station Geographical Place designated as Polling Station and Counting Station Code Constituency LC1 A0101 Joint Professional Centre Hong Kong Island Unit 1, G/F., The Center, 99 Queen's Road Central, Hong Kong A0102 Hong Kong Park Sports Centre 29 Cotton Tree Drive, Central, Hong Kong A0201 Raimondi College 2 Robinson Road, Mid Levels, Hong Kong A0301 Ying Wa Girls' School 76 Robinson Road, Mid Levels, Hong Kong A0401 St. Joseph's College 7 Kennedy Road, Central, Hong Kong A0402 German Swiss International School 11 Guildford Road, The Peak, Hong Kong A0601 HKYWCA Western District Integrated Social Service Centre Flat A, 1/F, Block 1, Centenary Mansion, 9-15 Victoria Road, Western District, Hong Kong A0701 Smithfield Sports Centre 4/F, Smithfield Municipal Services Building, 12K Smithfield, Kennedy Town, Hong Kong Code and Name of Polling Station Geographical Place designated as Polling Station and Counting Station Code Constituency A0801 Kennedy Town Community Complex (Multi-purpose
    [Show full text]
  • Heritage Impact Assessment on Block M at the Kowloon Hospital
    Heritage Impact Assessment for Adaptive Reuse of Block M at Kowloon Hospital No.147A Argyle Street, Mong Kok, Kowloon For Hospital Authority By Chau Lam Architects & Associates Architects & Engineers (H.K.) Ltd. In association with China Point Consultants Limited Contract No. 8110001199 September 2013 Heritage Impact Assessment For Adaptive Re-use of Block M at Kowloon Hospital Version: Type: Second Draft Submission of HIA Date of Submission: September 2013 Details of Heritage Conservation Consultant: Chau Lam Architects & Associates Architects & Engineers (H.K.) Ltd. Unit 1, 20/F, Phase 1 Chai Wan Industrial City, 60 Wing Tai Road, Chai Wan, Hong Kong Principal Consultant: Joseph Tang Project Consultant: Tain Kirkwood Email: [email protected] China Point Consultants Limited Room 520A, 5/F, InnoCentre, 72 Tat Chee Avenue, Kowloon Tong, Kowloon Principal Consultant: Curry Tse Project Consultant: K.S. Yu Email: [email protected] HIA Checked and Approved by: Name: TSE Ching Kan, Curry (HKICON , HKIA, Registered Architect HK) Caveat: The HIA was carried out within the context of the refurbishment proposal of Block M of Kowloon Hospital, as provided by Hospital Authority. ____________________________________ Authorized Signature: Tse Ching Kan, Curry 1 September 2013 Heritage Impact Assessment For Adaptive Re-use of Block M at Kowloon Hospital TABLE OF CONTENT page 1 EXECUTIVE SUMMARY 5 2 INTRODUCTION 6 2.1 The Brief 6 2.2 Objectives 8 2.3 Methodology 9 2.4 Authorship 9 2.5 Definitions 10 2.6 Limitations 11 3 UNDERSTANDING THE SITE 12
    [Show full text]
  • Annual Report on Capital Works Reserve Fund Block Allocations for the 2006-07 Financial Year
    For information PWSCI(2007-08)13 NOTE FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE Annual Report on Capital Works Reserve Fund Block Allocations for the 2006-07 Financial Year We have been compiling exception reports on block allocations under the Capital Works Reserve Fund (CWRF) to account for the difference between the actual programme and the indicative one which we presented to Members for approving the funding allocation. This report covers the 2006-07 financial year. Enclosures 1 to 11 provide details on each block allocation under the 11 CWRF Heads of Expenditure and include – (a) a comparison of the approved provision and actual expenditure in 2006-07 and the reasons for those items with variations greater than 15%; (b) a list of minor works projects which were implemented in 2006-07 as planned, including those which had had the works contracts awarded but had not started incurring spending (as compared with the indicative list in PWSC(2005-06)33), and those which were shelved or withdrawn; and (c) a list of new injection items (i.e. items not shown in the indicative list in PWSC(2005-06)33) approved in 2006-07. 2. In overall terms, the approved allocation for CWRF block allocations in 2006-07 totalled $7,952 million. The actual expenditure was $6,044 million. ------------------------- Financial Services and the Treasury Bureau October 2007 PWSCI(2007-08)13 Index of Enclosures and Annexes Head/Subhead Reference Page Head 701 - Land Acquisition ......................... Enclosure 1 1 Subhead 1004CA Annex 1A 2 - 4 Subhead 1100CA Annex 1B 5 - 9 Head 702 - Port and Airport Development ..
    [Show full text]
  • Figure 3.2.6 Temporary At-Grade Works Area (Sheet 6 Of
    o f ­ T H e » c o h n ´ n g o ä l K o t o r g ± n u y g o M C I n C t · s o e u l r l n e ~ n e g a 33.2 V U e t L µØ•^ L N 21.8 i 26.5 30.1 o L G 7 30.4 n KOWLOON a Ä Wa Ying College S KOWLOON E E E B 38.3 7 l L x H a L N E CITY E L s ² I . 6 U k N BAY C e N VE o t 2 A u b G 0 r a 0 0 L ® t l N . IA l 34.5 S 5 T È T ES 3 N 0 ´ 0 ³¯·ç¸R¡]³0 R EL L L E C H I O o ä E 6 8 0 T i ¶ 49.0 48.9 3 P 41.7 Chan Sui Ki (La Salle) College I E P S o in } 24.2 9 35.6 6 6 7 L e f g ¥ 34.1 T R c 49.4 o C C ­ 31.6 U o F A n h P 2 3 d m a 3 3 G a m m U P ¹ ry e b 4 r 8 8 8 L i r e L N I MONG nc Å S c r s e c e L H s F H I F s ho ¤ KOK P C o T o l 1 b C G u N 30.1 TO rt ¥ L H L O R KWA T L L C D § l l 38.3 N F WAN  a P YAU E H A R Celestial Heights New Method College H L HO 26.9 O E L Ä 47.8 25.2 MA B M F S a x 47.4 MAN s ² TEI k 36.4 T 20.5 C e R EE o tb o R TIN 19.3 u a a ST r l L O t l d W NG Ä H HEU B W S 33.1 a x L 69.5 s ² C © 30.1 k ` JORDAN C e 35.9 ± o t HUNG u b S S r a 32.7 45.6 e t t ll c .
    [Show full text]
  • (Site E4) Ma Tau
    Ma Tau Kok (Site E4) Area (Plan E4) : “CDA ” Zone 2013^ (in ha) (about) 4.63# No. of Private Industrial Buildings : 201 3^ Occupied 8 Wholly vacant 2 Under renovation - Tot al 10 Other Building(s)/Site(s) : 2013 ^ Private Residential 1 Petrol filling station 1 Vacant site 1 Government AFCD’s Kowloon Animal 1 Management Centre ex-EMSD quarters and workshop# 1 Hong Kong Society for the Blind 1 site (HKSB)# ^ Survey was undertaken in May 2013. # The land area involved part of the “CDA(3)” site (about 0.6 ha) including the AFCD’s Kowloon Animal Management Centre, ex-EMSD quarters and workshop together with the HKSB site, which were rezoned to “R(A)” and “G/IC” respectively in May 2015. Details of Private Industrial Buildings Total No. of Private Industrial Buildings : 10 Total No. of Units Involved : 190 Total GFA* Involved (about) : 115,070m2 No. of Units Successfully Surveyed : 177 (93.2%) * 2 Total GFA Successfully Surveyed (about) : 106,025m (92.1%) No. of Buildings Wholly Under Occupied Tot al vacant renovation No. of Storeys 1 - 7 storeys 7 2 - 9 8 - 19 storeys 1 - - 1 20 storeys or above - - - - Land Ownership (as at end June 2014) Single 4 2 - 6 Multiple 4 - - 4 * Conversion factor from internal floor area to gross floor area is 1.3333. Ma Tau Kok “CDA” Area 1 No. of Buildings Wholly Under Occupied Tot al vacant renovation Building Age (as at end March 2014) < 15 years - - - - 15 – 29 years - - - - 30 years or above 8 2 - 10 Building Condition Good 1 - - 1 Fair 7 2 - 9 Poor - - - - Surrounding Land Uses : Residential developments, government, institution and community uses, Cattle Depot Artist Village, open spaces, industrial buildings in nearby “R(A)” and “R(E)” areas and East Kowloon Corridor.
    [Show full text]
  • G.N. 2565 Urban Renewal Authority Ordinance (Chapter 563
    G.N. 2565 Urban Renewal Authority Ordinance (Chapter 563) NOTIFICATION OF COMMENCEMENT OF THE KAU PUI LUNG ROAD/CHI KIANG STREET DEVELOPMENT SCHEME BY THE URBAN RENEWAL AUTHORITY Pursuant to section 23(1) of the Urban Renewal Authority Ordinance (‘URAO’), it is hereby notified that the Urban Renewal Authority (‘URA’) will commence the implementation of its project CBS-2:KC Kau Pui Lung Road/Chi Kiang Street (‘the Project’). In accordance with section 23(2) of the URAO, the commencement date of the implementation of the Project shall be the date on which notice of the Project is first published in the Gazette, i.e. 22 May 2020. The Project will be implemented by way of a development scheme under section 25 of the URAO. A draft Development Scheme Plan (‘DSP’) of the Project will be submitted by the URA under section 25(5) of the URAO to the Town Planning Board (‘TPB’) for consideration. The Project covers a gross site area of about 16 473 m2, broadly bounded by a row of buildings at Ma Tau Wai Road to the east, Chi Kiang Street to the south, Kau Pui Lung Road to the west and Lok Shan Road to the north. The Project includes the buildings developed under the Civil Servants’ Co-operative Building Society Scheme at Nos. 59–77, 99–117, 123–133 Maidstone Road (odd nos.), Nos. 82–128 Maidstone Road (even nos.), Nos. 153–175, 181–189 Kau Pui Lung Road (odd nos.), Nos. 1–3, 7–9 Kiang Su Street (odd nos.), Nos. 4–14 Kiang Su Street (even nos.), Nos.
    [Show full text]
  • Promoting All-Round Education for Girls
    Promoting All-Round Education for Girls A History of Heep Yunn School, Hong Kong Patricia P. K. Chiu Hong Kong University Press The University of Hong Kong Pokfulam Road Hong Kong https://hkupress.hku.hk © 2020 Hong Kong University Press ISBN 978-988-8528-38-7 (Hardback) ISBN 978-988-8528-39-4 (Paperback) All rights reserved. No portion of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or any information storage or retrieval system, without prior permission in writing from the publisher. British Library Cataloguing-in-Publication Data A catalogue record for this book is available from the British Library. Cover illustration by Chow Tik Man Mandy, Heep Yunn School, Class of 2016. 10 9 8 7 6 5 4 3 2 1 Printed and bound by Paramount Printing Co., Ltd. in Hong Kong, China Contents List of Illustrations viii Forewords Paul Kwong x Timothy Kwok xii Roland Chow Kun Chee xiii Minnie Lai Wei Kit Lin xiv Acknowledgements xv List of Abbreviations xvii Introduction 1 1. From Fairlea and Victoria to Heep Yunn (1880s–1936) 14 2. Finding Footing on New Ground (1936–1945) 37 3. Striking Out on a New Path in Postwar Development of Education (1945–1958) 58 4. Building an Aspiring Anglo-Chinese Girls’ School (1958–1978) 92 5. Transformation and Reform (1978–2002) 122 6. From a Grant School to a DSS School (2002–2016) 158 Appendices 189 Bibliography 226 Index 231 Illustrations Box Box 3.1: Rededication service programme, 6 December 1946 63 Figures Figure 1.1: Graduates of the junior middle school, Fairlea School 28 Figure 1.2: Staff and girls of the Victoria Home and Orphanage, Kowloon 30 Figure 2.1: Mrs.
    [Show full text]
  • Architectural Services Department
    PO KONG VILLAGE ROAD FUNG SHING STREET 500 U YING FUNG LANE FESSENDEN ROAD L 墓地 150 WANG TAU HOM 墓地 B3 施工中 Luso B2 A 柵 80 Apartments E 岩地 B1 One Beacon Hill BROADCAST DRIVE Fence LOCAL VSRs - OPERATION PHASE 550 LUNG CHEUNG ROAD 柵 C1 D1 Rocky 柵 LUNG POON ST M F Area A C2 D3 50 R U C 墓地 O N 100 N FU YUE STREET BEACON HILL I G D2 R CHING TAK STREET A1 200 Residential Development along Sung Wong Toi O Graves 施工中 A D T K D I A N G Works in Ka Keung K 岩地 L-01(R) T MUK LUN STREET 岩地 progress Court WANG TAU HOM EAST ROAD U C2 R 柵 N CHUK YUEN ROAD O G 550 250 A S T Road FU MEI ST D FU KEUNG STREET 牆 岩地 柵 Rocky Fence A2 Fence S Area 450 C H H A 柵 I C1 Mid-rise Development in Chung Seen Mei Chuen T 飛鵝山 N Fu Keung Court I G 柵 Wang Tau Hom Estate N J L-02(R) TAI HOM ROAD A KOWLOON PEAK T CHUN YAN STREET 150 T A A P 50 ' 400 K CHI LIN DRIVE S (FEI NGO SHAN) Fence 柵 HAMMER HILL ROAD PING TING ROAD and Kowloon City WANG TAU HOM CENTRAL RD S S I 250 T S R N FU WAN ST E E C 岩地 施工中 R 100 L T 500 柵 O 岩地 I Fence 施工中 N 柵 A 伯公坳 B E Tak D JUNCTION ROAD Keung 100 PAK KUNG AU High-rise Residential Groups - North of Prince 柵 KENT ROAD 350 柵 Fence Court 斧山 岩地 F Fence CHOI HUNG ROAD 350 L-03(R) U 450 施工中 HAMMER HILL 柵 D O N R Fence S WANG TAU HOM SOUTH RD G 柵 400 施工中 DEVON ROAD E T Edward Road East CRE S C E N T 300 NG FONG STREET 柵 M Fence O Customs Pass 施工中 250 柵 S A T 施工中 R Fence L-04(R) Residential at Choi Hung and Diamond Hill EE T SOMERSET ROAD 柵 KAI TAK RIVER B TAI SHING STREET LUNG CHEUNG ROAD LUK HOP STREET Fence T E 施工中 CHOI YEE LANE 200 RENFREW ROAD E
    [Show full text]