Quantitative Analysis of the Impact of Craft Labor Availability on Construction Project Performance

Total Page:16

File Type:pdf, Size:1020Kb

Quantitative Analysis of the Impact of Craft Labor Availability on Construction Project Performance University of Kentucky UKnowledge Theses and Dissertations--Civil Engineering Civil Engineering 2017 QUANTITATIVE ANALYSIS OF THE IMPACT OF CRAFT LABOR AVAILABILITY ON CONSTRUCTION PROJECT PERFORMANCE Hossein Karimi University of Kentucky, [email protected] Author ORCID Identifier: https://orcid.org/0000-0001-7290-7822 Digital Object Identifier: https://doi.org/10.13023/ETD.2017.368 Right click to open a feedback form in a new tab to let us know how this document benefits ou.y Recommended Citation Karimi, Hossein, "QUANTITATIVE ANALYSIS OF THE IMPACT OF CRAFT LABOR AVAILABILITY ON CONSTRUCTION PROJECT PERFORMANCE" (2017). Theses and Dissertations--Civil Engineering. 56. https://uknowledge.uky.edu/ce_etds/56 This Doctoral Dissertation is brought to you for free and open access by the Civil Engineering at UKnowledge. It has been accepted for inclusion in Theses and Dissertations--Civil Engineering by an authorized administrator of UKnowledge. For more information, please contact [email protected]. STUDENT AGREEMENT: I represent that my thesis or dissertation and abstract are my original work. Proper attribution has been given to all outside sources. I understand that I am solely responsible for obtaining any needed copyright permissions. I have obtained needed written permission statement(s) from the owner(s) of each third-party copyrighted matter to be included in my work, allowing electronic distribution (if such use is not permitted by the fair use doctrine) which will be submitted to UKnowledge as Additional File. I hereby grant to The University of Kentucky and its agents the irrevocable, non-exclusive, and royalty-free license to archive and make accessible my work in whole or in part in all forms of media, now or hereafter known. I agree that the document mentioned above may be made available immediately for worldwide access unless an embargo applies. I retain all other ownership rights to the copyright of my work. I also retain the right to use in future works (such as articles or books) all or part of my work. I understand that I am free to register the copyright to my work. REVIEW, APPROVAL AND ACCEPTANCE The document mentioned above has been reviewed and accepted by the student’s advisor, on behalf of the advisory committee, and by the Director of Graduate Studies (DGS), on behalf of the program; we verify that this is the final, approved version of the student’s thesis including all changes required by the advisory committee. The undersigned agree to abide by the statements above. Hossein Karimi, Student Dr. Timothy R. B. Taylor, Major Professor Dr. Yi-Tin Wang, Director of Graduate Studies QUANTITATIVE ANALYSIS OF THE IMPACT OF CRAFT LABOR AVAILABILITY ON CONSTRUCTION PROJECT PERFORMANCE _____________________________________ DISSERTATION _____________________________________ A dissertation submitted in partial fulfillment of the requirements for the degree of Doctor of Philosophy in the College of Engineering at the University of Kentucky By Hossein Karimi Lexington, Kentucky Director: Dr. Timothy R. B. Taylor, Professor of Civil Engineering Lexington, Kentucky Copyright Hossein Karimi 2017 ABSTRACT OF DISSERTATION QUANTITATIVE ANALYSIS OF THE IMPACT OF CRAFT LABOR AVAILABILITY ON CONSTRUCTION PROJECT PERFORMANCE A shortage of skilled craft labor in the North American construction industry has been an unfortunate cyclic trend since the late 1980s. This shortage has been reported and discussed frequently by numerous past studies in the context of construction industry. The 2008 U.S. recession was at least one period when the craft shortage temporarily improved, as witnessed by spikes in construction unemployment rates above 20% due to the work slowdowns. However, the current economic recovery period is once again experiencing craft shortages in some sectors of the U.S. construction industry. Although the past literature provides wealth of information about influence of craft labor shortage on construction project, less attention has been given to quantifying the impact of craft labor availability on construction project performance. The primary contribution of this study to the body of knowledge is to fill the gap in existing literature by quantitatively modelling and elucidating the influence of craft labor availability on construction project performance as measured by safety, schedule, productivity and cost. Data from 97 construction projects completed in the U.S. and Canada between 2001 and 2014 were collected from two data sources. A number of t-tests and regression analyses were conducted in both databases to examine the significance of the influence of craft labor shortage on construction project performance. The primary analysis shows that projects that experienced craft shortages underwent significant higher growth in cost overrun, time overrun, safety incident and also lower productivity compared to projects that did not. Further analysis on two databases returned the following models: 1) a Poisson regression model that demonstrates a positive exponential relationship between increased craft worker recruiting difficulty and Occupational Safety and Health Administration (OSHA) Total Number of Recordable Incident Cases per 200,000 Actual Direct Work Hours (TRIR) on construction projects. 2) a statistically significant correlation between increased craft recruiting difficulty and lower project productivity and higher schedule overruns 3) a multiple regression models that demonstrate a relationship between increased construction cost overrun with two variables of increased actual cost and increased craft staffing difficulty. These models are intended to be used by project management team to perceive the risk that skilled craft labor variability poses on project safety, productivity, time, and cost performance. In addition, understanding the level of impact that craft shortages are having through robust statistical analyses is a first step in developing the motivation for industry leaders, communities, and construction stakeholders to address this challenge. KEYWORDS: Labor Shortage, Safety, Cost, Time, Productivity, Risk Assessment Hossein Karimi Student’s Signature 06/28/2017 Date QUANTITATIVE ANALYSIS OF THE IMPACT OF CRAFT LABOR AVAILABILITY ON CONSTRUCTION PROJECT PERFORMANCE By Hossein Karimi Timothy R. B. Taylor Director of Dissertation Yi-Tin Wang Director of Graduate Studies 06/28/2017 Date To my parents, parents-in-law My wife, Adeleh and my children Elina Zahra and Amir Neekan ACKNOWLEDGEMENT The completion of this work would never have been possible without the guidance and support from a lengthy list of academic faculty members and family. First, I would like to express my gratitude to my advisor Prof. Timothy R.B. Taylor for his incredible supervision, motivation, and continuous assistance. I also must acknowledge Prof. Paul Goodrum for his constant support, encouragement and patience over our past four years research study. A deep understanding of conducting research in construction management beside many invaluable lessons I have learned from these two professors helped me to shift towards a mentoring role. I must also acknowledge and sincerely thank Prof. William Maloney and Prof. Gabriel Dadi for their valuable supervision and advice. My gratitude is extended to Prof. Srinivasan, who spent his valuable time in countless meetings to help me solve the complicated statistical problems in my study. I never forget his kindness, incessant support and encouragement. I would like to sincerely thank my parent, parents-in-law and my wife for their endless support, kindness, and inspiration. It has been my wife’s, Adeleh, infinite patience and support that helped me to pursue graduate study abroad. I also would like to especially thank my father for his invaluable advices and incredible support to me and my three brothers to pursue graduate study. iii Table of Contents ACKNOWLEDGMENTS ................................................................................................. iii LIST OF TABLES .............................................................................................................. x LIST OF FIGURES ......................................................................................................... xiii CHAPTER ONE: INTRODUCTION. ................................................................................ 1 1.1 Background and Motivation ...................................................................................... 1 1.2 Research Objectives ................................................................................................... 2 1.3 Dissertation Organization .......................................................................................... 3 CHAPTER 2: Quantitative Analysis of the Impact of Craft Worker Availability on Construction Project Safety Performance (Paper No.1) ..................................................... 5 1.2 Synopsis ..................................................................................................................... 5 2.1. Introduction and Background .................................................................................... 6 2.2. Craft Shortage Impact on Project Safety Performance ................................................ 7 2.3. Research Methodology .............................................................................................. 10 2.3.1. Data Collection ......................................................................................................
Recommended publications
  • Delays and Its Analysis: Indian Residential Construction Projects
    KICEM Journal of Construction Engineering and Project Management www.jcepm.org Online ISSN 2233-9582 http://dx.doi.org/10.6106/JCEPM.2017.7.4.020 Delays and its Analysis: Indian Residential Construction Projects Rakesh L. Metha1* and Suraj V. Gaikwad2 Abstract: In almost every construction project, delay is an inevitable yet controllable phenomenon. The Indian construction industry encounters an enormous amount of delays in projects. Delay affects both time and money in the forms of schedule and cost overruns, respectively. Due to impressive and dynamic growth in the Indian construction sector, planned efforts are essential to limit these undesirable delays. On account of the surge in the rate of residential building construction, the task of identification and analysis of the delays in residential projects in India has been attempted by the authors. A questionnaire survey was conducted involving 100 stakeholders. Further analysis included an Importance Index to rank the identified delays, Principle Component Analysis for advanced statistical analysis, and Correlation Analysis to check the extent of agreement amongst stakeholders. Conclusions drawn with reference to the analysed data eventually reflected finance-related issues, as well as labour related problems as the dominating causes of delays. The aim of the research is to provide insight to the construction stakeholders and researchers, on an international scale, with the obtained results. Keywords: Residential Projects, Construction Delays, Importance Index, Correlation Analysis, Principal Component Analysis. I. INTRODUCTION cost overrun in the delayed projects has resulted in a 20.95% increase in the original cost, which is USD 97.326 Billon The construction sector is a major contributor in almost [1].
    [Show full text]
  • Litigation Section Newsletter Winter 2001
    THE LITIGATION NEWSLETTER Winter 2001 OFFICERS: Chairperson David C. Sarnacki, Grand Rapids Chair’s Letter Chairperson-Elect Richard W. Paul, Bloomfield Hills by: David C. Sarnacki Secretary Anne Warren Bagno, Detroit Treasurer We are pleased to present this issue of the Litigation Section Newsletter, the Robert June, Northville first of three to focus on financial issues arising in our litigation practices. This issue COUNCIL MEMBERS: will help you to center yourself on key issues in calculating lost profits and Term Expires 2001 preparing appropriate document requests, addressing liquidated damages in Marilyn A. Madorsky, construction contracts, and understanding fraudulent disbursements schemes. Bloomfield Hills E. Thomas McCarthy, Grand Rapids Our plans are to provide you with additional resources on financial issues in Mark W. McInerney, Detroit our third and fourth issues of my year as Chair. You might recall that our first issue Kevin J. O’Dowd, Grand Rapids of the year was a theme issue on litigation management written by some of the best Jerome P. Pesick, Southfield C. Robert Wartell, Southfield attorneys in the state. Our next issue will help you understand financial statements, Term Expires 2002 and our final issue will help you deal with business valuations in the context of Thomas F. Cavalier, Detroit litigation. In order to bring you this valuable and practical advice on financial Gary W. Faria, Bloomfield Hills Gordon S. Gold, Southfield matters, we are looking beyond our membership to the very experts who assist us James C. Partridge, Ann Arbor in our litigation practices. Each of these issues will highlight the expertise and Marvin W.
    [Show full text]
  • Review of Various Delay Causing Factors and Their Resolution by Application of Lean Principles in India
    Baltic Journal of Real Estate Economics and Construction Management ISSN: 2255-9671 (online) November 2017, 5, 101–117 doi: 10.1515/bjreecm-2017-0008 http://www.degruyter.com/view/j/bjreecm REVIEW OF VARIOUS DELAY CAUSING FACTORS AND THEIR RESOLUTION BY APPLICATION OF LEAN PRINCIPLES IN INDIA Shumank DEEP1, Mohd ASIM2, Mohd Kashif KHAN3 1School of Architecture and Built Environment, University of Newcastle, Callaghan 2308 NSW, Australia 2, 3Department of Civil Engineering, Integral University, P.O Bas-ha Dasauli Kursi Road Lucknow 226026 UP, India Corresponding author e-mail: [email protected] Abstract. Practically speaking, not all real estate construction projects are accomplished in the defined span and within budget. Various factors responsible for occurrence of delays are one of the long-standing issues in the field of real estate. Delays make contractors endure productivity loss, cause high disturbance expenses, and prolongation costs. The aim of the research is to summarize several delay causing factors, which are observed in the execution of previous real estate construction projects. It then proposes implementation of standard prevention procedures to minimize delays. Time effect examination is the approach to evaluating and allotting the upshots of delays or changing a venture schedule. This review sets execution framework of the two sub-principles of the Toyota Way attributes known as philosophy sub-principles and process sub- principles to guide real estate construction businesses in their lean change to delay free real estate construction work. These are implemented after investigating the critical factors responsible for delays in the delayed projects by comparing their as-planned schedules with the adjusted schedules.
    [Show full text]
  • Dealing with Mid-Course Adjustments in Project Planning and Scheduling and Resultant Claims
    American Bar Association Forum on the Construction Industry Dealing with Mid-Course Adjustments in Project Planning and Scheduling and Resultant Claims John S. Vento, Esq. Trenam, Kemker, Scharf, Barkin, Frye, O'Neill & Mullis, P.A. Tampa, Florida Michael F. D'Onofrio, P.E. Capital Project Management, Inc. Blue Bell, Pennsylvania October 25 & 26, 2007 Hyatt Regency Newport Hotel & Spa – Newport, Rhode Island © 2007 American Bar Association I. Introduction II. Using the Schedule as an Effective Management Tool A. Baseline Schedule 1. Contract Requirements (Compliance with Scheduling Provisions) 2. Approval (Owner’s Refusal to Accept) B. Schedule Updates 1. Progress 2. Logic Revisions 3. Fragnets 4. Actual (As-built) dates C. Analysis of Progress and Delays D. Notice Provisions E. Risks and Liabilities Associated with Failing to use the Schedule III. Contributing to and Documenting Responsibility for Delay A. Excusable Delays B. Force Majeure C. Non-excusable Delays D. Concurrent Delay E. Compensable vs. Non-compensable Delay IV. Adjustments During Performance A. Reasonableness of Schedule 1. Accuracy of Schedule Updates (Failure to Maintain) B. Recovery Schedules C. Work Acceleration D. Issues Associated with Multiple Schedules V. Delay and Disruption Claims A. Delay Claims 1. Time Impact Analysis B. Disruption and Inefficiency Claims 1. Measured Mile i Draft 08/175/07 - VI. Acceleration (Actual vs. Constructive) Claims VII. Dispute Resolution A. Early Neutral Evaluation B. Pre-suit Mediation (Contractual or Agreed) C. Non-binding Arbitration D. Dispute Review Boards E. Declaratory Judgment Actions VIII. Conclusion i i Draft 08/175/07 - Dealing with Mid-Course Adjustments in Project Planning and Scheduling and Resultant Claims1 I.
    [Show full text]
  • Causes of Delay and Cost Overruns During
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by Digital Repository, University of Moratuwa Assessment of delays and cost overruns during construction projects in Pakistan Naeem Ejaz PhD, Assistant Professor, Civil Engineering Department University of Engineering & Technology, Taxila – Pakistan [email protected] Imran Ali Sub Divisional Officer, Sub-Division Attock, Communication and Works Department, Punjab _ Pakistan Muhammad Fiaz Tahir PhD Scholar, Assistant Professor, Civil Engineering Department University of Engineering & Technology, Taxila – Pakistan Abstract Construction projects are commonly delayed due to price escalation of building materials and faulty management in Pakistan. This research paper focused on the main reasons of delay and cost overruns. This research activity was exclusively assessed through questionnaire survey, interviews, field visits and discussion to the concerned authorities. A preplanned survey was conducted through a questionnaire for assessment and evaluation of the important factors those may effect construction delays and cost overruns. Approximately, twenty six numbers of factors were selected initially for the proper assessment of most critical factors. The respondents were selected from construction hub mainly client, contractor and consultant firms. At the same time, the opinion of general public and other stakeholders were also assessed while considering the indigenous trends. The results accomplished from survey revealed that the major causes of delays and cost overruns during construction projects are the escalation of the materials prices and discontinuity of funds. According to the group of contractors escalation of prices is the significant factor for delays. The consultants are blaming the poor supervision and mismanagement by contractors.
    [Show full text]
  • Guidelines for Delay Control in Construction Projects Vol
    PM World Journal Guidelines for Delay Control in Construction Projects Vol. VI, Issue II – February 2017 by Dr. Mostafa H.A. Kolb, Dr Moustafa I.A. Dief, www.pmworldjournal.net Dr. Hatem S. El Beheiry, and Featured Paper Eng Ahmed Saad M. Kafifi Guidelines for Delay Control in Construction Projects Prof. Dr. Mostafa Hassan Aly Kotb Al Azhar University, Egypt Dr. Eng. Moustafa Ismail Abu Dief, Ph.D, CFCC™ ZAMIL Group, Saudi Arabia Dr. Hatem Shaker El Beheiry Al Azhar University, Egypt Eng. Ahmed Saad M. Kafafi ZAMIL Group, Saudi Arabia ABSTRACT Project time is one element of construction project triple constraints, which include time, scope and cost so, different researchers shaded the light on the significant factors which may affect the project duration and cause delay or disruption. It is appropriate to identify the need to distinguish between delay and disruption of the projects. Projects may be very badly disrupted without the completion date being affected but construction delay is often responsible for making the project time to be prolonged, causing different losses to the projects. Consequently, the necessity of delays mitigation and control has risen because it usually has an impact on projects cost, depending on who is culpable either the owner or the contractor, they will have to pay to control either delay or disruption. Minimizing the adverse impact of delay calls the developed mitigation measures to avoid the criticality of the inevitable project’s delay. The aim of the study is to present some mitigation measures for risks of delay in construction projects which are considered on the standard forms of construction contracts such as the international Federation of Consulting Engineers (FIDIC) and The New Engineering Contract(NEC3) through identification of the responsibilities of each party and providing the guidelines for delay control process .
    [Show full text]
  • General Construction Contract Documents
    GENERAL CONSTRUCTION CONTRACT DOCUMENTS FOR CITY AND BOROUGH OF WRANGELL CASSIAR STREET ROADWAY AND UTILITIES IMPROVEMENTS ISSUED BY: CITY AND BOROUGH OF WRANGELL WRANGELL, ALASKA PREPARED BY: R&M ENGINEERING-KETCHIKAN, INC. KETCHIKAN, ALASKA February 2014 CITY AND BOROUGH OF WRANGELL CASSIAR STREET ROADWAY AND UTILITIES IMPROVEMENTS PART 1 - BID PROCEDURES SECTION SECTION 1 NOTICE TO CONTRACTORS INVITING BIDS SECTION 2 INFORMATION TO BIDDERS SECTION 3 BID BOND SECTION 4 BID PROPOSAL SECTION 5 PERFORMANCE BOND SECTION 6 PAYMENT BOND SECTION 7 CERTIFICATE OF INSURANCE SECTION 8 WAGE AND HOUR RATES - State of Alaska SECTION 9 AGREEMENT SECTION 10 STANDARD FORMS Contractor's Request For Payment Change Order Release, Waiver, and Discharge of All Claims and Liens Statement Concerning Claims Non-Collusion Affidavit PART 2 - GENERAL CONDITIONS PART 3 - SPECIAL CONDITIONS PART 4 - SPECIFICATIONS AND DRAWINGS DIVISION ONE - GENERAL REQUIREMENTS 01010 Summary of Work 01011 General Project Requirements 01025 Measurement and Payment 01026 Unit Prices 01043 Jobsite Administration 01050 Field Engineering 01220 Schedule and Meetings 01340 Project Data Submittals 01400 Quality Control 01410 Testing Laboratory Services 01500 Temporary Facilities 01515 Temporary Water 01545 Protection and Maintenance of Work and Property 01567 Pollution Control 01568 Erosion, Sediment and Pollution Control 01570 Traffic Regulation 01631 Deviations from Plans and Specifications 01700 Project Closeout 01710 Cleaning 01720 Project Record Documents DIVISION TWO - SITE WORK
    [Show full text]
  • Those Who Serve
    NOVEMBER 2013 Honoring Those Who Serve Honoring Ironworker Veterans 4 Helmets to Hardhats 10 World War II Merchant Mariners 15 Ironworkers in the Military 18 15331_IWNov13.indd 1 11/6/13 6:53 AM 1750 New York Ave., N.W., Suite 400 Washington, D.C. 20006 p (202) 383-4800 www.ironworkers.org [email protected] INTERNATIONAL OFFICERS Volume 113 | NOVEMBER 2013 | Number 10 WALTER WISE JOE STANDLEY General President Fourth General Vice President Suite 400 1660 San Pablo Avenue, Suite C 1750 New York Avenue, NW Pinole, CA 94564 Washington, DC 20006 p (510) 724-9277 p (202) 383-4810 f (510) 724-1345 FEATURES f (202) 638-4856 MARVIN RAGSDALE Ironworker Veterans JOSEPH HUNT Fifth General Vice President 4 General President Emeritus 3003 Dawn Drive Suite 400 Suite 104 8 Union Veterans Council 1750 New York Avenue, NW Georgetown, TX 78628 Washington, DC 20006 p (512) 868-5596 Helmets to Hardhats p (202) 383-4845 f (512) 868-0823 10 f (202) 638-4856 DARRELL LABOUCAN 12 Helmets to Hardhats Canada ERIC DEAN Sixth General Vice President General Secretary #8-205 Chatelain Drive Project Labor Agreements in Colorado? Suite 400 St. Albert, Alberta T8N 5A4 13 1750 New York Avenue, NW Canada Washington, DC 20006 p (780) 459-3389 15 Merchant Mariners of World War II p (202) 383-4820 f (780) 459-3308 f (202) 347-2319 50th Anniversary of the March on Washington RON PIKSA 16 EDWARD C. MCHUGH Seventh General Vice President General Treasurer 10828 Grevelly Lake Boulevard, SW 18 Active Iron Worker Military Members Suite 400 Suite 212 1750 New York Avenue, NW Lakewood, WA 98499 Local 44 Volunteers Time for 9/11 Memorial Washington, DC 20006 p (253) 984-0514 19 p (202) 383-4830 f (253) 984-0533 f (202) 383-6483 21 Ironworkers Graduate from National Labor College BERNARD EVERS JR.
    [Show full text]
  • CONSTRUCTION DELAY: Handling and Avoiding the Inevitable
    CONSTRUCTION DELAY: Handling and Avoiding the Inevitable By S.S. Saucerman Ask any contractor this question: “What’s the most frustrating tle, a few lost hours waiting for a generator, a worker showing part of your job?” Nine times out of IO, the response will deal up late to work, or a simple day-to-day material not arriving with construction delays. I agree. at the promised time. Unexpected interruptions in project schedule are a killer-and The Effects of Delay not just because they create ulcers for the project manager. Delay is so deadly because it invariably requires extra time, Imagine you’re a project superintendent for a million-dollar extra attention and extra labor by the general contractor project, and you have the enviable day-to-day responsibility of and/or subcontractors to correct the delay—all of which cost coordinating—perhaps—14 or 15 different skilled trades (in money. Now, spending money’s not a bad thing—if you had different unions), scores of workers, and hundreds of material planned on spending it. Unfortunately, most of the money deliveries for your project. expended making up for delay is (probably) unaccounted for during estimating. Broken a sweat yet? Good—it gets better! Most of the time, delay is a silent thief—slowly and steadily Now, let’s suppose for a moment that everyone of these indi- encroaching on the bottom line. Other times, it’s easy to spot. vidual skilled-trade people has their own agendas, attitudes, It may reveal itself in a bold, in-your-face kind of a way—such and opinions (of which they’re seldom afraid to share) about as a backhoe busting a hose or the main air-handler not show- virtually everything going on in the project.
    [Show full text]
  • An Overarching Review on Delay Analyses in Construction Projects
    buildings Article An Overarching Review on Delay Analyses in Construction Projects Murat Çevikba¸s 1 and Zeynep I¸sık 2,* 1 Department of Civil Engineering, Isparta University of Applied Science, 32260 Isparta, Turkey; [email protected] 2 Department of Civil Engineering, Yildiz Technical University, 34220 Istanbul, Turkey * Correspondence: [email protected]; Tel.: +90-5332568998 Abstract: Numerous studies have been conducted by researchers on the delay analysis topic, which is one of the primary areas of scientific study due to the effects of delays on time and cost in construction projects. Following fruitful contributions made by the researchers, it is believed to be extremely important to summarize the existing studies in terms of being a road map for future studies and practitioners. In this context, not only does this study aim to detect the most significant authors, sources, organizations and countries contributing to the improvement of delay domain in the construction industry concerning delay analyses worldwide but also to provide the researchers with extensive insights concerning the prominent research themes, trends and gaps in the literature. Hence, 168 documents related to delay analyses from 1982 to 11 February 2021 were detected through the Scopus Database and the Web of Science Database, and scientometric analyses were conducted via VOSviewer software. By evaluating the related research, two main research areas were detected in this field, namely; improving the delay analysis methods and resolving the disputes before they occur. This study is believed to make theoretical and practical contributions in that it examines the delay analysis topic in all aspects such as prominent institutions, countries, authors and sources, Citation: Çevikba¸s,M.; I¸sık,Z.
    [Show full text]
  • RM8470 CONSTRUCTION DIR.Qxp Layout 1
    DIRECTORY OF ATTORNEYS 2017 ® ® ® USLAW Construction Law Practice Group MISSION STATEMENT The members of the USLAW Construction Law Group represent owners, developers, general contractors, subcontractors in all trade special- ties, construction managers, design professionals including architects and engineers, construction product manufacturers, and material sup- pliers. Some of our members also represent insurance companies in connection with construction-related issues. Collectively, the group’s members provide a wide variety of legal services related to a myriad of construction issues. Construction attorneys with diverse practice areas are brought together in a forum which allows for a sharing of ideas, insights and perspectives. By creating a na- tional forum of experienced construction attorneys and industry representatives actively networking to share information, experiences, re- sources and business opportunities, our members stay ahead of the curve with respect to current trends and construction market changes and deliver the most efficient and effective service to clients. Through seminars, publications, webinars, and the exchange of expert and re- search information, our members have access to the most current and comprehensive resources to effectively serve their clients in litigation, transactional matters, risk avoidance, risk reduction and alternative dispute resolution. WHY CHOOSE USLAW CONSTRUCTION LAW FIRMS? The members of USLAW’s Construction Law Group are uniquely qualified to assist clients in construction-related legal issues and disputes. Our focus is to provide our clients with access to a team of top lawyers who have extensive and practical experience in all aspects of construc- tion law and who are dedicated to helping provide solutions to our clients most pressing and complex construction-related needs.
    [Show full text]
  • Labor Stability Study and Project Labor Agreement
    AGENDA Antioch City Council Special Meeting/Workshop and Regular Meeting Date: Tuesday, June 12, 2018 Time: 3:30 P.M. – Closed Session 4:30 P.M. – Special Meeting/Workshop 7:00 P.M. – Regular Meeting Place: Council Chambers, 200 H Street Sean Wright, Mayor Lamar Thorpe, Mayor Pro Tem Monica E. Wilson, Council Member Tony Tiscareno, Council Member Lori Ogorchock, Council Member Arne Simonsen, CMC, City Clerk Donna Conley, City Treasurer Ron Bernal, City Manager Derek Cole, Interim City Attorney 6. BRACKISH WATER DESALINATION PLANT – LABOR STABILITY STUDY Recommended Action: It is recommended that the City Council adopt a resolution accepting the Brackish Water Desalination Plant - Labor Stability Study and authorizing the City Manager or his designee to negotiate with the trade unions to execute a Project Stability Agreement. STAFF REPORT ) ( STAFF REPORT TO THE CITY COUNCIL DATE: Regular Meeting of June 12, 2018 TO: Honorable Mayor and Members of the City Council SUBMITTED BY: Jon Blank, Public Works Director ~ APPROVED BY: Ron Bernal, City Manager SUBJECT: Brackish Water Desalination Plant - Labor Stability Study RECOMMENDED ACTION It is recommended that the City Council adopt a resolution accepting the Brackish Water Desalination Plant - Labor Stability Study and authorizing the City Manager or his designee to negotiate with the trade unions to execute a Project Stability Agreement. STRATEGIC PURPOSE This action supports Strategy K-1 in the Strategic Plan by ensuring well-maintained public facilities and .Strategy K-2 by delivering high quality water to our customers. By investigating and pursuing alternative potable water sources that improve treated water reliability, especially in times of severe drought, this project is an important part of maintaining a highly functioning and reliable water system.
    [Show full text]