Federal Register/Vol. 63, No. 110/Tuesday, June 9, 1998/Notices

Total Page:16

File Type:pdf, Size:1020Kb

Federal Register/Vol. 63, No. 110/Tuesday, June 9, 1998/Notices Federal Register / Vol. 63, No. 110 / Tuesday, June 9, 1998 / Notices 31549 Information on Services for Individuals designations that: (1) specify highway on the Internet at: With Disabilities routes over which hazardous materials http://www.fhwa.dot.gov. For information on facilities or (HM) may, or may not, be transported Section 5112(c) of title 49, United services for individuals with disabilities within their jurisdictions; and/or (2) States Code, requires the Secretary of or to request special assistance at the impose limitations or requirements with Transportation, in coordination with the meeting, contact Mr. Payne as soon as respect to highway routing of HM. States, to update and publish possible. States and Indian Tribes are also periodically a list of current effective required to furnish updated HM route hazardous materials highway routing Dated: June 4, 1998. information to the FHWA. designations. In addition, 49 CFR Joseph J. Angelo, FOR FURTHER INFORMATION CONTACT: 397.73(b) requires each State or Indian Director of Standards, Marine Safety and Tribe to furnish information on any new Mr. Kenneth Rodgers, Safety and Environmental Protection. or changed HM routing designations to Hazardous Materials Division (HSA±10), [FR Doc. 98±15425 Filed 6±8±98; 8:45 am] the FHWA within 60 days after Office of Motor Carrier Safety, (202) BILLING CODE 4910±15±M establishment. The FHWA maintains a 366±4016; or Mr. Raymond W. Cuprill, listing of all current State routing Office of the Chief Counsel, Motor designations and restrictions. In Carrier Law Division (HCC±20), (202) DEPARTMENT OF TRANSPORTATION addition, the FHWA has designated a 366±0834, Federal Highway point of contact in each FHWA Division Administration, 400 Seventh Street, Federal Highway Administration Office to provide local coordination SW., Washington, DC, 20590±0001. with State agencies and other interested Transportation of Hazardous Materials; Office hours are from 7:45 a.m. to 4:15 parties. Designated and Restricted Routes p.m., e.t., Monday through Friday, This notice is being published to except for Federal holidays. AGENCY: Federal Highway provide the public with the FHWA's Administration (FHWA), DOT. SUPPLEMENTARY INFORMATION: current list of HM StateÐdesignated ACTION: Notice. Electronic Access routes (alphabetically by State) along with the State and Federal points of SUMMARY: This notice provides a current An electronic copy of this document contact. listing of all designated and restricted may be downloaded using a modem and Authority: 23 U.S.C. 315; 49 U.S.C. 5112; State routes for transporting hazardous suitable communications software from and 49 CFR 1.48. materials that have been reported to the the Federal Register Electronic Bulletin Issued: May 19, 1998. FHWA. Periodically updating and Board Service at (202) 512±1661. Gloria J. Jeff, publishing this listing is required by the Internet users may reach the Federal Hazardous Materials Transportation Act Register's home page at: http:// Deputy Federal Highway Administrator. of 1975 (HMTA) as amended (49 U.S.C. www.nara.gov/nara/fedreg and the Federal Highway Administration 5112). The FHWA's regulations (at 49 Government Printing Office's database NRHM Route Registry CFR part 397) include Federal standards at: http://www.access.gpo.gov/suldocs. and procedures which the States and In the near future, the FHWA plans to Report Date: 03/26/98 Indian Tribes must follow if they provide public access to all routing The following key applies to establish, maintain, or enforce routing information via the FHWA Home Page information listed for all 50 states. RESTRICTION/DESIGNATION KEY Restrictions Designations 0ÐAll Hazmats AÐAllHazmats 1ÐClass 1ÐExplosives BÐClass 1ÐExplosives 2ÐClass 2ÐGas IÐInhalants 3ÐClass 3ÐFlammable MÐMedical Waste 4ÐClass 4ÐFlammable solid/Combustible PÐPreferred Radioactive Route 5ÐClass 5ÐOrganic 6ÐClass 6ÐPoison 7ÐClass 7ÐRadioactive 8ÐClass 8ÐCorrosives 9ÐOther iÐInhalants State: Alabama Agency: AL DOT POC: John E. Lorentson Address: Montgomery, AL 36130±3050 Phone: (334)±242±6474 Fax: FHWA: AL Field Office FHWA POC: Mr. Tom Russell Address: 500 Eastern Blvd., Suite 200, Montgomery, AL 36117 Phone: (334) 223±7374 Fax: 31550 Federal Register / Vol. 63, No. 110 / Tuesday, June 9, 1998 / Notices Restrict Designation design date Route description 0123456789i ABIMP AL Restricted Routes 11/07/94 ............ Wallace Twin Tunnels [I10 & US90 in Mobile] .................................................................................................. 0 [A signed detour is in place to direct traffic along Water St., US43, and Alt US 90. Traffic will pass over the Mobile River using the Cochrane Bridge.] AL Designated Routes 08/26/96 ............ Battleship Parkway [Mobile] from Bay Bridge Rd. [Mobile] to Interstate 10 [exit 27] ....................................... P 08/26/96 ............ Bay Bridge Rd. [Mobile] from Interstate 165 to Battleship Parkway [over Africa Town Cochran Bridge] P [Westbound Traffic: Head south on I165; To by-pass the downtown area, head north on I165.]. 08/26/96 ............ Interstate 10 from Mobile City Limits to exit 26B [Water St] [Eastbound Traffic: To avoid the downtown P area, exit on I±65 North.] 08/26/96 ............ Interstate 10 from Mobile City Limits to Exit 27 ................................................................................................ P 08/26/96 ............ Interstate 65 from Interstate 10 to Interstate 165 [A route for trucks wishing to by-pass the downtown P area.] 08/26/96 ............ Interstate 65 from Mobile City Limits to Interstate 165 ..................................................................................... P 08/26/96 ............ Interstate 165 from Water St. [Mobile] to Bay Bridge Rd. exit [Mobile] ............................................................ P 11/07/94 ............ US43/Alt US90 from State 16/US 90 or I±10 to State 16/US 90 or I±10 ......................................................... A 08/26/96 ............ Water St. [Mobile] from Interstate 10 [exit 26B] to Interstate 165 .................................................................... P State: Alaska Agency: AK DOT & Public Facilities POC: Bruce Freitag Address: Div of Eng & Op, 2132 Channel Drive, Juneau, AK 99801±7898 Phone: (907) 465±6963 Fax: FHWA: AK Field Office FHWA POC: Mr. Al Fletcher Address: Federal Building, 709 W. 9th St., Room 751, Juneau, AK 99802±1648 Phone: (907) 587±7428 Fax: Restrict Designation design date Route description 0123456789i ABIMP AK Designated Routes ** * No Routes Designated as of 07/11/97 * * *. State: Arizona Agency: AZ DOT, Hwy. Div. POC: Mike Manthey Address: 206 South 17th Ave, Phoenix, AZ 85007±3213 Phone: (602) 255±7766 Fax: (602) 407±3243 FHWA: AZ Field Office FHWA POC: Mr. Phil Bleyl Address: 234 North Central Ave., Suite 330, Phoenix, AZ Phone: (602) 379±3608 Fax: Restrict Designation design date Route description 0123456789i ABIMP AZ Designated Routes 01/01/90 ............ Interstate 10 [Deck TunnelÐPhoenix] from 7th St. exit [Mile Post 144.3] to 7th Ave. exit [Mile Post 146.2] 0 [Interstate 17 is the designated truck route which has been posted as the alternative route for hazmat traffic.] 10/16/95 ............ State 202 from MP 8.33 [McClintock Exit] to MP 11.07 [Dobson Exit] [Alternate Routes are as follows: 1. 0 McClintock to University to Dobson. 2. McClintock to McKellips to SR±101. Note: Freeway ends at SR± 101 with temporary lanes to Dobson. Alternative routing may vary with continuing construction.] Federal Register / Vol. 63, No. 110 / Tuesday, June 9, 1998 / Notices 31551 Restrict Designation design date Route description 0123456789i ABIMP AZ Designated Routes 01/01/90 ............ Interstate 17 from Interstate 10 [west of Deck Tunnel] to Interstate 10 [east of Deck Tunnel] ....................... A State: Arkansas Agency: AR Hwy & Transportation Dept. POC: 1Lt. George R. Franks, Jr. Address: Arkansas Highway Police Div., P.O. Box 2779, Little Rock, AR 72203 Phone: 501±569±2421 Fax: FHWA: AR Field Office FHWA POC: Mr. Gary DalPorto Address: 700 W. Capitol, Room 3128, Little Rock, AR 72201 Phone: (501) 324±6441 Fax: Restrict Designation design date Route description 0123456789i ABIMP AR Restricted Routes 07/08/92 ............ Interstate 30 from interstate 440 to Interstate 40 [in downtown Little Rock] [Exception for local delivery.] .... 0 07/08/92 ............ Interstate 630 [Entire Highway] [Exception for local delivery.] .......................................................................... 0 State: California Agency: Depart of CA Hwy Patrol POC: Rik Rasmussen Address: P.O. Box 942898, Sacramento, CA 94298±0001 Phone: (916) 327±3310 Fax: FHWA: CA Field Office FHWA POC: Mr. Matthew Schmitz Address: US Bank Plaza, 980 Ninth Street, Suite 400, Sacramento, CA 95814±2724 Phone: (916) 498±5889 Fax: Restrict design Designation date Route description 0123456789i ABIMP CA Restricted Routes 01/09/95 ............ Berryessa Knoxville Rd [Napa Valley] from Homestake Mining to South [Restrictions are placed on mine's 0 operating permits.] 01/01/95 ............ Monterey Traffic Underpass [City of Monterey] from Washington St. to Lighthouse Ave. [Alternate route: 0 Pacific St. to Del Monte Ave.] 01/09/95 ............ Napa County [general county restriction] .......................................................................................................... 1 01/09/95 ............ Napa County [Hazmat to and from the Geysers project in Lake and Sonoma county are excluded
Recommended publications
  • NYMTC Regional Freight Plan
    3-1 CHAPTER 3: THE THE TRANSPORTATION SYSTEM Photo Source: NYMTC Photo Source: 5. Implementation Guidance 3. Identifying & Assessing Needs 4. Improvements & Solutions 1. Regional Freight Plan Purpose & Desired Freight Outcomes 2. Freight System & Market Overview Regional Freight Plan 2018-2045 Appendix 8 | Regional Freight Plan 2018-2045 Table of Contents 1.0 Regional Freight Plan Purpose and Desired Freight Outcomes ................................................... 1-1 1.1 Plan 2045 Shared Goals and Desired Freight Outcomes ......................................................... 1-2 1.2 Institutional Context ................................................................................................................... 1-1 1.3 Regional Context ....................................................................................................................... 1-2 1.4 Required Federal Performance Measures................................................................................. 1-4 2.0 Freight System and Market Overview .............................................................................................. 2-1 2.1 Freight System Description and Operating Characteristics ....................................................... 2-1 2.1.1 Roadway Network ......................................................................................................... 2-1 2.1.2 Rail Network .................................................................................................................. 2-8 2.1.3 Waterborne Network
    [Show full text]
  • December 2012 Storm Data Publication
    DECEMBER 2012 VOLUME 54 STORM DATA NUMBER 12 AND UNUSUAL WEATHER PHENOMENA WITH LATE REPORTS AND CORRECTIONS NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION noaa NATIONAL ENVIRONMENTAL SATELLITE, DATA AND INFORMATION SERVICE NATIONAL CLIMATIC DATA CENTER, ASHEVILLE, NC Cover: This cover represents a few weather conditions such as snow, hurricanes, tornadoes, heavy rain and flooding that may occur in any given location any month of the year. (Photos courtesy of NCDC) TABLE OF CONTENTS Page Storm Data and Unusual Weather Phenomena......…….…....…………...…...........….........................3 Reference Notes.............……...........................……….........…..….….............................................252 STORM DATA (ISSN 0039-1972) National Climatic Data Center Editor: Rhonda Herndon STORM DATA is prepared, and distributed by the National Climatic Data Center (NCDC), National Environmental Satellite, Data and Information Service (NESDIS), National Oceanic and Atmospheric Administration (NOAA). The Storm Data and Unusual Weather Phenomena narratives and Hurricane/Tropical Storm summaries are prepared by the National Weather Service. Monthly and annual statistics and summaries of tornado and lightning events resulting in deaths, injuries, and damage are compiled by the National Climatic Data Center and the National Weather Service’s (NWS) Storm Prediction Center. STORM DATA contains all confirmed information on storms available to our staff at the time of publication. Late reports and corrections will be printed in each edition. Except
    [Show full text]
  • Massachusetts Oversize/ Overweight Permit Manual
    Oversize/ Overweight Permit Manual Massachusetts Foreword The Specialized Carriers & Rigging Association is pleased to publish this Oversize/ Overweight Permit Manual. Each state analysis includes information in a standardized format: contact, legal limits, special permit limits, general restrictions, types of permits available, fees, escort needs, fines, and restricted travel areas. Telephone numbers, locations, and hours of operation are listed for ports of entry and permit branches. However, readers are always advised to check with the state offices on current laws and procedures. This project could not have been completed without the advice and consultation of many state officials. We thank all of those who provided permit manuals, maps, laws, regulations, and various other forms of documentation. Legal Notice This SC&RA Oversize/Overweight Permit Manual is intended only to provide concise, easily read information, useful in planning movements of overdimensional and overweight loads. This Permit Manual is not intended to be an accurate summary of all the applicable laws and regulations. Users of the Permit Manual should confirm the information contained herein before dispatching vehicles and loads. The SC&RA cautions Permit Manual users that state laws and regulations are subject to change without notice, and that some time elapses between the effective date of such changes and the amendment of the Permit Manual to reflect those changes. The SC&RA assumes no responsibility for accident, injury, loss or claim, penalties or any other
    [Show full text]
  • Oversight Hearing on the Boston Central Artery/Tunnel Project
    S. HRG. 106–1110 OVERSIGHT HEARING ON THE BOSTON CENTRAL ARTERY/TUNNEL PROJECT HEARING BEFORE THE COMMITTEE ON COMMERCE, SCIENCE, AND TRANSPORTATION UNITED STATES SENATE ONE HUNDRED SIXTH CONGRESS SECOND SESSION MAY 3, 2000 Printed for the use of the Committee on Commerce, Science, and Transportation ( U.S. GOVERNMENT PRINTING OFFICE 80–706 PDF WASHINGTON : 2003 For sale by the Superintendent of Documents, U.S. Government Printing Office Internet: bookstore.gpo.gov Phone: toll free (866) 512–1800; DC area (202) 512–1800 Fax: (202) 512–2250 Mail: Stop SSOP, Washington, DC 20402–0001 VerDate Apr 24 2002 08:01 Jun 10, 2003 Jkt 080706 PO 00000 Frm 00001 Fmt 5011 Sfmt 5011 S:\WPSHR\GPO\DOCS\80706.TXT SCOM1 PsN: CAROLT SENATE COMMITTEE ON COMMERCE, SCIENCE, AND TRANSPORTATION ONE HUNDRED SIXTH CONGRESS SECOND SESSION JOHN MCCAIN, Arizona, Chairman TED STEVENS, Alaska ERNEST F. HOLLINGS, South Carolina CONRAD BURNS, Montana DANIEL K. INOUYE, Hawaii SLADE GORTON, Washington JOHN D. ROCKEFELLER IV, West Virginia TRENT LOTT, Mississippi JOHN F. KERRY, Massachusetts KAY BAILEY HUTCHISON, Texas JOHN B. BREAUX, Louisiana OLYMPIA J. SNOWE, Maine RICHARD H. BRYAN, Nevada JOHN ASHCROFT, Missouri BYRON L. DORGAN, North Dakota BILL FRIST, Tennessee RON WYDEN, Oregon SPENCER ABRAHAM, Michigan MAX CLELAND, Georgia SAM BROWNBACK, Kansas MARK BUSE, Republican Staff Director MARTHA P. ALLBRIGHT, Republican General Counsel KEVIN D. KAYES, Democratic Staff Director MOSES BOYD, Democratic Chief Counsel (II) VerDate Apr 24 2002 08:01 Jun 10, 2003 Jkt 080706 PO 00000 Frm 00002 Fmt 5904 Sfmt 5904 S:\WPSHR\GPO\DOCS\80706.TXT SCOM1 PsN: CAROLT C O N T E N T S Page Hearing held on May 3, 2000 ................................................................................
    [Show full text]
  • View the Meeting Presentation
    SHERIDAN EXPRESSWAY – HUNTS POINT PLANNING STUDY March 7, 2013 NYCDCP & NYCDOT ‐ SEHP 1 AGENDA Review of Scenarios Traffic Model Results •Travel Times •Truck Volumes •Summary Next Steps 3/7/2013 NYCDOT - SEHP - DRAFT South Bronx Transportation Network + SEHP Study Area CROSS BRONX EXPRESSW AY SEHP Study Area SHERIDAN EXPRESSWAY Trucks exit the Sheridan at Westchester Ave and continue on local streets BRUCKNER EXPRESSWAY LOCAL STREETS Hunts Point Food Distribution Center north Oak Point Ramp Area Truck Route on Local Streets Improved access to Hunts Point Oak Point Ramps BRUCKNER EXPRESSWAY BRUCKNER EXPRESSWAY • On/Off ramps going east BRUCKNER EXPRESSWAY BRUCKNER EXPRESSWAY and west on the Bruckner Expressway • Ramp design requires L E GGETT approx 9,000 linear feet AVE of roadway • Design requires acquisition of private property and potential realignment of rail lines AMTRAK / CSX OAK POI NT A VE NYS Department of Transportation ‘Bruckner-Sheridan Expressway Interchange Reconstruction and Hunts Point Peninsula Access Environmental Impact Statement’ July 2010 East Ramps • On/Off ramps going Y BRUCKNER EXPRESSWAY BRUCKNER EXPRESSWA east on the Bruckner BRUCKNER EXPRESSWAY BRUCKNER EXPRESSWAY Expressway • Ramp design requires approx 4,000 linear feet LE GGET T of roadway AVE • Less impact on private or rail properties • Potential to remove north traffi c from Hunts Pt Ave through Sheridan ramp OAK POI closure NT A VE NYC Department of Transportation Proposal to create direct access to Hunts Point • Catalyzes changes to Sheridan Expressway at grade section Sheridan Expressway CROSS BRONX Cross Bronx - connections to remain E 174th E 173th at grade E 172nd At grade JENNINGS Bruckner Expressway - WESTCHESTER AVE connections to remain Below Grade below grade BRUCKNER EXPWY north Above Grade above grade Sheridan Expressway - At Grade - Existing Conditions CROSS BRONX Key map • $81M of public investment along West E 174th the southern Bronx River has Farms E 173th Rezoning led to a cleaner more active E 172nd JENNINGS waterfront.
    [Show full text]
  • BANKRUPTCY SALE Office Building / Medical / Professional 1 Prospect Park
    BANKRUPTCY SALE Office Building / Medical / Professional 1 Prospect Park Winthrop Street 2 5 Utica Church Avenue Avenue FLATBUSH 2 3 4 2 5 Kings County Hospital Beverly Road 2 5 SUNY Downstate Medical Center Lincoln Terrace / Newkirk Arthur S. Somers Park Sutter Ave- Avenue Rutland Rd 2 5 2 3 4 Utica Avenue Holy Cross Saratoga Cemetery Retail Corridor Flatbush Avenue Avenue 2 3 4 2 5 Rockaway BROOKLYN PKWY ROCKAWAY Avenue 2 3 4 UTICA AVE Junius Street FARRAGUT RD 2 3 4 EAST FLATBUSH FOSTER AVE RALPH AVE LINDEN BLVD KINGS HWY 2 3 TABLE OF CONTENTS 7. EXECUTIVE SUMMARY 9. PROPERTY OVERVIEW 10. FINANCIAL OVERVIEW 22. LOCATION OVERVIEW 5 EXECUTIVE Summary Rosewood Realty Group is pleased to present the opportunity to purchase 1414 & 1376 Utica Avenue; two properties being sold together in bankruptcy. The properties can be delivered vacant at closing, OR with the current tenant (owner) in place paying rent as a sale-leaseback. The first property located at 1414 Utica Avenue is a 10,083± square foot elevator building on a 4,000± square foot lot. It stands 3 stories plus a lower level / basement, currently in use. The building can be used for office, medical office, or professional use. Additionally, the M1-1 Zoning allows not only for office, but for light industrial use, repair shops, storage facilities, potential retail, funeral home and community facility. The second property located at 1376 Utica Avenue is a 3,000 Square foot lot (30’ x 100’), has curb cut ramps, and is being used as a parking lot.
    [Show full text]
  • BQE in Context: Report from AIANY BQE Task Force | July 2019 1 BQE in Context: Report from AIANY BQE Task Force
    BQE in Context: Report from AIANY BQE Task Force | July 2019 1 BQE in Context: Report from AIANY BQE Task Force Introduction................................................................................................................................... 2 Background of BQE Project....................................................................................................... 3 AIANY Workshop I – BQE Planning Goals............................................................................ 4 AIANY Workshop II – Evaluation of BQE Options............................................................... 5 Workshop Takeaways.................................................................................................................. 6 Appendix: AIANY Workshop II Summaries Sub-group A: Atlantic Avenue / Carroll Gardens / Cobble Hill................................ 10 Sub-group B: Brooklyn Heights / Promenade.............................................................. 15 Sub-group C: DUMBO / Bridge Ramps......................................................................... 17 Sub-group D: Larger City / Region / BQE Corridor................................................... 19 BQE Report Credits...................................................................................................................... 26 Early in 2019, members of the American Institute of Architects New York Chapter's (AIANY) Planning & Urban Design and Transportation & Infrastructure committees formed an ad hoc task force to examine issues and opportunities
    [Show full text]
  • Staten Island Overeaters Anonymous (SIOA) Intergroup Invites You to Celebrate
    Staten Island Overeaters Anonymous (SIOA) Intergroup Invites You To Celebrate The 45th Anniversary of SIOA Saturday, June 10, 2017 9 AM to 5 PM 9:00 AM to 9:30 AM Registration Program Begins Promptly at 9:30 AM Break for Fellowship and Bring-Your-Own-Lunch Free Refreshments of Coffee, Tea and Bottle Water AvailaBle Throughout the Even The Annual SIOA IG Spring Event Will Be Held at The Michael J. Petrides Education Complex 715 Ocean Terrace Staten Island, New York 10301 Handicap Accessible Plenty of FREE Parking Contact Information Cathy K. Chair of Spring Event Committee 347-407-4360 Angela C. Chair of SIOA IG 917-417-2695 Buddy K Vice Chair of SIOA IG 917-257-0110 SIOA Hotline: 718-605-1393 www.sioa.org This is our Sapphire Anniversary The sapphire includes the qualities of candor, faithfulness, sincerity and truth. It symbolizes wisdom, power and faith The star sapphire is known as the “Stone of Destiny” because travelers believed the gemstone would bring good luck on journey. Directions From Brooklyn, Manhattan, Queens, Long Island, Bronx, New York Take the Verrazano Bridge to the Staten Island Expressway I-278 West to Narrows Road NORTH in Staten Island. Take Exit 13A from I-278 West. Follow Narrows Road North and Little Clove Road to Safety City Boulevard From the Outerbridge Crossing Take the exit onto NY-440 N/W Shore Expy toward NY-440/I-278 Take the Interstate 278 E/Staten Island Expwy E/NY-440 E exit toward Verrazano Br. Merge onto I-278 E/NY-440 N Continue to follow I-278 E Take exit 13 toward Richmond Rd/Clove Rd/Hylan Blvd
    [Show full text]
  • Big Dig $458.2 Million Global Agreement
    Big Dig $458.2 Million Global Agreement State Agencies State A-Z Topics Skip to main content Need help resizing text? State Forms The Official Website of the Attorney General of Massachusetts Attorney General in Attorney General Martha Coakley About the Attorney Consumer Doing Business in Government News and Updates Public Safety Bureaus General's Office Resources Massachusetts Resources Home News and Updates Press Releases 2008 MARTHA COAKLEY For Immediate release - January 23, 2008 ATTORNEY GENERAL Big Dig Management Consultant and Designers To Pay $450 Million Media Contact Press Conference Audio and Supporting Documents Included Below Massachusetts Attorney General's Office: Emily LaGrassa (617) 727-2543 BOSTON - The joint venture of Bechtel/Parsons Brinckerhoff, Bechtel Infrastructure Corp., and PB Americas, Inc., f/k/a Parsons U.S. Attorney's Office: Brinckerhoff Quade and Douglas, Inc. ("Bechtel/Parsons Brinckerhoff"), the management consultant to the Central Artery/Tunnel Christina DiIorio-Sterling Project ("the Big Dig") has agreed to pay over $407 million to resolve its criminal and civil liabilities in connection with the collapse (617) 748-3356 of part of the I-90 Connector Tunnel ceiling and defects in the slurry walls of the Tip O'Neill tunnel. In addition, 24 Section Design Consultants-other contractors who worked on various parts of the project--have agreed to pay an additional $51 million to resolve certain cost recovery issues associated with the design of the Big Dig. In total, the United States and the Commonwealth will recover $458 million, including interest. United States Attorney Michael J. Sullivan, Massachusetts Attorney General Martha Coakley, Theodore L.
    [Show full text]
  • Advanced Access Medical Care
    Advanced Access Medical Care Advanced Access Medical Care Bronx m P Park Bronx and Pelha kwy. W. 1733 Eastchester Road, Suite 2 1 Albert Bronx, NY 10461 Einstein College of 6 Medicine New York B Zoo r u Eastchester Rd. c k n e r e. ont Av E E. Trem x Waters Pl. p . y e . v A r e st 95 48 Wesche 695 3 . er Expy 278 Bruckn 1733 Eastchester Road, Suite 2 Bronx, NY 10461 Phone: 718-409-2007 Fax: 718-409-3374 BY CAR: From MANHATTAN or BROOKLYN Take East Side Drive (FDR Drive) to RFK Triboro Bridge. Exit I-278 East/Bruckner Expressway and proceed to the New England Thruway/95 N. Exit 8C to Pelham Parkway West. Turn left onto Eastchester Road and continue to 1733 Eastchester Medical Building. From WESTCHESTER Take Hutchinson River Parkway south to East Tremont Avenue/ Westchester Avenue exit. Bear right to Waters Place, and turn right onto Eastchester Road. Continue to 1733 Eastchester Medical Building. OR Take Saw Mill River Parkway south to Cross County Parkway east to Bronx River Parkway south. Proceed east on Pelham Parkway, cross over to the service road and make a right onto Eastchester Road. Continue to 1733 Eastchester Medical Building. From QUEENS Take Whitestone Bridge to Hutchinson River Parkway.Exit at Pelham Parkway West. Turn left onto Eastchester Road and continue to 1733 Eastchester Medical Building. OR Take Throgs Neck Bridge to Bruckner Express Way. Proceed to New England Thruway/95 N to Pelham Parkway West. Turn left onto Eastchester Road and continue south to 1733 Eastchester Medical Building.
    [Show full text]
  • Federal Register/Vol. 65, No. 233/Monday, December 4, 2000
    Federal Register / Vol. 65, No. 233 / Monday, December 4, 2000 / Notices 75771 2 departures. No more than one slot DEPARTMENT OF TRANSPORTATION In notice document 00±29918 exemption time may be selected in any appearing in the issue of Wednesday, hour. In this round each carrier may Federal Aviation Administration November 22, 2000, under select one slot exemption time in each SUPPLEMENTARY INFORMATION, in the first RTCA Future Flight Data Collection hour without regard to whether a slot is column, in the fifteenth line, the date Committee available in that hour. the FAA will approve or disapprove the application, in whole or part, no later d. In the second and third rounds, Pursuant to section 10(a)(2) of the than should read ``March 15, 2001''. only carriers providing service to small Federal Advisory Committee Act (Pub. hub and nonhub airports may L. 92±463, 5 U.S.C., Appendix 2), notice FOR FURTHER INFORMATION CONTACT: participate. Each carrier may select up is hereby given for the Future Flight Patrick Vaught, Program Manager, FAA/ to 2 slot exemption times, one arrival Data Collection Committee meeting to Airports District Office, 100 West Cross and one departure in each round. No be held January 11, 2000, starting at 9 Street, Suite B, Jackson, MS 39208± carrier may select more than 4 a.m. This meeting will be held at RTCA, 2307, 601±664±9885. exemption slot times in rounds 2 and 3. 1140 Connecticut Avenue, NW., Suite Issued in Jackson, Mississippi on 1020, Washington, DC, 20036. November 24, 2000. e. Beginning with the fourth round, The agenda will include: (1) Welcome all eligible carriers may participate.
    [Show full text]
  • City of Mobile
    December 2011 Preliminary Feasibility Report: City of Mobile Prepared for and supported by: ARTSPACE PROJECTS, INC. 250 ThirdOctober Avenue 2011 N., Suite 500 Minneapolis, MN 55401 612.333.9012 www.artspace.orgDe Introduction n the last decade the City of Mobile, founded in 1702 and Alabama’s oldest city, has fashioned a mini-renaissance in its picturesque historic downtown, increasingly with the I arts. Mobile is the historic capital of the French Colony of Louisiana and the proud originator of the American Mardi Gras. At nearly 500,000 in population, the Mobile metro area has equal numbers of African American and Caucasian citizens with growing immigrant populations as well. The City of Mobile’s population in 2010 was estimated at 195,000, a decrease from its peak of over 203,000 in 1960. This history is important to understand in the context of a City that distances itself from the state of Alabama but is fiercely proud of its own identity. Mobile has more than 140 historic buildings and seven districts on the National Register. During the mid 19th century Mobile and its port served as the gateway to Alabama’s fertile Black Belt. Fueled by rich cotton production and export trade with Europe, Mobile was an economic powerhouse of the Southern U.S. This wealth helped create deep cultural traditions and a gentile, educated population. Mobile’s influence continued through the civil rights era of the 1950s and ‘60s – Alabama’s oldest city was considered “more respectful” than other Southern cities to the concerns of integration. Downtown Mobile had suffered the typical late 20th century urban decay – with much of its middle class population moving across the bay to smaller communities such as Spanish Fort, Fairhope and Daphne.
    [Show full text]