Bhiwani Road (Within Rohtak District Boundary) from Km. 16.00 to 53.700, Under Forest Division and District Rohtak, Haryana

Total Page:16

File Type:pdf, Size:1020Kb

Bhiwani Road (Within Rohtak District Boundary) from Km. 16.00 to 53.700, Under Forest Division and District Rohtak, Haryana Minutes of the Meeting of the State Advisory Group, Haryana held in the Conference Room of the Northern Regional Office on June, OS, 2013 at 11:30 hours under the Chairmanship of Shri A.K. Goyal, IFS, Add!. Principal Chief Conservator of Forests (Central), Govt. of India, Ministry of Environment and Forests, Northern Regional Office, Chandigarh A meeting of the State Advisory Group, Haryana was held on June, OS, 2013 at 11:30 hours in the office of Addl. Principal Chief Conservator of Forests (Centra]), Govt. of India, Ministry of Environment and Forests, Northern Regional Office, Bay No. 24-25, Sector 31-A, Chandigarh under the Chairmanship of Sh. A.K. Goyal, IFS, Addl. Principal Chief Conservator of Forests (Central), GOI, MoEF, Chandigarh. The list of members who participated in the meeting is attached as annex. 2 The SAG discussed the following proposals for diversion of forest lands for non-forestry purposes under the Forest (Conservation) Act, 1980: (i) Diversion of 19.464 ha. forest land for in favour of Executive Engineer, Provincial DivIt. No.1, PWD, B&R Br., Rohtak for widening and strengthening of Gohana-Lakhan Majra-Meham­ Bhiwani road (within Rohtak district boundary) from km. 16.00 to 53.700, under forest division and District Rohtak, Haryana. 3 The SAG discussed the proposal and decided to recommend the same for approval subject to (a) CA site should be in a compact block instead of patches of linear forests as shown in the proposal and identified in such forest areas which are not going to be diverted in near future for development works such as construction and widening of roads, canals etc; and (b) The linear plan of the forest area to be diverted with reference to KM. 37.850 to 33.850 should be revised and area calculation should be properly shown. (ii) Diversion of 21.36 ha. forest land in favour of Deputy General Manager-In, HSRDC Ltd., Sonipat for widening and strengthening of road UP bOl'de.r to Sonipat-Gohana upto District Sonipat boundary fl'o~n km 11.600 to 74.010, under forest division and District Sonipat, Haryana. 4 The SAG discussed the proposal and decided to recommend the same for approval subject to providing (a) A revised map clearly showing the forest and non-forest areas and the area proposed for diversion; and a clarification regarding ownership of land in the 'No Objection Certificate' issued by PWD B&R (iii) Diversion of 16.4760 ha. of forest land in favour of Project Director, NHAI, Rohtak for 4-laning of Rohtak-Hisar section of NH 10 from km. 115.000 to 123.000, under forest division and District Bhiwani, Haryana. 5 The SAG discussed the proposal and decided that the User Agency should submit (a) A combined proposal for diversion of forest areas in the three districts namely Rohtak, Bhiwani and Hissar directly to the Ministry of Environment and Forests, Government of India, New Delhi with a copy to the Northern Regional Office, Chandigarh along with proposing CA sites in a compact block instead of patches of linear forests and CA site should be identified in such forest areas which are not going to be diverted in the future for development works such as widening of' roads, etc. 6 It was observed that after inspection of the sites by the Conservator of Forests concerned, not much reduction in felling of trees or reduction in forest area proposed for diversion is being proposed. The CFs during inspections should attempt to propose reduction in number of trees .to be felled and forest area to be diverted. The meeting ended wi tl1 a vote of thanks to the Chair and the participants. .
Recommended publications
  • District Wise Skill Gap Study for the State of Haryana.Pdf
    District wise skill gap study for the State of Haryana Contents 1 Report Structure 4 2 Acknowledgement 5 3 Study Objectives 6 4 Approach and Methodology 7 5 Growth of Human Capital in Haryana 16 6 Labour Force Distribution in the State 45 7 Estimated labour force composition in 2017 & 2022 48 8 Migration Situation in the State 51 9 Incremental Manpower Requirements 53 10 Human Resource Development 61 11 Skill Training through Government Endowments 69 12 Estimated Training Capacity Gap in Haryana 71 13 Youth Aspirations in Haryana 74 14 Institutional Challenges in Skill Development 78 15 Workforce Related Issues faced by the industry 80 16 Institutional Recommendations for Skill Development in the State 81 17 District Wise Skill Gap Assessment 87 17.1. Skill Gap Assessment of Ambala District 87 17.2. Skill Gap Assessment of Bhiwani District 101 17.3. Skill Gap Assessment of Fatehabad District 115 17.4. Skill Gap Assessment of Faridabad District 129 2 17.5. Skill Gap Assessment of Gurgaon District 143 17.6. Skill Gap Assessment of Hisar District 158 17.7. Skill Gap Assessment of Jhajjar District 172 17.8. Skill Gap Assessment of Jind District 186 17.9. Skill Gap Assessment of Kaithal District 199 17.10. Skill Gap Assessment of Karnal District 213 17.11. Skill Gap Assessment of Kurukshetra District 227 17.12. Skill Gap Assessment of Mahendragarh District 242 17.13. Skill Gap Assessment of Mewat District 255 17.14. Skill Gap Assessment of Palwal District 268 17.15. Skill Gap Assessment of Panchkula District 280 17.16.
    [Show full text]
  • Baseri & Bari, Bajri Mineapplicant Name
    Project Name: Jainpur Unit-1 Sand UNIT, Sand mining (minor mineral) PRE-FEASIBILITY REPORT District: Sonipat, Haryana M/s Shyam Jaina Ram. PRE- FEASIBILITY REPORT Vardan Environet, Gurgaon Page | 21 Project Name: Jainpur Unit-1 Sand UNIT, Sand mining (minor mineral) PRE-FEASIBILITY REPORT District: Sonipat, Haryana M/s Shyam Jaina Ram. 1.0 EXECUTIVE SUMMARY Letter of Intent (LOI) for mining contract Jainpur Unit-1, Sonipat for minor mineral sand over an area of 38.10 ha has been granted from Director Mines & Geology department, Chandigarh, Haryana,. Memo No. DMG/Hy/Cont/Jainpur-1/2015/319 dated 21/01/2015, for the period of 9 year to M/s Shyam Jaina Ram (Copy enclosed as Annexure-I) The proposed production capacity of sand is 14.35 Lakhs MTPA. The contract area lies on Yamuna riverbed/Private Agricultural land. The total mine contract area is 38.10 ha which is non-forest land. The proposed mining contract project covered the riverbed/Private agriculture land. 1. Jainpur-1 River bed Block (area of 28.10 Ha.) 2. Jainpur-1 Outside River bed Block (area of 10.00 ha) The period of contract shall be 9 years and same shall commence with effect from date of grant of Environmental Clearance by the competent authority or on expiry of 12 months from the date of issuance of Letter of Intent, whichever is earlier. The following special conditions shall be applicable for the excavation of minor mineral from river beds in order to ensure safety of river-beds, structures and the adjoining areas: a.
    [Show full text]
  • Village & Townwise Primary Census Abstract, Rohtak, Part XII-A & B
    CENSUS OF INDIA 1991 SERIES-8 HARYANA DISTRICT CENSUS HANDBOOK PART XII - A & B VILLAGE &TOWN DIRECTORY VILLAGE & TOWNWISE PRIMARY CENSUS ABSTRACT DISTRICT ROHTAfK v.s. CHAUDHRI DI rector of Census Operations Haryana Published by : The Government of Haryana, ]993 HARYANA DISTRICT ROHTAK Km5 0 5 10 15 10Km bLa:::EL__ :L I _ b -~ (Jl o DISTRICT ROHTAK CHANGE IN JURISDICTION 1981-91 z Km 10 0 10 Km L-.L__j o fTI r BOUNDARY, STATE! UNION TERRi10RY DIS TRICT TAHSIL AREA GAINED FROM DISTRIC1 SONIPAT AREA GAINED FROM DISTRICT HISAR \[? De/fl/ ..... AREA LOST TO DISTRICT SONIPAT AREA LOST TO NEWLY CREATED \ DISTRICT REWARI t-,· ~ .'7;URt[oN~ PART OF TAHSIL JHAJJAR OF ROHTAK FALLS IN C.D,BLO,CK DADRI-I . l...../'. ",evA DISTRICT BHIWANI \ ,CJ ~Q . , ~ I C.D.BLOCK BOUNDARY "- EXCLUDES STATUTORY ~:'"t -BOUNDARY, STATE I UNION TERRITORY TOWN (S) ',1 DISTRICT BOUNDARIES ARE UPDATED TAHSIL. UPTO I. 1.1990 C.D.BLOCK HEADQUARTERS '. DISTRICT; TAHSIL; C. D. BLOCK. NATIONAL HIGHWAY STATE HIGHWAY SH 20 C. O. BLOCKS IMPORTANT METALLED ROAD RS A MUNDlANA H SAMPLA RAILWAY LINE WITH STATION, BROAD GAUGE IiiiiI METRE GAUGE RS B GOHANA I BERI CANAL 111111""1111111 VILLAGE HAVING 5000 AND ABOVE POPULATION WITH NAME Jagsi C KATHURA J JHAJJAR URBAN AREA WITH POPULATION SIZE-CLASS I,!I,lII, IV & V" ••• ••• 0 LAKHAN MAJRA K MATENHAIL POST AND TELEGRAPH OFFICE PTO DEGREE COLLEGE AND TECHNICAL INSTITUTION .. [liiJ C'a E MAHAM L SAHLAWAS REST ClOUSE, TRAVELLERS' BUNGALOW' AND CANAL BUNGALOW RH, TB, CB F KALANAUR BAHADURGARH Other villages having PTO IRH/TBIC8 ~tc.,are shown as.
    [Show full text]
  • Country Advice India Treatment of India National Lok Dal Members – Haryana – Kakrala Sikh Welfare Organisation – Treatment of Sikhs 15 December 2009
    Country Advice India Treatment of India National Lok Dal members – Haryana – Kakrala Sikh Welfare Organisation – Treatment of Sikhs 15 December 2009 1. Please provide an update on the results of the 2009 elections in relation to the INLD candidates in Haryana. Outcome of the National Election in May 2009 in Haryana The 2009 Indian National (Lok Sabha) election took place over five weeks with voting in different areas of India between 16 April 2009 and 13 May 2009.1 Voting for all ten of Haryana‟s Sabha seats took place on 7 May 2009.2 The INLD failed to win even a single seat in Haryana.3 The Congress Party won nine out of the ten seats except for the Hisar seat which was won by Haryana Janhit Congress (HJC) leader Bhajan Lal. 4 The Indian National Lok Dal (INLD) in Haryana is led by former chief minister Om Prakash Chautala. In order to challenge the ruling Congress party in this year‟s national election, the INLD formed a new alliance with the Bharatiya Janata Party (BJP).5 The INLD nominated five candidates for the Lok Sabha seats it would share with the BJP in Haryana. The BJP announced nominees for the districts of Ambala, Karnal, Sonepat, Gurgaon and Faridabad whilst the INLD nominated candidates for Hisar (former Finance Minister Sampat Singh), Kurukshetra (INLD State President Ashok Arora), Sirsa (Dabwali MLA Sita Ram), Rohtak (Nafe Singh Rathee), and Bhiwani-Mahendragarh (INLD Secretary General Ajay Singh Chautala).6 Defections from INLD 1 Election Commission of India 2009, General Elections – 2009 Schedule of Elections, 2 March, p.12 http://eci.nic.in/press/current/pn020309.pdf – Accessed 20 April 2009 – Attachment 2; „Haryana‟s Lok Sabha battle is for a bigger war‟ 2009, Indo-Asian News Service, 20 April – Attachment 3.
    [Show full text]
  • Inventory Survey Rohta,K District
    For Official Use Only INVENTORY SURVEY ( Non - Forest Area) OF ROHTA,K DISTRICT (IIARYANA STATE) INVEJ. TORY RES I-iTS FOREST SURVEY 0 1· INDIA OR1 HER ZOj. };' SHI MLA-l 1995 For Official Use Only INVENTORY SURVEY (NON- FOREST AREA) OF ROHTAK DISTRICT HARYANA STATE INVENTORY RESULTS FOREST SURVEY OF INDIA NORTHERN ZONE SH1MLA- 1 1995 PRE F ACE F·pn.'~~st ,Sut""vr.v of Indi'," for· tf18 fixst I.:i..me to()l~ L!O .LnVE>lltOr"Y !-t.'I~ve\..'s in t:hE.' r'ur~l =I.'~if'!c S wi.th thr~ pr-illl·l.rv I')b'ie(:tive of "~!'5sE-~5sin\;1 til'? c1is1:riLuth:m of tre'-i'!::i ~l1d !:II<=: (J'~QL.Jj n(J stocl- j.n thE_ r'U r-<:11 ,":\,f:'.?S ill1(1 '1-.0 hay!"? 1n Dver-yj e{-,t or the Vi:H-.i.(:Jus. 50c(':I1 -FoI'-esl:r-y schern~_s ,implernf=.l1ted tlV th(-. St,I:.L r-or<!!~t D8p,,;II~tm!?llts. T~le inventory surVLV "'leiS carri~d .)ut decordina to ~tr~tifleU random 5dmplinc ITH.t:horlol(Jqy~ [lne ot thE.. impnr-tan!: point ill thi_::; survey w~s to ~at8QQris~ variour tvp~s of trees 1n a villaqe.TlH~ I:i:lteoor·i.es we;'r€' far-m forestry. rDad side fllal1t~tiJns, villa'Je lNoodlots. block pl'3nt:,::.t:ions. pl~n·­ ta 1.:i (JiI!: done- "" lanD .:c3 n.=t 1 !~. r-~i 1 Lo,I,;l." 1 ines. pfJllds <:lnd other-so This n~PQ'~t per-t,ins ta district a:;~"\.i...
    [Show full text]
  • (Rupees in Lac) Sr
    Loans disbursed by NCR Planning Board during F.Y 2016-17 (Rupees in Lac) Sr. NAME OF THE PROJECT Estimated City State Loan No. cost of Released project 1 Augmentation of Water Supply for Farrukh 1390.00 Farrukh Nagar Haryana 365.00 Nagar Town & five Villages, Gurgaon Distrct. 2 Alwar Water Supply Upgradation Project 17486.00 Alwar Rajasthan 728.00 3 Behror Water Supply Upgradation Project 2602.00 Behror Rajasthan 111.00 4 Rajgarh Water Supply Upgradation Project 2024.00 Rajgarh Rajasthan 84.00 5 Tijara Water Supply Upgradation Project 1646.00 Tijara Rajasthan 71.00 6 “Construction of 4 lane ROB at Lakhanmajra 5604.00 Rohtak District Haryana 926.00 Meham road at L/C 79 on Delhi Bhatinda 7 “ConstructionRailway line in ofRohtak2 lane District”ROB at L/C No. 54 3258.00 Panipat District Haryana 447.00 on Jind Panipat section (location 66/9-10) crossing road along with Delhi water carrier link channel in Panipat district” 8 “Construction of 2 lane ROB at LC No. 55 on 2946.00 Panipat District Haryana 452.00 Jind Panipat, Section Location 67/10-11 over road on Panipat Kabri road in Panipat district” 9 “Construction of additional 2 lane ROB at LC 7467.00 Hisar Haryana 2240.00 no. 3 on Hissar, Sadalpur Railway line crossing old DHS at RD 164.60 at Dabra Chowk, Hissar” 10 “Construction of Elevated Road on National 15283.00 Rohtak District Haryana 4585.00 Highway No 10 from Chottu ram Chowk to Old bus stand (KM 74.00 to 75.86) in Rohtak city Portion” 11 “Four lanning of Jhajjar Farukhnagar- 11511.00 Jhajjar/Gurgao Haryana 3453.00 Gurgaon road in
    [Show full text]
  • Land Record Modernization GURGAON T
    Land Record Modernization GURGAON T. L. Satyaprakash Municipal Commissioner & Dy. Commissioner & Dr. Sultan Singh, Scientist NRDMS-HarSAC Land Records Gaps in Indian System • Revenue Records are Presumptive Title awarded only through adjudication based on circumstantial evidence • Deed Registration doesn't convey title • Urban records & Registration: separate systems • Multiple handling agencies – lack of coordination • Old and outdated, incomplete and inaccurate cadastral records – graphical + textual Impact on Economy Current Land Record System • Insecure Title: 1.3% loss in India’s GDP growth rate due to unclear land titles • Title & Boundary Dispute: Costly Litigation – 5% of urban areas, 28% of peri-urban areas • Single Task-Multiple Processes, Difficult accessibility to public and interest groups • Land Records become the primary bottleneck for ensuring Ease of Doing Business. Haryana Revenue System Historical Scenario • First Survey and Settlement 1907-13 • Re-Survey for Consolidation 1957-61 – Land Area 44,212 sq. km. – No. of. Villages 7,085 – No. of Musavies 65,000 – No. of Parcels 1,05,00,000+ • Fairly evolved Land Record System for that time Haryana Revenue System Progress in Recent Years • In 2007, started experiments in Digitization & Modernisation of Land Records • Digitisation of Cadastal Map in Entire District – Sirsa – Kamal Village • Digitisation of Urban Land Records and Habitats – Bhiwani District • Digitisation of both Urban & Rural Areas – Rohtak District What we couldn't achieve? • 100% textual record entry and updation • GIS Mapping • Linkages between GIS & textual Data • No correction of historical errors Ground Reality: Increasing Disputes Case Study: Nala Encroachement Good Governance Importance of Land Record Modernization • Move from “Presumed Titles” to “Conclusive Titles” • Link the conclusive titles to the economic process, disaster management, food security, land acquisition, rehabilitation & resettlement.
    [Show full text]
  • The District Is Named After Its Headquarters Town, Gurgaon. It Is Said That the Name Gurgaon Is a Corruption of Guru .Gram, I.E
    The district is named after its headquarters town, Gurgaon. It is said that the name Gurgaon is a corruption of Guru .Gram, i.e. village of aspirituat leader. The traditional account is tbat Yudhishthira, the eldest of the Pandavas, gave this village to his guru, Dronacharya, in whose memory a tank still exists on the west side of the road to the rail,vay station. The tradition also has it . that it was here that Dronacharya gave instruction to the Kauravas and Pandavas.1 It may also be the case that on account of its association with Dr-(}nacaarya or otherwise, this gram was considered guru or big. Adjectives like bada, chhota and unchaare sometimes used in the place names to indicate their physical character. Location and boundaries. - The district~ lies between' 270 39' and 280 32' north parallels of latitude and 760 42' and 770 33' east meridians of ' lo,pgitude, forming the extreme south-east corner of Har~ana State. It stretch~s towards the outlying hills of the Rajasthan tablelands, and is very irregular in~shape. It is bounded on the north-west by the Rohtak district and 08 the north-east bythe, Union Territory of Delhi. On the east, river Yamuna separates it from the Bulandshahar and Aligarhdistricts of Uttar Pradesh. On the south, it adjoins the Mathura district of Uttar Pradesh and the Bhara!pur district of Rajasthan, on the south-west the Alwai district of Rajasthan and on the west the Mahendr garh district. In fact, it touches inter-State border on three sides and is connected with its own State only on .the west and thee north-west.
    [Show full text]
  • Badli-Gurgaon Road Subproject Initial Environm
    Initial Environmental Examination Document Stage: Draft Project Number: 41598 ADB Loan Number: 2660 April 2013 India: National Capital Region Urban Infrastructure Financing Facility–Project 1 – Badli-Gurgaon Road Subproject Prepared by Marc Technocrats Private Limited For the Haryana State Roads and Bridges Development Corporation Limited The initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. ABBREVIATIONS ADB : Asian Development Bank BIS : Bureau of Indian Standards CBR : California Bearing Ratio CHC : Community Health Centres EC : Environmental Clearance EHS : Environmental Health and Safety EIA : Environmental Impact Assessment EMP : Environmental Management Plan EMS : Environmental Management System EO : Environmental Officer ESMS : Environmental and Social Management System GoI : Government of India GRC : Grievance Redressal Committee HSIIDC : Haryana State Industrial & Infrastructure Development Corporation HSRDC : Haryana State Road Development Corporation IA : Implementing Agency IEE : Initial Environmental Examination IRC : Indian Road Congress MDR : Major District Road MoEF : Ministry of Environment and Forest MoRTH : Ministry of Road Transport and Highways MSL : Mean Sea Level NCR : National Capital Region NCRPB : National Capital Region Planning Board NCRUIFF : National Capital Region Urban Infrastructure Financing Facility PHC : Primary Health Centres RoW : Right of Way RPM : Respirable Particulate Matter SC : Supervision Consultant SEIAA : State Environmental Impact Assessment Authority SPM : Suspended Particulate Matter CONTENTS Page I. INTRODUCTION 7 A. Overview 7 B. Environmental Compliance Requirements 7 II. DESCRIPTION OF SUBPROJECT 10 A. Need for the Subproject 10 B. Description of Subproject 10 C. Construction Activities 17 D. Implementation Schedule 17 III.
    [Show full text]
  • Gazetteer of India
    GAZETTEER OF INDIA HARYANA JIND HARYANA DISTRICT GAZETTEER JIND RAGHBIR SINGH, I.A.S., State Editor (Gazetteers) JEET RAM RANGA EDITOR (Gazetteers) HARYANA GAZETTEERS ORGANISATION REVENUE DEPARTMENT CHANDIGARH (INDIA) 1986 GOVERNMENT OF HARYANA Available from: The Controller Printing and Stationery, Haryana, Chandigarh (India) Price: Rs. Printed by: Controller of Printing and Stationery Department, Union Territroy, Chandigarh FOREWORD A district gazetteer is not merely a statistical report on the economic development in the district. It brings out all the facets of life in the district, depicting its history, geography and its people. It should thus prove of use to the administrators in knowing the district. The Jind district with its varied history of administration, lies west of kurukshetra and karnal districts. It is a land of legendary and the sacred Sarasvati. The town of Jind is believed to have been founded at the time of Mahabharata, when the Pandvas built a temple in honour of Jainti Devi (Goddess of victory). The town Jaintapuri grew up around the temple, which later got corrupted to Jind. The district has many places of pilgrimage. I am thankful to the Chief Minister and the Revenue Minister for the encouragement they gave to the Gazetteer staff. CHANDIGARH: April, 1986. L.C. GUPTA Financial Commissioner, Revenue, Haryana. PREFACE This volume is the sixth in the series of the revised District Gazetteers of Haryana. It has been prepared on the pattern laid down by the Government of India. Before Independence (1947), the district was under the different Princely States; jind and Safidon tahsils formed part of Jind State while Narwana tahsil formed a part of Princely State of Patiala.
    [Show full text]
  • Communications
    CHAPTER VII COMMUNICATIONS INTRODUCTION The communication networks of an area are akin to the circulatory and nervous systems of a body which facilitate trade, transport, social integration, and economic development that particular area. These facilitate extensions and specializations of markets. Just like a body cannot develop properly and fully in the absence of its circulatory and nervous system, an area cannot develop properly and fully in the absence of means of communications. The growth of communications of an area serves an important indicator of the overall development of an area and its society, and hence means of communications in an area are of great importance. A brief account of development of major means of communications in the Jhajjar district is given below under different headings. ROADS AND ROAD TRANSPORT ROADS Prior to 1870, almost fair weather unmetalled roads served for the transport action of grain to the markets. The chief lines of communication through roads were Rohtak to Jhajjar; from Beri towards Bhiwani and to Sampla; and feeder roads from Jhajjar towards Dadri, Kanaund, Pataudi, to Farruknagar and Bahadurgarh. The road of the Custom preventive line, which was removed in 1879, ran athwart the district, from Meham to Badli, through Kalanaur, Kanhaur, Beri and Jhajjar, was kept up, although the line was abolished.1 All the roads were usually in very fair condition, and easy for the traffic of country carts, except after heavy rain. Many of them were strikingly broad, but the heavy traffic of the country carts soon spoiled them and they were often bad for driving and riding alike.
    [Show full text]
  • 2005-06 to 2009-10
    District Development Plan Rewari (2005-06 To 2009-10) Prepared by Additional Deputy Commissioner Rewari CONTENTS Sr. No. Chapter Page No. 1. Introduction 1-13 1.1 History 1-2 1.2 Location and Extent 2 1.3 Administration 2 1.4 Topography 3 1.5 Geology 3 1.6 Climate 3-4 1.7 Temperature 4 1.8 Rainfall 4-5 1.9 Demographic Profile 5-6 1.10 Resource Profile 6-7 1.10.1 Soils 6 1.10.2 Agriculture 6 1.10.3 Hydrology/Hydro morphology 6 1.10.4 Ground Water 6-7 1.11 Drainage and Canals 7-8 1.11.1 Irrigation. 8 1.12 Flora and fauna (Ecology) 8 1.13 Minerals 9 1.14 Natural Hazardous 9 1.15 Live Stock Resource 9 1.16 Industries 9 1.17 Cooperation 9-10 1.17.1 Dairy Cooperatives 10 1.18 Health 10 1.19 Public Health 11 1.20 Infrastructure 11-12 1.21 Revenue 12 1.22 Decentralization /Panchayati Raj Institutions 12 1.23 Description of Blocks 12-13 2. Departmental Activities 14-48 2.1 Agriculture 14-21 2.2 Animal Husbandry and Dairying Department 21-27 2.3.1 Health 27-31 2.3.2 Ayurveda 31-32 2.4.1 Public Works Department (Public Health) 32-38 2.5 Public Works Department (B&R) 38-39 2.6 Education 39-40 2.7 Transport 40-42 2.8.1 Cooperation 42-44 2.8.2 Dairy cooperatives 44 2.9 Rural Development and Poverty Alleviation 44 2.10 Women and Child Development 44-45 2.11 Welfare of Scheduled Castes and Backward Classes 45-47 2.12 Social Justice and Empowerment Department 47-48 3.
    [Show full text]