Understanding the Platform (PDF)

Total Page:16

File Type:pdf, Size:1020Kb

Understanding the Platform (PDF) 35 HUDSON THE MAKING OF HUDSON YARDS HUDSON YARDS RIVER 15 HUDSON UNDERSTANDING THE “PLATFORM” YARDS 12TH AVE. To complete Hudson Yards, two “PODIUM” WESTERN 30 HUDSON “platforms” must be constructed to STRUCTURE: 30 HUDSON YARDS PLATFORM YARDS bridge over 30 active Long Island UPPER TRUSSES Columns and other support 10 HUDSON structures land between the rail YARDS Rail Road train tracks. Finished Tall trusses support hung HUDSON lines—and are placed to avoid PODIUM buildings will extend through the sections of this building, which YARDS underground utilities—while trusses 34TH ST. connects 10 Hudson Yards and platform and rise above, with suppotin the towes south fae 11TH AVE. 30 Hudson Yards, and will 33RD ST. caissons drilled deep into bedrock span the tracks. house a collection of shops and HIGH LINE EASTERN between the rail lines to support the restaurants on multiple floors. 30TH ST. PLATFORM structures. 10TH AVE. Glossary 10 Hudson Yards. Opened in 2016, the 895 ft. tall (1.8 million square foot) office tower on the corner of “PODIUM” BASE 10th Avenue and West 30th Street houses the world STRUCTURE OVER headquarters of oah, In. and the oth eian STRUCTURE s of Oal USA and SAP. Location and construction of THE YARDS 30 Hudson Yards. A 1296 ft. tall office tower (2.6 columns supporting this Trusses must bridge over this million square feet) on the corner of 10th Avenue and building—home to a collection of narrow section of the rail yard. West 33rd Street that will house the headquarters for Time Warner, Inc. and KKR. It will be the second-tallest shops and restaurants on its office building in New York City. lower floors—must be coordinated with tunnels, tracks Caisson. A large-diameter pipe drilled into rock and filled with concrete. At Hudson Yards, more than 300 and LIRR facilities, which will caissons will be installed to support buildings and the remain active through platform. construction. BUILDABLE AREAS Eastern Rail Yard Platform. A 10-acre deck Due to the location of tracks, built above Hudson Yards. It will support more than five HIGH LINE ABOVE SITE: underground tunnels and utilities, acres of open space, four towers, a culture center and 33,000 SF (0.75 ACRES) EASTERN RAIL one million square feet of shops and restaurants. 11TH AVENUE YARD PLATFORM only 38% of the site can be used to support structures. Empire Line. Amtrak rail line that runs along 30TH STREET anhattans west side, linin enn tation to lan. Gateway Project. tas plan to uild two new 33RD STREET rail tunnels under the Hudson River to connect Penn Station and the Northeast Corridor. A concrete shell has 10TH AVENUE been installed below Hudson Yards to secure a path for the tunnels. Hudson Yards. The 28-acre rail yard—framed by LONG ISLAND RAILROAD TRACKS: West 30th Street to the south, West 33rd Street to the 23,000 SF (5.5 ACRES) 42% OF SITE north, 10th Avenue to the east and 12th Avenue to the 10 HUDSON YARDS NO. 7 TRAIN west—where LIRR trains are “parked” between runs. STATION The yard also includes an indoor maintenance shop, FOUNDATION 34TH STREET 12-car-long cleaning platform and various SYSTEM: DRILLED employee-support facilities. LIRR. Long Island Rail Road commuter system, North CAISSONS eias usiest. It tanspots 50,000 ides dail. This tower is the only building No. 7 Subway Extension. A 1.5-mile extension being constructed completely on to the Flushing (Queens) line, moving its final stop from terra firma—and not on the Times Square to Hudson Yards. The project opened in platform. NORTH RIVER September 2015 and will be able to accommodate more TUNNELS than 42,000 commuters during peak times. UNDERGROUND North River Tunnels. Built between 1904 and EMPIRE 1908 as part of the original Pennsylvania Station INFRASTRUCTURE LINE TUNNEL project, today these two passages funnel 445 trains and more than 600,000 riders daily. FUTURE GATEWAY Truss. A structural system of beams, bars or rods that TUNNELS support a roof or bridge. hudsonyardsnewyork.com.
Recommended publications
  • Fairytale of New York: Hudson Yards
    September 29th, 2017 Fairytale of New York: Hudson Yards At three times the size of the Rockefeller Center, when it is fully built out, some time around 2040, more than 27m sq ft of new class-A office space, 20m sq ft of new housing, 3m sq ft of hotels and 2m sq ft of retail will have been delivered by developers that include Related Companies, Oxford Properties, Brookfield and Tishman Speyer. Millions of square feet of space have already been completed and leased to blue-chip occupiers, and further significant deals are rumoured to be on the cards. No wonder the Hudson Yards district is one of the hottest property markets in New York City at the moment. So how did a development of this scale and ambition come about, who is doing what in the district and where is Hudson Yards’ new office occupier base being drawn from? Historically the Hudson Yards district consisted of warehousing and industrial space alongside the Manhattan waterfront. The area primarily acted as a rail hub that was fed 747 Third Avenue, Floor 18 New York, NY 10017 212.889.0808 [email protected] marinopr.com by the High Line - which closed years ago and has over the past decade been converted into green public spaces - as well as the Long Island Rail Road. But that all started to change when New York mayor Michael Bloomberg came to power in the early 2000s. “He noted that the average age of commercial office property in Manhattan was north of 75 years and with that in mind, he said, quite correctly, if we’re going to attract the best and brightest in the TAMI [technology, advertising, media and information] sectors, we’ve got to have some new product,” says Bruce Mosler, chairman of global brokerage at Cushman & Wakefield.
    [Show full text]
  • Dual-Mode Locomotive Requirements Document
    Standardized Technical Specification PRIIA Du a l Mode (DC) Passenger Locomotive Requirements Document Is su e Revis ion 1.3 Adopted by the Executive Board December 6 th, 2011 Copyright 2011 Amtrak All rights reserved Table of Contents 1-1 Table of Contents 1.0 Introduction [Informative] ........................................................................................ 1-2 1.1 PRIIA Mandated Requirements ............................................................................ 1-2 1.1.1 Tech n ica l: ...................................................................................................... 1-2 1.1.2 Process: ......................................................................................................... 1-2 1.2 Operational Considerations ................................................................................. 1-3 1.2.1 Th e Specification to Be Developed .................................................................. 1-3 1.2.2 Passenger Train Access to New York City ........................................................ 1-3 2.0 Requirements [Normative unless otherwise in dica ted] ............................................... 2-1 2.1 Key Requ irem en ts ............................................................................................... 2-1 2.2 Capacity and Locomotive Performance ................................................................. 2-1 2.3 Dimensions, Clearances and Track Geometry....................................................... 2-2 2.3.1 Overall Carbody Dimensions
    [Show full text]
  • Route Assessment for Multi-Combination Vehicles (MCV) and Performance Based Standards (PBS) Vehicles in Queensland
    Guideline Route Assessment for Multi-Combination Vehicles (MCV) and Performance Based Standards (PBS) Vehicles in Queensland June 2021 Copyright © The State of Queensland (Department of Transport and Main Roads) 2021. Licence This work is licensed by the State of Queensland (Department of Transport and Main Roads) under a Creative Commons Attribution (CC BY) 4.0 International licence. CC BY licence summary statement In essence, you are free to copy, communicate and adapt this work, as long as you attribute the work to the State of Queensland (Department of Transport and Main Roads). To view a copy of this licence, visit: https://creativecommons.org/licenses/by/4.0/ Translating and interpreting assistance The Queensland Government is committed to providing accessible services to Queenslanders from all cultural and linguistic backgrounds. If you have difficulty understanding this publication and need a translator, please call the Translating and Interpreting Service (TIS National) on 13 14 50 and ask them to telephone the Queensland Department of Transport and Main Roads on 13 74 68. Disclaimer While every care has been taken in preparing this publication, the State of Queensland accepts no responsibility for decisions or actions taken as a result of any data, information, statement or advice, expressed or implied, contained within. To the best of our knowledge, the content was correct at the time of publishing. Feedback Please send your feedback regarding this document to: [email protected] Guideline, Transport and Main Roads,
    [Show full text]
  • Brochure Show the Situation During Formwork Assembly and Are Therefore Incomplete from the Safety Aspect
    Understanding how to build high faster. Formwork solutions for your highrise project The Formwork Experts. _Understanding your highrise project as a partner _Understanding the construction process truly and being knowledgeable about it is the prerequisite for being a partner in the construction industry. We have this un- derstanding from the initial planning stage through to completion of construction. _Understanding such as this is based on more than 40 years' experience in self- climbing technology and more than 1,000 highrise projects successfully realised worldwide. Construction of the world’s tallest building, the Burj Khalifa in Dubai, 828 metres tall, is an outstanding example. With this comprehensive know-how, we are well-qualified to be your high- performing and reliable partner in highrise construction. 2 Doka is able to look back on a long history of _ understanding. Listening intently, understanding the world as seen through the eyes of our custom- ers, learning to understand all aspects and thinking ahead. We are passionate about not being satisfied with the first solution that might get the job done. Rather, we continue fine-tuning it until we come up with a true benefit for our customers. This is the only way a small woodworking shop could grow into a globally operating form- work company, known by the brand name Doka since 1956. "Thanks to the reliable technology and efficient on-site support provided by Doka, we were able to meet the schedule of Colombo Costruzioni S.p.A. with its detailed plan for completion of the Torre Isozaki build in Milan. As a result, we were able to shorten the original schedule for finishing the building shell by approximate- ly three months." Gianfranco Cesana, Engineering Manager for Colombo Important information: Always observe all relevant safety regulations (e.g.
    [Show full text]
  • Hudson Yards 2019-30HY Mortgage Trust Table of Contents
    JUNE 2019 STRUCTURED FINANCE: CMBS PRESALE REPORT Hudson Yards 2019-30HY Mortgage Trust Table of Contents Capital Structure 3 Transaction Summary 3 Rating Considerations 5 DBRS Viewpoint 5 Strengths 6 Challenges & Considerations 6 Property Description 8 Tenant and Lease Summary 9 Market Overview 10 Local Economy 10 Office Market 11 Office Submarket Description 12 Competitive Set 13 5 Manhattan West 13 55 Hudson Yards 13 10 Hudson Yards 13 441 Ninth Avenue 13 1 Manhattan West 14 The Farley Building 14 50 Hudson Yards 14 Sponsorship 14 DBRS Analysis 15 Site Inspection Summary 15 DBRS NCF Summary 16 DBRS Value Analysis 17 DBRS Sizing Hurdles 17 Loan Detail & Structural Features 18 Transaction Structural Features 19 Methodology 20 Surveillance 21 Chandan Banerjee Edward Dittmer Senior Vice President Senior Vice President +1 (212) 806 3901 +1 212 806 3285 [email protected] [email protected] Kevin Mammoser Erin Stafford Managing Director Managing Director +1 312 332 0136 +1 312 332 3291 [email protected] [email protected] HUDSON YARDS 2019-30HY JUNE 2019 Capital Structure Description Rating Action Class Amount Subordination DBRS Rating Trend Class A New Rating – Provisional 348,695,000 35.831% AAA (sf) Stable Class X New Rating – Provisional 389,169,000 -- AAA (sf) Stable Class B New Rating – Provisional 40,474,000 28.383% AA (high) (sf) Stable Class C New Rating – Provisional 38,758,000 21.507% A (high) (sf) Stable Class D New Rating – Provisional 147,887,000 10.621% A (low) sf Stable Class E New Rating – Provisional 144,286,000 0.000% BBB (sf) Stable Class RR NR 30,320,000 0 NR Stable RR Interest NR 7,580,000 0 NR Stable 1.
    [Show full text]
  • FY 2022 EXECUTIVE BUDGET CITYWIDE SAVINGS PROGRAM—5 YEAR VALUE (City $ in 000’S)
    The City of New York Executive Budget Fiscal Year 2022 Bill de Blasio, Mayor Mayor's Office of Management and Budget Jacques Jiha, Ph.D., Director Message of the Mayor The City of New York Executive Budget Fiscal Year 2022 Bill de Blasio, Mayor Mayor’s Office of Management and Budget Jacques Jiha, Ph.D., Director April 26, 2021 Message of the Mayor Contents BUDGET AND FINANCIAL PLAN SUMMARY Budget and Financial Plan Overview .......................................................................... 3 State and Federal Agenda ........................................................................................................... 4 Sandy Recovery .......................................................................................................................... 6 Contract Budget .......................................................................................................................... 9 Community Board Participation in the Budget Process ............................................................ 10 Economic Outlook .................................................................................................. 11 Tax Revenue .......................................................................................................... 27 Miscellaneous Receipts ............................................................................................ 52 Capital Budget ........................................................................................................ 58 Financing Program .................................................................................................
    [Show full text]
  • TOLL TMS WEST Transporting Dangerous Goods
    TOLL TMS WEST Transporting Dangerous Goods TMS West Tom Freeman – Regional Manager (TransSafe Presentation August 2017) 1 The Supply Chain ° The importance of feeding the mines sites with explosive products is critical to WA’s viability ° The dangerous goods which we transport are governed by the Dangerous Goods Act and its regulations – applied by Department of Mines Industry Regulation and Safety (DMIRS) ° TMS is responsible for moving 80% of the Ammonium Nitrate by road (ex CSBP) to supply the mining industry of WA TMS West Tom Freeman – Regional Manager (TransSafe Presentation August 2017) 2 Operating Fleet and Personnel TGL Mining West currently operates 94 vehicles in regional WA, ranging from quad road trains to single trailer movements transporting various forms of Ammonium Nitrate and Cyanide. These vehicles pick-up and deliver based on customer requirements and forecasts. TGL Mining West has the ability to deliver ANsol, Emulsion, Cyanide, Bagged and Bulk Ammonium Nitrate. Fleet Personnel ° 11 x AB Triple Belly Dumper Sets ° 108 x Drivers ° 4 x Quad Belly Dumper Sets ° 19 x Operational/Admin Staff ° 26 x AB Triple End Tipper Sets ° 34 x TGOS Equipment Staff ° 7 x Pocket Road Train ANsol Tanker Sets ° 3 x Pocket Road Train ANE Tanker Sets ° 2 x Quad Road Train ANE Tanker Sets ° 10 x Triple Road Train ANE Tanker Sets ° 2 x AB Triple Road Train ANE Tanker Sets ° 4 x Quad Road Train Flat Top Sets ° 6 x Pocket Road Train Flat Top Set ° 7 x Block Trucks (incl 2 at Tom Price) ° 13 x Sub Contractor Vehicles ° 5 x Pocket Road Train Skel
    [Show full text]
  • Birkenhead RO-2008-001 Final
    2008 5 March Australia, South Birkenhead, Collision, Crossing Level ATSB TRANSPORT SAFETY REPORT Rail Occurrence Investigation RO-2008-001 Final Level Crossing Collision Birkenhead, South Australia 5 March 2008 ATSB TRANSPORT SAFETY REPORT Rail Occurrence Investigation RO-2008-001 Final Level Crossing Collision Birkenhead, South Australia 5 March 2008 Released in accordance with section 25 of the Transport Safety Investigation Act 2003 - i - Published by: Australian Transport Safety Bureau Postal address: PO Box 967, Civic Square ACT 2608 Office location: 62 Northbourne Avenue, Canberra City, Australian Capital Territory Telephone: 1800 020 616; from overseas + 61 2 6257 4150 Accident and incident notification: 1800 011 034 (24 hours) Facsimile: 02 6247 3117; from overseas + 61 2 6247 3117 E-mail: [email protected] Internet: www.atsb.gov.au © Commonwealth of Australia 2009. This work is copyright. In the interests of enhancing the value of the information contained in this publication you may copy, download, display, print, reproduce and distribute this material in unaltered form (retaining this notice). However, copyright in the material obtained from other agencies, private individuals or organisations, belongs to those agencies, individuals or organisations. Where you want to use their material you will need to contact them directly. Subject to the provisions of the Copyright Act 1968, you must not make any other use of the material in this publication unless you have the permission of the Australian Transport Safety Bureau. Please direct requests for further information or authorisation to: Commonwealth Copyright Administration, Copyright Law Branch Attorney-General’s Department, Robert Garran Offices, National Circuit, Barton ACT 2600 www.ag.gov.au/cca ISBN and formal report title: see ‘Document retrieval information’ on page v.
    [Show full text]
  • NEC One-Year Implementation Plan: FY17 Contents
    Northeast Corridor One-Year Implementation Plan Fiscal Year 2017 September 2016 Congress established the Northeast Corridor Commission to develop coordinated strategies for improving the Northeast’s core rail network in recognition of the inherent challenges of planning, financing, and implementing major infrastructure improvements that cross multiple jurisdictions. The expectation is that by coming together to take collective responsibility for the NEC, these disparate stakeholders will achieve a level of success that far exceeds the potential reach of any individual organization. The Commission is governed by a board comprised of one member from each of the NEC states (Massachusetts, Rhode Island, Connecticut, New York, New Jersey, Pennsylvania, Delaware, and Maryland) and the District of Columbia; four members from Amtrak; and five members from the U.S. Department of Transportation (DOT). The Commission also includes non-voting representatives from four freight railroads, states with connecting corridors and several commuter operators in the Region. 2| NEC One-Year Implementation Plan: FY17 Contents Introduction 6 Funding Summary 8 Baseline Capital Charge Program 10 1 - Boston South Station 12 16 - Shore to Girard 42 2 - Boston to Providence 14 17 - Girard to Philadelphia 30th Street 44 3 - Providence to Wickford Junction 16 18 - Philadelphia 30th Street - Arsenal 46 4 - Wickford Junction to New London 18 19 - Arsenal to Marcus Hook 48 5 - New London to New Haven 20 20 - Marcus Hook to Bacon 50 6 - New Haven to State Line 22 21 - Bacon to Perryville 52 7 - State Line to New Rochelle 24 22 - Perryville to WAS 54 8 - New Rochelle to Harold Interlocking 26 23 - Washington Union Terminal 56 9 - Harold Interlocking to F Interlocking 28 24 - WAS to CP Virginia 58 10 - F Interlocking to PSNY 30 25 - Springfield to New Haven 60 11 - Penn Terminal 32 27 - Spuyten Duyvil to PSNY* 62 12 - PSNY to Trenton 34 28 - 30th St.
    [Show full text]
  • Understanding the “Platform” River 15 Hudson Yards 12Th Ave
    35 HUDSON BUILDING HUDSON YARDS HUDSON YARDS UNDERSTANDING THE “PLATFORM” RIVER 15 HUDSON YARDS 12TH AVE. To build the first half of Hudson Yards, a “PODIUM” WESTERN 10-acre “platform” was constructed over the 30 HUDSON STRUCTURE: PLATFORM YARDS Eastern Rail Yard of the Long Island Rail Road. 30 HUDSON YARDS A similar structure will be built over the UPPER TRUSSES Columns and other support 10 HUDSON YARDS Western Rail Yard. When completed, the two Tall trusses support hung structures land between the rail HUDSON platforms will support approximately three sections of this building, which lines—and were placed to avoid YARDS PODIUM quarters of the 28-acre primary development. connects 10 Hudson Yards and underground utilities—while 34TH ST. 11TH AVE. The foundations of the buildings that sit on 30 Hudson Yards. trusses supporting the tower’s 33RD ST. the Eastern Rail Yard platform extend through south face span the tracks. HIGH LINE EASTERN 30TH ST. and rise above it, while the platform itself is PLATFORM supported by 300 caissons of varying sizes 10TH AVE. drilled into bedrock between the tracks. GLOSSARY Caisson. A large-diameter pipe drilled into rock and filled with concrete. “PODIUM” BASE STRUCTURE OVER STRUCTURE Eastern Rail Yard Platform. A 10-acre deck THE YARDS The location and construction built above 30 LIRR tracks that supports of the columns supporting this Trusses bridge over this narrow more than five acres of open space, four building—which is home to a section of the rail yard, where towers, a cultural center and one million collection of shops and there was no room for caissons.
    [Show full text]
  • 2019 COMBINED CONTINUING DISCLOSURE FILINGS PURSUANT to SEC RULE 15C2-12 Relating to METROPOLITAN TRANSPORTATION AUTHORITY Dedic
    2019 COMBINED CONTINUING DISCLOSURE FILINGS PURSUANT TO SEC RULE 15c2-12 relating to METROPOLITAN TRANSPORTATION AUTHORITY Dedicated Tax Fund Bonds Transportation Revenue Bonds State Service Contract Bonds Special Obligation Taxable Refunding Bonds Hudson Rail Yards Trust Obligations and TRIBOROUGH BRIDGE AND TUNNEL AUTHORITY (MTA BRIDGES AND TUNNELS) General Revenue Bonds Subordinate Revenue Bonds Dated: April 30, 2019 [THIS PAGE INTENTIONALLY LEFT BLANK] INTRODUCTION This book contains the 2019 Combined Continuing Disclosure Filings prepared by Metropolitan Transportation Authority (“MTA”) and Triborough Bridge and Tunnel Authority (“TBTA”) pursuant to various written undertakings made to assist the underwriters in complying with their obligations in accordance with SEC Rule 15c2-12 in connection with the following credits: • MTA Transportation Revenue Bonds, • TBTA General Revenue Bonds, • TBTA Subordinate Revenue Bonds, • MTA Dedicated Tax Fund Bonds, • MTA State Service Contract Bonds, • MTA Special Obligation Taxable Refunding Bonds, and • MTA Hudson Rail Yards Trust Obligations. A roadmap to the continuing disclosure information that MTA or TBTA has contractually agreed to update, in accordance with the respective continuing disclosure agreements in official statements, describing where the materials required may be found in MTA’s Annual Disclosure Statement is set forth at the end of this Introduction. This Annual Information booklet contains the following information: PART I contains the MTA Annual Disclosure Statement (“ADS”). The ADS describes the Related Entities, and includes the information necessary to meet the requirements of the continuing disclosure agreements under MTA and TBTA official statements, offering circulars and remarketing circulars, as applicable, for all credits. PART II includes the following, which are also part of the Annual Continuing Disclosure Filings: • Tab 1 lists, by designation, the various issues of securities outstanding for all credits.
    [Show full text]
  • Hudson Yards FGEIS
    96TH ST. 96TH ST. BROADWAY 86TH ST. 86TH ST. RIVERSIDE PARK 72ND ST. 72ND ST. WEST NEW YORK QUEENS CENTRAL PARK ROOSEVELT ISLAND AMSTERDAM AVE. CENTRAL PARK WEST QUEENSBORO BRIDGE 57TH ST. DEWITT CLINTON PARK FIFTH AVE. FIRST AVE. SIXTH AVE. THIRD AVE. TENTH AVE. EIGHTH AVE. SEVENTH AVE. WEEHAWKEN 49TH ST. 42ND ST. Area of Proposed ROUTE 9A PARK AVE. Action 34TH ST. HUDSON RIVER B R EAST RIVER O A D W A Y PARK AVE. SOUTH 23RD ST. UNION SQUARE 14TH ST. F O U R T H A V E . F D R D R I TOMPKINS V HOBOKEN SQUARE AVE. C E PARK WASHINGTON SQUARE PARK N ST. HOUSTO EAST RIDGE SBURG B B RIVER WILLIAM O PARK W V E A R R Y Y ST. I ANC C DEL K S T . ST. GRAND Y H C A U AN W AL D D ST. A S RO O B N ST A W S E T E . S T S T Y . A W W O Y R D CITY HALL K . A A R R A D W PARK O P R D R VE A B I R O T T R S S A E B E BATTERY PARK CITY W M A N H A FULTON ST. TT BRO AN OKL B WTC YN R BRI ID DGE G NEW JERSEY E WALL ST. BROOKLYN BATTERY 0 2000 4000 Feet PARK Legend Project Area Boundary Location of Proposed Action Figure 1-1 NO. 7 SUBWAY EXTENSION-HUDSON YARDS REZONING AND DEVELOPMENT PROGRAM 92 W.
    [Show full text]