SECTION 1 Introduction Dendrobium Mine – Plan for the Future: Coal for Steelmaking – Environmental Impact Statement

TABLE OF CONTENTS

1 INTRODUCTION 1-1 LIST OF FIGURES 1.1 PROJECT OVERVIEW 1-1 1.1.1 Purpose of this Report 1-1 Figure 1-1a Regional Location 1.1.2 Background 1-1 Figure 1-1b Regional Location Inclusive of Historical Mine Workings 1.1.3 Project Objectives 1-6 Figure 1-2 General Arrangement of the 1.1.4 Project Summary 1-6 Approved Dendrobium Mine 1.1.5 Site Location and Tenure 1-7 Figure 1-3 General Arrangement of the Project 1.1.6 Applicant 1-7 Figure 1-4 Relevant Land Tenure 1.1.7 Interaction with the Figure 1-5 Approved Dendrobium Mine Approved Dendrobium Mine 1-7 Figure 1-6 Interaction of Existing and Proposed 1.1.8 Interaction with the Approvals Approved Bulli Seam Figure 1-7 Other Mining Operations and Major Operations 1-10 Developments in the Vicinity of the 1.1.9 Interaction with Project BlueScope Steelworks 1-14 1.1.10 Interaction with Port Kembla Coal Terminal 1-14 1.2 POTENTIAL CUMULATIVE INTERACTIONS WITH OTHER PROJECTS 1-14 1.3 SECRETARY’S ENVIRONMENTAL ASSESSMENT REQUIREMENTS 1-17 1.4 PROJECT CONSULTANTS 1-17 1.5 DOCUMENT STRUCTURE 1-20

LIST OF TABLES

Table 1-1 Summary Comparison of the Approved Dendrobium Mine and the Project Table 1-2 Interaction of Existing and Proposed Approvals Table 1-3 Secretary’s Environmental Assessment Requirements – Reference Summary Table 1-4 Content Requirements of an EIS – Clause 7 of Schedule 2 of the EP&A Regulation

Section 1 1-i

Dendrobium Mine – Plan for the Future: Coal for Steelmaking – Environmental Impact Statement

1 INTRODUCTION 1.1.2 Background

The Dendrobium Mine is an underground coal mine The Dendrobium Mine currently extracts coal from situated in the Southern Coalfield of New South the Wongawilli Seam within CCL 768 using Wales (NSW) approximately 8 kilometres (km) west underground longwall mining methods. The of (Figures 1-1a and 1-1b). Dendrobium Mine primarily produces hard coking coal for steelmaking and has an approved Coal Holdings Pty Ltd (Illawarra Coal), a operational capacity of up to 5.2 million tonnes per wholly owned subsidiary of South32 Limited annum (Mtpa) of run-of-mine (ROM) coal until (South32), is the owner and operator of the 31 December 2030 under Development Consent Dendrobium Mine1. DA 60-03-2001.

This document is an Environmental Impact Key surface facilities at the Dendrobium Mine Statement (EIS) for the Dendrobium Mine – Plan for include the: the Future: Coal for Steelmaking (the Project). • Dendrobium Nos 1, 2 and 3 Shafts The Project proposes the extraction of additional (i.e. ventilation shafts); coal reserves within Consolidated Coal Lease • Dendrobium Pit Top; (CCL) 768. The extraction of additional Project coal reserves would be supported by the development of • Kemira Valley Coal Loading Facility; supporting infrastructure and the use and augmentation of existing surface facilities at the • Kemira Valley Rail Line; Dendrobium Mine. • Dendrobium Coal Preparation Plant (CPP) located at Port Kembla; and

1.1 PROJECT OVERVIEW • West Cliff Stage 3 Coal Wash Emplacement.

1.1.1 Purpose of this Report The general arrangement of the approved Dendrobium Mine is shown on Figure 1-2. This EIS has been prepared to accompany a Development Application made for the Project, in The Project includes the extraction of additional coal accordance with Part 4 of the NSW Environmental in the Wongawilli and Bulli Seams in two proposed Planning and Assessment Act, 1979 (EP&A Act). underground mining areas, namely Areas 5 and 6 (Figure 1-3). The Project would provide continued This EIS considers the potential environmental employment for the existing Dendrobium Mine impacts of the Project in accordance with clauses 6 workforce, with some increase in employment and 7 of Schedule 2 of the NSW Environmental during Project construction and during additional Planning and Assessment Regulation, 2000 underground development. (EP&A Regulation) and the Secretary’s Environmental Assessment Requirements (SEARs) The Cordeaux Pit Top was used for personnel and issued by the NSW Department of Planning and materials access for the Cordeaux Colliery, which is Environment (DPE) (Attachment 1). now in care and maintenance (Figures 1-1a and 1-1b). The Project is seeking development The SEARs were issued in accordance with the consent for use of the Cordeaux Pit Top for mining requirements of clause 3 of Schedule 2 of the support activities for the Project and Project mine EP&A Regulation. A summary of the SEARs is access. provided in Section 1.3. South32 is seeking development consent for development application SSD 16_8194 under Division 4.7 of Part 4 of the EP&A Act for the Project.

1 Throughout this Environmental Impact Statement Illawarra Coal is referred to as South32.

Section 1 1-1

CAMDEN LGA Campbelltown NSW Camden y ilwa Ra R Project Area E n CAMPBELLTOWN V r I e R h LGA t u S o E S G VER I R

n

R i O

a E G M

d

a Menangle o R Waterfall

d a n o w R

o

R t E

l l Holsworthy V Royal

e I b Military R National Park p

m

N Area

a

A A

C

-

E R

n

i

P O p Woronora E p N

A N O Special Area Helensburgh R gle O L an IV en W R M Douglas y a w Park H r A o T t A o R M C Appin A A Dharawal National Park y W a w T e A West Cliff re F R Appin East e A m C Coal Wash u T Pit Top H Emplacement A Appin West p p Pit Top in Appin North Stanwell Park R I Pit Top V Illawarra E R Escarpment SCA WOLLONDILLY s e

c LGA y n R i

o w ad r P H

s e CATARACT c in DAM r P C P Metropolitan O i cto R n Special Area

D

E

A Legend U WOLLONGONG Upper Nepean X LGA Surface Locations SCA Thirroul Highways

R I Main Roads V Cordeaux E R Pit Top Railway Lines Dendrobium Mining Lease

WINGECARRIBEE y Local Government Areas a LGA w h

g ADF Military Reserve i CCL 768 R H o a Urban Areas M CORDEAUX d a ld DAM National Park

o s

n e - D c o n Nature Reserve i South

m r

b P a PacificState Conservation Area r t o AVON n Ocean R Declared Catchment Area DAM a il C o r r i

d

o Kemira Valley

r Coal Loading K Facility em Wollongong ir Dendrobium Pit Top a V a Mount l Port Kembla l e Kembla y Coal Terminal Ra il SCA Li Metropolitan ne Dendrobium y Special Area a w CPP il y a a w R il a a Port err R nd Kembla a n U t - s e a l o a C V h DENDROBIUM MINE s t

s u

o o S

M Figure: 1-1a LAKE Regional Location ILLAWARRA Version 3 23 March 2019

0 2 4 6 8

Kilometres CAMDEN LGA Campbelltown NSW Camden y ilwa Ra R Project Area E Sydney n V r CAMPBELLTOWN I e R h t LGA u S o E S G VER I R

n

R i O

a E G M

d

a Menangle o R Waterfall

d n a o w R

o

R t E l l Holsworthy V Royal

e I b R National Park p Military

m N

a Area

A A

C

-

E R

n

i

P O p Woronora E p N

A N O Special Area Helensburgh R e O L ngl IV na W R e Douglas y M a w Park H r A o T t A o R M C Appin A A Dharawal National Park y W a w T e A West Cliff re F R Appin East e A m C Coal Wash u T Pit Top H Emplacement A Appin West p p Pit Top in Appin North Stanwell Park R I Pit Top V Illawarra E R Escarpment SCA WOLLONDILLY s e c

LGA n y i

R w oad r P H

s e CATARACT c in DAM r P C Metropolitan

O P ict R on Special Area

D

E Legend A U WOLLONGONG Upper Nepean X Surface Locations LGA SCA Highways Area Thirroul R Main Roads I Cordeaux V 6 E R Pit Top Railway Lines Project Longwall Mining Areas

y Dendrobium Mining Lease

a

w h Local Government Areas g i Area 5 CCL 768 H R o ADF Military Reserve a M CORDEAUX d a ld DAM Historical Mine Workings

o s

n e - D c Urban Areas o n i South

m r b P National Park a Pacific r t o AVON n OceanNature Reserve R DAM a il C State Conservation Area o r r i Declared Catchment Area d

o Kemira Valley WINGECARRIBEE r LGA Coal Loading K Facility em ir Dendrobium Pit Top a Wollongong V a Mount l Port Kembla l e Kembla y Coal Terminal Illawarra Escarpment Ra il SCA Li Metropolitan ne Dendrobium y Special Area a w CPP il y a a w R il a a Port err R nd Kembla a n U t - s e a l o a C V h s t DENDROBIUM MINE

s u

o o S

M Figure: 1-1b LAKE Regional Location Inclusive ILLAWARRA of Historical Mine Workings Version 4 28 April 2019 0 2 4 6 8

Kilometres Upper Nepean Cordeaux SCA Pit Top Cataract

P Dam ic t on Cordeaux Dam

R o a d

Area 3C

CCL768 Illawarra Area 3B Dendrobium Escarpment Area 3A Nos 2 & 3 Shafts SCA Avon Dam Area 2 Area 1

Dendrobium No 1 Shaft Kemira Valley Coal Loading Facility Wollongong Dendrobium Pit Top K em ira Va lle y Legend R a Port Kembla Highways i l L Coal Terminal Main Roads ine Railway Lines DSC Notification Areas DENDROBIUM MINE Figure: 1-2 Surface Locations General Arrangement of the Approved Dendrobium Mine Dendrobium Mine Mining Areas Dendrobium Dendrobium Mining Lease CPP Version 5 21 April 2019 0 1 2 3 4 5 State Conservation Area Kilometres Upper Nepean SCA Area 6 Cordeaux Pit Top Cataract Dam P ic t Shaft Site on No. 6B Shaft Site No. 6A Shaft Site Cordeaux No. 5B Dam R o a Area 5 d Shaft Site Area 3C No. 5A CCL768 Dendrobium Nos 2 & 3 Shafts Illawarra Area 3B Escarpment Area 3A SCA Avon Dam Area 2 Area 1

Dendrobium No 1 Shaft Kemira Valley Coal Loading Facility Dendrobium Legend Pit Top K e Highways m i Main Roads ra Va Railway Lines lle y R Surface Locations a Port Kembla il Proposed Ventilation Shaft Sites L Coal Terminal ine Dendrobium Mine Mining Areas Project Longwall Mining Areas DENDROBIUM MINE Area 5 Figure: 1-3 Area 6 Dendrobium General Arrangement of the Project DSC Notification Areas CPP Dendrobium Mining Lease Version 5 21 April 2019 0 1 2 3 4 5 State Conservation Area Kilometres Dendrobium Mine – Plan for the Future: Coal for Steelmaking – Environmental Impact Statement

The proposed action to extend underground mining A number of alternatives to the Project have been and processing operations at the Dendrobium Mine considered by South32 (Section 9.2). This EIS was referred to the Federal Minister for the presents and assesses South32’s preferred Environment and Energy in December 2016 indicative design and staging for the Project and (EPBC 2017/7855) (the proposed action). A how this would be integrated with the extraction of delegate of the Federal Minister determined on the approved Dendrobium Mine Areas 3B and 3C 6 March 2017 that the proposed action is a under Development Consent DA 60-03-2001. “controlled action” and therefore the action also requires approval under the Commonwealth Details of how the Project addresses the principles Environment Protection and Biodiversity of Ecologically Sustainable Development (ESD) are Conservation Act, 1999 (EPBC Act). provided in Section 9.

The proposed action is to be assessed pursuant to 1.1.4 Project Summary the agreement between the Commonwealth of

Australia and the State of relating The Project would include the following to Environmental Assessment Department of the development: Environment dated 26 February 2015. Therefore, this EIS provides an assessment of potential • longwall mining of the Bulli Seam in a new impacts on the following controlling provisions underground mining area (Area 5); considered by the Federal Minister to be relevant to the action: • longwall mining of the Wongawilli Seam in a new underground mining area (Area 6); • threatened species and communities listed under the EPBC Act; and • development of underground roadways within the Bulli Seam, Wongawilli Seam and other • water resources. strata required to access Project mining areas;

A summary, indicating where supplementary SEARs • use of existing underground roadways and that relate to the controlling provisions have been drifts for personnel and materials access, addressed in the EIS, is provided in Attachment 2. ventilation, dewatering and other ancillary activities related to Areas 5 and 6; 1.1.3 Project Objectives • development of surface infrastructure associated with mine ventilation and gas The Project would support the extraction of management and abatement, and other approximately 78 million tonnes (Mt) of ROM coal. ancillary infrastructure; This ROM coal would be processed at the existing • handling and processing of up to 5.2 Mtpa of Dendrobium CPP to primarily produce coking coal ROM coal; products for use in steelmaking. • use of the existing Dendrobium Pit Top, Due to gas constraints identified in some approved Kemira Valley Coal Loading Facility, mining areas at the Dendrobium Mine (Section 2) Dendrobium CPP and Dendrobium Shafts with the Project would also provide an opportunity to minor upgrades and extensions; safely drain this gas before the approved Area 3C is • use of the Cordeaux Pit Top for mining support mined. activities;

Therefore, the Project would maintain continuity of • augmentation of mine access arrangements, longwall operations and facilitate the continuation of including upgrades to, and the use of, the benefits derived from the existing approved Cordeaux Pit Top; Dendrobium Mine subject to an extension to the life of Development Consent DA 60-03-2001 (subject to • transport of sized ROM coal from the Kemira separate approval). Valley Coal Loading Facility to the Dendrobium CPP via the Kemira Valley Rail Line; The extraction of underground coal from the • delivery of product coal from the Dendrobium Dendrobium Mine provides benefits at national, CPP to the Port Kembla Steelworks for state and local levels. South32 provides domestic use or to the Port Kembla Coal approximately 60 per cent (%) of BlueScope Steel Terminal for transport to Liberty Primary Steel (AIS) Pty Ltd’s (BlueScope) coking coal Whyalla Steelworks or export; requirements.

Section 1 1-6

Dendrobium Mine – Plan for the Future: Coal for Steelmaking – Environmental Impact Statement

• transport of coal wash by road to customers for Relevant land ownership information for land engineering purposes (e.g. civil construction parcels within the immediate vicinity of the Project is fill), for other beneficial uses and/or for provided in Attachment 4. emplacement at the West Cliff Stage 3 and Stage 4 Coal Wash Emplacement; The Project underground mining areas would be located wholly within CCL 768. No additional mining • development and rehabilitation of the West tenements are required for the proposed Cliff Stage 3 Coal Wash Emplacement; underground mining associated with the Project. • progressive development of sumps, pumps, pipelines, water storages and other water Similarly, no additional mining tenements are management infrastructure; required for the continued use of the Dendrobium Mine surface facilities for the Project. • controlled release of excess water in accordance with the conditions of Environmental Protection Licence (EPL) 3241 1.1.6 Applicant and/or beneficial industrial re-use; Illawarra Coal Holdings Pty Ltd • monitoring, rehabilitation and remediation of (ABN 69 093 857 286) is the applicant for the subsidence and other mining effects; and Project2. Illawarra Coal Holdings Pty Ltd is a wholly owned subsidiary of South32 Ltd. Throughout this • other associated infrastructure, plant, EIS Illawarra Coal Holdings Pty Ltd is referred to as equipment and activities. South32. The contact details for Illawarra Coal

Holdings Pty Ltd are: An indicative Project general arrangement showing the underground mining areas is provided on Illawarra Coal Holdings Pty Ltd Figure 1-3. Level 35

108 St Georges Terrace Table 1-1 provides a comparative summary of PERTH WESTERN AUSTRALIA 6000 activities associated with the Project compared to Phone: (02) 4286 3000 the approved Dendrobium Mine.

The Illawarra Coal website is: 1.1.5 Site Location and Tenure https://www.south32.net/what-we-do/places- The Project Development Application Area includes we-work/illawarra-metallurgical-coal those lands listed in the real property description provided in support of the Development Application The Dendrobium Mine is located at Cordeaux Road, (Attachment 3). NSW 2526.

The Project is located in the Wollongong, 1.1.7 Interaction with the Approved Wingecarribee and Wollondilly Local Government Dendrobium Mine Areas (LGAs) (Figure 1-1a). A description of land zoning in the Project Development Application area Approved Dendrobium Mine under the relevant local environmental plans (LEPs) for these LGAs is provided in Attachment 6. The existing operations at the Dendrobium Mine are

undertaken in accordance with Development The Project underground mining areas are located Consent DA 60-03-2001 (as modified), as well as within the catchments of the Avon and Cordeaux the Approval Decision (EPBC 2001/214) under the Rivers, which are part of Greater Sydney’s water EPBC Act. supply system. These catchments are included within the Metropolitan Special Area (a WaterNSW Special Area) declared under the Water NSW Act, 2014 (Figure 1-4). There has been a long history of underground longwall coal mining in these water catchments (Section 2.1).

2 At all relevant times in relation to the Project, Illawarra Coal Holdings Pty Ltd will be acting as agent for and on behalf of Dendrobium Coal Pty Ltd in respect of all mining and exploration tenements held by Dendrobium Coal Pty Ltd.

Section 1 1-7

CCL724 Dharawal CCL767 National Park Dharawal SCA West Cliff Coal Wash Emplacement (Stage 3)

Upper Nepean SCA Cordeaux Thirroul Area 6 Pit Top CATARACT DAM

Site Site No. 6B Site No. 6A No. 5B CCL768 Area 5 Area 3C CORDEAUX Legend Site DAM No. 5A Dendrobium Declared Catchment Area Nos 2 & 3 Shaft Illawarra Project Area (Surface Facilities) Escarpment Project Area (Longwall) Area 3B Area 3A SCA AVON Dendrobium Mining Lease DAM Dendrobium Crown Land Area 2 Area1 Nos 1 Shaft Dendrobium Mine Mining Areas Cadastral Parcels South 32 Owned Land ML1510 Kemira Valley WaterNSW Owned Land Coal Loading Facility Sydney Water Owned Land K e Longwalls and Workings m ira V State Conservation Area Dendrobium a DENDROBIUM MINE lle y Figure: 1-4 National Park Pit Top R a Relevant Land Tenure il Li West Cliff Coal Wash Emplacement ne Dendrobium Stage 3 (Project) Illawarra CPP Version 3 9 July 2019 Escarpment 0 1 2 3 4 Stages 1, 2, & 4 SCA Kilometres Dendrobium Mine – Plan for the Future: Coal for Steelmaking – Environmental Impact Statement

Table 1-1 Summary Comparison of the Approved Dendrobium Mine and the Project

Approved Dendrobium Mine Component Project (DA 60-03-2001) Mine Life Until 31 December 2030. Until 31 December 2048. Mining Method Underground extraction using longwall mining No change. methods. Resource Mining of the Wongawilli Seam in Areas 1, 2, 3A, Additional mining of the Bulli Seam in Area 5 and 3B and 3C within CCL 768. the Wongawilli Seam in Area 6 within CCL 768. Annual Handling and processing of up to 5.2 Mtpa of No change. Production ROM coal. Resource to be At 1 July 2019, it is estimated that approximately Approximately 78 Mt of additional ROM coal. Recovered 35 Mt of ROM coal will remain. Coal Handling Transport of coal from underground workings to No change. and Processing the Kemira Valley Coal Loading Facility via an underground conveyor network. Sizing and stockpiling of coal at the Kemira Valley Coal Loading Facility prior to transport to the Dendrobium CPP via the Kemira Valley Rail Line, in accordance with the approved hours of operation. Processing of up to 5.2 Mtpa of sized ROM coal at the Dendrobium CPP. Management of Transportation of up to approximately 1.1 Mtpa of Transportation of up to approximately 1.6 Mtpa of Mining Waste coal wash by road from the Dendrobium CPP to coal wash by road from the Dendrobium CPP to the West Cliff Stage 3 and Stage 41 Coal Wash the West Cliff Stage 3 and Stage 4 Coal Wash Emplacement. Emplacement. Development and rehabilitation of the West Cliff No change. Stage 3 Coal Wash Emplacement.

Supply of coal wash to customers for engineering No change. purposes (e.g. civil construction fill) or for other beneficial uses. General • Dendrobium Pit Top. Continued use of existing infrastructure with minor Infrastructure upgrades and extensions. • Kemira Valley Coal Loading Facility. Use of the Cordeaux Pit Top for mining support • Kemira Valley Rail Line. activities. • Dendrobium CPP. Augmentation of mine access arrangements, • Dendrobium Shafts Nos 1, 2 and 3. including upgrades to, and the use of, the Cordeaux Pit Top.

Development of surface infrastructure associated with mine ventilation and gas management and abatement, and other ancillary infrastructure. Product Transport Delivery of product coal from the Dendrobium No change. CPP to the BlueScope Port Kembla Steelworks (BlueScope Steelworks) or to Port Kembla Coal Terminal for transport to Liberty Primary Steel Whyalla Steelworks or for export. Water Water management infrastructure to separate Augmentations and extensions to existing water Management clean, oily and dirty water. management infrastructure (including use of Use of a combination of recycled treated mine existing infrastructure). water and potable water purchased from Sydney Continued use of a combination of recycled Water in underground and surface operations. treated mine water and potable water purchased from Sydney Water in underground and surface Release of water in accordance with the conditions of EPL 3241. operations. Continued release of water in accordance with the conditions of EPL 3241. Release volumes and release infrastructure to be modified as required based on Project mine inflow rates. Beneficial re-use of excess Project water by industrial users, where practicable.

Section 1 1-9

Dendrobium Mine – Plan for the Future: Coal for Steelmaking – Environmental Impact Statement

Table 1-1 (Continued) Summary Comparison of the Approved Dendrobium Mine and the Project

Approved Dendrobium Mine Component Project (DA 60-03-2001) Workforce Current workforce of approximately 400 personnel At full development, employment in the order of (including South32 staff and on-site contractor 500 operational personnel (including South32 personnel). staff and on-site contractor personnel). Up to approximately 200 contractor personnel would also be required for construction and development activities. Hours of Operated on a continuous basis, 24 hours per No change. Operation day, seven days per week. Trains do not travel on the Kemira Valley Rail Line between 11.00 pm and 6.00 am, unless written approval is obtained from the NSW Environment Protection Authority (EPA) for emergency use of the rail line. 1 Development and rehabilitation of the West Cliff Stage 4 Coal Wash Emplacement would continue to be conducted in accordance with Project Approval 08_0150 for the Bulli Seam Operations.

The Project does not include the approved Coal Wash Management underground mining operations in the Wongawilli Seam in Areas 1, 2, 3A, 3B and 3C at the Coal wash produced at the Dendrobium CPP as Dendrobium Mine and associated surface activities part of the Project would be transported by road to (such as monitoring and remediation). These the West Cliff Stage 3 and Stage 4 Coal Wash underground mining operations would continue to Emplacement. operate in accordance with Development Consent DA 60-03-2001 (as modified). The West Cliff Stage 3 Coal Wash Emplacement is currently approved under the Dendrobium Mine However, a number of other existing activities and Development Consent DA 60-03-2001, although it is works currently approved at the Dendrobium Mine proposed that the new development consent for the would be covered by the development consent for Project would prevail to the extent of any the Project (if granted). These activities and works inconsistency with Development Consent are described in Section 3. DA 60-03-2001 (e.g. with respect to the Project life).

It is proposed that if development consent is granted Table 1-2 and Figures 1-5 and 1-6 provide a for the Project, surface facilities and underground summary of the interaction of the Project with the roadways used by the Project would be operated in approved Dendrobium Mine. accordance with only the conditions of the Development Consent for the Project rather than 1.1.8 Interaction with the Approved Bulli DA 60-03-2001. Seam Operations

During the life of the Project it is proposed that the Coal Wash Management extraction of Project Areas 5 and 6 would be integrated with the extraction of approved Development and rehabilitation of the West Cliff Dendrobium Mine Areas 3B and 3C (Section 3.5). Stage 4 Coal Wash Emplacement would continue to Mining could occur within the approved Area 3C be conducted in accordance with Project concurrently with Area 3B. Extraction within Area 3C Approval 08_0150 for the Bulli Seam Operations. would also likely occur between mining within

Area 5 and Area 6 and would occur after the current For the Project to proceed to its full extent, an approved duration of Dendrobium Mine operational extension of Project Approval 08_0150 from activities (2030), although first workings for these 31 December 2041 to 31 December 2048 would be areas may occur prior to this. required to allow for the continued use of the West

Cliff Stage 4 Coal Wash Emplacement. This would The necessary extension to the operational life of be subject to a separate application and approval. Dendrobium Mine under Development Consent

DA 60-03-2001 would be subject to a separate application and approval.

Section 1 1-10

LEGEND DA 60-03-2001 (Until 31 December 2030) DA 74/134 Project Approval 08_0150 (Until 31 December 2041) Road Transport - Surface Rail Transport - Surface Coal Clearance Men & Materials - Underground Air Flow Product Coal

Areas 1 and 2 Longwalls (Monitoring and Remediation) Kemira Valley Coal West Cliff Stage 3 Loading Facility Emplacement

Main Headings Areas 3A and 3B Longwalls West Cliff Stage 4 (Mining, Monitoring & Remediation) Emplacement Dendrobium Pit Top

Coal Wash Cordeaux Pit Top Area 3C Longwalls Beneficial Uses (Care and Maintenance) (Future Mining, Monitoring & Remediation)

Shafts (Dendrobium Shafts 1,2 and 3) Dendrobium CPP

Export Port Kembla Coal Terminal

BlueScope Steelworks DENDROBIUM MINE Approved Dendrobium Mine

Figure 1-5 STH-16-02_EIS_002B LEGEND New Development Consent (Until 31 December 2048) Overlap - New Development Consent prevails to extent of any inconsistency with DA 60-03-2001 DA 60-03-2001 (Until 31 December 2030) [Note: Area 3C to be extracted prior to end of 2030, or future modification sought] Project Approval 08_0150 (Until 31 December 2041) [Note: Extension in life may be required at later date] Road Transport - Surface Rail Transport - Surface Coal Clearance Areas 1 and 2 Longwalls Men & Materials - Underground (Monitoring and Remediation) Kemira Valley Coal West Cliff Stage 3 Air Flow Loading Facility Emplacement Product Coal

Main Headings Areas 3A and 3B Longwalls West Cliff Stage 4 (Mining, Monitoring & Remediation) Emplacement Dendrobium Pit Top

Coal Wash Area 3C Longwalls Cordeaux Pit Top Beneficial Uses (Future Mining, Monitoring & Remediation)

Areas 5 and 6 Shafts (Future Mining, Monitoring (Dendrobium Shafts 1,2 and 3; and Development) Project Shaft Nos 5A, 5B, 6A and 6B) Dendrobium CPP

Export Port Kembla Coal Terminal

BlueScope Steelworks DENDROBIUM MINE Interaction of Existing and Proposed Approvals

Figure 1-6 STH-16-02_EIS_002A Dendrobium Mine – Plan for the Future: Coal for Steelmaking – Environmental Impact Statement

Table 1-2 Interaction of Existing and Proposed Approvals

Existing Approval / Operations Proposed Approval Current Status / Comments Consent Underground Mining Areas 1, 2 and 3A DA 60-03-2001 Continuation of DA 60-03-2001 Currently approved development – mining has occurred in these domains. Area 3B DA 60-03-2001 Continuation of DA 60-03-2001 Currently approved development – currently mining in this area. Area 3C DA 60-03-2001 Continuation of DA 60-03-2001 Currently approved development – mining delayed due to high gas content identified, with modification therefore, modification to DA 60-03-2001 would be required to allow mining post-2030 subject to a separate application and approval. Area 5 - SSD 8194 New development for the Project – new mining domain. Area 6 - SSD 8194 New development for the Project – new mining domain. Surface Facilities Dendrobium Shafts 1, 2 and 3 DA 60-03-2001 SSD 8194 Currently approved development – to be used by the Project. Dendrobium Pit Top DA 60-03-2001 SSD 8194 Currently approved development – to be used by the Project. Kemira Valley Coal Loading DA 60-03-2001 SSD 8194 Currently approved development – to be used by the Project. Facility Kemira Valley Rail Line DA 60-03-2001 SSD 8194 Currently approved development – to be used by the Project. Dendrobium Coal Preparation DA 60-03-2001 SSD 8194 Currently approved development – to be used by the Project. Plant (CPP) West Cliff Stage 1 and Stage 2 PA 08_0150 for Bulli PA 08_0150 for Bulli Seam Currently approved development under PA 08_0150. Coal Wash Emplacement Seam Operations Operations West Cliff Stage 3 Coal Wash DA 60-03-2001 SSD 8194 Currently approved development – to be used by the Project. Emplacement West Cliff Stage 4 Coal Wash PA 08_0150 for Bulli Continuation and modification of Currently approved development – extension to life of Project Approval 08_0150 from 31 Emplacement Seam Operations PA 08_0150 for Bulli Seam December 2041 to 31 December 2048 required to facilitate ongoing emplacement for the Operations Project. Shafts Nos 5A, 5B, 6A and 6B - SSD 8194 New development for the Project – new ventilation shafts. Cordeaux Pit Top D74/134 issued by SSD 8194 Currently approved development – to be used by the Project. Wollongong Council in 1974

Section 1 1-13

Dendrobium Mine – Plan for the Future: Coal for Steelmaking – Environmental Impact Statement

The environmental impacts of the West Cliff Coal 1.1.10 Interaction with Port Kembla Coal Wash Emplacement have been previously assessed Terminal as part of the Application for Further Approval of West Cliff Emplacement Stage 3 (Cardno Forbes The Port Kembla Coal Terminal (Figure 1-7) Rigby, 2007) and the Bulli Seam Operations operates in accordance with Project Environmental Assessment (Illawarra Coal, 2009). Approval 08_0009. It receives coal from a number The currently approved West Cliff Coal Wash of operations in the region via a combination of Emplacement has sufficient capacity for the Project public and private roads and rail. and other South32 operations (Section 3). This is partly due to South32’s supply of coal wash for Coal from the Project to be sold for export would be engineering purposes (e.g. civil construction fill) or transported to the Port Kembla Coal Terminal via for other beneficial uses, reducing the quantity of private road within the steelworks, where it would be coal wash required to be emplaced at the West Cliff stockpiled for transport to Liberty Primary Steel Coal Wash Emplacement. Whyalla Steelworks or for export. The handling and stockpiling of Project coal at the Port Kembla Coal Therefore, there is no proposed change to the Terminal would occur in accordance with the capacity, extent, height, final landform or approvals for the Port Kembla Coal Terminal, and rehabilitation of the West Cliff Stage 3 and Stage 4 these activities are not part of the Project. Coal Wash Emplacement required for the Project.

1.2 POTENTIAL CUMULATIVE Processing of Bulli Seam Operations Coal INTERACTIONS WITH OTHER

PROJECTS ROM coal from the Bulli Seam Operations would continue to be transported to the Dendrobium CPP This section describes the potential interaction for processing (consistent with Project between the Project and other major projects in the Approval 08_0150). Wollongong LGA and other adjacent LGAs that may

be of potential relevance to the environmental Table 1-2 provides a summary of the interaction of assessment of the Project. the Project with the approved Bulli Seam

Operations. Key proposed or approved projects (in addition to

those described above) that may potentially interact 1.1.9 Interaction with BlueScope Steelworks with, or have potential cumulative impacts with the Project include: BlueScope owns and operates the BlueScope Steelworks at Port Kembla in the Wollongong LGA. • Port Kembla Outer Harbour Development; The steelworks are located on approximately 742 hectares (ha) of land adjacent to Port Kembla • Port Kembla Gas Terminal; Harbour (Figure 1-7) and operate under a number of • Port Kembla Bulk Liquids Terminal; approvals. • Albion Park Rail Bypass; The Dendrobium CPP is located within the • Hume Coal Project; steelworks and is integrated with its operations. • Tahmoor South Coal Project; Coal from the Project that is sold to BlueScope for • Cordeaux Colliery (South32-owned, under steelmaking would continue to be transported to care and maintenance); operations (e.g. Pulverised Coal Injection [PCI] Facility) within the steelworks via infrastructure • Russell Vale Colliery (under care and operated by BlueScope. The handling and use of maintenance); Project coal at BlueScope’s operations beyond the Dendrobium CPP would occur in accordance with • Wongawilli Colliery; and the approvals for the steelworks, and these activities • Metropolitan Mine. are not part of the Project. Figure 1-7 shows the locations of these other major developments relative to the Project.

Section 1 1-14

y a lw Rai ern h t u o S

n d i a a o

M R

n R Menangle w E o V t d l I Waterfall

l a e R o

R b Holsworthy

p Royal N

m

Military A National Park a A

R

C E

- Area O

n

i P N p Woronora E p O L A NSW N R Special AreaIV O R gle y an W a en Douglas H w M A r T o Park A t o

C Metropolitan Project Area y R Sydney M a A A Mine w Appin Dharawal National Park e T W re F A Appin East West Cliff e R A A p um C Pit Top p Coal Wash T i H n Emplacement Appin West Pit Top Appin North Stanwell Park R Pit Top Illawarra I V E Escarpment

R s y

e SCA WOLLONDILLY w c

n H

C LGA i

R r O o ad P s

R e Tahmoor South CATARACT c Legend D in r Coal Project E DAM P

A Metropolitan Surface Locations P U ic ton Special Area X Mining Operations R R WOLLONGONG E Other Major Developments IV LGA Upper Nepean Proposed Mining Operations SCA Thirroul Area Cordeaux Proposed Other Major Developments 6 Pit Top

y Dendrobium Mining Lease Russell Vale a w

Colliery h Project Longwall Mining Areas Area CCL 768 g

Hi 5 R CORDEAUX o Highways M a a DAM d ld Main Roads o South n s - e D c

o n Pacific Railway Lines m i r

AVON b P a Ocean r Local Government Areas DAM t o n

ADF Military Reserve R

a Kemira Valley Coal WINGECARRIBEE il Urban Areas C Loading Facility

LGA o

r

r i

d Dendrobium Pit Top K Wollongong National Park e o m BlueScope

r ir a Steelworks Port Kembla Bulk Liquids Terminal Nature Reserve V Illawarra all ay ey Port Kembla Coal Terminal State Conservation Area w R l Escarpment a Metropolitan ai y il Port Kembla Gas Terminal R SCA a L Declared Catchment Area w in a il e Special Area r a Port Kembla r e R d Port Kembla Outer Harbour Development nan Dendrobium CPP U t - Wongawilli s e a l Colliery o a C V h s t

s u

o o S M

DENDROBIUM MINE

Figure: 1-7 Other Mining Operations and Major Developments in the Vicinity of the Project Version 4 31 March 2019 Hume Coal Princes Highway Project Albion Park 0 2 4 6 8 Rail Bypass Kilometres Dendrobium Mine – Plan for the Future: Coal for Steelmaking – Environmental Impact Statement

Port Kembla Outer Harbour Development The construction workforce would be approximately 140 personnel, with an operational workforce of The Port Kembla Outer Harbour Development was 5 to 12 personnel (Cardno, 2015a). approved in 2011 and would involve the development of additional portside and landside The traffic generated during the construction of the facilities for a project life of 27 years Port Kembla Bulk Liquids Terminal is expected to (AECOM, 2010). utilise some of the same roads as those used by the Project (Cardno, 2015b), therefore, potential Construction of the Port Kembla Outer Harbour cumulative traffic impacts have been considered in Development is predicted to take place in intervals the Road Transport Assessment for the Project over a 20 to 30 year time frame, with the first stage (Appendix H). of the construction phase commencing in 2013 (NSW Ports, n.d.). Princes Highway Albion Park Rail Bypass

The Port Kembla Outer Harbour Development is An extension to the Princes Motorway, between located proximal to the Dendrobium CPP in Port Yallah and Oaks Flats to bypass the Albion Park Kembla and the traffic generated during the Rail was approved in January 2018, with construction phases is, therefore, expected to utilise construction expected to commence in 2019. The some of the same roads as the Project extension to the Princes Motorway will span a (AECOM, 2010). Potential cumulative traffic impacts distance of 9.8 km and will be developed by the have been considered in the Road Transport Roads and Maritime Services (RMS). Assessment for the Project (Appendix H). The construction period is expected to occur for a Port Kembla Gas Terminal Project three year period and involve a construction workforce of approximately 550 personnel The Port Kembla Gas Terminal Project is proposed (Cardno, 2015c). by Australian Industrial Energy (AIE) and the Development Application was approved in Consideration of the potential cumulative workforce April 2019. The Port Kembla Gas Terminal Project and temporary accommodation demands of the would involve the development of a liquefied natural Princes Highway Albion Park Rail Bypass project gas import terminal at Port Kembla with a project life have been included in the Social Impact of 10 to 15 years. Construction is scheduled for Assessment for the Project (Appendix K). commencement in 2019, with the construction period predicted to take some 10 to 12 months Hume Coal Project (GHD, 2018a). The proposed Hume Coal Project is located The proposed construction workforce is approximately 35 km south-west of the Project 150 personnel, with a peak operational workforce of underground mining areas. 50 personnel (GHD, 2018a). The Hume Coal Project is seeking to develop an The Port Kembla Gas Terminal Project is located underground coal mine and associated proximal to the Dendrobium CPP in Port Kembla, infrastructure to support the mining operations, and therefore traffic generated during the construction of is expected to have a construction life of two years the Port Kembla Gas Terminal Project is predicted and a project life of 23 years, with an operational to utilise some of the same roads as the Project workforce of 300 personnel (EMM, 2017). (GHD, 2018b). Potential cumulative traffic impacts have been considered in the Road Transport In December 2018, the DPE recommended refusal Assessment for the Project (Appendix H). for the Hume Coal Project (DPE, 2018a). Notwithstanding, the potential cumulative workforce Port Kembla Bulk Liquids Terminal demand for the Hume Coal Project is considered in the Social Impact Assessment for the Project The Port Kembla Bulk Liquids Terminal was (Appendix K). approved in 2016 to develop a fuel and ethanol import terminal, located approximately 0.8 km north of the Port Kembla wharf facilities (Cardno, 2015a), however, construction of the Port Kembla Bulk Liquids Terminal has not yet commenced.

Section 1 1-16

Dendrobium Mine – Plan for the Future: Coal for Steelmaking – Environmental Impact Statement

Tahmoor South Coal Project A summary of the SEARs is provided in Tables 1-3 and 1-4, as well as in the relevant section of the EIS The Tahmoor South Coal Project is located where the SEARs are addressed. approximately 80 km south-west of Sydney and approximately 6 km north-west of the Project A summary indicating where the supplementary underground mining areas. The Tahmoor South SEARs (relating to EPBC Act requirements) have Coal Project is seeking an extension to underground been addressed in the EIS is provided in longwall mining and associated activities, with coal Attachment 2. extraction up to 5 Mtpa as well as an extension of the current mine life by 15 years. All coal processing 1.4 PROJECT CONSULTANTS and handling would occur at the existing Tahmoor Colliery Coal Handling Preparation Plant. This EIS was prepared by South32 and Resource Strategies Pty Ltd with specialist input provided by The existing operations at the Tahmoor Colliery the following organisations: currently employs approximately 400 personnel across its operations, and the potential for • South32 (project design, alternatives and cumulative workforce impacts on the Project if this justification, baseline data, stream mapping, workforce were to continue at the Tahmoor South geographical information system management, Coal Project is considered in the Social Impact land tenure, resource economics, geological Assessment for the Project (Appendix K). structure review, consultation, preliminary Groundwater modelling for the Project (Appendix B) hazard analysis, rehabilitation and has considered the Tahmoor South Coal Project. environmental management and monitoring);

Other Regional Operations • Mine Subsidence Engineering Consultants (MSEC) (subsidence predictions and impact Potential interactions with other major developments assessment); in the region are usually limited to shared use of supporting contractors, contributions to regional • HydroSimulations (groundwater assessment traffic movements and socio-economic effects on and numerical groundwater modelling); the region. • Watershed HydroGeo (hydrogeological data review); Petroleum and Gas Projects • Hydro Engineering & Consulting Pty Ltd (HEC) The Camden Gas Project is located throughout the (surface water assessment and site water Macarthur region of NSW and operates within balance); Campbelltown and Wollondilly LGAs, approximately • Niche Environment and Heritage (Niche) 65 km south-west of Sydney (AGL Upstream (baseline flora and fauna surveys, biodiversity Investments, 2017). assessment report and biodiversity offset strategy, Aboriginal cultural heritage It is unlikely that any material cumulative impacts assessment, historical heritage assessment); would arise for the Project from the gas extraction and production activities being undertaken by the • GTA Consultants (road transport assessment); Camden Gas Project. • Ramboll Australia Pty Ltd (Ramboll) (air quality and greenhouse gas assessment); 1.3 SECRETARY’S ENVIRONMENTAL • Renzo Tonin & Associates (noise and blasting ASSESSMENT REQUIREMENTS assessment);

The SEARs for the Project were originally issued by • Elliott Whiteing (social impact assessment); the DPE on 6 February 2017, with supplementary SEARs issued on 9 May 2017 (EPBC Act • Cadence Economics (economic assessment); requirements). The SEARs were reissued for the • JBS&G Australia Pty Ltd (JBS&G) (land Project, with the final SEARs (Attachment 1) dated contamination assessment); 18 September 2018. • AXYS Consulting Pty Ltd (facilitation of environmental risk assessment); and

• Minter Ellison (legal review).

Section 1 1-17 Dendrobium Mine – Plan for the Future: Coal for Steelmaking – Environmental Impact Statement

Table 1-3 Secretary’s Environmental Assessment Requirements – Reference Summary1

Summary of EIS Requirements EIS Reference General Requirements The EIS must include: • Form requirements in clause 6 of Schedule 2 of the EP&A Regulation. Front of EIS and Attachment 3 • Content requirements in clause 7 of Schedule 2 of the EP&A Regulation. Refer to Table 1-4 • An executive summary. Executive Summary • Description of the Project, including: • historical mining operations at the Dendrobium Mine and in the region; Section 2 • resource to be extracted; Section 3 • mine layout and scheduling; Section 3 • minerals processing and transportation; Section 3 • infrastructure and facilities; and Section 3 • interaction of the Project with the Dendrobium Mine and other existing, Sections 1.1.7 and 1.1.8 approved and proposed mining operations. • A list of approvals that must be obtained before the Project can Section 4 commence. • A risk assessment of the potential environmental impacts, identifying key Section 6.1 and Appendix M issues. • A description of the existing environment. Section 6 • An assessment of the likely impacts of all stages of the Project, including Section 6 appropriate worst-case scenarios and consideration of any cumulative impacts. • A description of the measures that would be implemented to mitigate Sections 6, 7 and 8 and/or offset the likely impacts of the Project, and an assessment of: • whether these measures are consistent with industry best practice and represent the full range of reasonable and feasible mitigation measures that could be implemented; • the likely effectiveness of these measures, including performance measures where relevant; and • whether contingency measures (including Trigger Action Response Plans) would be necessary to manage any residual risk. • A description of the measures that would be implemented to monitor and Sections 6, 7 and 8 report on the environmental performance of the development if it is approved. • Consideration of alternatives, including development of the Area 3C and Section 9.2 Area 4 mining domains, the development of a mine plan that avoids key sensitive surface features, including swamps and water storage infrastructure, and the “do nothing” option. • Consideration of the Project against relevant environmental planning Section 4 and Attachment 6 instruments. • Justification of the Project, taking into consideration alternatives, the Section 9 suitability of the site for the Project, the economic, social, biophysical and environmental impacts of the project as a whole, and whether the Project is consistent with the objects of the EP&A Act. • A signed statement from the author of the EIS, certifying that the Front of EIS information contained within this document is neither false nor misleading. • An accurate estimate of the capital investment value of the Project. Attachment 8 • An accurate estimate of the jobs that would be created during each stage Attachment 8 of the Project.

Section 1 1-18

Dendrobium Mine – Plan for the Future: Coal for Steelmaking – Environmental Impact Statement

Table 1-3 (Continued) Secretary’s Environmental Assessment Requirements – Reference Summary1

Summary of EIS Requirements EIS Reference Specific Issues • Subsidence. Sections 6.3 to 6.11 and Appendices A to G • Water. Sections 6.5 to 6.9 and Appendices B to E • Noise. Sections 6.13 to 6.15 and Appendix J • Air. Sections 6.17 and 6.21 and Appendix I • Biodiversity. Sections 6.7 to 6.9 and Appendices D and E • Land. Section 6.4 and Attachment 6 • Rehabilitation and Final Landform. Section 7 • Heritage. Sections 6.10 and 6.11 and Appendices F and G • Transport. Sections 6.12 and Appendix H • Visual. Section 6.18 • Hazards. Section 6.22 and Appendix N • Waste. Section 3.11 • Social and Economic. Sections 6.19 and 6.20 and Appendices K and L Consultation • Description of the consultation that was carried out, identification of the Section 5 issues raised during this consultation and explanation of how these issues have been addressed in the EIS. 1 The complete version of the SEARs is presented in Attachment 1.

Table 1-4 Content Requirements of an EIS – Clause 7 of Schedule 2 of the EP&A Regulation

Summary of Clause 7 of Schedule 2 of the EP&A Regulation EIS Reference The EIS must include: • Summary of the EIS. Executive Summary • Objectives of the Project. Sections 1.1.3 and 9 • Analysis of any feasible alternatives to the Project, including the Section 9 consequences of not carrying out the Project. • Description of the Project. Section 3 • Description of the environment likely to be affected by the Project. Section 6 • The likely impacts on the environment of the Project. Section 6 • Description of the measures proposed to mitigate any adverse effects of Sections 6, 7 and 8 the Project on the environment. • A list of any approvals that must be obtained under any other Act or law Section 4 before the Project may lawfully be carried out. • Compilation (in a single section of the EIS) of the measures proposed to Section 8 mitigate any adverse effects of the Project on the environment. • The reasons justifying the carrying out of the development, activity or Section 9 infrastructure in the manner proposed, having regard to biophysical, economic and social considerations, including the principles of ESD.

Section 1 1-19

Dendrobium Mine – Plan for the Future: Coal for Steelmaking – Environmental Impact Statement

In addition to the above, peer review was Section 10 Lists the documents referenced in undertaken by the following specialists Sections 1 to 9 of this EIS. (Attachment 5): Section 11 Defines abbreviations, acronyms and terms used in Sections 1 to 9 • Dr Frans Kalf (groundwater); and of this EIS. • Emeritus Professor Thomas McMahon (surface water). Attachments to the main text are also provided as follows:

1.5 DOCUMENT STRUCTURE Attachment 1 Secretary’s Environmental Assessment Requirements. This EIS comprises a main text component and supporting studies, which include Appendices A Attachment 2 Cross Reference to Assessment through to P. An overview of the main text is Requirements Relevant to the presented below: EPBC Act. Attachment 3 Development Application Area Section 1 Provides an introduction to the and Real Property Descriptions. Project and this EIS. Attachment 4 Land Ownership and Section 2 Describes the history and Landholder Key. components of the approved Dendrobium Mine and the Attachment 5 Peer Review Letters. Cordeaux Colliery. Attachment 6 Relevant Environmental Planning Section 3 Describes the various components Instruments and Government and stages of the Project. Policies. Section 4 Outlines the strategic planning Attachment 7 Aquifer Interference Policy context and statutory provisions Considerations and Water relevant to the Project. Licensing Addendum. Section 5 Describes the consultation and Attachment 8 Capital Investment Value Estimate engagement undertaken in Report. relation to the EIS and ongoing Attachment 9 Community Information. community involvement. Attachment 10 JORC Statement. Section 6 Details the environmental assessment of the Project, Appendices A to P contain supporting information, including a description of the including a number of specialist reports: existing environment, an assessment of potential impacts Appendix A Subsidence Assessment. and a description of measures that would be implemented to avoid, Appendix B Groundwater Assessment. minimise, mitigate, offset, manage Appendix C Surface Water Assessment. and/or monitor the potential impacts of the Project. Appendix D Biodiversity Assessment Report and Biodiversity Offset Strategy. Section 7 Describes rehabilitation of the Project and mine closure. Appendix E Aquatic Ecology Assessment. Section 8 Provides a summary of the Appendix F Aboriginal Cultural Heritage proposed environmental Assessment. management, mitigation, Appendix G Historical Heritage Assessment. monitoring and reporting in relation to the Project. Appendix H Road Transport Assessment. Section 9 Describes how the project (when Appendix I Air Quality and Greenhouse Gas compared with other alternatives) Assessment. is in the public interest and balances impacts, strategic needs, Appendix J Noise and Blasting Assessment. and benefits. Appendix K Social Impact Assessment. Appendix L Economic Assessment.

Section 1 1-20 Dendrobium Mine – Plan for the Future: Coal for Steelmaking – Environmental Impact Statement

Appendix M Environmental Risk Assessment. Appendix N Preliminary Hazard Analysis. Appendix O Land Contamination Assessment. Appendix P Geological Structure Review.

Section 1 1-21