Second Avenue Subway Second Avenue Subway

Total Page:16

File Type:pdf, Size:1020Kb

Second Avenue Subway Second Avenue Subway Second Avenue Subway, New York Geotechnical Design and Construction Chu Ho Sc.D., P.Eng., M.ASCE Arup, New York TEAM • Owner & Program Manager • Design Consultant • Consultant Construction Manager 8. 5 miles of new subway 16 new stations 1 renovated station Yards for 28 trains 2 services, TT& Q Connection to existing Q line Transfers to 7 other rail lines Phase 2 Phase 1 Phase 4 (Existing) Lexington Ave/ 63rd Street Station Phase 3 Phase 1 – Construction In Progress 96th Street Station (Cut & Cover) 63rd Street/ 86th Street Station Lexington Ave Station (Rock Cavern) (Existing) 72nd Street Station (Rock Cavern) Phase 1 – Subway Alignment Geology Existing Tunnel (Existing) Lexington 72nd St 86th St 96th St Ave / Station Station Station 63rd St Station Subsurface Stratification Fill Organics Silty Sand Varved Silt/Clay Glacial Till Decomposed Rock Bedrock (Manhattan Schist) Rock Caverns and Tunnels Rock Tunnels Ground Level 45’-85’ Top of Rock 15’-70’ 6m (19’-99)”)ID ID 6. 75m (22’-1”) OD Steel Fiber Reinforced Concrete Lining TBM Tunneling • Hard rock TBM drives • Abrasive rock • Faults and shear zones • Curve towards 63rd Street (616’ Min Radius) • Water-bearing fissures • Final lining omitted through future cavern zones Soft Ground Conditions 92nd Street 93rd Street 94th Street Top of rock 96th Street Station (Cut and Cover) 96th St Station (Existing) Lexington Ave / 72nd St Station 86th St Station 63rd St Station Subsurface Stratification Fill Organics Silty Sand Varved Silt/Clay Glacial Till Decomposed Rock Bedrock (Manhattan Schist) 96th Street Station (Cut and Cover) TBM Launch Shaft 92nd Street 93rd Street Entrance 2 (Temporary secant pile wall) (Slurry wall) Permanent station slurry wall Entrance 2 Ancillary 1 (Slurry wall) (Permanent secant pile wall) Entrance 3 Ancillary 2 (Slurry wall) (Permanent secant pile wall) Existing Tunnel Link to Existing Tunnel (Temporary Secant pile wall) TEMPORARY SECANT PILE WALLS AT TBM LAUNCH BOX West Typical East Design Profile Fill Sand Decomposed rock Sound Rock (TCR > 50%) Cast-in place Box PERMANENT SLURRY WALLS FOR STATION BOX Typical East Design Profile Fill Organics Silty sand Varv ed Silt and Clay Typically: 1. Water level maintained 2ft below bottom of excavation 2. Required factor of safety for bottom failure is 1.2 3. Hydrostatic pressure imposed for 25ft below water level below excavation in varved silt/clay Typical Slurry Wall Panel • 42 inches thick 20 feet long • Maximum depth 100 feet • Water Stop between Panels • Couplers for mezzanine and roof slabs PERMANENT SECANT PILE WALLS AT ANCILLARY BUILDING 1 PERMANENT SECANT PILE WALLS AT ANCILLARY BUILDING 2 Plaxis Model Typically: • Roof and base slab are fixed; mezzanine slab is pinned BttBottom 5ftf5ft of sl urry wall lli is unre ifinforce d • Building loads are applied 10ft beloground surface at basement level Wall Deformations West Wall Deflection East Wall Deflection 120 120 110 Stage 10: Excav to EL. 56.5 Long term 110 100 Stage 17: Backfill to G.S. 100 90 90 Stage 19: Apply LL+SDL on Roof, Mezz Bottom of 80 80 Stage 21: Long term K0 Condition EtiExcavation 70 70 60 60 50 50 levation (ft) levation (ft) E 40 E 40 30 30 20 20 10 10 -1 -050.5 0 050.5 1 151.5 2 252.5 3 353.5 4 454.5 5 -5 -454.5 -4 -353.5 -3 -252.5 -2 -151.5 -1 -050.5 0 050.5 1 Wall Deflection (in) Wall Deflection (in) Bending Moment Diagram West Wall Bending Moment East Wall Bending Moment 120 120 110 Excavation Excavation 110 Side Side 100 100 90 90 80 80 Stage 10: Excav to EL. 56.5 70 70 Stage 17: Backfill to G.S. Stage 19: Apply LL+SDL on 60 60 Roof, Mezz tion (ft) Stage 21: Long term K0 50 ation (ft) 50 aa Condition vv Stage 22: Unbalanced, East K0 40 40 Ele Elev Stage 23: Unbalanced Pressure 30 30 - West K0 Envelope 20 20 10 10 -800 -600 -400 -200 0 200 400 600 800 -800 -600 -400 -200 0 200 400 600 800 Working Bending Moment (kips-ft/ft) Working Bending Moment (kips-ft/ft) Shear Force Diagram West Wall Shear Force East Wall Shear Force 120 120 Excavatio Excavatio 110 n Side n Side 110 100 100 90 90 80 80 70 70 60 Stage 10: Excav to EL. 56.5 60 Stage 17: Backfill to G.S. ation (ft) ation (ft) vv 50 vv 50 Stage 19: Apply LL+SDL on Roof, Mezz Ele 40 Stage 21: Long term K0 Condition Ele 40 Stage 22: Unbalanced, East K0 30 30 Stage 23: Unbalanced Pressure -West K0 20 20 Envelope 10 10 -80 -60 -40 -20 0 20 40 60 80 100 -80 -60 -40 -20 0 20 40 60 Working Shear Force (Kips/ft) Working Shear Force (Kips/ft) Ground Displacements Vertical Movement 10ft Below Ground Surface 0.5 0.0 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 )) -0.5 -1.0 Settlement from wall installation al Movement (in al Movement cc -151.5 Hor izon ta l Movemen t 10ft Be low Groun d Sur face Towar ds Bottom of Excavation (w/o movement by Excavation wall install) Verti 1.0 Bottom of Excavation -2.0 (with movement by wall install) 0.8 End of Construction (w/o movement by -2.5 wall install) 0.6 Left Wall Right Wall ) X (ft) nn 0.4 0.2 0.0 -160 -140 -120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120 140 160 -0.2 tal Movement tal Movement (i nn -0.4 Bottom of Excavation -0.6 Horizo End of -0.8 Construction -1.0 Left Wall Right Wall X (ft) Jet Grouting for Excavation Support Plaxis Model Wall Deformation South Wall Deflection North Wall Deflection 120 120 110 110 100 100 90 90 80 80 70 70 60 60 Elevation (ft) Elevation 50 Stage 13: Excav to EL. 61 (ft) Elevation 50 40 40 Stage 15: Excav to EL. 42.5 30 30 20 Stage 19: Remove S5 20 10 10 0 0 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 -5 -4.5 -4 -3.5 -3 -2.5 -2 -1.5 -1 -0.5 0 0.5 1 -10 -10 Wall Deflection (in) Wall Deflection (in) Bending Moment Diagram South Wall Working Bending Moment North Wall Working Bending Moment 120 120 Excavation 110 Side Excavation 110 Side 100 100 90 90 80 80 70 70 60 60 Elevation (ft) Elevation 50 50 Elevation (ft) Elevation Stage 13: Excav to EL. 61 Stage 13: Excav to EL. 61 40 40 Stage 15: Excav to EL. 42.5 30 Stage 15: Excav to EL. 42.5 30 20 20 Stage 19: Remove S5 Stage 19: Remove S5 10 10 Envelope Envelope 0 0 -400 -300 -200 -100 0 100 200 300 400 -400 -300 -200 -100 0 100 200 300 400 -10 -10 Working Bending Moment (kips-ft/ft) Working Bending Moment (kips-ft/ft) Shear Force Diagram South Wall Working Shear Force North Wall Working Shear Force 120 120 110 Excavation Excavation 110 Side Side 100 100 90 90 80 80 70 70 60 60 Elevation (ft) Elevation 50 50 Elevation (ft) Elevation 40 Stage 13: Excav to EL. 61 40 30 Stage 15: Excav to EL. 42.5 30 20 Stage 19: Remove S5 20 10 Envelope 10 0 0 -60 -40 -20 0 20 40 60 80 -80 -60 -40 -20 0 20 40 60 -10 -10 Working Shear Force (Kips/ft) Working Shear Force (Kips/ft) Ground Settlement Contours - XDISP Underpinning 1802 2nd Avenue Basement Predicted Ground Settlements Micropile elastic shortening settlement Underpinning Using Micropiles Micropile Detail • Working Load = 250 kips • Casing: 9-5/8ins OD 0.545ins thick, Fy = 80ksi • Reinforcing bar: 2.5ins diam Dyygwidag Threadbar, Fu = 250ksi • Grout: 5000psi • Centralizers at 10 ft c/c • Steel plate w/ nut: 18ins x 18inx 2ins thick, Fy = 50ksi • RkRock soc kt85iket: 8.5ins diam, 9ft long • Bond strength: 200psi Test Pile Sister bar strain gages levation, ft EE Tension Load Test Movement Symbol Measurement Location Reinforcement Bar Steel Casing Movement Symbol Measurement Location Reinforcement Bar Steel Casing Strain Measurements Strain Gauge Strain Gauge Symbol Strain Gauge ID Symbol Strain Gauge ID Elevation, ft Elevation, ft SG1 +1054.3 SG1 +1054.3 SG2 +69.3 SG2 +69.3 SG3 +32. 3 SG3 +32. 3 SG4 +24.3 SG4 +24.3 SG5 +21.3 SG5 +21.3 Pile Load Distribution Head % De si gn Applied Net Upward Symbol Load Load, kip Movement, in 25 39 0.11 50 99 0.26 75 162 0.41 100 228 0.57 125 290 0740.74 150 348 0.92 175 409 1.12 200 471 1.39 Rock Socket Bond Resistance fsu = 315.8 psi Side Elevation Symbol Resistance, Pile Interface Range, ft ksf +21.3' to 24.3' 45.48 Grout-Bedrock +24.3' to +27.1' 6.99 Grout-Bedrock fs,max = 46.5 psi Jet Grouting Trial Trial Site Existing Lexington Ave /63rd St Station Existing Tunnel 72nd St Station 86th St Station 96th St Station Jet Grouting Trial Site treet reet tt SS S th th 97 96 2nd Avenue Jet Grouting Trial Site Soil Stratification at Jet Grouting Trial Site Standard Penetration Test, N (blows/0.3m) 0 5 10 15 20 0.0 Fill WtWater Tbl27Table 2.7m 5.0 5.5m Organics 7.6 10.0 Silty Sand 15.0 17.7m epth (m) DD 20.
Recommended publications
  • Chapter 3: Description of Construction Methods and Activities A. INTRODUCTION
    Chapter 3: Description of Construction Methods and Activities A. INTRODUCTION This chapter describes the construction process for the Second Avenue Subway. Potential envi- ronmental impacts that could result from its construction, as well as mitigation measures to lessen their effects, are discussed in subsequent technical chapters. A preliminary sequencing plan for the proposed construction activities is also identified, although this plan could still change as engineering evolves and depending on the availability of funding. At this time, design of the Second Avenue Subway is still ongoing, and will continue to evolve over the next year. Consequently, this Final Environmental Impact Statement (FEIS) assesses the range of construction methods and activities that may be required, using a reasonable worst case approach throughout to describe potential impacts. In other words, where a variety of construction techniques could reasonably be used to build a particular project element, the method that would result in the worst overall impacts is the one that has been selected for analysis. The Second Avenue Subway would consist largely of twin tunnels with outside diameters of up to 23½ feet. (The tunnels described in the SDEIS would have had outside diameters of 21 feet.) Each tunnel would be approximately 8.5 miles long, running from East Harlem to Lower Manhattan. Sixteen new stations, numerous fan plants and ventilation cooling facilities, pumping stations, electrical power substations, new train storage yards, and various other elements would also be built. As described later in this chapter, where possible, construction would take place underground to minimize disruptions at the surface. Between approximately 92nd and 4th Streets (instead of 6th Street as described in the SDEIS), and again from Maiden Lane south, where Manhattan’s hard bedrock is relatively close to the surface, tunnels and stations would mostly be constructed underground in the rock, by one of several mining techniques.
    [Show full text]
  • 21 Ncac 58A .0104 Agency Agreements and Disclosure
    21 NCAC 58A .0104 AGENCY AGREEMENTS AND DISCLOSURE (a) Every agreement for brokerage services in a real estate transaction and every agreement for services connected with the management of a property owners association shall be in writing and signed by the parties thereto. Every agreement for brokerage services between a broker and an owner of the property to be the subject of a transaction shall be in writing and signed by the parties at the time of its formation. Every agreement for brokerage services between a broker and a buyer or tenant shall be express and shall be in writing and signed by the parties thereto not later than the time one of the parties makes an offer to purchase, sell, rent, lease, or exchange real estate to another. However, every agreement between a broker and a buyer or tenant that seeks to bind the buyer or tenant for a period of time or to restrict the buyer's or tenant's right to work with other agents or without an agent shall be in writing and signed by the parties thereto from its formation. A broker shall not continue to represent a buyer or tenant without a written, signed agreement when such agreement is required by this Rule. Every written agreement for brokerage services of any kind in a real estate transaction shall be for a definite period of time, shall include the broker's license number, and shall provide for its termination without prior notice at the expiration of that period, except that an agency agreement between a landlord and broker to procure tenants or receive rents for the landlord's property may allow for automatic renewal so long as the landlord may terminate with notice at the end of any contract period and any subsequent renewals.
    [Show full text]
  • D. Rail Transit
    Chapter 9: Transportation (Rail Transit) D. RAIL TRANSIT EXISTING CONDITIONS The subway lines in the study area are shown in Figures 9D-1 through 9D-5. As shown, most of the lines either serve only portions of the study area in the north-south direction or serve the study area in an east-west direction. Only one line, the Lexington Avenue line, serves the entire study area in the north-south direction. More importantly, subway service on the East Side of Manhattan is concentrated on Lexington Avenue and west of Allen Street, while most of the population on the East Side is concentrated east of Third Avenue. As a result, a large portion of the study area population is underserved by the current subway service. The following sections describe the study area's primary, secondary, and other subway service. SERVICE PROVIDED Primary Subway Service The Lexington Avenue line (Nos. 4, 5, and 6 routes) is the only rapid transit service that traverses the entire length of the East Side of Manhattan in the north-south direction. Within Manhattan, southbound service on the Nos. 4, 5 and 6 routes begins at 125th Street (fed from points in the Bronx). Local service on the southbound No. 6 route ends at the Brooklyn Bridge station and the last express stop within Manhattan on the Nos. 4 and 5 routes is at the Bowling Green station (service continues into Brooklyn). Nine of the 23 stations on the Lexington Avenue line within Manhattan are express stops. Five of these express stations also provide transfer opportunities to the other subway lines within the study area.
    [Show full text]
  • October 5, 2016 Veronique Hakim President, New York City Transit
    UNITED STATES HOUSE THE NEW YORK THE NEW YORK THE COUNCIL OF THE OF REPRESENTATIVES STATE SENATE STATE ASSEMBLY CITY OF NEW YORK October 5, 2016 Veronique Hakim President, New York City Transit Metropolitan Transportation Authority 2 Broadway New York, NY 1004 Dear President Hakim, Please restore the M15 Select Bus Service at 72nd Street. The M15 Limited stopped at 72nd Street until it was phased out in favor of M15 Select Bus Service. With high bus-dependent populations, infrequent local service, crosstown bus service, hospitals, community support and opening of the Second Avenue Subway with a station at 72nd Street, now is the perfect opportunity to increase ridership by restoring M15 Select Bus Service at 72nd Street. 72nd Street Only Location Omitted from Select Bus Service When Select Bus Service was introduced to First and Second Avenues on the M15 route, Select Bus Stations replaced Limited Service stops in every location above Houston Street other than East 72nd Street. Since October 2010, residents living in the East 72nd Street area, for example at 73rd off York Avenue, now must choose between walking three avenues and six blocks, more than half a mile, to a Select Bus Service bus station at 67th or 79th Streets and Second Avenue, versus half that distance to 72nd Street. Walking more than half a mile in both directions is simply too far for many residents. High Concentration of Seniors and Children Need Select Bus Service at 72nd Street The neighborhood that would be served by a Select Bus Service station at 72nd Street includes Census Tracts in Manhattan number 124, 126, 132, and 134 spanning from 69th to 79th between 3rd Avenue and the East River with a population of 44,756, one of the highest near any Select Bus station: 8,679 or 32.7% of households include children (under 18) or seniors (65 and over) who may rely on bus service due to age: o 3,326 or 12.5% of households have children under 18 years-old.
    [Show full text]
  • The Case of the Second Avenue Subway Performing Organization: the City College of New York, CUNY
    front cover page.ai 1 8/20/2014 9:55:30 AM University Transportation Research Center - Region 2 Final Report The Politics of Large Infrastructure Investment Decision-Making: The Case of the Second Avenue Subway Performing Organization: The City College of New York, CUNY November 2013 Sponsor: University Transportation Research Center - Region 2 University Transportation Research Center - Region 2 UTRC-RF Project No: 49111-16-23 The Region 2 University Transportation Research Center (UTRC) is one of ten original University Transportation Centers established in 1987 by the U.S. Congress. These Centers were established Project Date: November 2013 with the recognition that transportation plays a key role in the nation's economy and the quality of life of its citizens. University faculty members provide a critical link in resolving our national and regional transportation problems while training the professionals who address our transpor- Project Title: The Politics of Large Infrastructure Invest- tation systems and their customers on a daily basis. ment Decision-Making: The Case of the Second Avenue Subway The UTRC was established in order to support research, education and the transfer of technology in the ield of transportation. The theme of the Center is "Planning and Managing Regional Project’s Website: Transportation Systems in a Changing World." Presently, under the direction of Dr. Camille Kamga, http://www.utrc2.org/research/projects/transportation- the UTRC represents USDOT Region II, including New York, New Jersey, Puerto Rico and the U.S. Virgin Islands. Functioning as a consortium of twelve major Universities throughout the region, mega-project-case-ny-2nd-ave-subway UTRC is located at the CUNY Institute for Transportation Systems at The City College of New York, the lead institution of the consortium.
    [Show full text]
  • Second Avenue Subway Phase 2 Profile
    Second Avenue Subway Phase 2 New York, New York New Starts Project Development (Rating Assigned November 2019) Summary Description Proposed Project: Heavy Rail 1.8 Miles, 3 Stations Total Capital Cost ($YOE): $6,390.31 Million (Includes $659.35 million in finance charges) Section 5309 CIG Share ($YOE): $2,000.00 Million (31.3%) Annual Operating Cost (opening year 2027): $91.82 Million 111,800 Daily Linked Trips Current Year Ridership Forecast (2017): 32,100,900 Annual Linked Trips 122,500 Daily Linked Trips Horizon Year Ridership Forecast (2035): 35,150,400 Annual Linked Trips Overall Project Rating: Medium-High Project Justification Rating: Medium-High Local Financial Commitment Rating: Medium-High Project Description: The New York Metropolitan Transportation Authority (MTA) proposes to extend heavy rail subway service along the East Side of Manhattan with the Second Avenue Subway Phase 2 project. The project is the second of four planned sections of the Second Avenue Subway, and will connect the northern end of Phase 1 at 96th Street to the Lexington Avenue Line at 125th Street. The project includes power substations, signal and communications systems, and car cleaning facilities. In the opening and horizon year, service is planned to operate every three minutes during weekday peak periods and every five minutes during weekday off-peak periods and every six minutes on weekends. The service is planned to operate 24 hours a day, seven days a week. Project Purpose: The Second Avenue Subway is intended to provide much needed transit access in Manhattan to East Side residents, workers, and visitors; reduce crowding on the nearly 100-year old Lexington Avenue Subway Line; and improve mobility for all New Yorkers.
    [Show full text]
  • May 12, 2020 Kate Perez Baywater Corbin Partners
    May 12, 2020 Kate Perez Baywater Corbin Partners, LLC 1019 Boston Post Road Darien, CT 06820 Town of Darien Architectural Review Board 2 Renshaw Road Darien, CT 06820 Follow up to: ARB #08 – 2020, Baywater Corbin Partners, LLC, CBD Zone and Corbin Subarea. Revisions to Proposed Buildings I, H, and K on the east side of Corbin Drive Dear Architectural Review Board Members: We sincerely appreciate your time in reviewing the height adjustments to the first three buildings of our Corbin project and value your guidance. We understand the height adjustments proposed have been approved and we are writing in response to two other suggestions that arose during our discussion related to 1) the residential entries on buildings H and K and 2) the building H storefronts. We have addressed those comments in the following drawings. First, we have re‐evaluated the residential entries on buildings K and H with an eye toward making those entries more solid than the glass entries originally proposed, and with a more markedly residential feel. The reconsidered entries for each building, and elevations shown at the 4/29/2020 ARB meeting, are attached here for your review. Second, there was a question about the rhythm and amount of storefront glass on the building H facade facing Corbin Drive. On a typical mixed‐use new development, the ground floor storefronts would be designed by the tenants of the various spaces. On building H, Beinfield Architects is designing the storefronts so we can ensure the best possible overall composition. Beinfield has made a few adjustments to the storefronts to adjust the rhythm and increase the amount of non‐glass surface.
    [Show full text]
  • Jfk Tearsheet Map 17X11 4-16F
    V Va n John F. Kennedy International Airport A a Ai n W Legend ir rT W Tr y N ra yc ai ck n MMTATA NNYCYC TBusransit Bus in k E John F. Kennedy International Airport T x To E o xp J w MTA NYC Transit Subway Blvd a p M TA NYC Transit Subway ay J aw am wy Express Bus to Manhattan ma y Express Buses to Manhattan ai 1 JFK Plaza c 1 5 i Fairfield Inn and LaGuardia Airport a 5 and LaGuardia Airport Rock c 0 Hotel Fairfield Inn 0 a EXITEXIT 20 20 by Marriott G S G S by Marriott S u Rental Car, Hotel t u Rental Car, Hotel St t JFK Inn R y a Hampton JFK Inn y Hampton Rockawayockawa Blvdy and Cargo Area Shuttles t R and Cargo Area Shuttles at Courtyard R d Courtyard d Rockaway Blvd i InnInn to HolidayHoliday Inn Inn Express Express v v B Rockaway Blvd l B i byby Marriott Marriott l r Eastern Rd Taxi Pick Up Area on B r e Taxi Pick Up Area B N 1 e 130 St w n BestBest B s s w 3 vvee DaysDays Inn Inn lvd r A r e 0 St A WesternWestern e Airport Plazas - 55 e e r Hotels 1133 HiltonInternational New York r ComfortComfor Innt Inn & &Suites Suites m m B Food, gas, truck parking r r B 254 255 JFKJFK Hotel Hotel vee l 256 AAv a a l v t F F v d Parking iit d P u 257 Hotels EXIT 2 CrowneDoubletree Plaza nd Nassau Expwy Four oondu Kiss & Fly Pointsoiintsn CC Hiltonton tthh P Parking Soouu PA Medical AMBAM CargoB Cargo Bldgs Bldgs Garden Inn S Gardenrdenen InnInnn 262262 N.
    [Show full text]
  • Second Avenue Subway: 63Rd Street Station
    Supplemental Archaeological Assessment Second Avenue Subway: 63rd Street Station New York, New York Prepared for: Metropolitan Transportation Authority New York City Transit New York, NY Prepared by: AKRF, Inc. 440 Park Avenue South New York, New York 10016 July 2009 Management Summary SHPO Project Review Number: 05PR00975 Involved Agencies: Metropolitan Transportation Authority, New York City Transit, and the Federal Transit Administration Phase of Survey: Supplemental Phase 1A Archaeological Assessment Project Location: East 63rd Street between Second and Park Avenues and Third Avenue between East 63nd and East 64th Streets Minor Civil Division: 06101: Manhattan County: New York County Location Information: Survey Area Length: Approximately 1200 feet (365.76 meters) Survey Area Width: Variable; between approximately 60 feet (18.28 meters) and 470 feet (143.25 meters) Number of Acres Surveyed: Approximately 2.6 USGS 7.5 Minute Quadrangle Map: Central Park Report Author: Elizabeth D. Meade, RPA Date of Report: July 2009 Table of Contents Chapter 1: Introduction .............................................................................................................................................. 1 A. Project Overview and Background................................................................................................................... 1 B. Previously Analyzed Portions of the 63rd Street APE ..................................................................................... 1 C. Research Goals and Methodology ...................................................................................................................
    [Show full text]
  • Chapter 2: Project Alternatives
    Chapter 2: Project Alternatives A. INTRODUCTION Numerous alternatives have been developed and analyzed for a new Second Avenue Subway since the project was first conceived nearly 75 years ago. Although routes continued to evolve during those seven decades, three major plans were developed: a 1929 plan with an alignment under Second Avenue and Water Street, 1940s plans with a similar alignment to the 1929 plan but with additional connections to the Nassau Street Line and the Manhattan Bridge, and a 1968 plan (also along Second Avenue and Water Street), which was partially constructed in East Harlem and the Lower East Side in the late 1970s before construction was suspended because of New York City’s fiscal situation at the time. Most recently, MTA/NYCT undertook an extensive Major Investment Study (MIS) and Draft Environmental Impact Statement (DEIS), published in 1999, that analyzed a wide range of possible alternatives to ease transit problems on Manhattan’s East Side. That study, known as the Manhattan East Side Transit Alternatives (MESA) Study, was undertaken in compliance with the National Environmental Policy Act (NEPA) and the MIS process established by the Intermodal Surface Transportation Efficiency Act (ISTEA), now the Transportation Efficiency Act for the 21st Century (TEA-21). For more information on the process and the extensive public outreach effort for the MESA Study, see Chapter 4, “Public Outreach and Review Process.” The MIS/DEIS evaluated a large number of possible alternatives, considering the project’s goals and objectives,
    [Show full text]
  • Development of the New York City Rail System
    Feature Evolution of Urban Railways Development of the New York City Rail System Peter Derrick New York City has the most extensive was planned and implemented in four constructed largely with funds provided rapid transit system in the world, with stages: (1) the original, solely elevated by the City of New York, and was 1142 track-km on 390 route-km. For more networks in Manhattan, The Bronx and municipally owned. The lines of stages 2 than a century before the completion of Brooklyn, late 1860s to 1890s; (2) the first and 3 were leased to two private companies the last major new subway line in 1940, subway, 1890–1908; (3) the Dual System, for operation until 1940. In 1940, all the the fundamental purpose of all public 1902–1931; and (4) the Independent subways in New York City were unified into transportation in New York—streetcar, System, 1920–1940. The periods overlap one publicly operated system. Since then, elevated railway and subway—was to because planning for new lines began two former railroad lines have been accommodate the city’s rapid population before construction was completed on the incorporated into the rapid transit network, growth. As the number of inhabitants in lines of the previous stage of development. one in 1941, the other in 1956. A massive what is now New York City rose steadily During each of these stages, final expansion program begun in 1968 has had from 391,000 in 1840 to 7.455 million in decisions on route configuration, only limited success, as most available 1940, each addition to the transit network financing and terms of operation of new capital funds have been needed to revitalize opened up new territory for residential rapid transit lines were made only after the existing system.
    [Show full text]
  • Student Metrocard ® Two Ways to Pay Before You Board 2
    ® Student MetroCard Two Ways to Pay Before You Board 2. Coin Fare Collector Other travel tips: Use this machine if you have a Half­Fare Can I make any transfer I want? Can I get off GET SCHOOLED 1. MetroCard Fare Collector Student MetroCard and your first trip is on a Select Bus Service changes the way buses the bus and then back on again? Select Bus. operate and makes your ride faster and more Use this machine if you have a Student MetroCard OR you have a Subject to applicable terms and conditions. Name (print) reliable. In addition to customers paying before Transfers from a local bus to a limited bus and Only valid for student named above on days when student's school is in session. Half­Fare Student MetroCard that Pay your fare with coins, exact Student Transportation they board, this service features dedicated bus from a limited bus to local buses are allowed in Valid Monday to Friday, you swiped on a previous bus change only. 5:30 a.m. until 8:30 p.m. S lanes, enforcement against traffic violators, The 01-23-4567 The the same direction. You can’t get back on the Grades K-6 before getting on the Select Bus. The machine doesn’t take dollar Subject to applicable terms and conditions. Name (print) cameras that catch illegally parked cars and Only valid for student named above on days when student's school is in session. same bus you started on, though. bills, half­dollars, or pennies. Student Transportation trucks, and traffic signal priority, all contributing to Valid Monday to Friday, There are also some other bus transfers that are 5:30 a.m.
    [Show full text]