What Is the Stuttgart–Ulm Rail Project?

Total Page:16

File Type:pdf, Size:1020Kb

What Is the Stuttgart–Ulm Rail Project? WHAT IS THE STUTTGART–ULM RAIL PROJECT? INFRASTRUCTURE FOR THE FUTURE, THE NEW MAIN STATION, FACTS AND FIGURES. OVERVIEW 03 AUGMENTED REALITY EXPERIENCE 20 THE PROJECT VIRTUALLY 1. DOWNLOAD THE FREE “ITS-BROSCHÜRE” APP FROM THE APP STORE OR GOOGLE PLAY. 2. SELECT THE “SCANNEN” MENU ITEM. 3. SCAN PAGES WITH THE AUGMENTED REALITY SYMBOL 15 AND VIEW DIGITAL CONTENT. THE 10 PROJECT AT A GLANCE 04 THE STUTTGART–ULM RAIL PROJECT 06 INFRASTRUCTURE FOR THE FUTURE 10 THE NEW MAIN STATION 14 FAST AND DIRECT TRAVEL 16 THE ROSENSTEIN QUARTER 18 BWEGT – PUBLIC TRANSPORT FOR THE FUTURE 20 AN EFFICIENT S-BAHN SERVICE FOR THE REGION 22 “DEUTSCHLANDTAKT” AND DIGITAL HUB 24 SUSTAINABILITY 26 CONSTRUCTION PROCESS AND LOGISTICS 28 FACTS AND FIGURES 0 32 FURTHER INFORMATION 34 PUBLISHING INFORMATION STUTTGART–ULM RAIL PROJECT STUTTGART–ULM RAIL PROJECT 04 05 Thanks to shorter journey times, the economic THE STUTTGART–ULM RAIL PROJECT TWO SUB-PROJECTS, centres of Stuttgart, Ulm and Munich are CONSISTS OF TWO SUB-PROJECTS: growing closer together. A HOST OF BENEFITS STUTTGART 21 AND THE NEW WENDLINGEN–ULM SECTION. The owner of the Stuttgart–Ulm Rail Project is Deutsche Bahn, which is tackling the project Around 120 kilometres of new track are together with its partners. These are: being built. THE FEDERAL REPUBLIC OF GERMANY The Stuttgart–Ulm Rail Project will bring THE STATE OF BADEN-WÜRTTEMBERG tremendous changes and improvements for THE STATE CAPITAL OF STUTTGART WHAT IS THE Stuttgart and the State of Baden-Württem- THE VERBAND REGION STUTTGART AND berg. 75 percent of people in Baden-Württem- STUTTGART AIRPORT. berg live in rural districts which will benefit from reduced journey times and a greater The project is also being funded by the Euro- number of direct connections. The Stuttgart– pean Union through the federal government. STUTTGART– Ulm Rail Project is also boosting the region’s economy. It will create thousands of new jobs. Not only during the construction period, but also beyond. The project is encouraging ULM RAIL investment and bringing money to the region. Göppingen PROJECT? FILS Geislingen NECKAR BRIDGE CANNSTATT (355 M) TUNNEL BAD CANNSTATT (3,507 M) Bad STATION Cannstatt UNTER- UNTERTÜRKHEIM ROSENSTEIN TÜRKHEIM TUNNEL TUNNEL HOLDING (1,080 M) (1,170 M) SIDINGS Untertürkheim MITTNACHTSTRASSE Obertürkheim Feuerbach S-BAHN STATION STG CITY S-BAHN TUNNEL (1,157 M) Esslingen AICHELBERG FILS FEUERBACH OBERTÜRKHEIM TUNNEL TUNNEL TUNNEL (5,730 M) (252 M) (3,026 M) Stuttgart STUTTGART FILDER TUNNEL MAIN STATION (9,468 M) TUNNEL UNDER MERKLINGEN IMBERG A8 MOTORWAY TUNNEL TUNNEL (173 M) (394 M) (499 M) FREIGHT TRAIN Wendlingen CONNECTION am Neckar Kirchheim DANUBE unter Teck A8 MOTORWAY TUNNEL KÖRSCH BOSSLER TUNNEL FILSTAL BRIDGE (378 M) (8,806 M) (485 M) AIRPORT CURVE TUNNEL (1,547 M) DENKENDORF TUNNEL ALBVORLAND TUNNEL (768 M) (8,176 M) THIRD TRACK STATION STEINBÜHL TUNNEL WIDDERSTALL MERKLINGEN ALBABSTIEG TERMINAL STATION (4,847 M) TUNNEL REGIONAL TUNNEL (963 M) STATION* (5,940 M) OBERBOIHINGEN WENDLINGEN Filderstadt TUNNEL TUNNEL (494 M) (755 M)* Ulm Neu-Ulm Stuttgart Airport ROHR CURVE NEW LINE Nürtingen NEW LINE NEW LINE TUNNEL EXISTING LINE MOTORWAY STATION DANUBE BRIDGE UNDERPASS ULM MAIN (125 M) TUNNEL NECKAR STATION (173 M) * Wendlingen Tunnel and Merklingen regional station are not part of the project and were N 10 KM BERGHAU STUTTGART AIR- planned and financed subsequently. TUNNEL PORT LONG-DIS- (446 M) TANCE RAILWAY TUNNEL (2,207 M) Stuttgart 21 | New Wendlingen–Ulm section ITS PROJECTITS NFRASTRUCTURE INFRASTRUCTURE INFRAS INFRASTRUCTURE INFRASTRUC INFRASTRUCTURE FOR THE FUTURE INFRASTRUCTURE FOR THE FUTURE 06 07 STUTTGART 21: FOUR STATIONS AND AROUND 57 KILOMETRES OF NEW TRACKS. The Stuttgart 21 project goes far beyond the To support Stuttgart 21, Stuttgart-Vaihingen high-profile remodelling of the main station. station is being extended into a regional The entire Stuttgart rail hub will be restruc- train station. tured. In the process, the rail network will be expanded. Around 57 kilometres of tracks are being laid for long-distance and regional trains THE NEW as well as S-Bahn traffic. In addition, four sta- MAIN STATION tions will be built as part of the project: AS THE CENTREPIECE THE MAIN STATION AS A THROUGH STATION The new Stuttgart Main Station is the centre- THE FLUGHAFEN/MESSE piece of the project. The terminus station will (AIRPORT/TRADE FAIR) STATION be converted into a through station. It will THE MITTNACHTSTRASSE lie at right angles to the present tracks at a S-BAHN STATION AND depth of about 11 metres. Around 50 points THE HOLDING SIDINGS AT will link the station’s eight platform tracks UNTERTÜRKHEIM. and eight through tracks. The new station has been designed to accommodate the doubling of passenger numbers compared to 2010. The envisaged “Deutschlandtakt” synchronized MANNHEIM, timetable will only be made possible thanks FRANKFURT, Fellbach COLOGNE, PARIS to trains being able to arrive and depart more Feuerbach SCHWÄBISCH quickly at the new station. The Stuttgart hub HALL, AALEN, Bad Cannstatt NUREMBERG will be Germany’s first digitally controlled hub. It will improve the rail service’s performance and punctuality. The above-ground tracks will HOLDING SIDINGS MITTNACHTSTRASSE S-BAHN STATION be removed when the new station is complete. STUTTGART MAIN STATION The freed-up land will be turned into a new Untertürkheim urban district: the Rosenstein Quarter. ESSLINGEN, TÜBINGEN, ULM, MUNICH, VIENNA AIRPORT/TRADE FAIR, Infrastructure for today, TÜBINGEN, ULM, MUNICH, VIENNA, ZURICH tomorrow and future generations Obertürkheim ITS PROJECTITS INFRASTRUCTURE FOR THE FUTURE INFRASTRUCTURE FOR THE FUTURE 08 09 Merklingen regional Danube Bridge TRACKSTRACKS TO BAD TO CANNSTATT OBERTÜRKHEIM AND FILSTAL BRIDGE (485 M) railway station (125 m) TO UNTERTÜRKHEIM HOLDING SIDINGS 1000 1000 900 Ulm Main Neu-Ulm 900 Stuttgart Main Station 800 Stuttgart Airport Station station 800 700 700 600 600 500 A8 MOTORWAY 500 400 TUNNEL (378 M) 400 300 300 200 AICHELBERG WIDDERSTALL MERKLINGEN 200 FEUERBACH TUNNEL FILDER TUNNEL DENKENDORF TUNNEL ALBVORLAND TUNNEL TUNNEL BOSSLER TUNNEL STEINBÜHL TUNNEL TUNNEL TUNNEL IMBERG TUNNEL ALBABSTIEG TUNNEL 100 (3,026 M) (9,468 M) (768 M) (8,176 M) (252 M) (8,806 M) (4,847 M) (963 M) (394 M) (499 M) (5,940 M) 100 1.5 1.1 1.2 1.3 A/B 1.4 2.1 2.2 2.3 2.4 2.5 Feuerbach Main Filder Tunnel Airport connection and Filder area to Alb Foreland Alb Ascent Alb Plateau Alb Descent Ulm feeder station Gäubahn feeder Wendlingen 2.1 A/B 2.1 C A1 A2 Wendlingen–Kirchheim Kirchheim– Ulm Danube Aichelberg Main Bridge Stuttgart 21 New Wendlingen–Ulm section Station FLOWING FLUGHAFEN/MESSE RAILWAY TRAFFIC (AIRPORT/TRADE FAIR) STATION: THE NEW TRAFFIC HUB The through station will have half as many platform tracks as the old terminus station. And yet, it will be able to handle more trains with fewer delays. A new station for long-distance and regional trains is being built between Stuttgart Airport THERE ARE THREE KEY REASONS FOR THIS: and the trade fair centre. Journey times from Trains entering and leaving the station will there to the main station in the city centre will no longer get in each other’s way. be reduced from 27 to 8 minutes. In future, it The number of incoming/outgoing tracks will also be possible to reach most regions of NEW WENDLINGEN– for long-distance and regional trains will rise Baden-Württemberg from the airport station from five to eight. without the need to change trains. ULM SECTION: In future, trains will be able to arrive and depart at 60 to 100 kilometres per hour. The present THIS WILL BENEFIT REDUCED JOURNEY speed limit is 30 to 40 kilometres per hour. ten million airline passengers per year, more than a million trade fair visitors TIMES, MORE A predominately underground railway ring will per year and connect the new station to the existing network. a quarter of a million people in the catchment CAPACITY Filstal Bridge New holding sidings will be built on railway area of the new station. at Mühlhausen premises in Untertürkheim. With the long-distance bus station and a light rail connection, a traffic hub will be created between rail, road and airspace. THE RAILWAY CROSSES THE RIVER NECKAR to 70 kilometres per hour on some sections AT WENDLINGEN. THIS IS WHERE THE NEW of the old line in order to cross the Swabian 60 KILOMETRE-LONG SECTION TO ULM BEGINS. Jura. In contrast, they will be able to travel at S-BAHN: THE NEW speeds of up to 250 kilometres per hour on MITTNACHTSTRASSE It connects directly to the high-speed line from the new line. Stuttgart to Wendlingen which is being STATION constructed as part of Stuttgart 21. Most of At present, the ICE from Stuttgart to Ulm takes the route to Ulm runs parallel to the A8 approximately an hour. In future, this will be The S-Bahn will also benefit from Stuttgart 21. motorway. Where this is not possible, the roughly halved. Journey times for regional Currently, it has to share the tracks with regional route passes through five long tunnels. trains will also be reduced from 60 to around trains. In future, these lines will be used exclusively 41 minutes. This includes stops at the airport by S-Bahn trains. Furthermore, the new Mittnacht- At around 85 metres, one of the highest and the new station in Merklingen. The new strasse S-Bahn station will serve the Rosenstein railway bridges in Germany is also being line will relieve the existing railway line. Quarter. It will also enable faster transfers between constructed in the Filstal valley at Mühl- Capacity will be freed up for regional trains Feuerbach and Bad Cannstatt.
Recommended publications
  • Liste Ambulante Pflegedienste Im Landkreis Göppingen
    Ambulante Pflegedienste im Landkreis Göppingen Stand Mai 2021/ Angaben ohne Gewähr Gemeinde Pflegedienst Kontakt Einzugsgebiet Bad Boll Diakoniestation Raum Bad Boll Telefon: Aichelberg, Bad Boll, Dürnau, Gammelshausen, Blumhardtweg 30 07164/2041 Hattenhofen, Zell unter Aichelberg. 73087 Bad Boll www.diakoniestation-badboll.de E-Mail: [email protected] Bad Überkingen Pflegedienst Mirjam Care GmbH & Co. Telefon: Bad Ditzenbach und Teilorte, Bad Überkingen KG 07331/951520 und Teilorte, Deggingen mit Reichenbach, Amtswiese 2 Drackenstein, Geislingen und Teilorte, 73337 Bad Überkingen E-Mail: Gruibingen, Hohenstadt, Kuchen, Mühlhausen, www.mirjam-care.de [email protected] Wiesensteig Böhmenkirch Pflegedienst Mirjam Care Böhmenkirch Telefon: Böhmenkirch und Teilorte, Donzdorf und GmbH 07332/9247203 Teilorte, Geislingen und Teilorte, Lauterstein Buchenstraße 44 89558 Böhmenkirch E-Mail: www.mirjam-care-boehmenkirch.de info@mirjam-care- boehmenkirch.de 1 Gemeinde Pflegedienst Kontakt Einzugsgebiet Deggingen Sozialstation Oberes Filstal Telefon: Bad Ditzenbach und Teilorte, Deggingen mit Am Park 9 07334/8989 Reichenbach, Drackenstein, Gruibingen, 73326 Deggingen Hohenstadt, Mühlhausen, Wiesensteig www.sozialstation-deggingen.de E-Mail: sozialstation-deggingen@t- online.de Donzdorf Sozialstation St. Martinus Telefon: Böhmenkirch und Teilorte, Donzdorf und Hauptstraße 60 07162/912230 Teilorte, Lauterstein 73072 Donzdorf www.sozialstation-donzdorf.de E-Mail: [email protected] Ebersbach Dienste für Menschen gGmbH Telefon:
    [Show full text]
  • SULP-POLICY-DOCUMENT-Stuttgart
    SULP POLICY DOCUMENT STUTTGART Version 2 Deliverable D.T3.2.7 04 2019 Table of Contents 1. THE SULPITER PROJECT ................................................................................................................... 2 2. THE SULP POLICY DOCUMENT ........................................................................................................... 2 2.1. HOW TO USE THIS TEMPLATE .......................................................................................................... 3 3. TRANSPORT POLICIES - STATE OF THE ART ANALYSIS ................................................................................ 3 4. URBAN FREIGHT TRANSPORT - STATE OF THE ART ANALYSIS ..................................................................... 5 5. SULP’S SPECIFIC OBJECTIVES .............................................................................................................. 6 6. MEASURES VS. DEMANDS ................................................................................................................. 6 6.1. REGULATORY MEASURES ................................................................................................................ 8 6.2. TECHNOLOGY ............................................................................................................................... 9 6.3. INFRASTRUCTURE DEVELOPMENT ....................................................................................................10 6.4. SERVICES....................................................................................................................................14
    [Show full text]
  • New Wendlingen–Ulm High-Speed Railway
    Stuttgart Ulm 7 Langenau Aalen The new Wendlingen–Ulm high-speed railway (NBS) PFA 2.1 Heiningen Amstetten Co-financed by the European Union PFA 1.4 represents a quantum leap forwards in rail transport in Baden- Württemberg. Together with Stuttgart 21, the infrastructure Trans-European Transport Network (TEN-T) Alb Foreland Hausen PFA 2.5 a1 PFA 2.5 a2 Filder area PFA 2.2 designed to carry trains at 250 km/h creates the basis for more Connecting Europe Facility Lonsee attractive journey times throughout Baden-Württemberg, to Wendlingen PFA 2.1 c Urspring Ulm Main Station Danube bridge at Ulm Plochingen Alb Ascent PFA 2.3 Westerstetten Germany and Europe. For example, the journey time for long- Aufhausen PFA 2.1 a/b Schlierbach distance trains between Stuttgart and Ulm will be practically Kirchheim– Bad Boll Deggingen Alb Plateau halved from 54 to 28 minutes – and even regional trains will Aichelberg PFA 2.5 PFA 2.5 Esslingen Wendlingen–Kirchheim in future whisk passengers between the two cities in only 41 Neckar 10 466 40,0* Ulm Neu-Ulm minutes. Together with Stuttgart 21, the Filder area, including Stuttgart Aichel- Beimerstetten Wernau berg Bad Ditzenbach Stuttgart airport and the exhibition grounds, will also be ide- 40,0* 8 297 Tunnel „Aichelberg rest PFA 2.4 ally accessible by rail. If nothing else, the existing track in the stop“ (253 m) PFA 2.5 b Nellingen Filstal valley will be noticeably relieved, creating capacity for 45,0 Gruibingen Gosbach Alb Descent additional rail traffic. Wendlingen Holz- 65,0 Scharenstetten Neu-Ulm 21 Kirchheim maden EÜ L 1214 10 Jesingen 8 am Neckar Ötlingen Weilheim Mühlhausen Tunnel Merklingen (394 m) Tomerdingen Neckar Bridge (136 m) 35,0 Dornstadt Half of the 60 km-long route runs through 9 tunnels; else- unter Teck an der Teck im Täle Temmen- 25,0 Goods train connection 75,0 where, it closely follows the A8 motorway.
    [Show full text]
  • Landeszentrale Für Politische Bildung Baden-Württemberg, Director: Lothar Frick 6Th Fully Revised Edition, Stuttgart 2008
    BADEN-WÜRTTEMBERG A Portrait of the German Southwest 6th fully revised edition 2008 Publishing details Reinhold Weber and Iris Häuser (editors): Baden-Württemberg – A Portrait of the German Southwest, published by the Landeszentrale für politische Bildung Baden-Württemberg, Director: Lothar Frick 6th fully revised edition, Stuttgart 2008. Stafflenbergstraße 38 Co-authors: 70184 Stuttgart Hans-Georg Wehling www.lpb-bw.de Dorothea Urban Please send orders to: Konrad Pflug Fax: +49 (0)711 / 164099-77 Oliver Turecek [email protected] Editorial deadline: 1 July, 2008 Design: Studio für Mediendesign, Rottenburg am Neckar, Many thanks to: www.8421medien.de Printed by: PFITZER Druck und Medien e. K., Renningen, www.pfitzer.de Landesvermessungsamt Title photo: Manfred Grohe, Kirchentellinsfurt Baden-Württemberg Translation: proverb oHG, Stuttgart, www.proverb.de EDITORIAL Baden-Württemberg is an international state – The publication is intended for a broad pub- in many respects: it has mutual political, lic: schoolchildren, trainees and students, em- economic and cultural ties to various regions ployed persons, people involved in society and around the world. Millions of guests visit our politics, visitors and guests to our state – in state every year – schoolchildren, students, short, for anyone interested in Baden-Würt- businessmen, scientists, journalists and numer- temberg looking for concise, reliable informa- ous tourists. A key job of the State Agency for tion on the southwest of Germany. Civic Education (Landeszentrale für politische Bildung Baden-Württemberg, LpB) is to inform Our thanks go out to everyone who has made people about the history of as well as the poli- a special contribution to ensuring that this tics and society in Baden-Württemberg.
    [Show full text]
  • Refugee and Migrant Labor Market Integration in Germany Status Update and Insights June 1 to August 21, 2017
    Refugee and Migrant Labor Market Integration in Germany Status Update and Insights June 1 to August 21, 2017 Table of Contents Highlights to Date 1 The Context, Opportunity, and Challenges 2 1. Potential for Global impact from Germany’s success 2 2. Germany is the “Silicon Valley” of Immigration – and it’s exciting! 3 3. National Challenges, played out at the regional and local Level 3 4. The Stuttgart Ausbildungscampus is a promising local model 3 5. Targets, metrics, and incentives not sufficiently focused on job placement 3 6. All of the programs are “succeeding”, but labor market integration is not yet succeeding 4 Summary of Deliverables Status 5 1. Serve Refugees 5 a. Get hands-on in job readiness and career coaching of refugees 5 b. Facilitate job placement of refugees 5 c. Evaluate appropriateness of UpGlo curriculum/program approach to Germany 5 2. Assess Potential Jobseeker Service Partners 6 a. Get to know the Community Foundation Stuttgart better and campus partners 6 b. Meet and observe programs of other potential partners in Stuttgart and beyond 6 c. Partnership conversations with expansion partners 6 3. Progress Conversations with possible Employer Partners 7 4. Assess Viability of UpGlo Platform to meet German market needs 8 a. Demo the platform for JobCenter/Arbeitsagentur (government) staff 8 b. Demo the platform (Online training only) for refugees 8 c. Decide go/no go to customize platform vs build new German one 8 d. If go, formulate list of customizations, based on feedback from demo participants 8 5. Assess and Evaluate Viability of Revenue Plan 9 a.
    [Show full text]
  • Ausgabe 47/2019
    STRAUBENHARDT Conweiler · Feldrennach · Langenalb · Ottenhausen · Pfinzweiler · Schwann Amts- und Mitteilungsblatt Herausgeber: Gemeinde Straubenhardt • Verantwortlich für die Veröffentlichungen im amtlichen Teil: Bürgermeister H. Viehweg, 75334 Straubenhardt • Tel (07082) 948616 • Fax (07082) 948641 • E-Mail: [email protected] • Druck und Verlag: Druckhaus Müller GmbH • Achim Müller • Bahnhofstraße 42-44 • 75305 Neuenbürg • Tel (07082) 94500 • Fax (07082) 945033 E-Mail: [email protected] Freitag, denden 30.22. JanuarNovember 2015 2019 Nr. 05 Nr. 47/2019 Einzelpreis:Einzelpreis: 1,00 0,75 E €,, Bezugspreis:Bezugspreis: jährlichjährlich 28,8022,20 E€ Achtung! Letzte Vollverteilung 2019 Unsere letzte Vollverteilung in Straubenhardt erscheint in KW 48/2019, am 29. November 2019. Es werden dann nahezu 4.850 Gemeindeblätter zur Verteilung kommen. Der Anzeigenannahmeschluss für diese Ausgabe ist ! Dienstag, 26. November 2019, 12.00 Uhr ÖFFNUNGSZEITEN: Mo., Di., Do., Fr.: 8.00 – 12.00 Uhr Servicezeiten der Telefonzentrale: Di.: 15.00 – 18.00 Uhr Montag: 8.00 – 12.00 Uhr Mi.: Geschlossen Dienstag: 8.00 – 12.00 Uhr Zusätzliche Öffnungszeiten des Bürgerbüros: Mittwoch: 8.00 – 12.00 Uhr Di. von 7.30 – 12.00 und 14.00 – 18.30 Uhr Donnerstag: 8.00 – 12.00 Uhr Do. von 14.00 – 16.00 Uhr Freitag: 8.00 – 12.00 Uhr Telefonzentrale 07082/948-50 Abteilung 3 Kinder, Jugend und Familie RATHAUS FELDRENNACH Abteilungsleiter Rouven Rudisile 07082/948-629 Bürgermeister Sachbearbeiterin/ Bürgermeister Helge Viehweg 07082/948-511
    [Show full text]
  • Amtliche Bekanntmachungen
    Nummer 17 Donnerstag 29. April 2021 Amtliche Bekanntmachungen 2.7 Veranschlagter Finanzierungs- mittelüberschuss /-bedarf (Saldo aus 2.3 und 2.6) von 1.530.125,00 Haushaltssatzung für das Haushaltsjahr 2021 2.8 Gesamtbetrag der Einzahlungen aus Finanzierungstätigkeit von 380.000,00 Auf Grund von § 79 der Gemeindeordnung für Baden-Würt- temberg hat der Gemeinderat am 23.02.2021 die folgende 2.9 Gesamtbetrag der Auszahlungen Haushaltssatzung für das Haushaltsjahr 2021 beschlossen: aus Finanzierungstätigkeit von - 493.400,00 § 1 2.10 Veranschlagter Finanzierungs- Ergebnishaushalt und Finanzhaushalt mittelüberschuss /-bedarf aus Der Haushaltsplan wird festgesetzt Finanzierungstätigkeit (Saldo aus 2.8 und 2.9) von - 113.400,00 1. im Ergebnishaushalt mit den folgenden Beträgen Euro 2.11 Veranschlagte Änderung des Finanzierungsmittelbestands, 1.1 Gesamtbetrag der ordentlichen Saldo des Finanzhaushalts Erträge von 11.667.810,00 (Saldo aus 2.7 und 2.10) von 1.416.725,00 1.2 Gesamtbetrag der ordentlichen § 2 Aufwendungen von - 12.683.575,00 Kreditermächtigung 1.3 Veranschlagtes ordentliches Ergeb- Der Gesamtbetrag der vorgesehenen nis (Saldo aus 1.1 und 1.2) von -1.015.765,00 Kreditaufnahmen für Investitionen und Investitionsförderungsmaßnahmen 1.4 Gesamtbetrag der außer- (Kreditermächtigung) wird festgesetzt auf 0 Euro ordentlichen Erträge von 2.488.000,00 § 3 1.5 Gesamtbetrag der außer- Verpflichtungsermächtigungen ordentlichen Aufwendungen von 0,00 Der Gesamtbetrag der vorgesehenen 1.6 Veranschlagtes Sonderergebnis Ermächtigungen zum Eingehen von Ver- (Saldo aus 1.4 und 1.5) von 2.488.000,00 pflichtungen, die künftige Haushaltsjahre mit Auszahlungen für Investitionen und 1.7 Veranschlagtes Gesamtergebnis Investitionsförderungsmaßnahmen belasten (Summe aus 1.3 und 1.6) von 1.472.235,00 (Verpflichtungsermächtigungen), wird fest- gesetzt auf 0 Euro 2.
    [Show full text]
  • Baumaßnahmen RB 16 Zwischen Ulm Und Stuttgart 21
    Baumaßnahmen RB 16 zwischen Ulm und Stuttgart 21. bis 25. März 2020 Aufgrund von Bauarbeiten im Abschnitt Geislingen (Steige) – Eislingen (Fils) vom 21.03. 23:00 Uhr – 25.03. 03:00 Uhr wird die Filstalbahn gesperrt. Aus diesem Grund wird es im genannten Zeitraum Änderungen hinsichtlich der Ankunfts- und Abfahrtszeiten zwischen Stuttgart und Ulm geben. Zwischen Geislingen (Steige) und Eislingen (Fils) findet außerdem ein Schienen-Ersatzverkehr statt! Weitere Informationen: https://www.go-ahead-bw.de/unterwegs-mit-go-ahead/fahrplanabweichungen.html Legende: entfällt spätere Lage SEV-Bus NEU SEV-Haltestellen Plochingen Bussteig 1 Reichenbach (Fils) Bahnhofsvorplatz Ebersbach (Fils) Bahnhofsvorplatz Uhingen Bahnhofsstraße Faurndau Stuttgarter Straße Göppingen Bussteig O und P Eislingen (Fils) Hauptstraße (Fils-Brücke) Salach Hauptstr. / Marktplatz Süßen Bussteig F Gingen (Fils) Mühlgasse Kuchen Hauptstr. „Löwen“ / „Heinkel“ Geislingen West Ecke Gutenbergstr. / Rheinlandstr. Geislingen (Steige) Bussteig F Baumaßnahmen RB 16 zwischen Ulm und Stuttgart 21. bis 25. März 2020 Legende: entfällt spätere Lage SEV-Bus NEU SEV-Haltestellen Plochingen Bussteig 1 Reichenbach (Fils) Bahnhofsvorplatz Ebersbach (Fils) Bahnhofsvorplatz Uhingen Bahnhofsstraße Faurndau Stuttgarter Straße Göppingen Bussteig O und P Eislingen (Fils) Hauptstraße (Fils-Brücke) Salach Hauptstr. / Marktplatz Süßen Bussteig F Gingen (Fils) Mühlgasse Kuchen Hauptstr. „Löwen“ / „Heinkel“ Geislingen West Ecke Gutenbergstr. / Rheinlandstr. Geislingen (Steige) Bussteig F Baumaßnahmen RB 16 zwischen Ulm und Stuttgart 21. bis 25. März 2020 Legende entfällt spätere Lage NEU SEV-Bus Go-Ahead Baden-Württemberg www.go-ahead-bw.de Kundenservice: +49 711 400 53444 Baumaßnahmen RB 16 zwischen Ulm und Stuttgart 21. bis 25. März 2020 SEV-Haltestellen Plochingen Bussteig 1 Reichenbach (Fils) Bahnhofsvorplatz Ebersbach (Fils) Bahnhofsvorplatz Uhingen Bahnhofsstraße Faurndau Stuttgarter Straße Göppingen Bussteig O und P Eislingen (Fils) Hauptstraße (Fils-Brücke) Salach Hauptstr.
    [Show full text]
  • Baden-Württemberg Exchange Program
    Baden-Württemberg Exchange Program Program Overview This program is a North Carolina Exchange program hosted by UNC Greensboro. In this unique program, North Carolina students have the chance to study at one of the Baden-Wuerttemberg Universities in Germany, and in exchange, Baden-Wuerttemberg students have the opportunity to study at one of the participating North Carolina public institutions. Program Facts Application & Eligibility Locations Program Dates *University of Mannheim (Mannheim) (Karlsruhe, Konstanz, Tübingen, and Hohenheim ) Heidelberg University (Heidelberg) Full Academic Year .................... Aug, Sept, or Oct to July *University of Hohenheim (Stuttgart) Spring .........................................Jan, Feb, or April to July *Karlsruhe Institute of Technology (KIT) (Karlsruhe) *University of Konstanz (Konstanz) Application Deadlines University of Stuttgart (Stuttgart) Fall/Academic Year ...................................... Mid-February *University of Tübingen (Tübingen) Spring ......................................................... Early October University of Ulm (Ulm) University of Freiburg *spring options Eligibility • (All but Mannheim) Minimum equivalency of two years of German Type of Program ............................................... Exchange • (Mannheim) Two years of German if taking German Program Dates classes • Must a degree-seeking student (Most Locations) • Have at least sophomore standing Full Academic Year ........................ October to September • Have at least a 2.75 cumulative GPA Spring
    [Show full text]
  • Inaugural Event for “Excellent“ Energy Research
    Press Release No. 044 | mhe | march 26, 2019 Inaugural Event for “Excellent“ Energy Research Official Opening of the CELEST Research Platform and POLiS Battery Cluster of Excellence 1. Bildunterschrift ( max. zweizeilig + Zeil e für Quellenangabe Launch of the Center for Electrochemical Energy Storage Ulm & Karlsruhe (CELEST), one of the biggest German research and development platforms in the area of electrochemical energy storage. Together with guests from politics, research, and indus- try, KIT, Ulm University, and the Center for Solar Energy and Hy- KIT Energy Center: Having future in mind drogen Research Baden-Württemberg (ZSW) celebrated the opening of the joint research platform and its first outstanding Monika Landgraf success: approval of the Cluster of Excellence on Post Lithium Chief Press Officer, Storage (POLiS) within the Excellence Strategy launched by the Head of Corp. Communications federal and state governments. Germany's largest electrochemical energy research platform was of- Kaiserstraße 12 ficially launched today, Tuesday, March 26: At the Center for Electro- 76131 Karlsruhe chemical Energy Storage Ulm & Karlsruhe (CELEST), researchers Phone: +49 721 608-21105 from various disciplines are developing high-performance and envi- Email: [email protected] ronmentally friendly energy storage systems – which are urgently Press contact: needed for a successful energy revolution and climate-friendly elec- tric mobility. The platform was co-founded by the Karlsruhe Institute Helmholtz Institute Ulm (HIU): of Technology (KIT), Ulm University, and the Center for Solar Energy Daniel Messling and Hydrogen Research Baden-Württemberg (ZSW). State Secretary Phone: +49 731 50 34013 of the Federal Ministry of Education and Research (BMBF), Christian [email protected] Luft, and Ministerial Director of the Ministry of Science, Research and the Arts Baden-Württemberg, Ulrich Steinbach, attended the inaugu- Karlsruhe Institute of Technology (KIT): ration ceremony at the Helmholtz Institute Ulm to honor the platform's Dr.
    [Show full text]
  • Herzlich Willkommen
    Herzlich Willkommen. AM ANFANG DER ALB. DIE STADT WENDLINGEN AM NECKAR. Inhaltsverzeichnis. DIE STADT WENDLINGEN AM NECKAR. Seite Seite Grußwort des Bürgermeisters. 1 Kulturelle Einrichtungen. 31 Kurzinfo. 2 Turn- und Sportstätten. 33 Ein Blick in die Geschichte. 3 Städtisches Freibad. 34 Stadtportrait. 5 Kinderspielplätze. 35 Branchenverzeichnis. 10 Ausstellungen. 35 Partnerstädte. 12 Märkte. 36 Geschenkideen der Stadt Wendlingen am Neckar. 14 Veranstaltungen. 37 Der Gemeinderat. 15 Lokale Agenda 21. 38 Behörden, Dienststellen, Einrichtungen. 16 Handels- und Gewerbeverein (HGV). 39 Leben in der Stadt. 17 Freizeittipps von A – Z. 40 Stadtverwaltung. 18 Gesundheitswesen. 41 Wegweiser der Stadtverwaltung. 20 Soziale Dienste. 45 Schulen. 28 Vereine. 48 Kindergärten. 29 Notrufe. U3 Kirchen. 30 Impressum. U3 U = Umschlagseite STADTMUSEUM WENDLINGEN AM NECKAR. Kirchstraße 4, 73240 Wendlingen am Neckar. Tel. 07024/46 63 40. Öffnungszeiten: Donnerstag, 16 bis 20 Uhr. Samstag, 14 bis 17 Uhr. Sonntag, 10 bis 12 Uhr und 14 bis 17 Uhr. Eintrittspreise: Erwachsene: 1 Euro. Kinder (unter 1 m): frei. STADTMUSEUMSchüler: 0,50 Euro. Gruppen: 0,70 Euro (ab 7 Personen). DIE STADT Grußwort des Bürgermeisters. WENDLINGEN AM NECKAR. Sehr geehrte Gäste der Stadt Wendlingen am Neckar, liebe Mitbürgerinnen und Mitbürger, ich heiße Sie in unserer Stadt sehr herzlich will- Einzelhandelsgeschäften, den Handwerkern, kommen. Dieser Willkommensgruß gilt gleicher- Gewerbetreibenden und Dienstleistern. Selbst- maßen allen Gästen wie allen Bürgerinnen und verständlich präsentiert sich Wendlingen am Bürgern der Stadt. Sie halten die Willkommens- Neckar auch als ein hervorragender Schul- broschüre der Stadt Wendlingen am Neckar in standort mit allen allgemeinbildenden Schulen Händen, die Ihnen viele wissenswerte und nütz- am Ort. Auch unsere Partner in Europa sollen liche Informationen zur Verfügung stellen soll.
    [Show full text]
  • Terminsliste Samstagstrauungen 2022
    Stand: 12.08.2021 Januar Februar März 15.01.2022 Stuttgart (Standesamt, StadtPalais) 05.02.2022 Stuttgart-Bad Cannstatt (Kleiner und Großer Kursaal) Stuttgart-Bad Cannstatt (Rathaus) 05.03.2022 Stuttgart (Standesamt, Stiftigung Geissstraße) Stuttgart-Vaihingen (Rathaus) 12.02.2022 Stuttgart-Untertürkheim (Rathaus) 12.03.2022 Stuttgart-Bad Cannstatt (Rathaus) 22.01.2022 Stuttgart-Bad Cannstatt (Kleiner und Großer Kursaal) 19.02.2022 Stuttgart (Standesamt, StadtPalais) Stuttgart-Botnang Stuttgart-Botnang Stuttgart-Bad Cannstatt (Rathaus) Stuttgart-Vaihingen (Alte Kelter) Stuttgart-Plieningen-Birkach Stuttgart-Vaihingen (Rathaus) Stuttgart-Weilimdorf 19.03.2022 Stuttgart (Standesamt, StadtPalais) 26.02.2022 Stuttgart-Botnang Stuttgart-Bad Cannstatt (Kleiner und Großer Kursaal) 29.01.2022 Stuttgart-Untertürkheim (Rathaus) Stuttgart-Weilimdorf Stuttgart-Degerloch 26.03.2022 Stuttgart-Vaihingen (Rathaus) Stuttgart-Wangen (Kelter) April Mai Juni 02.04.2022 Stuttgart-Vaihingen (Rathaus) 07.05.2022 Stuttgart (OutOfOffice) 04.06.2022 Stuttgart (Standesamt, Stiftung Geissstrasse) Stuttgart-Zuffenhausen Stuttgart-Bad Cannstatt (Kleiner und Großer Kursaal) Stuttgart-Vaihingen (Rathaus) Stuttgart-Münster 09.04.2022 Stuttgart (Standesamt, Marmorsaal) Stuttgart-Untertürkheim (Priesterhaus der Grabkapelle) 11.06.2022 Stuttgart (OutOfOffice) Stuttgart-Bad Cannstatt (Rathaus) Stuttgart-Vaihingen (Rathaus) Stuttgart-Bad Cannstatt (Rathaus, Theaterschiff) Stuttgart-Degerloch Stuttgart-Wangen (Kelter) Stuttgart-Hedelfingen 18.06.2022 Stuttgart (StadtPalais)
    [Show full text]