Merced Irrigation District

Total Page:16

File Type:pdf, Size:1020Kb

Merced Irrigation District 15746 Federal Register / Vol. 77, No. 52 / Friday, March 16, 2012 / Notices Issued in Washington, DC on March 12, composed of an intake, tunnel and to the project. However, MID is 2012. penstock; (6) a 94.5 feet-long, 108-inch- proposing to remove from the project, LaTanya R. Butler, diameter steel pipe from New but retain in operation outside the Acting Deputy Committee Management Exchequer power tunnel to Merced license, seven water delivery facilities, Officer. River north of New Exchequer which function, in part, to deliver water [FR Doc. 2012–6415 Filed 3–15–12; 8:45 am] powerhouse; (7) a semi-outdoor, above- to a wildlife refuge. MID is also BILLING CODE 6450–01–P ground, concrete powerhouse located at proposing capital improvements to the base of New Exchequer dam on the recreation areas at 5 existing recreation south side of Merced River; (8) a sites, as well as the development of a DEPARTMENT OF ENERGY switchyard located adjacent to New new non-motorized recreation area Exchequer Powerhouse and; (9) four along the west shore of Lake McClure. Federal Energy Regulatory developed recreation facilities (McClure l. Locations of the Application: A Commission Point, Barrett Cove, Horseshoe Bend, copy of the application is available for [Project No. 2179–043] and Bagby) with 515 camping units, 4 review at the Commission in the Public boat launch facilities, boat rentals, Reference Room or may be viewed on Merced Irrigation District; Notice of showers, 28 comfort stations, 3 the Commission’s Web site at http:// Application Tendered for Filing With swimming lagoons, 2 marinas, gas and www.ferc.gov using the ‘‘eLibrary’’ link. the Commission and Establishing oil service stations, 186 water-electrical Enter the docket number excluding the Procedural Schedule for Licensing and campsite hookups, washers and dryers, last three digits in the docket number Deadline for Submission of Final 117 picnic units and fish cleaning field to access the document. For Amendments stations. assistance, contact FERC Online McSwain Development—(1) McSwain Support at Take notice that the following Dam—located 6.3 River Miles [email protected] or toll- hydroelectric application has been filed downstream from New Exchequer dam, free at 1–866–208–3676, or for TTY, with the Commission and is available McSwain is an 80 feet-high (202) 502–8659. A copy is also available for public inspection. embankment structure, with a crest for inspection and reproduction at the a. Type of Application: New License. length of 1,620 feet and a crest elevation address in item (h) above. b. Project No.: 2179–043. of 425 feet; (2) an ungated concrete m. You may also register online at c. Date Filed: February 27, 2012. overflow spillway located in a flat ridge http://www.ferc.gov/docs-filing/ d. Applicant: Merced Irrigation on the southeast side of McSwain dam. esubscription.asp to be notified via District (MID). The spillway includes two sections: a email of new filings and issuances e. Name of Project: Merced River 150-feet-long section with a crest related to this or other pending projects. Hydroelectric Project. elevation at 402 feet, and a 475-feet-long For assistance, contact FERC Online f. Location: The existing project is section with a crest elevation at 400 feet; Support. located on the Merced River in Merced (3) McSwain Reservoir—a 4.8 mile long n. Procedural Schedule: The and Mariposa counties, California. The reservoir with a normal maximum water application will be processed according project would occupy 3,152.9 acres of surface elevation at 400 feet above mean to the following preliminary Hydro federal land managed by the Bureau of sea level, a gross storage capacity of Licensing Schedule. Revisions to the Land Management. 9,730 acre-feet of water, a surface area schedule may be made as appropriate. g. Filed Pursuant to: Federal Power of 310 acres, and a shoreline length of Act, 16 U.S.C. 791(a)–825(r). about 12.5 miles; (4) a diversion facility Milestone Target date h. Applicant Contact: Merced composed of an intake, conduit and Irrigation District, P.O. Box 2288, penstock; (5) a 160 feet-long, 96-inch Notice of Acceptance/Notice November Merced, CA 95344; Telephone (209) diameter steel pipe from the McSwain of Ready for Environ- 2013. 722–5761. power tunnel intake to Merced River mental Analysis (when i. FERC Contact: Matt Buhyoff, (202) FERC approved studies north of McSwain powerhouse. The are complete). 502–6824 or [email protected]. bypass releases directly into Pacific Gas Filing of recommendations, January 2014. j. This application is not ready for and Electric Company’s (PG&E) Merced preliminary terms and environmental analysis at this time. Falls reservoir (P–2467); (6) an outdoor, conditions, and fishway k. The Project Description: above-ground, concrete powerhouse prescriptions. The project consists of two located at the base of McSwain dam on Commission issues Draft EA July 2014. developments: the north side of the Merced River. The or EIS. New Exchequer Development—(1) Powerhouse releases directly into Comments on Draft EA or August 2014. New Exchequer Dam—a 490 feet-high PG&E’s Merced Falls reservoir; (7) a EIS. dam with a crest length of 1,220 feet and switchyard located adjacent to McSwain Modified Terms and Condi- November a crest elevation of 879 feet; (2) an ogee- tions. 2014. powerhouse, and; (8) one developed Commission Issues Final February 2015. type concrete spillway located about recreation facility with 99 camping EA or EIS. one mile north of New Exchequer dam units, 1 boat launch facility, boat in a saddle; (3) an earth and rock dike rentals, showers, 5 comfort stations, a o. Final amendments to the 62-feet-high and 1,500-feet-long, located swimming lagoon, marina, gas and oil, application must be filed with the in a saddle about 0.75 mile north of 65 water-electrical campsite hookups, Commission no later than 30 days from New Exchequer Dam; (4) Lake washers and dryers, 48 picnic units, a the issuance date of the notice of ready McClure—a reservoir formed by New concession store, and fish cleaning for environmental analysis. Exchequer dam with normal maximum stations. water surface elevation of 867 feet above The Merced River Project has a Dated: March 12, 2012. mean sea level, a gross storage capacity dependable capacity of 103.5 MW and Kimberly D. Bose, of 1,024,600 acre-feet, a surface area of an annual average generation of Secretary. 7,110 acres, and a shoreline length of approximately 385 gigawatt-hours. MID [FR Doc. 2012–6402 Filed 3–15–12; 8:45 am] about 82 miles; (5) a diversion facility is not proposing any structural changes BILLING CODE 6717–01–P VerDate Mar<15>2010 17:10 Mar 15, 2012 Jkt 226001 PO 00000 Frm 00030 Fmt 4703 Sfmt 9990 E:\FR\FM\16MRN1.SGM 16MRN1 mstockstill on DSK4VPTVN1PROD with NOTICES.
Recommended publications
  • Attachment 1 Credentials of Trlia Board of Senior Consultants
    ATTACHMENT 1 CREDENTIALS OF TRLIA BOARD OF SENIOR CONSULTANTS FAIZ I. MAKDISI, PH.D., P.E. PRINCIPAL ENGINEER EDUCATION SKILLS AND EXPERIENCE Ph.D., Geotechnical Dr. Makdisi’s 28-year career has combined applied research and Engineering, University of professional practice in geotechnical and foundation/earthquake California, Berkeley, 1976 engineering for commercial, residential, industrial, and critical M.Sc., Geotechnical structures. Recently he has focused on geotechnical studies and safety Engineering, University of evaluations of earth and rockfill dams, embankments, and landfills. His California, Berkeley, 1971 work includes feasibility evaluations and preliminary design studies; field investigation design and planning; borrow area material studies; in B. Eng., Civil, American situ and laboratory testing; and evaluation and interpretation of static University of Beirut: and dynamic material properties of dams and their foundations. Studies Lebanon, 1970 also included stability evaluations of embankment slopes, seepage analyses, and static and dynamic stress analyses to evaluate stability REGISTRATION during earthquakes. Professional Civil Engineer, He has performed studies to determine earthquake-induced permanent CA No. C29432, 1978 deformations in slopes and embankments, and developed and published Civil Engineer, Institute of widely used simplified procedures for estimating dynamic response and Civil Engineers, Lebanon, permanent deformations in earth and rockfill dams and embankments. 1970 He is a lead participant in earthquake ground motion studies and development of seismic design criteria for key facilities such as dams AFFILIATIONS and nuclear power plants. He was principal investigator of the “Stability American Society of Civil of Slopes, Embankments and Rockfalls” chapter of the Seismic Retrofit Engineers Manual for the Federal Highway Project being prepared for the National Earthquake Engineering Center for Earthquake Engineering Research.
    [Show full text]
  • System Reoperation Study
    System Reoperation Study Phase III Report: Assessment of Reoperation Strategies California Department of Water Resources August 2017 System Reoperation Study Phase III Report This page is intentionally left blank. August 2017 | 2 Table of Contents Chapter 1. Introduction .......................................................................................................................................................................................1 -1 1.1 Study Authorization ....................................................................................................................................................................................1 -1 1.2 Study Area ..................................................................................................................................................................................................1 -2 1.3 Planning Principles .....................................................................................................................................................................................1 -4 1.4 Related Studies and Programs...................................................................................................................................................................1 -4 1.5 Uncertainties in Future Conditions ............................................................................................................................................................. 1-6 1.5.1 Climate Change ..........................................................................................................................................................................1
    [Show full text]
  • STUDY of INCREASING CONVEY CAPACITY of MERCED RIVER at the CONFLUENCE with SAN JOAQUIN RIVER a Project Presented to the Faculty
    STUDY OF INCREASING CONVEY CAPACITY OF MERCED RIVER AT THE CONFLUENCE WITH SAN JOAQUIN RIVER A Project Presented to the faculty of the Department of Civil Engineering California State University, Sacramento Submitted in partial satisfaction of the requirements for the degree of MASTER OF SCIENCE in Civil Engineering (Water Resources Engineering) by Hani Nour SUMMER 2017 © 2017 Hani Nour ALL RIGHTS RESERVED ii STUDY OF INCREASING CONVEY CAPACITY OF MERCED RIVER AT THE CONFLUENCE WITH SAN JOAQUIN RIVER A Project by Hani Nour Approved by: __________________________________, Committee Chair Dr. Saad Merayyan __________________________________, Second Reader Dr. Cristina Poindexter, P.E. ___________________________ Date iii Student: Hani Nour I certify that this student has met the requirements for format contained in the University format manual, and that this project is suitable for shelving in the Library and credit is to be awarded for the project. _________________________, Department Chair ______________ Dr. Benjamin Fell, P.E. Date Department of Civil Engineering iv Abstract of STUDY OF INCREASING CONVEY CAPACITY OF MERCED RIVER AT THE CONFLUNENCE WITH SAN JOAQUIN RIVER by Hani Nour Flooding in California’s Central Valley is very common and expected to occur every year anywhere throughout the region. The climate and geography of the Central Valley, together, are responsible for over flow streams, rivers, and lakes causing water flooding, particularly at the lower elevation areas. San Joaquin Basin is located between the Sierra Nevada (on the east) and the Coast Ranges (on the west) where flooding is typically characterized by infrequent severe storms during winter season due to heavy rain and snow- melt runoff coming from the foothills, east of Merced County (Jesse Patchett 2012).
    [Show full text]
  • Bryan Kelly Director of Regulatory Compliance and Government Affairs, Water Merced Irrigation District
    Bryan Kelly Director of Regulatory Compliance and Government Affairs, Water Merced Irrigation District Testimony on H.R. 869 - To clarify the definition of flood control operations for the purposes of the operation and maintenance of Project No. 2179 on the Lower Merced River. Subcommittee on National Parks, Forests and Public Lands June 14, 2011 Chairman Bishop, Ranking Member Grijalva, and members of the Subcommittee, my name is Bryan Kelly and I am the Director of Regulatory Compliance and Government Affairs -Water for the Merced Irrigation District (MID). I am pleased to be offered this opportunity to testify in support of H.R. 869, legislation that would allow the Federal Energy Regulatory Commission (FERC) to consider proposed improvements to the spillway at New Exchequer Dam that will provide additional water supply to Merced County and the San Joaquin Valley of California. I’d like to begin by thanking Congressman Denham and the cosponsors of H.R. 869 for introducing this bipartisan bill that could improve the precarious water supply situation in California’s San Joaquin Valley without major environmental impact and at no cost to the federal government. The Merced Irrigation District is a California Public Agency under the California Irrigation District Law. MID owns, operates and maintains hydro-electric facilities on the Merced River, consisting of the New Exchequer Dam and Reservoir (Lake McClure) and McSwain Dam and Reservoir (Lake McSwain). They are located in the western foothills of the Sierra Nevada mountain range, approximately 23 miles northeast of the City of Merced. Lake McClure has a storage capacity of 1,024,600 acre feet, while Lake McSwain has a storage capacity of 9,730 acre feet and is operated principally as a regulating reservoir for MID’s hydroelectric generation facilities at New Exchequer Dam (FERC Project No.
    [Show full text]
  • Billing Code 6717-01-P
    This document is scheduled to be published in the Federal Register on 03/16/2012 and available online at http://federalregister.gov/a/2012-06402, and on FDsys.gov BILLING CODE 6717-01-P FEDERAL ENERGY REGULATORY COMMISSION Merced Irrigation District Project No. 2179-043 NOTICE OF APPLICATION TENDERED FOR FILING WITH THE COMMISSION AND ESTABLISHING PROCEDURAL SCHEDULE FOR LICENSING AND DEADLINE FOR SUBMISSION OF FINAL AMENDMENTS Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New License b. Project No.: 2179-043 c. Date Filed: February 27, 2012 d. Applicant: Merced Irrigation District (MID) e. Name of Project: Merced River Hydroelectric Project f. Location: The existing project is located on the Merced River in Merced and Mariposa counties, California. The project would occupy 3,152.9 acres of federal land managed by the Bureau of Land Management. g. Filed Pursuant to: Federal Power Act, 16 USC 791 (a)-825(r) h. Applicant Contact: Merced Irrigation District, P.O. Box 2288, Merced CA, 95344; Telephone (209) 722-5761 i. FERC Contact: Matt Buhyoff, (202) 502-6824 or [email protected] j. This application is not ready for environmental analysis at this time. k. The Project Description: The project consists of two developments: New Exchequer Development - (1) New Exchequer Dam - a 490 feet-high dam with a crest length of 1,220 feet and a crest elevation of 879 feet; (2) an ogee-type Project No. 2179-043 2 concrete spillway located
    [Show full text]
  • Sacramento River and San Joaquin River) San Joaquin River Or Proposed San Luis Drain Extension, Sacramento River
    FIGURES Selenium source Organic carbon-enriched sediment deposits Depositional environments Freshwater Seawater Geologic sources Coal Soils and Alluvium Oil Phosphorite Anthropogenic Power Generation Irrigation Refining Mining activity Pollutants Ash, Flue Gas Scrubbing Subsurface drainage Wastewater Tailings, runoff Kesterson NWR, San Francisco Blackfoot San Joaquin River, Receiving waters Belews Lake, Bay-Delta River watershed, (examples) North Carolina Tulare Basin, California Estuary, California Idaho scoter, scaup, coot, duck, grebe Species of bluegill, sunfish, sturgeon, splittail, trout, coot, horse, concern bass, bullhead avocet, stilt, sculpin, splittail, salmon flounder, salmon, sheep, elk, cow Dungeness crab Figure 1. Conceptual model of Se pollution with examples of source deposits, anthropogenic activities, receiving water bodies, and biota at risk. Bay-Delta Selenium Model Composite Source Load ¸ Composite Volume (oil refinery discharges, agricultural drainage via (Sacramento River and San Joaquin River) San Joaquin River or proposed San Luis Drain extension, Sacramento River Composite Freshwater Endmember Concentration (head of estuary) Transformation Phytoplankton, algae, bacteria Dissolved species Partitioning (Kd) suspended particulate material and bed sediment (selenate, selenite, organo-Se) (elemental Se, particulate organo-Se, adsorbed selenite/selenate) bioaccumulation prey clams zooplankton amphipods trophic transfer sturgeon splittail striped bass predators diving ducks flounder splittail effects Impaired reproduction, teratogenesis, selenosis Figure 2. Conceptual model describing linked factors that determine the effects of selenium on ecosystems. The sequence of relations links environmental concentrations to biological effects. The general term “bioaccumulation” can be applied to all of the biological levels of selenium transfer through the food web, but in this report we use the term explicitly in reference to particulate/invertebrate bioaccumulation. 122°30' 122°00' .
    [Show full text]
  • Oroville Dam Citizens Advisory Commission
    OROVILLE DAM CITIZENS ADVISORY COMMISSION Hosted by the California Natural Resources Agency ITEM 1: WELCOME AND INTRODUCTIONS ITEM 2: NOVEMBER MEETING RECAP AND UPDATES ITEM 3: U.S. ARMY CORP OF ENGINEERS BRIEFING USACE ROLE IN NORTHERN CA FLOOD CONTROL OPERATIONS 237 217 200 80 252 237 217 200 119 174 237 217 200 27 .59 255 0 163 131 239 110 112 62 102 130 255 Oroville0 Dam163 Citizens132 Advisory65 Commission135 92 102 56 120 255 Southside0 163 Oroville122 Community53 Center120 56 130 48 111 Oroville, CA February 21, 2020 Joe Forbis, P.E. Chief, Water Management Section Sacramento District, U.S. Army Corps of Engineers “The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.” AGENDA • USACE Sacramento District Overview • Authorities, Roles, and Responsibilities • Water Control Manuals – Folsom Example • Pilot Project - FIRO Spillway Fuse Gates at Terminus Dam SOUTH PACIFIC DIVISION SACRAMENTO DISTRICT FC PROJECTS 8 SACRAMENTO DISTRICT (SPK) WATER MANAGEMENT USACE – 14 Section 7 – 31 Total – 45 SPK RESERVOIR EXAMPLES Largest Reservoir Shasta Dam and Lake 4,500,000 acre-feet Smallest Reservoir Mountain Dell Dam and Reservoir 3,200 acre-feet FLOOD OPS PARTNERS • Irrigation Districts – Stockton East Water District • Flood Control Districts – Fresno Metro Flood Control District • Federal Water Masters – Truckee River Basin Reservoirs • Water Storage Districts – Tulare Lakebed • Government Agencies – DWR – USBR Black Butte Dam USACE AUTHORITY FOR FLOOD OPS • Section 7 of the Flood Control Act of 1944 (58 Stat.
    [Show full text]
  • Bowman South Dam Seismic Stability Analyses
    Nevada Irrigation District Staff Report for the Regular Meeting of the Board of Directors, August 14, 2019 TO: Honorable Board of Directors FROM: Keane Sommers, P.E., Hydroelectric Manager Dar Chen, P.E., G.E., Senior Engineer - Dam Safety DATE: August 7, 2019 SUBJECT: Bowman South Dam Seismic Stability Analyses HYDROELECTRIC RECOMMENDATION: Award a sole source contract in the amount of $225,581.30 to Quest Structures for the Bowman South Dam Seismic Stability Analyses, and authorize the General Manager to execute the necessary documents. BACKGROUND: Bowman South Dam is a 105-foot-high and 567-foot-long concrete arch dam built in 1927 in a small canyon south of Bowman North Rockfill Dam. Both of the dams form Bowman Lake, which stores and transmits water from 6 other reservoirs on Canyon Creek and the Middle Yuba River upstream to Canyon Creek and the Bowman- Spaulding Canal downstream. According to the Federal Energy Regulatory Commission (FERC) and the Division of Safety of Dams of California (DSOD), Bowman South is classified as an extremely-high-hazard dam due to the potential impacts on the downstream lives and properties in the case of its failure. It is approximately 15 miles west of the Mohawk Valley fault, which can generate up to a magnitude 7.3 earthquake. The last seismic stability analysis for the dam was performed in the mid-1990s. The study identified potential instabilities at the left abutment thrust block. Since then, the seismic criteria and the method of stability analyses have greatly evolved. Based on their dam safety inspections in 2012 and 2016, the FERC required Independent Consultants recommended that the District complete seismic stability analysis updates of the dam based on the latest seismic ground motions and methods of analysis, which include 3-D non-linear, dynamic, finite-element modeling of the dam.
    [Show full text]
  • Flood Damage Reduction Technical Appendix Flood Damage Reduction
    Flood Damage Reduction Technical Appendix Flood Damage Reduction UPPER SAN JOAQUIN RIVER BASIN STORAGE INVESTIGATION Initial Alternatives Information Report Flood Damage Reduction Technical Appendix TABLE OF CONTENTS Chapter Page CHAPTER 1. INTRODUCTION.................................................................................. 1-1 STUDY AREA .........................................................................................................................1-2 SURFACE WATER STORAGE MEASURES CONSIDERED IN THE IAIR ...........................1-3 OBJECTIVE OF THIS TECHNICAL APPENDIX ....................................................................1-5 ORGANIZATION OF THIS TECHNICAL APPENDIX.............................................................1-5 CHAPTER 2. EXISTING CONDITIONS ..................................................................... 2-1 HISTORICAL PERSPECTIVE OF FLOOD PROTECTION IN THE SAN JOAQUIN RIVER BASIN ......................................................................................................................2-1 DESCRIPTION OF EXISTING FLOOD MANAGEMENT FACILITIES ...................................2-3 Friant Dam and Millerton Lake ............................................................................................2-3 Hidden Dam and Hensley Lake...........................................................................................2-4 Buchanan Dam and H. V. Eastman Lake............................................................................2-4 Chowchilla Canal Bypass and Eastside
    [Show full text]
  • Merced Irrigation District Hydrologic and Hydraulic Operations (MIDH2O) Model September 05, 2018
    Merced Irrigation District Hydrologic and Hydraulic Operations (MIDH2O) Model September 05, 2018 Marco Bell, Merced Irrigation District Bibek Joshi, Dewberry Objective • Introduce HEC-RTS • Benefits of MIDH2O 2 | | MIDH2O September 05, 2018 MIDH2O Origins • 2015 USBR WaterSMART – Drought Resiliency Project Grant • MIDH2O is the Merced Irrigation District Hydrologic and Hydraulic Operations Model • MIDH2O is a tool to assist MID in the management of the Merced River flows, operation of New Exchequer Dam and regulate MID irrigation diversions. • MIDH2O can serve as a decision support tool for power generation and help link water and power operations to the hydro power market. • Based on HEC-RTS 3 | | MIDH2O September 05, 2018 Merced Irrigation District • Established in 1919 * • Store and distribute water for irrigation • Total irrigable lands in MID: 138,000 acres • 825 miles of water distribution facilities (earth lined, concrete lined channels and pipes) • Also provides water for domestic uses, provide flood control, hydroelectric power generation, and recreation • Provides water to approximately 2,200 farmers in Merced County and affordable electricity to 7,500 residences and business • Owns and operates New Exchequer and McSwain Dams, reservoirs and hydroelectric facilities * http://www.mercedid.com/index.cfm/about/history‐of‐the‐district/ 4 | | MIDH2O September 05, 2018 Merced Irrigation District 5 | | MIDH2O September 05, 2018 Merced River Watershed • Tributary of San Joaquin River • Drainage Area: 1,267 square miles (1,037 square
    [Show full text]
  • TABLE 1 SIMMARY of SPAWNING ESCAPEMENT in CENTRAL VALLEY 1953-1969 (In Thousands of Fish) Year Sacramento Mokelme San Joaquin and Tributaries and Cosumnes Wibutaries
    State of California The Resources Agency Department of Fish and Game KING SALMON (ONCORHYNCHUS TSHA~SCHA)SPAWNING s QCS OF THE CALIFOmIA CENTRAL VALLEY, 1953-1969 ,17' DONALD H. FRY, JR. AND ALEWER PETROVICH, JR. Anadromous Fisheries Branch SUMMARY This paper lists counts and estimates of king salmon (Oncorh scha) spawning escapements in the Sacramento-Sane Joaqu n R ver ==%-System om 1953 through 1969. Methods used are discussed. King salmon are the only salmon of any importance in Central Valley streams. Three basically different runs of king salmon enter the Valley; fall, spring and winter run. Fall-run fish are most numerous; they enter streams in the fall or winter and usually spawn within a few weeks of their arrival. Spring-run salmon are now the least numerous; they enter in the spring, spend the summer in the deeper holes and spawn in the fall. Winter-run fish are confined to the main stem of the Sacramento River, They enter in the winter and spawn from mid-spring to early sumner. Major changes in salmon streams since 1959 include a storage dam (unladdered) on the Feather River near Oroville and a major divereion dam (laddered)' on the Sacramento River near Red Bluff. TABLE 1 SIMMARY OF SPAWNING ESCAPEMENT IN CENTRAL VALLEY 1953-1969 (in thousands of fish) Year Sacramento Mokelme San Joaquin and Tributaries and Cosumnes Wibutaries 1/ - Anadromous Fisheries Administrative Report No. 70-11 This paper lists the best available counts and estimates of king salmon spawning escapements in the Sacramento-San Joaquin River System from 1953 through 1969 (~igure1).
    [Show full text]
  • Putting New Storage Projects in Perspective Looking at the Dams
    Putting new storage projects in perspective Looking at the dams Southern California Water Dialog MWD, July 27, 2016 Presented by Friends of the River Statewide water use: 40/42 million acre-feet per year Demand profile: 80% agricultural, 20% urban Source: Roughly 50% groundwater, 50% surface water swinging with surface water availability Central Valley Project: 7 million acre-feet per year deliveries 9 million acre-feet per year control Unpaid CVP reimbursable costs approximately $1.3 billion Today Reclamation (USBR) wants up-front cost-sharing State Water Project: Average deliveries more than 2 million acre-feet/year Average Groundwater Overdraft 1 to 2 million acre-feet per year (mostly San Joaquin Valley) Statewide Surface Storage: 42 million acre-feet Central Valley Groundwater: 683 million acre-feet (1975 California Water Atlas) Urban Southern California (San Gabriel, San Fernando, Santa Anna, San Jacinto river and mountain watersheds): 109 million acre-feet (1975 California Water Atlas) Size Post-1990 Storage Project Description (acre-feet) Groundwater aquifer developed jointly by Kern County Water Agency, Kern Water Bank and the City of Bakersfield. Most of 2,500,000 Kern these supplies are used locally, but some of this water has been sold to other regions. Groundwater storage, developed by Semitropic Water Storage District, serving as a water bank for a variety of agencies in 1,650,000 Semitropic northern and southern California. Additional capacity is available for new partners. Surface reservoir built and paid for by Metropolitan Water Diamond Valley (Domenigoni) 800,000 District of Southern California (MWDSC) to improve dry-year reliability. Additional groundwater storage developed by the Yuba 200,000 Yuba County Water Agency.
    [Show full text]