Central Walking and Cycling Delivery Plan

Appendix A. Cycling Route Interventions

Document No. R1a.1 1.0West R1a.10 R1a.7 1.3Nelson R1b.13 R1a.6 R1a.3 1. Portway R1a.9 1.1Nelson R1b.11 R1a.5 R1a.2 R1a.4 R1a.8 1.2Nelson R1b.12

Scheme Reference Riversway Lytham A5074 A583, A5073 to Riversway A583, A583, A5072 Riversway to to A5075

Nelson Nelson Nelson

Strand

Blackpool Blackpool

Way Way Way

Road, New

to

Way Way Way from from from from

West

to to to

(A5072) Road

Freckleton

Strand Strand Strand

Nelson Nelson Nelson Nelson Road Road Road

Strand

from

from from from Road/Liverpool Road/Liverpool Road/Liverpool

Way Way Way Way

A5072 A583,

Preston Preston Preston

to to to to location/section

Blackpool Portway Portway Portway Portway

New New New

Road Road Road

West West West West

Rd Road Road Road

ucinMaintenance Junction Junction ucinNew Junction junction

Strand Strand Strand Strand

junction junction junction

to

walking walking New/upgraded Junc walking New/upgraded ped/cyc improvement Public improvement Public Maintenance walking New/upgraded walking New/upgraded New/upgraded Junc New ped/cyc

upgrade upgrade ped/cyc ped/cyc

realm realm

/ / / / / movements movements

cycling cycling cycling cycling cycling

/ /

crossing rsigProvide crossing works ok Route works to to

off off streetscape streetscape

dedicated dedicated dedicated dedicated dedicated Scheme type

incorporate incorporate ‐ ‐ facility facility facility facility facility road road

Upgrade At Route Deliver lane needs tracks those Route Upgrade Replace Junction inconsistent of accordance physical Deliver residential tracks Construct require Junction

dual Junction Scheme

and

travelling requires through deteriorating & to

carriageway continuous new

some

dedicated

existing segregation.

ROUTE

improve upgrade upgrade section existing subway be

new

access

Description

of

with

agreed 2 and

reallocation way Blackpool

2 car maintenance

from

1

on

way where guidance piecemeal

to 2

pedestrian at at to

parallel park

off way ‐ off

link road

in Pedders Nelson route

Blackpool cycle ‐

‐ road parts road

requires off no

to

Road mandatory

of

‐ (approx crossing Rylands and facility

track

road

cycle

Road (approx cycling and

refuge carriageway (aggressive Way

&

provides

Road

cycle Riversway clearer

in requires

track to

to (approx

4200m) accordance Cresent at facility

for 1100m)

incorporate

lane incorporate

area

junction track

(approx

north

demarkation

altnernative vegetation

some with space

of 2000m) along

(R3) from in

Preston.

south

accordance

dedicated of

330m).

with scheme description

resurfacing provide

ped/cyc

this

Riversway ped/cyc Nelson

movements clearance guidance

stretch.

quiet

and Replacing

Quite

dedicated

Way phase

2

phase wayfinding. with

road way

ok & £100,000 W&C works to

narrow Current

replacing and be sweeping)

guidance

off to

alternative to current

shared

Chain link

‐ crossing link road

along

infrastructure

Potential east/west

east/west existing

informal

cycle Caul ‐ use. (approx

Regular here

facility

Improves a & £28,000 W&C Way track

to advisory so

cycle

00)WC£400,000 W&C 3000m) crossings cycle

provide for regime may

in is

£70,000 C & £30,000 W&C & £5,000 W&C W & £175,000 W&C £150,000 C £175,000 W & £30,000 W&C & £840,000 W&C & £175,000 W&C

&

£400,000 C Synergies

High level cost (£) Public realm / streetscape Redesign rail crossing barriers at Navigation Way to prioritise ped/cyc movements outside R1b.18 Nelson Way to Strand Road/Liverpool Road Junction W&C £15,000 improvement off‐road periods of rail operation

Public realm / streetscape Lighting on on riverside section of path from Liverpool Road to Navigation Way (approx R1b.14 Nelson Way to Strand Road/Liverpool Road Junction W&C £160,000 improvement off‐road 1900m)

R1b.19 Nelson Way New ped/cyc crossing Upgrade existing informal drop kerb crossing with central island to parallel crossing W&C £35,000 R2a.1 2. Fishwick R2d.2 R2a.4 2. A59 R2a.7 2. A59 R2a.8 2. Salmesbury R2b.3 R2a.3 2. Fishwick R2d.1 2. Off R2d.3 2. Tickled R2a.5 R2c.1 2. A59 R2a.9 2. A59 R2a.6 2. Blackpool R2a.2 R2b.1 2. Salmesbury R2b.2

Scheme Reference New Brockholes Blackpool Ribble New Preston Glenluce Whalley Salmesbury access ‐ road

/ from / at

Hall Hall

M6 M6

crossing

Tickled Trout

New

Road

Parade Parade section Drive

Lane Lane

ucinPublic junction junction Road

Brow

EZ south EZ

Road Services

from /

ru New Trout from main access

from M6 junction /

Chruch Chruch

from

(A59) New

EZ

to (A677)

A59 junction

junction access

Junction site Potter

at Fishwick Hall

from

Avenue Avenue junction nr

access

from

Lane

Woods to

aeTraffic Lane

to Glenluce with

location/section

with Mellor

Whalley Road

A59

onaotJunc roundabout to to

to

Blackpool

London rwNew Brow Fishwick Fishwick

Salmesbury Junction

to ro New/upgraded Brook

Drive

Mercer Road

Road

to Road Road Road

to ucinNew/upgraded junction

River

tPublic St EZ

to

to

site

Traffic New/upgraded New/upgraded Public Public New/upgraded New/upgraded New/upgraded

upgrade ped/cyc ped/cyc

realm realm realm realm Management Management

/ / / /

rsigCrossing crossing rsigDedicated crossing to

streetscape streetscape streetscape streetscape

dedicated dedicated dedicated dedicated dedicated dedicated dedicated

incorporate

mnmnsInvestigate amendments amendments

walking walking walking walking walking walking walking improvement improvement improvement improvement

ped/cyc Scheme type

/ / / / / / /

cycling cycling cycling cycling cycling cycling cycling

movements

off off on off

facility facility facility facility facility facility facility

‐ ‐ ‐ & road odJunction road road

off ‐ road Scheme procurement Deliver Replace measures alternative Link some carriageway possible. highway/verge Improvements Lane Re Extend north available Deliver wooded making Environmental Deliver with 1000m) Environmental Removal (include desire dedicated Challenges Pavement (approx Reduce from ‐ allocation

in

local

arm Preston

Description challenges side

line

to

2 new new new

it

the

2200m)

existing verge

area

narrowings facility

of way Should and

path

feel

enhancement (bollards)

crossing parking ped/cyc linking

paths.

at to opportunities central radius

2 2 2 cyclists

of

seperating City or carrigeway cycle Potter New unsafe

way way way

protection down

to enhancement enhancements width.

needed

road carriageway

on continuous

(approx

Better to lighting

Council

at

is

off off off facilities Hall ‐ crossing hatching track

road

to and

existing

and Lane blocking

to roundabout space ‐ ‐ ‐

Will

road road road keep

Road

River

to

signage

scheme calm

dual from side

advisory

space.

600m)

for if and where

(potential also access

cycle cycle cycle possible to

to

this lane

to

path

realignment. filtered

(approx Ribble

programme off road carriagways.

area

maintenance deliver main access to

deliver require

At

needed route

(approx residential road

track. track. track, improve not

to employment lanes

priority Salmesbury for

site where slow and

inside

permeability

be 1200m) proposed

segregated

cycle pedestrians. free segregated

some

extending May Likely

with entrance

feasible

move

1100m) vehicles

to perceptions

Provide

ramn £50,000 C treatment This

route

of

boundary

track.

with property.

require scheme description make

2

localized

to vehicles.

way

lighting EZ

ieWC£60,000 W&C site would Brockholes

be

there debris

will

cycle to

existing Enforcement access and

by cycle verge

route

Zebra on off

land Mellor

go localised

of

May

need

improve south

narrowings. of may columns road tracks

on

tracks. under golf

protection more upgrade

purchase personal

crossing track

surface

require

Brow Brook be

to

cycle

course) side

along

incorporate lsrsWC£10,000 W&C closures

some

attractive bridge

Width

environment

needed to to

cycle

and

track.

existing

access

added

Potter safety, rear and as some

corridor to

(approx scope

insufficent require to may

lane track

over

of

or

Some

emerge

land as (approx to

Lane.

lighting

path path

physical

present additional

where

within an

New grown

tua)WC£60,000 W&C (toucan) to

for 650m)

land verge

tie width

on

on

Hall

and

in

the

& £30,000 W&C & £75,000 W&C £130,000 W & £15,000 W&C & £250,000 W&C £500,000 C £140,000 W & £200,000 W&C & £15,000 W&C £265,000 C £300,000 C £440,000 C

Synergies

High level cost (£) R2d.4 Mercer St, Cranborne St, Adelade St and Primrose Hill Traffic Management amendments Extension of 20mph limit to whole stretch W&C £15,000

Environmental enhancement programme with junction narrowings and some R2d.5 Mercer St, Cranborne St, Adelade St and Primrose Hill Public realm / streetscape improvement on & off‐road W&C £50,000 potential calming to make less hositle for peds/cyclists (approx 350m) £2,755,000 3a. Blackpool R3(a).1 3a.3Blackpool R3(a).13 3a.1Moor R3(a).11 3a.1Ashton R3(a).21 3a.7Blackpool R3(a).17 3a. Blackpool R3(a).9 3a.9Blackpool R3(a).19 3a. Blackpool R3(a).7 3a. Blackpool R3(a).5 3a.2Blackpool R3(a).12 3a.8Blackpool R3(a).18 3a. Blackpool R3(a).4 3a. Whole R3(a).2 3a.4Blackpool R3(a).14 3a.0Blackpool R3(a).20 3a.6Blackpool R3(a).16 3a.0Blackpool R3(a).10 3a. Blackpool R3(a).6 3a. Blackpool R3(a).8 3a. R3(a).3 3a.5Blackpool R3(a).15

Scheme Reference

akNew/upgraded Park

ot New/upgraded route akNew/upgraded Park

Road Road Road Road Road Road Road/ Road/Garstang Road Road Road Road Road Road Road Road Road akNew/upgraded Park

/ side / / / at / /Miller / / / / at / /

Ribbleton

New Lancaster Parkside Haslams Pedders Inkerman Sir St Brook

Deepdale orsn New/upgraded Morrisons

Gregory

streets Tom

Hall

Road

tetJunc Street

Road

Finney

Road

Lane Park

ucinJunc junction

Lane

Avenue

tetJunc Street aa New/upgraded from

shopping Rd ucinJunc junction

Road

ucinJunc junction

ucinJunc junction ucinJunc junction

ucinPublic junction

onaotJunc roundabout Way

Gartstang

ucinJunc junction ucinJunc junction

etePublic centre ucinJunc junction

Road location/section

to

Tom

Benson

a Traffic Way Public road

upgrade upgrade upgrade upgrade upgrade upgrade upgrade upgrade upgrade upgrade upgrade

realm realm realm management

/ / /

to to to to to to to to to to to

streetscape streetscape streetscape

dedicated dedicated dedicated dedicated dedicated dedicated

incorporate incorporate incorporate incorporate incorporate incorporate incorporate incorporate incorporate incorporate incorporate

mnmnsInvestigate amendments Scheme

walking walking walking walking walking walking improvement improvement improvement

ped/cyc ped/cyc ped/cyc ped/cyc ped/cyc ped/cyc ped/cyc ped/cyc ped/cyc ped/cyc ped/cyc Scheme type ROUTE

Description

/ / / / / /

cycling cycling cycling cycling cycling cycling

3 movements oeet Reduce movements oeet Tighten movements movements movements movements movements movements movements oeet Include movements movements

off on on

facility facility facility aiiyInvestigate facility facility facility ‐ ‐ ‐ road odTighten road road

&

off ‐ Remove pedestrian Upgrade Provide Widen Tighten (approx arms due (approx

investigate Residential Tighten on Tighten Improve Reduce Remove Tighten Tighten cycle Remove Tighten Tighten segregated provision Surface investigate Provide to

to

bypass housing)

trees. and

formal the to and junction junction junction junction junction junction and junction junction

off

70m) 1100m)

guard guard guard protected gateway East/West

on

consistent

crossing

upgrade dedicated dedicated opportunity contra parking cycle road

radius

formalise

simplify

all Could

(approx railings? railings? railings? pedestrian

arms.

and to and and and and and and cycle lanes

to

‐ at

flow

cycle

reduce off use

facility and

Guild

park

junction,

roundabout provide provide provide provide provide provide provide

single

desire

track pedestrian pedestrian

highway (approx

600m)

'Please opportunites

for

North/South approaches.

from

Walk phases

crossing to

dedicated carriageway with

line

protected protected protected protected protected protected protected

improve provide

Blackpool

consider 8000m)

path needs

new

path

to on provision provision

distance

slow

to all

on

& path

canal

through protected path review. access

shared

dedicated junction cycle cycle cycle cycle cycle cycle cycle

other side along

Road vehicles

to

along on on access

for

roads approach approach approaches. approaches. approaches. approaches. approaches. shared

path At

enitre all all greenspace use. and

pedestrians

arms

cycle

signals, scheme description

northern arms. arms.

and

from pedestrian

to investigate user Light

use. length

improve and improve approaches.

and

Remove Remove

Blackpool signs'

if potential May

Widen Widen Widen Widen Widen

protected

possible on boundary

dedicated

& and

otherside provision

create be (approx

local opportunity environment

guard guard turning

pedestrian pedestrian pedestrian pedestrian pedestrian some

od£50,000 Road

for

&

(may network

cycle dedicated of dedicated

outbound

pedestrian

E/W railings? railings?

challenges

on park

of vehicle

be

prahs£175,000 approaches

route all ‐ for

oppostion

refuge refuge refuge refuge refuge for emaiiy£50,000 permeability through 340m,

rs £125,000 arms.

realigning

on

pes£30,000 speeds on

pedestrian straight to

phases

with ‐ carriageway

road Morrisons and on on and on N/S

trees

all all all as

‐ width

ylss£250,000 cyclists ahead 210m) on

backs arms. arms. arms.

all

£200,000 £200,000 £200,000 £125,000 £30,000 £50,000 £50,000 £175,000 £220,000 £120,000 £110,000 £125,000 £175,000 £75,000 £1,920,000

High level cost (£) Improve crossing facility of Blackpool Road to access Ashton Community Science R3(a).22 Junc upgrade to incorporate ped/cyc movements £60,000 (toucan) Provide protected cycle approaches. & dedicated pedestrian provision on all arms. General R3(a).23 Blackpool Road / Greaves Town Lane junction Junc upgrade to incorporate ped/cyc movements £175,000 improvements needed in area to improve ped/cyc access to Tesco Express R3(a).24 Blackpool Road / Riversway junction New ped/cyc crossing Provide dedicated controlled crossing facilities for pedestrians / cyclists £200,000 Junction treatment on Blackpool Road to aid cyclist crossing into and out of Stocks Road R3(b).1 Stocks Road / Blackpool Road junction Junc upgrade to incorporate ped/cyc movements £20,000 (protected central refuge) Parking restrictions & drop kerbs on corner to improve visibility for cyclists entry & exit of R3(b).2 Stocks Road / Roebuck junction Public realm / streetscape improvement on‐road £5,000 Stocks Road Built out with drop kerb on Roebuck Road, gateway treatment to canal and replace steps with R3(b).3 Roebuck Road to New/upgraded dedicated walking / cycling facility £60,000 ramped access R3(b).4 Roebuck Road Public realm / streetscape improvement on‐road Pavement parking an issue. Highway works to reinforce 20 and manage parking £15,000 Safer Routes to School works needed to reinforce parking restrictions, review of drop kerbs, R3(b).5 Roebuck Road / Inkerman Street Public realm / streetscape improvement on‐road £30,000 potential to tighten junction making it simpler and reclaiming space for peds/cyclists Junction treatment to reduce crossing distances and simplify for pedestrians / cyclists. Provide R3(b).6 Inkerman Street / Eldon Street Junc upgrade to incorporate ped/cyc movements £30,000 formalised crossing points Wide carriageway. Highways, environmental scheme to reinforce 20 and create more pleasant R3(b).7 Eldon Street Public realm / streetscape improvement on‐road environment for walking and cycling. Could use staggered parking. Pavement parking continues £100,000 to be an issue. (Bus corridor) Opportunity for raised table and improved crossing for pedestrians and cyclists on busy R3(b).8 Eldon Street / Plungington Street junction Junc upgrade to incorporate ped/cyc movements £30,000 corridor. Would reinforce 20mph Safer Routes to School works to reinforce parking restrictions, review of drop kerbs. Ensure R3(b).9 Eldon Street at Eldon Public realm / streetscape improvement on‐road £30,000 parking restrictions on corners of all side roads. R3(b).10 Broughton Road / Brackenbury Road Public realm / streetscape improvement on‐road Parking restrictions reinforced on corners with Eldon St & Ripon St £5,000 R3(b).11 Ripon Road Public realm / streetscape improvement on‐road Widen and protect contra‐flow cycle lane approaching Garstang Road junction £10,000 Move pedestrian signals more inline with Ripon Rd crossing & upgrade to toucan. Provide R3(b).12 Ripon Road / Garstang Road junction New ped/cyc crossing £125,000 protected central island for more confident cyclists Rationalise barriers and improve link from St Thomas' Road near Kent St. Improving access to R3(b).13 Moor Park Avenue Public realm / streetscape improvement off‐road £5,000 park

R3(b).14 Moor Park Avenue Public realm / streetscape improvement off‐road Gateway / junction wayfinding feature where path crosses R3. Maintenance & some works to £10,000 reduce puddling needed Replace gate with bollard at junction with R3 to improve access for those with adapted bikes, R3(b).15 Moor Park Avenue Public realm / streetscape improvement off‐road £5,000 mobility scooters etc Provide dedicated controlled crossing for pedestrians / cyclists more inline with desire line R3(b).16 Moor Park Avenue / Sir Tom Finney Way ( Road) junction New ped/cyc crossing £60,000 route from Moor Park Ave. Could help manage match day access. Remove central hatching and replace reclaimed space with segregated cycling facility and R3(b).17 Deepdale Road from Moor Park Avenue to St Stephen's Road New/upgraded dedicated walking / cycling facility investigate opportunity for improved pedestrian crossing facilities from £50,000 (approx 130m)

R3(b).18 St Stephen's Road at Deepdale Community Primary School Public realm / streetscape improvement on‐road Safer Routes to School works to reinforce parking restrictions £30,000

R3(b).19 St Stephen's Road Public realm / streetscape improvement on‐road Reinforce parking restrictions on junctions of all side roads off St Stephen's Road £15,000 Reinforce parking restrictions on junction with St Stephen's Road and ensure parking doesn't R3(b).20 Falcoln Street Public realm / streetscape improvement on‐road £5,000 block cycle crossing of St George's Road. Rationalise bollards R3(b).21 Skeffington Road Public realm / streetscape improvement on‐road Reinforce parking restrictions and traffic calming needed to reinforce 20mph £15,000 R3(b).23 Preston North End Ground Wayfinding / signing improvement Improve legibility of permissive route through club and car park £30,000 R4b.4 Ringway R4a.1 R4b.6 R4b.7 R4b.8 4.3West R4a.13 4. Fletcher R4a.7 4.0West R4a.10 4. Meadow R4a.4 4.4West R4a.14 R4b.11 R4b.3 4. Meadow R4a.2 R4b.5 4.5West R4a.15 4.1West R4a.11 4. Fletcher R4a.8 R4b.2 4. Peel R4a.5 R4b.1 4. Meadow R4a.3 4.2West R4a.12 R4b.10 4. Fletcher R4a.9 4. Peel R4a.6 R4b.9

Scheme Reference Off Redscar Off Off Redscar Off Redscar Redscar Redscar Off Off Redscar Off Off Redscar Off Redscar Off Redscar Redscar Redscar Off ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ road road road road road road road road road road road

Hall Hall

iwJunc View iwMinor View View View iwWayfinding View iwNew/upgraded View

Industrial Industrial Industrial Industrial Industrial Industrial Industrial Industrial Industrial Industrial Industrial

Road odPublic Road odTraffic Road

junction route route route route route route route route route route route St St St tPublic St St

Leisure Leisure

nr / / /

Deepdale Deepdale St

/ junction

on on on on on on on on on on on

West Paul's

to

old old old old old old old old old old old

Estate Estate Estate Estate Estate Estate Estate Estate Estate Estate Estate Centre etePublic Centre

Meadow

View

railway railway railway railway railway railway railway railway railway railway railway Road

of Mill Road

‐ Golbourne

ucinNew/upgraded junction

rail St ucinJunc Junction

ucinJunc Junction

line line line line line line line line line line line odMinor Road ucinWayfinding junction

path

from from from from from from from from from from from

cesPublic access

tPublic St location/section

West West West West West West West West West West West

View View View View View View View View View View View

Leisure Leisure Leisure Leisure Leisure Leisure Leisure Leisure Leisure Leisure Leisure

Centre Centre Centre Centre Centre Centre Centre Centre Centre Centre Centre

to to to to to to to to to to to

Public Public Maintenance New/upgraded New/upgraded New/upgraded Public Public New/upgraded Public Public

upgrade upgrade upgrade

realm realm realm realm realm realm realm realm realm realm realm Highway highway management

/ /

/ / / / / / / / / / /

signing signing ok Some works to to to

streetscape streetscape streetscape streetscape streetscape streetscape streetscape streetscape streetscape streetscape streetscape

mrvmnsSide improvements dedicated dedicated dedicated dedicated dedicated dedicated improvements

incorporate incorporate incorporate

mnmnsShould amendments mrvmn Improve improvement improvement

walking walking walking walking walking walking improvement improvement improvement improvement improvement improvement improvement improvement improvement improvement improvement

ped/cyc ped/cyc ped/cyc

/ / / / / /

cycling cycling cycling cycling cycling cycling Scheme type

oeet Junction movements oeet Upgrade movements oeet Junction movements

off off off off off off off off off off off

aiiyWiden facility aiiyShorter facility facility facility facility facility ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ road road odImprove road road road odRemove road odPotential road road road odRegular road road Scheme ROUTE

Description

4 Rationalise Remove Rothwell Vegetation 70m) Improve (approx Improve depot Resurfacing and make cyclists, improve Surface Extension Carphne enforcement Investigate (at cyclists Environmental (with Barrier Surface dedicated Clear

Fairfax

improve road

advance access

this surfacing aware

shared be removal,

aware

and and section

dog wheelchair 3700m

staggered motorcycle

wayfinding drop access gateways signage treatment, redesign Warehouse)

zebra

Cresent for

priority

an of link) contra Rd),

clearance potential /

needed.

formalise formalise refuse

points

trail

remove future transition. of attractive &

kerbing that path signing

Chatburn crossing enhancement

clear will of / liklehood points

environmental

‐ at

drainage along and flow

across to

linking

to

route

barriers

bins at Morrisons beyond

users extend

environmental

to barriers

incorporate potential Upgrade

for signage

motorcycle

open

and

(approx Gamull both)

for

desire desire transition

for at

access

access

disused to on Ensure

link

dead

Road

continues Garsdale

path route.

of and landscaping

cycling parallel

works

ot & £10,000 W&C route up if (look

as (approx

cyclists

to

line line

new throughout.

scheme Lane

mobility route filtered

30m)

end junction and substandard point raised with (some

route parking

railway

enhancement Ensure

to

east/west barriers like path path needed

hogotC£1,000 C throughout sections

rsigC£30,000 C crossing Road

ucinWC£10,000 W&C junction better to

enhancement access straight bollard

to 1300m

recent table

path from open

needed permeability

through from

to

scooters

the as

from doesn't parking

and

improve

as

on promote

unclear

toucan

improvements

built)

and

off Preston

to up

width

cyclist

ahead retail if frequent

addition)

route, Sion Leisure

‐ account

access in

road access and

greenspace

improved

block enforcement throughout

conjuction

ls & £5,000 W&C Close park from

crossings (approx where environment movements

gateway route

to Greenlands and route.

Centre

shared scheme description

filtered udigWC£70,000 W&C puddling and

and allow

for

opposite A6

at

to

throughout

route

rail better needed) 0)WC£10,000 W&C 50m) replace route junc Surfacing

on

of oWC£1,000 W&C go with

whole passage scheme to path

permeability. keeps

and

junction

otherside

Deepdale from

to Community

ing & £30,000 W&C signage (regular

Morrisons

access leisure promote

on

St Tram

with route

junction

Meadow needed needed Paul's of

West eg.

+ adapted

bollard, points,

access)

centre

regime

of at minor (across Mill

route

View

Road (Currys, route

Park Improve primary

(including as clear.

Street St

to

to puddling.

design

resurface

needs

cycles. (approx Close, to distance (approx

to

allow remove

Ensure Peel PC

Morrisons and (via signage

to works World

Brookfield signage)

Ensure

easy

Hall

Stuart St

0)WC£10,000 W&C 10m)

0m & £50,000 W&C 200m)

be (approx of

(machine

fencing Haulage

Paul's

3700m) agreed) tC£125,000 C St

to passage

to &

(approx

Road

make

at

Road

100m) Park

and

lay)

or of

& £50,000 W&C & £30,000 W&C & £200,000 W&C £1,000 C & £50,000 W&C £15,000 C & £20,000 W&C & £5,000 W&C £10,000 C & £50,000 W&C & £25,000 W&C & £50,000 W&C & £5,000 W&C & £20,000 W&C

Synergies

High level cost Off‐road route on old railway line from West View Leisure Centre to R4b.12 Public realm / streetscape improvement off‐road Fencing in disrepair on route after M6 crossing (approx 250m) W&C £5,000 Redscar Industrial Estate Off‐road route on old railway line from West View Leisure Centre to Create new direct dedicated off‐road link to new employment site just north of M6 crossing before R4b.13 New/upgraded dedicated walking / cycling facility W&C £15,000 Redscar Industrial Estate path crosses B6242 (approx 15m) Off‐road route on old railway line from West View Leisure Centre to R4b.14 Public realm / streetscape improvement off‐road New Gateway features to route at B6242 on both sides of highway W&C £15,000 Redscar Industrial Estate Off‐road route on old railway line from West View Leisure Centre to R4b.15 New/upgraded dedicated walking / cycling facility Remove barriers and upgrade (widen) link from The Hills to the route (approx 320m) W&C £75,000 Redscar Industrial Estate Off‐road route on old railway line from West View Leisure Centre to R4b.16 Public realm / streetscape improvement off‐road Improve gateway to route and prevent parking at Recycling Centre W&C £10,000 Redscar Industrial Estate Off‐road route on old railway line from Redscar Industrial Estate to R4c.1 New/upgraded dedicated walking / cycling facility Extension of trail along disused railway from Redscar Industrial Estate to . (approx 800m) W&C £200,000 Off‐road route on old railway line from Redscar Industrial Estate to Extension of trail along disused railway from Grimsargh to Longridge ‐ linking in at Hacking R4c.2 New/upgraded dedicated walking / cycling facility W&C £400,000 Longridge Drive/Mardale (approx 2100m) Off‐road route on old railway line from Redscar Industrial Estate to R4c.3 New ped/cyc crossing Crossing of B6243 Preston Road at Plough Road and linking paths W&C £35,000 Longridge Clear route direction signage & minor works to reinforce 20mph. On street parking enforcement R4d.1 St Paul's Road Wayfinding / signing improvement W&C £25,000 review Gateway / junction wayfinding feature where path crosses R3. Maintenance & some works to reduce R4d.2 Moor Park Avenue Public realm / streetscape improvement off‐road C £10,000 puddling needed R4d.3 Moor Park New/upgraded dedicated walking / cycling facility Moor Park ‐ upgrade path surface to 3m machine laid through park (approx 450m) W&C £100,000 Enhancement scheme with gateway treatment of path into park and linking Blackpool Road and Lower R4d.4 Blackpool Road Public realm / streetscape improvement off‐road W&C £30,000 Park Road across Eaves Brook (approx 170m) Park Walk cycle route crossing Higher Bank Road, Lower Bank Road and Change junction priority or use build outs (speed control table with crossing) to reduce crossing R4d.5 Traffic management amendments W&C £20,000 Victoria Road distance and slow traffic Review destinations to cover more relevant local destinations & replace stickers with more permenant R4d.6 Signage Wayfinding / signing improvement C £5,000 & visible signs Traffic calm and simplify crossing from Chapel Road across Watling St Road to Park Walk opening up R4d.7 Watling St Road / Chapel Rd Junction Public realm / streetscape improvement on‐road W&C £25,000 and better promoting link R4d.8 Eastway (B6241) to Fulwood Hall Lane Public realm / streetscape improvement off‐road Landscaping and widen access to off‐road link improving visibility. W&C £10,000 Improve transition from road to off‐road link by widening stretch of drop kerb and path linking down to R4d.9 Midgery Lane to Eastway (B6241) Minor Highway improvements C £10,000 crossing R4d.10 Midgery Lane Traffic management amendments On‐street parking suspension at access to Fulwood Hall Hospital C £5,000 R4d.11 Eastway (B6241) from Midgery Lane to Pittman Way New/upgraded dedicated walking / cycling facility Investigate opportunity for bi‐directional off‐road cycle track (approx 810m) W&C £200,000 R4d.12 Pittman Way from Eastway to Midgery Lane New/upgraded dedicated walking / cycling facility Investigate opportunity for bi‐directional off‐road cycle track (approx 310m) C £70,000 51Fishergate R5.1 57Friargate R5.7 51 Garstang R5.14 55Ringway R5.5 51 Garstang R5.16 51 Garstang R5.18 51 Garstang R5.15 53RnwyPublic Ringway R5.3 51 Moor R5.10 51 North R5.13 58Corporation R5.8 52Corporation R5.2 51 Garstang R5.17 54RnwyNew/upgraded Ringway R5.4 52 Whole R5.20 56Friargate R5.6 R5.11 59Adelphi R5.9 Scheme Reference Moor Broughton

Lane Lane/Garstang Road

ordrJunc corridor

Quarter

/

from Road Road Road Road Road

Friargate

/ roundabout) (Adelphi

/ Corporation St Street

Moor

Ringway from / / / / /

ucinJunc Junction Aqueduct Blackpool Black Moor Lytham

/

Lane

ucinMinor junction

quarter Adelphi Ringway

Road

Bull Park

to

Road ucinJunc Junction Street

Market Lane Steet Road A6

Ave

junction quarter

ucinMinor junction

ucinJunc Junction (North

location/section

ucinMinor junction

ucinJunc Junction ucinJunc Junction

ucinJunc Junction ucinJunc Junction

qaeTraffic Square

Junction to

Rd

North

Junction

to Rd

iga New/upgraded Ringway

ucin New/upgraded Junction)

to

M55

Public New/upgraded

upgrade upgrade upgrade upgrade upgrade upgrade upgrade upgrade

realm realm Highway Highway Highway Management

/ /

to to to to to to to to

streetscape streetscape

dedicated dedicated dedicated dedicated improvements improvements improvements

incorporate incorporate incorporate incorporate incorporate incorporate incorporate incorporate

mnmnsNo amendments

walking walking walking walking improvement improvement

ped/cyc ped/cyc ped/cyc ped/cyc ped/cyc ped/cyc ped/cyc ped/cyc Scheme type

/ / / /

cycling cycling cycling cycling

oeet Review movements oeet Include movements oeet Include movements movements oeet Include movements movements movements movements

on off

aiiyCreation facility aiiyCreation facility aiiyCreation facility aiiyPath facility

‐ & odRationalise road

off ‐ Scheme odLimited road ROUTE

Description when to Vehicles it Improve Move works improve Major Improve central Include Side from improve Potential

more

5 North

entry

road

sub Moor

turning pedestrian needed review

island junction. intuitive pedestrian pedestrian pedestrian scope

protected

still wayfinding wayfinding/coherence drop drop

Road of of of except

standard for junction

Lane, signage dedicated dedicated dedicated

have outbound

needed for off kerbing kerbing as

cycles

bus Ped A6 more provide signals

priority

narrowing width cycle

phases phases phases to

to and

corridor

/cyc

to on on on transition transition ensure

on access confident left

crossings

allow

more reduce

for carriageway carriageway carriageway

for

at Friargate facilities & and and

turn

shared this tactiles

southbound

(with full and

route.

continuation inline tactiles tactiles

to

cycle pedestrian

to to

junction cyclists effective

and recent

access

provided

access access ped/cyc

South use.

& Clearer with

bypass

segregated segregated segregated

increase & & protected

Reallocate protected protected

local

route.

making Ripon access allowing toucan toucan

path

crossing priority) of

but signing

enhacement segrgated

size

width

Rd Clearer

not

to

cycle it crossings crossings cycle cycle cycle

access

crossing cycle cycle Moor difficult

of space

of distances intuitive. along scheme description

available. pedestrian

intended

rsigWC£125,000 W&C crossing lanes lanes lanes

signing

crossing. crossing. lanes.

Lane from

to whole

of of

ceeWC£50,000 W&C scheme to &

Market (approx (approx (approx

Potential junction junction upgrade (30

negotiate

and

central Should of

Clear route

corridor eueWC£200,000 W&C refuge

junctions) intended And Increase

southbound

qaeC£1,000 C Square

70)C£890,000 C 3700m) 3m £150,000 C 630m) 3m £130,000 C 630m)

signs

needed.

+ + increase allow refuge

to dutch

minor minor on

toucan. to

size to foot route

reduce northbound

style to indicate

design design

of size

straight

or widen

needed Provide central

roundabout? by

of vehicle

works works bike.

central shared

aiiyWC£100,000 W&C facility ahead

cycle

refuge. to protected

Minor speeds

help to to

s.WC£10,000 W&C use. eueWC£125,000 W&C refuge

bypass bypass

make

& £250,000 W&C & £125,000 W&C & £125,000 W&C & £450,000 W&C & £10,000 W&C & £900,000 W&C & £10,000 W&C & £5,000 W&C

Synergies

High level cost 6. Ringway R6a.1 6. Priory R6a.9 6.8Shelley R6a.18 6.0Path R6a.10 6.7Ridley R6a.17 R6a.21 6. Westons R6a.7 6. Leighton R6a.3 6. Priory R6a.8 6.3Fylde R6a.13 6. Marsh R6a.2 6. Leighton R6a.5 6. Leighton R6a.4 6.2Aquaduct R6a.12 R6a.22 6. Pedder R6a.6 6.3Woodplumpton R6a.23

Scheme Reference Tom Shelley Junction

Benson from

Road

Street Street Road Lane

Road Road Street

from Street Street Street /

Street

Steeple Priory

junction

Way / / /

/ Corporation Carltons Ashton Lytham

Westons / nr

Road Road

Street Pedder

View Tuscon

from /

Street Road

/

Cadley ucinWayfinding junction to

Steeple Street junction

rv Minor Drive

Fylde

Street Blackpool

/ ucinMinor junction

Woodplumpton

location/section Causeway

junction

Road View

to

Marsh

Road

ucin Wayfinding junctions onaotNew roundabout

Lane junction

Road

Link

to

facility off road Public road Public New/upgraded facility Public off Junc Public off movements New/upgraded facility Public off Public off Public New/upgraded Public off ‐ ‐ ‐ ‐ ‐ ‐ road road road road road road

upgrade ped/cyc

realm realm realm realm realm realm realm realm highway highway

/ /

/ / / / / / / /

signing signing rsigCrossing crossing to

streetscape streetscape streetscape streetscape streetscape streetscape streetscape streetscape

improvements mrvmnsInclude improvements dedicated dedicated dedicated

incorporate

mrvmn Signage improvement mrvmn Signage improvement

Scheme type

walking walking walking improvement improvement improvement improvement improvement improvement improvement improvement

ped/cyc

/ / /

cycling cycling cycling Scheme

on off off on on on on on

‐ ‐ & & & & & &

Description

ROUTE Create Environmental Maintenance Lancaster visibility. Environmental lane Wide provide Fleetwood thereafter. Junction Junction Busy point) Could No carriageway Landscaping Needs Blackpool change wait cyclists needs ped/cycle Highways

entry

as to crossing

carriageway

add regular

some

short

quite activate 6

junction cycle formalised / /

treatment treatment facilities

Reduce except

wayfinding wayfinding

Junction Canal. Road priority.

kerb

St Vegetation

segregated

and TLC

section

steep.

bypass to

(sweeping of sweeping.

and and

protection

needed

crossing

Fylde

priority cyclists Leighton

Currently and minor

speed needed

and

Pavement

treatment

or

Highway Highway to needed Reduce

of

in signals mrvmnsWC£500 W&C improvements mrvmnsWC£500 W&C improvements

informal Road,

prevent

footways. clearance

road

dedicated

surfacing

limit

with islands cycle

and Informal

Street at

hidden to

to

speed

closure roundabout

replacing. needs enhancement. enhancement. on vegetation

parking

contra parking to lanes.

narrow

parking

crossing.

are

Pedder from move

of Potential

to

protected

crossing and limit

management

a

link ‐ open and Narrow

flow

restriction bit

an

Unversity

and

blocked parking at Symbols

to

St

to

clearance) tight

Improve ensure issue zba £35,000 W (zebra)

Roebuck

up

20mph

and scheme open make of scope

May Pavement

cycle

all

access.

Fleetwood description for

(approx

surronding

further by

side

to parking accomodation

up

easier be

non for

signage (Speed lane and

parked

indicate

Street

needed

visibility. scope road

Add creation ‐

standard

improve from parking 2700m) and

to

doesn't

St.

control lighting junctions

vehicles for

and negotiate roads for

clear where

and

Parking junction

designated

of

protected

drop

an

and

signage bicycles.

regular

lc £15,000 C block dedicated

to link

table

on

su & £10,000 W&C issue cyclists

and

20mph

car kerb

blocks

for corner. up and

with

park.

have regime

pedestrians to

uphill Could

to cycle improve

should

start link

on

access

crossing

Path Could

route

cycle from

of

/

£10,000 C & £10,000 W&C & £15,000 W&C & £15,000 W&C £50,000 C & £15,000 W&C & £10,000 W&C £10,000 C & £30,000 W&C & £60,000 W&C & £25,000 W&C & £650,000 W&C

Synergies

High level cost Junc upgrade to incorporate ped/cyc Need formalised controlled crossing for pedestrians / cyclists. Currently informal at R6a.24 Tag Lane / Tom Benson Way roundabout W&C £125,000 movements busiest locations where junctions flair to dual approaches / exits

Public realm / streetscape improvement off‐ R6a.25 Tag Lane / Tom Benson Way roundabout Remove motorcycle barriers to access Guildwheel W&C £5,000 road Formalise crossing of Tom Benson Way and maintain (sweeping) and sign shared R6a.27 Cottom Hall Lane New ped/cyc crossing W&C £35,000 use path Create gateway feature and open up acces to Canal to make it feel safer and Public realm / streetscape improvement off‐ promote it better. Surface and upgrade link to stairs at start of Lancaster Canal. R6b.1 Lancaster Canal from Aquaduct Street W&C £75,000 road Renew stairs and investigate potential for cycle / accessible ramp. Litter clearance and benches need renewing. Regular maintenance needs agreeing

Widen and surface towpath making it suitable for cycling. Remove motorcycle Lancaster Canal from Aquaduct Street to Woodplumpton New/upgraded dedicated walking / cycling R6b.2 barriers and ramp up to bridge over access to Canal boat yard making route W&C £200,000 Road facility accessible to cycles, wheelchair users and mobility scooters.

Lancaster Canal from Aquaduct Street to Woodplumpton Public realm / streetscape improvement off‐ R6b.3 Lighting along canal route to make it accessible after dark W&C £90,000 Road road Lancaster Canal from Aquaduct Street to Woodplumpton Public realm / streetscape improvement off‐ R6b.4 Environmental enhancement and landscaping to open up Canal W&C £30,000 Road road New/upgraded dedicated walking / cycling R6b.5 Lancaster Canal / Roebuck Street Investigate option to upgrade to ramped access to canal W&C £50,000 facility New/upgraded dedicated walking / cycling R6b.6 Blackpool Road Investigate option to provide ramped access to canal W&C £50,000 facility New/upgraded dedicated walking / cycling R6b.7 Woodplumpton Road Investigate option to upgrade to ramped access to canal W&C £50,000 facility Lancaster Canal from Woodplumpton Street to Hollins New/upgraded dedicated walking / cycling R6b.8 Widen and improve surface for cycling and use by wheelchairs, mobility scooters W&C £120,000 Grove facility Lancaster Canal from Woodplumpton Street to Hollins Public realm / streetscape improvement off‐ R6b.9 Lighting along canal route making it accessible after dark W&C £50,000 Grove road Lancaster Canal from Woodplumpton Street to Hollins Public realm / streetscape improvement off‐ R6b.10 Remove motorcycle barriers to access Haslam Park W&C £5,000 Grove road Lancaster Canal from Woodplumpton Street to Hollins Public realm / streetscape improvement off‐ R6b.11 Some safety fencing work needed at slope down to W&C £10,000 Grove road

Public realm / streetscape improvement off‐ Improve signage from Woolplumpton Road and open up access to Lancaster Canal R6b.12 Hollins Grove W&C £15,000 road route with improved drop kerbs. Potential gateway feature 7. Eastway R7b.6 7. Hoyles R7a.1 7.3Public Minor Lightfoot R7b.3 R7a.13 R7a.12 7. Lightfoot R7a.4 7. Path R7a.8 7. Lightfoot R7a.6 7. Lightfoot R7b.2 R7b.1 7.4Midgery R7a.14 7. Garstang R7b.4 7.1D'Urton R7a.11 7. B6421 R7b.7 7.5Midgery R7a.15 R7a.5 7. Maintenance R7a.2 7. B6421 R7b.8 R7a.9 7.6Midgery R7a.16 7. Eastway R7b.5 7. Jacksons R7a.7 7. Public R7a.3 7.0D'Urton R7a.10

Scheme Reference Tom roundabout Lightfoot Midgery Sandyforth Path Lane Broughton

Benson from from

/ / Lane

Sherwood Pittman Lane Lane

/ / Lane Lane Lane Lane

Quarry Road Ln Lane Green Ln Lane

D'Urton Longfield Jacksons Sandygate

College Lane

to (B6241) / Way

from from railway Tabley to / /

/

Pittman A6 Oliver Pittman

Lane

Tom cesPublic access Oakengate Way from

/

at

Lane

Way Garstang B6241

Eastway Quarry ucinJunc junction

/

ata Junc Eastway

Lane

Benson Lane rsigWayfinding crossing at

onaotJunc roundabout Place Lightfoot Wychnor

Way onaotJunc roundabout / Way Jacksons

Oliver's

roundabout

ucinJunc junction

to to

ucinMinor Junction

(B6241)

Road

junction Way

Garstang Sandygate location/section

Lane ucinJunc junction

uryMinor Quarry Place

(A6) /

Walker

from to

to

Road to

onaotJunc roundabout Lightfoot

aePublic Lane Midgery

Midgery Tag

aeNew/upgraded Lane

(A6)

Lane

via Green

aePublic Lane

aePublic Lane

New/upgraded New/upgraded New Public Public

upgrade upgrade upgrade upgrade upgrade upgrade upgrade ped/cyc

realm realm realm realm realm realm realm realm Highway Highway Highway

/

/ / / / / / / /

signing rsigDedicated crossing ok Aggressive works to to to to to to to

streetscape streetscape streetscape streetscape streetscape streetscape streetscape streetscape

dedicated dedicated dedicated improvements improvements improvements

incorporate incorporate incorporate incorporate incorporate incorporate incorporate

mrvmn Existing improvement

walking walking walking improvement improvement improvement improvement improvement improvement improvement improvement

ped/cyc ped/cyc ped/cyc ped/cyc ped/cyc ped/cyc ped/cyc

Scheme type

/ / /

cycling cycling cycling

oeet Roundabout movements movements movements movements oeet Roundabout movements oeet Roundabout movements oeet Junction movements

off on off on on on on off

aiiySurface facility facility facility ‐

‐ ‐ ‐ & & & & odHighways road odLighting road odVegetation road odLighting road Scheme

off off off off ‐ ‐ ‐ ‐ road road odRural road od20mph road ROUTE

Description

7 Replace 4800m) Widen Redesign Dependent Convert Parking of Dedicated Widen narrowing Fast crossing shuttle Lightfoot dedicated crossing measures Environmental Guild

non

section

lane, wheel. ‐

links and standard

working along

enforcement desire

bridge

staggered of and verge narrowing

Green junction

traffic

e.g. pedestrian

cycling parallel

whole

cutting requires have clearance

on

through

of

widening need need need

corridor

rumble

to

line which would enhancement road.

Lane. calming bicycles

consistent

dedicated

of

phase

to dedicated dedicated dedicated crossing back barriers ikWC£17,500 W&C link

and

lighting

Midgery

to

widen

Reduce side (double

to

/ require

strips, May and of

cycle

shared

of

dedicated create

or throughout. or existing

cycle

vegetation physical

require

&

use or

width substandard mobility 2 and

gateway crossin

pedestrian pedestrian pedestrian

Lane

speed gates

way to 'Please yellow by

use

more underpass route,

open clear

chicane path

facility

off

to set

and localised measures

g limit with

scooter

lines). ‐

open Sycamore

consider

road passing feature to

up back junction

provide

/ / /

expose

width bollards to on access arwn.WC£17,500 W&C narrowing.

cycle cycle cycle roundabouts

route

cycle

rsigWC£20,000 W&C crossing Dedicated 30mph

s one narrowing

to and onsWC£90,000 W&C points

scheme description other

may

shared formal crossings rsig & £125,000 W&C crossings rsig & £125,000 W&C crossings

ls & £115,000 W&C Close

ensure and full

track side maintenance

or cyclists

with

require effective

increase create path

moving

(challenges parallel use dedicated

& deec & £15,000 W&C adherence will

corresponding

link

side user' warning

path

more tightening need

gap in footway crossing

road

crossing

to

in £1,000 C signs to by

pedestrian pleasant expose dedicated to

around path sign creating

priority

allow

away it W width

s and

or highway proposed

full

by the

easy

approach

provision (approx

chicane from

paralle

/ chicane ufc & £5,000 W&C surface

Maples cycle

passage

onrWC£20,000 W&C corner for

and

to

of

4WC£125,000 W&C R4 &

& £125,000 W&C £5,000 £30,000 W&C C & £10,000 W&C & £970,000 W&C £15,000 C & £17,500 W&C & £10,000 W&C & £75,000 W&C £125,000 C & £150,000 W&C

Synergies £5,000

High level cost 8. Fishergate R8a.1 8.0Liverpool R8a.10 8. Fishergate R8a.3 8. River R8a.6 R8a.2 8.1Liverpool R8a.11 8. Liverpool R8a.7 8.7Hutton R8a.17 R8a.14 8.9Longton R8a.19 8. Fishergate R8a.4 8. Liverpool R8a.9 8.8Liverpool R8a.18 8.2Liverpool R8a.12 R8a.15 8.6Hutton R8a.16 8.3Liverpool R8a.13 8. Liverpool R8a.8 8. Fishergate R8a.5 8. R8b.1

Scheme Reference Fishergate Hutton end end Hutton School

of

Ribble

previous ‐ ‐ ‐ ‐ ‐ Moor Liverpool Liverpool Liverpool

Road Road Road Road Road Road Road Road akPublic Park Liverpool

Hill Hill Hill Hill Hill

Bridge

/ from from from /

aeNew/upgraded Lane / to / between / / from

/ scheme) Bow Strand

Howick Leyland

Lindle Longton Cop

utnMaintenance Hutton

Road Road Road

to

Road Bow railway Bow

Hill Lane

Lane Hill

Road Lane

from outside /

Road Moor Hutton

Lane Lane to

Road

through Bypass Moor odNew/upgraded Road

ucinJunc junction

ucinNew junction

River crossing

ucinMinor junction ucinMinor junction

location/section

Longton

to

to to (A59) Lane

Lane Hutton

and

Howick River River at Ribble

to

utnNew Hutton

ucinPublic junction

(at

village ogo New/upgraded Longton ucinJunc junction ucinMinor junction

Bypass Ribble Ribble

County CofE crossing

Moor

eteTraffic centre

Grammar

rsigMaintenance crossing rsigTraffic crossing to

Lane

Hall

village

and

Traffic New/upgraded Public New/upgraded

upgrade upgrade ped/cyc ped/cyc

realm realm realm Highway Highway Highway Management Management Management

/ / /

rsigIntroduce crossing crossing ok Existing works ok Surfacing works to to

streetscape streetscape streetscape

dedicated dedicated dedicated dedicated dedicated mrvmnsRedesign improvements improvements mrvmnsToucan improvements

incorporate incorporate

mnmnsReduce amendments amendments mnmnsAllow amendments

walking walking walking walking walking improvement improvement improvement

ped/cyc ped/cyc Scheme type

/ / / / /

cycling cycling cycling cycling cycling

oeet Provision movements movements

off on on

facility facility aiiyConstruct facility facility facility ‐

‐ & odGateway road road

off ‐ road Scheme With approach carriageway Route Undertake segregated create Potential segregated and push Provision 520m) Reduce Currently Reduce 1750m) opportunities potentiallly Tighten pedestrian Remove Potential Tighten ROUTE

Description opening

on capacity

cycling

needs consistent

8 crossings speed outbound speed

junction. and

segregated street road

feature raised for junction

of of needed 4 footway formal

Safer /

lanes cycle phase

reduce

pedestrian bidirectional redesign

segregated cycle up bigger more

in

centre

for reduction

limit limit parking

inbound to table

Routes

lanes. into

(approx parallel Add on projects

width

due pedestrian

waiting entry highway

improve clearly

along

capacity to to cycle scheme

all line

junction

ewrhmWC£15,000 W&C or pedestrian 20mph 20mph to

further

arms Reduce crossing

along to

cycle to

due

gateway bus

damange length and

track crossings. cycle

770m) defining time such

prioritise School

capacity

wayfinding at to

to

aeC£0 C lane

but

introduce crossing.

through through lanes length.

to

from village single

needs

track as

Penwortham speed

of facilities

improve don't

phase

feature

Park work

Moor through from

(approx Move

to school pedestrians

or

lane maintenance

Either centre.

through

village village

single If cater &

dependent on

with into

heavy

Lane cycle

on

stride

visibility and 50mph

road + Park

620m)

through

all

east/west

for

school. extension bypass lane with with

(approx

track repurpose

local eilsC£30,000 C vehicles rsWC£60,000 W&C arms

desire advisory

with /

speed

and

ylssWC£15,000 W&C cyclists

highway highway for

on and

on

centre

repurpose Investigate scheme description cutting

dedicated

capacity pedestrians

repurpose

4m £80,000 W 540m)

lines.

signal

south of regular

increase

lanes. space

parking

and traffic traffic

into Small

crossings side,

reduction

regime residential road

Widen to

signage opportunity

verge to space

amn & £10,000 W&C calming calming,

enforcement.

create and scale rationalise

beyond

space

footway reduce thereafter and

or

to

surfacing &

dedicated by

highway

create

some area

to carriagway protected

rsig & £125,000 W&C crossing.

Penwortham for

create crossing

crossing

where to

widening Look minor

dedicated

(approx works

20mph narrowing

on

on

to cycle

narrowing. possible to

carriageway path distances.

carriageway

promote to

reduce

bypass (approx footway 10)C£15,000 C 1100m)

eov & £15,000 W&C resolve

junction

on widening

(approx

to

to

£60,000 W £150,000 C £160,000 C & £15,000 W&C £100,000 C & £15,000 W&C & £430,000 W&C & £50,000 W&C & £500,000 W&C & £50,000 W&C

Synergies

High level cost Local enhancement scheme to improve priority and wayfinding for pedestrians / cyclists. Gateway to R8b.2 Riverside Road / Leyland Road Junction Public realm / streetscape improvement on & off‐road W&C £30,000 city. R8b.3 Leyland Road New ped/cyc crossing Provide formalised parallel crossing W&C £60,000 Light complete route and undertake maintenance / landscaping to open up route through fenced R8b.4 Shared path from Leyland Road to Golden Way Public realm / streetscape improvement off‐road area. Path needs resurfacing. Widen to 3m wherever possible and reinstate unsegregated (approx W&C £130,000 330m of lighting and 550m of path improvement) Shared path in Hurst Grange Path parallel with Golden Path needs resurfacing to Cop Lane and lighting. Needs widening to 3m along section by school R8b.5 Public realm / streetscape improvement off‐road W&C £150,000 Way playing fields (approx 600m of lighting, 200m of widening and 400m of resurfacing) Raise parapets to allow cycling, remove staggered barriers and introduce shared use ' please consider R8b.6 Bridge over Golden Way to Kingsfold New/upgraded dedicated walking / cycling facility C £20,000 other path user signage' R8b.7 Path access at Cop Lane Minor Highway improvements Minor works to improve destination signage at junction and remove 'cyclists dismount' signs. C £1,000

R8b.8 Cop Lane signalised junction Junc upgrade to incorporate ped/cyc movements Central pen too small to negotiate with tag along or non‐standard bicycle W&C £30,000 R8b.9 Cop Lane / Cromwell Ave junction Minor Highway improvements Needs narrowing and provision of safe transition to path and Cop Lane crossing W&C £15,000 Local enhancement. Opening up access, some low level lighting & replace concrete bollard with R8b.10 Path from Cromwell Lane to Oak Avenue Public realm / streetscape improvement off‐road W&C £10,000 standard to improve visibility and access R8b.11 Oak Avenue / Broad Oak Lane Wayfinding / signing improvement Improve signage. Not visible due to hedges C £500 R8b.12 Blackthorne Drive close to Acorn Close New ped/cyc crossing Provide formalised parallel crossing to link two shared paths W&C £35,000 R8b.13 Path from Blackthorn Drive along Howick Moor Lane Public realm / streetscape improvement off‐road Surface needs maintanence (clearance). Light along entire length. (approx 620m) W&C £62,500

R8b.14 Path from Blackthorn Drive along Howick Moor Lane Public realm / streetscape improvement off‐road Rationalise bollards to allow easier movement of adapted cycles or mobility scooters W&C £1,000

R8b.15 Path from Blackthorn Drive along Howick Moor Lane New/upgraded dedicated walking / cycling facility Surface link through to Townlea Close (approx 40m) W&C £10,000

R8b.16 Path from Blackthorn Drive along Howick Moor Lane New/upgraded dedicated walking / cycling facility Remove staggered barriers and surface link through to Crown Lee. (approx 90m) W&C £500

R8b.17 Path from Blackthorn Drive along Howick Moor Lane New/upgraded dedicated walking / cycling facility Ensure dedicated link to Primary school either new link or through R8(b):16 W&C £10,000

Tighten junction and upgrade with side road priority. Design currently only caters for straight ahead R8b.18 Howick Moor Lane / Liverpool Road junction Minor Highway improvements W&C £15,000 movements along Liverpool Road. Improve to allow better access to and from Howick Moor Lane R8b.19 Millbrook Road Minor Highway improvements Widen path at bus stop to reduce ped / cyc conflict. Side road ped / cyc priority. Path needs sweeping W&C £15,000 Permenant 20mph with highway traffic calming. Could remove road centre line & introduce on road R8b.20 Cop Lane New/upgraded dedicated walking / cycling facility W&C £10,000 advisory lanes Open up concealed access and widen footway with build out to create gateway. Could introduce R8b.21 Cop Lane / Hurst Grange Park access Public realm / streetscape improvement on & off‐road formal or informal crossing. Increase gap between barriers to improve access for mobility scooters, W&C £10,000 wheelchairs and adapted cycles. Hurst Grange Park Access at Hill Road / Valley Road R8b.22 Wayfinding / signing improvement Replace cyclists dismount sign with 'please consider other path users' C £500 junc R8b.23 Hurst Grange Park central route Public realm / streetscape improvement off‐road Investigate feasibility of lighting (approx 450m) W&C £37,500 91 Brownedge R9.15 91Chapel R9.1 93Old R9.3 95Old R9.5 91 Railway R9.12 98Rail R9.8 92 Quiet R9.20 91 Bamber R9.18 91 Medway R9.10 91 Brownedge R9.14 91 Path R9.19 91 Brown R9.16 R9.13 92Avenham R9.2 91 Brownedge R9.17 94Old R9.4 91 Todd R9.11 96Old R9.6 92 Quiet R9.21 99New R9.9 97Linking R9.7

Scheme Reference Brownedge roundabout

railway Tramway railway railway route

parrallel development

Lane road road

Edge Street path

trail Bridge

Close

akPublic Park link

North

route route

path path path

Road Road Road Road

to ucinPublic Junction from junction

from with from off

to Brownedge Railway

from from or

from from

neps Public underpass to (B527) (B527) to rail rail

railway east

Ribble Fishergate old

Tardy rnaeNew Irongate

ot New/upgraded route with

path

Ribble Ribble Bampton Bampton

rma Public Tramway neps Public underpass of

from junction

Bridge

Watering

London Gate

ieNew/upgraded line to Clos location/section

Bridge Bridge

old

London to e

at

Drive Drive

to Avenham tram to

Watering Way

Bamber Pool to to Station

Way

to to odNew/upgraded road Bamber Bamber

onaotNew roundabout

Carr Carr aeNew/upgraded Lane

akPublic Park

odPublic Road rdeMaintenance Bridge Pool

tetWayfinding Street tetTraffic Street

rdeMaintenance Bridge rdePublic Bridge

Lane

New/upgraded Public Public

ped/cyc ped/cyc

realm realm realm realm realm realm realm realm realm realm Management

/

/ / / / / / / / / /

signing rsigWiden crossing crossing ok Route works ok Route works

streetscape streetscape streetscape streetscape streetscape streetscape streetscape streetscape streetscape streetscape

dedicated dedicated dedicated dedicated dedicated

mnmnsContra amendments mrvmn Sign improvement

walking walking walking walking walking improvement improvement improvement improvement improvement improvement improvement improvement improvement improvement Scheme type

/ / / / /

cycling cycling cycling cycling cycling

on off on off on off off off off off

aiiyProvide facility aiiyWiden facility aiiyUpgrade facility aiiyPotential facility aiiySurface, facility

‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ & & odJunction road road odEnvironmental road odEnvironmental road road odSteep road road odLighting road

off off ‐ ‐ road road Environmental speeds Gateway wheelchairs Widen staggered (approx Create scooters wayfinding junction Provide Remove

quiet

approach. requires requires

path space & dedicated flow

additonal more

800m)

required

light or at

narrowing

and surface feature additonal

barriers route

Irongate rationalise and

cycle to

between surface

and visible

create and enhancement, enhancement

maintenance maintenance visits

and

Investigate

informal

and

along

parallel lane sign sloped

to

highways sloped and

turn

open

signage

(approx to make enhancement alternative

new barriers Carr bollards

whole route gateway

off accces crossing

link

up

access

link tetC£5,000 C Street access

more

to

(cutting (cutting to

enhancement 8m & £40,000 W&C 180m) to barriers

landscaping

up route

on

provide to and guide

open to

to

link

to

to

route allow gradual off possible

old

upgrade 20mph

of roundabout (rail old

back back avoiding

the and up for

route

railway additional

easy to railway

&

and easy

junction

raise

slope. and and

and

allow

tram to

raWC£15,000 W&C area scheme

access from

passage

create

those

underpass

cesC£5,000 C access route sweeping) sweeping)

regular

awareness

route

both and access Replace

space Fishergate removing

into

on to

a

(approx

formalise

of

appox (approx

safer scheme description

aneac & £10,000 W&C maintenance reinforce

non

for

Edward non for

(approx barriers and and

of

‐ non

pc & £15,000 W&C space pedestrians standard

‐ the

3300m,

standard 0)WC£30,000 W&C 50m) to

route a a 0)WC£30,000 W&C 50m)

crossing ‐

regular regular

standard

Avenham

Street need 20mph

0m £40,000 C 200m) with

through

additional

cycles

to

bicycles,

more

(approx

regime regime

facilities and

and cross

cycles,

Park

or

cyclists expectation the accessible

4

requiring

via thereafter.(approx thereafter.(approx 7m & £100,000 W&C 475m) wheelchairs tram

lanes mobility Park. (approx

Winckley

and

link

of Widen

etr & £30,000 W&C feature

mobility

reduce traffic.

approx 0)WC£125,000 W&C 20m) of scooters

cyclists and Square

or

Tighten

vehicle remove mobility 10)WC£275,000 W&C 1100m)

aid

and 30)WC£15,000 W&C 3300m) 30)WC£15,000 W&C 3300m)

to s

aid

& £125,000 W&C & £10,000 W&C & £20,000 W&C & £50,000 W&C & £1,000 W&C & £30,000 W&C

Synergies

High level cost 1b5Coote R10b.5 1a1Wheelton R10a.1 1a8Farington R10a.8 1a1 Todd R10a.11 1b7Leigh R10b.7 1b1Croston R10b.1 1a6Stanifield R10a.6 1b3Croston R10b.3 1b6Coote R10b.6 1a4Centurion R10a.4 1a9Todd R10a.9 1a2Wheelton R10a.2 1b8Wateringpool R10b.8 1a5Centurion R10a.5 1b4Croston R10b.4 1a1 Todd R10a.12 1b2Croston R10b.2 1a7Farington R10a.7 R10a.10 1a3Centurion R10a.3 1c1Scheme R10c.1

Scheme Reference Todd junction

Lane Lane Lane Lane Brow

Lane Lane

Road Road Road Road

aeNew/upgraded Lane

Road Road

Lane Lane a New/upgraded Way Way Way ot New/upgraded North ot New/upgraded South North South/Brownedge

rdePublic Bridge from /

Leyland

suh New/upgraded (south) nrh New/upgraded (north) / / Lane

/ / School / (A582) A8)New (A582)

Stanifield Mill Fir Centrurion /

Old

/ delivered Trees

Brownedge aeNew/upgraded Lane Road/Brownedge

Lane railway /

Todd

Road

Ave

Lane

Junction

Way

by Road/Todd

Lane line to location/section (A582)

ucinJunc junction

City

Road

Leyland ucinNew Junction

junction

South

Deal

onaotJunc roundabout onaotPublic roundabout

Road

Lane

Road ucinMinor junction Team

junction

North

Minor New/upgraded Public road Public road Public road Public road

upgrade upgrade ped/cyc ped/cyc

realm realm realm realm realm realm Highway Highway

/ / / / / /

rsigProvide crossing crossing to to

streetscape streetscape streetscape streetscape streetscape streetscape

dedicated dedicated dedicated dedicated dedicated dedicated dedicated dedicated mrvmnsTighten improvements mrvmnsTighten improvements

incorporate incorporate

walking walking walking walking walking walking walking walking improvement improvement improvement improvement improvement improvement Scheme type

ped/cyc ped/cyc

/ / / / / / / /

cycling cycling cycling cycling cycling cycling cycling cycling

oeet Narrow movements oeet Provision movements

on off on on on on

aiiySurface facility facility aiiyRemove facility aiiyRemove facility facility aiiyRemove facility aiiyCreation facility aiiyRemove facility

‐ & & & & odReduce road odEnvironmental road

off off off off ‐ ‐ ‐ ‐ Scheme route Side Side motorcycle Provision enforcement of sustainable Junction New west Narrow Narrow and ROUTE

footway.

provision

road road

Description crossing side).

through

junction and junction junction carriageway junction junction

crossing

road road road road narrowings of 10

of of priority junction

Some

dedicated barriers

travel light dedicated dedicated

needed centre centre centre centre

of site

enhancement

approach wide

where mouth where mouth on

track

HGV

across

improvements narrowing

Centurion

to with line line line line

to

advisory on

traffic

pedestrian facilities. from

improve

possible possible

and to

accomdate junctions,

and and and and

carriageway chicane

radii reduce

Centurion potential

so

install install install install and and

Way lanes.

and

ideally

environment Some and and

proposed

pedestrian to lighting cycle speed

widen

to

advisory advisory advisory advisory improve

access

aid provision resurface

Beyond

for segregated allow

scope Way off

crossings access

of

Safer ‐ to to road

to

traffic as

to

transition

guidance

create for cycle cycle cycle cycle drop

priority,

A5083 for Cuerden

part

Mill for

across

routes too provision.

off

pedestrians and

cycle

exiting cyclists kerbs

lanes. lanes. lanes. lanes

of Lane

‐ and more road

turning

Cuerden

ucinWC£100,000 W&C junction

widening improvements

width to

from

strategic

ae £200,000 C lanes crossing

and with to

scheme description

Widen Reduce

school provision,

52 & £15,000 W&C A582. open

making Minimal

slow

shared

where provision up

some and

Strategic

area

footways

to esrsWC£20,000 W&C measures footway vehicles site of

speed

turning

wayfinding

employment

road provision

path associated possible requires

improving via

to

on

limit

make A582

Site for

to

and if

where east movements.

possible

segregated

old

and

development. land

to would

aid

improvements and

route

side

highway

perceptions 30mph

railway

site

possible. move pedestrians

from to

and

in be more alongside

provide

vicinity

lamp

removal Stanfield

aiiisWC£60,000 W&C facilities hogotC£150,000 C throughout path. new calming

Formalise nutv & £175,000 W&C intuitive

of

route

columns

for link Remove and

of aeyWC£15,000 W&C safety River

of

esrsC£75,000 C measures ylssWC£75,000 W&C cyclists col £75,000 C schools Business

to ylssWC£35,000 W&C cyclists

centre to

new otc & £200,000 W&C Lostock parking

link

to

back

cycle

into line park

/

& £125,000 W&C & £15,000 W&C & £125,000 W&C & £50,000 W&C & £120,000 W&C £75,000 C £300,000 C

Synergies

High level cost ROUTE 11 Scheme Description cost

type

Reference

description

level

Synergies Scheme High location/section Scheme scheme

R11(a).1 Park Road from Union St to A6 Preston Street New/upgraded dedicated walking / cycling facility Upgrade existing on‐road advisory lanes to light or fully segregated C £240,000

Provide dedicated crossing for pedestrians and cyclists to access Park Road from Preston Road A6 with associated R11(a).2 A6 Preston St junction with Park Road New ped/cyc crossing W&C £125,000 improvements to make the route clear to users.

A6 Preston Street from Park Rd junction () to Lane Create dedicated on carriageway light segregated lanes by removal of central hatching and reallocation of carriagway space. R11(a).3 New/upgraded dedicated walking / cycling facility C £250,000 roundabout Alternative to find previous LCC Cycle Safety scheme submitted to DfT (around 2013)

Reduce to consistent narrow vehicle running lanes & remove central hatching along enitre lenth & create dedicated on A6 Preston St from Euxton Lane roundabout to Four Oaks Rd R11(a).4 New/upgraded dedicated walking / cycling facility carriageway light segregated lanes in either direction. Where parking needed then ensure parking protected cycle lanes. C £1,400,000 roundabout at Challenging narrow bit at from Euxton Rd to Hardacre Lane (approx 5800m)

A6 Preston St from Euxton Lane roundabout to Four Oaks Rd R11(a).5 Traffic management amendments Reduce speed limit to consistent 30mph along entire length W&C £10,000 roundabout at Walton Summit R11(a).6 A6 / Boynton Rd roundabout Junc upgrade to incorporate ped/cyc movements Reduce size of junction slowing vehicle speeds and making it easier to negotiate for peds/cyclists W&C £50,000 R11(a).7 A6 / Rd roundabout Junc upgrade to incorporate ped/cyc movements Reduce size of junction slowing vehicle speeds and making it easier to negotiate for peds/cyclists W&C £50,000 R11(a).8 Four Oaks Rd / A6 roundabout Junc upgrade to incorporate ped/cyc movements Dedicated pedestrian / cycle crossing on Four Oaks Road arm of roundabout. Parallel crossings. W&C £125,000 Provision of 2‐way cycle tracks on both sides on road. Ensure clear transition and access from Walton Summit and For Oaks Rd R11(a).9 Four Oaks Rd roundabout to Walton Summit Rd roundabout New/upgraded dedicated walking / cycling facility W&C £100,000 roundabouts R11(a).10 Walton Summit Rd roundabout Junc upgrade to incorporate ped/cyc movements Dedicated pedestrian / cycle crossing on Four Oaks Road arm of roundabout. Parallel crossings. W&C £125,000 R11(a).11 M6 / A6 roundabout Junc upgrade to incorporate ped/cyc movements Provision of dedicated ped/cyc crossings at on‐slip and off‐slip to M6. Likely to be toucan crossings W&C £125,000 Provide dedicated ped/cyc crossing at this junction to improve provision for less confident cyclists. Could be parallel crossing R11(a).12 Church Road / B6258 / Havelock Rd Junction New ped/cyc crossing W&C £50,000 and gateway feature as entrance to R11(a).13 Holme Rd / Cuerden Way through to Brownedge Rd Public realm / streetscape improvement on & off‐road Environmental improvements to open up area and improve feelings of personal safety and natural wayfinding W&C £30,000 Dedicated pedestrian / cycle crossing from Ackhurst Drive path to Copperwood Way and across Copperwood Way. Parallel R11(b).1 Ackhurst Drive at Copperwood Way roundabout Junc upgrade to incorporate ped/cyc movements W&C £70,000 crossings. R11(b).2 Ackhurst Drive from Foxhole Rd to Copperwood Way roundabout Maintenance works Existing path needs some surface maintenance work and moving of existing lamp columns to rear of path. C £50,000 R11(b).3 Ackhurst Drive near to Common Bank Lane New ped/cyc crossing Dedicated crossing needed to provide link to existing shared use facility. Parallel crossing prefereable. W&C £35,000 R11(b).4 Ackhurst Road from Southport Rd to Foxhole Rd B5251 New/upgraded dedicated walking / cycling facility Widen existing footway to create shared use facility W&C £30,000 R11(b).5 Southport Road at Astley Park access New ped/cyc crossing Toucan crossing needed. Currently no facility on busy road linking into Astley Park and local network. W&C £60,000 R11(a).10 Walton Summit Rd roundabout Junc upgrade to incorporate ped/cyc movements Dedicated pedestrian / cycle crossing on Four Oaks Road arm of roundabout. Parallel crossings. W&C £125,000 R11(a).11 M6 / A6 roundabout Junc upgrade to incorporate ped/cyc movements Provision of dedicated ped/cyc crossings at on‐slip and off‐slip to M6. Likely to be toucan crossings W&C £125,000 Provide dedicated ped/cyc crossing at this junction to improve provision for less confident cyclists. Could be parallel crossing R11(a).12 Church Road / B6258 / Havelock Rd Junction New ped/cyc crossing W&C £50,000 and gateway feature as entrance to Bamber Bridge R11(a).13 Holme Rd / Cuerden Way through to Brownedge Rd Public realm / streetscape improvement on & off‐road Environmental improvements to open up area and improve feelings of personal safety and natural wayfinding W&C £30,000 Dedicated pedestrian / cycle crossing from Ackhurst Drive path to Copperwood Way and across Copperwood Way. Parallel R11(b).1 Ackhurst Drive at Copperwood Way roundabout Junc upgrade to incorporate ped/cyc movements W&C £70,000 crossings. R11(b).2 Ackhurst Drive from Foxhole Rd to Copperwood Way roundabout Maintenance works Existing path needs some surface maintenance work and moving of existing lamp columns to rear of path. C £50,000 R11(b).3 Ackhurst Drive near to Common Bank Lane New ped/cyc crossing Dedicated crossing needed to provide link to existing shared use facility. Parallel crossing prefereable. W&C £35,000 R11(b).4 Ackhurst Road from Southport Rd to Foxhole Rd B5251 New/upgraded dedicated walking / cycling facility Widen existing footway to create shared use facility W&C £30,000 R11(b).5 Southport Road at Astley Park access New ped/cyc crossing Toucan crossing needed. Currently no facility on busy road linking into Astley Park and local network. W&C £60,000 R11(b).6 Astley Park at Hall Gate Maintenance works When path needs resurfacing, widen to 3m and make shared unsegregated. W&C £20,000 Direction signing needs improving as unclear at this point. Remove cyclists dismount signs and replace with 'Please consider R11(b).7 Astley Park at Hall Gate Wayfinding / signing improvement W&C £5,000 other path users' R11(b).8 Astley Village Shops Public realm / streetscape improvement off‐road Minor path widening along desire line with some signing improvements W&C £5,000 R11(b).9 Chancery Road at Astley Village Shops New ped/cyc crossing Dedicated ped/cyc crossing to cater for desire line from bus stops and access to Buckshaw Primary School. W&C £60,000 Side road priority crossings along entire route widen where possible to 3m and replace as cycle track or shared unsegregated R11(b).10 Chancery Road for entire length New/upgraded dedicated walking / cycling facility W&C £300,000 path. R11(b).11 Chancery Road for entire length Maintenance works Whole route needs aggressive vegetation clearance. W&C £15,000 R11(b).12 Chancery Road / Euxton Lane roundabout Junc upgrade to incorporate ped/cyc movements Dedicated ped/cyc crossings on alll arms. Roundabout has poor visibility and difficult to cross at peak times W&C £250,000

R11(b).13 West Way from Balshaw Lane to Euxton Lane New/upgraded dedicated walking / cycling facility Dedicated bi‐directional cycle track using existing verge to link into paths at either end W&C £240,000 Widen substandard width shared path. Need to liaise with hospital regarding land. Move lamp columns to rear from centre of R11(b).15 Euxton Lane from Chancery Road to A6 Preston Road New/upgraded dedicated walking / cycling facility W&C £500,000 path Euxton Lane from Chancery Road roundabout to Buckshaw Village Path in poor condition in parts (south sides) and needs resurfacing. Where possible add verge separation from highway. Side R11(b).16 Maintenance works C £50,000 main road road priority incorporated into works R11(b).17 Buckshaw Village main road near Townsend Drive Wayfinding / signing improvement Signing at bus stop inconsistent and needs review W&C £5,000 R11(b).18 Buckshaw Village main road roundabout Junc upgrade to incorporate ped/cyc movements Dedicated ped/cyc crossing on all arms to allow safe crossing at roundabout W&C £70,000 R11(b).19 Buckshaw Village Central Avenue New/upgraded dedicated walking / cycling facility Potential for new short links to village to improve permeability and access to the network W&C £30,000 R11(b).20 Buckshaw Village Central Avenue / Main street roundabout Junc upgrade to incorporate ped/cyc movements Dedicated ped/cyc crossing (parallel crossing) on all arms to allow safe crossing at roundabout W&C £70,000 Dedicated ped/cyc crossing (parallel crossing) on Old Worden Ave arm to allow safe crossing at roundabout and continue R11(b).21 Buckshaw Village Central Avenue / Old Worden Ave roundabout New ped/cyc crossing W&C £35,000 continuity of path R11(b).22 Dawson Lane / Waitrose depot access New ped/cyc crossing Dedicated ped/cyc crossing (parallel crossing) to allow safe crossing at roundabout and continue continuity of path W&C £60,000 R11(b).23 Dawson Lane / Wigan Road (A49) junction Junc upgrade to incorporate ped/cyc movements Remove advisory lane to straight on lane C £5,000

R11(b).24 A49 Wigan Road from Dawson Lane to A6 Traffic management amendments Reduce speed limit to consistent 40mph (30 where possible) along entire length. W&C £5,000

Revive previous LCC scheme on western verge and deliver continuous cycle track along this route. May be some scope to work R11(b).25 A49 Wigan Road from Dawson Lane to Lancaster Lane New/upgraded dedicated walking / cycling facility C £250,000 within field boundary on westside. Likely to be substandard width for large lengths if path must remain on highway land

R11(b).27 Lancaster Lane / A49 Wigan Road junction Wayfinding / signing improvement Direction signing unclear and also unclear which sections of path are shared use C £5,000

Deliver continous cycle track. Path is substandard width and should be widened where possible to conform with guidance. Side R11(b).28 A49 Wigan Road from Lancaster Lane to Rowan Manor New/upgraded dedicated walking / cycling facility C £100,000 road priority treatments to create coherent route R11(b).29 Rowan Manor development roundabout Junc upgrade to incorporate ped/cyc movements Dedicated ped/cyc tiger or toucan crossings to create coherent / safe route W&C £125,000 Deliver continous cycle track along this route. May require some land acquisition. Likely to be substandard width for large R11(b).30 A49 Wigan Road from Rowan Manor to A6 New/upgraded dedicated walking / cycling facility W&C £440,000 lthN hit li ti h bl 3 Sid d iit t i ROUTE 12 Scheme Description cost

type

Reference

description

level

Synergies Scheme High location/section Scheme scheme

R12.1 B6258 from Church Road to roundabout at School Lane (Pear Tree PH) Traffic management amendments Reduce speed limit to 20mph along entire length through town centre W&C £10,000

Environmental enhancements to help reinforce lower speed limit through town centre with junction R12.2 B6258 from Church Road to roundabout at School Lane (Pear Tree PH) Public realm / streetscape improvement on & off‐road W&C £200,000 narrowings, pedestrian side road priority and gateway & repeater features.

R12.3 School Lane roundabout (Pear Tree PH) to Holland House Road roundabout New/upgraded dedicated walking / cycling facility Creation of dedicated on carriageway light segregated cycle lanes C £290,000

R12.4 Holland House Road roundabout to Hennel Lane roundabout New/upgraded dedicated walking / cycling facility Creation of dedicated on carriageway light segregated cycle lanes. Up hill most important C £60,000

Widen shared use path to recommended guidance if possible. Requires narrowing carriagway lanes to R12.5 Victoria Road from Winery Lane to Grove Road New/upgraded dedicated walking / cycling facility W&C £50,000 absolute minimum 3.25m

Tighten junction and improve surface and camber for cyclists. Investigate scope to rationalise to one R12.6 Grove Road junction & Ashbirdge Nursery access Junc upgrade to incorporate ped/cyc movements W&C £30,000 junction making it simpler for ped/cyc to negotiate.

R12.7 Ashworth Grove Junction Minor Highway improvements Tighten junction mouth and potential for side road priority W&C £15,000

Some surfacing works needed and clearance of mud on surface. Increase gap between staggered barriers R12.8 Route to car park upstream of London Road Bridge on Guildwheel Maintenance works W&C £5,000 on Guild wheel

Some surfacing works needed although challenging as operational farm track. Need to ensure regular R12.9 Path from Mete House Farm to River Ribble Maintenance works W&C £20,000 clearance of farm animal waste & mud

Investigate scope for lighting of path. May be some challenges due to operational farm and flooding. R12.10 Path London Road River Ribble Bridge to A59 River Ribble road bridge Public realm / streetscape improvement off‐road W&C £275,000 Regular maintenance to clear path necessary

R12.11 A59 River Ribble Road Bridge Public realm / streetscape improvement off‐road Remove barriers to aid access and from path and Guild wheel. W&C £5,000 ROUTE 13 Scheme Description cost

type

Reference

description

level

Synergies Scheme High location/section Scheme scheme

Upgrades to bidirectional cycle track along Queen Street/Avenham Lane from London Road to Knowsley Street junction on the southern side of the carriageway, and remove the grass verge. Comprehensive 13.a.1 London Road to Ribbleton Place via Avenham Lane New/upgraded dedicated walking / cycling facility cycle route signage. (approx 650m) £572,000

13.a.2 Toucan Crossings at Manchester Road junction x2 £194,400

Cyclists to continue on‐road from Knowsley Street junction to Winkley Square/Ribblesdale Road 13.a.3 (Proposed Winkley Square cycling route 9). Limited carriageway space (approx 405m) N/A

From Fishergate junction to car park (TCF proposed cycle route) implement shared pedestrian/cycle priority route (approx. 340m). This includes removal of roundabout along Butler Street, removal of right turn to Fishergate Car Park and pedestrian/central reservation (costed 13.b.2 New/upgraded dedicated walking / cycling facility for in Walking audit). 293760

13.c.1 Meadow Street to Church Street via Old Vicarage Road New/upgraded dedicated walking / cycling facility Highlighted Crossing at Carlisle Street (Bus route entrance) £6,192

Cyclists to continue on‐road from Meadow Street (TCF Route ends) to Lancaster Road via Old Vicarage 13.c.2 Road due to limited carriageway width availability. (approx. 320m) £62,000

Implement traffic calming / informal streets along Lancaster Road from Old Vicarage Road to 13.c.3 Fishergate. (approx 300m) £259,200

13.c.4 Comprehensive cycle signage throughout the route £10,368

Segregated cycle super highway, along the ringway from Corporation Street to Queen Street London Road Junction + comprehensive cycle route signage. (approx 1.3km). Pedestrian provision is costed for 13.d.1 Ringway: Corporation Street to Queen Street/London Road junction New/upgraded dedicated walking / cycling facility as part of W6.3 and W6.4 in the walking audit. £1,907,464

Junction improvements at Church Street/Ringway junction and Queen 13.d.2 Street/Ringway junction Junction improvement Two CYCLOPS junctions proposed along Ringway] £7,000,000

Introduce traffic calming / informal streets along Church Street, from Lancaster Road junction to 13.e.1 Church Street: Lancaster Road junction to Ringway New/upgraded dedicated walking / cycling facility ringway. Continuation of Fishergate scheme. (approx. 510m) £440,640

13.e.2 Comprehensive cycle route signage. £8,813

Frenchwood Ave/London Road junction to Church Street via Cardinal 13.f.1 Newman College New/upgraded dedicated walking / cycling facility Ashworth Grove to Frenchwood Avenue upgrade existing shared walking and cycle path. (approx. 320m) £281,600

Cyclists to continue on‐road from Frenchwood Ave to Manchester Road. Plus comprehensive cycle route 13.f.2 signage. (approx. 360m). Residential parking on both sides of carriageway limits scope of interventions. N/A

Along Manchester Road from Frenchwood Ave junction to Halsbury Junction (approx. 210m), cyclists to continue on road due to limited scope for segregation as a result of high levels of on‐street parking. Plus 13.f.3 comprehensive cycle route signage. £130,637

From Halsbury Street junction introduce informal cycle streets scheme to Queen Street junction. 13.f.4 (approx. 260m) £224,640

Cyclists to continue on‐road to Church Street due to limited carriageway width availability. (approx. 13.f.5 290m). Links in with W3.5 walking audit costing. £87,696

13.f.6 Comprehensive cycle signage from Queen Street to Church Street. (approx. 290m) £5,011

Implement traffic calming / informal streets, similar to Fishergate along Adelphi Street from Victoria Street junction to Friargate. (approx 360m). North Friagate will be fully pedestrianised, see Preston City 13.g.1 Friargate: Victoria/Adelphi Street junction to A59 Ringway New/upgraded dedicated walking / cycling facility Transport Plan. £311,040

13.g.2 Comprehensive cycle signage throughout the route £6,221

13.h.1 Avenham Lane to Church Street via Syke Hill‐Stoney Gate Integrate with informal street measure W4.13 within the walking audit. (approx 100m) £30,000

13.h.2 Cycle signage throughout the pedestrian prirority (informal street) route W4.13. £1,728 £11,833,410 Walking and Cycling Delivery Plan

Appendix B. Walking Route Interventions

Route Intervention ID Intervention overview Suggested intervention Indicative costing (high cost) Indicative costing (low cost)

PW1

Implement pedestrian priority route from Liverpool Road junction to Fishergate (approx. W1.1 750m). This has been costed for in the Cycling Audit, however costings have been implemented to reflect a more accurate Pedestrian Priority Measures. costing here. £300,000 £100,000 W1.4

W1.5 W1.2 W1.3 PW1. Fishergate Hill to Ribbleton Upgrade crossings to controlled crossing at Lane/Ringway junction Crossing Improvements Bow Lane junction and Waltons Parade x3. £140,400 £86,400 W1.3 Crossing Improvements Implement Zebra Crossing at County Hall £46,800 £28,800 W1.2 Introduce pedestrian priority route along W1.4 Church Street, from Lancaster Road junction to W1.1 ringway (extension of Fishergate). (approx. W1.1 Pedestrian Priority Measures 510m) £24,840 £24,840

W1.5 Increase number of unsignalised pedestrian Crossing Improvements crossings along Church Street x3. £38,880 £38,880 High cost: Low cost: £550,920 £278,920

W2.1 Flyde Road to the Adelphi roundabout PW2 (UCLAN) will be undergoing a transfromational change, the scheme is described in detail Pedestrian Priority Measures. within the UCLAN masterplan. N/A N/A

W2.6 Improve the quality of the footway surfacing W2.2 and dropped kerbing at junctions along Corporation Street, both-sides. (approx. Pedestrian Priority Measures 350m) £7,949 £680 PW1.1

W2.3 Build out footways along Marsh Lane W2.1 (Eastern/Western sides at Corporation Street W2.5 Crossing Improvements junction. (approx 30m) £3,024 £3,024

PW2. UCLAN Corridor W2.2 W2.4 Introduce traffic calming measures along Corporation Street from Fishergate to Adelphi Traffic Calming Measures roundabout. £24,840 £24,840 W2.4

Introduce pedestrian priority measures from Victoria Street junction to Ringway. (approx. W2.3 725m). Only costed for measures from Victoria W2.5 Street to Adelphi Roundabout (approx. 350m) since north Friargate pedestrian/cycling priority measures have been accounted for in the cycle costings. Improve wayfinding along Pedestrian Priority Measures Friargate South. £300,000 £200,000

W2.6 Widen footways and introduce measures to reduce traffic flow from Aqueduct Street to Pedestrian Priority Measures Victoria Street. (approx. 325m) £15,805 £15,805 High cost: Low cost: £351,619 £244,350 PW3 W3.1 Improve the quality of the footway through dropped kerbing at juntions and surface quality along Frenchwood Ave (both-sides). Footway Improvements (approx. 365m) £7,956.81 £5,942.38

W3.2 Implement pedestrian priority measures along Manchester Road in proximity to Cardinal Pedestrian Priority Measures Newman College. (approx. 260m) £24,840 £24,840

PW3. London Road to Fishergate via Cardinal W3.4 Newman College W3.5 W3.3 Public realm improvements around to promote safety and Public Realm Improvements access. £2,851.20 £2,376.00 W3.3 W3.2 W3.4 Upgrade Queen Street/Manchester Road junction to add toucan crossing on southern Crossing Improvement arm, and priority crossing on other arms. £150,192.00 £114,192.00

W3.1 Implement pedestrian priority route along W3.5 Manchester Road, from Queen Street junction to Church Street, measures should follow similar to those posed along Manchester Footway Improvements Road. (approx 290m) £24,840.00 £24,840.00 High cost: Low cost: £210,680 £172,190

W4.1 Consider improving public realm/lighting of route throughout Amney Park, Old Tram Public Realm Improvements Bridge to Ribblesdale Road. (approx .400m) £33,120 £33,120

Drop kerbs at East Cliff/East Cliff Road W4.2 junction to imrpove pedestrian access along East Cliff Road. (Consider Highlighted junction PW4 Pedestrian Priority Measures crossing). £6,192.00 £6,192.00

At East Cliff Road/Garden Street/Fishergate W4.3 car park, drop kerbs at the junction (Car Park entrance) and remove bollards. Consider upgrading zebra crossing to parrallel cossing Crossing Improvements to provide access through car park. £8,784 £8,136

W4.4 From East Cliff Road/Garden W4.14 Street/Fishergate car park entrance build out footway adjacent to car park, northern-side to W4.9 4.15 Footway Improvements Butler Street. (approx. 120m) £10,080.00 £10,080.00

W4.17 W4.12 W4.5 Redesign Butler Street junction to remove W4.7 mini-roundabout and build out footways at junction. Add in zebra crossing point at Butler W4.11 W4.16 W4.13 Crossing Improvements Street arm (North-side). £58,104.00 £40,104.00 W4.3 W4.8 W4.4 W4.6 Remove right turn into Fishergate car park and remove pedestrian island/central W4.10 Pedestrian Priority Measures reservation. £49,392.00 £49,392.00

W4.6 W4.9 W4.7 Implement signalised crossing from Fishergate Car Park crossing Butler Street to Crossing Improvements Preston Railway Station East side entrance. £89,280 £72,720 W4.5 W4.2 PW4. South to East Corridor

Implement shared pedestrian/cycling priority W4.8 route along Butler Street from Preston Rail W4.1 Station car park to Fishergate junction. Pedestrian Priority Measures (approx. 340m) £84,211.20 £51,408.00

Implement pedestrian priority route (similar W4.9 to that along Friargate) from Ribblesdale Place/ entrance to Fishergate. Pedestrian Priority Measures (approx 360m) £311,040 £207,360

W4.10 Implement Zebra crossing at Winkley Crossing Improvements Square/Ribblesdale junction. £46,800 £28,800

W4.11 Traffic calming measures to reduce on-street Traffic calming measures parking along Winkley Square. £24,840 £24,840

W4.12 Increase number of unsignalised pedestrian Crossing Improvements crossing provisions along Avenham Lane x3. £38,880 £38,880

W4.13 Implement signalised crossing outside Crossing Improvements Avenham Health Centre/Syke Hill junction. £89,280 £72,720

W4.14 Implement pedestrian priority measures along Syke Hill and Stoneygate, from Avenham Lane Footway Improvements to Church Street. £24,840 £24,840

Improvements to footway quality through W4.15 drop kerbing along North-side of Syke Street. Footway Improvements (approx. 130m) £7,776.00 £5,832.00

W4.16 Syke Street/Glover Street junction crossing requires a highlighted junction crossing, to Crossing Improvements improve pedestrian access along Syke Street. £6,192 £6,192

Improvements to drop kerbing at junctions W4.17 along both sides of Cross Street required. Footway Improvements (approx. 170m) £6,480.00 £4,860.00 High cost: Low cost: £895,291 £685,476 W5.1 Large scale junction redesign at A6/Moor Lane PW5 Junction Improvements to accommodate pedestrian movements. £1,180,800 £403,200

Improve quality of footway along A6 through W5.1 W5.2 dropped kerbing and surface quality improvements, both sides of the carriageway. Footway Improvements (approx. 780m) £213,926.40 £133,488.00 W5.6 W5.3 Traffic calming measures to reduce traffic flow Traffic Calming Measures along A6. (approx. 780m) £16,200 £11,376 W5.2 W5.10 W5.4 Upgrade pedestrian islands to signalised W5.3 Crossing Improvements crossings x2 along A6. £178,560 £145,440

Consider implementing puffin crossing on east W5.8 W5.5 and western arm of Sedgwick Street/A6 W5.5 Crossing Improvements junction. £178,560 £145,440

W5.4 Improve footway quality of Moor Lane, W5.7 W5.9 W5.6 through dropped kerbing at junctions - Footway Improvements bothsides. (approx. 750m) £20,736 £15,552

PW5. Northern Corridor W5.7 Traffic calming measures to reduce traffic flow Traffic calming measures along Moor Lane. (approx. 750m) £24,840 £24,840 W5.11 W5.8 Increase number of unsignalised pedestrian Crossing Improvements provisions along Moor Lane. £51,840 £51,840 W5.12 Implement highlighted crossings for W5.9 pedestrians on the eastern side of the Crossing Improvements carriageway along Moor Lane x5. £30,960 £30,960

W5.10 Traffic management measures to reduce on- Traffic Management measures street parking along Moor Lane. £7,704 £7,704 W5.14 W5.11 Crossing Improvements Parallel Crossing at Carlisle Street. (Bus Station) £46,800 £46,800 W5.13

W5.12 Build out footway along Old Vicarage Footway Improvements Road/Lancaster Gate junction. (approx. 10m) £5,040 £5,040

W5.13 Pedestrian priority route along Lancaster Road. Pedestrian Priority Measurements (approx. 300m) £24,840 £24,840

W5.14 Removal of bollards and Street signage outside Public Realm Improvements the Market Hall and along Lancaster Road. £1,000 £500 High cost: Low cost: £1,981,806 £1,047,020

W6.1 Remove central reservation throughout the Ringway and implement pedestrian priority Pedestrian Priority Measures measurements similar to that of the A6 Salford. £24,840 £24,840

W6.2 Improve footway quality along Leighton Street from Pedder Street to Corporation Street via W6.4 Footway Improvements Marsh Lane, West-side. (approx. 150m) £37,152 £22,680 W6.2 W6.3 Implement highlighted crossing at Leighton Street/Marsh Lane junction to provide access Crossing Improvements to Corporation Street/town centre. £6,192 £6,192 W6.6

W6.7 W6.4 Widen footway along Ringway between A6/A59 W6.5 junction to Primrose Hill junction, both sides. W6.1 W6.3 W6.8 Footway Improvements (approx. 1000m) £60,480 £60,480 W6.10 W6.9 Widen footway along Ringway between PW6. Ringway Corridor W6.5 Primrose Hill junction to Ashworthgrove junction, eat into grass verge where can, Footway Improvements western-side. (approx. 650m) £80,640 £80,640

W6.6 Cost for a grade A junction crossing at St Pauls Crossing Improvements Square junction. £388,800 £316,800

W6.7 Remodel Preston HMP Junction. Cyclops track Crossing Improvements junction required. £1,180,800 £403,200

W6.8 Remodel and consider junction redesign at Crossing Improvements A59/New Hall Lane junction £1,180,800 £403,200

W6.9 Upgrade Queen Street junction, controlled Crossing Improvements crossings on each arm x2. £93,600 £57,600

W6.10 Traffic calming measures along the ringway to Traffic Management measures reduce speeds and traffic flow. (approx. 2.4 km) £24,840 £24,840 High cost: Low cost: £3,078,144 £1,400,472 Route Intervention ID Intervention overview Suggested intervention Indicative costing (high cost) Indicative costing (low cost) LoW1

Implement pedestrian priority zone along Leyland Road from Harrold Terrace to Jubilee W1.1 Road-widening footway widths, reducing W1.1 speeds and increasing crossing provision (approx 200m). Costings align with those Pedestrian Priority Measures costed in the cycling audit Route 10b.6. £172,800 £115,200 W1.2

Add puffin crossing on Brownedge Road arm W1.4 W1.2 of Brownedge Road/Leyland Road junction; with footway build outs incorporated within Crossing Improvements W1.1 £97,200.00 £79,200.00 W1.3

W1.3 Increase number of unsignalised crossing W1.6 W1.5 LoW1. North to South Route Crossing Improvements points along Watkins Lane x2 £25,920.00 £25,920.00 Resurface disabled access to Rail W1.4 Station and add highlighted crossing from Footway Improvements footway (approx. 200m) £55,728.00 £36,432.00 W1.7 W1.5 Traffic calming measures to reduce on-street Traffic Management parking along Watkins Lane. £24,840.00 £24,840.00

W1.6 Improve footway quality along Watkins Lane, through improvements to dropped kerbing at Footway Improvements junctions. Both sides. (approx 300m) £7,776.00 £5,832.00

W1.7 Traffic calming measures along Stanfield Lane Traffic Management to reduce speeds. £24,840.00 £24,840.00 High cost: Low cost: £409,104 £312,264

W2.1 Widen footways along Brownedge Road on the northern side of the carriageway, from LoW2 Footway Improvements Leyland Road junction. (approx 20m) £4,953.60 £3,024

Widen footways along Coote Lane from W2.2 Leyland Road junction, both-sides (approx Footway Improvements 20m). £2,520.00 £2,520.00

W2.3 Introduce signalised/zebra crossing along Crossing Improvements Wateringpool Lane £46,800.00 £28,800.00

W2.4 W2.5 Increase number of unsignalised pedestrian W2.11 W2.3 Crossing Improvements crossings along Brownedge Road x4 £51,840.00 £51,840.00

W2.5 Introduce controlled crossings at Brownedge W2.1 Road arm and A6 North arm at Londo Way W2.2 Junction Improvements (A6) roundabout. £93,600.00 £57,600.00 W2.4

W2.6 Introduce unsignalised crossing along Coote W2.6 LoW2. East to Western Routes Crossing Improvements Lane after Charnock Moss Roundabout £12,960.00 £12,960.00

W2.7 Improve quality of footway along Coote Lane, through dropped kerbing at junctions, from Firs Tree Ave to Church Lane junction (approx W2.7 Footway Improvements 920m) £5,184.00 £3,888.00

W2.8 Intoduce zebra crossing outside Farington W2.4 Crossing Improvements Moss Primary School along Croston Road £46,800.00 £28,800.00 W2.8

W2.9 Upgrade Church Lane unsignalised crossing Crossing Improvements point. £89,280.00 £72,720.00 W2.9

W2.10 Croston Road/A582 roundabout, upgrade to Junction Improvements improve pedestrianisation of roundabout. £175,000.00 £175,000.00

Improvements to footway quality along W2.10 W2.11 Waterington Lane, through improving surface quality and dropped kerbing at junctions between Brownedge Roundabout to Footway Improvements Doodstone Nook. (approx 310m) £3,888.00 £2,916.00 High cost: Low cost: £532,826 £440,068

LoW3

W3.1 Introduce x2 Zebra crossings or signalised crossings at Lostock Hall Community High Crossing improvement School. £93,600 £57,600

W3.2 Improve footway quality along Todd Lane, W3.1 through dropping kerbs and improving Surfacing improvement surface quality at junctions. (1.13Km) £12,960.00 £9,720.00 W3.3

W3.3 At Todd Lane North/Brownedge Road/Todd W3.2 Lane South junction build out footway where Crossing improvement possible and resurface footways. £100,000 £100,000 LoW3. Todd Lane to North Cuerden W3.4 Build out footway from Railway Bridge to W3.4 W3.6 Townsway junction Todd Lane South (utilise W3.5 Footway Improvements grass verge) approx 175m. £20,160.00 £20,160.00

W3.5 Upgrade A6 Todd Lane junction to puffin Crossing improvement crossing £89,280.00 £72,720.00 W3.7

W3.6 Increase number of unsignalised crossing Crossing improvement points along Todd Lane South x3 £38,880.00 £38,880.00

Upgrade crossing provisions at A6 junction W3.7 and A49 (Wigan Road) junction (Southside) to accommodate for pedestrians and cyclists. X2 Crossing improvement controlled crossings. £93,600.00 £57,600.00 High cost: Low cost: £448,480 £356,680