Regional and Metropolitan Roads
Total Page:16
File Type:pdf, Size:1020Kb
REGIONAL AND METROPOLITAN ROADS 2018/19 (Approved Budget) Comments * Approved State Black Spot Budget doesn’t include 1/3 mandatory State Black Spot Program - Regional and Metropolitan Local Roads contribution by LGA towards the Total Project Budget. Great Southern Region North Road/Bethel Way (City of Albany) Improve sight distance, shorten existing bus pull-over bay, relocate pedestrian crossing on median island and $20,000 improve signs. Kampong Road/Sydney Street (City of Albany) $30,000 Change intersection priority, install signs, delineation, kerbing and install additional street lighting. Pile Road/Muir Highway (Shire of Plantagenet) $26,546 Widen intersection, install advisory signs and reflective raised pavement markers. Denmark Mt Barker Road/Kernutts Road (Shire of Denmark) $45,333 Seal Kernutts Road approach to the intersection. Kukerin Road (Shire of Kent) $44,000 Widen and seal floodway and approaches, install signs and line marking. Scotsdale Road/Fernley Road and Kordabup Road SLK 0.00 - 0.05 (Shire of Denmark) Seal Fernley Road and Kordabup Road approaches to intersection, install signs and centre lines with Scotsdale $73,333 Road at an angle greater than 70 degree. Albany Highway/Locke Street (City of Albany) $18,417 Improve Locke Street approach radius and realign pedestrian path. Salt River Road/Solomons Road (Shire of Cranbrook) Widen intersection approaches, improve drainage, extend culvert headwalls, remove vegetation, upgrade $70,000 signs and delineation. Emu Point Drive/Mermaid Avenue/Clark Street (City of Albany) Upgrade intersection layout to enforce speed limit, install median islands and upgrade delineation of cycle $26,667 lane through intersection. Total Great Southern Region RRG $354,296 Page 1 of 10 REGIONAL AND METROPOLITAN ROADS 2018/19 (Approved Budget) Comments * Approved State Black Spot Budget doesn’t include 1/3 mandatory State Black Spot Program - Regional and Metropolitan Local Roads contribution by LGA towards the Total Project Budget. South West Region Chain Avenue/Vasse-Yallingup Siding Road SLK 2.11 - 3.11 (City of Busselton) $90,000 Stage 2. Stage 1 funded in 2017/18 (Total cost to State $ 130,000). Improve drainage and relocate roadside drain. Boyanup Road West/Elgin Road (Shire of Capel) $16,000 Stage 2. Stage 1 funded in 2017/18 (Total cost to State $ 156,000). Realign and widen intersection. Del Park Road SLK 17.50 - 19.50 (Shire of Murray) Widen seal to 7.0m with 1.5m gravel shoulders, install barriers at selected locations, guide posts and centre $326,000 Stage 2. Stage 1 funded in 2017/18 (Total cost to State $ 406,000). line. Waterloo Road SLK 0.67 (Shire of Dardanup) $126,500 Stage 3. Stages 1 & 2 funded in previous years (Total cost to State $ 457,000). Widen Bridge. Southern Estuary Road SLK 1.31 - 3.24 (Shire of Waroona) $140,000 Seal shoulders, improve curve superelevation, install signs and reflective raised pavement markers. Harvey Myalup Road SLK 3.00 - 8.00 (Shire of Harvey) $666,667 Widen and seal shoulders, remove roadside hazards in clear zone, upgrade signs and delineation. Honeymoon Road SLK 1.00 - 4.00 (Shire of Harvey) $286,594 Stage 1. Stage 2 to be funded in future years (Total cost to State $ 300,000). Widen and seal to 6.0m, remove roadside hazards in clear zone, upgrade signs and delineation. Eaton Drive/Lavender Way/Blue Wren Drive (Shire of Dardanup) $80,000 Stage 1. Stage 2 to be funded in future years (Total cost to State $ 580,000). Install roundabout. Ludlow North Road/Stirling Road (Shire of Capel) $120,000 Stage 1. Stage 2 to be funded in future years (Total cost to State $ 132,000). Widen intersection, remove roadside vegetation in clear zone, upgrade signs and delineation. Crooked Brook Road SLK 8.60 - 10.53 (Shire of Dardanup) Improve site distance, prune or remove roadside vegetation, improve road geometry, widen formation and $173,500 Stage 1. Stage 2 to be funded in future years (Total cost to State $ 300,000). seal to 6.0m, install advisory signs and guide posts. Old Coast Road/Wilderness Road (City of Mandurah) Modify left turning lane and install splitter island to increase sight distance for right turning vehicles from $53,500 Stage 1. Stage 2 to be funded in future years (Total cost to State $ 120,000). Wilderness Road. Total South West Region RRG $2,078,761 Page 2 of 10 REGIONAL AND METROPOLITAN ROADS 2018/19 (Approved Budget) Comments * Approved State Black Spot Budget doesn’t include 1/3 mandatory State Black Spot Program - Regional and Metropolitan Local Roads contribution by LGA towards the Total Project Budget. Gascoyne Region RRG did not submit any complying applications for 2018/19. Total Gascoyne Region RRG $0 Mid West Region Wubin-Mullewa Road/Oversby Road (Shire of Perenjori) $154,000 Stage 2. Stage funded in 2017/18 (Total cost to State $ 227,333). Widen intersection to accommodate 36.5m long vehicle movements, upgrade signs and line marking. Mingenew-Morawa Road/Yandanooka North East Road (Shire of Mingenew) Stage 2. Stage 1 funded in 2016/17, Stage 3 to be funded in future years (Total cost $30,000 Improve site distance, realign approach, widen and construct intersection. to state $ 440,000) Midlands Road/Arrino South Road/Lynch Road/Rothsay Road (Shire of Three Springs) Upgrade three intersections with Midlands Road in close proximity. Improve sight distance, clear vegetation in $150,000 Stage 1. Stage 2 to be funded in future years (Total cost to State $ 483,000). clear zone, upgrade signs and line marking. Narandagy Road/Yandanooka Melara Road/Manarra Road (Shire of Mingenew) Upgrade two intersections with Narandagy Road, improve sight distance at intersections, clear vegetation in $63,000 Stage 1. Stage 2 to be funded in future years (Total cost to State $ 158,911). clear zone, widen and seal 920m between intersections, improve drainage, install signs and delineation. Cathedral Avenue/Sandford Street (City of Greater Geraldton) 2018/19 Reserve Project (Total cost to State $ 50,820). Install right turning lane, pedestrian refuge and pram ramps. Total Mid West Region RRG $397,000 Total Mid West - Gascoyne Region $397,000 Page 3 of 10 REGIONAL AND METROPOLITAN ROADS 2018/19 (Approved Budget) Comments * Approved State Black Spot Budget doesn’t include 1/3 mandatory State Black Spot Program - Regional and Metropolitan Local Roads contribution by LGA towards the Total Project Budget. Goldfields - Esperance Region Cassidy Street North/Brookman Street (City of Kalgoorlie-Boulder) $28,000 Extend median island to reinforce priority, improve sight distance and upgrade street lighting. Cotter Street South and Cotter Place (Premier Street to Hare Street) (City of Kalgoorlie-Boulder) $14,000 Stage 1. Stages 2-5 to be funded in future years. (Total cost to State $ 423,000). Install median islands at intersections, reinforce priority, upgrade signs and road markings. Wilson Street (Roberts Street to Federal Road) (City of Kalgoorlie-Boulder) $74,000 Stage 1. Stage 2 to be funded in future years. (Total cost to State $ 296,000). Upgrade street lighting. Mort Harslett Drive SLK 8.18 - 9.73 (Shire of Dundas) $91,763 Stage 1. Stage 2 to be funded in future years. (Total cost to State $ 183 525). Realign and seal gravel road, install roadside furniture, drainage and signs. Coolgardie North Road/Carbine Ora-Banda Road (Shire of Coolgardie) $65,400 Realign and widen intersection, seal approaches, install signs and delineation. Padbury Street/Leake Street (Shire of Esperance) $43,680 Install median islands on Leake Street to improve visibility, install signs and pavement marking. Bandya Road SLK 36.40 - 35.70 (Shire of Laverton) $193,133 Modify road geometry, install culverts and upgrade signs. Roberts Street (Rhodes Street to President Street) (City of Kalgoorlie-Boulder) 2018/19 Reserve Project (Total cost to State $ 77,700). Install median islands, reinforce priority, upgrade signs and road markings. Swan Road/Burnside Road (Shire of Esperance) 2018/19 Reserve Project (Total cost to State $ 29,333). Realign intersection to staggered intersection. Quast Road/Fagan Road (Shire of Esperance) 2018/19 Reserve Project (Total cost to State $ 29,333). Realign intersection to staggered intersection. Kendall Road/Liebeck Road (Shire of Esperance) 2018/19 Reserve Project (Total cost to State $ 29,333). Realign intersection to staggered intersection. Coolgardie North Road SLK 1.11 - 6.00(v)(Shire of Coolgardie) 2018/19 Reserve Project (Total cost to State $ 78,400). Widen and seal to 7.0m, upgrade drainage, install signs and delineation. Bandya Road SLK 32.20 - 32.40 (Shire of Laverton) 2018/19 Reserve Project (Total cost to State $ 224,067). Modify road geometry, install culverts and upgrade signs. Total Goldfields - Esperance Region RRG $509,976 Page 4 of 10 REGIONAL AND METROPOLITAN ROADS 2018/19 (Approved Budget) Comments * Approved State Black Spot Budget doesn’t include 1/3 mandatory State Black Spot Program - Regional and Metropolitan Local Roads contribution by LGA towards the Total Project Budget. Kimberley Region Coolibah Drive/Ironwood Drive (Shire of Wyndham/East Kimberley) $39,917 Stage 2. Stage 1 funded in 2016/17. (Total cost to State $ 159,917). Upgrade street lighting on Coolibah Drive. Carnarvon Street (Haas Street to Frederick Street) (Shire of Broome) $71,669 Install pedestrian path. Geikie Gorge Road/Russ Road (Shire of Derby/West Kimberley) Realign intersection to T junction, close existing Y junction, improve access to Russ Road properties and install $173,690 hazard markers. Dakas Street (Shire of Broome) $57,392 Upgrade pedestrian crossing with Kerr Park path, install signs, line marking and a new street lighting. Sandford Road/Skuthorp Road (Shire of Derby/West Kimberley) 2018/19 Reserve Project (Total cost to State $ 735,328). Realign intersection to T junction within road reserve, close existing junction, install signs and delineation.