Regional and Metropolitan Roads

Regional and Metropolitan Roads

REGIONAL AND METROPOLITAN ROADS 2018/19 (Approved Budget) Comments * Approved State Black Spot Budget doesn’t include 1/3 mandatory State Black Spot Program - Regional and Metropolitan Local Roads contribution by LGA towards the Total Project Budget. Great Southern Region North Road/Bethel Way (City of Albany) Improve sight distance, shorten existing bus pull-over bay, relocate pedestrian crossing on median island and $20,000 improve signs. Kampong Road/Sydney Street (City of Albany) $30,000 Change intersection priority, install signs, delineation, kerbing and install additional street lighting. Pile Road/Muir Highway (Shire of Plantagenet) $26,546 Widen intersection, install advisory signs and reflective raised pavement markers. Denmark Mt Barker Road/Kernutts Road (Shire of Denmark) $45,333 Seal Kernutts Road approach to the intersection. Kukerin Road (Shire of Kent) $44,000 Widen and seal floodway and approaches, install signs and line marking. Scotsdale Road/Fernley Road and Kordabup Road SLK 0.00 - 0.05 (Shire of Denmark) Seal Fernley Road and Kordabup Road approaches to intersection, install signs and centre lines with Scotsdale $73,333 Road at an angle greater than 70 degree. Albany Highway/Locke Street (City of Albany) $18,417 Improve Locke Street approach radius and realign pedestrian path. Salt River Road/Solomons Road (Shire of Cranbrook) Widen intersection approaches, improve drainage, extend culvert headwalls, remove vegetation, upgrade $70,000 signs and delineation. Emu Point Drive/Mermaid Avenue/Clark Street (City of Albany) Upgrade intersection layout to enforce speed limit, install median islands and upgrade delineation of cycle $26,667 lane through intersection. Total Great Southern Region RRG $354,296 Page 1 of 10 REGIONAL AND METROPOLITAN ROADS 2018/19 (Approved Budget) Comments * Approved State Black Spot Budget doesn’t include 1/3 mandatory State Black Spot Program - Regional and Metropolitan Local Roads contribution by LGA towards the Total Project Budget. South West Region Chain Avenue/Vasse-Yallingup Siding Road SLK 2.11 - 3.11 (City of Busselton) $90,000 Stage 2. Stage 1 funded in 2017/18 (Total cost to State $ 130,000). Improve drainage and relocate roadside drain. Boyanup Road West/Elgin Road (Shire of Capel) $16,000 Stage 2. Stage 1 funded in 2017/18 (Total cost to State $ 156,000). Realign and widen intersection. Del Park Road SLK 17.50 - 19.50 (Shire of Murray) Widen seal to 7.0m with 1.5m gravel shoulders, install barriers at selected locations, guide posts and centre $326,000 Stage 2. Stage 1 funded in 2017/18 (Total cost to State $ 406,000). line. Waterloo Road SLK 0.67 (Shire of Dardanup) $126,500 Stage 3. Stages 1 & 2 funded in previous years (Total cost to State $ 457,000). Widen Bridge. Southern Estuary Road SLK 1.31 - 3.24 (Shire of Waroona) $140,000 Seal shoulders, improve curve superelevation, install signs and reflective raised pavement markers. Harvey Myalup Road SLK 3.00 - 8.00 (Shire of Harvey) $666,667 Widen and seal shoulders, remove roadside hazards in clear zone, upgrade signs and delineation. Honeymoon Road SLK 1.00 - 4.00 (Shire of Harvey) $286,594 Stage 1. Stage 2 to be funded in future years (Total cost to State $ 300,000). Widen and seal to 6.0m, remove roadside hazards in clear zone, upgrade signs and delineation. Eaton Drive/Lavender Way/Blue Wren Drive (Shire of Dardanup) $80,000 Stage 1. Stage 2 to be funded in future years (Total cost to State $ 580,000). Install roundabout. Ludlow North Road/Stirling Road (Shire of Capel) $120,000 Stage 1. Stage 2 to be funded in future years (Total cost to State $ 132,000). Widen intersection, remove roadside vegetation in clear zone, upgrade signs and delineation. Crooked Brook Road SLK 8.60 - 10.53 (Shire of Dardanup) Improve site distance, prune or remove roadside vegetation, improve road geometry, widen formation and $173,500 Stage 1. Stage 2 to be funded in future years (Total cost to State $ 300,000). seal to 6.0m, install advisory signs and guide posts. Old Coast Road/Wilderness Road (City of Mandurah) Modify left turning lane and install splitter island to increase sight distance for right turning vehicles from $53,500 Stage 1. Stage 2 to be funded in future years (Total cost to State $ 120,000). Wilderness Road. Total South West Region RRG $2,078,761 Page 2 of 10 REGIONAL AND METROPOLITAN ROADS 2018/19 (Approved Budget) Comments * Approved State Black Spot Budget doesn’t include 1/3 mandatory State Black Spot Program - Regional and Metropolitan Local Roads contribution by LGA towards the Total Project Budget. Gascoyne Region RRG did not submit any complying applications for 2018/19. Total Gascoyne Region RRG $0 Mid West Region Wubin-Mullewa Road/Oversby Road (Shire of Perenjori) $154,000 Stage 2. Stage funded in 2017/18 (Total cost to State $ 227,333). Widen intersection to accommodate 36.5m long vehicle movements, upgrade signs and line marking. Mingenew-Morawa Road/Yandanooka North East Road (Shire of Mingenew) Stage 2. Stage 1 funded in 2016/17, Stage 3 to be funded in future years (Total cost $30,000 Improve site distance, realign approach, widen and construct intersection. to state $ 440,000) Midlands Road/Arrino South Road/Lynch Road/Rothsay Road (Shire of Three Springs) Upgrade three intersections with Midlands Road in close proximity. Improve sight distance, clear vegetation in $150,000 Stage 1. Stage 2 to be funded in future years (Total cost to State $ 483,000). clear zone, upgrade signs and line marking. Narandagy Road/Yandanooka Melara Road/Manarra Road (Shire of Mingenew) Upgrade two intersections with Narandagy Road, improve sight distance at intersections, clear vegetation in $63,000 Stage 1. Stage 2 to be funded in future years (Total cost to State $ 158,911). clear zone, widen and seal 920m between intersections, improve drainage, install signs and delineation. Cathedral Avenue/Sandford Street (City of Greater Geraldton) 2018/19 Reserve Project (Total cost to State $ 50,820). Install right turning lane, pedestrian refuge and pram ramps. Total Mid West Region RRG $397,000 Total Mid West - Gascoyne Region $397,000 Page 3 of 10 REGIONAL AND METROPOLITAN ROADS 2018/19 (Approved Budget) Comments * Approved State Black Spot Budget doesn’t include 1/3 mandatory State Black Spot Program - Regional and Metropolitan Local Roads contribution by LGA towards the Total Project Budget. Goldfields - Esperance Region Cassidy Street North/Brookman Street (City of Kalgoorlie-Boulder) $28,000 Extend median island to reinforce priority, improve sight distance and upgrade street lighting. Cotter Street South and Cotter Place (Premier Street to Hare Street) (City of Kalgoorlie-Boulder) $14,000 Stage 1. Stages 2-5 to be funded in future years. (Total cost to State $ 423,000). Install median islands at intersections, reinforce priority, upgrade signs and road markings. Wilson Street (Roberts Street to Federal Road) (City of Kalgoorlie-Boulder) $74,000 Stage 1. Stage 2 to be funded in future years. (Total cost to State $ 296,000). Upgrade street lighting. Mort Harslett Drive SLK 8.18 - 9.73 (Shire of Dundas) $91,763 Stage 1. Stage 2 to be funded in future years. (Total cost to State $ 183 525). Realign and seal gravel road, install roadside furniture, drainage and signs. Coolgardie North Road/Carbine Ora-Banda Road (Shire of Coolgardie) $65,400 Realign and widen intersection, seal approaches, install signs and delineation. Padbury Street/Leake Street (Shire of Esperance) $43,680 Install median islands on Leake Street to improve visibility, install signs and pavement marking. Bandya Road SLK 36.40 - 35.70 (Shire of Laverton) $193,133 Modify road geometry, install culverts and upgrade signs. Roberts Street (Rhodes Street to President Street) (City of Kalgoorlie-Boulder) 2018/19 Reserve Project (Total cost to State $ 77,700). Install median islands, reinforce priority, upgrade signs and road markings. Swan Road/Burnside Road (Shire of Esperance) 2018/19 Reserve Project (Total cost to State $ 29,333). Realign intersection to staggered intersection. Quast Road/Fagan Road (Shire of Esperance) 2018/19 Reserve Project (Total cost to State $ 29,333). Realign intersection to staggered intersection. Kendall Road/Liebeck Road (Shire of Esperance) 2018/19 Reserve Project (Total cost to State $ 29,333). Realign intersection to staggered intersection. Coolgardie North Road SLK 1.11 - 6.00(v)(Shire of Coolgardie) 2018/19 Reserve Project (Total cost to State $ 78,400). Widen and seal to 7.0m, upgrade drainage, install signs and delineation. Bandya Road SLK 32.20 - 32.40 (Shire of Laverton) 2018/19 Reserve Project (Total cost to State $ 224,067). Modify road geometry, install culverts and upgrade signs. Total Goldfields - Esperance Region RRG $509,976 Page 4 of 10 REGIONAL AND METROPOLITAN ROADS 2018/19 (Approved Budget) Comments * Approved State Black Spot Budget doesn’t include 1/3 mandatory State Black Spot Program - Regional and Metropolitan Local Roads contribution by LGA towards the Total Project Budget. Kimberley Region Coolibah Drive/Ironwood Drive (Shire of Wyndham/East Kimberley) $39,917 Stage 2. Stage 1 funded in 2016/17. (Total cost to State $ 159,917). Upgrade street lighting on Coolibah Drive. Carnarvon Street (Haas Street to Frederick Street) (Shire of Broome) $71,669 Install pedestrian path. Geikie Gorge Road/Russ Road (Shire of Derby/West Kimberley) Realign intersection to T junction, close existing Y junction, improve access to Russ Road properties and install $173,690 hazard markers. Dakas Street (Shire of Broome) $57,392 Upgrade pedestrian crossing with Kerr Park path, install signs, line marking and a new street lighting. Sandford Road/Skuthorp Road (Shire of Derby/West Kimberley) 2018/19 Reserve Project (Total cost to State $ 735,328). Realign intersection to T junction within road reserve, close existing junction, install signs and delineation.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    10 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us