Emissions Reductions Delivered Document and Has Been Endorsed by the Over a Longer Period of Time Provide the TDNS Programme Board

Total Page:16

File Type:pdf, Size:1020Kb

Emissions Reductions Delivered Document and Has Been Endorsed by the Over a Longer Period of Time Provide the TDNS Programme Board Portishead Branch Line (MetroWest Phase 1) TR040011 Applicant: North Somerset District Council 9.10 ExA.WQ1.D2.V1 – Appendix CC.1.1-1 to Applicant's responses to the Examining Authority's Written Questions ExQ1 Author: Womble Bond Dickinson (UK) LLP Version: 1 Date: November 2020 OFFICIAL TRACTION DECARBONISATION NETWORK STRATEGY Interim Programme Business Case 31st July 2020 OFFICIAL 1. PREFACE Important Notice – This document and its appendices have been produced by Network Rail (NR) in response to a recommendation made by the Rail Industry Decarbonisation Taskforce. The document summarises evidence and analysis carried out by NR in the period between 1st April 2019 and 29th May 2020. This analysis considers technological, operational and economic methodologies to identify the optimum application of decarbonised traction technologies. The document ultimately identifies the optimum deployment of these traction technologies (battery, electrification and hydrogen) on the unelectrified UK rail network. Note that reference to UK railway infrastructure and operations in this document relate to those contained within England, Scotland and Wales and this document does not consider rail operations in Northern Ireland. The primary purpose of this document and its appendices is to provide DfT, Transport Scotland and Welsh Government with recommendations to inform decisions required to remove diesel trains from the network, achieve net-zero legislative targets, and identify the capital works programme required to achieve this. The document should be used to inform discrete project business cases being developed by project teams. The document provides the strategic rationale for rail traction decarbonisation, as well as initial high-level economic and carbon abatement appraisals of options to underpin the recommendations made. The recommendations have been made using a balanced range of priorities and this work has broad cross industry support. This document should be used exclusively for the purposes of informing further development activity to be carried out by the rail industry. Any person who obtains access to this document and its appendices accepts and agrees that it has been produced by NR in accordance with the instructions provided in an agreement with a cross-industry programme board and was produced exclusively for the benefit and use of DfT, Transport Scotland, Welsh Government and others within the rail industry for the purposes set out above. It should be noted that the recommendations within this report will change as further analysis is carried out, with an update to be provided in the TDNS Programme Business Case. Whilst cost and benefit assessments have been provided, the recommendations made as part of this document have not had any significant bottom-up development or deliverability assessment carried out and assume that the current general service provision of the network is maintained. This work has been endorsed by a number of industry partners and ratified by the TDNS Programme Board. DOCUMENT CONTROL Document Title Traction Decarbonisation Network Strategy – Interim Programme Business Case Version and date C02 - Final Author System Operator Strategic Planning (FNPO) Security Level Official OFFICIAL 2. FOREWORD It is overwhelmingly accepted that the global climate is changing due to human impact. The scientific evidence is increasingly clear. Every year, across the planet, weather records are broken and there is increased incidence of extreme weather events such as flooding and drought. There is an increasingly strong demand for urgent action by populations across the world, to protect the planet and future generations. The UK government set out in June 2019 its legal commitment to achieve ‘net zero’ greenhouse gas emissions by 2050. In respect of the railway, in 2018 the DfT challenged the rail industry remove all diesel-only trains from the network by 2040. The Scottish Government has set a target to decarbonise domestic passenger rail services by 2035. The railways in Great Britain play a critical role in supporting the economy and connectivity between communities across Britain. Rail is a relatively environmentally friendly mode of transport, but we need to do more, and we need to be part of the solution to the climate change challenge. Over the last year the rail industry has come together collaboratively and constructively, under the co-ordination of the System Operator, to assess the issues and options for removing all diesel trains from the rail network. The result of this work is the Traction Decarbonisation Network Strategy and I am delighted that we can now set out the rail sector’s response to the climate challenge by outlining how we can end the direct emissions of greenhouse gases from trains on the network. This document, and other supporting material being provided as part of the Traction Decarbonisation Network Strategy, will support the decisions on what needs to be achieved, and by when. The Strategy considers where overhead electrification, battery or hydrogen trains might be most effectively deployed. The work to end greenhouse gas emissions will require a commitment to a long-term, stable and efficient programme of works which will last at least the next thirty years. In order to meet the UK government’s commitment to achieve net zero by 2050, and any interim emissions targets along the way, we need to set the wheels in motion. One of the key things we pledged when we started work on the Strategy was that we would be open and transparent and that the work would involve the industry as a full part of the process. As a result, the work to produce the Strategy has been overseen by a Programme Board comprised of representatives from across the industry. We have also engaged with over two-hundred and fifty different organisations from both within the rail industry and outside of it, including a number of UK Government departments and other infrastructure managers from around Europe. Much more work will be needed beyond the Strategy, including the development of Regional delivery plans, but this document outlines the journey we must take together. We must now move forward with focus, determination and collective will to see rail rise to the climate change challenge and to maintain its position as a critical and environmentally friendly mode of transport. Paul McMahon Managing Director – System Operator Network Rail OFFICIAL 3. CONTENTS 5. Strategic Case ............................. 2 6.8 Economic case limitations ...... 117 5.1 Strategic Case: Summary ............ 2 6.9 Economic Case: Conclusions .. 119 5.2 Context ....................................... 7 7. Commercial Case .................... 121 5.3 Case for Change ........................ 24 7.1 Introduction ........................... 121 5.4 Strategic Objectives .................. 36 7.2 Network Rail Capability .......... 122 5.5 Strategic Benefits ..................... 43 7.3 Supply Chain Capability .......... 122 5.6 Decarbonisation Traction Options 7.4 Delivery Structures and 59 Procurement .................................... 125 5.7 Methodology ............................ 73 7.5 Commercial Case: Conclusions 5.8 Traction Decarbonisation 126 Recommendations ............................. 76 8. Financial Case ......................... 128 5.9 Recommendations – Scotland’s 8.1 Financial Case: Summary ....... 128 Railway ............................................... 82 8.2 Spend Profile .......................... 128 5.10 Recommendations - Eastern 82 8.3 Financial Case: Conclusions .... 132 5.11 Recommendations - Southern 9. Management Case .................. 134 84 9.1 Management Case: Summary 134 5.12 Recommendations – Wales 9.2 Programme of Decarbonisation and Western ....................................... 85 134 5.13 Recommendations – North 9.3 Governance ............................ 139 West and Central ................................ 85 9.4 Project Business Case 5.14 Traction Decarbonisation Development .................................... 139 Programme ......................................... 86 9.5 Further Synergies ................... 141 5.15 Strategic Case: Conclusion .... 87 9.6 Management Case: Conclusions 6. Economic Case .......................... 90 141 6.1 Economic Case: Summary ........ 90 Appendix 1 – Network Rail Regions and 6.2 Introduction.............................. 91 Service Overview .............................. 143 6.3 Pathways Appraised ................. 93 Appendix 2 – Rolling Stock Tables.... 149 6.4 Economic Approach ................. 97 Appendix 3 – Decarbonisation 6.5 Economic Outputs .................. 105 Programme (Non-Traction) .............. 154 6.6 Analysis of Outputs ................ 110 Appendix 4 – Sub-Regional Context and 6.7 Sensitivities ............................. 115 Emissions Targets ............................. 156 OFFICIAL Appendix 5 – Strategic and Economic Appendix 9 – Strategic Assumptions, Benefits ............................................ 161 Risks and Opportunities ................... 240 Appendix 6 – Traction Types Technical Appendix 10 – Economic Model Summary .......................................... 164 Sources ............................................. 246 Appendix 7 – Embodied Carbon and Appendix 11 – Acronyms and Glossary Ethics ................................................ 180 247 Appendix 8 – Traction Decarbonisation Recommendations Regional Breakdown ....................................... 182 OFFICIAL 4. EXECUTIVE SUMMARY Alongside the current global
Recommended publications
  • South West Main Line Strategic Study 3 MB
    OFFICIAL South West Main Line Strategic Study Phase 1 2021 1 OFFICIAL Network Rail Table of Contents 1.0 Executive Summary ............................................................................................................................................ 3 2.0 Long-Term Planning Process ........................................................................................................................... 6 3.0 The South West Main Line Today................................................................................................................. 8 4.0 Strategic Context ..............................................................................................................................................13 5.0 South West Main Line - Demand ................................................................................................................25 6.0 Capacity Analysis ..............................................................................................................................................34 7.0 Intervention Feasibility ...................................................................................................................................59 8.0 Emerging Strategic Advice ............................................................................................................................62 Appendix A – Safety Baseline .....................................................................................................................................74 Appendix B – Development
    [Show full text]
  • Tracks the Monthly Magazine of the Inter City Railway Society
    Tracks the monthly magazine of the Inter City Railway Society Volume 40 No.7 July 2012 Inter City Railway Society founded 1973 www.icrs.org.uk The content of the magazine is the copyright of the Society No part of this magazine may be reproduced without prior permission of the copyright holder President: Simon Mutten (01603 715701) Coppercoin, 12 Blofield Corner Rd, Blofield, Norwich, Norfolk NR13 4RT Chairman: Carl Watson - [email protected] (07403 040533) 14, Partridge Gardens, Waterlooville, Hampshire PO8 9XG Treasurer: Peter Britcliffe - [email protected] (01429 234180) 9 Voltigeur Drive, Hart, Hartlepool TS27 3BS Membership Secretary: Trevor Roots - [email protected] (01466 760724) (07765 337700) Mill of Botary, Cairnie, Huntly, Aberdeenshire AB54 4UD Secretary: Stuart Moore - [email protected] (01603 714735) 64 Blofield Corner Rd, Blofield, Norwich, Norfolk NR13 4SA Magazine: Editorial Manager: Trevor Roots - [email protected] details as above Editorial Team: Sightings: James Holloway - [email protected] (0121 744 2351) 246 Longmore Road, Shirley, Solihull B90 3ES Traffic News: John Barton - [email protected] (0121 770 2205) 46, Arbor Way, Chelmsley Wood, Birmingham B37 7LD Website: Website Manager: Mark Richards - [email protected] 7 Parkside, Furzton, Milton Keynes, Bucks. MK4 1BX Yahoo Administrator: Steve Revill Books: Publications Manager: Carl Watson - [email protected] details as above Publications Team: Combine & Individual / Irish: Carl Watson - [email protected] Pocket Book: Carl Watson / Trevor Roots - [email protected] Wagons: Scott Yeates - [email protected] Name Directory: Eddie Rathmill / Trevor Roots - [email protected] USF: Scott Yeates / Carl Watson / Trevor Roots - [email protected] Contents: Officials Contact List .....................................2 Traffic and Traction News................
    [Show full text]
  • Annex G – Forming & Delivering a Strategy
    Swindon and Wiltshire Rail Study 09/05/2019 Reference number 107523 ANNEX G – FORMING & DELIVERING A STRATEGY SWINDON AND WILTSHIRE RAIL STUDY ANNEX G – FORMING & DELIVERING A STRATEGY IDENTIFICATION TABLE Client/Project owner Swindon and Wiltshire Local Enterprise Partnership Project Swindon and Wiltshire Rail Study Study Annex G – Forming & Delivering a Strategy Type of document Report Date 09/05/2019 File name Framework N/A Reference number 107523 Number of pages 33 APPROVAL Version Name Position Date Modifications Author J Jackson Associate 12/03/2019 Checked A Sykes Associate 13/03/2019 1 by Approved D Bishop Director 15/03/2019 by Author J Jackson Associate 09/05/2019 Checked A Sykes Associate 09/05/2019 2 by Approved A Sykes Associate 09/05/2019 by TABLE OF CONTENTS 1. INTRODUCTION 6 2. IDENTIFYING THE COMPONENTS OF THE STRATEGY 7 3. NETWORK-WIDE INITIATIVES 8 4. GREAT WESTERN MAINLINE 11 RECOMMENDATIONS 11 PHASE 0: 1 TPH WESTBURY – SWINDON 12 PHASE 1: 1 TPH SOUTHAMPTON CENTRAL – SWINDON 13 PHASE 2 & 2A: GREAT WESTERN CONNECT 14 PHASE 3: EXTENSION OF GREAT WESTERN CONNECT 16 DELIVERY OF GREAT WESTERN CONNECT 16 THE SOUTH COTSWOLDS LINE 17 5. BERKS & HANTS ROUTE 18 EXTENSION OF LONDON – BEDWYN SERVICES 18 DEVIZES PARKWAY 19 EXTENSION OF LONDON – WESTBURY SERVICES TO BRISTOL (PEAK ONLY) 19 ENHANCEMENT OF PADDINGTON – EXETER SERVICES TO HOURLY 19 DELIVERING AND ENHANCED BERKS & HANTS SERVICE 19 6. WEST OF ENGLAND LINE 21 SALISBURY – LONDON JOURNEY TIME REDUCTIONS 21 PORTON STATION 22 WILTON STATION 23 ANDOVER – LUDGERSHALL LINE 23 7. TRANS WILTS CORRIDOR 24 ASHTON PARK STATION 25 THE IMPACT OF METRO WEST 25 8.
    [Show full text]
  • Appendix F CAPABILITY MODELLING
    Ref: 139797 Version: 1.1 Date: June 2015 Appendix F CAPABILITY MODELLING Governance of Railway Investment Projects Ref: 139797 Version: 1.1 Date: June 2015 This page left deliberately blank Governance of Railway Investment Projects Group Strategy - Capability Analysis MetroWest Phase 2 Report Rhys Bowen Group Strategy – Capability Analysis MetroWest Phase 2 Report Document Control Scheme Name MetroWest Phase 2 Report Document Ref. No. Document V:\SAP-Project\CA000000 - MetroWest RSV8 TH\004 Report\Phase Two Location Version No. 1.0 Status Final Author Rhys Bowen Version Date 15/12/2014 Security Level Unrestricted Authorisation Control Lee Mowle Signature Date Project Manager –Capability Analysis (Document Owner) Alistair Rice Signature Date Major Schemes Project Manager - South Gloucester council Andrew Holley Signature Date Senior development Manager - Network Rail Group Strategy – Capability Analysis MetroWest Phase 2 Report DOCUMENT CONTROL & ADMINISTRATION Change Record Version Date Author(s) Comments 0.1 12/09/14 Rhys Bowen First Draft 0.2 17/09/14 Rhys Bowen Amended after diagrams added 0.3 18/09/14 Rhys Bowen Amended after review 0.4 23/09/14 Rhys Bowen Amended after review 0.5 26/09/14 Rhys Bowen Draft for external review 0.6 04/11/14 Rhys Bowen Final draft for internal review 0.7 07/11/14 Rhys Bowen Final draft for external review 0.8 28/11/14 Toby Hetherington Minor amendments to final draft. Further minor amendments and report 1.0 15/12/14 Toby Hetherington finalised. Reviewers Version Date Reviewer(s) Review Notes Structure
    [Show full text]
  • M4 Junction 18A Link Study – Combined Modelled and Appraisal Report
    M4 Junction 18a Link Study – Combined Modelled and Appraisal Report Prepared for South Gloucestershire Council and Highways England March 2018 Draft 1 The Square Temple Quay Bristol BS1 6DG Draft Document history M4 Junction 18a Link Study Combined Modelling and Appraisal Report This document has been issued and amended as follows: Version Date Description Created by Verified by Approved by 001 01.03.18 Working Draft JB HS HS Draft Contents Section Page Introduction ................................................................................................................................ 1‐1 1.1 Purpose of this Report ............................................................................................... 1‐1 1.2 Scheme Objectives ..................................................................................................... 1‐1 1.3 Scheme Description ................................................................................................... 1‐1 1.4 Previous Studies ......................................................................................................... 1‐3 Local Transport Situation ............................................................................................................ 2‐3 2.1 Existing Local Transport System ................................................................................ 2‐3 2.2 Key Travel Demands .................................................................................................. 2‐5 2.3 Transport Problems and Factors ...............................................................................
    [Show full text]
  • CP6 Delivery Plan Update – Wales & Western
    Wales & Mark Langman, managing director, Western Wales & Western In 2019, as part of the Putting Passengers First programme we established Wales & Western, bringing together Wales & Borders route, Western route and Western and Wales Infrastructure Projects. Our aim is to deliver a safe, reliable and punctual railway for the passengers, communities and businesses we serve across Wales, the Thames Valley and the west. The new accountabilities and decision-making authorities we have will help us be more responsive to the needs of our train operators, stakeholders and passengers. The introduction of a new, enhanced timetable in step change in connectivity for passengers in and out of December 2019 realised the benefits of 10 years key cities. investment to modernise and electrify the Great Western Alongside this, we continue our relentless drive to improve Main Line from Paddington to Cardiff, Newbury and performance through a combination of robust renewals Chippenham. In January 2020, this culminated in the plans to improve safety, reliability and reduce delays and completion of electrification to Cardiff, enabling electric through improved rapid incident response, efficient trains to operate in South Wales for the first time. track access planning and better traffic management of Improved infrastructure, electric trains and better signalling the network. enable us to timetable more trains on the Wales Western We are determined to improve passengers’ experience, network and allows Great Western Railway (GWR) to particularly those who need help when travelling. We have offer new high-speed peak services for customers in South tripled the team at London Paddington who are able to Wales, the South West and from Bristol to London.
    [Show full text]
  • North Somerset
    Portishead Branch Line (MetroWest Phase 1) TR040011 Applicant: North Somerset District Council 6.6, Environmental Statement, Volume 2, Chapter 3 Scheme Development and Alternatives Considered The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009, regulation 5(2)(a) Planning Act 2008 Author: CH2M Date: November 2019 Notice © Copyright 2019 CH2M HILL United Kingdom. The concepts and information contained in this document are the property of CH2M HILL United Kingdom, a wholly owned subsidiary of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This document has been prepared on behalf of, and for the exclusive use of Jacobs’ client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this document by any third party. Where any data supplied by the client or from other sources have been used, it has been assumed that the information is correct. No responsibility can be accepted by Jacobs for inaccuracies in the data supplied by any other party. The conclusions and recommendations in this report are based on the assumption that all relevant information has been supplied by those bodies from whom it was requested. Where field investigations have been carried out, these have been restricted to a level of detail required to achieve the stated objectives of the work. This work has been undertaken in accordance with the quality management system of Jacobs.
    [Show full text]
  • Metrowest Phase 2 Gloucestershire Extension Study
    FINAL REPORT MetroWest Phase 2 Gloucestershire Extension Study Prepared for Gloucestershire County Council South Gloucestershire Council December 2016 1 The Square Temple Quay Bristol BS1 6DG Contents Section Page Document History ........................................................................................................................... v Executive Summary ...................................................................................................................... vii Introduction ................................................................................................................................ 1‐1 1.1 MetroWest Phase 2 ................................................................................................... 1‐1 1.2 Gloucestershire Rail Study ......................................................................................... 1‐2 1.3 Gloucestershire extension study ............................................................................... 1‐2 1.4 This Report ................................................................................................................. 1‐3 Approach .................................................................................................................................... 2‐1 2.1 Building on the PBC .................................................................................................... 2‐1 2.1.1 Information taken directly from MetroWest Phase 2 PBC ........................... 2‐1 2.1.2 Information augmented and/or adapted from
    [Show full text]
  • C17 Land Disposal, Andover Station Yard, Hampshire Decision Notice
    Les Waters Senior Manager, Licensing Railway Markets and Economics Telephone 020 7282 2106 E-mail: [email protected] Company Secretary Network Rail Infrastructure Limited 1 Eversholt Street London NW1 2DN 17 January 2020 Network licence Condition 17 (land disposal): Andover station yard, Hampshire Decision 1. On 3 October 2019, Network Rail gave notice of its intention to dispose of land at Andover station yard, Hampshire (“the land”), in accordance with Condition 17 of its network licence. The land is described in more detail in the notice (copy attached) and at Annex B. 2. We have considered the information supplied by Network Rail including the responses received from third parties consulted. For the purposes of Condition 17 of Network Rail’s network licence, ORR consents to the disposal of the land in accordance with the particulars set out in its notice. Reasons for decision 3. In considering this case, and with Network Rail’s agreement, we considered it appropriate, under Condition 17.5 of Network Rail’s network licence, to extend the deadline to 20 January 2020, to allow Network Rail sufficient time to address the points we raised below. i. We considered that the disposal was inconsistent with Network Rail’s freight site enhancements plan for Andover, as it would remove the area designated as a “Bufferstop Overrun Risk Zone” (shown in Annex B). Further, the proposed disposal could also reduce operational flexibility for passenger train through-running towards Basingstoke and beyond, and it was not clear whether this had been considered sufficiently. ii. We noted that Andover Town Council wished to see redevelopment north of Andover station, which would include the provision of direct pedestrian access to the station.
    [Show full text]
  • Multi-Million Pound Investment for Rail Across the West of England Gets the Green Light
    Multi-million pound investment for rail across the West of England gets the green light June 19, 2019 Better connections and more frequent rail services are coming down the tracks after the West of England Combined Authority (WECA) approved a further £3.5m investment in the MetroWest project. The funding was approved by WECA on 14 June to support the next stage in the project, which aims to deliver additional infrastructure and train operations by the end of 2021 to provide: A half hourly service for Yate local station on the Bristol Parkway to Gloucester line, through the provision of an additional service between Bristol Parkway and Yate An hourly service for a reopened Henbury Line with new stations at Henbury and North Filton. A new station will also be constructed at Ashley Down, on the existing Filton Bank (between Filton Abbey Wood and Stapleton Road). The WECA Committee has also agreed to take forward ambitions for a brand-new rail station serving Charfield and the surrounding towns and villages, with a further investment of £900,000 to develop the full business case. West of England Mayor, Tim Bowles, said: “Rail is a key part of my ambition to improve public transport in the region, giving people more sustainable ways to travel. “This includes improving the Severn Beach line to provide direct services to Bath and Westbury, re- opening Henbury station and more frequent services to Yate. We also have plans to open new train stations in Portishead, Henbury, Portway and Charfield. “Improved and more frequent rail services will give people better access to jobs, link new homes and communities with employment areas and encourage more people to use public transport.
    [Show full text]
  • Publicity Material List
    Early Guides and Publicity Material Inventory Type Company Title Author Date Notes Location No. Guidebook Cambrian Railway Tours in Wales c 1900 Front cover not there 2000-7019 ALS5/49/A/1 Guidebook Furness Railway The English Lakeland 1911 2000-7027 ALS5/49/A/1 Travel Guide Cambrian & Mid-Wales Railway Gossiping Guide to Wales 1870 1999-7701 ALS5/49/A/1 The English Lakeland: the Paradise of Travel Guide Furness Railway 1916 1999-7700 ALS5/49/A/1 Tourists Guidebook Furness Railway Illustrated Guide Golding, F 1905 2000-7032 ALS5/49/A/1 Guidebook North Staffordshire Railway Waterhouses and the Manifold Valley 1906 Card bookmark 2001-7197 ALS5/49/A/1 The Official Illustrated Guide to the North Inscribed "To Aman Mosley"; signature of Travel Guide North Staffordshire Railway 1908 1999-8072 ALS5/29/A/1 Staffordshire Railway chairman of NSR The Official Illustrated Guide to the North Moores, Travel Guide North Staffordshire Railway 1891 1999-8083 ALS5/49/A/1 Staffordshire Railway George Travel Guide Maryport & Carlisle Railway The Borough Guides: No 522 1911 1999-7712 ALS5/29/A/1 Travel Guide London & North Western Railway Programme of Tours in North Wales 1883 1999-7711 ALS5/29/A/1 Weekend, Ten Days & Tourist Bookings to Guidebook North Wales, Liverpool & Wirral Railway 1902 Eight page leaflet/ 3 copies 2000-7680 ALS5/49/A/1 Wales Weekend, Ten Days & Tourist Bookings to Guidebook North Wales, Liverpool & Wirral Railway 1902 Eight page leaflet/ 3 copies 2000-7681 ALS5/49/A/1 Wales Weekend, Ten Days & Tourist Bookings to Guidebook North Wales,
    [Show full text]
  • September 2021 Newsletter
    The Train at Pla,orm 1 The Friends of Honiton Staon Newsle9er 18 - September 2021 Welcome to the September newsle1er. The announcement of South Western Railway’s 2022 Timetable consultaon gave everyone involved with our local railway an opportunity to have their say. The detailed specificaon document issued will form the basis of SWR’s future plans, and so it was vital that we took up the chance to respond to what they had to say. Along with our colleagues at SERUG, we have sent SWR a detailed reply on the behalf of all our members. Our response is summarised below. We will keep members and supporters updated in the months ahead. Milton Keynes, London Birmingham and the North Victoria Watford Junction London Brentford Waterloo Syon Lane Windsor & Shepherd’s Bush Eton Riverside Isleworth Hounslow Kew Bridge Kensington (Olympia) Datchet Heathrow Chiswick Vauxhall Airport Virginia Water Sunnymeads Queenstown Egham Barnes Bridge Wraysbury Road Longcross Whitton TwickenhamSt. MargaretsRichmondNorth Sheen BarnesPutneyWandsworthTown Sunningdale Clapham Junction Staines Ashford Feltham Mortlake Wimbledon Earlsfield Martins Heron Strawberry Ascot Hill Tramlink Raynes Park Bracknell Wokingham Winnersh Triangle SheppertonUpper HallifordSunbury Kempton ParkHampton Fulwell Teddington Hampton WickKingston Norbiton New Oxford, Birmingham Winnersh and the North Hampton Court Malden Thames Ditton Berrylands Chertsey Surbiton Malden Motspur Reading to Gatwick Airport Esher Earley Bagshot ChessingtonTolworthManor Park Hersham Addlestone Walton-on- South Wales,
    [Show full text]