Invitation to Tender: Project Management Services for Design of Tourism Supporting Bulk and Basic Infrastructure for Shashe, Letsibogo and Thune Dams

Total Page:16

File Type:pdf, Size:1020Kb

Invitation to Tender: Project Management Services for Design of Tourism Supporting Bulk and Basic Infrastructure for Shashe, Letsibogo and Thune Dams INVITATION TO TENDER: PROJECT MANAGEMENT SERVICES FOR DESIGN OF TOURISM SUPPORTING BULK AND BASIC INFRASTRUCTURE FOR SHASHE, LETSIBOGO AND THUNE DAMS PROFILE The Botswana Tourism Organisation (BTO) is a body corporate established through an Act of Parliament with the mandate to: market and promote Botswana as a tourist destination of choice; promote investment in the tourism sector; as well as grade and classify tourist facilities. BTO is mandated to develop and improve existing tourism opportunities and diversify the sector, into other forms of tourism. In an endeavor to grow the tourism base and accelerate the development of MAP 1: SHASHE DAM LOCATION the tourism sector the organisation is implementing the dams’ tourism initiative, the purpose of which is to unlock the tourism potential of the country’s major dams. To this end Tourism Master Plans for Shashe, Letsibogo and Thune have been developed. BTO would like to invite interested companies, partnerships and consortia in the field of Built Environment Engineering Consultancy (Civil and Structural), to tender for project management services for design and construction for tourism supporting bulk and basic infrastructure at Shashe, Letsibogo and Thune Dams. 1. INVITATION TO TENDER: PROJECT MANAGEMENT SERVICES FOR DESIGN OF B U L K A N D B A S I C I N F R A S T R U C T U R E A T S H A S H E D A M TENDER NO: BTO026/16/11-18-19/SHASHEPMS Shashe Dam is located on the boundary between Central District and North East District in Botswana, approximately 30 km south of Francistown (See Map 1). A Tourism Master Plan (TMP) to guide tourism development in the dam precinct was developed in November 2017. The TMP has proposed a range of tourism developments and activities to be undertaken in the dam precinct. The Project Management Consultancy will oversee the design and construction of tourism supporting bulk and basic infrastructure in accordance with The Tourism Master Plan Proposals. 2. INVITATION TO TENDER: PROJECT MANAGEMENT SERVICES FOR DESIGN OF MAP 2: LETSIBOGO DAM LOCATION BULK AND BASIC INFRASTRUCTURE AT LETSIBOGO DAM TENDER NO: BTO011/2611-18-19/LETSPMS Letsibogo Dam is located approximately 2km north-west of Mmadinare village in the Central District (See Map 2). A Tourism Master Plan (TMP) to guide tourism development in the dam precinct was developed in November 2017. The TMP has proposed a range of tourism developments and activities to be undertaken in the dam precinct. The Project Management Consultancy will oversee the design and construction of tourism supporting bulk and basic infrastructure in accordance with The Tourism Master Plan Proposals. 3. INVITATION TO TENDER: PROJECT MANAGEMENT SERVICES FOR DESIGN OF B U L K A N D B A S I C I N F R A S T R U C T U R E A T T H U N E D A M TENDER NO: BTO010/2611-18-19/THUNEPMS Thune Dam is located on Thune River, about 13 kilometers upstream from its confluence with the Motloutse River, and just over 30 km southeast of Bobonong in Central District. (See Map 3). A MAP 3: THUNE DAM LOCATION Tourism Master Plan (TMP) to guide tourism development in the dam precinct was developed in December 2017. The TMP has proposed a range of tourism developments and activities to be undertaken in the dam precinct. The Project Management Consultancy will oversee the design and construction of tourism supporting bulk and basic infrastructure in accordance with The Tourism Master Plan Proposals. 1. Bidders are invited to collect Terms of Reference documents for the tender, at a non-refundable fee of P1000.00 starting from 1st November 2018 at the following addresses; Botswana Tourism Organisation, Block 1A and 1B East Wing Plot 70667 Fairscape Precinct, Gaborone 1. These are 3 separate tenders, all the Bidders must clearly indicate which DAM they are bidding for, and seal each bid in a separate envelope which should be labelled accordingly. 2. All the Bidders will be expected to participate in a self-funded site visit to the specific site of interest coordinated by Botswana Tourism Organization at a date to be communicated. 3. Clearly marked and sealed tender submissions should be hand delivered or couriered to Botswana Tourism Organisation, Block 1A and 1B East Wing Plot 70667 Fairscape Precinct , Gaborone. 4. Enquiries relating to the Tender may be addressed to The Procurement Manager, Tel: +2673913111; Fax: +267 395 9220; e-mail: [email protected] not later than 7 days before the Tender closing date. 5. The closing date for receipt of Tender submissions is the 26th November 2018 at 1200 hours and should be addressed to “The Chief Executive Officer” and can be delivered to: Botswana Tourism Office Head Office at Fairscape Precinct, Fairgrounds Office Park, (1A & 1B), 1st Floor, Gaborone, Botswana. 6. Tender submissions received after 1000hrs on the closing date, faxed or e-mailed submissions will not be accepted. 7. Botswana Tourism Organisation reserves the discretionary right to recall, suspend or annul this tender. 8. Notwithstanding anything in the foregoing, Botswana Tourism Organisation is not bound to accept any bid submission nor incur expenses in the preparation thereof. Please note that failure to provide the information above may lead to disqualification. www.botswanatourism.co.bw .
Recommended publications
  • ANNEX 6 - Fisheries Management Framework
    "Strengthening Fisheries Management in ACP Countries" ANNEX 6 - Fisheries Management Framework Fish Stock Assessment in Major Dams in Botswana Project ref. N° SA-3.2- B15 Region: Southern Africa Country: Botswana November 2012 Assignment by: Project Funded by the European Union. “This publication has been produced with the assistance of the European Union. The contents of this publication are the sole responsibility of Prof Ian Cowx on behalf of Landell Mills and can in no way be taken to reflect the views of the European Union.” “The content of this document does not necessarily reflect the views of the concerned governments.” Fish Stock Assessment in Major Dams in Botswana Fish Stock Assessment in Major Dams in Botswana Project ref. N° SA-3.2- B15 Name of individual consultant Professor Ian Cowx Contents amendment record This report has been issued and amended as follows: Revision Description Date Signed 1 First draft 3/11/2012 2 Report 22/11/2012 Designed and produced at Landell Mills Ltd Task management & quality assurance by Charlotte Howell This report has been prepared with the financial support of the European Union. The contents of this publication are the sole responsibility of Landell Mills and can in no way be taken to reflect the views of the European Union. Project Funded by the European Union A project implemented by Landell Mills pg. 2 Fish Stock Assessment in Major Dams in Botswana Contents LIST OF ACRONYMS.......................................................................................................................... 4 1. BACKGROUND ............................................................................................................................ 6 2. BACKGROUND INFORMATION ON MAJOR DAMS IN BOTSWANA ............................. 8 3. STATUS OF THE FISHERIES IN THE MAJOR DAMS......................................................
    [Show full text]
  • HIV Medication Affordable
    Botswana’s Future Modeling Population and Sustainable Development Challenges in the Era of HIV/AIDS Warren C. Sanderson, Molly E. Hellmuth, and Kenneth M. Strzepek Executive Summary February 2001 International Institute for Applied Systems Analysis A-2361 Laxenburg, Austria This study was achieved with the financial contribution of the European Union Environment in Developing Countries Budget Line (B7-6200). The authors are solely responsible for all opinions expressed in this document, and do not necessarily reflect that of the European Union. Executive Summaries bring together the findings of research done at IIASA and elsewhere and summarize them for a wide readership. Views or opinions expressed herein do not necessarily represent those of the Institute, its National Member Organizations, or other organizations supporting the work. Copyright © 2001 International Institute for Applied Systems Analysis All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopy, recording, or any information storage or retrieval system, without permission in writing from the copyright holder. Cover design by Anka James Contents Foreword .............................................................................................................iv Acknowledgments................................................................................................v Main Findings .....................................................................................................vi
    [Show full text]
  • Botswana Environment Statistics Water Digest 2018
    Botswana Environment Statistics Water Digest 2018 Private Bag 0024 Gaborone TOLL FREE NUMBER: 0800600200 Tel: ( +267) 367 1300 Fax: ( +267) 395 2201 E-mail: [email protected] Website: http://www.statsbots.org.bw Published by STATISTICS BOTSWANA Private Bag 0024, Gaborone Phone: 3671300 Fax: 3952201 Email: [email protected] Website: www.statsbots.org.bw Contact Unit: Environment Statistics Unit Phone: 367 1300 ISBN: 978-99968-482-3-0 (e-book) Copyright © Statistics Botswana 2020 No part of this information shall be reproduced, stored in a Retrieval system, or even transmitted in any form or by any means, whether electronically, mechanically, photocopying or otherwise, without the prior permission of Statistics Botswana. BOTSWANA ENVIRONMENT STATISTICS WATER DIGEST 2018 Statistics Botswana PREFACE This is Statistics Botswana’s annual Botswana Environment Statistics: Water Digest. It is the first solely water statistics annual digest. This Digest will provide data for use by decision-makers in water management and development and provide tools for the monitoring of trends in water statistics. The indicators in this report cover data on dam levels, water production, billed water consumption, non-revenue water, and water supplied to mines. It is envisaged that coverage of indicators will be expanded as more data becomes available. International standards and guidelines were followed in the compilation of this report. The United Nations Framework for the Development of Environment Statistics (UNFDES) and the United Nations International Recommendations for Water Statistics were particularly useful guidelines. The data collected herein will feed into the UN System of Environmental Economic Accounting (SEEA) for water and hence facilitate an informed management of water resources.
    [Show full text]
  • Botswana Environment Statistics Water Climate
    BOTSWANA ENVIRONMENT STATISTICS: WATER & CLIMATE DIGEST 2014 Published by Statistics Botswana Private Bag 0024, Gaborone Phone: 3671300 Email: [email protected] Contact Unit: Environment Statistics Unit Phone: 3671395 Copyright Reserved © 2015 Extracts may be published if Sources are duly acknowledged ISBN: 978-99968-429-8-6 PREFACE This is the first edition of the Botswana Environment: Water and Climate Digest, which eventually will be produced on a quarterly basis. The purpose of the Digest is to provide data for use by decision-makers in water management as well as for monitoring trends related to climate. The indicators in this report cover data on dam levels, water production, rainfall and temperature. The indicators will however be gradually expanded in subsequent editions as more data become available. In compiling this report, international standards and guidelines were followed, particularly the United Nations Framework for the Development of Environment Statistics (UNFDES) and the United Nations International Recommendations for Water Statistics. Eventually, the data collected through these methodologies would feed into the UN System of Environmental Economic Accounting (SEEA) for water and hence facilitate an informed management of water resources. The sustained production of the Water and Climate Digest would depend on the cooperation of relevant data providers to provide the necessary data. I therefore would like to extend by gratitude and appreciation to all stakeholders who assisted in the production of this digest, in particular the Water Utilities Corporation and the Department of Meteorological Services for availing the water and climate data as required. For more information and further enquiries, contact the Directorate of Stakeholder Relations at 3671300.
    [Show full text]
  • Botswana North-South Carrier Water Project Field Survey
    Botswana North-South Carrier Water Project Field Survey: July 2003 1. Project Profile & Japan’s ODA Loan Angola Zambia Botswana Zimbabwe Namibia Maun Francistown Ghanzi Palapye Mamuno Maharapye South Africa Gaborone Tshabong Project location map Mmamashia Water Treatment Works 1.1 Background Botswana is a landlocked country that is situated in the Kalahari Basin on the plains of southern Africa (average altitude: approximately 900 meters); it is bordered by the Republic of South Africa, Zimbabwe, Namibia, and Zambia. Its territory is generally flat and covers an area of 582 thousand square meters or approximately one-and-a-half times the size of Japan. It has a sub-tropical climate, with much of the country being arid or semi-arid. Annual rainfall averages 400mm nationwide, with southwestern regions seeing the least precipitation (250mm) and southeastern areas the most (600mm). Rainfall levels are seasonally affected and unstable. Botswana has few surface water resources in consequence of its topographical and geographical features and sources the majority of its water from groundwater fossil resources. At the time of appraisal, the water supply rate was 100 percent in urban areas centered around the capital, Gaborone, but in view of the fact that demand was growing at exponential rates, large-scale development of underground water was problematic and water resources around the capital had been developed, the country was considering water transmission from other regions. In addition, Gaborone was importing water on a regular basis from South Africa and the country harbored a long-cherished wish to develop independent national water resources. By contrast, the water supply rate in the regions was 50 percent and reliant on groundwater.
    [Show full text]
  • Daily Hansard (Parliamentary Debates)
    HANSARDYOUR VOICE IN PARLIAMENT DAILY HANSARD (PARLIAMENTARY DEBATES) TTHEHE SECONDFIRST MEE MEETINGTING O FOF THE THE SECOND SECOND SESSIO SESSIONN OOFF THE ELEVENTH PARLIAMENT HANSARD NO. 181182 TUESDAY 1 MARCH 2016 DISCLAIMER Unofficial Hansard This transcript of Parliamentary proceedings is an unofficial version of the Hansard and may contain inaccuracies. It is hereby published for general purposes only. The final edited version of the Hansard will be published when available and can be obtained from the Assistant Clerk (Editorial). NATIONAL ASSEMBLY ENGLISH VERSION THE NATIONAL ASSEMBLY SPEAKER The Hon. Gladys K. T. Kokorwe MP. DEPUTY SPEAKER The Hon. Kagiso P. Molatlhegi, MP Gaborone South Clerk of the National Assembly - Ms B. N. Dithapo Deputy Clerk of the National Assembly - Dr R.D. Dingalo Ag. Learned Parliamentary Counsel - Mr S. Chikanda Assistant Clerk (E) - Mr R. Josiah CABINET His Excellency Lt. Gen. Dr. S. K. I. Khama PH, FOM, - President DCO, DSM, MP. His Honour M. E. K. Masisi, MP. (Moshupa-Manyana) - Vice President Minister of Foreign Affairs and International Hon. Dr. P. Venson-Moitoi, MP. (Serowe South) - Cooperation Minister of Local Government and Rural Hon. S. Tsogwane, MP. (Boteti North) - Development Minister of Infrastructure, Science and Hon. N. E. Molefhi, MP. (Selebi Phikwe East) - Technology Hon. S. Kgathi, MP. (Bobirwa) - Minister of Defence, Justice and Security Minister of Minerals, Energy and Water Hon. O. K. Mokaila, MP. (Specially Elected) - Resources Hon. P. M. Maele, MP. (Lerala - Maunatlala) - Minister of Lands and Housing Hon. E. J. Batshu, MP. (Nkange) - Minister of Labour and Home Affairs Hon. D. K. Makgato, MP. (Sefhare - Ramokgonami) - Minister of Health Hon.
    [Show full text]
  • Major Villages Sanitation Project
    Our Ref: WUC 014 (2021) 18 June 2021 TO: All Tenderers Dear Sir / Madam SUPPLY OF WATER TREATMENT CHEMICALS - TENDER NO WUC 014 (2021) ADDENDUM No. 2 The tenderer must note and consider the amendments and/or additions to the Tender Document issued under the above-mentioned tender constitutes Addendum 2 that should be duly incorporated in the Tender Document. Clarification on the above tender refers: 1. Bidders wishing to tender for Supply of Water Treatment Chemicals under the flocculant category are advised as follows: Question 1 Is it compulsory to submit Jar test results at tender stage? In other would we be disqualified if we do not submit them? Response: Please refer to Item 4.2.2.2 Flocculants in the Tender Document - TENDER NO WUC 014 (2021) “All flocculants must be accompanied by the standard specifications as indicated out below at the time of tendering. At the time of delivery, certificates of analysis, which include both physical and chemical parameters, should accompany the chemicals. The Tenderer shall carry out laboratory jar-tests on all raw water supplies in the presence of the Water Utilities Corporation, or other method deemed necessary by the Corporation to evaluate chemical optimum performance”. The statement above requests compulsory testing by the Tenderer of the flocculant they are tendering to supply and obtain performance results which they will share with the Corporation. Refer to response to 6 a. below for further information on contact people and venues for sample collection. Question 2 We wish to request to visit the various sites for raw water sample collection.
    [Show full text]
  • BOTSWANA ENVIRONMENT STATISTICS 2016 Revised Version (RV)
    BOTSWANA ENVIRONMENT STATISTICS 2016 Revised Version (RV) ----- ------- --- ---- --- -- ------ -------- -- -- -- --- - -- --- -- -- - - -- - -- -- - -- - - - - - - -- - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- -- -- - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- - --- - -- --- - - - - -- - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- ---- - - - -- - - -- -- - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- ----- - - - - - - - -- -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
    [Show full text]
  • Assessment of the Water Quality of the Dikgathong Dam in Botswana Using Remote Sensing Techniques
    UNIVERSITY OF ZIMBABWE FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING Integration of physicochemical assessment of water quality with Remote sensing techniques for the Dikgathong Dam in Botswana By KAGISO MOSIMANEGAPE M.Sc. THESIS IN IWRM HARARE, MAY 2016 Assessment of the Water Quality of the Dikgathong Dam in Botswana using Remote Sensing Techniques In collaboration with UNIVERSITY OF ZIMBABWE DEPARTMENT OF CIVIL ENGINEERING Integration of physicochemical assessment of water quality with Remote sensing techniques for the Dikgathong Dam in Botswana By KAGISO MOSIMANEGAPE MASTER OF SCIENCE THESIS IN INTEGRATED WATER RESOURCES MANAGEMENT A thesis submitted in partial fulfilment of the requirements for the Degree of Master of Science in Integrated Water Resources Management of the University of Zimbabwe SUPERVISORS: Eng. Z. Hoko Mr W. Gumindoga JULY 2016 Assessment of the Water Quality of the Dikgathong Dam in Botswana using Remote Sensing Techniques DECLARATION I, Kagiso Mosimanegape, declare that this research report is my own work. It is submitted for the degree of Master of Science in Integrated Water Resources Management (IWRM) at the University of Zimbabwe. It has not been submitted before for any other degree of examination at any other University. The findings, interpretations and conclusions expressed in this study neither reflect the views of the University of Zimbabwe, Department of Civil Engineering nor those of the individual members of the MSc Examination Committee, nor of their respective employers. Signature: ___________________________________ Date: ________________ MSC IWRM 2015/16, KAGISO MOSIMANEGAPE I Assessment of the Water Quality of the Dikgathong Dam in Botswana using Remote Sensing Techniques CONTENTS DECLARATION ................................................................................................................................................... i TABLE OF CONTENTS .....................................................................................................................................
    [Show full text]
  • Motloutse Dam Feasibility/Preliminary Design Study
    Department of Water Affairs Republic of Botswana MOTLOUTSE DAM FEASIBILITY/PRELIMINARY DESIGN STUDY. ANNEX B WATER RESOURCES DRAFT July 1989 SIR M MACDONALD & PARTNERS Demeter House, Station Road, Cambridge CB1 2RS, England Department of Water Affairs Republic of Botswana MOTLOUTSE DAM FEASIBILITY/PRELIMINARY DESIGN STUDY. SIR M MACDONALD & PARTNERS Demeter House, Station Road, Cambridge CBI 2RS, England Department of Water Affairs 1 Republic of Botswana MOTLOUTSE DAM • FEASIBILITY/PRELIMINARY DESIGN STUDY. THIS BOOK IS DUE ON OR BEFORE THE LAST DATE STAMPED BELOW DUE DATE DUE DATE DUE DATE eN-fic-- (oc) SIR M MACDONALD & PARTNERS I Demeter House, Station Road, Cambridge CB1 2RS, England MOTLOUTSE DAM FEASIBILITY/PRELIMINARY DESIGN STUDY This report consists of a MAIN REPORT ALBUM OF DRAWINGS Accompanied by thirteen Annexes : Annex A: Hydrology Annex B: Water Resources Annex C: Geology and Site Investigations Annex D: Dam Studies Annex E: Water Supply Annex F: Soils and Land Suitability Annex G: Agriculture Annex H: Markets and Prices Annex I: Irrigation Engineering Annex J: Economic and Financial Analysis of Irrigation Development Annex K: Environmental Impact Studies Annex L: Pollution Studies Annex M: Development Economics UST OF CONTENTS Page No. CHAPTER B1 INTRODUCTION B1.1 General B1 -1 CHAPTER B2 RESERVOIR YIELD ANALYSIS B2.1 Reservoir Operation Modelling B2 -1 B2.1.1 General B2 - 1 B2.1.2 Reservoir Inflow Sequence B2- 1 B2.1.3 Rainfall on the Reservoir B2 - 2 82.1.4 Evaporation B2 - 3 B2.1.5 Initial Conditions B2 - 3 B2.1.6 Sedimentation
    [Show full text]
  • ANNUAL REPORT 2015/16 Water for People, Water by People ANNUAL REPORT
    ANNUAL REPORT 2015/16 Water for People, Water by People ANNUAL REPORT REPORT ANNUAL 2015/16 2015/16 ANNUAL REPORT WATER FOR PEOPLE, WATER BY PEOPLE GABORONE HEAD OFFICE, SEDIBENG HOUSE Plot 17530, Luthuli Road P/Bag 00276, Gaborone Tel: 360 4400 | Fax: 397 3852 E-mail: [email protected] 1 A newly introduced pre-paid public stand pipe in Mogoditshane 2 ANNUAL REPORT 2015/16 Water for People, Water by People VISION TO BE A WORLD CLASS WATER UTILITY MISSION To provide sustainable water and wastewater management services in a cost effective and environmentally friendly manner to the economy. 01 Batho Pele/ People First We understand and exceed expectations by putting the customer first. Botho WeTITLE display aARTI strongCL Lorem ipsum dolor sit,t Kgetsi ya workconsectetur ethic adipiscing and Donel et. c respectsit amet euismod Seden Tsie/ 05 gravidatortor sedrate vulputate, forquis varius people odio alt Team Work VALUES We believe in working together to 02 accomplish more Botswerere/ Quality We provide a high quality of products and service Therisanyo/ Consultation delivery to our customers TITLE ARTICL WeLorem value ipsum open dolor and free sit,t ameconsectetu exchangeadipiscing of views Donec elit. and sit amet euismo ideasSed gravidatortor sed erat vulputate, qu varius odio alt 04 03 3 TABLE OF CONTENTS Performance Highlights ......................................................................................................... 5 Five Year Performance at a Glance ........................................................................................................
    [Show full text]
  • Water Accounts of Botswana (1992-2003)
    Water accounts of Botswana (1992-2003) Prepared by the Department of Environmental Affairs in association with the Centre for Applied Research July 2006 Botswana Water Accounts Report Table of contents List of Tables 4 List of Figures 5 Acronyms 6 Acknowledgements 7 Executive Summary 9 1 Background 11 1.1 Introduction 11 1.2 Water scarcity 11 1.3 Surface and groundwater resources 12 1.4 Wastewater resources 19 2 Water and wastewater management and planning 20 2.1 Introduction 20 2.2 Water planning and management 20 2.3 Wastewater planning and management 21 3 Framework for water accounts and data sources 23 3.1 Introduction 23 3.2 Type of accounts 23 3.3 Classification of water supply 24 3.4 Classification of water users 25 3.5 Data sources and major data problems 25 4 Water resources and use in the period 1990-2003 28 4.1 Introduction 28 4.2 Stock accounts 28 4.3 Water use accounts 30 4.4 Wastewater accounts 32 5 Economic aspects of water supply and use 36 5.1 Introduction 36 5.2 Water supply costs 36 5.2.1 Water Utilities Corporation 36 5.2.2 Department of Water Affairs 38 5.2.3 District Councils and self providers 40 5.3 Wastewater treatment costs 40 5.4 Unaccounted for water and supply losses 41 5.5 Value added per unit of water 42 5.6 Benefits of wastewater re-use 43 6 Policy implications and further work 46 References 49 Appendix 1: Definition of terms 51 Appendix 2: Methodological details 52 2 Botswana Water Accounts Report Appendix 3: Details of the water accounts 54 Appendix 4: Features of current wastewater treatment works 59
    [Show full text]