Turning a New Page 1H FY2016 Results Presentation

Total Page:16

File Type:pdf, Size:1020Kb

Turning a New Page 1H FY2016 Results Presentation Strictly confidential Turning a new page 1H FY2016 results presentation November 2015 Disclaimer 106 The information contained in this presentation is provided by CSI Properties Limited (the "Company") for reference purposes only, and should not be relied upon for the purpose of making any investment decision or for any other purpose whatsoever. 75 50 The information contained in this presentation has not been independently verified. No representation or warranty, expressed or implied, is made as to, and no reliance should be placed on, the fairness, reasonableness, accuracy, completeness or correctness of such information or opinions contained herein. In particular, 106 no inference of any matter whatsoever shall be drawn from the presence or absence of any project or investment referred to in this presentation, whether or not held or being reviewed by the Company or otherwise. The information and opinions contained in this presentation are provided as at the date of this presentation and are 75 subject to change without notice. The Company undertakes no obligation (i) to amend or update this presentation to reflect any developments, whether actual or 50 contemplated, and whether occurring before or after the date of this presentation; or (ii) to correct any inaccuracies in this presentation. None of the Company nor any of its affiliates, or any of its directors, officers, employees, advisers or representatives shall have any liability whatsoever (in negligence or otherwise) for any loss howsoever arising from any use of this presentation or its contents or otherwise arising in connection with this presentation/document. 106 75 Certain information contained in this presentation may constitute "forward-looking statements", which can be identified by the use of forward-looking terminology 50 such as "may", "will", "should", "expect", "anticipate", "target", "project", "estimate", "intend", "continue" or "believe" or the negatives thereof or other variations thereon or comparable terminology. These forward-looking statements (if any) are based on a number of assumptions about the Company's operations and factors beyond the Company's control and are subject to significant risks and uncertainties, and, accordingly, actual results may differ materially from these forward-looking 106 statements (if any). The Company undertakes no obligation to correct or update these forward-looking statements (if any) for any reason whatsoever. No statement 75 in this presentation is intended to be or may be construed as a profit forecast or similar forecast or prediction of any kind. 50 This presentation does not constitute nor form part of and should not be construed as, an offer to sell or issue or the solicitation of an offer to buy or acquire or sell or dispose of securities of the Company or any holding company or any of its subsidiaries in any jurisdiction or an inducement to enter into investment activity. No part 106 of this presentation, nor the fact of its distribution, shall form the basis of or be relied upon in connection with any contract or commitment whatsoever. 75 50 106 75 50 1 Table of contents Section 1 1H FY2016 Results Highlights 3 106 Section 2 New Acquisition Highlights 11 75 Section 3 Company Background 15 50 Section 4 Commercial and Residential Portfolio Highlights 31 106 75 50 106 75 50 106 75 50 106 75 50 106 75 50 2 Section 1 1H FY2016 Results Highlights FY 2016 interim results highlights 106 75 (Year ended 31st March) 1H FY’2016 1H FY2015 % change (HK$m) (A) (B) (A/B-1) 50 Gross revenue from property business 229 362 37% 106 Property sale 124 270 75 Rental income1 105 92 50 Gross profit 130 114 14% 106 75 50 Profit from property JV/associates 526 84 526% 106 75 Profit attributable to equity holders 526 169 211% 50 EPS (basic) 5.0 cents 1.8 cents 179% 106 75 50 Note: 1 Rental income including JV/ Associates together should amount 106 to HK$300 million annually 75 50 4 FY 2016 interim results highlights (cont’d) Strong cash and cash-equivalent investment balances demonstrate financial stability while allowing for flexibility in capturing future investment opportunities 106 75 1H FY 2016 FY 2015 (HK$m) 30th Sep 2015 31st Mar 2015 50 Properties & related assets 11,716 9,830 106 75 Cash & bank balances 1,307 1,280 50 Investments 1,094 1,293 106 75 Other assets 86 159 50 Total assets 14,203 12,562 106 75 Bank loans 3,457 2,756 50 Guaranteed notes 1,170 1,170 106 Other liabilities 892 369 75 50 Total liabilities 5,518 4,295 106 Minority interests 10 2 75 50 Shareholders’ equity 8,674 8,265 5 FY 2016 YTD key sales CSI has made a few key sales this fiscal year to capitalize on positive market sentiment, especially in the HK office sector 106 75 Sale price 50 Projects sold YTD Location (HK$m) 106 13 Floors of Henan Building1 Wanchai 508 75 50 131 units of yoo Residence2 (50% interest) Causeway Bay c. 2,000 106 75 17-19th Floors of AXA Centre (plus 10 parking spaces)3 Wanchai 730 50 4 106 20-21st Floors of AXA Centre(plus 7 parking spaces) Wanchai 499 75 50 Platinum Building (50% interest) Shanghai RMB2.88bn 106 Notes: 75 1 All closed except 2 floors remaining to be completed Dec 2015 50 2 Completion expected Nov/Dec 2015 3 Completed late Oct 2015 4 Completed late Oct 2015 106 75 50 6 FY 2016 YTD key acquisitions CSI has made several key acquisitions in the current fiscal year to build up its commercial and residential landbank to accelerate growth of Group in the future 106 75 50 Purchase price Projects acquired YTD Location (HK$m) 106 Office land site (government tender) 75 Kowloon Bay 3,038 (30% interest) 50 106 Residential land site (government tender) FanLing 302 75 (100% interest) 50 Peak road project (17 apartments and one house) Peak 1,800 106 for refurbishment 75 Novotel Hotel Jordan (Consolidation of remaining 50 Jordan, Kowloon 1,700 50% stake) 106 75 50 106 75 50 7 1H FY 2016 financial highlights 106 1H FY 2016 FY 2015 75 (HK$m) (HK$m) 50 Book NAV attributable to shareholders 8,674 8,265 106 Pro-forma adjusted NAV attributable to shareholders 12,493 12,970 75 Net debt 3,320 2,646 50 Current ratio 5.99x 7.65x 106 Gearing ratio1 (consolidated) 32.6% 31.3% 75 Pro forma Gearing ratio (consolidated & mark-to-mkt) 25.7% 22.7% 50 Gearing ratio1 (incl. JV/associate) 49.3% 48.5% 106 Pro forma Gearing ratio (incl. JV/associate & 38.9% 35.3% 75 mark-to-mkt) 2 50 Committed property JV/associate loans 2,381 2,171 106 Final dividend payout NA 39.6 75 Special dividend payout NA 26.4 50 Total dividend payout ratio (% of net profit) NA 25.1% 106 Dividend yield (on announcement date) NA 2.03% 75 50 Note: 1 Gearing ratio calculated based on historical book cost with no mark-to-market revaluation accounted for 2 Subsequent to end of 1H FY 2016, CSI successfully disposed the 5 upper floors of AXA Center which will lower the gearing ratio 8 Pro-forma Balance Sheet adjusted for market valuation Properties valued at historical cost basis on book with no revaluation surplus. Even after revaluation adjustment still represents significant value in terms of a significant discount to pro forma adjusted NAV of 106 HK$1.19 per share when compared to current share price 75 50 Net asset value 106 (HK$m) 75 50 Net assets attributable to shareholders (audited FY2015) 8,274 106 Add 75 Attributable revaluation surplus relating to the group‘s properties held for sale as per 50 2,787 independent valuations at 31 March 20151 106 Attributable revaluation surplus relating to the group‘s properties held for sale by jointly 1,033 75 controlled entities as per independent valuations at 31 March 20151 50 Net assets attributable to shareholders as if properties held for sale by jointly 106 controlled entities and interests in jointly controlled entities were stated at open market 12,495 75 value2 50 Pro-forma adjusted NAV per share3 HK$1.19 106 75 Notes: 50 1 Independent valuations conducted by professional valuers incl. DTZ, CBRE, Jones Lane Lasalle and AG Wilkinson at 31 March 2015 (adjusted by sale of Platinum) 2 Deferred tax liabilities have not been provided for the attributable surplus of properties held for sale 3 NAV per share calculated based on 10,487 million shares in issue 9 Visible disposal and profitability pipeline¹ FY 2016 AXA Centre- 17-21st floors plus 17 car parks (Sold at total HK$1.23 billion) 106 The Platinum in Shanghai (50% stake) (Sold at RMB 2.88 billion) 75 Remaining units of yoo Residence (50% stake) (Proposed Sale Value c. HK$700m) (131 units presold for c. HK2.0 billion and 50 completing Nov/ Dec 2015) 5 detached houses in Kau To Shan (expecting 13k sq.ft.) 106 1st phase of c.75 houses in Daihongqiao (50% stake) in Shanghai (Sold over 45 villas as of end of November) 75 50 106 75 FY 2017 50 AXA Centre-remaining units including ground floor shop, sky sign and 52 car park spaces Wanchai Road site (50% stake) 106 Remaining 15 detached houses in Kau To Shan (expecting 39k sq.ft.) 75 2nd phase of c.150 houses in Daihongqiao in Shanghai(50%) (remaining c. 47k sqm) 50 Yan Ching Road, Tuen Mun presale (expecting residential: 67.8k sq.ft. and commercial: 12.7k sq.ft.) 106 Shelley Street Redevelopment presale (expecting 40k sqft) 75 50 106 75 50 Steady sales pipeline in commercial properties coupling with increasingly strong residential properties sales will ensure target sales of around HK$3 billion every year with excellent profitability in the coming years Notes: 1 Only key sales listed All market value and book cost data based on independent valuers’ estimates and historical acquisition costs 10 Section 2 New Acquisition
Recommended publications
  • 7-Eleven Store List – ZALORA Return Service HK Island
    7-Eleven Store List – ZALORA Return Service Region Store No. ADDRESS HK Island Aberdeen 0286 Shop S24A, Comm. Centre, Wah Fu Estate (II), Aberdeen, HK 0493 Shop 102, Tin Wan Shopping Centre, Tin Wan Estate, Aberdeen, HK 0568 Shop No.401 + 401A, Chi Fu Landmark, Pokfulam, HK 0572 Shop 25, G/F., Aberdeen Center, Site 2 (7-11 Nam Ning St), HK 0688 G/F., 11 Wu Nam Street, Aberdeen, HK 1089 G/F., No. 178 Aberdeen Main Road, HK 1239 G/F., No.38 Aberdeen Main Road, Aberdeen, HK 1607 Shop No. 1, G/F, Noble Square, Wah Kwai Shopping Centre, Wah Kwai Estate, No. 3 Wah Kwai Road, Aberdeen, HK Apleichau 0030 Shop Nos. 6-9, G/F., Ning Fung Mansion, Nos. 25-31 Main St., Apleichau, HK 0165 Cooked Food Stall 6, Multi-Storey Carpark, Ap Lei Chau Estate, HK 0235 Shop 102, Lei Tung Estate, Phase I, Apleichau, HK 0366 G/F, Shop 47 Marina Square West Comm Blk, South Horizon,Ap Lei Chau, HK 0744 Shop B G/F., Coble Court, No.127-139 Apleichau Main Street, Apleichau, HK Causeway Bay 0094 Shop 3, G/F, Professional Bldg., 19-23 Tung Lo Wan Road, HK 0325 Shop C, G/F Pak Shing Bldg, 168-174 Tung Lo Wan Rd, Causeway Bay, HK 0468 G/F., No. 16 Matheson Street, Causeway Bay, HK 0608 Shop 7, G/F., Malahon Apartments, Nos.513 Jaffe Rd., Causeway Bay, HK 0920 Shop Nos.8 & 9, G/F., Bay View Mansion, 13-33 Moreton Terrace, Causeway Bay, HK 0929 Shop Nos.6A & 6B, G/F., Lei Shun Court, No.106-126 Leighton Road, Causeway Bay, HK 1075 Shop G, G/F, Pun Tak Building, 478-484 Lockhart Road, Causeway Bay, HK 1153 G/F, 17 Pennington Street, Causeway Bay, HK 1241 Ground Floor & Cockloft, No.68 Tung Lo Wan Road, Tai Hang, HK 1289 Ground Floor, No.60 Percival Street, Causeway Bay, HK 1295 Shop A & Portion of Shop B, Ground Floor, Vulcan House, Nos.21-23 Leighton Road, Causeway Bay, HK 1475 Shop Nos.
    [Show full text]
  • CT Catalyst Air Purification Service Job Reference of Residence
    Homeasy Services Limited – CT Catalyst Air Purification Service Job Reference of Residence Apartments & Houses – HK Island (in alphabetical order) ** Different Phases with no other specific names will not be stated separately in the list. HK Island Central Central-Mid-Levels Aigburth Ewan Court Hong Lok Mansion Tavistock Branksome Grande Greenland Court Horizon Mansion The Mayfair Clovelly Court Grenville House Kennedy Park At Central Tregunter Dynasty Court Hillsborough Court Magazine Court Central / Sheung Wan / Admiralty 149 Hollywood Road (6 Levels) Goodview Court Ka Fung Building Bel Mount Garden Hollywood Terrace Lascar Court Evora Building Hongway Garden Rich View Terrace Causeway Bay / Wan Chai 15A Matheson Street Gold Jade Mansion No. 1 Star Street Sung Lan Mansion Cathay Lodge Greenway Terrave One Wanchai The Avenue Cleveland Mansion Hay Wah Building Pearl City Mansion The Zenith Convention Plaza Lok Moon Mansion Riviera Mansion Yue King Building Apartments Elizabeth House Monmouth Place Southorn Garden Gold Harbour Mansion Monticello Star Crest Happy Valley / East-Mid-Levels / Tai Hang 99 Wong Nai Chung Rd High Cliff Serenade Village Garden Beverly Hill Illumination Terrace Tai Hang Terrace Village Terrace Cavendish Heights Jardine's Lookout The Broadville Wah Fung Mansion Garden Mansion Celeste Court Malibu Garden The Legend Winfield Building Dragon Centre Nicholson Tower The Leighton Hill Wing On Lodge Flora Garden Richery Palace The Signature Wun Sha Tower Greenville Gardens Ronsdale Garden Tung Shan Terrace Hang Fung Building
    [Show full text]
  • 7-Eleven Store List – Return Service Store No
    7-Eleven Store List – Return Service Store No. Dist ADDRESS 0001 D03 G/F., Winner House,15 Wong Nei Chung Road, Happy Valley, HK 0008 D01 Shop C, G/F., Elle Bldg., 192-198 Shaukiwan Road, Shaukiwan, HK 0009 D01 Shop 12-13, G/F., Blk C, Model Housing Est., 774 King's Road, HK 0011 D07 Shop No. 6-11, G/F., Godfrey Ctr., 175-185 Lai Chi Kok Rd., Kln 0015 D12 Shop D., G/F., Win Cheung Hse, 131-137 Sha Tsui Road, Tsuen Wan, NT Shop B2A,B2B, 2-32 Man Tai St, Wing Wah Bldg & Wing Yuen Bldg, Blk F&G,Whampoa 0016 D06 Est, Kln 0022 D14 Shop No. 57, G/F., Hop Yick Ctr., 31 Hop Yick Rd., Yuen Long, NT 0030 D02 Shop Nos. 6-9, G/F., Ning Fung Mansion, Nos. 25-31 Main St., Apleichau, HK 0035 D04 Shop J G/F, San Po Kong Mansion, Nos. 2-32 Yin Hing St, Kowloon 0036 D06 Shop A, G/F, TAL Building, 45-53 Austin Road, Kln 0037 D04 G/F, 109 Geranum House, Ma Tau Wai Estate, Kln 0058 D05 Shop D, G/F & C/L, Lap Hing Bldg., 37-43 Ting On St., Ngau Tau Kok, Kln 0067 D13 G/F., Shops A & B, Golden Court, 42-58 Yan Oi Tong Circuit, Tuen Mun, NT 0069 D07 B2, G/F, Yuet Bor Building, 10-12 Shun Fong Street, Kwai Chung, NT 0070 D07 Shop 15-17, G/F, Block 9, Pak Tin Estate, Kln 0077 D08 Shop A-D, G/F., Leung Ling House, 96 Nga Tsin Wai Rd, Kowloon City, Kln 0083 D04 Shop D, G/F&C/L Yuk Wah Mansion, 1-11 Fong Wah Lane, Tsz Wan Shan, Kln 0084 D03 G6, G/F, Harbour Centre, 25 Harbour Rd., Wanchai, HK 0085 D02 G/F., Blk B, Hiller Comm Bldg., 89-91 Wing Lok St., HK 0086 D07 Shop 1, Mei Shan House, Block 42, Shekkipmei Estate, Kln 0093 D08 Shop 7, G/F, Hing Wong Mansion, 79 Tai Kok Tsui Road, Kln 0094 D03 Shop 3, G/F, Professional Bldg., 19-23 Tung Lo Wan Road, HK 0096 D01 62-74, Shaukiwan Main East Road, Shaukiwan, HK 0098 D13 8-9 Comm.
    [Show full text]
  • 4H GROWSEAL Job Reference (E)~Version 24 (Long Top) 20201126
    GROWSEAL SYSTEM - WATERPROOFING, HEAT INSULATION, EXPANSION JOINT. Selected Job Reference Location Product Treated Area Year Waterproofing work for the vertical expansion joint at Worfu (Growseal CCW + Nano-brush Coat) 3 LM 2020 Waterproofing work for the floor and wall at basement at Worfu (Growseal CCW + Nano-brush Coat) 160 sq.m. 2020 Waterproofing work for the soffit of the podium at 5/F, 847 - 865 Canton Road (Growseal CCW + Nano-brush Coat) 46 sq.m. 2020 - 2019 Waterproofing work for the soffit at G/F and Basement, External Wall, Worfu (Growseal CCW + Nano-brush Coat) 100 sq.m. 2020 - 2019 Waterproofing work for sump pit at EVB, B1, Wanchai-Central Bypass (Growseal CCW + Nano-brush Coat) 26 sq.m. 2019 Waterproofing work for the soffit of the podium at Shop UG2, Provident Centre (Growseal CCW + Nano-brush Coat) 150 sq.m. 2019 Waterproofing work for 6, 6A, 8 & 8A Austin Avenue, TST Growseal Brushcoat Plus 2,500 sq.m. 2019 Waterproofing work for Walk-in Chiller Room at 1/F, Nam Pak Hong Building (Growseal CCP + Nano-brush Coat) 80 sq.m. 2019 Waterproofing work for external wall at 6 - 12 Sai Yeung Choi Street South De Neef HA Cut CFL AF 100 LM 2019 Waterproofing work for Basement Wall at Worfu, Wharf Road Growseal CCW 25 sq.m. 2019 Waterproofing work for swimming pool, 146 Waterloo Road Growseal Nano-brush Coat 160 sq.m. 2019 Waterproofing work for podium at 386 Castle Peak Road, Ting Kau Growseal Nano-brush Coat 100 sq.m. 2019 Waterproofing work for F.S.
    [Show full text]
  • Directors and Parties Involved in the Placing
    DIRECTORS AND PARTIES INVOLVED IN THE PLACING DIRECTORS Name Address Nationality App1A41 Executive Directors 3rd Sch.-6 Mr. KWONG Chak Chung 1902 Chinese (Chairman) May Tower I 7 May Road Hong Kong Mr. YIP Sam Lo 16K Chinese (Managing Director) 33 Tai Tam Road Hong Kong Mr. LEUNG Yiu Chown, Desmond 8B Ventris Court Chinese 15 Ventris Road Happy Valley Hong Kong Mr. XU Jie Room 501 Chinese 38 Gong He Qi Xiang Guangzhou The PRC Mr. LEE Sai Yeung 24B Canadian Block 2 Clovelly Court 12 May Road Hong Kong Independent Non-executive Directors Rule 5.05 Ms. TAI Kar Ping, Noreen Flat 1003 Canadian Po Hing Mansion 2-8 Po Hing Fong Sheung Wan Hong Kong Mr. David Egryn JONES Flat 2 British 1st Floor 14 Shouson Hill Road West Hong Kong —33— DIRECTORS AND PARTIES INVOLVED IN THE PLACING PARTIES INVOLVED App1A3 International Co-ordinator Core Pacific - Yamaichi Capital Limited Rule 11.09 and Sponsor 30th Floor Two Pacific Place 88 Queensway Hong Kong Lead Manager Core Pacific - Yamaichi International (H.K.) Limited App1A15 (3)(h) 30th Floor Two Pacific Place 88 Queensway Hong Kong Co-Managers China Everbright Securities (HK) Limited 36th Floor Far East Finance Centre 16 Harcourt Road Hong Kong Core Pacific Securities International Limited 30th Floor Two Pacific Place 88 Queensway Hong Kong DBS Asia Capital Limited 26th Floor CITIC Tower 1 Tim Mei Avenue Central Hong Kong Kingsway SW Securities Limited 5th Floor Hutchison House 10 Harcourt Road Central Hong Kong Yuanta Brokerage Company Limited 1902-3 Bank of American Tower 12 Harcourt Road Central Hong
    [Show full text]
  • Directors and Parties Involved in the Global Offering
    DIRECTORS AND PARTIES INVOLVED IN THE GLOBAL OFFERING HK Electric Investments HK Electric Investments, as constituted by the Trust Deed in A1A1 Hong Kong Company HK Electric Investments Limited A1A1 Trustee-Manager HK Electric Investments Manager Limited, in its capacity as trustee-manager of HK Electric Investments TRUSTEE-MANAGER DIRECTORS AND COMPANY DIRECTORS The Trust Deed requires that: (a) the board of directors of the Trustee-Manager shall at all times comprise the same individuals who serve as directors of the Company; (b) no person shall serve as a director of the Trustee-Manager unless he also serves as a director of the Company at the same time; and (c) no person shall serve as a director of the Company unless he also serves as a director of the Trustee-Manager at the same time. Accordingly, the compositions of the Trustee-Manager Board and the Company Board are the same. The Trust Deed also requires that the memberships of the Company Audit Committee and the Trustee-Manager Audit Committee must be the same. —79— DIRECTORS AND PARTIES INVOLVED IN THE GLOBAL OFFERING The members of each Board are as follows: Name Address Nationality Executive Directors A1A41 CO Sch 3 para 6 Mr. FOK Kin Ning, Canning 10/F, 1 King Tak Street British (Chairman) Kowloon Hong Kong Mr. WAN Chi Tin Flat A, 15/F, Block 10 Chinese (Chief Executive Officer) Braemar Hill Mansions 33 Braemar Hill Road North Point Hong Kong Mr. CHAN Loi Shun Flat A, 16/F, Tower 1 Chinese Island Crest 8 First Street Hong Kong Mrs.
    [Show full text]
  • Legislative Council
    立法會 Legislative Council LC Paper No. CB(1)205/12-13(02) Ref: CB1/PL/TP Panel on Transport Special meeting on 27 November 2012 Background brief on safety of franchised bus operation and safety of long downhill roads Purpose This paper gives an account of the major views and concerns expressed by Legislative Council ("LegCo") Members and the Panel on Transport ("the Panel") in past discussion on the safety of franchised bus operation and safety of long downhill roads. Background 2. The Transport Department ("TD") monitors the operation of franchised bus services in accordance with the Public Bus Services Ordinance (Cap. 230) and the Road Traffic Ordinance ("RTO") (Cap. 374) and their Regulations. The franchised bus operators are required to carry out maintenance and repair as the Commissioner for Transport may specify, and TD's examiners are empowered to inspect the buses and maintenance facilities at any reasonable time. While buses should observe the general speed limits designated on roads, the maximum speed of a bus is restricted under RTO to 70 km/h on roads with a posted speed limit over 70km/h. 3. The Panel has all along been actively following the items on safety of long downhill roads and safety of franchised bus operation. The major incidents involving the operation of franchised buses and happening on long downhill roads are set out below. Traffic accident on Tuen Mun Road 4. Following a serious traffic accident happened on Tuen Mun Road on 10 July 2003, in which a bus carrying 40 passengers broke through a section of vehicular parapet and plunged into the hillside about 31 metres beneath, resulting in 21 fatalities and 20 injuries, the Chief Executive - 2 - appointed an independent Expert Panel to examine and make recommendations on safety measures to prevent similar catastrophes.
    [Show full text]
  • M / SP / 14 / 161 PLAN No
    74 55 6 Ð 3 I 1.6.6 D 100 1.6.1 1.6.1 CHONG FU ROAD A¿q 150 Knight Court 25 CHAI WAN ROAD CORRIDOR 2 200 7 3 150 26 ±²õ EASTERN 100 »›·M–~• 1.6.2 SHING TAI ROAD K ]¡ã®WÆ HK Institute of x'¥ ISLAND Shau Kei Wan Vocational Education Government ã®W (Chai Wan) 150 Secondary School CHAI WAN AU 100 ±²õ 6 F“ˇ «⁄ªfi SHING TAI ROAD Citybus Chai Wan Depot t `±w ã®W Service Reservoir 300 F“ˇ⁄w…⁄H Pamela Youde Nethersole 20 SHEUNG ON STREET 350 1.6.4 s¤A Eastern Hospital Shan Tsui Court 26 …` Ã¥õ A»W LOK MAN ROAD CHEUNG 2 MAN ú©ø³u¤ ·qfiF“o… …A 29 KA YIP STREET 15 ROAD Neptune M.P. Industrial Centre A»W SUN YIP STREET TransferIsland Station East 450 Terrace Tsui Wan Estate WING TAI ROAD 28 17 30 TSUI WAN ST FU HONG STREET FUNG YIP STREET p¤è¦WÆ »²Á Siu Sai Wan 1.5.8 23 ON YIP STREET 31 Sports Ground Ź~ã®WÆø 14 d±A 18 Chai Wan `±w 1 ´~ 25 Greenwood Terrace 30 Fire Station CHAI WAN ROAD 350 I´d 400 200 ³¿Á 16 21 Hing Man w¦~ Estate ã® “´ s·~ p¤è¦ ÅÂWÆ CHAI WAN 13 Island Resort 32 24 d±Á 1.6.3 250 Q§³ 1 Koway Court 34 »²Q LEE CHUNG STREET ã®WÆ ®ºW CH A I W AN Chai Wan Park Yue Wan Estate RO ã®W AD TAI TAM ROAD Q§³ 2 û¹ 300 CHEUNG LEE STREET 150 35 Kai Pei Ha 5 I´Yª Nƒ 22 Harmony Garden ªfiW˘ 20 10 HONG MAN STREET 28 SAN HA STREET 29 ú©R· Chai Wan HARMONY ROAD 100 Swimming Pool ¤n KUT SHING STREET 36 6 Caritas Chai Wan S p I Marden Foundation U è 19 »§w Secondary School p¤è CHAI WAN ROAD W S A 7 Walton Estate D I´Y I j⁄ SIU SAI WAN W A 33 3 N HIU TSUI STREET s·A» …a FU YEE ROAD R 200 New Jade O 32 Lok Hin Terrace 50 p¤è¦ A ‡¿ ( Garden … œ' 4 D s·H I·
    [Show full text]
  • Residents' Service Route No
    Residents’ Service Route No. : HR53 Destinations: Pacific View – Central (Connaught Place) Routeing: PACIFIC VIEW to CENTRAL (CONNAUGHT PLACE): via Tai Tam Road, Stanley Gap Road, Repulse Bay Road, Island Road, Wong Chuk Hang Road, Aberdeen Tunnel, Wong Nai Chung Road, Queen’s Road East, Queensway, Queen’s Road Central, Pedder Street and Connaught Place. CENTRAL (CONNAUGHT PLACE) to PACIFIC VIEW: via Connaught Place, Connaught Road Central, Harcourt Road, Cotton Tree Drive slip road, Queensway, Queen’s Road East, Wing Fung Street, Star Street, Monmouth Path, Queen’s Road East, Wong Nai Chung Road, Aberdeen Tunnel, Wong Chuk Hang Road, Island Road, Repulse Bay Road, Stanley Gap Road and Tai Tam Road. PACIFIC VIEW to OCEAN PARK STATION: via Tai Tam Road, Stanley Gap Road, Repulse Bay Road, Island Road, Wong Chuk Hang Road and Ocean Park Road. OCEAN PARK STATION to PACIFIC VIEW: via Ocean Park Road, Wong Chuk Hang Road, Island Road, Repulse Bay Road, Stanley Gap Road and Tai Tam Road. Stopping Places: Pacific View to Central : 1. Loading area at Pacific View* 2. Ocean Park Road L/P 49738# 3. 141 – 145 Queen’s Road East^ 4. Queensway High Court^ 5. Connaught Place^ Central to Pacific View : 1. Connaught Place* 2. Drop off / Pick Up zone at Wing Fung Street* 3. 168-182 Queen’s Road East* 4. Ocean Park Road L/P 49738# 5. Loading area at Pacific View ^ * pick up only ^ set down only # pick up/set down for departures terminating at Ocean Park Road or circular departures truncating at Ocean Park Road Operation Period: From Pacific View From Central Mondays to Fridays (Except Public Holidays) 7.15 a.m.
    [Show full text]
  • To Browse the Annual Traffic Census 2018 on the Internet
    THE ANNUAL TRAFFIC CENSUS -2018- TSSD Publication No. 19CAB1 While every caution has been taken to ensure the accuracy of the information contained in this publication, the Transport Department of the Hong Kong Special Administrative Region Government is not to be held liable for any loss or damage arising from the use of these data. Acknowledgement should be made in reproducing in any manner in whole or part of this publication. TRAFFIC SURVEY AND SUPPORT DIVISION August 2019 © THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION SUMMARY During the year 2018, the annual average daily traffic (A.A.D.T.) in the territory showed the following changes as compared with that of 2017: General There were 784 434 vehicles licensed in Hong Kong at the end of 2018, representing an increase of 2.38% when compared with the corresponding figure in 2017. This total accounted for 90.7% of the number of registered vehicles. The highest percentage increase was found in private light bus, with a growth of 9.0%. There were 565 213 private cars licensed at the end of 2018. The number of franchised buses licensed was 6 151, an increase of 2.8% over 2017. The total number of goods vehicles licensed in 2018 was 117 567, showing an increase of 2.5% over 2017. During the year, road travel in the territory amounted to 38.25 million vehicle- kilometres per day. Of this total, 6.00 million vehicle-kilometres occurred on Hong Kong Island while 8.53 million vehicle-kilometres and 23.72 million vehicle- kilometres occurred in Kowloon and the New Territories respectively.
    [Show full text]
  • Prestigious Full Seaview Residential Development No.19 Tai Tam Road
    PRESTIGIOUS FULL SEAVIEW RESIDENTIAL DEVELOPMENT NO.19 TAI TAM ROAD HONG KONG SUBJECT TO CONTRACT AND AVAILABILITY Whilst every care has been taken in preparing these particulars, the Agents and the Vendors give no warranty as to the accuracy of the information contained and potential purchasers should satisfy themselves as to that accuracy. The information contained does not form part of an offer or contract. Licence No. C-013197 1/18/2011 No. 19 Tai Tam Road, Hong Kong SUBJECT TO CONTRACT AND AVAILABILITY Whilst every care has been taken in preparing these particulars, the Agents and the Vendors give no warranty as to the accuracy of the information contained and potential purchasers should satisfy themselves as to that accuracy. The information contained does not form part of an offer or contract. Licence No. C-013197 1/18/2011 No. 19 Tai Tam Road, Hong Kong SUBJECT TO CONTRACT AND AVAILABILITY Whilst every care has been taken in preparing these particulars, the Agents and the Vendors give no warranty as to the accuracy of the information contained and potential purchasers should satisfy themselves as to that accuracy. The information contained does not form part of an offer or contract. Licence No. C-013197 1/18/2011 The Property No. 19 Tai Tam Road, Hong Kong Location Overlooking a panoramic seaview over Tai Tam Bay, the Property is situated on the northwest side of Tai Tam Road in the Island South area of the Hong Kong Island. Within close proximity is the American Country Club and developments in vicinity mainly comprise detached/ semi- detached houses and high quality apartment blocks.
    [Show full text]
  • Bus Routes and Costs
    Aug 2015 Bus Routes and Costs Pick-up Drop-off Areas Bus Route Time Stop No. Bus Stops (Pick-up) Time Stop No. Bus Stops (Drop-off) Costs 1 Marinella (Junction at Welfare Rd/ Nam Long Shan Road) 1 Marinella (Junction at Welfare Rd/ Nam Long Shan Road) 2 Bel-Air Phase 3 (Fountain) 2 Bel-Air Phase 3 (Fountain) Hong Kong Island Bel-Air Phase 2 (bus stop opposite to Glass Door at Cyberport 3 Bel-Air Phase 2 (Glass Door at Cyberport Road) 3 Road) $2,600 4 Victoria Garden (Bus Stop at Victoria Rd towards Central) 4 Victoria Garden (Main Entrance) Aberdeen / A 06:45-07:15 15:25-16:05 Pokfulam / Central / 5 86 Victoria Road (Carpark entrance) 5 86 Victoria Road (Bus Stop opposite to building) Wan Chai Kennedy Town Swimming Pool (Bus Stop at Kennedy Town Kennedy Town Swimming Pool (Bus Stop at Kennedy Town 6 6 Praya towards Central) Praya towards Central) 7 Central Ferry Pier No. 3 (Bus Stop) 7 Central Ferry Pier No.3 (Bus Stop) $1,900 Harbour Road (Road entrance at Convention Plaza 8 8 Harbour Road (Shui On Centre) Apartments) Pick-up Drop-off Areas Bus Route Time Stop No. Bus Stops (Pick-up) Time Stop No. Bus Stops (Drop-off) Costs Roundabout at Ap Lei Chau Drive/ Ap Lei Chau Praya Road Roundabout at Ap Lei Chau Drive/ Ap Lei Chau Praya Road 1 1 Hong Kong Island (opposite to Sham Wan Towers) (opposite to Sham Wan Towers) 145 Pokfulam Road (Bus stop outside Chinese Cuisine 2 2 Pokfulam Road (Bus Stop outside Pokfulam Village) Training Institue HK) Pokfulam Road /Smithfield Road (Bus Stop next to pedestrian Pokfulam Road /Smithfield Road (Bus
    [Show full text]