Final Policy Note Top 10 Quick-Win Smart City Services for Cairo

Total Page:16

File Type:pdf, Size:1020Kb

Final Policy Note Top 10 Quick-Win Smart City Services for Cairo [2018 SEPTEMBER] Final Policy Note Public Disclosure Authorized Top 10 Quick-Win Smart City Services for Cairo Governorate: Estimated Budgets and Actions Public Disclosure Authorized Public Disclosure Authorized Provided by KLID (Korea Local Information Research & Development Institute) Public Disclosure Authorized 1 INDEX Executive Summary ................................................................................................................................................... 7 1. Strategic Framework ........................................................................................................................................ 9 1.1 Overview ..................................................................................................................................................... 9 1.2 Cairo Mission Overview ....................................................................................................................... 12 1.3 Interview findings from stakeholders .............................................................................................. 12 1.3.1 Central Ministries ................................................................................................................................... 15 1.3.2 Cairo Governorate and Districts ......................................................................................................... 18 2. Questionnaire Survey Results ..................................................................................................................... 22 2.1 Smart City Service Survey Overview ................................................................................................ 22 2.2 Analysis Results ..................................................................................................................................... 26 2.3 Summary of Survey and Interview results ..................................................................................... 30 3. Action Plans of Top 10 Quick-Win Services for Smart Cairo Transition ........................................... 38 3.1 Capacity Building for Healthcare Services with Hospital Information System (HIS) ........... 38 3.2 Integrated Smart CCTV System Design and Pilot Implementation .......................................... 46 3.3 Solid Waste Management Design and Pilot Project .................................................................... 53 3.4 Emission Test System and Database for Vehicles ......................................................................... 56 3.5 Redesign Cairo Traffic Flow and Public transportation ............................................................... 60 3.6 T-Money Card (Transportation Payment Card) ............................................................................. 64 3.7 Call Taxi Service for Disabled People ............................................................................................... 71 3.8 E-learning Systems against Illiteracy in Local Areas .................................................................... 76 3.9 Cloud Based Software Defined Data Center (SDDC) .................................................................... 82 3.10 Citizen Service Center Innovation (One-Stop Service) - 1st Phase ........................................... 85 4. Overall Budget ................................................................................................................................................ 89 5. Discussion ......................................................................................................................................................... 90 References ................................................................................................................................................................ 92 2 Figure Index <Figure 1> Process of Cairo Smart City Project Mission .................................................................... 10 <Figure 2> Analysis Framework for Policy Note ............................................................................................. 11 <Figure 3> Conceptual difference between e-government and smart city solutions ......... 12 <Figure 4> Interview of MOPMAR ....................................................................................................................... 14 <Figure 5> Sharing Korean G2G Service Bus (Public Data Sharing) ............................................................. 14 <Figure 6> Interview with the Minister of MoLD............................................................................................. 16 <Figure 7> Strategic Meeting for Cooperation ................................................................................................. 16 <Figure 8> Interview with Cairo Governorate .................................................................................................. 19 <Figure 9> Visit Heliopolis district office............................................................................................................ 20 <Figure 10> Visit Heliopolis Citizen Service Center ......................................................................................... 20 <Figure 11> Visit Salem district office ................................................................................................................ 21 <Figure 12> Visit Salem Citizen Service Center ................................................................................................ 21 <Figure 13> Questionnaire Survey Respondents’ Organizations .............................................................. 25 <Figure 14> Standardized Score of Healthcare Smart Services ................................................................. 27 <Figure 15> Standardized Score of Housing and Environment Smart Services ..................................... 28 <Figure 16> Standardized Score of Traffic/Transportation Smart Services ............................................. 29 <Figure 17> Selection of Smart City Services for Cairo Governorate.......................................... 37 <Figure 18> SNUH-SKSH Cooperation ............................................................................................................. 40 <Figure 19> Incheon Smart City Control Center ............................................................................................ 47 <Figure 20> Integrated Security Functions (including traffic function) ................................................... 48 <Figure 21> Intelligent Street Pole .................................................................................................................... 49 3 <Figure 22> Integrated Security Center with Police Function (Anyang City in Korea) ......................... 50 <Figure 23> Integrated Security Center Design (Anyang City in Korea) ................................................... 50 <Figure 24> Integrated Security with Police, Fire Station and Military (Anyang City in Korea) ......... 51 <Figure 25> Gangnam district CCTV Location Map ....................................................................................... 51 <Figure 26> Sang-am Waste Recycling Facility .............................................................................................. 53 <Figure 27> Waste Management System ........................................................................................................ 54 <Figure 28> Sang-Am Waste Recycling Facility Control ............................................................................... 55 <Figure 29> Recycling Products made from bi-product of ashes and debris ......................... 55 <Figure 30> Vehicle Testing System (MECAR) ................................................................................................. 57 <Figure 31> Vehicle Testing Example ................................................................................................................ 58 <Figure 32> Structure of Vehicle Emission Integrated Management System ......................................... 59 <Figure 33> Transportation Simulation Example ........................................................................................... 61 <Figure 34> Before Traffic Simulation (UAE Project) .................................................................................... 63 <Figure 35> After Traffic Simulation (UAE Project) ....................................................................................... 63 <Figure 36> T-Money Card Payment Flow ...................................................................................................... 65 <Figure 37> T-Money Card Charging Station .................................................................................................. 66 <Figure 38> Charging T-money Card Instruction ........................................................................................... 66 <Figure 39> T-Money Card System Architecture ............................................................................................ 69 <Figure 40> T-money Card System ................................................................................................................... 70 <Figure 41> Webpage of Call Taxi for Disabled People (www.sisul.or.kr) ............................................. 72 <Figure 42> Vehicle types .................................................................................................................................... 72 <Figure 43 > Common Type of
Recommended publications
  • Effectiveness of Non-Pharmacological Nursing Intervention Program on Female Patients with Rheumatoid Arthritis
    Cent Eur J Nurs Midw 2017;8(3):682–690 doi: 10.15452/CEJNM.2017.08.0019 ORIGINAL PAPER EFFECTIVENESS OF NON-PHARMACOLOGICAL NURSING INTERVENTION PROGRAM ON FEMALE PATIENTS WITH RHEUMATOID ARTHRITIS Eman Ali Metwaly1, Nadia Mohamed Taha1, Heba Abd El-Wahab Seliem2, Maha Desoky Sakr1 1Medical- Surgical Nursing Department, Faculty of Nursing, Zagazig University, Egypt 2Rheumatology and Rehabilitation Department, Faculty of Medicine, Zagazig University, Egypt Received October 31, 2016; Accepted June 22, 2017. Copyright: This is an open access article distributed under the terms of the Creative Commons Attribution International License (CC BY). http://creativecommons.org/licenses/by/4.0/ Abstract Aim: The aim of study was to evaluate the effectiveness of non-pharmacological nursing intervention programs on female patients with rheumatoid arthritis. Design: A quasi-experimental design was used in this study. Methods: Pre-post follow-up assessment of outcome was used in this study. The study was conducted in the inpatient and outpatient clinics of rheumatology and rehabilitation at Zagazig University Hospitals, Egypt. Results: There was a significant improvement in knowledge and practice of patients with RA in the post and follow-up phase of the program in the intervention group. In addition, the patients showed a high level of independence regarding ability to perform ADL. There was a statistically significant decrease in disability for patients in the intervention group. Conclusion: It is recommended that non-pharmacological intervention programs be implemented for patients with RA in different settings to help reduce the number of patients complaining of pain and disability. Keywords: intervention program, non-pharmacological, rheumatoid arthritis.
    [Show full text]
  • Final Report on the Journey of 16 Women Candidates
    Nazra For Feminist Studies 2 | Nazra for Feminist Studies Nazra for Feminist Studies is a group that aims to build an Egyptian feminist movement, believing that feminism and gender are political and social issues affecting freedom and development in all societies. Nazra aims to mai nstream these values in both public and private spheres. | About Women Political Participation Academy Nazra for Feminist Studies launched the Women Political Participation Academy in October 2011 based on its belief in the importance of women political participation and to contribute in activating women’s role in decision making on different political and social levels. The academy aims to support women’s role in their political participation and to build their capacity and support them in contesting in different elections like the people’s assembly, local councils & trade unions. For more information: http://nazra.org/en/programs/women -political-participation -academy- program | Contact Us [email protected] www.nazra.org | Team This report was written by Wafaa Osama, Advisor of the Women Political Participation Academy (WPPA). She was assisted in r esearch and documentation by Yehia Zayed, the Academy Trainer, and Was em Kamal, Statistical Analyst. Mohammad Sherin Atef, the Academy Consultant, Doaa Abdelaal, Mentoring on the Ground Consultant of the Academy, and Pense Al -Assiouty, Academy Coordinator, contributed to field- work. This report was edited by Mozn Hassan, the Executive Director of Nazra for Feminist Studies. This report was edited and translated into English by Elham Aydarous. | Copyright This report is published under a Creative Common s Attribution-NonCommercial 3.0 Unported License. http://creativecommons.org/licenses/by -nc/3.0 | April 2013 Women Political Participation Academy Nazra For Feminist Studies April 2013 Nazra For Feminist Studies 3 Contents CHAPTER ONE: WOMEN IN PREVIOUS PARLIAMENTS ..............................................................................
    [Show full text]
  • Maat for Peace, Development, and Human Rights
    Violating Rights of Local Civilian Submitted to: Mechanism of Universal Periodical Review By: Maat for Peace, Development, and Human Rights. August 2009 انعنوان: أول ش انمهك فيصم - برج اﻷطباء – اندور انتاسع – شقه 908 – انجيزة ت / ف : 37759512 /02 35731912 /02 موبايم : 5327633 010 6521170 012 انبريد اﻻنكتروني : [email protected] [email protected] انموقع: www.maatpeace.org www.maat-law.org Report Methodology This report will discuss four components which are drinking water, draining services, environment services, and health services. The report will focus on those four components because there is a connection between them and because they are the more urgent and spread needs watched by Maat Institution. This report depended on three information sources: 1- Results of discussion meetings with citizens: there are 33 discussion meetings were held in some Egyptian governorates, in order to define problems and violations related to public utilities and essential services. 2- Citizens complaints: big number of citizens and their representatives in local public councils delivered written complaints to Maat Institution about specific violations they suffer regarding public utilities and essential services. 3- Journalism subjects published in Egyptian journals regarding violations of economical and social rights and depriving from essential services. First violation regarding the right to have safe drinking water: Egypt witnessed in the last three years increasing public anger because of shortage in drinking water available in many places of the republic. Thus, protest forms rose like demonstrations and stays-in strike to force executive managers to solve this problem. This period also witnessed many cases of water pollutions or mixing drinking water with draining water this is the problem which makes many people infected with hepatitis and renal failure.
    [Show full text]
  • 11973328.Pdf
    Foreign Exchange Rate: USD 1 = JPY 96.60 USD 1 = LE 5.56 (Average Betw een March 2009 and August 2009) LOCATIO N MAP (1) LOCATIO N MAP (2) FINALREPORT VOLUME II ENVIRO NMENTALAND SOCIAL IMPACTASSESSMENT O F ABU RAWASH WWTP PROJECT Location Map Table of Contents List of Tables List of Figures Abbreviations Summary TABLEOF CONTENTS CHAPTER 1 INTRODUCTION............................................................................................1-1 1.1 Background.....................................................................................................1-1 1.2 Objective ofthe Environmental and Social Impact Assessment Study..................1-2 1.3 Report Structure...............................................................................................1-3 CHAPTER 2 LEGAL AND ADMINISTRATIVE FRAMEWORK..........................................2-1 2.1 Administrative Framework................................................................................2-1 2.1.1 Construction Authority for Potable Water andWastewater............................2-2 2.1.2 Holding Company for Water andWastewater..............................................2-3 2.1.3 Cairo Sanitary Drainage Company..............................................................2-4 2.1.4 Cairo Water Supply Company....................................................................2-4 2.1.5 Giza Water and Wastewater Company.........................................................2-5 2.1.6 Egyptian Environmental AffairsAgency.....................................................2-5
    [Show full text]
  • Assessment of Expanded Program of Immunization Provided for Children Less Than Five Years in Family Health Centers at Cairo Governorate
    Acta Scientific Pharmaceutical Sciences (ISSN: 2581-5423) Volume 2 Issue 10 October 2018 Research Article Assessment of Expanded Program of Immunization Provided for Children less than Five Years in Family Health Centers at Cairo Governorate Mohammed El-Hady Imam Salem*, Sayed Ahmed Sayed Khalil, and Moustafa Mahmoud Rabea Mahmoud Department of Public Health and Community Medicine, Faculty of Medicine, Al-Azhar University, Egypt *Corresponding Author: Mohammed El-Hady Imam Salem, Department of Public Health and Community Medicine, Faculty of Medicine, Al-Azhar University, Egypt. Received: August 27, 2018; Published: September 17, 2018 Abstract Background: Assessment of expanded program on immunization (EPI) is an important tool as it improves its general status, give solutions to the weak points as well as it enables immunization stakeholders with the evidence needed to manage programs more Objectives: To characterize the degree of development of the program to detect children with improper vaccination status, to assess effectively and efficiently. knowledge, attitude and practices of health care providers (HCPs) and to assess community satisfaction towards EPI. Subjects and Methods: To characterize the degree of development of the program to detect children with improper vaccination status, to assess knowledge, attitude and practices of health care providers (HCPs) and to assess community satisfaction towards EPI. standardized questionnaire and observation checklist. About 45 of HCPs and 144 of immunization beneficiaries were included in this study. Data was collected using two pre-designed Results: Knowledge of HCPs towards EPI was accepted with presence of some weakness areas, especially vaccine type and its trained workers and who have experience. About 13% of HCPs scored negative attitude especially for shortage of vaccines and the contraindication; about 71% recorded an average level of knowledge.
    [Show full text]
  • Construction Projects Sector - Q2 2019 Report
    Construction Projects Sector - Q2 2019 Report Construction Projects 2 (2019) Report American Chamber of Commerce in Egypt - Business Information Center 1 of 17 Construction Projects Sector - Q2 2019 Report Special Remarks The Construction Projects Q2 2019 report provides a comprehensive overview of the Construction Projects sector with List of sub-sectors focus on top tenders, big projects and important news. Administrative Buildings Airports Tenders Section Bridges Cultural Buildings & Clubs - Integrated Jobs (Having a certain engineering component) - sorted by Earthmoving Works - Generating Sector (the sector of the client who issued the tender and who would pay for the goods & services ordered) Hospitals - Client Hotels & Tourist Development Integrated works Parks & Landscaping - Supply Jobs Renovation, Concrete Treatment & Paints - Generating Sector Residential Buildings - Client Roads Construction Schools & Other Educational Buildings Non-Tenders Section Steel Structure, Possible Prefab - Business News - Projects Awards - Projects in Pre-Tendering Phase - Privatization and Investments - Published Co. Performance - Loans & Grants - Fairs and Exhibitions This report includes tenders with bid bond greater than L.E. 50,000 and valuable tenders without bid bond Tenders may be posted under more than one sub-sector Copyright Notice Copyright ©2019, American Chamber of Commerce in Egypt (AmCham). All rights reserved. Neither the content of the Tenders Alert Service (TAS) nor any part of it may be reproduced, sorted in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of the American Chamber of Commerce in Egypt. In no event shall AmCham be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits.
    [Show full text]
  • 5 Environmental and Social Impacts ______27 5.1 Introduction ______Error! Bookmark Not Defined
    Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Submitted to : Egyptian Natural Gas Holding Company EGAS ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FRAMEWORK Prepared by: Executive Summary Public Disclosure Authorized NATURAL GAS CONNECTION PROJECT IN 20 GOVERNORATES IN EGYPT (January 2017) Executive summary 1 List of acronyms and abbreviations AFD Agence Française de Développement (French Agency for Development) BUTAGASCO The Egyptian Company for LPG distribution CAPMAS Central Agency for Public Mobilization and Statistics EHDR Egyptian Human Development Report 2010 EEAA Egyptian Environmental Affairs Agency EGAS Egyptian Natural Gas Holding Company EGP Egyptian pound ESDV Emergency Shut Down Valve ESIAF Environmental and Social Impact Assessment Framework ESMMF Environmental and Social Management and Monitoring Framework ESMP Environmental and Social Management Plan FGD Focus Group Discussion GoE Government of Egypt HP High Pressure HSE Health Safety and Environment LDC Local Distribution Companies LPG Liquefied Petroleum Gas LP Low Pressure mBar milliBar NG Natural Gas NGO Non-Governmental Organizations PAP Project Affected Persons PRS Pressure Reduction Station QRA Quantitative Risk Assessment RAP Resettlement Action Plan RPF Resettlement Policy Framework SDO Social Development Officer SFD Social Fund for Development SSIAF Supplementary Social Impact Assessment Framework TOR Terms of Reference Town Gas The Egyptian Company for Natural Gas Distribution for Cities WB The World Bank US $ United
    [Show full text]
  • Four Records of New to Egypt Gastropod Species Including the First Reported Tropical Leatherleaf Slug Laevicaulis Alte (D’A
    Zoology and Ecology, 2020, Volume 30, Number 2 Print ISSN: 2165-8005 https://doi.org/10.35513/21658005.2020.2.8 Online ISSN: 2165-8013 FOUR RECORDS OF NEW TO EGYPT GASTROPOD SPECIES INCLUDING THE FIRST REPORTED TROPICAL LEATHERLEAF SLUG LAEVICAULIS ALTE (d’A. DE FÉRUSSAC, 1822) (PULMONATA: VERONICELLIDAE) Reham Fathey Alia, b and David Gwyn Robinsonc* aDepartment of Zoology and Agricultural Nematology, Faculty of Agriculture, Cairo University, El-Gammaa St., 12613; Giza, Egypt; bFaculty of Organic Agriculture, Heliopolis University for Sustainable Development, 3 Cairo-Belbeis Desert Rd, El-Nahda, Second Al Salam, Cairo, Egypt, 11785, P. O.: 3020; cUSDA APHIS PPQ National Identification Services, National Malacology Laboratory, Academy of Natural Sciences, Philadelphia, Pennsylvania, USA *Corresponding author. Email: [email protected] Article history Abstract. A survey of terrestrial mollusks was performed during their activity season in various Received: 4 March 2020; spots of gardens, nurseries and agricultural fields in Cairo, Giza as well as in some neighboring accepted 11 November 2020 areas between December 2014 and October 2018. Several invasive terrestrial gastropod species were identified.These gastropods are invasive and abundant pests causing considerable and serious Keywords: damage to agricultural areas in the Nile Delta Region of Egypt. The specimens were collected from Invasive; terrestrial different locations in the governorates of Cairo and Giza. A total of 12 species (8 species of terrestrial gastropod; abundant pests; snails and 4 of slugs) were identified by their shell characteristics and genital-anatomical characters. snail; slug; Egypt The following four species were identified for the first time in Egyptian gardens and nurseries: 1) Polygyra cereolus (Megerle von Mühlfeld, 1816), 2) Oxychilus cf.
    [Show full text]
  • Chapter 6: Hardware Opportunities
    MiNTS: Misr National Transport Study The Master Plan CHAPTER 6: HARDWARE OPPORTUNITIES The formation of transport corridors, and the hardware (infrastructure) projects contained therein, is discussed in this chapter. The underlying planning horizon extends through year 2027. The paralleling humanware and software projects are presented in subsequent Chapters 7 and 8, respectively. The MiNTS Hardware Component A total of 92 hardware (infrastructure) projects have been nominated. Background information is contained in Technical Reports 1 through 4 describing the road, rail, inland waterway and maritime sectors, respectively. Prioritization of hardware (infrastructure), humanware and software projects is further discussed in Chapter 9 of this volume. The hardware projects include, in summary: 15 projects includes a) new construction (3), b) widening/improvement (2) Expressway and c) upgrade arterial to expressway (10) Road Arterial Road 33 projects including a) new construction (19) and b) widening (14) Main Grade Separations Two bridges and one tunnel High Speed Railway Alexandria – Cairo and Cairo – Aswan New Railway Link and Railway Eight new railway links and five double/triple tracking projects Double/Triple Tracking Others Includes improvement of track, signal and station for cargo Ports Port enhancement/development in Upper Egypt and Cairo region Inland Improvement via dredging to enhance safety and navigability; also prevent Waterway Waterway sedimentation build-up in major fairways. Transport Locks Lock expansion and improvement
    [Show full text]
  • Pdacq934.Pdf
    TABLE OF CONTENTS I. Background ................................................................................................................................. 1 II. Year One Activities: Highlights and Challenges ....................................................................... 2 HIGHLIGHTS ............................................................................................................................ 2 Start-Up .................................................................................................................................. 2 Component I: Improve the Quality of Teaching, Learning, and IT Management in Targeted Schools .................................................................................................................... 4 Component 2: Public-Private Partnerships ........................................................................ 21 Component 3: Capacity for Management of Technology .................................................. 24 Component 4: Monitoring and Evaluation ......................................................................... 26 CHALLENGES & UPDATES ................................................................................................. 29 III. Upcoming Quarter Forecast: ................................................................................................... 30 GOALS FOR UPCOMING QUARTER .................................................................................. 30 UPCOMING TRAVEL ...........................................................................................................
    [Show full text]
  • Fragmenting a Metropolis Sustainable Suburban Communities from Resettlement Ghettoes to Gated Utopias
    OPEN ACCESS http://www.sciforum.net/conference/wsf3 Article Fragmenting a Metropolis Sustainable Suburban Communities from Resettlement Ghettoes to Gated Utopias Wael Salah Fahmi1,* 1 Department of Architecture, University of Helwan, 34, Abdel Hamid Lofti Street, Giza, 12311, Egypt; E-Mail: [email protected] * Author to whom correspondence should be addressed; E-Mail: [email protected]; Tel.: +2 02 33370485 ; Fax: + 2- 02- 3335 1630 Received: 23 September 2013 / Accepted: 28 October 2013 / Published: 01 November 2013 Abstract: The paper examines the impact of the Greater Cairo Master Plan and New Towns Policy on urban housing crisis through some case studies focusing especially on New Cairo City, to the east of downtown Cairo. The empirical research attempts to qualitatively examine the complex reasons for the failure of various policies and implementations in meeting housing needs of middle and low-income people. This has resulted in the emergence of nearly empty new towns, and the increasing fortification of the affluent nouveaux riche within exclusive desert condominiums and gated communities, a phenomenon which aggravated social injustice and housing inequality. These communities’ global architectural styles and marketing strategies are linked to neo-liberal economic policies and private entrepreneurial urban governance related to individualised rights of seclusion, privacy and consumption. Influenced by expatriates in the Gulf monarchies, these desert enclaves are located in Greater Cairo's western desert (6th October City: Dream Land, Gardenia and Beverly Hills) and in the eastern suburbs (New Cairo City: Katameya Heights, Golf City, Al Rehab City, Mirage City, Arabella). Surrounded by golf courses, recreational and commercial facilities, these luxurious residential districts tend to be exterritorial with their construction, maintenance and economies, being largely controlled by international property development firms, whilst locally underlining the ever- sharper social disparity between rich and poor.
    [Show full text]
  • First Report on the Crimes of Violence by Muslim Brotherhood and Supporters
    The Popular Campaign to Designate the Muslim Brotherhood as an International Terrorist Organization First Report On The Crimes of Violence by Muslim Brotherhood and Supporters th (From June 30th to December 25 , 2013) Note: “The Universal Campaign to Designate the Muslim Brotherhood as a Terrorist Organization” is one of the projects of the “Liberal Democracy Institute” of Egypt. All rights reserved. Muslim Brotherhood is a Terrorist Organization Introduction In preparation for the people’s upheaval that toppled the Muslim Brotherhood regime on June 30th, 2013, both supporters and opponents of the regime attempted to mobilize the public. While opponents used growing anger towards the failure of the regime as a catalyst, the leaders of the Muslim Brotherhood incited their supporters to practice violence to deter the opponents. They announced that the legitimacy of the regime is a red line that cannot be crossed. In public statements, Muslim Brotherhood leaders threatened to shed blood and execute bombings to turn Egypt into hell if the people revolted against the regime of Morsi. In response, members and supporters of the Muslim Brotherhood turned those statements into action. They tortured and killed opponents, abused women and children, and destroyed facilities, during and after gathering in Rabe’a and Alnahda Squares. They forced children to wear coffins and walk in the streets to give a false impression that the situation in Egypt was similar to Syria, where children are killed because of war between the regime and armed Islamist rebels. The members and supporters of the Muslim Brotherhood burnt and bombed several important facilities including police stations, churches, and government buildings after the evacuation of Rabe’a and Alnahda gatherings.
    [Show full text]