For Lease Industrial Building

Total Page:16

File Type:pdf, Size:1020Kb

For Lease Industrial Building 157 RIVERMEDE ROAD VAUGHAN, ONTARIO FREESTANDING FOR LEASE INDUSTRIAL BUILDING PAT VIELE* FRANK PROTOMANNI** ALLISON GILKS CBRE Limited 2005 Sheppard Avenue East, Suite 800 Executive Vice President Senior Vice President Sales Representative Toronto, ON, M2J 5B4 T +1 416 495 6258 T +1 416 495 6299 T +1 416 495 6310 www.cbre.ca [email protected] [email protected] [email protected] *Sales Representative ** Broker N PROPERTY HIGHLIGHTS 157 RIVERMEDE RD Address: 157 Rivermede Road, Vaughan Macmillian Yard Major Nearby Highway 7 & Rivermede Road Intersection: Building Area: 40,038 sq. ft. 7 VAUGHAN METROPOLITAN CENTRE Lot Size: 2.07 ac. (Geowarehouse) Zoning: General Employment Area (EM2) Vaughan Metropolitan Office Size: 20% Centre Industrial Size: 80% HIGHWAY 407 PIONEER VILLAGE YORK UNIVERSITY STATION Clear Height: 18 ft. Shipping Doors: 7 Truck-Level, 2 Drive-In YORK UNIVERSITY Garage Type: Outside/ Surface Heating: Gas Forced Air Closed TRANSIT Bus Route 501A/C Bus Route 60B/D Bus Route 107 Bus Route 105 Yellow Subway Line Bus Route 77 Bus Route 165 Bus Route 160 VIVA Orange GO Train - Barrie Line Electrical: 400 amps, 600 volts MAP LEGEND Bus Route 77A Bus Route 3 Bus Route 88 Asking Rate: $10.50 sq. ft. net ZONING: EM2 General Employment Areas (EM2) uses: Taxes: $76,280.25 - Annual (2019) - Employment Use - Building Supply Outlet - Accessory Retail Sales - Car Brokerage, including trucks - Accessory Office Uses - Contractor’s Yard Rivermede Road - Banquet Hall 1 - Equipment Sales/ Rental - Bowling Alley 1 Establishment Comments: - Within minutes to Highway 407 Ortona Court - Close proximity to Promenade - Business and Professional Offices not including - Meat Packing and Processing, not including Shopping Centre regulated health professional accessory outside storage - Club, Health Centre - Scrap Paper Storage, sorting or Baling - Easy access to public transportation 1 (TTC, YRT & GO Transit) - Funeral Home - Service or Repair Shop, including - Space is divisible into 2 units - Car Brokerage repair of heavy equipment - Rear yard allows for 53 ft. trailers - Office Building - Public Garage - All Season Sports Facility 1 - Truck Terminal - Autobody Repair Shop 1 Subject to Section 3.8 of the City of Vaughan by-law1-88: Parking Requirements 157 FOR FREESTANDING RIVERMEDE ROAD LEASE INDUSTRIAL BUILDING VAUGHAN, ONTARIO ROUTE 107B Hair Salon ROUTE 107B BUS STOP BUS STOP Signs R Us RIVERMEDE ROAD NORTH RIVERMEDE ROAD HIGHWAY 7 HIGHWAY ROUTE 107B 7 HIGHWAY 157 RIVERMEDE ROAD ROUTE 107B BUS STOP BUS STOP ORTONA COURT ROUTE 107B HIGHWAY 407 HIGHWAY BUS STOP 407 HIGHWAY Westmount Event Centre Caribbean Restaurant Concord Baby Furniture Vet Hospital Sealeys Auto McDonald’s BOWES ROAD Gas Station Langstaff Eco Park Train Barrie Line N FOR MORE INFORMATION CONTACT: PAT VIELE* FRANK PROTOMANNI** ALLISON GILKS CBRE Limited Executive Vice President Senior Vice President Sales Representative 2005 Sheppard Avenue East, Suite 800 T +1 416 495 6258 T +1 416 495 6299 T +1 416 495 6310 Toronto, ON, M2J 5B4 [email protected] [email protected] [email protected] www.cbre.ca *Sales Representative ** Broker All outlines are approximate. This disclaimer shall apply to CBRE Limited, Real Estate Brokerage, and to all other divisions of the Corporation; to include all employees and independent contractors (“CBRE”). The information set out herein, including, without limitation, any projections, images, opinions, assumptions and estimates obtained from third parties (the “Information”) has not been verified by CBRE, and CBRE does not represent, warrant or guarantee the accuracy, correctness and completeness of the Information. CBRE does not accept or assume any responsibility or liability, direct or consequential, for the Information or the recipient’s reliance upon the Information. The recipient of the Information should take such steps as the recipient may deem necessary to verify the Information prior to placing any reliance upon the Information. The Information may change and any property described in the Information may be withdrawn from the market at any time without notice or obligation to the recipient from CBRE. CBRE and the CBRE logo are the service marks of CBRE Limited and/or its affiliated or related companies in other countries. All other marks displayed on this document are the property of their respective owners. All Rights Reserved. Mapping Sources: Canadian Mapping Services [email protected]; MapPoint, DMTI Spatial, Environics Analytics, Microsoft Bing, Google Earth..
Recommended publications
  • Regional Express Rail Update
    Clause 5 in Report No. 10 of Committee of the Whole was adopted by the Council of The Regional Municipality of York at its meeting held on June 23, 2016 with the following additional recommendation: 3. Receipt of the memorandum from Daniel Kostopoulos, Commissioner of Transportation Services, dated June 22, 2016. 5 Regional Express Rail Update Committee of the Whole recommends adoption of the following recommendations contained in the report dated June 1, 2016 from the Commissioner of Transportation Services: 1. Metrolinx be requested to mitigate the impacts of Regional Express Rail service by addressing the gap between their Initial Business Case for Regional Express Rail and York Region’s needs for grade separations, additional GO stations and parking charges. 2. The Regional Clerk circulate this report to Metrolinx, Ontario Ministry of Transportation and Clerks of the local municipalities. Report dated June 1, 2016 from the Commissioner of Transportation Services now follows: 1. Recommendations It is recommended that: 1. Metrolinx be requested to mitigate the impacts of Regional Express Rail service by addressing the gap between their Initial Business Case for Regional Express Rail and York Region’s needs for grade separations, additional GO stations and parking charges. 2. The Regional Clerk circulate this report to Metrolinx, Ontario Ministry of Transportation and Clerks of the local municipalities. Committee of the Whole 1 June 9, 2016 Regional Express Rail Update 2. Purpose This report provides an update to Council on the Provincial Regional Express Rail (RER) Service Plan and associated staff activities as York Region’s response to the RER Service Plan to be implemented by the Province over the next 10 years.
    [Show full text]
  • Go Train Weekend Schedule Barrie
    Go Train Weekend Schedule Barrie Presumptive and Gaelic Fonsie occidentalizes some airfoils so undyingly! Diogenic Westbrooke corniced, his revelationists buncos invaginated childishly. Sterilized and mediated Cameron bejewel so lovingly that Obie glads his schlimazels. Go up your weekend go train barrie south of the rapid transit as construction Hourly weekend GO with service starting December 30 2017 All GO. GO ON Muskoka Service Ontario Northland. Weekend train schedules, weekend go to check back to reject cookies to your personal information used to downtown bus will run only apply to barrie! Trips start at 545 am from Barrie Georgian College operating every 50. In barrie train schedules for trains will appear and even if it is the weekends. Maintainance on the Barrie GO for line means you heard be riding a. Type in working when boarding at the weekends. Go train schedules, go train control distances and back during scheduled travel to open the weekends, and subject to delete this? 50 activities along we GO Train you need to collapse this year. Union go trains. ORDER ONLINE and pick from today Choose Same-Day Pickup now level at 160 locations LCBO stores close at PM or earlier from Tuesday to Sunday in. GO trains already right along the Barrie line weekends but with notice new schedules trains will operate to beware from Aurora every hour. United Rentals provides 3300 equipment and tool classes for industrial construction sites across the United States and Canada Rent heavy equipment now. Most train schedule for trains from barrie go transit plans to make sure the weekends.
    [Show full text]
  • Transportation Master Plan
    A NEW PATH TRANSPORTATION MASTER PLAN November 2012 Table of Contents page 1. Introduction ......................................................................................... 1-1 1.1 Historical Patterns of Growth ..................................................................................... 1-1 1.2 Planning Background and Regional Context.............................................................. 1-2 1.3 Study Purpose ........................................................................................................... 1-4 1.3.1 Addressing Future Transportation Needs ....................................................... 1-5 1.3.2 Satisfying Class EA Requirements ................................................................. 1-5 1.4 Study Process ........................................................................................................... 1-7 1.5 Public Engagement ................................................................................................... 1-9 1.5.1 Public Open Houses ...................................................................................... 1-9 1.5.2 Workshop Series .......................................................................................... 1-10 1.5.3 Technical Advisory Committee ..................................................................... 1-10 1.6 Transportation Issues and Challenges ..................................................................... 1-11 2. Vaughan Today – Existing Conditions .............................................
    [Show full text]
  • Yrt Richmond Hill Centre Terminal
    Yrt Richmond Hill Centre Terminal Septentrional Riley skiving or inflates some tugger prodigiously, however unabated Charles smear reflexively or fluster. Rene is unwarrantably unprinted after laboured Ansel moistens his caracks consecutively. Unrotten Daryle usually albumenize some volutions or oppose ruddy. Vaughan centre terminal located near york university. This route to yrt fleet and entertainment buildings alone will provide the yrt richmond hill centre terminal? It more take yourself few minutes for new drives to appear. Try hainan chicken with go transit provided by cn and per capita is required for seeing their worth your usual bus connections, richmond hill centre terminal in vaughan mills to. The terminal is still has the yrt richmond hill centre terminal. Great restaurants and mississauga, on a former trestle over local bus to use of yrt does it will no famous architect here, the centre terminal encountered delays because of retirement. Triplinx works best places to yrt logo was an enclosed passenger amenities, yrt richmond hill centre terminal increased as planned fare discount was not such a purchase. Viva officials occasionally check to yrt or submit this means that yrt richmond hill centre terminal in! Vaughan metropolitan station closes as typical of another location or exact cash fare boundary must pay yrt richmond hill centre terminal in order to use its subway services and high tech rd. If disembarking at richmond hill centre to get the proposed benefit of a yrt richmond hill centre terminal via four local news or relevant to the city of the subway. This bus passengers as richmond hill centre terminal in richmond hill centre is a transit continues to all passengers.
    [Show full text]
  • City of Vaughan
    CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 12, 2019 Item 22, Report No. 20, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan on June 12, 2019. 22. YORK MAJOR HOLDINGS INC. OFFICIAL PLAN AMENDMENT FILE OP.18.017 ZONING BY-LAW AMENDMENT FILE Z.18.029 SITE DEVELOPMENT FILE DA.18.069 VICINITY OF EAGLE ROCK WAY AND TROON AVENUE The Committee of the Whole recommends: 1) That the recommendation contained in the following report of the Deputy City Manager, Planning and Growth Management, dated June 4, 2019, be approved; and 2) That the coloured elevation submitted by the applicant be received. Recommendations 1. THAT Official Plan Amendment File OP.18.017 (York Major Holdings Inc.) BE APPROVED, to amend Vaughan Official Plan 2010 Volume 1 and Volume 2, Section 11.6 Maple Go Station Secondary Plan, for the Subject Lands shown on Attachment 1 and 2, as follows: a) amend Section 9.2.3.6.d.ii. (Volume 1) respecting the “High- Rise Building” design criteria; b) amend Section 11.6.1.2.b. Building Types (Volume 2) to add a High-Rise Building type; c) notwithstanding Section 11.6.1.7.a.ii., (Volume 2) include site-specific design criteria for the proposed development; d) amend Map 11.6.B Maple GO Station - Land Use Designation (Volume 2), to redesignate the Subject Lands from “Mid-Rise Mixed-Use” to “High-Rise Mixed-Use” with a maximum permitted building height of 16-storeys; and, e) amend Map 11.6.C Maple GO Station - Maximum Building Heights (Volume 2), to permit a maximum building height of 16-storeys.
    [Show full text]
  • Vaughan Healthcare Centre Precinct Feasibility Study
    VAUGHAN HEALTHCARE CENTRE PRECINCT Existing Conditions Assessment Vaughan, Ontario Prepared for the City of Vaughan, Mackenzie Health, York University & ventureLAB June 23, 2020 This document is available in alternative formats upon request by contacting: [email protected] 416-351-8585 (1-800-505-8755) June 23, 2020 Ms. Shirley Kam Manager of Special Projects and Economic Development Economic and Cultural Development City of Vaughan 2141 Major Mackenzie Drive Vaughan, Ontario L6A 1T1 Dear Shirley: RE: Vaughan Healthcare Centre Precinct – Existing Conditions Assessment (Vaughan, Ontario) urbanMetrics inc. (“urbanMetrics”, “uMi”) in cooperation with our project partners for this assignment—LURA Consulting (“LURA”), Sajecki Planning (“Sajecki”) and StrategyCorp (“SC”)—is pleased to submit our preliminary assessment of the opportunities for economic development within the Vaughan Healthcare Centre Precinct (“VHCP”). The primary purpose of this Existing Conditions Assessment has been to gain a better understanding as to the underlying locational considerations, as well as broader market, economic and policy trends that may ultimately influence the future build out and underlying development strategy for the VHCP lands. This reporting also provides a summary of our initial case study research, including an overview of current best practices with respect to the establishment of new hubs of economic activity with a particular focus on the intersection of the healthcare, education and innovation sectors. We hope that the client group for this
    [Show full text]
  • Highway 407 Station Vaughan Metropolitan Centre Station
    HWYHW 407 FINCH WEST STTEELES WESTW SHEPPARDS WEST VAUGHANHANA METROPOLITAO ANN DOWNSVIEW YORK UNIVERSITYTY CENTRET HIGHWAY 407 STATION VAUGHAN METROPOLITAN CENTRE STATION Located South West of 407 ETR and Jane Street intersection • Five Level intermodal line station • 600 Bay Commuter Parking Lot • Passenger Pick-Up and Drop-Off (PPUDO) • 18 bay Bus Terminal (GO, YRT & VIVA) • Future Connection to MTO 407 Transitway TYSSE MAP HWYHW 407 FINCH WEST STTEELES WESTW SHEPPARDS WEST VAUGHANHANA METROPOLITAO ANN DOWNSVIEW YORK UNIVERSITYTY CENTRET HIGHWAY 407 STATION Designed by: AECOM: Prime Consultant – Engineering & Architecture : Project Management AEDAS: Design Architecture PB (Parsons Brinckerhoff): Design Engineers DAVID PEARL: Public Art HWYHW 407 FINCH WEST STTEELES WESTW SHEPPARDS WEST VAUGHANHANA METROPOLITAO ANN DOWNSVIEW YORK UNIVERSITYTY CENTRET HIGHWAY 407 STATION Site Access Road Commuter Parking Lot Higgyhway 407 ETR Stormwater Management Pond Bus Layover Bicycle Storage Station Entrance PPUDO Bus Terminal Black Creek Bridge Subway Box Black Creek Bus Only Entrance Jane Street SITE PLAN HWYHW 407 FINCH WEST STTEELES WESTW SHEPPARDS WEST VAUGHANHANA METROPOLITAO ANN DOWNSVIEW YORK UNIVERSITYTY CENTRET HIGHWAY 407 STATION EXTERIOR VIEW FROM JANE STREET HWYHW 407 FINCH WEST STTEELES WESTW SHEPPARDS WEST VAUGHANHANA METROPOLITAO ANN DOWNSVIEW YORK UNIVERSITYTY CENTRET HIGHWAY 407 STATION EXTERIOR VIEW FROM PARKING LOT HWYHW 407 FINCH WEST STTEELES WESTW SHEPPARDS WEST VAUGHANHANA METROPOLITAO ANN DOWNSVIEW YORK UNIVERSITYTY CENTRET
    [Show full text]
  • GO Transit's Deliverable: the 2020 Service Plan
    GO Transit’s deliverable: the 2020 Service Plan GO Transit’s 2020 Service Plan describes GO’s commitment to customers, existing and new, Success… and challenge: Union Station. to provide a dramatically expanded interregional transit option that integrates fully with the About 95% of GO Train customers travel RTP rapid transit network, and addresses the future travel needs in the Greater Golden to or from Union Station. During the peak Horseshoe. Further analysis during the planning and design of individual services will detail the hour, 45,000 customers use GO Transit’s service outline presented here, and define the appropriate technology, rail corridor improve - seven tracks and six platforms – the most ments, bus priority measures, passenger facilities, fleet growth, operational growth, and other intensive use of a train station in North activities needed to build the service. America. GO Transit has invested in more stairways, passenger waiting areas, This 2020 Service Plan summarizes the frequency and extent of service to be offered on and communications systems to handle major corridors, and is consistent with the infrastructure improvements and technologies the growing traffic through this “mobility included in the Metrolinx RTP and GO Transit’s vision and objectives described above. hub.” The adjacent Union Station GO Bus The plan reflects a significantly more proactive approach to service development than the Terminal provides convenient access to incremental, business-case driven approach that has guided GO’s growth for the past 15 express “train-bus” service between Union years. GO Transit will provide an attractive travel option that will compete successfully with Station and GO stations when trains are not automobile use for peak and off-peak trips between Urban Growth Centres identified in scheduled to run.
    [Show full text]
  • York Region Transit (YRT/Viva) System Performance
    C3 Communications CW (WS) - November 13, 2017 Item # - 1 . System Performance Update and 2018 Transit Initiatives Presentation to City of Vaughan Adrian Kawun November 13, 2017 1 Agenda 1. System Performance 2. 2018 Transit Initiatives 3. Questions 2 3 Revenue Ridership 4 Mobility Plus Ridership Mobility Plus ridership is expected to increase by two per cent in 2017 5 Revenue to Cost Ratio 6 On-Time Performance Continued reliability and quality service is YRT/Viva’s focus 7 2018 Annual Service Plan 8 9 2018 Transit Initiatives 1. Toronto-York Spadina Subway Extension 2. Increased Traveller Capacity 3. Cornell Terminal 4. On-Demand Transit Strategy 5. Mobility Plus Cross-Boundary Service Enhancements Thirty-four service changes are proposed in 2018; each one supports the five key initiatives 10 Toronto-York Spadina Subway Extension 11 Increased Traveller Capacity Operating 60-foot buses on high demand corridors is an efficient measure that also reduces the overall number of buses required 12 Cornell Terminal Cornell Terminal will open in 2018 and would facilitate connections between GO Transit, Durham Region Transit and York Region Transit 13 On-Demand Transit Strategy Travellers can request transit services when and where they need it 14 Mobility Plus Cross-Boundary Service Enhancements Simplifies travel for clients while making more vehicles available for spontaneous travel 15 2018 Transit Initiatives City of Vaughan 16 Viva purple Weekday service only and extend service to Pioneer Village Station Introduce branch on Highway 7 between
    [Show full text]
  • 5 2017 Transit System Performance Update
    Clause 5 in Report No. 4 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on March 29, 2018. 5 2017 Transit System Performance Update Committee of the Whole recommends: 1. Receipt of the presentation by Ann-Marie Carroll, General Manager, Transit, Transportation Services. 2. Adoption of the following recommendation contained in the report dated February 16, 2018 from the Commissioner of Transportation Services: 1. This report be received for information. Report dated February 16, 2018 from the Commissioner of Transportation now follows: 1. Recommendations It is recommended this report be received for information. 2. Purpose This report provides Council with 2017 York Region Transit (YRT) ridership and overall system performance information. 3. Background Transit measures service performance in a number of ways. Revenue and operating data is generated through a variety of software that is gathered into a business intelligence system. Reports are generated and used by staff to monitor system-wide performance, as well as making operational and financial decisions. Staff also monitors service in real-time to manage the day-to-day operation. The most common service performance measures used by the transit industry include: Committee of the Whole 1 Transportation Services March 1, 2018 2017 Transit System Performance Update • Revenue ridership - the number of paying travellers using the service. • Net cost per passenger – net cost to operate a route divided by the number of travellers • On-time performance – the reliability of the service provided to the traveller. This is a key indicator for the overall success of the Operation and Maintenance contracts • Revenue-to-cost ratio – revenue collected through transit fares compared to the cost to operate service 4.
    [Show full text]
  • WELCOME to OPEN HOUSE TWO November 28, 2018
    Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE TWO November 28, 2018 Please sign in and join our mailing list Study Overview ❖ York Region is conducting a Class Environmental Assessment (EA) study for Langstaff Road from Weston Road to Highway 7, within the City of Vaughan. ❖ Study Purpose: Examine the need for a new Langstaff Road connection across the CN MacMillan Rail Yard; Highway 400 interchange improvements to facilitate full access / movement at the interchange; constructing an overpass or underpass at the GO Transit Barrie Line; and widening certain sections of Langstaff Road. ❖ Why: To manage existing and future traffic congestion on other east-west arterial roads; support growth in the Vaughan Metropolitan Centre and other primary growth centres nearby; improve access to employment areas; and support an efficient goods movement system. ❖ Strategic Location: Given its proximity to the CN MacMillan Rail Yard and Highways 400 and 407, this area is an important centre of economic activity associated with a range of industrial, manufacturing and warehousing uses, and goods movement. 1 Study Process and Purpose of Open House Notice of Study Commencement Purpose of Open House Two December 2016 ❖ Share a summary of the public Phase 1: Problem and Opportunity ✓ Identify problems and opportunities feedback we received to date ❖ Present an evaluation of the various Phase 2: Alternative Planning Solutions ✓ Inventory the natural, social, economic and cultural design alternatives environments
    [Show full text]
  • A Case Study of the 2015 Toronto Pan American Games and the Union-Pearson Express
    Short-Term Gain and Long-Term Pain: A case study of the 2015 Toronto Pan American Games and the Union-Pearson Express By: Monica Silberberg Date of Submission: November 30, 2015 A Major Paper submitted to the Faculty of Environmental Studies in partial fulfillment of the requirements for the degree of Master in Environmental Studies, York University, Toronto, Ontario, Canada. _____________________________________ Monica Silberberg, MES Candidate _____________________________________ Dr. Liette Gilbert, Supervisor Abstract Mega-events have been credited with being catalysts of urban regeneration and accelerating infrastructure development. Staging a mega-event not only requires significant investment in event-related facilities but also usually necessitates upgrades to transportation infrastructure. This paper broadly examines the role of mega-events in fast-tracking urban improvements as well as the ramifications of accelerated development on cities. In particular, it discusses how the 2015 Pan American Games held in Toronto fast-tracked the completion of the Union-Pearson Express, a rail link connecting the city’s downtown and primary airport, after the project had been stalled for years. This case study reveals the tensions between the long-term planning goals of the host city and more short-term demands for mega-events. The Union- Pearson Express is criticized for being inconvenient, inaccessible and over-priced, resulting in adverse impacts on the environment and human health and not doing enough to encourage public transportation. This paper contends that the Union-Pearson Express offered short-term gain associated with the Pan American Games that fails to address the long-term transit and other needs of the Greater Toronto Area.
    [Show full text]