Nagpur Metro Rail Project Covering a Route Length of 38 Km Over 38 Stations
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Detailed Project Report for Nagpur Metro
Detailed Project Report for Nagpur Metro Presentation By Delhi Metro Rail Corporation Sep.02, 2013 22, 2013 NAGPUR AT A GLANCE • Nagpur is the third largest city of Maharashtra and also the winter capital of the state. • With a population of approximately 25 lakhs, Nagpur Metropolitan Area is the 13th largest urban conglomeration in India. • The last decade population Growth rate in NMC area was 17.26%. • Current Vehicle Statistics (2012) shows number of registered vehicles are 12.37 lakh out of which 10.32 lakhs are two wheelers. • As per provisional reports of Census India, population of Nagpur NMC in 2011 is 2,405,421; of which male and female are 1,226,610 and 1,178,811 respectively. Although Nagpur city has population of 2,405,421; its urban UA / metropolitan population is 2,497,777 of which 1,275,750 are males and 1,222,027 are females. http://www.census2011.co.in/census/city/353- nagpur.html 9/17/2013 DMRC 2 REGISTERED VEHICLES IN NAGPUR CITY (As per Motor Transport Statistics of Maharashtra as on 31st March, 2012) CATEGORY VEHICLES % TOTAL OF TWO WHEELERS 1032607 83.47 AUTO RICKSHAWS 17149 1.38 CARS (Cars, Jeeps, Station Wagons 132709 10.73 & Taxi) OTHERS (Bus, Truck, LCV, 54634 4.42 Tractors etc.) TOTAL OF ALL TYPES 1237099 100 9/17/2013 DMRC 3 RAIL AND AIR TRANSPORT IN NAGPUR CITY • A total of 160 trains from various destinations halt at Nagpur. • Almost 1.5 lakh passengers board/alight different stations in Nagpur Daily. • Nagpur central alone is used by nearly 100,000 passengers. -
ANSWERED ON:20.07.2016 Metro Rail Projects Kambhampati Dr
GOVERNMENT OF INDIA URBAN DEVELOPMENT LOK SABHA UNSTARRED QUESTION NO:672 ANSWERED ON:20.07.2016 Metro Rail Projects Kambhampati Dr. Hari Babu;Mohammed Shri Faizal P.P.;Senguttuvan Shri Balasubramaniam;Somaiya Dr. Kirit;Thomas Prof. Kuruppassery Varkey;Venugopal Dr. Ponnusamy Will the Minister of URBAN DEVELOPMENT be pleased to state: Will the MINISTER OF URBAN DEVELOPMENT be pleased to state: (a) the details of metro rail proposals received by the Government during the last three years and the current year, stretch and State/ UT-wise along with the estimated cost of each stretch; (b) the details of proposals cleared and lying pending stretch and State-wise, the reasons for pendency along with the time by which pending proposals are likely to be cleared; (c) the funds sanctioned, released and utilized during the above period for various projects, stretch and State/UT-wise; (d) the present status of various under construction and sanctioned metro rail stretches, stretch and city-wise and the time by which these are likely to be completed and operationalized; and (e) Whether various metro rail projects are going behind schedule and if so, the details thereof, stretch and city-wise and the details of cost escalated as a result thereof along with the steps taken/being taken to complete these projects within a reasonable period of time? Answer THE MINISTER OF STATE IN THE MINISTRY OF URBAN DEVELOPMENT (RAO INDERJIT SINGH) (a)& (b) : The details of metro rail proposals received/ cleared/pending during the last three years and the current year along with the names of stretch and the estimated cost stretch wise, State/UT-wise are given in Annexure-I & IA. -
Rashtrasant Tukadoji Maharaj Nagpur University
New Ordinance a Ccc RASHTRASANT TUKADOJI MAHARAJ NAGPUR UNIVERSITY “(Established by Government of Central Provinces Education Department by Notification No.513 dated the 1st of August, 1923 & presently a State University governed by Maharashtra Universities Act, 1994.)” : NOTIFICATION : No.: RTMNU/Ph.D. (Cell)/8/1657 Dated : 25 February, 2013 It is notified for general information that the following candidates are hereby declared eligible for the award of Ph.D. Degree in the faculty mentioned against their respective names: Sr. Name and Address of Candidate Date of Degree Faculty Subject Title of Thesis Name and Address of Supervisor No. Registration 1. 2. 3. 4. 5. 6. 7. 8. 1. Ku. Sairabanu Sahebkhan Pathan 15.01.2007 Ph.D. Law Law “Directive Principle of State Policy Dr. J.L. Aparajit Plot No. 314 and its changing Dimension under Dr. Babasaheb Ambedkar Ganesh Nagar the constitution of India (An College of Law Nagpur analytical and critical study with Nagpur reference to the decisions of High Courts and Supreme Court)” Page 1 of 7 New Ordinance 2. Ku. Preeti Gangadhar Dharmik 01.01.2009 Ph.D. Science Microbiology “Potentiation of Antibiotic Activity Dr. A.V. Gomashe 270, Jai Durga Layout No. 1 by Citric Acid Against Drug Dept. of Microbiology Narendra Nagar Resistant Entero Pathogenic Shivaji Science College Nagpur Bacteria” Nagpur Co-Guide Dr. B.J. Wadher Dept. of Microbiology Rashtrasant Tukadoji Maharaj Nagpur University Nagpur 3. Ku. Minakshi Annaji Mhaisgawali 06.01.2007 Ph.D. Science Microbiology “Phytochemical and Antimicrobial Dr. A.V. Gomashe Plot No. 17 Investigations in some plants” Dept. of Microbiology Behind Radhakrishna Talkies Shivaji Science College Balewadi Nagpur Tukum Co-Guide Dist. -
Maha Metro Connect Year 03 Volume 03 March-April 2021
Year 03 | Volume 03 | March-April 2021 Dear Colleagues, Best ever performance when conditions are the toughest and most challenging, is the hardest thing to achieve. But that is what has been precisely achieved by Maha Metro in Nagpur & Pune Metro Projects, in the month - March'21 and the year 2020-21 in terms of our physical & financial progress, despite the gravest challenges posed by COVID19 pandemic through the year. The following are the figures: PROGRESS PREVIOUS BEST Month March ‘21 Rs. 685 Crores Month March ’19 Rs. 669 Crores Year 2020-21 Rs. 3303 Crores Year 2018-19 Rs. 2894 Crores The credit goes to dedication, discipline and delivery of each and every • MD’s Message member of Team Maha Metro and the superb Team Work. No words • Four New Stations operational in can truly capture the exemplary bravery and sacrifice of all of you and Nagpur your families in the trying circumstances in delivering the above • Maha Metro using Pandemic performance. Period to its advantage • Balanced Cantilever Bridge over I compliment and congratulate all of you and your families not only for this outstanding performance but coming out victorious in the fight Railway tracks with this pandemic. • Maintenance Depot on viaduct • Pune Metro Multi-modal A total of 819 of our team members were unfortunately affected by Integration updates the pandemic, 418 of them have already overcame the challenge. • Tunneling under Mutha river However, 4 (Maha Metro-1, GC-1, Contractors-2) lost the battle • New Joinees & Project updates despite best efforts. Our heartfelt condolences to their families. -
Maha-Metro CONNECT
Year 03 | Volume 02 | March 2021 Dear Colleagues, The year 2021 is turning out to be a testament of Maha Metro’s excellence in executing Mass Rapid Transit projects as can be seen from the multiple new projects recently awarded to us. We have been rewarded for our hard work with the sanction of Nagpur Metro Phase–II & Nashik Metro Neo and also with the opportunity to complete balance works of Navi Mumbai Metro Line-1. These are just new beginnings with many more additional responsibilities to come. The sanction of Phase - II of Nagpur Metro Project is an endorsement of the good work done by us over last 6 years & is a matter of great pride for us. It is very rare that Phase-II of a project gets sanctioned even before completion of Phase-I. Nagpur city is attaining new heights and Maha-Metro is happy to be a part of the process. It is also a matter of great pride for us that our concept of Metro Neo has been • MD’s Message given recognition by the Union government as a new MRT system to be • Sanction of Nagpur Metro implemented in cities having a Peak Hour Peak Direction Trac (PHPDT) of less than 10,000. Nashik will be the rst city to have Metro-Neo & this MRTS Phase-II and Nashik Metro Neo system will act as a game changer in propelling city’s growth. • Maha-Metro & CIDCO sign MOU for Navi Mumbai Metro The agreement with CIDCO to complete balance work of Navi Mumbai Metro • Pune Metro signs MOU with Line 1 reects the belief of the other organizations on Maha-Metro’s ability to DRDO for Bio-digester technology eectively execute a project and is a reection of our excellence. -
Notification 24 November, 2010
New Ordinance Page No. 1 a Ccc RASHTRASANT TUKADOJI MAHARAJ NAGPUR UNIVERSITY “(Established by Government of Central Provinces Education Department by Notification No.513 dated the 1st of August, 1923 & presently a State University governed by Maharashtra Universities Act, 1994.)” : NOTIFICATION : No.: RTMNU/Ph.D. (Cell)/1114 Dated : 24 November, 2010 It is notified for general information that the following candidates are hereby declared eligible for the award of Ph.D. Degree in the faculty mentioned against their respective names: Sr. Name and Address of Candidate Date of Degree Faculty Subject Title of Thesis Name and Address of Supervisor No. Registration 1. 2. 3. 4. 5. 6. 7. 8. 1. Ku. Mangla Nimbaji Kadwey 06/03/2007 Ph.D. Science Zoology “Studies on the Effect of Pathogens Dr. D.D. Barsagade At Post-Siratha on Some Vital Organs of Tropical Reader Tah. – Pandurna Tasar Silkworm Antheraea Mylitta Dept. of Zoology Dist. – Chhindwara – 480 338 (Drury) Rashtrasant Tukadoji Maharaj (Lepidoptera : Staurniidae)” Nagpur University Nagpur Contd. Page No. 2 Page No. 5 2. Shri Sanjay Sitaram Bhotmange 19/08/2006 Ph.D. Education Physical “Comparative Study of Selected Dr. Tapan Dutta Near Dhantoli Post Office Education Anthropometric Measurements, Nagpur Sharirik Shikshan Dhantoli Body Composition Aerobic and Mahavidyalaya Nagpur Anaerobic Capacities of Handball Dhantoli Players of Different Level of Nagpur Performance” 3. Shri Rampal Singh 09/01/2007 Ph.D. Education Physical “Comparative Study of Physical Dr. Tapan Dutta Vill-Post-Neemera Education Fitness Components and Hockey Nagpur Sharirik Shikshan Via-Jajod Playing Ability of Interversity Mahavidyalaya Dist. – Sikar Level Players of North Zone Dhantoli Rajsthan Universities” Nagpur 4. -
Maha-Metro CONNECT NOVEMBER 2019 | Volume 1
maha-metro CONNECT NOVEMBER 2019 | Volume 1 MD’s Corner In this issue Dear Reader, It gives me immense pleasure to introduce MAHA-METRO CONNECT, Journey so far... the Monthly Bulletin of Maha-Metro (Maharashtra Metro Rail Corporation Limited). It comes a little late in the day because, Maha- Introducing Metro Neo Metro team since day zero has been perpetually in motion in crafting the big dream of Making Metro Rail at Nagpur and Pune and making the dream Pune Metro Highlights come true with laser focus attention and deep-rooted passion. We at Maha-Metro have a rare distinction (exceptions being DMRC in India and Nagpur Metro Highlights MTRC, Hong Kong in the world elsewhere), of having been given the SPECIAL FEATURE responsibility to simultaneously plan and construct multi-city multi- Environment Sustenance Maha- location metro rail systems. Nagpur and Pune Metro together, both being developed by us, Metro Way : Tree Transplantation accounts for nearly 10% of total metro rail construction being carried out in the country. This responsibility will turn more humungous soon with likely addition of Metro Neo at Nashik, likely INNOVATION CORNER sanction of Thane Metro and eventual sanction of phase II of Nagpur and Pune Metro Rail. Virtual Reality becomes a Reality st in Maha-Metro Projects Our dream journey took first baby-steps on 21 August 2014 with the sanction of two-line 38.2 km Nagpur Metro Rail Project and laying of its foundation stone by the Prime Minister on the SOCIAL MEDIA ENGAGEMENT same day. On 24th December 2016, the dream got bigger by laying of the foundation stone of two-line 33.645 km metro rail project at Pune by the Prime Minister. -
Global Report Global Metro Projects 2020.Qxp
Table of Contents 1.1 Global Metrorail industry 2.2.2 Brazil 2.3.4.2 Changchun Urban Rail Transit 1.1.1 Overview 2.2.2.1 Belo Horizonte Metro 2.3.4.3 Chengdu Metro 1.1.2 Network and Station 2.2.2.2 Brasília Metro 2.3.4.4 Guangzhou Metro Development 2.2.2.3 Cariri Metro 2.3.4.5 Hefei Metro 1.1.3 Ridership 2.2.2.4 Fortaleza Rapid Transit Project 2.3.4.6 Hong Kong Mass Railway Transit 1.1.3 Rolling stock 2.2.2.5 Porto Alegre Metro 2.3.4.7 Jinan Metro 1.1.4 Signalling 2.2.2.6 Recife Metro 2.3.4.8 Nanchang Metro 1.1.5 Power and Tracks 2.2.2.7 Rio de Janeiro Metro 2.3.4.9 Nanjing Metro 1.1.6 Fare systems 2.2.2.8 Salvador Metro 2.3.4.10 Ningbo Rail Transit 1.1.7 Funding and financing 2.2.2.9 São Paulo Metro 2.3.4.11 Shanghai Metro 1.1.8 Project delivery models 2.3.4.12 Shenzhen Metro 1.1.9 Key trends and developments 2.2.3 Chile 2.3.4.13 Suzhou Metro 2.2.3.1 Santiago Metro 2.3.4.14 Ürümqi Metro 1.2 Opportunities and Outlook 2.2.3.2 Valparaiso Metro 2.3.4.15 Wuhan Metro 1.2.1 Growth drivers 1.2.2 Network expansion by 2025 2.2.4 Colombia 2.3.5 India 1.2.3 Network expansion by 2030 2.2.4.1 Barranquilla Metro 2.3.5.1 Agra Metro 1.2.4 Network expansion beyond 2.2.4.2 Bogotá Metro 2.3.5.2 Ahmedabad-Gandhinagar Metro 2030 2.2.4.3 Medellín Metro 2.3.5.3 Bengaluru Metro 1.2.5 Rolling stock procurement and 2.3.5.4 Bhopal Metro refurbishment 2.2.5 Dominican Republic 2.3.5.5 Chennai Metro 1.2.6 Fare system upgrades and 2.2.5.1 Santo Domingo Metro 2.3.5.6 Hyderabad Metro Rail innovation 2.3.5.7 Jaipur Metro Rail 1.2.7 Signalling technology 2.2.6 Ecuador -
Executive Summary
EXECUTIVE SUMMARY 0.1 INTRODUCTION 0.2 TRAFFIC DEMAND 0.3 SYSTEM SELECTION 0.4 GEOMETRIC DESIGN NORMS 0.5 CIVIL ENGINEERING 0.6 STATION PLANNING 0.7 TRAIN OPERATION PLAN 0.8 ROLLING STOCK 0.9 POWER SUPPLY, SYSTEM OF TRACTION AND POWER TARIFF 0.10 MAINTENANCE DEPOT 0.11 SIGNALLING SYSTEM 0.12 TELECOMMUNICATION & AUTOMATIC FARE COLLECTION 0.13 DISABLED FRIENDLY FEATURES 0.14 ENVIRONMENTAL IMPACT ASSESSMENT 0.15 SECURITY MEASURES FOR A METRO SYSTEM 0.16 DISASTER MANAGEMENT PLAN FOR A METRO RAIL SYSTEM 0.17 MULTI MODAL TRANSPORT INTEGRATION 0.18 COST ESTIMATES 0.19 FINANCING OPTIONS, FARE STRUCTURE AND FINANCIAL VIABILITY 0.20 ECONOMIC ANALYSIS 0.21 IMPLEMENTATION STRATEGY AND PROJECT IMPLEMENTATION 0.22 CONCLUSIONS AND RECOMMENDATIONS TABLES TABLE 0.1A ALIGNMENTS PROPOSED BY DMRC TABLE 0.1B FINAL ALIGNMENTS TABLE 0.2 SUMMARY OUTPUT : TRAFFIC TABLE 0.3 HORIZONTAL CURVE PARAMETERS TABLE 0.4 SUMMARY OF BORE HOLES : NS CORRIDOR TABLE 0.5 SUMMARY OF BORE HOLES : EW CORRIDOR TABLE 0.6 RCC PILE FOUNDATION DETAILS ; NS CORRIDOR TABLE 0.7 OPEN FOUNDATION DETAILS : NS CORRIDOR TABLE 0.8 RCC PILE FOUNDATION DETAILS ; EW CORRIDOR TABLE 0.9 OPEN FOUNDATION DETAILS : EW CORRIDOR TABLE 0.10 SUMMARY OF PERMANENT LAND REQUIREMENT TABLE 0.11A NS CORRIDOR :SEQUENCE OF STATIONS WITH CHAINAGES AND LOCATIONAL & PLATFORM CHARACTERISTICS TABLE 0.11B EW CORRIDOR :SEQUENCE OF STATIONS WITH CHAINAGES AND LOCATIONAL & PLATFORM CHARACTERISTICS TABLE 0.12 PHPDT CAPACITY PROVIDED TABLE 0.13 YEAR WISE RAKE REQUIREMENT TABLE 0.14 SIZE OF THE COACH TABLE 0.15 CARRYING CAPACITY -
Monetising the Metro
1 2 Indian Metro Systems – 2020 Analysis Contents Metro Rail In India: Introduction ............................................................................................................ 5 Brief Global History of Metro systems .................................................................................................... 5 Why is Metro the right MRT option? ...................................................................................................... 8 Key Benefits ........................................................................................................................................ 9 Impact on Urbanisation ...................................................................................................................... 9 When to Build a Metro ..................................................................................................................... 10 When Not to Build a Metro .............................................................................................................. 10 Implementation of Metro In Indian Context ........................................................................................ 11 Indian Issues with Implementation................................................................................................... 13 Metro in India: Spotlight Kolkata .......................................................................................................... 14 Metro in India: Spotlight Delhi ............................................................................................................. -
Brief About the Division
2.0 Brief About the Division: 2.1 Nagpur City: Nagpur, winter capital of Maharashtra, is the largest city in central India and third largest city in Maharashtra after Mumbai and Pune. With a population of 46,53,171 (2011), Nagpur is the 9th largest urban conglomeration in India. It has also recently been ranked as the second greenest city of India after Bangalore. In addition to being the seat of annual Winter Session of Maharashtra State assembly "VidhanSabha", Nagpur is also a major commercial and political center of the Vidarbha region of Maharashtra. It is also famous as "Orange City" for being a major trade center of oranges that are cultivated in the region. Nagpur lies on the Deccan plateau of the Indian Peninsula and has a mean altitude of 310 meters above sea level. Nagpur lies precisely at the center of the country with the Zero Mile Marker indicating the geographical center of India. The city was founded by the Gonds but later it became part of the Maratha Empire under the Bhonsles. The British East India Company took over Nagpur in the 19th century and made it the capital of the Central Provinces and Berar. After the first re-organization of states, the city lost its capital status but according to the informal "Nagpur Pact" between political leaders it was made the second capital of Maharashtra. Nagpur is also declared as "Tiger Capital of India” being gate way to many Tiger Reserves in India. Economy: MIDC, Hingna, is a sprawling Industrial Estate having more than 900 small and medium industrial units. -
India's Top 20 Promising Cities
SM@RT CITIES COUNCIL www.ConstructionWorld.inwww.ConstructionWorld.in COVER STORY SURAT NAGPUR LUCKNOW VADODARA VISAKHAPATNAM THANE JAIPUR PIMPRI CHINCHWAD INDIA’S TOP 20 PROMISING CITIES CHANDIGARH INDORE NAVI MUMBAI KANPUR KALYAN-DOMBIVLI FARIDABAD GURGAON GHAZIABAD 2 Construction World March 2013 1 RAJKOT BHOPAL LUDHIANA NASHIK SM@RT CITIES COUNCIL ndia in 2012: 153 rural, 219 transition, 84 semi-urban and 33 urban (Punjab), and Nashik (Maharashtra). In fact, representatives of these cities – districts (excluding the Northeast states and Jammu & Kashmir). And in their municipal chiefs – will be awarded at the upcoming Sm@rt Cities Summit 2025: 96 rural, 220 transition, 115 semi-urban and 58 urban districts. to be held in New Delhi in February and organised by FIRST Sm@rt Cities Council. These numbers from McKinsey & Company’s recent report, India’s Economic Geography in 2025: States, Clusters and Cities, attest to the Commissionerspeak Icountry’s growing urban sprawl. Attendant woes, though, include a big city So what makes these cities so promising? We spoke to some of their bias with the major cities consuming a bulk of natural and financial resources representatives for the answer. as well as unplanned development. As Prof Jagan Shah, Director, National For instance, Dr Amit Agrawal, Municipal Commissioner, Municipal Institute of Urban Affairs, says, “This has resulted in the sprawling of Corporation Faridabad, tells us how his city holds great promise to be a good existing urban centres with haphazard growth patterns and a corrosive effect urban centre. “The most important factor is the city’s location and connectivity,” on the surrounding region.” he reasons.