C2014-0949 Funded Connections Projects Attachment 1

Joh Map 1: Funded Ring Road H Crowchild Tr n Laurie Blvd NW ig h w a Connections Projects y ail NW 2 0 64 Avenue NE 1 Nose Hill Drive NW International Nose Hill Airport Park

W N il ra T i V p NE Street Centre alle p y a R n id a McKnight Blvd NW g g e a

h

B 1

85 Street NW 85 Street S l

v d Legend Bowness Design only/long term

Tra planning Canada ns -Ca Olympic nad a Park Hig hw ay Design and construct

ring roadNW Street 4 connection Old Banff Coach Road Design and construct Springbank Rd Old Banff C 16 Avenue NW oa c h improvement related to R Municipal o a

W d

S SW SW downstream traffic changes

Boundary tS

2a et 2b eet e r t tr St

85 Street SW 85 Street

Calgary’s SW 101 Street Ring Road BoBowBowowwT TTrailrraail SWSW

Lower Springbank Road Transportation Utility Corridor 17 Avenue SW

26 Avenue SW 14 Street SW Street 14 69 Street SW 69 Street SW 37 Street SW Trail Sarcee 33 Avenue SW 3 CITY OF

Range Road 25 8 ay High w 4 CALGARY

50 Avenue SW

E er Lott Creek Blvd Lott Creek lb iv 1. Flyover between Valley Ridge and Bownessow R e SW Trail Crowchild v r ri e areas: design only, long term planning D iv R le g ow Ea B A proposed fly-over connecting Valley Ridge y re SW G

and Bowness communities via Valley Springs l i

a

r

T

66 Ave SW

Road N.W. and Greenbriar Boulevard N.W. No t

o

o f construction timelines established. r 5 e

e

D 2. : design and construct Weaselhead Natural Area a) New road connecting to existing Bow Trail 6

Glenmore b) Widen existing Bow Trail to four lanes Reservoir between 85 Street and Old Banff Coach Heritage Drive SE 14 Street SW 14 Street Road/Strathcona Boulevard

3. Westhills Way S.W.: design and construct d

a 90 Avenue SW

o R

A new road connecting to Richmond Road and a d lhe 7 se Westhills commercial area ea W 4. Glenmore Trail: design and construct Widen Glenmore Trail to six lanes, between 37 Southland Drive SW Street S.W. and 8 Bu llhe 5. Glenmore Trail and Crowchild Trailad Elbow Drive SW Roa : design and construct d AndersonAAnnderndnderersonrsorsrson RoadRRooadoaadd SSWW Recommend constructing a short term

improvement to help accommodate opening

W

S

day traffic volumes. Recommend study for long d v

l

B

24 Street SW 24 Street

term solutions k

r

a p 6. 90 Avenue S.W.: design and construct 130 Avenue SW Woo d Design 90 Avenue S.W. connection as a M Canyon ead e SW Parkway (priority given to people who walk and ows Driv cycle) Fish Creek 7. Southland Drive: design and construct Provincial Park Construct Southland Drive from city limits to 146 Avenue SW 9 Fish Creek Blvd the TUC

W

S 8. S.W.: design and construct

d y E Shawness 10 b Blvd

v R S

10 a W

e t t Widen Anderson Road to six lanes, between r W i

r idge Drive S v

e k

TUC and 14 Street S.W. c M 162 Ave SW s Sun Valley Blvd

e 9. 146 Avenue: design only W 16 6 Str m 2 A e

a ve e J n u t

e S Design connection between TUC and future SW Sundance W Lake Providence development 37 Street SW 37 Street 53 Street SW 53 Street 24 Street SW 24 Street 10. 162 Avenue: design and construct SW 69 Street 11

a) Design connection between TUC and future SE Providence development W

b) Design and construct connection between S SW yS ay S Chaparral TUC and Bridlecrest Boulevard S.W. W Lake w ws owso W d dow

11. Way: design and construct ado ead e ea M Chaparral Blvd Tournament Lane SW Tournament

Widen Spruce Meadows Way between TUC ce c Red Deer SW Street Sheriff

and the Silverado community and future Lake SW Spruce Meadows Way development

C2014-0949 West and South West Ring Road Downstream Traffic Impacts - Att 1.pdf Page 1 of 1 ISC: CONFIDENTIAL