SIGNALLING & CONTROL D.O.O
Total Page:16
File Type:pdf, Size:1020Kb
SIGNALLING & CONTROL d.o.o. ___________________________________________________________________________________________________________________________________________ Reference List for participation in realization of the following „turn-key” projects Company Signalling & Control Ltd. has participated as subsuplier and subcontractor in realization of the following „turn-key” projects: Reconstruction and equipping a level crossing with the computer-based safety level crossing system: km. 1+357 – ”Kosjerić centar”, TITAN “Cementare Kosjeric”, Industrial line, Jun 2011. year. Project of reconstruction of City Railways – ”Beovoz”, Reconstruction of the railway station ”Novi Beograd”, Delivery, installation, commissioning and purtting into the operation of own EMMI system, JSC Serbian Railways / City Belgrade, December 2010. year. Reconstruction and equipping a level crossing with the computer-based safety level crossing system: km. 53+735 - ”Kovačica”, JSC Serbian Railways, December 2010. year. Reconstruction and equipping a level crossing with the computer-based safety level crossing system: km. 59+641 - ”Tomaševac”, JSC Serbian Railways, December 2010. year. Reconstruction and equipping a level crossing with the computer-based safety level crossing system: km. 10+261 - ”Matejevac”, JSC Serbian Railways, October 2010. year. Reconstruction and equipping a level crossing with the computer-based safety level crossing system: km. 269+576 - ”Magistralni prelaz”, ”Mokra Gora”, JSC Serbian Railways, 2010. year. Project EIB2 - T2 – Reconstruction of the railway line ”Batajnica – Golubinci”: Railway stations: ”Nova Pazova”, ”Stara Pazova”, ”Batajnica” i ”Golubinci”, Delivery, installation, commissioning and purtting into the operation of own EMMI system, JSC Serbian Railways, 2009. year. Reconstruction and equipping a level crossing with the computer-based safety level crossing system: km. 26+905 - ”Klenje”, JSC Serbian Railways, realised and FAT tested, December 2009. year. Reconstruction and equipping a level crossing with the computer-based safety level crossing system: km. 48+142 - ”Knić”, JSC Serbian Railways, Realised and FAT tested, 2008. year. Reconstruction and equipping a level crossing with the computer-based safety level crossing system: km. 268+844 – “9-ti kilometar”, Mokra Gora, JSC Serbian Railways, 2008. year. Reconstruction and equipping a level crossing with the computer-based safety level crossing system: km. 51+815 - “Petar Drapšin”, Mladenovac, JSC Serbian Railways, 2008. year. Reconstruction and equipping a level crossing with the computer-based safety level crossing system: km. 62+909 - ”Rabrovac”, JSC Serbian Railways, 2008. year. Reconstruction and equipping a level crossing with the computer-based safety level crossing system: km. 86+576 - ”Vuk Karadžić”, ”Kraljevo”, JSC Serbian Railways, 2007. year. __________________________________________________________________________________________________________________________ Adress: Branka Krsmanovića 20 Phone: +381 (0)11 64 54 977 e -mail: [email protected] ISO 9001:2008 11000 Belgrade, Serbia Fax: +381 (0)11 64 54 810 web: sig-con.com Page 1 of 2 SIGNALLING & CONTROL d.o.o. ___________________________________________________________________________________________________________________________________________ Reconstruction and equipping a level crossing with the computer-based safety level crossing system: km. 94+593 - ”Mataruška Banja”, ”Kraljevo”, JSC Serbian Railways, 2007. year. Reconstruction and equipping a level crossing with the computer-based safety level crossing system: km. 62+413 - ”Vrba”, ”Kraljevo”, JSC Serbian Railways, 2006. year. __________________________________________________________________________________________________________________________ Adress: Branka Krsmanovića 20 Phone: +381 (0)11 64 54 977 e -mail: [email protected] ISO 9001:2008 11000 Belgrade, Serbia Fax: +381 (0)11 64 54 810 web: sig-con.com Page 2 of 2 .