Newark Sewerage Strategy Overview Flood Risk Assessment Severn Trent Water

Total Page:16

File Type:pdf, Size:1020Kb

Newark Sewerage Strategy Overview Flood Risk Assessment Severn Trent Water Newark Sewerage Strategy Overview Flood Risk Assessment Severn Trent Water January 2015 Newark Sewerage Strategy Overview Flood Risk Assessment Notice This document and its contents have been prepared and are intended solely for Severn Trent Water’s information and use in relation to the Newark Sewerage Strategy, Overview Flood Risk Assessment. Atkins Ltd assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. This document has 28 pages including the cover. Document history Job number: 5117326 Document ref: 71_DG_002 Revision Purpose description Originated Checked Reviewed Authorised Date Rev 1.0 Draft for Client Review L. Hillcoat J. Lamont T. Rouse J. Lamont Nov 2013 H. Stockham Rev 2.0 Revision following Client L. Hillcoat - T. Rouse T. Rouse Dec 2013 Review Rev 3.0 Revision following L. Hillcoat C. Nunns T. Rouse T. Rouse Nov 2014 Environment Agency comments Rev 4.0 Final for issue L. Hillcoat C. Nunns T. Rouse T. Rouse Jan 2015 Atkins Overview Flood Risk Assessment | Version 4.0 | January 2015 | 5117326 Newark Sewerage Strategy Overview Flood Risk Assessment Table of contents Chapter Pages Glossary i Executive Summary ii 1. Introduction 1 1.1. Background 1 1.2. Scheme Proposals 1 1.3. Scope of this Overview FRA 4 2. Assessment of Flood Risk 6 2.1. Historical Incidents of Flooding 6 2.2. Fluvial Flooding 6 2.3. Surface Water Flood Risk 12 2.4. Groundwater Flood Risk 13 2.5. Flood Risk from the Sewerage Network 14 2.6. Other Sources of Flood Risk 14 2.7. Climate Change Implications 14 3. Conclusions and Recommendations 16 3.1. Conclusions 16 3.2. Recommendations 16 4. Bibliography 17 Appendices 18 Appendix A. Scheme Proposal 19 Appendix B. Environment Agency Flood Risk Data 20 Appendix C. Hydraulic Modelling Technical Note 21 Appendix D. Initial compensation assessment 22 Tables Table 1-1 Number of properties and existing risk of sewer flooding to properties 3 Table 2-1 Change in discharge rates for the 1% AEP event 8 Table 2-2 Hydraulic Modelling Results 9 Table 2-3 Peak levels for the design event combination analysis 11 Table 2-4 Impact of climate change, taken from Table 5 in the NPPF 15 Figures Figure 1-1 Scheme Overview Location Plan in Newark-on-Trent 2 Figure 1-2 Location of property at risk from flooding 4 Figure 2-1 Flood Zone Extent 7 Figure 2-2 Key locations for hydraulic model results 10 Atkins Overview Flood Risk Assessment | Version 4.0 | January 2015 | 5117326 Newark Sewerage Strategy Overview Flood Risk Assessment Glossary Term Definition AEP Annual Exceedance Probability FRA Flood Risk Assessment PFRA Preliminary Flood Risk Assessment SFRA Strategic Flood Risk Assessment SuDs Sustainable Drainage Systems WCS Water Cycle Study Annual Exceedance Probability (AEP) The severities of the events discussed in this report are defined mainly as Annual Exceedance Probabilities (AEP). The AEP is the probability that there will be an event exceeding a particular severity in any one year. Annual Exceedance Probability Probability (chance in any given year) 50% 1 in 2 10% 1 in 10 4% 1 in 25 3.3% 1 in 30 2% 1 in 50 1.33% 1 in 75 1% 1 in 100 0.5% 1 in 200 0.4% 1 in 250 0.1% 1 in 1000 Atkins Overview Flood Risk Assessment | Version 4.0 | January 2015 | 5117326 i Newark Sewerage Strategy Overview Flood Risk Assessment Executive Summary Severn Trent Water has highlighted the necessity to improve the existing sewer system within Newark-on- Trent owing to the current flooding problems, the aging system and to a lesser extent development growth within this area. The proposed improvements include increasing the capacity of the existing system and relocating or closing combined sewer overflow (CSO) outfalls. Information provided by Severn Trent Water predicts that a total of 118 properties would significantly benefit, in relation to sewer flood risk, as a result of the proposed scheme. This includes a reduction in internal property flooding to 50 properties. Severn Trent Water has commissioned Atkins to complete this Overview Flood Risk Assessment (FRA) for these proposed improvements. The aims of this Overview FRA are to provide reassurance that the overall scheme will not have negative impact on flood risk from all sources, and to inform the Level 3 FRAs which are necessary for the two elements requiring planning permission. Whilst this Overview FRA has been completed utilising current FRA guidance, it does slightly deviate from standard FRAs owing to the general scheme falling within Severn Trent Water’s permissive power which do not require planning permission. The proposed changes to CSO outfalls within the scheme have the potential to impact fluvial flood risk along the River Trent. However hydraulic modelling completed for this Overview FRA indicates the proposed rearrangement of CSO outfalls will cause minor localised changes in peak flood levels although these changes will have negligible impact on flood extents and risk to vulnerable property. There are minor localised impacts of 20mm during the 5% Annual Exceedance Probability (AEP) event and 10mm during the 1% AEP event to green open spaces and other such land uses not considered vulnerable. The proposed scheme involves development within Flood Zone 3 at Crankley Point. It was requested by the Environment Agency that an initial compensation assessment was completed for these works to inform this overview FRA owing to the limited area available for compensation. This initial compensation assessment has identified that sufficient compensation could be provided in the western area of the site, based on topography alone. Other potential constraints would need to be considered during the scheme design. There are currently surface water and sewer flood risk issues in Newark-on-Trent. However the proposed scheme is for works to increase the capacity of the existing system and alleviate the existing flood risk. Although there is a low to moderate risk of groundwater flooding the scheme, it is anticipated that the works will have a negligible impact on existing groundwater flood risk within the study area. There are no other known sources of flood risk to the study area, or that would be increased as a result of the proposed scheme. Climate change is predicted to cause an increase in flood risk to Newark-on-Trent in the future, particularly in relation to increased river flow and rainfall intensity. The increased fluvial flood risk as a result of climate change has been quantified through the hydraulic modelling completed for this Overview FRA. The proposed scheme will increase the capacity of the existing sewer system and hence will provide benefits in relation to surface water flooding in the future. Areas at an increased fluvial flood risk as a result of climate change will not be put at additional risk as result of the proposed scheme, as demonstrated through the hydraulic modelling completed for this Overview FRA. In summary, owing to the driver of the proposed scheme being to alleviate flooding from the existing surface water and sewer network, this Overview FRA concludes that the proposed scheme will provide a benefit in relation to flood risk from these sources within Newark-on-Trent. In addition, the hydraulic modelling completed for this assessment concludes the proposed scheme, in relation to the rearrangement of CSO outfalls, will not have an adverse impact on fluvial flood risk. Although there is potential that sufficient floodplain compensation could be provided for the works at Crankley Point, wider constraints need to be considered. The potential increase in risk as a result of the two elements of the scheme requiring planning permission (specifically in relation to development within the floodplain) will be further assessed through the completion of Level 3 FRAs. Atkins Overview Flood Risk Assessment | Version 4.0 | January 2015 | 5117326 ii Newark Sewerage Strategy Overview Flood Risk Assessment 1. Introduction 1.1. Background Severn Trent Water have identified that there is problem with sewer flooding within Newark-on-Trent as the existing combined sewers do not have sufficient capacity during high intensity rainfall events. The insufficient capacity causes flooding within Newark-on-Trent and the excess surface water runoff discharges into the River Trent. Newark-on-Trent is a growing town, with a high density of properties. Severn Trent Water have highlighted that the sewerage from properties needs to be improved due to the aging sewer system, the existing insufficient capacity and to support the town’s growth. Severn Trent Water is proposing a sewer replacement scheme to provide additional capacity and alleviate the existing flooding in Newark-on-Trent. Atkins has been commissioned to assess the flood risk implications of the scheme. The first element of this process is this Overview Flood Risk Assessment (FRA), the purpose of which is to assess the overall impact of the proposed scheme and in particular relevance to the changes in discharge rates and locations to the River Trent. This will then be followed by more detailed Level 3 FRAs for the two proposed elements of the scheme that require planning permission. Further details of the aims and scope of this assessment is provided in Section 1.3. 1.2. Scheme Proposals The purpose of the scheme is to alleviate flooding to over 130 locations. It is proposed that this will be achieved through upsizing the capacity of the sewers in Newark-on-Trent. In addition to this, the main storm relief outfall will become a single point discharge within the boundary of the existing sewage treatment works, with a smaller discharge further upstream. The outcome of which will be a net reduction in the peak discharge rate to the River Trent, through Newark-on-Trent, during periods of heavy rainfall.
Recommended publications
  • Nottinghamshire Local Flood Risk Management Strategy 2016 - 2021
    Nottinghamshire Local Flood Risk Management Strategy 2016 - 2021 Final June 2016 Nottinghamshire Local Flood Risk Management Strategy Review Local Flood Risk Management Strategy Rev Date Details Prepared by Checked by Approved by 1 August 2013 Outline Local Flood Risk Hannah Andy Wallace, Gary Wood, Group Management Strategy for O’Callaghan, Flood Risk Manager Highways Consultation Flood Risk Manager Planning, Access Management and Officer (Project Commissioning Manager) (Project Executive) 2 December Local Flood Risk Management Amy Ruocco, Sarah Kelly, Carl Pelling 2014 Strategy – Draft for Client Water and Principal Associate Comment Flood Risk Consultant Consultant (URS) (URS) (URS) 3 June 2015 Local Flood Risk Management Amy Ruocco, Sarah Kelly, Carl Pelling Strategy – Second Draft for Water and Principal Associate Client Comment Flood Risk Consultant Consultant AECOM AECOM AECOM (formerly URS) (Formerly URS) (Formerly URS) 4 July 2015 Local Flood Risk Management Amy Ruocco, Sarah Kelly, Carl Pelling Strategy – Final Draft for Water and Principal Associate Consultation Flood Risk Consultant Consultant AECOM AECOM AECOM 5 October Local Flood Risk Management Derek Hair Andy Wallace Transport and 2015 Strategy – Final Draft for Highways Principal Project Flood Risk Consultation Committee Engineer Manager AECOM 6 December Local Flood Risk Management Derek Hair Clive Wood Transport and 2015 Strategy – Final Draft for Highways Principal Project Flood Risk Consultation Committee Engineer Manager 7 June 2016 Local Flood Risk Management Derek
    [Show full text]
  • 68. Needwood & South Derbyshire Claylands
    National Character 68. Needwood & South Derbyshire Claylands Area profile: Supporting documents www.naturalengland.org.uk 1 National Character 68. Needwood & South Derbyshire Claylands Area profile: Supporting documents Introduction National Character Areas map As part of Natural England’s responsibilities as set out in the Natural Environment White Paper,1 Biodiversity 20202 and the European Landscape Convention,3 we are revising profiles for England’s 159 National Character Areas North (NCAs). These are areas that share similar landscape characteristics, and which East follow natural lines in the landscape rather than administrative boundaries, making them a good decision-making framework for the natural environment. Yorkshire & The North Humber NCA profiles are guidance documents which can help communities to inform West their decision-making about the places that they live in and care for. The information they contain will support the planning of conservation initiatives at a East landscape scale, inform the delivery of Nature Improvement Areas and encourage Midlands broader partnership working through Local Nature Partnerships. The profiles will West also help to inform choices about how land is managed and can change. Midlands East of Each profile includes a description of the natural and cultural features England that shape our landscapes, how the landscape has changed over time, the current key drivers for ongoing change, and a broad analysis of each London area’s characteristics and ecosystem services. Statements of Environmental South East Opportunity (SEOs) are suggested, which draw on this integrated information. South West The SEOs offer guidance on the critical issues, which could help to achieve sustainable growth and a more secure environmental future.
    [Show full text]
  • Part 1.7 Trent Valley Washlands
    Part One: Landscape Character Descriptions 7. Trent Valley Washlands Landscape Character Types • Lowland Village Farmlands ..... 7.4 • Riverside Meadows ................... 7.13 • Wet Pasture Meadows ............ 7.9 Trent Valley Washlands Character Area 69 Part 1 - 7.1 Trent Valley Washlands CHARACTER AREA 69 An agricultural landscape set within broad, open river valleys with many urban features. Landscape Character Types • Lowland Village Farmlands • Wet Pasture Meadows • Riverside Meadows "We therefore continue our course along the arched causeway glancing on either side at the fertile meadows which receive old Trent's annual bounty, in the shape of fattening floods, and which amply return the favour by supporting herds of splendid cattle upon his water-worn banks..." p248 Hicklin; Wallis ‘Bemrose’s Guide to Derbyshire' Introduction and tightly trimmed and hedgerow Physical Influences trees are few. Woodlands are few The Trent Valley Washlands throughout the area although The area is defined by an constitute a distinct, broad, linear occasionally the full growth of underlying geology of Mercia band which follows the middle riparian trees and shrubs give the Mudstones overlain with a variety reaches of the slow flowing River impression of woodland cover. of fluvioglacial, periglacial and river Trent, forming a crescent from deposits of mostly sand and gravel, Burton on Trent in the west to Long Large power stations once to form terraces flanking the rivers. Eaton in the east. It also includes dominated the scene with their the lower reaches of the rivers Dove massive cooling towers. Most of The gravel terraces of the Lowland and Derwent. these have become Village Farmlands form coarse, decommissioned and will soon be sandy loam, whilst the Riverside To the north the valley rises up to demolished.
    [Show full text]
  • River Trent Feasability Study
    Commercial Boat Operators Association Newsletter Issue 2 March 2008 cboa news River Trent feasability study In this issue The East Midlands Development Freight Strategy.Increased use of p2 Ombudsman success Agency has commissioned a £100k the River for freight would also p3 Tesco uses water for wine feasibility study on increasing use contribute to the aspirations of the p4 Canary Wharf for Hanson of the River Trent to Nottingham. Department of Transport’s White p6 Joined up IWAC While the northern 81 km from Paper: The Future of Transport the Humber Estuary of the river is (2004).That outlines Government p6 Regional news tidal, the 33km above Crowell Lock policy to encourage the transfer of to Nottingham.constrains carrying freight from road to sea and inland 3 Additional market opportunities capacity because the river extends waterways. that would be opened up through enlarged navigation, particularly to through six locks of a limited size There are four inter-related and from the Humber ports and in Newark, there are some objectives to the key one of restricting bridges seeing how feasible it would be to 4 Locations for wharves to handle British Waterways will manage the encourage a shift towards more traffics for both the existing and project.The project team includes sustainable modes of transport in improved waterway, including the CBOA’s Tim West of Wynns.As part of the East Midlands.The team will feasibility of establishing an inland their brief the team will look at the investigate: port in the Nottingham area. possibility of developing an inland 1 Market opportunities for moving They will also be looking at the port near Nottingham.
    [Show full text]
  • Advisory Visit River Trent, Stoke-On-Trent October 2014
    Advisory Visit River Trent, Stoke-on-Trent October 2014 Introduction This report is the output of a site visit undertaken by Tim Jacklin of the Wild Trout Trust (WTT) to the River Trent in Stoke on Trent on 17th October, 2014. Comments in this report are based on observations on the day of the site visit and discussions with Liz Horton and Nick Mott of Staffordshire Wildlife Trust (SWT) and subsequent discussion with (and addition of diagrams by) Paul Gaskell of WTT. SWT are the catchment hosts for the Staffordshire Trent Valley area under the government’s Catchment Based Approach to the Water Framework Directive (https://www.gov.uk/government/publications/catchment-based-approach- improving-the-quality-of-our-water-environment). This advisory visit focussed on areas of the urban River Trent where significant lengths of the river are in single ownership, for example the City Council. Normal convention is applied throughout the report with respect to bank identification, i.e. the banks are designated left hand bank (LHB) or right hand bank (RHB) whilst looking downstream. 1.0 Area Overview Stoke on Trent is located on the headwaters of the River Trent, the source of the river being a short distance north of the city on Biddulph Moor. The river flows south from its source, is impounded by Knypersley Reservoir, then enters the urban area at Norton Green and Milton. Tributaries within the city include Ford Green Brook (confluence at National Grid Reference SJ90404960), Fowlea Brook (confluence SJ88004500 approximately) and Lyme Brook (confluence SJ86504250). Other small tributaries include Causley Brook, Chitlings Brook, Adderley Green Brook, Bagnall Brook, Barnfield Brook, Scotia Brook, Longton Brook, and Longton Cockster Brook.
    [Show full text]
  • Chapter 2: Overview, Vision and Strategic Objectives
    Minerals Local Plan to 2030 CHAPTER 2: OVERVIEW, VISION AND STRATEGIC OBJECTIVES What you told us at the Issues and Options stage… Priority should be given to those sites with better transport links, in particular rail; Reclamation schemes which maximise biodiversity gains should be supported; Resources of specialist aggregates should be better protected; Reference should be made to the scope to improve public access to the rights of way network; Reference to archaeological remains should be expanded to include heritage assets; There should be a requirement for sites in Green Belt to be restored to the highest possible standards; Overview in Issues and Options document may be construed as assuming that there will be no future surface coal mining; The importance of Sherwood Sandstone should be recognised; It should be noted that Sand and Gravel extraction has changed the landscape in the Trent Valley and there should be more emphasis on the impacts of Sand and Gravel extraction; The impact of mineral workings on local communities should be recognised; The loss of agricultural land should be noted; The Portrait should acknowledge Nottinghamshire’s significant environmental assets; There should be a reference to the need for mineral working to be carried out in a sustainable manner; It is not considered that the protection of the environment is addressed significantly; It is inappropriate to suggest that minerals should be safeguarded if they are not listed; The use of secondary and recycled aggregates should be promoted; It should be acknowledged that restoration plans can include agriculture; The use of sustainable transport should be addressed.
    [Show full text]
  • 69: Trent Valley Washlands Area Profile: Supporting Documents
    National Character 69: Trent Valley Washlands Area profile: Supporting documents www.naturalengland.org.uk 1 National Character 69: Trent Valley Washlands Area profile: Supporting documents Introduction National Character Areas map As part of Natural England’s responsibilities as set out in the Natural Environment White Paper1, Biodiversity 20202 and the European Landscape Convention3, we are revising profiles for England’s 159 National Character Areas (NCAs). These are areas that share similar landscape characteristics, and which follow natural lines in the landscape rather than administrative boundaries, making them a good decision-making framework for the natural environment. NCA profiles are guidance documents which can help communities to inform their decision-making about the places that they live in and care for. The information they contain will support the planning of conservation initiatives at a landscape scale, inform the delivery of Nature Improvement Areas and encourage broader partnership working through Local Nature Partnerships. The profiles will also help to inform choices about how land is managed and can change. Each profile includes a description of the natural and cultural features that shape our landscapes, how the landscape has changed over time, the current key drivers for ongoing change, and a broad analysis of each area’s characteristics and ecosystem services. Statements of Environmental Opportunity (SEOs) are suggested, which draw on this integrated information. The SEOs offer guidance on the critical issues, which could help to achieve sustainable growth and a more secure environmental future. 1 The Natural Choice: Securing the Value of Nature, Defra NCA profiles are working documents which draw on current evidence and (2011; URL: www.official-documents.gov.uk/document/cm80/8082/8082.pdf) 2 knowledge.
    [Show full text]
  • Advisory Visit River Derwent, Cromford, Derbyshire August, 2012
    Advisory Visit River Derwent, Cromford, Derbyshire August, 2012 1.0 Introduction This report is the output of a site visit undertaken by Tim Jacklin of the Wild Trout Trust to the River Derwent, Cromford, Derbyshire on, 23rd August, 2012. Comments in this report are based on observations on the day of the site visit and discussions with John Pass, Head Bailiff for Cromford Fly Fishing Club. Normal convention is applied throughout the report with respect to bank identification, i.e. the banks are designated left hand bank (LHB) or right hand bank (RHB) whilst looking downstream. 2.0 Catchment / Fishery Overview The Derbyshire Derwent rises in the southern Pennines between Manchester and Sheffield and flows south to join the River Trent just south-east of Derby. The upper reaches of the river are impounded by Derwent, Howden and Ladybower reservoirs and hence the river flow is influenced by compensation flows and water releases. The geology of the catchment comprises the Millstone Grit and shales of the Dark Peak and carboniferous limestone in the White Peak where tributaries such as the Wye arise. The catchment is largely rural, with pastoral agriculture the predominant land use. The middle and lower river flows through towns such as Matlock, Cromford, Belper and Derby where pioneers of the Industrial Revolution such as Richard Arkwright harnessed the river’s energy to power mills, something recognised by the World Heritage Site status of the Derwent Valley. The mill weirs, combined with historical pollution in the Trent, led to the extinction from the Derwent of migratory fish species such as salmon and river lamprey.
    [Show full text]
  • Water Resources and Flood Risk Topic Paper April 2009 How the Sustainability Appraisal Framework Will Be 1 Used
    Contents 1 How the sustainability appraisal framework will be used 3 2 Purpose of this document 4 3 Stage A1: Identifying other relevant policies, plans and programmes 5 National 5 Regional 5 Local 5 Key Messages 5 4 Stage A2: Collecting baseline information 11 National Overview 11 Regional Overview 11 Derbyshire Dales & High Peak 12 5 Stage A3: Identifying sustainability issues and problems 26 6 Stage A4: Developing the Sustainable Appraisal Framework 27 Sustainable development objectives 27 Indicators and monitoring data 29 Water Resources and Flood Risk Topic Paper April 2009 How the sustainability appraisal framework will be 1 used 1.1 The purpose of a Sustainability Appraisal is to appraise the social, environmental and economic effects of the proposed strategy and policy options of the Core Strategy. This must be done at the beginning to ensure that Derbyshire Dales District Council and High Peak Borough Council can make informed decisions that accord with sustainable development. 1.2 Sustainability objectives are used to test and ask questions for each strategy and policy option considered in the Core Strategy. The Sustainability Appraisal process has a number of set stages that must be followed, but can be reconsidered when new information is collected. 1.3 The development of the Sustainability Appraisal for the Derbyshire Dales and High Peak Core Strategy will follow guidance as set out in “Sustainability Appraisal of Regional Spatial Strategies and Local development Documents (2005)” published by the Department of Communities and Local Government. 1.4 This topic paper follows Stage A (Pre Production – Evidence Gathering) of the guidance which is undertaken during the pre-production stage of the joint Core Strategy.
    [Show full text]
  • 1947 UK River Floods
    1947 U.K. River Floods: 60-Year Retrospective RMS Special Report I NTRODUCTION In the second half of March 1947, the most catastrophic river floods for at least 200 years occurred in the United Kingdom. The flooding, which inundated nearly all the main rivers in the South, Midlands, and the Northeast of England, was notable for its origins, regional extent, and duration. Impacting thirty out of forty English counties over a two week period, around 700,000 acres of land were underwater. Tens of thousands of people were temporarily displaced from their homes, and thousands of acres of crops were lost. The flooding was triggered by the rapid thaw of deep snow that covered much of the country after one of the coldest and snowiest winters on record. The thaw was triggered by the arrival of a succession of southwesterly depressions, each bringing significant additional rainfall. During this period, flooding was not only widespread in the U.K., but also extended across Europe. In Spain, Germany, Poland and the Czech Republic, rivers across the continent burst their banks as meltwater and heavy rainfall combined. As the event occurred before the era of flood insurance, and in the immediate aftermath of the Second World War to a backdrop of rationing and significant post-war deprivation, the overall economic impact of the catastrophe was not fully assessed at the time as impacts were considered local rather than national. Sixty years after the event, this retrospective reviews the events of March 1947 and assesses the economic and insurance costs that would be associated with a repeat of the same event in 2007.
    [Show full text]
  • Anchor Church Walk Overlooking Black Pool, Are 4 Interconnected Caves Known As Anchor Church, Mentioned As Long Ago As 1648
    Anchor_A3 7/6/04 12:36 PM Page 1 Set in a sandstone crag more than 100m long and 12m in height Anchor Church Walk overlooking Black Pool, are 4 interconnected caves known as Anchor Church, mentioned as long ago as 1648. The outcrop once formed the southern bank of the River Trent and the caves were partly formed by the This walk commences in the village of INGLEBY which is approached from Repton on the B5008 or Swarkestone action of river water on the soft rock, and partly cut out by hand. One legend on the A514. You should park in the far corner of the John Thompson Inn & Brewery car park, or a safe spot says St. Hardulph used to live and pray here around the 6-7th Century. It on the road. was to isolated places such as these that the early Christians sought refuge The walk is approximately 4.5 miles long (7.2km) and takes a leisurely 21/2 hours*. to worship God whilst avoiding persecution. Little more is known of him, but For a more detailed map you are recommended to refer to Ordnance Survey Explorer™ 245: The National Forest. the landmark church at nearby Breedon-on-the-Hill shares his name. [*Note: after prolonged rain the path beyond Anchor Church can be impassable. The alternative route below Another ancient legend tells of Sir Hugo de Burdett returning from the Crusades and involves retracing your steps and is therefore longer at 5.4 miles (8.6km) and takes 3 hours]. being tricked into believing his wife Johanne had been unfaithful, then killing her without asking for an explanation and cutting off her left hand which bore his wedding ring.
    [Show full text]
  • Flood Contingency Plan
    Local Resilience Forum Flood Contingency Plan Version 2.0 March 2018 Flood Contingency Plan Contents Page Contents i Document control ii 1 Background information 1 1.1 Introduction 1 1.2 Causes of flooding 2 1.3 Legislation 3 1.4 The context of flooding in Derbyshire and Derby City 4 1.5 Overview of the flood risks in Derbyshire and Derby City 5 1.6 Aims and objectives 6 1.7 Other related plans 6 2 Roles and responsibilities of responding agencies 8 3 Plan activation and response 20 3.1 Activation of the flood response 20 3.2 Response of selected agencies to flood alerts and flood warnings 25 3.3 Mutual aid arrangements 27 3.4 Evacuation and shelter arrangements 28 3.5 Traffic management 29 3.6 Recovery arrangements 29 4 Command and co-ordination arrangements 34 4.1 Airwave inter-agency communication 34 Appendix A - Action sheets A1 Police A1 Fire & Rescue Service A5 Ambulance Service A7 Derbyshire County Council Emergency Planning Division A10 Appendix B - Contacts B1 Appendix C - Flood and weather warning services C1 Appendix D - Specialist resources D1 Appendix E - Working near water, health and safety advice and E1 information Appendix F - Environmental considerations F1 Glossary Lexicon Version 2.0 March 2018 i Flood Contingency Plan Document control This plan has been produced by Derbyshire County Council’s Emergency Planning Division on behalf of the Derbyshire Local Resilience Forum. The plan is subject to periodic review; however partners should inform the author of any material changes within their respective organisations which may require the issue of an interim amendment.
    [Show full text]