Item 5 REPORTonctMai Meeting Date: August 28, 2018 General Plan Element: Character and Design General Plan Goal: Determine the appropriateness of all development in terms of community goals, surrounding area character, and the specific context of the surrounding neighborhood. ACTION Sereno Phase 4 16-PP-2017

Request to consider the following:

1. Approval of a final plat for a new residential subdivision, for the 129-acre Phase 4 development of the Sereno Canyon Community Plan, including the final plat and improvement plans.

Goal/Purpose of Request The applicant's request is to receive approval of a final plat to establish a residential and resort community. The site has had three cases approved that entitled the entire subject 350-acre site to ultimately achieve a combination of single-family, townhome lots, and a resort/spa development. The proposed final plat will establish the four (4) phases of the resort/spa development.

Key Items for Consideration • The Dynamite Foothills Character Area Plan • Approved General Plan Amendment Case lO-GP-2011 • Approved Zoning Cases l-ZN-2005#2 and 16-ZN-2011 • Approved Preliminary Plat (Development Review Board June 21, 2018) • Final Plat in association with abandonment Case 4-AB-2018 • Final Plat in association with Development Review Board Case 51-DR-2017 • No public input received regarding the proposed preliminary plat

LOCATION Northwest corner of East Pinnacle Peak Road and North 128*'^ Street

OWNER r' H ^.VfALLEYRD 0) McDowell Mountain Back Bowl, LLC Q Z 630-851-5490 CM & -CO— APPLICANT CONTACT 11^ SITE Jeff Denzak -1 Swaback Partners, LLC 5-E PINNACEBPEAK RD 480-367-2100 EPARAISODR

Action Taken General Location Map Q City Council Report | Case No. 16-PP-2017

BACKGROUND General Plan The General Plan Land Use Element describes the Resort/Tourism land use designation as accommodating for a variety of hotel and resort uses that can be freestanding or part of a resort community or master-planned development.

Character Area Plan The General Plan establishes Character Area Planning as a means of ensuring that the quality of development and consistency of character drive the Scottsdale General Plan within the context of community-wide goals. The property is located within the Dynamite Foothills Character Area boundary. Dynamite Foothills Character Area is designed to preserve the natural and visual qualities of the Sonoran Desert by using design qualities, building materials, and construction techniques that are sensitive to the desert environment. Projects located within the Dynamite Foothills Character Area should preserve natural open space areas, scenic and vista corridors, and support trail links and connections. Zoning This portion of the Sereno Canyon Resort and Spa project site is zoned Resort/Townhouse Residential, Environmentally Sensitive Lands (R-4R ESL) zoning. City Council approved a General Plan and Zoning District Map Amendment to include the existing zoning district in December 2012.

Surrounding properties, also located within the Sereno Canyon project area, are zoned with two additional zoning districts: 132 acres of the Resort/Townhouse Residential District, Environmentally Sensitive Lands (R-4R/ESL) zoning district, 95 acres of the Single-family Residential Districts, Environmentally Sensitive Lands (R1-43/ESL) zoning district, and 123 acres of the Single-family Residential District, Environmentally Sensitive Lands (R1-130/ESL) zoning district. The Sereno Canyon subdivision is located at the northwest corner of the East Pinnacle Peak Road and North 128‘^ Street, with the entire site stretching from East Pinnacle Peak Road, northward, to East Ranchgate Road.

The McDowell Sonoran Preserve is located immediately adjacent to the site's southern boundary. The McDowell Sonoran Preserve is zoned with the Single-family Residential District, Environmentally Sensitive Lands (R1-130/ESL) zoning district. Context Located at the northwest corner of the East Pinnacle Peak Road and North 128*’’ Street, the site stretches from East Pinnacle Peak, north, to East Ranchgate Road. The existing subdivision has a portion of the site adjacent to North 128‘*’ Street, and North 122"'* Street as its western boundary.

Please refer to context graphics attached.

Page 2 of 9 City Council Report | Case No. 16-PP-2017

Adjacent Uses and Zoning • North: Single-family Residential, Environmentally Sensitive Lands, zoned R1-130/ESL; Sereno Canyon Phase II subdivision. • South: Single-family Residential, Environmentally Sensitive Lands, zoned R1-130/ESL; McDowell Sonoran Preserve. • East: Single-family Residential, Environmentally Sensitive Lands, zoned R1-130/ESL; vacant lands. • West: Single-family Residential, Environmentally Sensitive Lands, zoned R1-130/ESL; Sereno Canyon Phase II subdivision

Other Related Policies, References: 36-ZN-1984, 113-ZN-1984, ll-TA-2000#3, l-ZN-2005, 22-PP-2005, 2-PP-2008, 2-PP-2008#2, l-ZN-2005#2, lO-GP-2011, 16-ZN-2011, 51-DR-2017, and 4-AB-2018

1999 Dynamite Foothills Character Area Plan 2001 City of Scottsdale General Plan 2003 Scenic Corridor Design Guidelines 2004 Trails Master Plan 2004 Environmentally Sensitive Lands Ordinance 2014 Transportation Master Plan

APPLICANT'S PROPOSAL Development Information This development proposal includes creating four (4) parcels (phases) for the future development of the Sereno Canyon Resort/Spa community. The phasing of the subject site was approved by the Development Review Board on June 21, 2018. The phases will help plan the development of the overall site. Each phase of the project will be brought back for final approval by the City Council. The final resort/spa development will eventually include 296 units in a variety of dwelling types and products. Previously approved General Plan amendment and zoning district map amendment cases have allowed an increase in density and intensity, and a decrease in the overall NAOS requirement. The approvals allowed 397 units on the 350-acre site to achieve combination of estate lots and a resort/spa development (44 original estate lots, 54 resort villas, and 299 key units). The entire Sereno Canyon Resort and Spa project proposes various types of resort-style living units to meet the differing demands of consumers of resort-style units. This portion of the Sereno Canyon Resort and Spa project was identified to have the 299 units (key, villas, townhomes, and the resort amenity).

The site received approval for a low density, master planned resort community, complete with residential and guest services on the site. Surrounding the resort core of the site will be dual unit attached product types known as "resort casitas" and "townhomes" which allow the option of private ownership, further surrounded by smaller single-family detached units known as "resort villas" that also allow private ownership; all of which to be surrounded by the "resort estate" product type, which is already entitled and adjacent to the surrounding rural neighborhoods.

Page 3 of 9 City Council Report | Case No. 16-PP-2017

The resort guest villas and casitas were identified to be in the central portion of the site and the main resort/spa building will be located at the southeast portion of the site. The main resort/spa building was identified as the front desk, dining room, and service amenity functions.

Development Information Table

Standard Rl-130/ Approved Rl-43 ESL, Proposed Request ESL on 350 acres R1-130/ESL, and R4-R ESL on 350 acres

Zoning per 350 acres of 123 acres of R4-R ESL on 132 acres Acre R1-130/ESL R1-130/ESL; 95 acres of R1-43/ESL; 132 acres of R4-R/ESL

Density 108 units 44 units remaining on Rl- 122 units on 330 acres; 130/ESL (.35 du/ac); 6 units on 20 acres 54 units on Rl-43 (.56 128 total units du/ac); 299 units on R4-R (2.2 du/acre) 2.2 du/ac this phase .31 du/ac total 1.1 du/ac total 1.1 du/acre overall site

NAOS 139 acres on 330 81 acres on remaining Rl- 205 acres on 330 acres of acres of Rl-130; 130; Rl-130; 8 acres on 20 acres 39 acres on the Rl-43 ESL; 8 acres on 20 acres 56 acres on the R-4R/ESL 53.9 acres 147 acres total 176 acres total 176.7 acres total

IMPACT ANALYSIS

Plat The proposed subdivision has been designed to meet all applicable city requirements, including access and utility service. The final phase of the project will contain approximately 263 parcels and several tracts. Two of the proposed lots, lots "181" and "182," will contain the main "Mountain House Lodge" building and resort cottages; and therefore, will contain more than one dwelling unit/keyed unit. The other 261 parcels will contain only one dwelling unit per lot. This will allow the project to maintain the variety of dwelling types and products described in the previously approved General Plan and Zoning District Map Amendment cases.

Page 4 of 9 City Council Report | Case No. 16-PP-2017

The final plat identifies dedicating a 100-foot-wide Scenic Corridor Easement along the North 128‘*’ street frontage of the site. The final plat will complete the vehicular connection through the site from East Ranch Gate Road to North 128'^ Street. An entry gate house currently exists at the East Ranch Gate Road entrance and will provide an additional entry gate house on the North 128*'’ Street entrance, just outside of the 100-foot-wide Scenic Corridor Easement. The proposed plat will update the required public utility easement locations. There are existing public utility easements that will be released in conjunction with the associated abandonment request (4-AB-2018). Public utilities have been notified of the applicant's proposed associated abandonment request and have indicated that there are no conflicts with the proposed abandonment, and support the abandonment, with the approval and recordation of the preliminary plat. A public utility easement will be retained over the street system that will be dedicated as shown on the preliminary plat. The request includes cuts and fills that are significantly greater than the 8 feet allowed to be approved administratively by the zoning ordinance. The "Cuts and Fills" exhibit identifies cuts up to 26 feet and fills of up to 16 feet. Proposed cuts and fills are required to maintain the proposed structures under the stipulated 24-foot maximum height above natural grade. The applicant has provided a nineteen-foot and six-inch- tall product type with the associated Development Review Board application (51-DR-2017). The applicant has contemplated submitting an application to amend the height requirement to that allowed by ordinance for the underlining zoning district (30- foot maximum height allowed). Transportation/Trails Access to the development is currently provided, and will always be provided, by two entrances; East Ranch Gate Road and North 128*'’ Street. Currently the site has access from East Alameda Road, to the west, and East Ranch Gate Road to the north, through private streets within the Sereno Canyon subdivision. The proposed phasing plat identifies the existing right-of-way easement that shall be dedicated as fee simple right-of-way to complete this portion of the street system. All internal-street improvements have been reviewed, permitted, and completed. The owner has, since the previous plat approval, improved East Ranch Gate Road from the existing gatehouse, located in the north-central portion of the site, to North 128*'’ Street.

Access to the proposed development will continue to be provided from East Alameda Road, to the west, and East Ranch Gate Road to the north, through private streets, until such time that North 128*'’ Street (Minor Collector street) to the east is constructed to a minimum 24-foot-wide paved standard. In the meantime, the resort/spa is proposed to be accessed from the existing East Ranchgate Road entrance by 125*'’ Street (private). The applicant has been requested by some area residents to close the Alameda Road entrance, restricting its use to emergency vehicles only.

The project is planned as having integrated trails and open space areas to complement the Tom's Thumb Trailhead within the McDowell Sonoran Preserve by providing a streetscape with an enhanced scenic corridor setback along North 128*'’ Street.

As stated before, this request is in conjunction with Abandonment Case 4-AB-2018 and Development Review Board Case 51-DR-2017. The associated abandonment will allow the project site, as shown in Attachments #4, to be implemented. The Applicant has already dedicated, and will

Page 5 of 9 City Council Report | Case No. 16-PP-2017 further dedicate, a private street system and all required public utility easements and public- nonmotorized access easements in accordance with the proposed preliminary plat. The site for the proposed abandonment is in the south-central portion of this request area and has been stipulated to be recorded with the final plat for this case. Water/Sewer The Water Resources Department has reviewed the applications and finds that there are adequate water and wastewater services for the proposed use.

Public Safety The Public Safety Department has reviewed the application and finds that there is adequate ability to provide fire and police services for the proposed use. Overall, emergency and non-emergency activities in Scottsdale are continually monitored and tracked to evaluate the effectiveness of our service delivery and to identify any potential for future public safety resource needs for the community. A 24-foot-wide Emergency and Service Vehicle Access easement has been provided over all proposed drive aisles for municipal uses to provide internal circulation and accommodations for a 55-foot turning radius for fire truck access and maneuverability, as well as all Fire Ordinance requirements.

All existing emergency and municipal access will be provided to the properties surrounding the abandonment area and maintained through existing dedicated public right-of-way from the East Ranchgate Road, East Alameda Road, and North 128**’ Street entrances. No impacts are anticipated.

Open Space/NAOS The previously approved General Plan amendment case (lO-GP-2011), and zoning district map amendment cases (l-ZN-2005#2 and 16-ZN-2011), identified a total of 176 acres of NAOS to be dedicated by the four phases of the Sereno Canyon final plat. These same cases identified fifty-six acres of NAOS being dedicated with Phase 4. This Phase 4 proposal identifies 53.9 acres of NAOS being dedicated within the Phase 4 boundary. The overall NAOS dedicated by all four phases will now total at 176.7 acres of NAOS (three quarters of an acre more than stipulated).

The original cases included the area, that would later be dedicated as right-of-way, as part of the R4-R area acreage. Now that the right-of-way (located along the N. 128*^ Street frontage) is being dedicated, the total acreage of the R4-R area has decreased, also decreasing the area in which NAOS could be dedicated. Therefore, the applicant redistributed the NAOS over the entire site without increasing the number of units allowed (in fact decreasing the total number of lots by three). As stated before, the overall NAOS dedicated by all four phases will now total at 176.7 acres of NAOS, versus the originally stipulated 176 acres.

Page 6 of 9 City Council Report | Case No. 16-PP-2017

Community Involvement The applicant distributed a notification to property owners within 750 feet of the proposed subdivision site. City staff has not received any comments with regards to this case.

Policy Implications This final plat is consistent in density previously approved in the zoning district map amendment case. All stipulations and ordinance requirements have been addressed. Approval of this request will enable the final plat to be recorded, establishing the lots.

OTHER BOARDS & COMMISSIONS Development Review Board Development Review Board heard this case as a preliminary plat request on June 21, 2018 and recommended approval with a 6-0 vote. The case was requested to be presented before the Development Review Board to give the Board members an opportunity to review the cuts and fills on the site. The board-member that requested the presentation commented that they were in support of the cuts and fills, but that they thought the significance of the cuts and fills warranted a discussion. A separate board-member complimented the design of the site.

Staff Recommendation to Development Review Board Staff recommended that the Development Review Board approve the preliminary plat for a new resort and residential subdivision, comprised of 296 lots and several tracts, including: the NAOS plan, the landscape plan, and cuts and fills plan, all on a 132-acre site, per the attached stipulations, finding that the provisions of the General Plan Rural Neighborhoods policies and goals, and the Development Review Criteria, have been met.

STAFF RECOMMENDATION Recommended Approach: Staff recommends that the City Council approve the Sereno Canyon Phase 4 final plat.

RESPONSIBLE DEPARTMENT

Planning and Development Services Planning Services

STAFF CONTACT Jesus Murillo Senior Planner 480-312-7849 E-mail: [email protected]

Page 7 of 9 City Council Report | Case No. 16-PP-2017

APPROVED BY

urillo. Report Author Date

Tim Curtis, Ar(jFyCurrent Planning Director Date H 480-312-4210, [email protected]

Mid20(6 Randy Grant,rant. Director Date Planning and Development Services 480-312-2664, [email protected]

Page 8 of 9 City Council Report | Case No. 16-PP-2017

ATTACHMENTS

1. Context Aerial lA. Aerial Close-Up 2. Zoning Map 3. Applicant's Narrative 4. DRB Approved Preliminary Plat 5. Final Plat 6. DRB Approved Natural Area Open Space Plan 7. DRB Approved Scenic Corridor Plan 8. DRB Approved Vehicular and Pedestrian Circulation and Trails Plan 9. DRB Approved Phasing Plan 10. Development Review Board meeting minutes

Page Oof 9 ssU :'S^«gSi^^5 ' -: Iv--;- ■ ■: :S: ^3!S3c&^3S^ ,m&m?r..s:^-^-^^&mmamMmm

»««

MliU^:^ e: Alameda Rood ^

li: ^iPilli«»iKI

~E. Pinnacle Peak Road^,Jp &w'pmtMM& Kinqi^ramiivjR^id^tic:ra*»i irVirontaliyjse' siti' i;pi)» mmmm Q.S. SMMmm

45-28 Google Earth Pro Ir

Sereno Canyon Phase 4 AnACHMENT #1 16-PP-2017 'mm- i«

Wm iSi*

‘m

mm mm'€^W'

^ Z '; —-^w»---^-..isae*-^aL.jrr*^:A» j:.aR^SmzP'i . ..^S3?K3i Cjesa^i.'. wm-.

msm^xmstsg lEl Sereno Canyon Phase 4 AnACHMENT#lA 16-PP-2017 mm mm Rl-43 ESL ,E. Alamed^Road R1-70ESL IMS v,;'D Tm

■?'>'. ■' - ’mmrnmsmm Rr-35^ESU mmMmm fo1rf,m N Jail '^mw EKTiafaiEs^

^Miiwii ■ T®Tj»

b»>. -•»-*>4V------mam. mmm. TCD ESL R1 -130 ESL SifS® E.i Pinnacle Peak Road wmmMm ppiiii*!mmJ lii Q.S. s®Msi 45-28 2016 GIS Orthophoto

Sereno Canyon Phase 4 AnACHMENT #2 16-PP-2017 ^giSWABACK Architects + Planners %// brothers

Sereno Canyon Phase 4 Resort Club Pre-Plat

Updated Narrative - 2"‘‘ Submittal 05.07,18

Program. Operation and Management

Introduction The Resort Club at Sereno Canyon (Phase 4 of the Sereno Canyon Community Plan) consists of 129 acres at the southern end of the property and will include 296 units. This "vacation home series" will include a range of designs including:

• 4 Estate Vacation homes • 90 Resort Townhomes • 129 Resort Villas • 44 Resort Paired Villas • 29 Lodge Cottages

The accompanying Resort Club Site Plan articulates the overall layout for this portion of Sereno Canyon. The vacation homes have been organized in a series of small enclaves that maximize the connection to the Sonoran Desert as well as provide stunning views in every direction. Significant areas of natural open space and rock outcroppings have been incorporated throughout the plan. The enclaves of housing units have been carefully situated around the resort's central amenity feature and include trail connections for convenient walking access. The new Resort Club Gatehouse is planned along 1128**’ Street.

Overview The central feature of the Resort Club, the "Resort Core", will include the impressive Mountain House Lodge, 44 resort paired villas and up to 29 lodge cottages (initial phase shall include 6 to 12 units- future cottage implementation to be based on demand and economic/ market success). "The Mountain House Lodge" (minimum of 9,000 sf (conditioned) complex) is envisioned as the community's iconic club facility with a resort lifestyle, luxury-level operation and a range of amenities expected to serve up to 397 homes in the Sereno Canyon community. The 268 Resort Club vacation oriented residences may be offered for overnight guest rentals as part of the Lodge experience as well as overnight rentals associated with the 29 lodge cottages. With its stunning location and back-drop along the McDowell Mountain Preserve, this exclusive private resort community will provide a unique setting and environment designed to serve overnight guests, resident members, outside members and guests of members.

In addition, the Resort Core will include; 2 swimming pools, fitness pavilion, spa, cafe and a series of beautiful outdoor terraces and patios that make the Mountain House Lodge feel more like a grand desert mountain estate. The carefully crafted indoor/ outdoor spaces will be engaged with spectacular, one-of-a-kind views in every direction. The club building's desert contemporary forms, colors and materials will complement the majestic mountains and will be accentuated with broad roof overhangs that provide shade for comfort and help to frame special vistas. Toll Brothers is also interested in coordinating with the Preserve Conservancy to explore opportunities for "glamping" and other unique resort experiences directly adjacent to the Lodge.

7550 E McDonald Drive • Scottsdale, Arizona 85250 • O 480.367.2100 info@swabacl<.com • www.swaback.com ATTACHMENT 3 Program The building program has been strategically organized to provide resident members and Lodge guests with the expected amenities of a high-end resort style desert community. The entry club room welcomes residents with dramatic views and a setting for comfortable gathering and social events. The state of the art fitness facility and spa provides a focus on health and wellness. The conference room/multi-purpose space provides the opportunity for special events and programs. In addition; the outdoor pools, lawns, yoga pavilion, barbecue terrace and series of desert botanical gardens will provide residents and guests with a beautiful mountain side focal amenity.

Members will be made up of residents of Sereno Canyon and certain adjacent property owners (specific to property owners who entered into agreements with the current owner of the development) who elect to join the club subject to an initiation fee and monthly dues, with membership working much like the club memberships offered by the Four Seasons, the Ritz Carlton, and the JW Marriott.

Office and management space has been incorporated into the overall Lodge building program. The entry club room includes a reception desk and alcove for the resort/ Lifestyle Director. On-site management staff will handle day-to-day operation and associated duties for the Mountain House Lodge and associated hospitality functions including but hot limited to; check-in and check-out of overnight guests, housekeeping, laundry and accounting services. Toll will explore the most appropriate arrangement for the management of the Lodge based on future discussions with potential consultants. Considerations include Troon Management (who manages the Resort Fractional Ownership Community-The Rocks Luxury Club), as well as Toll Golf (a division of Toll Brothers) which manages hospitality and high-end club facilities such as Snowmass in Colorado which includes a luxury spa, restaurant, specialty retail and championship golf course.

Spa appointments, fitness training and or yoga/fitness classes will be made in advance and coordinated with designated therapists and instructors (vendors) who will provide as needed services based on request. Based on demand and interest, we envision health and wellness programs will grow over time and become a significant component of the Lodge experience.

Resort Operations, Fees and Taxes Rates for the Lodge Cottages will be established based on specific industry related economic and market factors (supply and demand). For the remaining resort vacation oriented homes, overnight rates shall be determined by the individual unit owners based on parameters established and agreed upon within the community's CC&Rs. Owners will not be required to offer their unit for nightly rental, but they may elect to offer their units through online travel "sites", (e.g. Airbnb, VRBO, etc.). The Lodge management office will also be available to assist unit owners with the reservation process as well as all related concierge oriented services expected from a high-end boutique resort (check-in/ check-out/ unit preparation/ dining reservations/ travel and site seeing assistance/ recreation & golf reservations/ grocery services/ etc.). Units booked through any online travel sites will be handled by the resort management staff in order to ensure continuity and the highest level of service; for such units, payments of fees and taxes shall be the responsibility of the unit owner and/or the online travel site, depending on applicable law. Only actualized overnight guest stays will be tied to hotel taxation requirements, and otherwise the units will be taxed solely as typical residences.

2 1 1’ a g e Special Uses In addition to the core program for residents and guests, the Mountain House Lodge also includes a special dining component. The program inciudes a sophisticated kitchen with pizza oven, multipie bars, severai dining areas and a chef's table for special event dining as well as demo kitchen for cooking classes. Toll Brothers is currently working with Chef Tony Rea (previous head chef at the Boulders Resort) of "Creations in Cuisine" on the design and theme of the dining experience. Initially, the kitchen may be outfitted for light food preparation with the ability in the future to fit-out for a full-service kitchen (and associated equipment) based on economic demand factors (the kitchen area may also accommodate catering for special events). A simple but thoughtful menu will focus on healthy eating within a social atmosphere that celebrates the very best aspects of the desert setting. Additional staffing will be provided for food and beverage management, food preparation and food service. Laundry, maintenance, and miscellaneous services will be contracted with a yet to be identified vendor.

Lodge Phasing The Mountain House Lodge will be designed with multiple phases in mind based on economic conditions, the associated business model and realized demand. The intent is to build the Lodge all at once. The overall conceptual phasing strategy for the Resort Club is illustrated in the accompanying exhibits.

Overarching Design Concepts Associated with the Preliminary Plat

Ordinances, Master Plans, General Plan and Standards The overall design and theme of the proposed development is consistent with the natural setting of this specific area of the City, the ESLO and the scenic corridor designation along the 128*'' Street Right of Way. The land planning, site design and associated range of architectural components embrace the City's expectations for a very high-end desert centric resort community environment. All these project development components have been carefully orchestrated within the context of City policies, procedures, applicable design standards, plans and guidelines.

Architectural Character, Landscaping and Site Design The plan is organized in such a manner to promote desirable relationships between indoor and outdoor living. Building locations, open space opportunities and pedestrian connectivity will reinforce the beautiful desert setting.

The plan layout, organized around a series of small enclaves, along with the accompanying range of vacation home designs (all inspired by the design of the Mountain House Lodge) will ensure a vibrant and diverse palette of desert contemporary architecture.

The City's Sensitive Design Principles associated with desert environment have been at the forefront of both the site layout as well as the architectural design. Views, predominant breezes, solar orientation, topography and natural desert landscape have all been carefully considered relative to all aspects of the design. These incorporated design aspects relate directly to the City's Environmentally Sensitive Lands Overlay- with the singular purpose of "Conserving the character of the natural desert". The land planning and associated site design is complemented by unique architectural plans and elevations that move away from typical stylistic templates to ones that are oriented to contextual and authentic desert contemporary character.

3 1 P a g e Ingress, Egress, On-Site Circulation, Parking and Pedestrians The overall circulation plan has been carefully organized to ensure a safe, functional and attractive environment. The series of vacation home neighborhood enclaves have been located in close proximity to the Mountain House Lodge for convenient access. An internal trail and walkway system will provide convenient access. The Mountain House Lodge also includes a surface parking lots to accommodate Cottage guests' vehicles as well as those who might drive to the Lodge from the enclave neighborhoods. The plan also calls for a guard gates entry to the community to help direct resort guests to their destination.

Mechanical and Utility Equipment Because of the very special nature of the resort community project and desert setting, great care will be taken to screen and buffer all associated mechanical equipment, appurtenances and utilities. This will be accomplished through strategic locations that limit visual Impact, the incorporation of screen walls, architecturally designed gates where necessary, earth berms and landscape buffers.

4 I P a g e PRELIMINARY PLAT RANCH CATE RO. (AUGNUENI) SITE DATA rjws 4RU iCBts NO «u ijan ««s rwinc low t-ta/ta. SERENO CANYON PHASE 4 wxosg IWOUO ?OK»C WCKMZO loi cam. tsurt vK>7w »o«s s A REPLAT OF PORTIONS OF SERENO CANYON PHASE 2 AND 3 OF BOOK 974, PAGES 40 & 41 iQoa coHAas m RtSCHI via»$ i?9 AND PARCEL 1 AND PORTIONS OF PARCEL 2 OF GOLDIE BROWN PINNACLE PEAK RANCH UNIT 1 HC4QBI P«CD AWS <• BfMBT ltr*W

roH nuuiic Acctss iHamro cuCRctNCr scwcc rivc vtwcirs um pubuc iiitiit/fs »atss i«ii« Bin wi umo lo cus. accTwc, ieuphc ,C rurvsiCW. DSTiNiCE. WTH, SiNiTAW SP*fB

SIHtniOlIS, SCNS, 1>NDSCAP[, t A KTf swiol/ PW-cunioN scNsoR wa ac pRWCCO ai au. c conLOTAIirwS7ik;or PIR. fRt OTONAna A78S-M16.I, cnstKC WAtcB iNO rjniiNts roi us£d shail Et aoakwncd ai

SlANfWiDi 6. A^L ACOSSOE 'Aoimcs s 7. sconscMt.VCHIICN tlfWS CHfAIEB rw ?r Bf»B< HI««A;L IHSHaAllON. A OA’CB «u nan mopcbiv Id me iin siiiijH AS ippucAac lo me

PINNACLE PEAK RD. (ALIGNMENT)

OWNER RECORD OF REFERENCE HAPenMLZ.

PHO* 6»-e51-4490

I'A^uEiii srem i-ci TRACT 'N- 707 cctiiuAcir» 10 gsn COUPACTIEU At SUBWAIS 70i aroiHIBi IHC B767 C. UA DE WITURA. SUIT 390 St«B IJNt SunSAlt a7 857N A. LOCAL RESIDENTIAL STREET PHCNE: 400-314-67)1 5 C04TACT; OSCAR OamCUQ COiTACr nAD X ENGINEER sS $ PHflWX. m ec

raCcT MI 10 SCAU I70TH susn flKO aw S * 1. IP TRACT ■/ TRACT TABLE 9.6JIJ9* NAver U DATUM 4«.{srl USE IBACI ria AREA1037 (AC) LEGEND_ BASIS OF BEARING I=saUAIO 1.41 PHVAIE SlItET. HSfX., P.U.t. C.SV.A.L IBACI r 117,790 139 ruvAiE sinai. Ns.rx., p.ux., e.s.v.ac, LOT UNE 01R6 AW GunDI PROXCTTOL17024)flO NO. tw.ci c BJ.I67 1.91 D.E.. P.N.M.Ai, wsrx., OPEN SPACE EXStKG CUB9 AtO CUTTEH IBACI >1 70.379 1.61 D.£.. CPEN S>Aa FRCN1 SIBAO WCPQSCO BATDi UNE LOADED 17' TO IBACI 1 397,697 1177 D.E., OPEN SPAa '-riKMT SCTBAO pROPoan sDCR une IT" TO raWT mACi j 47,987 1.10 P.K.U.AX,, CPEN SPACI. D.[, SD l-AItR U4E BY OIMERS LOADED CARAa (70* U» mVE«AY] r TO UVAU STACe UTILITY PROVIDERS IBACI B 44Q.I37 1010 D.C., CFEN SPACE OSED SDCB UNE BY OTHERS P.N.I7.A.C-, P-Ui.. DE- SUMC CCRRWfl, CPEN giACt || ESSONG nAin! UHC IBACI L 99,ISO 7.78 O.E.. CPEH SPAfl |j e's -...... -cesnNc sewr utc IBACI U 77S801 ws.f.c., P.NMA.C., OPCY SPACE. D.E., SONIC CCRROOl, P UX. |j SANITARY SKR MANHOU IBACI II 38.787 16D88 66 SMIARY snCB am CBVcnw P.H.iJ.Ai, OPEN SPAa. D.E. I ARo»A peaK SRvia (aps) IBACI 0 1.600 004 •fTsiq ... .. nasniC cwrciK (s-rr) in siAnCK ll rvACimiAi i;ri 7.9118*3 .. -ojsnwc ewTo* (i-rr) ntC HTDRART ASEM9LY 66 94 rmCAL^T HSBUTY IRlANQi BOO OUIOOTtS RESORT RESORT RESORT RESORT RESORT ESTATE TOWNHOMES TOWNHOMES TOWNHOMES VACATION HOMES PAIREDLSt)C VILLASMl PAIREDIMM VILLASMA Ml lOTM sM uu

UM la 4M 177 1440 7W II7IU m 101 n 3i§:l S«7I IW TOO TO US iti lauu WXOSg SCRENO CA«Y» »)BA SM 147 4070 TO <717 7B tIHTt V} J-wgg sereno canyon K* U« 140 404 UO 4714 U3 7UU ^ ^ s ™^j-roN ■■:;4 \ sa iiu 140 4on HI MM W f>4M \- ■ SERENQ CaH 711 >00 Wl ■04 4fH RITA. 4HA04 n urn DII. '• l PM IV 1 11 t»t 1)1 iiu IB W> ■• ' 'o\w7eh'””' ‘ '' "' »J VM 117 4«S l« D ill sw •V.'.' ■ ,V UCOOVVCLL UT>J l« WO iU 4IU If? •4S0 rr , ___ Vi wo IM 404 la uso :aWENO CANYON ....1 M m IU 401 HO »ti UIT OWULK: «u;uwu.L SERCNQ CANYOt^ m;m qacv bom. llc APN;J|7-0I'II0 PHASE I M tTM ■u 4M IB 4H7 270 IM 8M <04 •U4 OWES: UCOOMLL tw - BACK BOM UC Ul MO W» ■B 0314 171 «t» IB )UI m on; ■ M m iU< TO 407 If? M4> B* wo TO 407 100 OU m wo 174 403 10 4B1 o» «PU TO «a MB nr UH TO m 7R«» 71U34 ilii ai in t» IIK

APN;: 1-I6f 73) IIM WO ni-«i, / I r —Ml - lOM RESORT VILLAS ...... ~MMM..u.i. . APN;Jl7-OI-16i \V'v RESORT VILLAS RESORT VILLAS LSIW Ml MA OViNCH: UCDO'AtLL Toa UTW. LOTM MA BACK aOM UC .1.; '. OMICR: UCOOMLL U-;N » U1 U3 B US U3 0U4 X, .'.'i-'-AJTN BACK DOM LLC • -'• » IB 70B i«ni 4SJI7 M an la 7KB IU 0373 J1 SI4 in MB 144 U73 a ■DC 103 r4] TO Ou> a 7010 7«a 147 OUT Im JO 03 «<104 033 TO U77 B44 SENCNO CANYON s OBf IB tal TO 07 D77 107 BV ■M 7130 0a 117 UM •OB a OHO IU om » un 7U •414 a m >14 10040 » liJ TRACT If 704 7B3 ”■•• ■r^TisB^iw^oji^AsEfr ia< 111 14W4 :fe... HU IM 1107 an 74« •40 111 0B4 344» 7S9 S •4M IU B77 IS nn ...... SCBCNO7-01-,,. CAJjrQN ASE 7 N •BO in 7W TO 070 Tt CM IB 7W 337 014 _ i. OWNER. UCOOMLl ^ P N,N B«CK _0OM UO 7B7 n an m TW is a MB i» lOU Ul 0707 >- £L ■ MB 133 •U7 740 7B1 SCNENO CANYON PHASE J 01 7M 134 «a 34 7BB a lei TO na 747 TUO M CM a u» IS 01u SEHCNO CAMVGf B 1IIB TO tut 3U oei irr...^.. B I04U TO BJ7 3M 1101 OTM 134 TIB SI xa MCOOMLL wtn « TITO IS mi ai ion «B •4B TO HIM ai 0404 •4 nil TO ru TM •777 B 7171 TO 07)3 ZU K2I SI'OCMO,,.7-O CANYONi-..m - ASC 7 TOO la BU 391 oar *7 B70 B7 BB OMICN; MfJOwtU « 140 BM I WIN Back IIOM 0314 141 BM Si •TO DATL 03/76/701S 7BI SI UB4 •• 147 lUO « rolA l,1l«.H< OCSCNER; CR/AAL

Pfi&£CTTOL1702-000 NO. s iTPCNO Canyon SCOChO I PhaST 7 PHA NCOOMU t NC.OOWEII !■ iixru iiov TRACT 'S ■.

NCOOMU NOUNlAJN VAUCY, . 'APNlVlT-Oiefi OJT$OaL£ (SURVEY) LOT 7-7' 0WNE«i CITY Of PP02

SHEET 2 Of 11 UNSTABLE CURVE TABLE lii£=r. IK MS IOS» sw locn uws ooe OLIA IMCDI kjM rfzOSi U|. •TTinn lan as wur SU0 ■nr USTJtf u.« Min'iit OI »7»sT*n r.M oi tour ULtf mr Arirti* •AH’ MWIAIlY LU. pnrm iiiM cs jauir ]Ujtt nr PW injo* SB'*i'at U7 ISI7 CB juy WJ5 ur 4lW4«* JTJT SOfflT^ ^|l ■ lA^YVt OS lOLW lutf isxr uvu* V.TT MTlOn ca mu' iiaw 1IAJ snrtr KH- sonntt _ i|

-ca sow 910 P«£C 18 it.:-' iH*l»#=■=« ■• ,\'.-Ja 1--W HORIZ. LEGEND C^ilf

Bsssa cassBsyATOuc DE#V ■ ■■■■■■■PAACa GOUWARV BssB^sanusc uc ------ROADWAfOCHT-Of-IKAY CDfltRM

------lOT U« -----OJa HO OJTTDl =oasmc cua ANs cunot -PMPOSa 1AIDI IK -pROPoas swjt uNt ...PAOPCaD UltR LK BY OUUS ------PACPosai snn uhe by okrs ------OaSTMC UIEB IK ------D3TWC SE«R IK ------SAWTARY sm UHmS ------» iWTASr toot not (Mtcnon '... -...... -essrwo auras O-FT} r„r:r_-_E~

LU \%fe ■/ < U\\V'ai^-43 : r^, is 2 ^ lU

tO* DWCT s £ 7^4--’-*^- onuNna [«iij[Ni •»^i I>ca MCS BOO' 97>-C.\ \ ^ROLa a Monti PACTASAHOOGlo 10 at i\\ MUnCR WArOHK

VctLA‘- rT a.IQfl-19 ir.A.C fIVfBOVO) A*8* AHf.A&c PAYDOir acnoH p£B u.Ac. spcc «i aMB«ro> TO APPLY tu COUPACnCM AT ajBOIA:iL

A. LOCAL RESIDENTIAL STREET

OATt- 03/76/J01B

0C9(»Cfl: Cfl/AAL

Pfi(iJECT NO. T±T < TOL1702-000 Lsoa CUBB AfljnDI - KOIL CUH fi 4CUTTO aWB IK HATCH IK ^ r R-t« ILC (MR «’ A.B.C. PAVOCNT ZCHON TOT B.JLt STCC 701 CCPW B^OCj^ESIDENTIi OKPACiKN AT SS0UK lAL STREET PP03

SHEET 3 or 11 lEGENO

.. . '•

w ■' 0„;

•mnNCLOt ?? Ll« PCBF PLAT, MSI DOCK 974 PACE ;10 BC R^ntD AS lOI ?

iiiii TOL1702-000

B. LOCAL RESIDENTIAL STREET LINE TABLE

CURVE TABLE

TRACT

Br'VRACT,^-.

<>/ ^

. t.K9 ?••■ 10 BC ABJMXHJ v ■

h^-ki!

LEGEND y *-l9 At (MX 8' Aat P*WO«I acnoN Pot u.At 9

TOL1702-000 CURVETABLE

LINE TABLE hmxt „ ...tSSS in^;;": .')■. ;• V';:. \M KWe lOew uxn tious owa can KWe 17. anrni HA «•«C7. xair uur au 7»3r«- uAtr KJTOlYrt in 1019 C7S 7.4T UAtf 7A.' iswjr a*e IMTWTn B4 i. / in onnr» ina on nM' me ue OTPYl* nA- uiVAn i ss-ScXti": 171 STOin lift. ei. ti.ii' moe •Af CT*-.r •ur i7iii/iri VAHE • '■ I-.' ! V"''’ . ' ■•(••; Mil \ !■ ■nrin XHJI ou •ur mM ■J- STOnf* mx M-44Yn eu VBM- ntf 04- •4wir J4J4- tsA-inn /■caswc loi; u*c Pt» rwu .• PUf, UCB BOW 9J< PAa .1 2- •T .'- /V.:-. C11I HAD- luor AAf \rufer tAir S7W4T* ■ \ 10 DC Btriiliru AS LOT J18 ■' CUO lusr Atf SLf 404YI* ifi.if Hinj-B-ii ' - '■■■ /\rir^ -fll

50' H0HI2 LEGEND mi TOUC

■ ■■■■■■■PARCa BOLtCARY Ptua LiNC eouNDAnY iM cr B(WT-0F-WAY SOTtXO CANTON PH.2 J ROUKAY CC^^E}Ule RtCWOCO M BOW 9I< . PER UCS LOT l«C AND sines

*lir' LOT 10' awND cumw PMA3 ■• ' V.'/ • ■ y,. ■- '- r- . .K'\j■'• ■■ ■'■ '-I 'a RtccmcD IN BOW «: usms OMKU) (i-ni PAtt <0 PtR UCB -.-T.-ri—

/ ■ ■■ .y.y-r... \ - '■ - /< ,, , '•,' |f'

#*1.

J: \l4..... KEV MAP

*sunD» ROLL CURS

7.BJ9 9 03/15/3018

OPAL Res DENT AL STREET

PROJCCITOL1 NO.702^00

StuMjnes (US

3* R~19 ACA.C (OVCR 5‘ AAC. PAlOCNT SC7KN PP06 P(? tLxe SPECKfC 7M.701 CONISACttRCONISACKR TO smY SSI COFACnC*)coFAcnc*) AI SJBOIAK NT1AL STREET S>€ET 6 or 11 HKS tHlWGRASS CCR.~^CAP •■; f rt aCII. T.W.RSL J ,■ / S

■/ 'J'; ^ ”Pr '•■■■ •2ii^."v

Ps2gpi-y:^p . , DEHM5 V • ' \ 3 .~-P- -'£*»“«T

re REB« « c«»—. BCM 1HC a COl LEGEND cr ac II. I.4IL Rsc. 03/78/JOia

LINE TABLE CURVE TABLE XaCNEH: CR/AAA 5<£CXE1): LB PROJECTTOL1702-000 Na

SWR WC— SATO LM y R-19 AC. OlitH 6 A8.C PAVP4NI aun ao« drcctcn WW FO UAt SPCC 70J. eWTRAt ..'OISWC CWTOUR (S-F7} simr BSx coiPAcnoN at sugcraoc DisTNG conou) (1-n^ PP07 caiPAcno* AT suooiAOC me H1CPIANT Asawav A. LOCAL RES DENT AL STREET B, LOCAL^SIDENTIAI RTRPFT ------sit MSBurr TOAUCU SHEET 7 or Roa onnopwe LINE TABLE CURVE TABLE IM HAVE UKM Ulf IDKtl RHU (Mm taiA lAison ■A C u_a*2 U« unon laio CM jM-ir ixuir rw s«rir lei-TT un 10 I27178ST aXM Oi sur M« BLI ASJir iiur KSI in wrs'ait l«U7 CM mu’ xaor n*.r acji-is- IMS- UQ iiTKort uu cm AUF UAIV UF wvw *ur ■7S w UnTATV 77J» os »0Y txtf Mr W*r Sff >qr< U4 ■pFSat nui CIS mw Sltf sir irarar lUM- nn mil^ili IM liU ON lUtf oaff Mr ruv >177 m Hi Mffins* iiiij CIS U47 aw was jAtr lun

50’ W0BI2. <®ii ■ ■■■■■■■pwca eiutiuiiT

IJCW ------BOAOWAT OKIDue ------'HKMT-Of-HlAf ...... LOT IJHC ------—.-euia AND aiTTO TRACT T :=nsT»(c on ANO ounDi -PBCPOaO lAIER UK -PMPOaD SnCR UNI -mVQSCD MIDI UK BY QDOB ------j:..... PUf>091l S10I UK BT (mCB — ...... —-OKmC jn£R UNE

- . 5AK1ABY SCKR FlOW OltlCCnON

------t04 VA91 .

J0.08- T ■k%,

S.100 s

LU “Sir f i.i s l5

iiO 5 (n£ "sr'' SEKR Wr^ WATDt US ^ 1* R*ia A.C. OKRT A.B.C PAKUOn aCTlCW KB M.A.t SPEC JOl eWTHACTtU 10 SUPPLY sa CEWPACrW AI aOSADE RESIDENTIAL STREET______

ocsuwft ca/AAL

PROJECT MO. 4.^ TOL1702-000 -*<***^7 ^Hoj.uunntoffla-’ WUTTDI MU OAB -J ROL CURB SMX US «ATDI UK y R-H AC OVCR S' Alt PAKKHT SCIION PCB ILAC ssc 701 ccKnucTOR TO amv s CaiPACnCKCOlPACnCK ATSSOIAK B^OCAL^SIDENTtAL STREET PP08 irT SHEET fl OF J1 3* fl-19 A C. O'® 6* A.at P. sccnw PCf) U.A.G. 9^C »}. ro sumT 93X ccliPAcnoN ai A. LOCAL RESIDENTIAL STREET

LINE TABLE CURVE TABLE

‘183-N ;

.2MN

rarA-!

LEGEND

!>aiej . CBsr,MC ccNtcsjH (s-n) • . , cnsmc coHioup (i-n) ■ L CASTAS OEL BO nT

LEGEND

CURVETABLE LINE TABLE mmmmmmm

■osjj,,.. ...tnsnHC (J-fT) ' y R-ia Kctmy *.8.c pivtuon acm acn» PtB UAC stc toj. c PO> HAG. 702 aXIDikCTa) TO SUPPIT g: ro SU>Pir S5X COUPACTCN *I A. LOCAL RESIDENTIAL STREET B. LOCAL RESIDt - Si PHASE TWRA ESTATES APN;217-01-JUSEREWO CAWTON PHASE APN 217-01- SERENOAPN:217-0I- CANYON cn?

APN:7I7-QI-SE«EN0 CANYON -ASE I

OVmCSi C8D AO ux Phase

Phase 1 Phase 2

"/oTlCs Phase 3 >N:2l7-01-237 TWflA ESTATES Phase 3 :^/ 260 .' OWNER: CBD 40 Li£ Phase 4

3 APN: 217-01- 32 '\\\ 154

APN;2l7-0»-2« BARA ESTATES Phase 1 OWNER: GSD «0) IXC a? '' is- TRACT |Jr- XK I02B. 5 5 ' SERENO CANYON filrs. ACT -N^-^ 125

Tf^CT'm;

3ATt 03/36/2015 Phase 4 238

PROXCTTOU702-000 NO. SEbEno canyon sebcno Canyo^ 'HASE ? PHASE 2 217-01-178 APN:717-QI-

TRACT 'J' ------aPN.217-0180 UCOOWEa UOUNTAM VAUEY APN;217-03- SCOTTSDALE (SURVEY) LOT Q1W4ER; CJTY OP OWNER: ELIZABETH S BELCHER, n AL FINAL PLAT FOR SERENO CANYON PHASE 4 A PORTION OF LAND LYING WITHIN SECTION 11. TOWNSHIP 4 NORTH. RANGE 5 EAST. OF THE GILA AND SALT BASE AND MERIDIAN. MARICOPA COUNTY, ARIZONA SEC.i 11 OWNER: TOLL brothers az construction company

nFDir.ATION PINNACLE PEAK RD AUCNUENT

5TATC Of ARIZONA ) N.T.S ) S.S. ^7 .VICINITY MAP COUNTY OF MARICOPA ) KNOWN ALL MEN BY TWESC PRESENTS; Fl^UL PLAT OF THAT TOLL BKOTHERS AZ CONSTRUCTION COMPANY. LLC, AN ARIZONA UMITED TIARA ESTATES LIABILITY COMPANY. OWNER, HEREBY SUBDIVIDES A PORTION OF LAND LYING WITHIN PER 6K. 1029. PG SECTION n PER TOWNSHIP 4 NORTH. RANGE 5 EAST OF THE GILA AND SALT RIVER II. MC.R. BASE AND meridian. MARICOPA COUNTY. ARIZCMA. UNDER THE NAME *S£RENO CANYON PHASE 4' AS SHOWN ON THIS HNAL PLAT. THIS PLAT SETS FORTH THE LEGEND & ABBREVIATIONS LOCATION ANO GIVES THE DIMENSIONS OF THE LOTS, TRACTS. STREETS AND ® SET BRASS CAP FLUSH PER MAC ST. DET. 120-1 'B* (UNLESS OTHERWISE NOTED) EASEMENTS CONSTITUTTNC THE SUBDIVISION. EACH LOT, TRACT, STREET AND i LOT ,2 \ FD REBAR 4l CAP (AS NOTED) EASEMENT SHALL BE KNOWN BY THE NUMBER. LETTER. NAME OR DESCRIPTION GIVEN EACH BESPECTIVaY ON THIS PLAT. THE EASEMENTS ARE DEDICATED FOR SET REBAR WITH PUSTIC CAP 'RLS 47373* THE PURPOSES, AND SUB,£CT TO THE CONDITION. STATED. TRACTS A INaUSIVE. IS DECLARED AS A COMMON AREA AND SHALL BE OWNED, PARCEL eOUNOART PG, PACE LOT 12 AND MAINTAINED BY THE SERENO CANTON PHASE 4 COMMUNITY ASSOCIATION. AN FlNAt PLAT OF B/W UNE EP.U.E. ARIZONA(•associationNONPROnT*) CORPORATION, AND ITS SUCCESSORS AND ASSCNS SERENO CANTON ^ LOT/TRACT UNE REWSTEPED LAND SURVEYOR E.D.E CENTER UNE EXISTING PUBUC UTTUTY EASEMENT \ LOT 4 LV.N.A.E. EASEMENT UNE EXISTING DRAINAGE EASEMENT TOLL BROTHERS AZ CONSTRUCTION COMPANY. LLC. AN ARIZONA UMITED UABIUTY EA.E, SECTION UNE EX^TINC VEHICULAR NON ACCESS EASEMENT COMPANY. OWNER, GRANTOR. DECLARES THE PRIVATE STREET SHOWN HEREON AS LM.U.P.T.E \^THACTA MEASUREDADJACENT PARCEL UNE BOULDER EASEMENT TRACT 'A' AS PRIVATE ACCESS WAYS. NOT DEDICATED TO THE PU0UC FOR ITS USE CALCUUTED EXISTING MULn-USE PUBUC TRAIL EASEMENT EXCEPT AS EXPRESSLY STATED HEREON. THE GRANTOR AND ITS SUCCESSORS RICHT-Or-WAY SHALL MAINTAIN, REPAIR AND REPLACE THE PRIVATE STREETS. THE CITY HAS NO LOT 1 09UCAT10N JO MAINTAIN, REPAIR AND REPLACE THE PRIVATE STREETS ARISING EASEMENTSFROM THIS PI>T. MARICOPA COUNTY RECORDS LINE TABLE NUMBER CURVE TABLE NUMBER TOLL BROTHERS AZ CONSTRUCTION COMPANY. LLC. AN ARIZONA UMITED UABIUTY > < COMPANY OWNER GRANTOR. DEDICATES TO THE DH OF SCOTTSDALE. AN ARIZONA LOT 3 MUNICIPAL CORPORATION. GRANTEE: )---

A. EMERGENCY AND SERVICE ACCESS (ESA); A PERPETUAL NON-EXCLUSIVE EASEMENT SHOWN HEREON UPON. OVER. UNDER AND ACROSS TRACT ’A’ ON THIS PLAT, FOR ACCESS FOR EMERGENCY, PUBUC SAFETY, REFUSE COLLECTION, UTILITY, AND OTHER SERVICE PERSONNa AND VEHICLES AND FOR THE RIGHT TO CONSTRUCT. OPERATE, USE. MAINTAIN. REPAIR AND REPLACE IMPROVEMENTS BASIS OF BEARING RELATED TO ACCESS AS OTY DEEMS NECESSARY FOR ACCESS PURPOSES, m A STRAIGHT UNE CALCULATED BETWEEN THE NORTHWEST CORNER Of SECTION II ANO THE SOUTHWEST CORNER OF SECTION. T.4N,. R.5E.. USING A BEARING OF SOUTH OOTiyOl* EAST AS EASEMENT SHOWN HEREON. UPON, OVER, UNDER AND ACROSS THE PROPERTY ACKNOWLEDGEMENT SHOW ON FINAL PLAT FOR SERENO CANYON PHASE 2 BOOK 374, PACE 40 PER MARICOPA ON THIS PLAT. FOR AU. FORMS OF NON-MOTORIZED TRANSPORTATION TOGETHER COUNTY BECORDS. WITH MOTORIZED EMERGENCY. LAW ENFORCEMENT. AND SERVICE VEHICLES. AND FOR CONSTRUCDON. OPERATION, USE. MAINTENANCE REPAIR. MODIFICATION AND STATE OF ARIZONA ) QWNER/DEVELOPER REPLACEMENT FROM RUE TO RHE OF IMPROVEMENTS RELATED THERETO. SEE ) S.S. SHEET INDEX SRC. CHARTER 47, AS AMENDED, FOR MAINTENANCE OBUCARONS COUNTY OF MARICOPA ) FP01 COVER SHEET, DEDICATION, NOTES TOLL BROTHERS AZ CONSTRUCTION COMPANY C. PUBUC UTIUTY (PU): A PERPETUAL NON-EXCLUSIVE EASEMENT SHOWN FR02-04 LOTS. TRACIS. B787 EAST WA OE VENTURA THIS DOCUMENT WAS ACKNOWIDCED BE FP05 UNE A CURVE TABLES HEREON UPON, OVD?. UNDER AND ACROSS THE PROPERTY ON THIS PLAT. FOB SUITE 390 SCOTTSDALE. AZ 65256 ELECTRICITY. TELECOMMUNICARONS. DATA TRANSMISSION. AND ALL OTHER „ FOR AND »l BEHALF OF TOLL BROTHERS A CONSTRUCTION COMPANY. UC. AN ARIZONA UMITED UABIUTY COMPANY. PH: 4e0-951-07B2 MANNER OF URURES. AND FOR CONSTHUCRON. OPERARON, USE. MAINTENANCE. _____ MY COMMISSION EXPIRES______UTILITIES REPAIR, AND REPLACEMENT OF IMPROVEMENTS RELATED TO URURES IN THE AREA SUMMARY EASEMENT. GRANTOR SHALL NOT PLACE OR ALLOW ANY (1) TREES. HEDGES SHRUBS OR OTHER PLANTS WHICH CAN CROW LARGER THAN IB INCHES TALL LEGAL DESCRIPTION (PARENT PARCEL) LOT AREA . 5,342.159 (SF.) 122,639 (AC.) UTILITY PROVIOER OR (2) HaROSCAPE, swimming POOLS. SHEDS OR OTHER VEBRCAL OR S.9B6 (AC.) ELECTRIQTYWATER, SEWER AND RRE CITY OF SCOTTSDALE < O (_■ o LOTS 1. 2 2 TELEPHONE CENTURY UNK HORIZONTAL STRUCTURES, — . ,...... lECCWDS ANO LOTS T THRU 5 AS WOWN ON RNAL PUT FOR ^ENO 106 S3S (4C.) X P C/1 M 974, PAGE TRIQTY APS CANYON PHASE 3 PER BOOK 974, PACE 41 PER MARICOPA COUNTY RECORDS. D- o < E D SIGHT distance (SD): A PERPETUAL NON-EXCLUSVE EA^ENT SHOWN CABLE TV COX COMMUNICATIONS y LaJ UJ S HEREON UPON, OVER. UNDER AND ACROSS THE PROPERTY ON THIS PUT. TO PARCa 1 AND PORTIONS OF PARCELS 2 * 7 AS SHOWN ON PARCEL MAP ‘THE GOLDIE BROWN PINNACLE PEAK SOUTHWEST CAS RANCH; UNIT ONE* PER BOOK 191, PACE 26 PER MARICOPA COUNTY RECORDS. o ^ - PRESERVE AN AREA FREE OF OBSTRUCTIONS TO ENHANCE TRAFFIC SAFETY VISBIUTY IN THE EASEMENT. GRANTOR SHAU NOT PUCE OR ALLOW ANY NOTES APPROVALS BUILDING. WALLS. TREES STRUCTURES, SCREENS OR OTHER OBSTRUCTIONS FROM 16 TO 98 INCHES HI01 ABOVE THE ELEVATION OF THE ADJACENT STREET. 1. THE AREA PUTTED HEREON IS APPROVED ANO UE5 WITHIN THE OOUESTTC WATER AREA OF THE QTY OF APPROVED BY THE COUNCIL Of THE OTY OF SCOTTSDAa. ARIZONA T HOWEVD?. THE GRANTEE MAY ALLOW POLES OR TREE TRUNKS THAT GRANTEE o < to SCOTTSDALE WHICH IS DESGNATED AS HAVING AN ASSURED WATER SUPPLY IN ACCORDANCE WITH ARS 45-576. OF 20 DETERMINES. IN WRITING, DO NOT ADVERSELY AFFECT TRAFFIC SAFETY V19BIUTY. o p t= 2. THE STREETS ARE PRIVATE STREETS. TO BE OWNED ANO MAINTAINED BY THE PROPERTY OWNERS ASSOCIATION, E. WATER Af?0 SEWER FACIUTIES (WSF); A PD?PETUAL NON-EXCLUSIVE USEMENT AFTER THIS PUT IS REC«?OEO. THE OTY OF SCOTTSOALE. WILL MOT ACCEPT DEOICATIOM OF THE STREETS TO THE SHOWN hereon upon. OVER, UNDER AND ACROSS THE PROPERTY ON THIS PUT PUBUC TD REUEVE THE PROPERTY OWNERS ASSOCIATION OF STRaT MAINTENANCE RESPONSI0IUTIES UNLESS ALL FOR WATEI? *ND SEWER PIPES AND OTHER REUTED FACIUTIES. AND FOR STRaT IMPROVEMENTS AND RIGHT-OF-WAYS MaT CURRENT APPUCABLE CITY STANDARDS. to < O CONSTRUCTION, OPERATION. USE. MAINTENANCE. REPAIR, MODIFICATION AND 3. CONSTRUCTION WITHIN PUBUC UTIUTY EASEMENTS, EXCEPT BY PUBUC AGENCIES ANO UTIUTY COMPANIES. SHAa BE UTY CLERK UMITED TO WOOD. WIRE OR REMOVABLE aCDON TYPE FENONC AND MUST 8E IN CONFORMANT WITH THE REPUCEMtNTDEDICATION OF PIPES AND OTHER REUTED FACIUTIES. THIS PUT HAS BEEN REVIEWED FDR COMPUANCE Vi ■I THE CITY OF SCOTTSDALTS STANDARDS A APPUCABLE CCIcR'S AND DESIGN CUIOEUNES. MANUAL SPECIFICATIONS 4. ELECTRIC UNES ARE TD BE CONSTRUCTED UNDERGROUND AS REQUIRED BY ARIZONA CORPORATE COMMISSION F GRANTOR WARRANTS AND COVENANTS TO GRANTEE AND ITS SUCCESSORS AND GENERAL ORDER U-46. CHIEF DEVELOPMENT OFFICER ASSIGNS THAT GRANTOR IS UWFULLY SEIZED AND POSSESSED OF THE 5. SIGNS REQUIRE SEPARATE APPROVALS ANO PERMITS. PROPERTY- THAT GRANTOR HAS A GOOD AND UWFUL RIGHT TO MAKE THE 6. COSTS FOR THE REMOVAL OF OBSTRUCTIONS AND/OR IMPEDIMENTS TO THE WATERCOURSES SHAa BE PAID BY THE CONVEYANCE DESCRIBED HEREIN; AND THAT GRANTEE SHALL HAVE TITLE AND PROPERTY OWNERS ASSOCIATION AND/OR PROPERTY OWNER. OU1ET PQSSESaON AGAINST THE CUIMS OF ALL PERSON. 7. THE EXTERIOR OF THE PERIMETER WALLS. INTERIOR SITE WALLS, AND DRAINAGE WALLS SHAa BE MAINTAINED BY A PROPERTY OWNERS ASSOCIATION, Aa WALLS SHAa BE CONSISTENT WITH THE APPROVED MASTER ENVIRONMENTAL > THE PERSON EXECUTING THIS DOCUMENT ON BEHALF OF A CORPORATION, TRUST DE9GN CONCEPT PUN, DEVELOPMENT ENQNEERINC MANAGER DATE I OR OTHER ORGANIZATION WARRANTS HIS OR HER AUTHORITY TO 00 SO AND 6. Aa BEARINGS AND/OR DIMENSIONS SHOWN HEREON ARE CALCUUTED UNasS OTHERWISE NOTED. THAT ALL PERSONS NECESSARY TO BIND GRANTOR HAVE JOINED IN THIS 9, INTERIOR PROPERTY CORNERS AND STREETS SHALL BE MONUMENTED AS SOON AS CDMPaTION OF THE LAND SURVEY CERTIFICATION DOCUMENT. THIS DOCUMENT RUNS WITH THE UND IN FAVOR OF GRANTEE’S INFRASTRUCTURE AND IMPROVEMENTS MAKE IT PRACTICAL TO DO SO, IF SUCH MONUMENTS WOULD DIFTCR FROM THE TYPE DESCRIBED ON THE FINAL A RECORDS OF SURVEY PUT SHAa BE RECORDED SHOWING THEa =1 SUCCESSORS ANO ASSIGNS, THIS IS TO CERTIFY THAT THE SURVEY ANO SUBDIVISION OF THE PREMISES DESCRIBED AND OlFTEREHCES, Aa MONUMENTS SET SHAa BE UNDER THE DIRECT SUPERVISION OF THE REGISTRANT SUBSEQUENT TD > DATED THIS DAY OF ______20 PLATIEO HEREW WAS MADE UNDER MY OIRECHON DURING THE MONTH EF FEBRUARY. 2D1B; THE RECORDING OF THE RNAL PUT. THE HEPUCEMENT REGISTRANT SHAa SET THE MONUMENT WITH HIS/HER THAT THE SURVEY IS TRUE ANO COMPLETE AS SHOWN; THAT THE MONUMENTS SHOWN GRANTOR;FOR:_____ lOENTIFYINC NUMBER AND A RECORD OF SURVEY PUT IN ACCORDANCE WTH THE CITY OF SCOTTSDALE DESIGN ACTUAaY EXIST OR wa BE SET AS SH0Y4I; THAT 7HQR POSTIONS ARE CORRECTLY SH0W4; o STANDARDS AND POUCT MANUAL AND THAT SAID MONUMENTS ARE SUFFICIENT TD ENABa THE SURVEY TO BE RETRACED. 10, AFFIDAVITS OF CORRECTION OR AMENDMENT TYPE aTTERS CONCERNING THIS PLAT ARE NOT VAUO. THERE Wia BE XSHUA 5. MOYSES 07-06-1B NO REViaONS TO THIS PUT WITHOUT THE PUT DEvaOPMENT ENGINEERING MANAGER’S APPROVAL REGISTERED UNO SURVEYOR 11, THE MAINTENANCE OF LANDSCAPING WITHIN THE PUBUC RICHT-OT-WAT TD BACK OF CURB SHAa BE THE RESPONSiaiun of the associations of property OWNERS,

H cn §i iffjS II im

\ \/ RLS» 2?2M

TRACT E FDSTAypED C.O.S.-. _ BRASS CAP. SEBEtA CAMYON RLSI 27Z39

Fo cas.

W\ VJr£l. CO C42^ \ A \ ‘yy/ BLS» 2': !§i 20‘ R/W LOT 4

LOTS ~~ ^ '^'ilPOSA Gb X o ^ ° LOT1 p 2 s

'-=fe s ° i ° MATCH SHEETS pii"

OAAWMiyuwn

SCALE: 1* - flO- FP-02 MATCH SHEET 2

N L0T1

LOTS

T ABOVE NATURAL GROUND NC TWE 51/4 COR. OF SEC. T,4N„ R.5E,. PER LOT 4

LOTS !

isSii.i

LINE TABLE LINE TABLE UNE TABLE UNE# LENCTH UNE# CURVE TABLE L£NCTN BEARING LMEI LENGTH BEARING CURVEI LENGTH RADIUS CURVE TABLE oaiA CURVE# LENGTH RADIUS OaTA BEARINC LI u.5a‘ N0W54 ‘W LJl 79.99' S32-D9-1TE LSI 94.32’ S303B’48*E CHD BEARING CHD LENGTH Cl 5252- 503.00’ 5-!a-55- S86-55 ’3e*W 5249* C51 26.12' 17,00' 88-02'X* CHDN58'43'X*W BEARING CHD23.65' LENGTH L2 942.1B' S89-SS'06*W L32 S2fl-41'43'E LSZ 160.30- S7715"2B*W C2 14570’ 300.00- 27'49'36* NBZ-OB’OZ'W C52 101,72' 42200' 13'*6'30* N2r36'45*W 101.47- L9 sa49' S89-35'0e'W L33 60.00-80 00' S25-43-S3'E L83 5080 S77-15-2B*W C3 189.46' 200.00' 144 27‘ 54-16-38' S84'37-27*W 182.48- C53 121.61' 200-00' 34'53'43* N4537'55*W 119.93' L4 N6814-14*W L34 2025' S15'37-31*E L64 103.22’ S77nS'28-» C4 497.90' 450.00- 6373’40- 58910-56M( 47283- C54 399.18' 410.00' 55'46'59* N35'31'18*1* 383.60' L5 54.05'52. IS’ NBei4-l4*» L35 1522' S62n2'42*W LBS 211,21’ N7-39-09’* CS 210.38' 600.00’ N89-09’5J*»f 209.30' C55 120.4X 240,00- 2B'45'38* N23'M'39*V* 119.21' LS 5559' N6814-14'M( L38 3019' S34-53-02*E L8B 7025- N5B-43’46'W 20-05'23' ; C6 194.88' 300,00' 3713-10- N7r43'47*«y 191.47’ C56 96.10' 20070- 26-22'58* N49'20'12*W 95-25' L7 2J6.7r 557-29'Oe‘IW L37 129.99' 528-08-48'E LB7 173.77' N59-07'19V C7 308.60’ 71-34-47* N43'Z5'12*W 380.94- C57 131.00' 243.70- »'47'58* N7616'52*W 129.43' L8 221,16' N3BT)7'12‘W L38 87,17' S66-2B-0S'E LBB 238.77' S3779’0e> 30553- C8 340.82' 220.00’ B8'42'34- N51-59-D5*y( 307,60' C58 17,99' 3257.97' 018'59* SB4'48'14’W 17.99' LS 107.43' K7-3r4B*W LJ9 94.0T S26'36'04'E L69 87.02- N6032't3‘M C9 369.64' 430.00- 49-1513- N3215'25*yi 358.3r C59 181.43' 260.00' 33-or5B* S79'49'2J*E 159.20' L10 B7.50' M7'3r4B'W L40 40.82' S39-48’09'E L70 3019' N70'5Ol8Ml CIO 140.46’ 300.00' N437a'or»f 139.20' ceo 470,00’ iei37'»* NB7-2a'23*W 131.78' L11 29.08' 577n5'2B*W L41 17,77’ N80'4r33'’E L71 17.45- Se9-55’08'W 26'49-48' : C11 136.7T 380.00- zffsrzi* N19'44’3Z*W 136.04' C61 1326245- 22' 470.00' 7'36'46* N79'ZO'2D> 8241' 94.32' N38-38-48‘W L42 93.09* S24-O0’23'-E L72 715.20’ NOTM’SO'W C12 36.02- 579,50’ 3'38’27’ N10-33’4B*W 36.82- C82 254.97- 470.x' 31'D4'54* 58118'4B**V 251.85' LULI 2 S57-2T59'-V* L43 14,49' S65-sr37'W L73 97.35- SBO5S-08-W C13 291.2T 579,50- 2B-47'54- N29'46’5e*W 288.22' C83 67.96' 470,«• 8iri3* 561'3X44*W 67.92' 14aS5' BB.04' N77n5'25-E L44 9078* S53'49’02'W L74 105.00 S01D3-13'W C14 148.05' 30000' N54-5roa*»( C64 170.52' ISO.X’ 5416'3B* S84'37'27*W 164.21' L15LI 4 349.13' N43-2r34*E L4S 2296' S47-26'24*W L75 64.49' N80T»’05‘W Z7-32-25* 1 146 62' C15 11548' 220.00' 30T34'33' NW41-04** 114.16' ces 4092* 7591.0J- 072'M* N6B'2r35*W 4092' LIS 192.40' S77*1S'2S'W L46 100.40- S53-4B’02‘W L76 23.59- NSBT4'14‘W C16 35,92’ 485.00- 475’33' N36-2B'DI*W 35.91' C66 15293' 31000- 2r35'18* NB2X'52l* 151.46' 7520' S17'34'58H L47 1059’ S49-42’22'W L77 557-29’OB'W 254.20 C17 214.50’ 67-55'IS- N88’40'23*W 239.65' C87 4013' 403.K' 5'42-35* sszTU'Aa'w 4011' LI 7 L18 234.48' 522*17'D5*W L48 40ir S52n4-3B'W 178136 99.89' 88’ 557-29-08*1* C1B 381.38' 505.50- N73T2-19** 374,65' CBB 28.75' 17.26' 88'46'29* N4519'39*W 24.15' L19 70.10' S32-04'30’E L49 B1.30- S26-5r58'E L79 6093' N39T>7‘23’W 3719'0a‘ ; C19 147.47* 250-00’ i3'4rs2’ N6071-30*E 145.34' C6B 32.42' 17.W 1«16'15* 554'31'48‘W 27.73' L20 20.00' N25'43'48*E L50 i28,ir S47-59'12*E L80 154.06’ N59-07-12-M C20 300.00- 68-03'Dr N976’00*£ 335.74' C70 23.51' 1914'X* sao-zrzB'E 23.40' L21 70.10' N32U4'30’W L51 131.74- LSI 97.50- NT3r48'W C21 35657,82 32'’ 700.00' 1B-3ff2a' Nir25'2B*E 57,42' C71 10,83' 70.M' 70.M' a5T52* sas-29'M*w 10.82' lU! L22 234,48- N2217'05*E L52 77,28’ N4T59-12*W542-Off 4fl-W LB2 3234- N77n5’26*E C22 226.09' 20050’ 62'D7'47* N1CT23-12*R 215.17' C72 33.20' 67,W 2B-23'35* NB4'44'S6*W 3286' L2J 7B.20- Nir34'58*E LS3 11,88- N9ff00-00*W L83 349-13' N4377'34*E C23 350.00’ N85'41’35*Vil 205.24' C73 20041' 2Z0.W 541B'3B* 584'37'27*W 2X.70' 'N L24 BS.24’ S42-39'58'E L54 1088- S44*48-3rw ZOO30’ 34-06-00' : Sllilsi 185.82' C24 230.00' 4614'29* Se814-I1*W 180.63' C74 1402B' 430.33' 19'44'33* 587-21'SZ'IW 147.55' L25 134.08' N62-04-11-E LJ5 175.82* 50-00'30'W C25 103.59' 350.00- 18-5X30' N73'35'42*E 103.21' C75 325-65' 430.TO' 43Z3'31* N81'03’38'W 317.93' L2B 37.21' NS6-4g-0B'E L5B 22061’ NCTOe’IB'W C28 215B6' 190.00' 6479'ZB* S49'49'42*W 202.75' C7B 96.BB' 620.W ff56'03* N63'35'13*W 96.58' L27 163.79' SiBnB'srE L57 97,26- N25-43’4B‘£ C27 450.00' 29-51'52' S2'39-02*R 231.9T C77 7248' 620.X' 6'4r4S* N7V24'07*W 72.41' L28 310.11- 540-9r20'E L58 20.00’ N25-43'48'E 234 56’ CZB 271.48' 450.00’ 34-3400' S5-00-05*W 267.33' C78 620.x' 4-27'35- N76-58'471» 4025' L2B SOOO' S36'34'29'-E L59 483,21- N1D'48'30'W C29 284.63' 300.00- 5471-35' S4'S3'42*E 274,07' C79 130.14'40 26' 287,96' 25'53'39* N8B17'29*W 129.04' L» BOOO' S39'36-39'E L60 117,13' NS7'2r59'E C30 18057- 300.00' 32H'42' 54810'2TE 168.3B' C80 230.41' 288.41' 45'46'2B* N30'M’D7’\* 224.33'

C31 157.33' 260.00' 32H'42* N4810-21** 155.27' CB1 28462' 4».X' 3614'1B* N25'44'58*W 279.90'

C32 26565' 280.00' 5471-35* N4-53'42*W CB2 102.22' 4X.X' 13W55* NX-22'341» 102,X'

C33 283.55’ 470.00' 34'34'00* N5-00'05'E 279,27'255. BO' CB3 131.12’ 26'49'4a* N43-2e'07*W 129.92'

C34 224.13- 430.00' 29-51’5r* Hr39’02*E 221.BO' CB4 9297- 380.x'280, X' 14'47'47* NZ2'39'19*W 9271-

C35 129.77- 17000’ 43-44-07* N3977’01*E 126.64' CBS 27.45- 17.X' 92'30'51* N31-00'X*E 24.56- site's

C38 30.88’ 17.00- S919’15*V» 25.79' CBB 159,27- 270.X' 33'4X52* N6ff21'M*E 156.97- I03-S9'40* ■ C37 179,55' 231.00' 44'32'02* N79'38'00'E 175,06' C87 21911' 320.x' 39'13’56* N23-50'36*E 214.88'

C3B 26.12’ 14.68' 100-35-20' NBDIB'IO** 2290' cea 66.16' 292X' 12'SB'II* N10'43'13*E 66.04'

C39 124,14’ 238.50' 30-04-3S' 553-41-04-E 122,72' C89 137.03' 22S.X' 34-53'39* N014'01*W 134.92' LOT AREA TABLE C40 140,11’ 291.50' NS4-5roe*y» 138.77' iiii o O d: [- C41 28298- 563.00' 28'47-54'27-3Z-25' , N26'46'5B** 280.01' S fe i g C42 26.60’ 17,00' 89-38-27* N3276’12*E 23.97'

C43 196-40' 330.00' 34-06-00* S85'41'35*E 193.52'

C44 201,77' 250.00' S8014'11*W 196.33'

C45 5282' 330.00' 4614-29* ; N89'42'03*E 5277- C48 81.58- 169.85' 20'48'30*910’17* : S7r41-46*W 61.25-

C47 109.51' 370.00' 16-57-30* S73-35-42*W 109.11- C4B 169.48' 210.00' 4614-29* 5a8i4-n*w 164.92' o AREA C49 11,27- 370.00' r44’44' N69-30'57*W 11.27' TRACT (ACRES) USE AREA ; C50 208.94- 370,00- 3Z71'16* N88'33'56*W 206.17' (SO,148.935 FT.) 3.419 TRACT A W.S.F., E.S., P.U.. S.O. SHCn 9 OF 5

FP-05 Sereno Canyon - Phase NATURAL AREA OPEN SPACE EXHIBIT

SITE DATA

i7-ot~ota. 217-oi-onA. 2i7-ot-onc. 2i7-oi-mi •0»Sf, J17-01-016K. J17-01-0ia. 2I7-01-14I. •IM, 217-01-160 to 217-0I-18#. 217-01-IM TO • 1W. 217-01-216, 717-01-717______

CROSS OPffl SP«£: 7iB5 6C/1J2.00 *C - J7.51I

GROUP CORRIDOR

PRESERVATION UND LEGEND

100'SCENIC CORRIDDH EASEMENT MCDOWELL MOUNTAIN PRESEKVE

Nolei Layout locations shown are conceptuai anc/may c/range during final

CONSERVATION AREAS & SCENIC CORRIDOR SWABACK PARTNERS SERENO CANYON PHASE 4 Planning, Ardiitcclun:. and Interior Des 6.4.18 I D.R.B. REVIEW «LrrMt«lnlr* Arizona UR0.167.2IOO RESORT CLUB DRB Padtoqe CIRCULATION PLAN PEDESTBIAN, VEHICULAR, BIKEWAYS, 8TRAILS

WALL LEGEND

STREET MAJOR TRAIL/WALKWAY MINOR TRAIL/WALKWAY PUBLIC TRAIL FUTURE 126TH ST TRAILiavoraEna

■ . /

ii/ouf (ocaffons shown are Lio/ one/ may change during final design phases

CIRCULATION SWABACK PARTNERS p SERENO CANYON PHASE 4 Planning, Archilcclurc, and Inlerior Design 6.4.18 I D.R.B. REVIEW RrnlkHaln AnVnna I 480167.210(1 RESORT CLUB DRB Podcaqe Sereno Canyon Phase 4

Ph3 Road \ Budget

Phase Loop 3 Phase 1 Parcel A., ^ Phase 2 2 Phase 3 Parcel B1 Phase 3 ^ Phase 4 Parcel B2

•Parcel E

rParcel F1 rParcel F2

Loop Sewer Road. Phase 2 VParcel Cl Station

'Loop o tn -Road Phase 3

Phase 2

-Phase 4

Parcel D- ■Parcel C2 Clubhouse ■* >-Parcel G1 ^Parcel G2 *-Parcel

EXHIBIT APPROVED 7/19/18

SCOTTSDALE DEVELOPMENT REVIEW BOARD KIVA-CITY HALL 3939 DRINKWATER BOULEVARD SCOTTSDALE, ARIZONA

Thursday, June 21, 2018

*SUMMARIZED MEETING MINUTES*

PRESENT: Linda Milhaven, Councilwoman/Chair Joe Young, Vice Chair Larry Kush, Planning Commissioner Tammy Caputi, Development Member Doug Craig, Design Member Shakir Gushgari, Design Member

ABSENT: William Scarbrough, Development Member

STAFF: Steve Venker Joe Padilla Jesus Murillo Jeff Barnes Meredith Tessier Steve Perone

CALL TO ORDER Councilwoman Korte called the meeting of the Scottsdale Development Review Board to order at 1:00 P.M.

* Note: These are summary action minutes only. A complete copy of the meeting audio/video is available on the Development Review Board website at: http ://scottsdale. granicus.com/ViewPublisher.php7view id=3 6

ATTACHMENT 10 Development Review Board Meeting Minutes 6/21/18 APPROVED 7/19/18

ROLL CALL A formal roll call was conducted confirming members present as stated above.

ADMINISTRATIVE REPORT 1. Identify supplemental information, if any, related to June 21, 2018 Development Review Board agenda items, and other correspondence.

MINUTES

2. Approval of the May 31. 2018 Development Review Board/Planninq Commission Joint Meeting Minutes: COMMISSIONER KUSH MOVED TO APPROVE THE MAY 31. 2018 DEVELOPMENT REVIEW BOARD MEETING MINUTES SECONDED BY BOARD MEMBER CAPUTI. THE MOTION CARRIED UNANIMOUSLY WITH A VOTE OF SIX (6) TO ZERO (0).

3. Approval of the June 7, 2018 Development Review Board Meeting Minutes: VICE CHAIR YOUNG MOVED TO APPROVE THE JUNE 7. 2018 DEVELOPMENT REVIEW BOARD MEETING MINUTES SECONDED BY BOARD MEMBER CAPUTI. THE MOTION CARRIED UNANIMOUSLY WITH A VOTE OF SIX (6) TO ZERO (0).

CONSENT AGENDA

4. 16-PP-2017 Sereno Canyon Phase 4

Request approval of the preliminary plat for Phase 4 development of the Sereno Canyon Community Plan, including the site plan, landscape plan, cuts and fills exhibit, circulation master plan, management reports and plans, water and wastewater reports, all on a 129-acre site.

MOVED TO REGULAR. BOARD MEMBER GUSHGARI MOVED TO APPROVE 16-PP-2017 SECONDED BY BOARD MEMBER CRAIG. THE MOTION CARRIED UNANIMOUSLY WITH A VOTE OF SIX (61 TO ZERO (01. Development Review Board Meeting Minutes 6/21/18 APPROVED 7/19/18

5. 1-PP-2018 Scottsdale Heights

Request approval of the preliminary plat for a 54-lot residential subdivision, including the NAOS exhibit, the conceptual landscape plan, the stormwater management report and plans, and the water and wastewater basis of design reports, all on a 13.3-acre site.

VICE CHAIR YOUNG MOVED TO APPROVE 1-PP-2018 SECONDED BY BOARD MEMBER GUSHGARI. THE MOTION CARRIED UNANIMOUSLY WITH A VOTE OF FIVE (51 TO ZERO fO) WITH REVISED STIPULATIONS AND BOARD MEMBER CRAIG RECUSING HIMSELF.

Robert Capel spoke in favor of the project.

6. 9-DR-2018 Cadence Senior Living Residential Community aka Ryan’s Assisted Living

Request approval of the site plan, landscape plan, and building elevations for a new residential healthcare facility, with approximately 135 dwelling units in a three-story-tall building, with 188,000 square feet of building area, and approval for walls and patios within the Desert Scenic Setback and excavation cuts over eight feet in depth, all on a 5.8-acre site.

BOARD MEMBER CAPUTI MOVED TO RECOMMEND 9-DR-2017 SECONDED BY VICE CHAIR YOUNG. THE MOTION CARRIED UNANIMOUSLY WITH A VOTE OF SIX (6) TO ZERO (0).

CONSENT AGENDA

7. 10-UP-2017 Fire Station 616 Municipal Use Master Site Plan

A recommendation to City Council regarding a request by City Staff for approval of a Municipal Use Master Site Plan (MUMSP) for constructing a fire station on 3.3 acres of City-owned property located at 10905 East Loving Tree Lane, with the Single-family District, Environmentally Sensitive Lands (R1-43/ESL) zoning designation.

BOARD MEMBER CAPUTI MOVED TO APPROVE 10-UP-2017 SECONDED BY VICE CHAIR YOUNG. THE MOTION CARRIED UNANIMOUSLY WITH A VOTE OF SIX (61 TO ZERO (01. Development Review Board Meeting Minutes 6/21/18 APPROVED 7/19/18

NON-ACTION AGENDA

8. City of Scottsdale Design Standards & Policies Sidewalk Widths Staff will provide information regarding sidewalk widths as requested by the Board in January 2018.

STAFF PROVIDED INFORMATION REGARDING THE DESIGN STANDARDS & POLICIES MANUAL SIDEWALK WIDTHS

Mike Leary and Don Madder spoke of concerns regarding sidewalk widths.

ADJOURNMENT With no further business to discuss, the regular session of the Development Review Board adjourned at 2:18 P.M.