Upgrade to Smart Motorway Junctions 3 to 12

Total Page:16

File Type:pdf, Size:1020Kb

Upgrade to Smart Motorway Junctions 3 to 12 M4 Upgrade to smart motorway Junctions 3 to 12 Public Information Exhibitions Spring 2019 About smart motorways Smart motorways are a technology All lane running driven approach to the use of our The hard shoulder will be motorways, increasing capacity converted to a permanent new gantries and relieving congestion while traffic lane. maintaining safety. new signals Drivers should obey all signs, new CCTV cameras Smart motorways help make including speed limits and lane journey times more reliable, at traffic monitoring emergency areas closure instructions and should radar detector less cost than traditional widening not stop on the motorway schemes, meaning better value for except in an emergency. the tax payer. message signs Emergency areas Key features of a smart motorway include: There will be highly visible emergency areas. Variable mandatory speed limits There will be an emergency Speed limits will be set to speed limit telephone in each emergency enforcement camera smooth traffic flows. area. lower noise surfacing The limits will be clearly This will connect you to displayed on overhead gantries signs Highways England’s Regional and roadside signs. Control Centres and will concrete barriers Signs will be used to inform pinpoint your location. drivers of conditions on the under carriageway ducts technology ducting network and when variable speed limits are in place. It is important for drivers to understand the different types of technology and features used on smart motorways M4 junctions 3 to 12 Key changes to the motorway The M4 is the main strategic route All lane running Bridge works between London, the west of Between junctions 3 and 12 the To accommodate the new smart England and Wales. It connects hard shoulder will be converted motorway: people, communities and to a traffic lane, so that there are businesses, carrying on average 11 bridges carrying local traffic four lanes available for use by 130,000 vehicles per day and is over the motorway will need road users. Between junctions 4 prone to congestion. demolition and replacement. and 4b, there will be five lanes. Highways England are improving Where a hard shoulder does not Several bridges that carry the the M4 between junction 3 at currently exist, the motorway will motorway over roads, railways Hayes and junction 12 at Theale be adapted to create a minimum and rivers will need widening. by upgrading it to a smart of four lanes. The barrier in the Several subways and culverts motorway. central reservation will be replaced that run under the motorway by a new concrete barrier. will also need work in order to This means there will be: accommodate the upgrade. An additional lane for traffic Through junction running Emergency areas increasing capacity to reduce This enables a consistent number The M4 junctions 3 to 12 project congestion. of lanes to pass through the There will be new high visibility received planning permission junction, reducing the need for emergency areas between More technology on the road through the Development Consent vehicles staying on the motorway junctions 3 and 12. Places of to smooth flows and manage Order (DCO) process. Following to change lane. Through-junction relative safety will be every 1.12 incidents. a statutory consultation, it was running will be in place at junctions miles on average and no more More reliable journeys. granted consent in September 4, 6, 7, 8/9 and 11 and at the than 1.6 miles apart. If you are 2016. This was followed by Reading motorway service area. driving at 60mph you will pass one detailed design and planning approximately once every work. Construction on the 90 seconds. motorway started in July 2018 and is expected to be completed in March 2022. What work is planned? This is the longest smart motorway project in England to date (51km, 32 miles). A40 N 4 lane smart motorway M40 A404 We started construction between 5 lane smart motorway junctions 8/9 and 10 in July 2018 A40 11 Through junction running M25 A40 A406 and subsequently began enabling 12 No through junction running Hillingdon Maidenhead work on four bridges between Bridges to be replaced Slough A308(M) M4 Hayes Southall Ealing junctions 8/9 and 7. The more A404(M) 6 8/9 4 M4 complex section of the scheme, 7 5 4b 3 A4 progressing east from junctions 8/9 Twyford Windsor M4 Heathrow Airport London towards junction 3, will commence M4 Hounslow Reading A30 M4 Feltham A316 in May 2019. This section includes A3290 significant structures work, 12 A308 A33 10 Egham Theale A329(M) M25 including the replacement of 11 M4 Bracknell A308 11 Wokingham M3 bridges. Surbiton A332 M3 We have carefully planned the Weybridge work to minimise disruption to our A33 M25 Camberley drivers and communities, however A3 A243 GFD18_0283 © Crown copyright and database rights 2019 OS 100030649 this timetable may change. Any changes will be published on our project web pages. Motorway Link J12 - 11 J11 - 10 J10 - 8/9 J8/9 - 6 J6 - 5 J5 - 4b J4b - 3 Visit www.trafficengland.com Start May 20 May 20 July 18 May 19 Dec 19 May 20 Jul 19 or follow @HighwaysSEAST on Finish Dec 20 Dec 20 May 20 Mar 22 Mar 22 Mar 22 Mar 22 Twitter for live and future traffic information. Bridge and structure works What to do if you break down If you need to stop in an Much of the M4 was originally built Where the motorway passes over, emergency on a smart motorway: as a two-lane dual carriageway, for example, the River Thames and has been upgraded over the at Bray and the railway line to Use an emergency area and years. Eleven bridges over the Windsor, we will need to widen the emergency telephone. motorway need to be replaced to bridges to support the new smart If you can, leave the motorway make room for a new lane where motorway. at a motorway service area, or there is no existing hard shoulder the next junction. Two subways, including at Sipson, To limit disruption, seven of the and several culverts that run under If you have to stop in a live lane: new bridges will be built next to the motorway will also need work Put your hazard warning lights the existing ones, before the old in order to accommodate the on to help other drivers see ones are demolished. These are: upgrade. you and help our control room staff spot you on CCTV. Ascot Road (A330) Some weekend closures will be Monkey Island Lane required for bridge works. Road If you are in the left hand lane Lake End Road diversions for all of these works and it is safe to do so, exit Huntercombe Spur have been agreed with the local the vehicle via the left hand Wood Lane and statutory authorities. Full door. Wait behind the barrier if Datchet Road details will be communicated and possible. Riding Court Road posted on our project webpages If you cannot exit the vehicle, well in advance. do not feel it is safe to do so However, where there is not or there is no other place of enough space for this, four of the relative safety, remain in the bridges will be demolished first, vehicle. Keep your seat belt on then a new bridge will be built in and dial 999. the same place. These are: Marsh Lane As soon as Highways England is alerted, our Oldway Lane Recreation Ground Regional Control Centre will close lanes to Old Slade Lane protect you and your vehicle until help arrives. Find out more Safety, red sign and incidents You can find out more about the plans for junctions 3 to 12 at these We use a red symbol to show Incident management is controlled exhibitions. Highways England and the design and construction teams that a lane is closed because of an by teams in our control centres: will be available to discuss the scheme and answer your questions. incident or people working on the road: Incidents will be detected by traffic sensors, CCTV or calls Drop by to meet the team This provides access for from the public. emergency services. Venue Date Time The control centre will set Wednesday Datchet Women’s Institute Hall, The Green, 13th March 17:00 – 21:00 You will see red symbols signs to protect incidents Datchet, Berkshire SL3 9EH 2019 on a gantry sign over the and clear an access route Slough Aspire, 350 Edinburgh Avenue, Friday 15th motorway or on a gantry sign for emergency vehicles. 12:00 – 19:00 Slough SL1 4TU March 2019 at the side of the motorway. Control centre staff will monitor Cippenham Community Centre, 90 Earls Monday 18th 16:00 – 20:00 Driving in a lane with a red traffic conditions throughout Lane, Slough SL1 5TD March 2019 symbol is dangerous and each incident, ensure signs are Heathrow Windsor Marriott, Ditton Road, Tuesday 19th 15:00 – 20:00 drivers must not use it. set to manage traffic, and will Slough SL3 8PT March 2019 reopen lanes as soon as it is Wednesday Langley Pavilion, Langley Road, Slough, 20th March 16:00 – 20:00 safe to do so. SL3 8BS 2019 Yiewsley & West Drayton Community Friday 22nd Centre, 228 Harmondsworth Road, West 17:30 - 20:00 March 2019 Drayton, Middlesex UB7 9JL Hayes & Harlington Community Centre, Saturday 23rd 12:00 – 16:00 Albert Road, Hayes, Middlesex UB3 4HR March 2019 Cranford Community College, High Street, Thursday 28th 18:00 – 21:00 Hounslow TW5 9PD March 2019 Iver Village Hall, Grange Way, Iver, Monday 1st 18:30 – 21:00 Buckinghamshire SL0 9NW April 2019 We will also be holding pop-up exhibitions at shopping centres, supermarkets, business parks, and major employment locations throughout Spring and Summer 2019.
Recommended publications
  • Basingstoke Motorway Service Area Junction 6 M3 Motorway Transport Assessment Page Left Intentionally Blank
    BA04 Basingstoke Motorway Service Area Transport Assessment BASINGSTOKE MOTORWAY SERVICE AREA JUNCTION 6 M3 MOTORWAY TRANSPORT ASSESSMENT PAGE LEFT INTENTIONALLY BLANK ii M342-DOC06 TA July 2017 BASINGSTOKE MOTORWAY SERVICE AREA JUNCTION 6 M3 MOTORWAY TRANSPORT ASSESSMENT DOCUMENT CONTROL Job No M342 File Reference G:\workfiles\M342\REPORTS\M342-DOC06 TA.docx Name Date Initials Prepared By P Key 22.09.2017 Checked By P L S Finlayson 27.09.2017 Issue Date Comments Approved For submission of 1 29.09.2017 planning application P L S Finlayson This document has been prepared for the exclusive use of the client in connection with the project and, unless otherwise agreed in writing by PFA Consulting, no other party may copy, reproduce, make use of or rely upon its contents other than for the purposes for which it was originally prepared and provided. Opinions and information provided in this document have been provided using due care and diligence. It should be noted and is expressly stated that no independent verification of any information supplied to PFA Consulting has been made. Warning: This document may contain coloured images which may not print satisfactorily in black and white. It may also contain images originally created at a size greater than A4 which may not print satisfactorily on small printers. If copying is authorised but difficulty is incurred in reproducing a paper copy of this document, or a scaled copy is required, please contact PFA Consulting. Authorisation for reproducing plans based upon Ordnance Survey information cannot be given. © PFA Consulting Ltd 2017 i M342-DOC06 TA September 2017 BASINGSTOKE MOTORWAY SERVICE AREA JUNCTION 6 M3 MOTORWAY TRANSPORT ASSESSMENT PAGE LEFT INTENTIONALLY BLANK ii M342-DOC06 TA September 2017 BASINGSTOKE MOTORWAY SERVICE AREA JUNCTION 6 M3 MOTORWAY TRANSPORT ASSESSMENT CONTENTS PAGE NO.
    [Show full text]
  • Road Investment Strategy: Overview
    Road Investment Strategy: Overview December 2014 Road Investment Strategy: Overview December 2014 The Department for Transport has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the Department’s website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact the Department. Department for Transport Great Minster House 33 Horseferry Road London SW1P 4DR Telephone 0300 330 3000 Website www.gov.uk/dft General enquiries https://forms.dft.gov.uk ISBN: 978-1-84864-148-8 © Crown copyright 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this information (not including logos or third-party material) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. Printed on paper containing 75% recycled fibre content minimum. Photographic acknowledgements Alamy: Cover Contents 3 Contents Foreword 5 The Strategic Road Network 8 The challenges 9 The vision 10 The Investment Plan 13 The Performance Specification 22 Transforming our roads 26 Appendices: regional profiles 27 The Road Investment Strategy suite of documents (Strategic Vision, Investment Plan, Performance Specification, and this Overview) are intended to fulfil the requirements of Clause 3 of the Infrastructure Bill 2015 for the 2015/16 – 2019/20 Road Period.
    [Show full text]
  • Appendix 1 I.01: DEPARTMENT for TRANSPORT (DFT) ROAD INVESTMENT STRATEGY (2014) Road Investment Strategy: Overview
    Appendix 1 I.01: DEPARTMENT FOR TRANSPORT (DFT) ROAD INVESTMENT STRATEGY (2014) Road Investment Strategy: Overview December 2014 Road Investment Strategy: Overview December 2014 The Department for Transport has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the Department’s website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact the Department. Department for Transport Great Minster House 33 Horseferry Road London SW1P 4DR Telephone 0300 330 3000 Website www.gov.uk/dft General enquiries https://forms.dft.gov.uk ISBN: 978-1-84864-148-8 © Crown copyright 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this information (not including logos or third-party material) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. Printed on paper containing 75% recycled fibre content minimum. Photographic acknowledgements Alamy: Cover Contents 3 Contents Foreword 5 The Strategic Road Network 8 The challenges 9 The Strategic Vision 10 The Investment Plan 13 The Performance Specification 22 Transforming our roads 26 Appendices: regional profiles 27 The Road Investment Strategy suite of documents (Strategic Vision, Investment Plan, Performance Specification, and this Overview) are intended to fulfil the requirements of Clause 3 of the Infrastructure Bill 2015 for the 2015/16 – 2019/20 Road Period.
    [Show full text]
  • Road Investment Strategy 2: 2020-2025
    Road Investment Strategy 2: 2020–2025 March 2020 CORRECTION SLIP Title: Road Investment Strategy 2: 2020-25 Session: 2019-21 ISBN: 978-1-5286-1678-2 Date of laying: 11th March 2020 Correction: Removing duplicate text on the M62 Junctions 20-25 smart motorway Text currently reads: (Page 95) M62 Junctions 20-25 – upgrading the M62 to smart motorway between junction 20 (Rochdale) and junction 25 (Brighouse) across the Pennines. Together with other smart motorways in Lancashire and Yorkshire, this will provide a full smart motorway link between Manchester and Leeds, and between the M1 and the M6. This text should be removed, but the identical text on page 96 remains. Correction: Correcting a heading in the eastern region Heading currently reads: Under Construction Heading should read: Smart motorways subject to stocktake Date of correction: 11th March 2020 Road Investment Strategy 2: 2020 – 2025 Presented to Parliament pursuant to section 3 of the Infrastructure Act 2015 © Crown copyright 2020 This publication is licensed under the terms of the Open Government Licence v3.0 except where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/ open-government-licence/version/3. Where we have identified any third party copyright information you will need to obtain permission from the copyright holders concerned. This publication is available at https://www.gov.uk/government/publications. Any enquiries regarding this publication should be sent to us at https://forms.dft.gov.uk/contact-dft-and-agencies/ ISBN 978-1-5286-1678-2 CCS0919077812 Printed on paper containing 75% recycled fibre content minimum. Printed in the UK by the APS Group on behalf of the Controller of Her Majesty’s Stationery Office.
    [Show full text]
  • Pfmv9 Assumptions Report
    PFMv9 Assumptions Report May 2020 © HS2 Ltd www.hs2.org.uk High Speed Two (HS2) Limited has been tasked by the Department for Transport (DfT) with managing the delivery of a new national high speed rail network. It is a non-departmental public body wholly owned by the DfT. High Speed Two (HS2) Limited, Two Snowhill Snow Hill Queensway Birmingham B4 6GA Telephone: 08081 434 434 General email enquiries: [email protected] Website: www.hs2.org.uk High Speed Two (HS2) Limited has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the HS2 website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact High Speed Two (HS2) Limited. © High Speed Two (HS2) Limited, 2020, except where otherwise stated. Copyright in the typographical arrangement rests with High Speed Two (HS2) Limited. This information is licensed under the Open Government Licence v2.0. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence/ version/2 or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. Printed in Great Britain on paper containing at least 75% recycled fibre PFMv9 Assumptions Report Revision: Rev01 Contents 1 Introduction
    [Show full text]
  • M5 Oldbury Viaduct Traffic Management Study Executive Summary
    M5 Oldbury Viaduct Traffic Management Study Executive Summary Oldbury and Park Street viaducts carry approximately 3km of the elevated sections of the M5 to the west of Birmingham between junctions 1 and 2. Constructed in 1970, it has deteriorated in recent years and has seen increased emergency interventions (55 in 2016). Therefore we need to repair and upgrade sections now in order to prevent bigger challenges and further disruption in the future. By maintaining this key corridor we’re delivering a huge investment that will support economic growth locally and in the wider West Midlands. Once complete, customers will benefit from a safer, more resilient route and enhanced driver experience. Other planned interventions on the strategic network in coming years include HS2, M6 J10 redesign, and on the local network, proposed Birchley island project and M5 junction 1 redesign. Therefore, we have a window of opportunitybetween April 2017 and autumn 2018 to complete this work at M5 Oldbury Viaduct. This section of the M5 motorway is particularly busy, carrying both local and strategic south-west and south-east to north-west traffic, with seasonal peaks. It is a commuter hub with traffic joining with the M6, other roads into and out of the Birmingham hub, and other cities in the region. Our engineers advised that in order to carry out the work safely, the carriageway would have to be treated in sections under traffic management. Four options were progressed to the modelling stage to understand impact and we chose the one that was safest, offered most value for money and most appropriate timeline.
    [Show full text]
  • Volume 7.0 M4 Junctions 3 to 12 Smart Motorway TR010019
    Safe roads, reliable journeys, informed travellers M4 junctions 3 to 12 smart motorway TR010019 7.3 Engineering and design report 5(2) (q) Revision 0 March 2015 Planning Act 2008 Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 Volume 7.0 Volume An executive agency of the Department for Transport HIGHWAYS AGENCY – M4 JUNCTIONS 3 TO 12 SMART MOTORWAY EXECUTIVE SUMMARY The Highways Agency (the "Agency") is making an application (the "Application") for development consent to improve the M4 motorway ("M4") to a smart motorway between junction 3 (Hayes) in west London and junction 12 (Theale), which is near Reading, (the "Scheme"). This Engineering and Design Report ("EDR") accompanies the Application and its purpose is to explain the design principles and design rationale for the Scheme. It describes how the design has been influenced by the technical and operational requirements of creating all-lane running and smart motorway infrastructure. It is similar to a Design and Access Statement ("DAS"), but provides additional Scheme-specific information beyond that usually provided for within a DAS. It also supports the environmental impact assessment of the Scheme. The Strategic Road Network ("SRN") in England comprises motorways and all-purpose trunk roads. The SRN is operated, maintained and improved in England by the Agency on behalf of the Secretary of State. The Agency is an executive agency of the Department for Transport (“DfT”). The M4 is the main strategic route between London and the west of England, and on to South Wales. The M4 currently suffers from heavy congestion between junctions 3 (Hayes) and 12 (Theale), which leads to unpredictable journey times.
    [Show full text]
  • M4 Smart Motorway Faqs
    Transport for NSW M4 Smart Motorway FAQs Here are some of our top questions about the M4 Smart Motorway project. Which motorway is the M4? The M4 Motorway is a 35km long motorway that opened in Sydney in the 1960’s. It stretches from Concord in the inner west to Lapstone in the Blue Mountains. The M4 Motorway connects to the M5 WestConnex at Haberfeld and also intersects the Westlink M7 at Eastern Creek. What is the M4 Smart The M4 Motorway will become frst smart motorway in Motorway Project? NSW with new road structures and technology being installed from Parramatta to Penrith. What is a Smart Motorway? A Smart Motorway, also known as a Managed Motorway in Victoria, use real-time information, communication and trafc control systems in and alongside the road to improve trafc fow. Variable road signs and messages communicate to drivers how to best travel along the motorway for a safer, more consistent journey with less congestion. roads-maritime.transport.nsw.gov.au Page 1 of 3 M4 Smart Motorway FAQs Where else is this technology Smart motorway technologies are being used on Melbourne’s being used in Australia? M1 motorway and introduced in southern Queensland on several roads including the Ipswich Motorway. Some individual elements of the technology are already in place on Sydney roads including the M1, M2, M5 and M7 Motorways. Has this system delivered Yes, studies have reported a signifcant reduction in improvements in other motorway incidents and improved trafc fow. On locations? Melbourne’s M1 Motorway reports have shown: • Travel times have been reduced by up to 42 percent • Crash rates have decreased by 30 percent • Vehicle emissions have been reduced by 11 percent How does the Smart There are a number of diferent parts that work together to Motorway work? ensure trafc fow and safety along the motorway.
    [Show full text]
  • Highways England Annual Report and Accounts 2015-2016
    Highways England Annual Report and Accounts 2015-2016 Highways England Annual Report and Accounts 2015-2016 Presented to the House of Commons pursuant to Section 7 of the Government Resources and Accounts Act 2000 Ordered by the House of Commons to be printed 13 July 2016 HC 529 © Crown copyright 2016 This publication is licensed under the terms of the Open Government Licence v3.0 except where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/open-government-licence/version/3 or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email: [email protected]. Where we have identified any third party copyright information you will need to obtain permission from the copyright holders concerned. This publication is available at www.gov.uk/government/publications Any enquiries regarding this publication should be sent to us at: [email protected] Print ISBN 9781474134279 Web ISBN 9781474134286 ID 2815682 07/16 Printed on paper containing 75% recycled fibre content minimum Printed in the UK by the Williams Lea Group on behalf of the Controller of Her Majesty’s Stationery Office Contents Our role and how to contact us 6 Section 1 Chairman’s statement 7 Section 2 Chief Executive’s review 9 Strategic report Section 3 Overview A snapshot of our performance against our KPIs 12 Performance headlines 13 Section 4 Making our network safer 14 Section 5 Improving customer service Customer satisfaction 17 A better maintained network 19 A free-flowing network 22 An accessible and
    [Show full text]
  • Bus Facilities on the Strategic Road Network Demonstration Project: Stakeholder Engagement Report by Campaign for Better Transport for Transport Focus
    Bus facilities on the Strategic Road Network demonstration project: stakeholder engagement report by Campaign for Better Transport for Transport Focus March 2019 Bus facilities on the Strategic Road Network demonstration project: stakeholder engagement report by Campaign for Better Transport for Transport Focus March 2019 CONTENTS Executive Summary Full report 1. Introduction 2. Methodology Our approach Stakeholder identification and contact Workshops Online survey Other submissions 3. Stakeholder views Common themes M32 case study A27 case study 4. Conclusions and next steps Lessons learned Key messages Next steps Appendices 1. List of participant groups 2. Examples of awareness raising materials 3. Workshop materials 4. Workshop notes 5. Survey questions and responses 6. Other submissions 1 Bus facilities on the Strategic Road Network demonstration project: stakeholder engagement report: Executive Summary Campaign for Better Transport has been commissioned in partnership with Transport Focus to collect stakeholder views on the priorities and opportunities for improving bus facilities on the Strategic Road Network to inform Highways England. This report records how the engagement with stakeholders was undertaken, and the responses received. Having captured their feedback, the report sets out some of the key issues identified by stakeholders, including challenges to be addressed, and opportunities to deliver improvements. It contains full reports of the stakeholder workshops and responses from the online surveys together with some additional individual submissions. This stakeholder engagement is part of a larger demonstration project commissioned by Highways England looking at two locations, to identify issues affecting bus and coach operation on the strategic road network to inform future investment. Methodology We contacted a wide range of local stakeholders in both case study areas and invited them to participate in a workshop held in January 2019 in the local area.
    [Show full text]
  • HIGHWAYS ENGLAND Asset Management Development Group
    HIGHWAYS ENGLAND Asset Management Development Group ASSET DATA MANAGEMENT MANUAL Part 2 – Requirements and Additional Information October 2020 Version: 12.0 Asset Data Management Manual Page 1 of 237 Date of Issue: October 2020 Part 2 - Requirements and Additional Information This page is intentionally left blank. Asset Data Management Manual Page 2 of 237 Date of Issue: October 2020 Part 2 - Requirements and Additional Information Revision Sheet For revisions across all ADMM documents see the Revision Log available on Standards for Highways: http://www.standardsforhighways.co.uk/ha/standards/admm/index.htm Version Date Issued 3.0 April 2016 4.0 September 2016 5.0 March 2017 6.0 September 2017 7.0 March 2018 8.0 October 2018 9.0 April 2019 10.0 October 2019 11.0 April 2020 12.0 October 2020 Asset Data Management Manual Page 3 of 237 Date of Issue: October 2020 Part 2 - Requirements and Additional Information Contents Contents……… ......................................................................................................... 4 Foreword…….. .......................................................................................................... 9 Part 2.1 – GENERIC ASSET DATA REQUIREMENTS .......................................... 12 1 Asset Data Lifecycle Requirements ......................................................... 13 1.1 Capture or Update ....................................................................................... 13 1.2 Store ...........................................................................................................
    [Show full text]
  • M180/M181 A180/A160 Investing in Our Road Network
    M180/M181 A180/A160 Investing in our road network We’ll be working on the M180 At Highways England we believe in a of Immingham which plays a key role in the long- connected country and our network term growth of the economy and provides essential access to global markets. makes these connections happen. Our improvements include vital repairs to the surface We strive to improve our major roads and motorways on the M180 and A180, bridge maintenance and – engineering the future to keep people today and improvements to junction 5 of the M180. moving better tomorrow. We want to make sure all We’re working closely with North Lincolnshire our major roads are more reliable, durable and, most Council to unlock jobs and homes in the Scunthorpe importantly, safe and that’s why we’re investing more area. The Lincolnshire Lakes development one of the than £5 million improving our network in this area. largest residential developments, not just in Yorkshire We’re carrying out a range of improvements along and the Humber region but in the whole of the UK the M180, M181, A180 and A160 over the next 12 and will create new homes, a business park and months to ensure we make the road safer and office accommodation. provide better journeys for drivers and residents. A new M181 junction will be created to improve By improving safety and creating smoother journeys access routes to the motorway and make the area we’ll create better links for those travelling to the Port more accessible as a place to live, visit and work.
    [Show full text]