Loans, Grants and Technical Assistance Portfolio

Total Page:16

File Type:pdf, Size:1020Kb

Loans, Grants and Technical Assistance Portfolio State-Owned Enterprise Engagement and Reform, Linked Document 4 LOANS, GRANTS AND TECHNICAL ASSISTANCE PORTFOLIO Table 1: Loans and Grants in 13 Selected Countries (2005–2017) Sector governance PPP and SOE- modality, Loan Amount Approval Closing Macro-level specific other NSO No. Modality Sector No. Title ($ million) Date Date Approaches Inputs projects People’s Republic of China (PRC) Gansu Heihe Rural Hydropower Development Investment Program–Erlongshan Hydropower 1 Loan ENE 2296 Project 22.00 18 Dec 06 30 Jun 10 x Tianjin Integrated Gasification Combined Cycle Power Plant 2 Loan ENE 2616 Project 135.00 8 Feb 10 31 Oct 14 x Low-Carbon District Heating Project in Hohhot in Inner 3 Loan ENE 3218 Mongolia Autonomous Region 150.00 9 Dec 14 31 Oct 21 x Shaanxi Accelerated Energy Efficiency and Environment 4 Loan ENE 3475 Improvement 150.00 28 Nov 16 30 Jun 22 x Air Quality Improvement in the 5 Loan ENE 3504 Greater Beijing-Tianjin-Hebei Regi 499.60 12 Dec 16 30 Sep 22 x Tianjin Integrated Gasification Combined Cycle Power Plant 6 Grant ENE 0196 Project 5.00 8 Feb 10 30 Jun 16 x Central Sichuan Roads 7 Loan TRA 2181 Development 600.00 22 Sep 05 31 Dec 12 x 8 Loan TRA 2182 Zhengzhou-Xi'an Railway Project 400.00 22 Sep 05 31 Dec 14 x Hunan Road Development III 9 Loan TRA 2219 (Jishou-Huayuan) 208.00 15 Dec 05 31 Dec 12 x Taiyuan-Zhongwei Railway 10 Loan TRA 2274 Project 300.00 23 Nov 06 31 Dec 12 x x Eastern Sichuan Roads 11 Loan TRA 2339 Development Project 200.00 17 Jul 07 31 Dec 12 x x Railway Safety Enhancement 12 Loan TRA 2390 Project 100.00 12 Dec 07 30 Jun 14 x Lanzhou-Chongqing Railway 13 Loan TRA 2471 Development Project 300.00 18 Nov 08 31 Dec 18 x x 2 Linked Document 4 Sector governance PPP and SOE- modality, Loan Amount Approval Closing Macro-level specific other NSO No. Modality Sector No. Title ($ million) Date Date Approaches Inputs projects Chongqing-Lichuan Railway 14 Loan TRA 2481 Development Project 150.00 8 Dec 08 30 Jun 15 x Jilin Water Supply and Sewerage 15 Loan WUS 2175 Development 100.00 18 Jul 05 13 Jul 12 x Jilin Urban Environment 16 Loan WUS 2360 Improvement Project 100.00 29 Oct 07 15 Oct 13 x Kunming Qingshuihai Water 17 Loan WUS 2388 Supply Project 80.00 12 Dec 07 30 Jun 13 x Songhua River Basin Water Pollution Control and 18 Loan WUS 2487 Management 200.00 11 Dec 08 27 Oct 14 x PRC Total (18) 3,699.60 India Khadi Reform and Development 105.00 * Loan IND 2452 Program 2 Oct 08 9 Jan 18 Madhya Pradesh Power Sector 19 Loan ENE 2323 Investment Program: Tranche 1 106.00 4 Apr 07 31 Jan 13 x Madhya Pradesh Power Sector 20 Loan ENE 2324 Investment Program: Tranche 2 45.00 4 Apr 07 15 Jul 13 x Madhya Pradesh Power Sector 21 Loan ENE 2346 Investment Program: Tranche 3 144.00 21 Aug 07 16 Sep 13 x Madhya Pradesh Power Sector 22 Loan ENE 2347 Investment Program: Tranche 4 90.00 21 Aug 07 1 May 14 x Madhya Pradesh Power Sector 23 Loan ENE 2520 Investment Program: Tranche 5 166.00 13 Apr 09 22 Jul 15 x Madhya Pradesh Power Sector 24 Loan ENE 2732 Investment Program: Tranche 6 69.00 21 Dec 10 26 Jun 15 x National Grid Improvement 25 Loan ENE 2787 Project 500.00 30 Sep 11 30 Jun 18 x National Grid Improvement 26 Loan ENE 2788 Project 250.00 30 Sep 11 30 Sep 17 x Rajasthan Renewable Energy Transmission Investment Prog– 27 Loan ENE 3052 Tranche 1 62.00 22 Oct 13 30 Jun 18 x Rajasthan Renewable Energy Transmission Investment 28 Loan ENE 8275 Program–Tranche 1 88.00 22 Oct 13 30 Jun 18 x Loans, Grants and Technical Assistance Portfolio 3 Sector governance PPP and SOE- modality, Loan Amount Approval Closing Macro-level specific other NSO No. Modality Sector No. Title ($ million) Date Date Approaches Inputs projects Assam Power Sector Investment 29 Loan ENE 3140 Program–Tranche 1 50.00 11 Jul 14 30 Jun 19 x Assam Power Sector Investment 30 Loan ENE 3327 Program–Tranche 2 48.00 23 Nov 15 31 Dec 19 x Rajasthan Renewable Energy Transmission Investment 31 Loan ENE 3482 Program–Tranche 2 238.00 5 Dec 16 31 Dec 21 x Rajasthan Renewable Energy Transmission Investment 32 Loan ENE 8312 Program–Tranche 2 110.00 5 Dec 16 31 Dec 21 x Rural Cooperative Credit Restructuring and Development 33 Loan FIN 2281 Program 1,000.00 8 Dec 06 30 Jun 13 x x Accelerating Infrastructure Investment Facility in India– 34 Loan FIN 3048 Tranche 1 400.00 21 Oct 13 31 Dec 16 x Clean Energy Finance Investment 34 Loan FIN 3186 Program–Tranche 1 200.00 17 Nov 14 30 Apr 19 x x Accelerating Infrastructure Investment Facility in India– 36 Loan FIN 3307 Tranche 2 300.00 30 Oct 15 cancelled x Solar Rooftop Investment 37 Loan FIN 8309 Program–Project 1 100.00 7 Oct 16 30 Jun 23 x Visakhapatnam-Chennai * Industrial Corridor Development Loan IND 3430 Program–Project 1 245.00 26 Sep 16 30 Jun 23 Visakhapatnam-Chennai * Industrial Corridor Development Grant IND 495 Program–Project 1 5.00 26 Sep 16 30 Jun 23 India Infrastructure Project 38 Loan PSM 2404 Financing Facility–Project 1 300.00 20 Dec 07 31 Mar 10 x x Assam Governance & Public Resource Management– 39 Loan PSM 2442 Subprogram II 100.00 17 Sep 08 31 Mar 12 x India Infrastructure Project 40 Loan PSM 2509 Financing Facility–Project 2 200.00 24 Feb 09 30 Nov 11 x x 4 Linked Document 4 Sector governance PPP and SOE- modality, Loan Amount Approval Closing Macro-level specific other NSO No. Modality Sector No. Title ($ million) Date Date Approaches Inputs projects Mizoram Public Resource 41 Loan PSM 2536 Management Program 94.00 18 Aug 09 31 Jan 15 x x Developing Public Resource 42 Loan PSM 2537 Management in Mizoram 6.00 18 Aug 09 31 Jan 15 x x Second India Project Financing 43 Loan PSM 2586 Facility–Project 1 210.00 27 Nov 09 31 Dec 14 x Second India Infrastructure Project Financing Facility–Tranche 44 Loan PSM 2717 2 250.00 7 Dec 10 31 Dec 14 x Second India Infrastructure Project Financing Facility–Tranche 45 Loan PSM 2822 3 240.00 1 Dec 11 14 Dec 14 x West Bengal Development 46 Loan PSM 2926 Finance Program 400.00 30 Oct 12 24 Jul 14 x Punjab Development Finance 47 Loan PSM 3187 Program 200.00 19 Nov 14 30 Jun 18 x Second West Bengal 48 Loan PSM 3563 Development Finance Program 300.00 20 Sep 17 30 Sep 19 x x x Second Jharkhand State Road 49 Loan TRA 3276 Project 200.00 9 Sep 15 30 Jun 20 x Kolkata Environmental Improvement Investment 50 Loan WUS 3053 Program–Tranche1 100.00 22 Oct 13 30 Jun 19 x Kolkata Environmental Improvement Investment 51 Loan WUS 3413 Program–Tranche 2 200.00 16 Aug 16 30 Apr 22 x Madhya Pradesh Urban Services 52 Loan WUS 3528 Improvement Project 275.00 18 May 17 31 Dec 22 x Bihar Urban Development 53 Loan WUS 3612 Investment Program–Tranche 2 84.00 4 Dec 17 31 Dec 21 x India Total (35) 7,125.00 Papua New Guinea Town Electrification Investment 54 Loan ENE 2713 Program–Tranche 1 40.90 6 Dec 10 31 Dec 19 x Town Electrification Investment 55 Loan ENE 2714 Program–Tranche 1 16.40 6 Dec 10 31 Dec 19 x Loans, Grants and Technical Assistance Portfolio 5 Sector governance PPP and SOE- modality, Loan Amount Approval Closing Macro-level specific other NSO No. Modality Sector No. Title ($ million) Date Date Approaches Inputs projects Town Electrification Investment 56 Loan ENE 3544 Program–Tranche 2 55.90 4 Jul 17 30 Jun 20 x Town Electrification Investment 57 Loan ENE 3545 Program–Tranche 2 5.00 4 Jul 17 30 Jun 20 x * Lae Port Livelihood and Social Grant HLT 9113 Improvement Project 1.50 18 Dec 07 4 Dec 15 58 Loan TRA 2398 Lae Port Development Project 60.00 18 Dec 07 30 Jun 16 x 59 Loan TRA 2399 Lae Port Development Project 40.00 18 Dec 07 30 Jun 16 x 60 Loan TRA 8237 Lae Port Development Project 6.00 18 Dec 07 30 Jun 14 x Civil Aviation Development 61 Loan TRA 2588 Investment Program–Project 1 25.00 1 Dec 09 15 Jul 16 x Civil Aviation Development 62 Loan TRA 2589 Investment Program–Project 1 50.00 1 Dec 09 15 Jul 16 x Civil Aviation Development 63 Loan TRA 2590 Investment Program–Project 1 20.00 1 Dec 09 15 Jul 16 x Lae Port Development Project– 64 Loan TRA 2803 Additional Financing 85.00 10 Nov 11 30 Jun 16 x Lae Port Development Project– 65 Loan TRA 2804 Additional Financing 4.12 10 Nov 11 30 Jun 16 x Civil Aviation Development 66 Loan TRA 3069 Investment Program–Project 2 115.00 25 Nov 13 31 Dec 18 x Civil Aviation Development 67 Loan TRA 3496 Investment Program–Project 3 213.00 8 Dec 16 31 Dec 18 x Civil Aviation Development 68 Loan TRA 3497 Investment Program–Project 3 35.00 8 Dec 16 31 Dec 18 x 69 Grant TRA 0102 Lae Port Development Project 0.75 18 Dec 07 25 Feb 16 x Papua New Guinea Total (16) 772.07 Uzbekistan 70 Loan ENE 8244 Talimarjan Power Project 300.00 21 Dec 09 30 Jul 19 x 71 Loan ENE 2629 Talimarjan Power Project 340.00 20 Apr 10 31 Dec 17 x 72 Loan ENE 2630 Talimarjan Power Project 10.00 20 Apr 10 30 Sep 18 x 73 Loan ENE 3058 Samarkand Solar Power Project 101.10 20 Nov 13 30 Sep 19 x 74 Loan ENE 3059 Samarkand Solar Power Project 8.90 20 Nov 13 30 Sep 19 x Takhiatash Power Plant Efficiency 75 Loan ENE 3141 Improvement Project 300.00 15 Jul 14 30 Apr 21 x 6 Linked Document 4 Sector governance PPP and SOE- modality, Loan Amount Approval Closing Macro-level specific other NSO No.
Recommended publications
  • Flood Risk Management in Dhaka a Case for Eco-Engineering
    Public Disclosure Authorized Flood Risk Management in Dhaka A Case for Eco-Engineering Public Disclosure Authorized Approaches and Institutional Reform Public Disclosure Authorized People’s Republic of Bangladesh Public Disclosure Authorized • III contents Acknowledgements VII Acronyms and abbreviations IX Executive Summary X 1 · Introduction 2 Objective 6 Approach 8 Process 9 Organization of the report 9 2 · Understanding Flood Risk in Greater Dhaka 10 disclaimer Demographic changes 13 This volume is a product of the staff of the International Bank for River systems 13 Reconstruction and Development/ The World Bank. The findings, interpretations, and conclusions expressed in this paper do not necessarily Monsoonal rain and intense short-duration rainfall 17 reflect the views of the Executive Directors of The World Bank or the Major flood events and underlying factors 20 governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and Topography, soil, and land use 20 other information shown on any map in this work do not imply any judgment Decline of groundwater levels in Dhaka on the part of The World Bank concerning the legal status of any territory or the 27 endorsement or acceptance of such boundaries. Impact of climate vulnerability on flood hazards in Dhaka 28 copyright statement Flood vulnerability and poverty 29 The material in this publication is copyrighted. Copying and/or transmitting Summary 33 portions or all of this work without permission may be a violation of applicable law. The International Bank for Reconstruction and Development/ The World Bank encourages dissemination of its work and will normally grant permission to 3 · Public Sector Responses to Flood Risk: A Historical Perspective 34 reproduce portions of the work promptly.
    [Show full text]
  • List of ADB Green Bond Eligible Projects As of 31 March 2021
    List of ADB Green Bond Eligible Projects As of 31 March 2021 Committed Amount Loan Number Country Project Name (in US$ millions) 2619 Indonesia Java-Bali Electricity Distribution Performance Improvement 12.21 2632 People's Republic of China Integrated Renewable Biomass Energy Development Sector 26.73 2713 Papua New Guinea Town Electrification Investment Program - Tranche 1 37.90 2737 Turkmenistan North-South Railway 18.89 2738 People's Republic of China Qinghai Rural Water Resources Management 28.18 2741 Viet Nam Ha Noi Metro Rail System (Line 3: Nhon-Ha Noi Station Section) 293.00 2765 People's Republic of China Railway Energy Efficiency and Safety Enhancement Investment Program - Tranche 3 203.10 2778 India Gujarat Solar Power Transmission 34.55 2793 India Railway Sector Investment Program-Tranche 1 106.25 2862 Bangladesh Greater Dhaka Sustainable Urban Transport Project 100.00 2956 Viet Nam Ho Chi Minh City Urban Mass Rapid Transit Line 2 Investment Program-Tranche 2 500.00 3014 People's Republic of China Hubei-Yichang Sustainable Urban Transport Project 96.29 3052 India Rajasthan Renewable Energy Transmission Investment Program-Tranche 1 43.62 3062 India Jaipur Metro Rail Line 1- Phase B Project 136.68 3075 People's Republic of China Qinghai Delingha Concentrated Solar Power Thermal Project 150.00 3082 People's Republic of China Railway Energy Efficiency and Safety Enhancement Investment Program-Tranche 4 160.00 3089 Indonesia Sarulla Geothermal Power Development Project 250.00 3097 Bangladesh Railway Sector Investment Program-Tranche
    [Show full text]
  • English Overview
    DIRECTIONS IN DEVELOPMENT Countries and Regions Overview Toward Great Dhaka A New Urban Development Paradigm Eastward Julia Bird, Yue Li, Hossain Zillur Rahman, Martin Rama, and Anthony J. Venables DIRECTIONS IN DEVELOPMENT Countries and Regions Overview Toward Great Dhaka A New Urban Development Paradigm Eastward Julia Bird, Yue Li, Hossain Zillur Rahman, Martin Rama, and Anthony J. Venables This booklet contains the overview, as well as a list of contents, from Toward Great Dhaka: A New Urban Development Paradigm Eastward, doi: 10.1596/978-1-4648-1238-5. A PDF of the final, full- length book, once published, will be available at https://openknowledge.worldbank.org/ and print copies can be ordered at http://Amazon.com. Please use the final version of the book for citation, reproduction, and adaptation purposes. © 2018 International Bank for Reconstruction and Development / The World Bank 1818 H Street NW, Washington DC 20433 Telephone: 202-473-1000; Internet: www.worldbank.org Some rights reserved This work is a product of the staff of The World Bank with external contributions. The findings, interpre- tations, and conclusions expressed in this work do not necessarily reflect the views of The World Bank, its Board of Executive Directors, or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Nothing herein shall constitute or be considered to be a limitation upon or waiver of the privileges and immunities of The World Bank, all of which are specifically reserved.
    [Show full text]
  • Multidimensional Approach to Quality of Life Issues a Spatial Analysis Multidimensional Approach to Quality of Life Issues Braj Raj Kumar Sinha Editor
    Braj Raj Kumar Sinha Editor Multidimensional Approach to Quality of Life Issues A Spatial Analysis Multidimensional Approach to Quality of Life Issues Braj Raj Kumar Sinha Editor Multidimensional Approach to Quality of Life Issues A Spatial Analysis 123 Editor Braj Raj Kumar Sinha Department of Geography Institute of Science Banaras Hindu University Varanasi, Uttar Pradesh, India ISBN 978-981-13-6957-5 ISBN 978-981-13-6958-2 (eBook) https://doi.org/10.1007/978-981-13-6958-2 Library of Congress Control Number: 2019934350 © Springer Nature Singapore Pte Ltd. 2019 This work is subject to copyright. All rights are reserved by the Publisher, whether the whole or part of the material is concerned, specifically the rights of translation, reprinting, reuse of illustrations, recitation, broadcasting, reproduction on microfilms or in any other physical way, and transmission or information storage and retrieval, electronic adaptation, computer software, or by similar or dissimilar methodology now known or hereafter developed. The use of general descriptive names, registered names, trademarks, service marks, etc. in this publication does not imply, even in the absence of a specific statement, that such names are exempt from the relevant protective laws and regulations and therefore free for general use. The publisher, the authors and the editors are safe to assume that the advice and information in this book are believed to be true and accurate at the date of publication. Neither the publisher nor the authors or the editors give a warranty, expressed or implied, with respect to the material contained herein or for any errors or omissions that may have been made.
    [Show full text]
  • The Project on the Revision and Updating of the Strategic Transport Plan for Dhaka SUMMARY Final Report
    Japan International Cooperation Agency (JICA) Dhaka Transport Coordination Authority (DTCA) The Project on the Revision and Updating of the Strategic Transport Plan for Dhaka SUMMARY Final Report November 2016 Almec Corporation Oriental Consultants Global Co., Ltd. Katahira & Engineers International Table of Contents 1. INTRODUCTION 1.1 Background ·························································································· 1 1.2 Goals and Objectives ············································································· 2 1.3 Project Area ·························································································· 2 1.4 Related Agencies and Implementation Structures ········································· 3 2. CURRENT URBAN STRUCTURE & SOCIO-ECONOMIC PROFILE 2.1 Description of the Project Area ································································· 4 2.2 Existing Land Use Patterns ······································································ 7 3. CURRENT URBAN TRANSPORT SYSTEM 3.1 Non-motorized and Motorized Transport Modes ·········································· 11 3.2 Public Transport ··················································································· 13 3.3 Urban Road Network ············································································· 16 4. ENVIRONMENTAL CONDITION 4.1 Natural Environment ·············································································· 18 4.2 Natural Disasters and Flooding ································································
    [Show full text]
  • Implications for Housing Development Projects in Dhaka, Bangladesh
    Alam Bandung J of Global South (2018) 5:2 https://doi.org/10.1186/s40728-018-0046-0 RESEARCH Open Access Rapid urbanization and changing land values in mega cities: implications for housing development projects in Dhaka, Bangladesh Md. Jahangir Alam* *Correspondence: jahangirsociology@gmail. Abstract com This paper explores changing land values in the process of rapid urbanization in Dhaka, Department of Sociology, University of Dhaka, Bangladesh and its implications for urban land management and administration in Dhaka 1000, Bangladesh the megacity. The study reveals that substantial increase in land values have resulted in land speculation among real estate and individual developers. Land values have increased by an average of 22.26% per year between 1990 and 2000, while the period spanning from 2000 to 2010 saw about 74% of yearly increase in Dhaka. The study revealed that due to increasing land values, prospective real estate developers are tempted to build housing in restricted areas defned by Dhaka metropolitan devel- opment plan such as food zones, lakes, canals, ditch and drainage channels etc. The paper proposes a re-look at the causes of increase in land values and land speculations and the resulting environmental damage pointed out in this study as part of a broad urban land and environmental management strategy in rapidly growing megacities. Keywords: Land value, Housing projects, Real estate developer, Dhaka, Bangladesh Background Urbanisation has become one of the greatest environmental challenges in the world today. Largely, the term urbanisation refers to the alteration of an agricultural economy to that of a manufacturing and service-oriented economy (Mandal 2000 cited in Dewan et al.
    [Show full text]
  • The Middle East and North Africa Rio Tinto's
    BER 2013 O T C O 2 No. THE BIANNUAL MAGAZINE OF INDUSTRIALL FEATURE The Middle East and North Africa SPECIAL REPORT Rio Tinto’s unsustainable corporate behaviour PROFILE Angeline Chitambo Welcome to Struggle for dignity We are determined to give all it takes to produce a profound change in Bangladesh. In Bangladesh, the Middle East and North Africa, as well as at Rio Tinto, In the Middle East and North Africa IndustriALL Global Union is leading (MENA) region, IndustriALL is supporting the development and growth of free and the struggle of workers for dignity independent unions. In this issue of Global and respect. Worker, we tell you how. In April, the eight-storey Rana Plaza In January 2011, Tunisian people overthrew building collapsed near Dhaka in the regime of president Ben-Ali in an uprising Bangladesh, killing 1,129 garment that marked the beginning of the Arab workers. This industrial homicide expedited Spring. Unrest, revolutions and even wars negotiations on a legally binding Accord on followed in several countries in the region. Fire and Building Safety in Bangladesh in the retail sector, led by IndustriALL and our People had clearly had enough of poverty, sister organization UNI. unemployment, social injustice, lack of democracy and lack of hope for a better Following the first signatures by H&M, life. They were angry and took to the Inditex and C&A, more than 100 leading streets to demand a change. brands and retailers of the world have signed the historic Accord that will help Today, more than two years after the make the Bangladeshi garment industry Arab Spring, we have seen changes safe and sustainable in a major five-year in the Middle East and North Africa project.
    [Show full text]
  • World Bank Document
    Public Disclosure Authorized Open Transport Development and Integration of Public Disclosure Authorized ICT and Transport Final Report Public Disclosure Authorized August 2015 Public Disclosure Authorized integrated transport planning Open Transport Development and Integration of ICT and Transport Final Report August 2015 Produced by: Integrated Transport Planning Ltd 32a Stoney Street The Lace Market Nottingham NG1 1LL Tel: 0115 9886905 Contact: Neil Taylor Email: [email protected] Web: www.itpworld.net Document Control Sheet Project Name Open Transport Development and Integration of ICT and Transport Client World Bank Project Code 1442 Project Manager Neil Taylor Project Director Peter Armitage Start Date 1st January 2015 Project Folder F:\1442\ Team Members Colin Brader, Peter Armitage, Neil Taylor, Ian Stott, Mark Dimond Sub Consultants Conveyal Ver File name Description Prepared Reviewed Approved Date F:\1442\Project Files \ 3-0 Final NT CB CB 25/01/16 Deliverables\FinalReport_v2-0.doc F:\1442\Project Files \ 2-0 Draft Final NT CB CB 18/12/15 Deliverables\FinalReport_v2-0.doc F:\1442\Project Files \ 1-0 Client Submission NT CB CB 25/08/15 Deliverables\FinalReport_v1-0.doc Notice This report has been prepared for The Wold Bank in accordance with the terms and conditions of appointment. Integrated Transport Planning Ltd cannot accept any responsibility for any use of or reliance on the contents of this report by any third party. OPEN TRANSPORT DEVELOPMENT IN DHAKA FINAL REPORT EXECUTIVE SUMMARY Integrated Transport Planning Ltd. (ITP) worked in partnership with the World Bank to support the Dhaka Transport Coordination Authority’s (DTCA) efforts to take on new organizational responsibilities for transportation policy, regulation, coordination, planning and management for the Greater Dhaka.
    [Show full text]
  • Characteristics of Atmospheric Trace Gases, Particulate Matter, and Heavy Metal Pollution in Dhaka, Bangladesh
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by Springer - Publisher Connector Air Qual Atmos Health (2008) 1:101–109 DOI 10.1007/s11869-008-0017-8 ORIGINAL PAPER Characteristics of atmospheric trace gases, particulate matter, and heavy metal pollution in Dhaka, Bangladesh Abdus Salam & Tofazzal Hossain & M. N. A. Siddique & A. M. Shafiqul Alam Received: 7 July 2008 /Accepted: 5 September 2008 /Published online: 27 September 2008 # The Author(s) 2008. This article is published with open access at Springerlink.com Abstract Aerosol particulate matter (PM10 and PM2.5) and Asian (Kanpur, Delhi, Mumbai, India; Lahore, Pakistan) trace gases (SO2,NO2, CO and O3) were sampled at five cities. locations in greater Dhaka, Bangladesh, between January and April 2006. Particulate matter was collected on micro- Keywords Air pollution . Heavy metals . Particulate matter . fiber filters with a low-volume sampler, and trace gases Trace gases (SO2,NO2,andO3) were collected with an impinger equipped with PM samplers. Carbon monoxide was determined using the Indicator Tube method. The total Introduction average concentrations of SO2,NO2, CO, and O3 were 48.3, 21.0, 166.0 and 28 μgm–3, respectively. The total Air pollution has a great impact on human health, climate average concentrations of SO2 and NO2 were much lower change, agriculture, and the natural ecosystem (Decker et than the annual average guideline values of the World al. 2000; Mayer et al. 2000; Molina and Molina 2004; Health Organization (WHO). The total average O3 concen- Molina et al. 2004). The modernization and industrializa- tration was also much lower than the daily maximum tion of developing countries has led to the increased use of values established by WHO (average of 100 μgm–3 for an fossil fuels and their derivatives.
    [Show full text]
  • Managing Megacities: a Case Study of Metropolitan Regional Governance for Dhaka
    Managing Megacities: A Case Study of Metropolitan Regional Governance for Dhaka. Sirajul Haq Talukder B.Sc (Hons.), M.Sc (Geography), University of Dhaka M.A. (Local & Regional Development), Institute of Social Studies (ISS), The Hague This Thesis is presented for the Degree of Doctor of Philosophy of Murdoch University, Australia January 2006 Declaration I declare that this is my own account of my research. Sirajul Haq Talukder ii Abstract Megacities of over 10 million population are a phenomenon not seen before in human history. Among 19 Megacities, 14 are in developing countries and 11 are in Asia. Dhaka represents one of the most extreme examples of rapid Megacity growth having a mere 129,000 at the start of the 20th century, 417,000 by 1950 and more than 12 million in 2001. How can a city be governed that has increased 30 times in size over a person’s lifetime? This thesis makes a case for integrated Metropolitan Regional Governance (MRG) of the Extended Metropolitan Region of Dhaka. The growing problems of Asian Megacities in general and Dhaka in particular are outlined, showing how governance has developed in a sectoral and national way rather than being place oriented. This has fractured and become totally inadequate as a means of solving the deep environmental, social and economic problems of the Megacity. The governance issues of Megacities are traced to the primary problem of the need for integrative functions in strategic and statutory planning as well as development facilitation of the Extended Metropolitan Region (EMR). Ten core principles of Metropolitan Regional Governance are established.
    [Show full text]
  • The Status of Engineering Geology: Constraints on Infrastructure Development in Bangladesh
    City University of New York (CUNY) CUNY Academic Works Publications and Research York College 2018 The Status of Engineering Geology: Constraints on Infrastructure Development in Bangladesh Mir Fazlul Karim Geotesting Express Inc. Muhammad Qumrul Hassan University of Dhaka Nazrul I. Khandaker CUNY York College Masud Ahmed New York City Department of Environmental Protection Belal Ahmed Sayeed Dewberry Geotechnical Company How does access to this work benefit ou?y Let us know! More information about this work at: https://academicworks.cuny.edu/yc_pubs/223 Discover additional works at: https://academicworks.cuny.edu This work is made publicly available by the City University of New York (CUNY). Contact: [email protected] Dhaka University The Status of Engineering Geology: Constraints on Infrastructure Development in Bangladesh 1 2 3 4 5 Mir Fazlul Karim , Muhammad Qumrul Hassan , Nazrul Islam Khandaker , Masud Ahmed and Belal Ahmed Sayeed (1) Engineering Geologist, GeoTesting Express Inc., Geocomp Corporation, Acton, MA 01720, USA (2) Department of Geology, University of Dhaka, Ramna, Dhaka, 1000, Bangladesh (3) Geology Discipline, Earth and Physical Sciences, York College Of CUNY, 94-20, Guy R. Brewer Blvd, Jamaica, NY 11451, USA (4) New York City Department of Environmental Protection, Geotechnical Section, NYCDEP, 59-17, Junction Blvd, Queens, New York, NY 11373, USA (5) Dewberry Geotechnical Company. 132 W 31st St #301, New York, NY 10001, USA ABSTRACT In recent years, megacity Dhaka is known to have one of the fastest urban population growths in Bangladesh. The population in Dhaka and other megacities has increased from 7 to 50 million during the last four decades. The rapid rate of urban population growth, along with the extreme paucity of real-estate for new infrastructure development or upgrading existing facilities, is already exacerbating the situation for the city planners and exerting tremendous pressure to come-up with viable solutions.
    [Show full text]
  • Decadal Urban Land Use/Land Cover Changes and Its Impact on Surface Runoff Potential for the Dhaka City and Surroundings Using Remote Sensing
    remote sensing Article Decadal Urban Land Use/Land Cover Changes and Its Impact on Surface Runoff Potential for the Dhaka City and Surroundings Using Remote Sensing Md Moniruzzaman 1,2 , Praveen K. Thakur 3 , Pramod Kumar 4, Md. Ashraful Alam 5, Vaibhav Garg 3 , Iman Rousta 6,7 and Haraldur Olafsson 8,* 1 Centre for Space Science and Technology Education in Asia and the Pacific (CSSTEAP), IIRS Campus, 4-Kalidas Road, Dehradun 248001, India; [email protected] 2 ASICT Division, Bangladesh Agricultural Research Institute, Gazipur 1701, Bangladesh 3 Water Resources Department, Indian Institute of Remote Sensing, 4-Kalidas Road, Dehradun 248001, India; [email protected] (P.K.T.); [email protected] (V.G.) 4 Urban and Regional Studies Department, Indian Institute of Remote Sensing, 4-Kalidas Road, Dehradun 248001, India; [email protected] 5 Urban and Rural Planning Discipline, Khulna University, Khulna 9208, Bangladesh; [email protected] 6 Department of Geography, Yazd University, Yazd 8915818411, Iran; [email protected] 7 Institute for Atmospheric Sciences—Weather and Climate, University of Iceland and Icelandic Meteorological Office (IMO), Bustadavegur 7, IS-108 Reykjavik, Iceland 8 Department of Physics, Institute for Atmospheric Sciences—Weather and Climate, University of Iceland and Icelandic Meteorological Office (IMO), Bustadavegur 7, IS-108 Reykjavik, Iceland * Correspondence: [email protected] Abstract: Rapid urban growth processes give rise to impervious surfaces and are regarded as the primary cause of urban flooding or waterlogging in urban areas. The high rate of urbanization has caused waterlogging and urban flooding in many parts of Dhaka city. Therefore, the study is Citation: Moniruzzaman, M.; Thakur, undertaken to quantify the changes in land use/land cover (LULC) and urban runoff extent based on P.K.; Kumar, P.; Ashraful Alam, M.; the Natural Resources Conservation Service (NRCS) Curve Number (CN) during 1978–2018.
    [Show full text]